HomeMy WebLinkAboutSFRA2025-001179ADDRESS
1065 Woodbriar Dr
Grapevine, TX 76051
LEGAL
Winding Creek Estates
Addition Blk 11 Lot 31
A 31
S220 11
Winding Creek Estates
Addn Block 11 Lot 31
PERMIT HOLDER
Thomas Kidd
Structured Foundation R
epairs, INC.
(972) 484-1200
COLLABORATORS
•Thomas Kidd
Structured Foundation
Repairs, INC.
(972) 484-1200
OWNERS
•Jessica B Jestis
INSPECTIONS 1
1. Building Final
INFORMATION FIELDS
**APPLICANT NAME (Individual)Thomas Kidd
**APPLICANT PHONE NUMBER 9724841200
APPLICANT E-MAIL
VALUATION 9150
* CONSTRUCTION TYPE VB
* OCCUPANCY GROUP R-3
DOCUMENTS - MISC 01 1065 Woodbriar GRAPEVINE ap.pdf
DOCUMENTS - MISC 02 1065 Woodbriar Dr. Grapevine Texas.pdf
* ZONING DISTRICT R-7.5
FEE TOTAL PAID DUE
Building Permit Fee, ($150.00
Flat Fee) Simple Alteration $ 150.00 $ 150.00 $ 150.00
TOTALS $ 150.00 $ 150.00 $ 0.00
READ AND SIGN
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF
MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO
THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN
COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING
CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT
DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR
ORDINANCE OF THE CITY OF GRAPEVINE.
I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY AND THAT
THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING
SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL
AGENCY(S).
April 07, 2025
City of Grapevine
PO Box 95104
Grapevine, Texas 76099
817) 410-3166
Building - Residential
Alteration
Project # 25-001179
Project Description: Install (13) Concrete Pilings for
Residential Foundation Repair [ELECTRONIC REVIEW]
Issued on: 04/07/2025 at 3:51 PM
MYGOV.US 25-001179, 04/07/2025 at 3:51 PM Issued by: Connie Cook
Page 1/2
1000 Buck Dobbs Rd.,
Aledo, Texas 76008
817-374-3559
info@nortierllc.com
Final Evaluation Report for Foundation Repair
Date: May 21, 2025
Attention: Structured Foundation Repair (The Client)
Subject: Foundation Review
1065 Woodbriar Dr., Grapevine, Texas
Authorization and Scope:
Nortier Engineering Consultants, LLC (NEC) has been retained by the Client to perform an evaluation of
the slab on grade foundation for a 2 story residential home located at the subject address in conjunction
with foundation repairs performed by the foundation repair Contractor. This report serves as confirmation
that repairs have been done, provides information on the post-lift condition of the foundation, and
provides our reasonable professional opinion on the repair measures taken to improve the foundation
performance.
This report does not take into consideration any changes to the condition of the foundation or the
surrounding soils after the date the evaluation was performed.
Foundation Repair Details:
The Contractor installed concrete piers to which the purpose of the installed piers is to improve the
performance of the foundation by providing support at the piered locations in an effort to achieve relative
levelness of the slab. The repairs performed conform to Chapter 4 of the 2021 International
Residential Code (IRC), as it relates to foundations and any local applicable amendments to the IRC. It
is understood that absolute levelness may not be achievable after repairs.
Data and Observations:
NEC performed a visual evaluation of the foundation for the subject property on 5/21/2025. NEC also
performed a floor survey using a Zip-level Pro-2000 series, collecting relative floor elevations, to aid in
surface topography mapping of the floor(s). Elevations shown are adjusted for the type of flooring
encountered to reflect a consistent measuring plane. The map of the post-lift floor elevations can be seen
in the figure attached to this report.
Based on the data gathered and our professional engineering opinion, the repairs performed by the
Contractor have improved the foundation to be within slope tolerances generally accepted as industry
standards.
1000 Buck Dobbs Rd.,
Aledo, Texas 76008
817-374-3559
info@nortierllc.com
General Recommendations:
It is recommended that a guttering system be installed if the house does not have gutters. Installing a
guttering system will direct water away from the foundation and reduce the potential for ground erosion
near the foundation footing.
It is also recommended that the plumbing systems be checked after any repairs are made to the foundation
system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure
and cause leaks.
It is recommended that soil grading be maintained such that the bottom portion of the foundation is below
grade, as per the governing code and a watering system be utilized around the perimeter of the house.
Fluctuations in moisture content of the soils near the foundation of the house can cause differential
movement. If the moisture content is kept consistent, the potential for differential movement is mitigated.
Furthermore, grading around the perimeter of the building should be maintained as sloping away from the
foundation at a minimum of 6 inches fall within the first 10 feet from the foundation. Such grading
configuration should prevent localized water accumulating around areas of the foundation. Saturated
soils decline in bearing capacity and can result in differential movement of the foundation.
Limitations:
This report is intended for information purposes only, and the sole use of the client and/or homeowner.
The scope of this report is limited to the items related to the foundation system only, and it is understood
that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of
this report does not include judgment on any of the superstructure, detached buildings, retaining or
privacy walls, concrete reinforcement and/or site drainage. In addition, the scope of this report excludes
material and soil sampling/testing procedures and as such were not performed. The report is not to be
used by others for any purpose without our written consent. Compliance with any code or specification
other than as expressly noted in this report is specifically excluded. It is the responsibility of any
Contractor to abide by any other applicable codes or specifications.
No warranty for any repairs, future foundation performance, structure, vegetation, or soils at the subject
property are offered by this report, nor does this report imply any liability to NEC, nor Daneel Nortier, PE
for any work to be performed as a result of this report. It is understood that soils in this area experience
movement due to moisture fluctuations. Such soil movement could cause the foundation to move after
the recommended repairs have been made. Any provided floor elevation data and recommended actions
are based on soil conditions as they exist at the time of the evaluation. NEC does not warrant or imply
that other problems may not occur in the future. No warranty, expressed or implied, is made or intended
and the limit of liability shall be limited to the fee paid for this report at the time of evaluation.
Report Prepared by:
Nortier Engineering Consultants, LLC
Texas Engineering Firm (F-16800)
5/21/2025
Daneel Nortier, P.E.
Professional Engineer (TX#113157)
1
1