Loading...
HomeMy WebLinkAboutDENSITY TESTING -F241078-148364798 98 23.9 98119.3 99 96.1 24.3 98120.3 118.9 119.9 119.4 95.7 22.6 96.9 22.6 98118.8 95.8 22.7 98 120.4 120.7 96.5 23.1 96.3 2 F/15 FG-4.0 1 6 3 F/13 FG-4.0 1 6 4 F/11 FG-4.0 1 6 5 F/9 FG-4.0 1 120.4 96.2 23.5 120.9 97.1 23.7 96.2 12 F/15 FG-2.0 1 10 F/9 FG-3.0 1 6 6 9 F/11 FG-3.0 1 6 6 F/17 FG-3.0 1 6 7 F/15 FG-3.0 1 6 8 F/13 FG-3.0 1 6 6 1483647 1 6 120.4 96.3 24.3 98 96.4 24.3 98 95.1 23.4 99 21.9 5058 Brush Creek Rd Fort Worth, TX 76119 www.TeamUES.com TBPELS Firm No. 813 In-Place Nuclear Density Test Report Client:GTIS Acquisitions, LLC Service Date:10/24/2024 787 Seventh Avenue, 50th Floor Report Date:11/1/2024 Grapevine, Texas Page Number:1 of Project:121 Commerce Center Addition (Lot 1)Project Number:F241078 Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony New York, NY 10019 Weather:Clear Work Order Number: Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data 38Dark brown clay with sand 951 100121.4 98.0 0 4 Percent Compaction (%) 22.6 99 98 15 F/9 F/11 FG-2.0 1 6 F/13 FG-2.0 1 6 97 97 96.6 1 F/17 FG-4.0 1 General Location Area:Leaveouts 417 Remarks: Field Test Data Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) 14 Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:9941 Manufacturer:Humboldt Model:5001EZ 13 120.0 96.4 23.5 98 120.1 FG-2.0 1 119.9 119.3 95.3 24.3 UES / Riner Engineering approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies This report is in general compliance with one or more of the following technical standards: D6938-15 Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written Ronnie Yeoman Project Manager 6 11 F/17 FG-2.0 1 6 Respectfully Submitted, Standard Count:(D): 2876 (M):