HomeMy WebLinkAboutSFRA2025-001093ADDRESS
1417 Hill St
Grapevine, TX 76051
LEGAL
Bellaire Addition Blk 12
Lot 8
A 8
S220 12
Bellaire Addition-
grapevine Block 12 Lot 8
PERMIT HOLDER
Thomas Kidd
Structured Foundation R
epairs, INC.
(972) 484-1200
COLLABORATORS
•Thomas Kidd
Structured Foundation
Repairs, INC.
(972) 484-1200
OWNERS
•Jared Richardson
INSPECTIONS 1
1. Building Final
INFORMATION FIELDS
**APPLICANT NAME (Individual)Thomas Kidd
**APPLICANT PHONE NUMBER 9724841200
APPLICANT E-MAIL
VALUATION 5154
* CONSTRUCTION TYPE VB
* OCCUPANCY GROUP R-3
DOCUMENTS - MISC 01 1417 Hill Street 3.21.25.pdf
DOCUMENTS - MISC 02 1417 Hill St GRAPEVINE ap.pdf
* ZONING DISTRICT R-7.5
FEE TOTAL PAID DUE
Building Permit Fee, ($150.00
Flat Fee) Simple Alteration $ 150.00 $ 150.00 $ 150.00
TOTALS $ 150.00 $ 150.00 $ 0.00
READ AND SIGN
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF
MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO
THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN
COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING
CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT
DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR
ORDINANCE OF THE CITY OF GRAPEVINE.
I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY AND THAT
THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING
SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL
AGENCY(S).
April 04, 2025
City of Grapevine
PO Box 95104
Grapevine, Texas 76099
817) 410-3166
Building - Residential
Alteration
Project # 25-001093
Project Description: Residential Foundation Repair
[ELECTRONIC REVIEW]
Issued on: 04/04/2025 at 11:38 AM
MYGOV.US 25-001093, 04/04/2025 at 11:38 AM Issued by: Connie Cook
Page 1/2
FoundationReport
Page 1 of 3
Adam A. Green, P.E. (TX), MBA
Austin | Dallas | Fort Worth | Houston |San Antonio | Waco (469) 751-7694
www.CrosstownEngineering.com
Date: April 3, 2025
Attention: Structured Foundation Repairs, Inc. (SFR) (via e-mail)
Subject: Final Report & Inspection
1417 Hill Street, Grapevine, TX
Dear Structured Foundation Repairs, Inc. and Property Owner:
Structured Foundation Repairs, Inc. (the contractor) retained Crosstown Engineering (CE) to visually in-
spect foundation repairs completed by Structured Foundation Repairs, Inc. Crosstown Engineering visited
the property, conducted a visual inspection, and determined that all work, including any approved changes,
has been completed per our original report dated 03/21/25.
Based on information provided by Structured Foundation Repairs, Inc. and visual observations, it appears
that the following was performed:
x Adjusted 5 existing pilings.
x Reset/re-shimmed 1,018 SQFT of the foundation.
The elevation data obtained during the inspection indicates the foundation is supported by pilings to prevent
further downward movement and may have been lifted. In some cases, the pilings are meant to support the
foundation and minimal to zero lift was intentional.
We recommend post-lift plumbing tests be performed on the sewer and potable plumbing lines and that
any leaks be immediately repaired. This limited repair plan is intended to provide reasonable repair to
improve the performance of the foundation and is not intended to level the foundation. The contractor
determined the amount of elevation correction needed based on the reaction of the structure during the lift
in order to minimize damages and additional stress.
If you have any questions or need additional information, please call our office.
Sincerely,
Crosstown Land Development Services
Texas Engineering Firm (F-15944)
Adam Green, P.E., MBA 4/3/25
Professional Engineer (TX #116597)
FoundationReport
Page 2 of 3
Adam A. Green, P.E. (TX), MBA
Austin | Dallas | Fort Worth | Houston |San Antonio | Waco (469) 751-7694
www.CrosstownEngineering.com
DISCLOSURE & DISCLAIMER
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due to expan-
sion, contraction or densification of the soils etc. This soil movement could possibly cause the foundation to move
after the remediation plan within the attached report has been implemented and may impact the stability of the foun-
dation and cause damage.
NO WARRANTY IS EXPRESSED OR IMPLIED BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS
FOUNDATION OR THE REPAIRS THERETO. Diligent foundation maintenance to maintain consistent soil condi-
tions along the perimeter should reduce further problems after the recommendations within this report have been
implemented. However, seasonal moisture variations, water leaks, erosion and other factors may affect the stability
of the foundation and put it in danger of further damage.
REPORT LIMITATIONS
This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the
property or an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current
conditions observed at the time of the inspection. THERE IS NO WARRANTY, EXPRESSED OR IMPLIED, CON-
CERNING THIS ENGINEERING REPORT.
The information in this report supersedes any verbal comments, expressed or implied, made by Crosstown Land De-
velopment Services or its principals, agents or employees. The client agrees that neither CLDS nor its employees or
owners will be responsible for:
1.Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite drilling and
testing of the recovered samples,
2.Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the client; and
3.Any other element such as joists or beams and other structural members that is boxed or otherwise not readily
available to CE for viewing, and releases CE from any liability attributable to such knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance
of the facility at the time of this structural survey. Compliance with any code or specification other than as expressly
noted is specifically excluded.
The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and
DOES NOT IMPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN
THE FUTURE.
This report was prepared expressly for the client and expressly for the purposes indicated by the client. Permission
for use by any other person for any purpose, or by the client for different purpose is denied unless otherwise stated in
writing by CE.
CE SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIONS BY THE CONTRACTOR OR HIS SUBCON-
TRACTORS PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE CONTRACTOR TO PER-
FORM THE WORK IN ACCORDANCE WITH THE REPAIR PLAN. CE IS NOT RESPONSIBLE FOR THE
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE OR PROCEDURES OR THE PRECAU-
TIONS INCIDENTAL THERETO.
CE expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE and the client ex-
pressly disclaims that it has contracted for or received any warranty of fitness for a particular purpose with respect to
this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF CE AND THERE ARE NO WAR-
RANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS AGREEMENT.
FRONT
NON-MONOLITHIC
NON-MONOLITHIC
MONO
CONVERTED
GARAGE
EV
EV
EV
EV
EV
EV EV
EV EV
EV
EV
EV
EVEVEV
EXISTING VENT
(TYP.)
CRAWLSPACE
ACCESS
CRAWLSPACE
ACCESS
2A
RESET/RE-SHIMMED
1A
5A
3A
0.3 -0.9
4A -0.9
-0.5
-1.0
-0.9 -1.0 -0.9 -1.0 0.4
-0.1 0.2
0.10.3
1.5
1.5
1.6
1.8 1.2
0.4
0.3
0.9
N/A
N/AN/A0.20.2
0.0-0.2
0.4
0.1
0.3
-0.3-0.5
-1.4
-0.6
N/A0.4
(-0.5)(-0.8)(-0.8)(-1.0)
(-0.6)
(0.3)
(0.1)
(0.2)
(0.5)(1.3)
(1.4)
(0.5)(1.0)
(1.5)
(0.1)
(-0.7)
(-0.8)(-0.3)
(-0.4)
(-0.4)(0.6)
(0.7)(N/A)
(-0.5)
(-1.5)
(0.2)
(-0.5)(-0.2)(0.0)
(0.4)(0.1)
(0.2)(0.1)(N/A)(N/A)
(N/A)
(0.4)
(0.3)
NON-
MONO
CROSSTOWN ENGINEERING
TBPE FIRM F-15944 - WWW.CROSSTOWNENGINEERING.COM
(469)-751-7694 - DALLAS METROPLEX
1417 HILL ST., GRAPEVINE, TX
LIMITED REPAIR PLAN *NOT TO SCALE - ALL LOCATIONS APPROXIMATE*
PRE-LIFT ELEVATIONS BY CE (3.21.25) POST-LIFT ELEVATIONS BY CE (04.02.25)
LEGEND
ELEVATION BASEPOINT INSTALLED PAD/BLOCK EXISTING PIER
INSTALLED BEAM EXISTING PAD/BLOCK INSTALLED BREAKOUT
EXISTING BEAM INSTALLED PIER EXISTING BREAKOUT
0.0 (X.X)
x ADJUSTED 5 EXISTING PILINGS.
x RESET/RE-SHIMMED 1,018 SQFT OF THE FOUNDATION.
CONSTRUCTION NOTE: IF INTERIOR PILING LOCATIONS ARE SHOWN ON THIS MAP THEY ARE APPROXIMATED AND ARE LOCATED WITHOUT
KNOWLEDGE OF THE LOCATIONS OF THE INTERIOR GRADE BEAMS. THE CONTRACTOR SHALL MAKE FIELD JUDGEMENTS BASED OFF OF THEIR
GRADE BEAM INVESTIGATIONS AND OBSERVED SLAB QUALITIES TO FIELD LOCATE THE FINAL INTERIOR PIER LOCATIONS. FINAL SCOPE CHANGES
SHALL BE APPROVED BY THE ENGINEER OF RECORD.PLEASE NOTE: THIS DRAWING IS PROVIDED FOR PRELIMINARY PERMITTING
AND CONSTRUCTION PURPOSES ONLY. IF EXISTING PILINGS ARE SHOWN ON
THIS MAP, THEIR LOCATION WAS PROVIDED BY THE CLIENT AND IS
APPROXIMATE. CE DOES NOT CERTIFY THEIR PERFORMANCE OR EXISTENCE.
IF THE READER WOULD LIKE TO DETERMINE IF THEY ARE ACTUALLY
PRESENT, THEY MUST CONTACT THE OWNER OR CONTRACTOR TO OBTAIN
AN ENGINEERING CERTIFICATE FOR THEM.
04/03/25