Loading...
HomeMy WebLinkAboutCOMA2025-001811ADDRESS 4051 State 121 Hwy. Grapevine, TX 76051 LEGAL D F W Trade Center Blk 1 Lot 1 Shell Building PERMIT HOLDER Marshall Clark Solar One Construction (903) 870-9052 COLLABORATORS •Marshall Clark Solar One Construction (903) 870-9052 OWNERS •SMS Infocomm Corporation TENANTS •Shell Building INSPECTIONS 4 1. Building Framing 2. Special Inspection 3. Final Fire Dept Inspection 4. Building Final INFORMATION FIELDS **APPLICANT NAME (Individual)Marshall Clark **APPLICANT PHONE NUMBER 9038709052 APPLICANT E-MAIL **NAME OF BUSINESS SMS InfoComm Corporation VALUATION 251899 Square Footage 535156 Acreage 26.71 What is use of Building/Structure?Office / Warehouse * CONSTRUCTION TYPE IIB * OCCUPANCY GROUP B/S-1 DOCUMENTS - MISC 01 APPLICATION.pdf, TDLR EXEMPTION.pdf DOCUMENTS - MISC 02 CONSTRUCTION PLANS - SMS Infocomm Corp Stamped Electrical Plans.pdf, ROOF FRAMING ANALYSIS - SMS Infocomm Corp.pdf * ZONING DISTRICT BP APPROVED TO ISSUE ELECTRIC YES Fire Sprinkler System?YES FEE TOTAL PAID DUE *Building Permit Fee (Value)$ 2,200.00 $ 2,200.00 $ 2,200.00 Building Permit, Plan Review $ 1,430.00 $ 1,430.00 $ 1,430.00 TOTALS $ 3,630.00 $ 3,630.00 $ 0.00 City of Grapevine PO Box 95104 Grapevine, Texas 76099 817) 410-3166 Building - Commercial Alteration Project # 25-001811 Project Description: Install 449.82 KW DC roof-mounted PV system. Conduits will be run from the roof-mounted system into the interior of the building. Install 3 SolarEdge inverters internally that will connect to a 600A Load Center & a 600A Fused AC disconnect."SMS InfoComm Corporation"… [ELECTRONIC REVIEW] Issued on: 05/19/2025 at 5:21 PM MYGOV.US 25-001811, 05/19/2025 at 5:21 PM Issued by: Connie Cook Page 1/2 READ AND SIGN I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY AND THAT THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). May 19, 2025 Signature Date City of Grapevine Building - Commercial Alteration Project # 25-001811 NOTICES 1) ALL work must be done in compliance with the 2021 INTERNATIONAL BUILDING CODE. **ALL work ISSUED prior to January 1, 2024, must be done in compliance with the 2006 INTERNATIONAL BUILDING CODE. 2) City Approved Stamped Plans must be on-site for ALL INSPECTIONS. 3) Project address must be clearly posted at the job site. NOTES > 24 HOUR INSPECTION NUMBER METRO (817) 410-3010, CUT OFF TIME FOR A.M. INSPECTION IS 7:30 A.M. --- CUT OFF TIME FOR P.M. INSPECTION IS 12:30 P.M. > PERMIT ISSUED IN ACCORDANCE WITH APPLICATION ON FILE IN THIS OFFICE. THIS PERMIT SHALL EXPIRE IF WORK IS NOT COMMENCED WITHIN (180 DAYS) OF ISSUANCE OR IF WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF (180 DAYS). THE ISSUANCE OR GRANTING OF THIS PERMIT AND / OR APPROVAL OF PLANS, SPECIFICATIONS AND COMPUTATIONS SHALL NOT BE CONSTRUED TO BE A PERMIT FOR, OR AN APPROVAL OF, ANY VIOLATION OF ANY OF THE PROVISIONS OF THE CODES AND ORDINANCES OF THE CITY OF GRAPEVINE. THE ISSUANCE OF A PERMIT BASED ON PLANS, SPECIFICATIONS, AND OTHER DATA SHALL NOT PREVENT THE BUILDING DEPARTMENT FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS, AND OTHER OR REQUIRING CORRECTIONS OF THE CONSTRUCTION ITSELF. MYGOV.US 25-001811, 05/19/2025 at 5:21 PM Issued by: Connie Cook Page 2/2