Loading...
HomeMy WebLinkAboutCOMA2023-002056ADDRESS 3000 Grapevine Mills Pkwy., 109 Grapevine, TX 76051 LEGAL Grapevine Mills Addition Blk 1 Lot 1r3 S PERMIT HOLDER Alejandro Gallegos The Construction Expert s (817) 703-1660 COLLABORATORS •Alejandro Gallegos The Construction Experts (817) 703-1660 OWNERS •Grapevine Mills Mall Lp (317) 636-1600 TENANTS •GLAMM St. Boutique INSPECTIONS 4 1. Building Framing 2. Final Health Inspection 3. Final Fire Dept Inspection 4. Building Final INFORMATION FIELDS **APPLICANT NAME (Individual)Syed Obaid **APPLICANT PHONE NUMBER 214-686-9533 **NAME OF BUSINESS Latte Factory VALUATION 20000 Square Footage 1156 What is use of Building/Structure?Coffee Shop * CONSTRUCTION TYPE IIB Sprinklered * OCCUPANCY GROUP B Fire Sprinkler System?YES * ZONING DISTRICT CC APPROVED TO ISSUE MECHANICAL YES APPROVED TO ISSUE PLUMBING YES APPROVED TO ISSUE ELECTRIC YES * OCCUPANCY LOAD 28 FEE TOTAL PAID DUE *Building Permit Fee (Value)$ 287.25 $ 287.25 $ 287.25 Building Permit, Plan Review $ 186.71 $ 186.71 $ 186.71 TOTALS $ 473.96 $ 473.96 $ 0.00 READ AND SIGN I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. City of Grapevine PO Box 95104 Grapevine, Texas 76099 817) 410-3166 Building - Commercial Alteration Project # 23-002056 Project Description: Interior Alteration for New Tenant [Grease Trap] "Latte Factory" [C/O 23-002057] Issued on: 09/28/2023 at 3:38 PM MYGOV.US 23-002056, 09/28/2023 at 3:38 PM Issued by: Connie Cook Page 1/2 ADDRESS 3000 Grapevine Mills Pkwy., 109 Grapevine, TX 76051 LEGAL Grapevine Mills Addition Blk 1 Lot 1r3 S PERMIT HOLDER Daniel Castillo Daniel’s Plumbing S ervice (469) 261-9203 COLLABORATORS •Daniel Castillo Daniel’s Plumbing Service (469) 261-9203 OWNERS •Grapevine Mills Mall Lp (317) 636-1600 TENANTS •GLAMM St. Boutique INSPECTIONS 8 1. Plumbing Rough In 2. Plumbing Sewer 3. Plumbing Top Out 4. Plumbing Water Service 5. Plumbing P-Trap 6. TCEQ Backflow Certification Submit 7. Backflow Device Inspection 8. Plumbing Final INFORMATION FIELDS **APPLICANT NAME (Individual)Daniel Castillo **APPLICANT PHONE NUMBER 4692619203 VALUATION 2500 Square Footage 1156 FEE TOTAL PAID DUE Plumbing Permit Fee {VALUE}$ 57.00 $ 57.00 $ 57.00 TOTALS $ 57.00 $ 57.00 $ 0.00 READ AND SIGN I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. I FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. November 09, 2023 Signature Date City of Grapevine PO Box 95104 Grapevine, Texas 76099 817) 410-3166 Plumbing Permit {VALUE} Project # 23-003935 Project Description: Plumbing for Alteration for New Tenant [Grease Trap] [Install mop sink, hand sink, 3 comp sink, water for ice and coffee machines, 2 sinks Interior] "Latte Factory" Issued on: 11/09/2023 at 8:20 AM MYGOV.US 23-003935, 11/09/2023 at 8:20 AM Issued by: Connie Cook Page 1/2 ADDRESS 3000 Grapevine Mills Pkwy., 109 Grapevine, TX 76051 LEGAL Grapevine Mills Addition Blk 1 Lot 1r3 S PERMIT HOLDER Charles DeLuna Agape Electric LTD Co. (469) 254-7614 COLLABORATORS •Charles DeLuna Agape Electric LTD Co. (469) 254-7614 OWNERS •Grapevine Mills Mall Lp (317) 636-1600 TENANTS •GLAMM St. Boutique INSPECTIONS 3 1. Electrical Ceiling 2. Electrical Rough 3. Electrical Final INFORMATION FIELDS **APPLICANT NAME (Individual)Charles DeLuna **APPLICANT PHONE NUMBER 4692547614 VALUATION 1200 Square Footage 1150 FEE TOTAL PAID DUE Electrical Permit Fee {VALUE}$ 45.00 $ 45.00 $ 45.00 TOTALS $ 45.00 $ 45.00 $ 0.00 READ AND SIGN I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. I FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. December 15, 2023 Signature Date City of Grapevine PO Box 95104 Grapevine, Texas 76099 817) 410-3166 Electrical Permit {VALUE} Project # 23-004377 Project Description: Replace Light Fixtures "Latte Factory" Issued on: 12/15/2023 at 11:28 AM MYGOV.US 23-004377, 12/15/2023 at 11:28 AM Issued by: Connie Cook Page 1/2 Building Inspection Department Plan Review Comments Letter Box 95104hone: (17) 1-161 Grapevine, Texas 761 : (17) 410-536 NAME OF ..• COMMERCIAL PLAN REVIEWER: W. Scott Leavelle NUMBEROF •` ZONING: OCCUPANT LOAD:•- - • 1 FIRE SPRINKLED: Yes OTAL SQ. FT: Undeterminef • r' + •# UILDING TYPE: . . ■ # i # • W 111# • • • 1 11 11 * • 1 # ` 4 • # GENERAL5. REFERENCE ALL APPLICABLE CODES ON COVER SHEET PER ITEM 4 OF THE •BELOW. PROVIDE6. AND SEALEDFOR PROPOSED FUR DOWN AND *RIFY LOCATIO i i'. s 8. PROVIDE REFERENCED SHEET P4 THAT HAS BEEN EXCLUDED FROM THE PROJECT DOCUMENTS. 10. PROVIDE iING CODE DATA _NT LOAD CALCULATIOWJ -02006 11. PROVIDE .E FRONT ELEVATIONS WITH DIMENSIONSAND 1 . Fire/Life safety document approval by Grapevine Fire Department. 2. ADA/TAS compliance document/inspection a• i i t by others. 3. E-com, info tech, and low voltage document approval by others. t Energy compliancedocumenVinspection approvalby others. County5. Public/semi-public food service and swimming pool document approval by the Tarrant Department. • Specification document approval by others. 7. Floor wall and ceiling finishes shall be in accordance with 2006 IBC chapter 8, table 803.5 and section 1210 as applicable. 8. Egress illuminationbe f •. 106 IBC sectioni• • Exit signand illumination shall be • s 016 IBC sectioni section10. Any glazing subject to human impact loads shall be in accordance with 2006 IBC 1 11. Plumbing trap seals shall be in accordancei• IPC sectionii 12. Plumbing r • exhaust vent terminationsbe in accordance016 IPC outlets shall be in accordanceIi article 210.8(B). 14. Exterior signage is by separate permit application/approval and shall be in accordance • • Ordinance Section •i. L - i 1. COORDINATE ALL FIRE ALARM PLANS, a APPROVALS AND INSPECTIONS WITH THE FIRE MARSHAL, BRYAN PARKER, AT 817-410-4420. 2. THE PROJECT SHALL BE DESIGNED TO COMPLY WITH THE 2015 IECC. VERIFICATIONO COMPLIANCE SHALLBE a, CERTIFIED r CODE INSPECTOR PRIOR ISSUANCE FINALBUILDING APPROVAL it CERTIFICATE.t 3. ALL a FROM CITY APPROVED r, PLANS REQUIRE r REVISED PLANS SUBMITTEDAND ADDITIONAL a THE CITY OF GRAPEVINEi. 1 CODES1 F 19: 1 Q W 0011 Mo A 97-AVIVA's I i! I *01:41FIF-11y I Lei ORAW I all 1 0 1 :1111 W 6119111 a" ED] MR "I MW I I 1Lm 0012,111 W Please review comments and have designers add all review comments, required information and created changes, all clouded within new plan sets. Please provide 3 copies of new full corrected plan sets. Plan size may not exceed 36" in a dimension. A copy of this plan ®© letter shall accompany the "response to comments" sets of drawings. If required, review of response to comments will placed on hold until Planning Services approval has been obtained. JST COMMENTS: 9 Date: --1-12/15/23 Permit / Project Number: — 23-002056 Project Name. Latte Factory I # 0 Name of Company Performing Inspection: Bostrom Ene�qy h9p '1 11111111111 1 1 : III ;lIpIlillig 11,111,11111i, - 0 It a - i• I iL 11' 1 1; g l.. 9 , I !11!111� I !! I ��ll 11 Signature of Inspector Development Services Department The Ci�,, of Gra-i * P.O. Box 95104 * Gri :!:I:i1i�I:?1III Ill Fax (817) 410-3012 * www.grapevinetexas.gov VEERINDER (VINNY) TANEJA, MBBS; MPH PUBLIC HEALTH DIRECTOR CATHERINE A. COLQUITT, M.D. LOCAL HEALTH AUTHORITY & MEDICAL DIRECTOR TARRANT COUNTY PUBLIC HEALTH Accountability · Quality · Innovation November 8, 2023 Brian Harrison, Latte Factory, 3000 Grapevine Mills Pkwy Grapevine, TX 76051 Brian.Harrison@theclearstore.com Re: Plan Review – Latte Factory Dear Mr. Brian, Thank you for providing the plans for review for Latte Factory. Please, share with corresponding parties involved in this process. I am glad to approve your plans as it relates to Tarrant County requirements and federal and state health codes, with the following reminders: 1. There shall be no direct connection between the sewage system and any drains originating from equipment in which food or utensils are placed. Such fixtures shall be drained through an indirect waste with a minimum one-inch air gap, where applicable. 2. The kitchen shall have soap and paper towels with dispensers before the final/opening inspection. Also, sanitizer and test strips. 3. Walls, floors (all areas) & ceiling must be smooth and easily cleanable and nonabsorbent in kitchen, ware wash, restroom and mop sink areas. 4. Vacuum breakers and backflow preventers provided as needed on any equipment directly connected to water supply including mop sink and 3 compartments. 5. Ensure city jurisdiction sign off and approval of required grease trap/interceptor system. 6. Ensure that that all handwash sinks for staff are conveniently available and have 100-degree Fahrenheit minimum hot water with soap, paper towels and the 3 compartments have 110 degrees water. 7. 3 compartments will have drain boards on each side. 8. Ensure adequate floor drains are present as needed. Please, contact us at least 7 days before construction is completed for a final inspection before opening. Before any alterations are made to the submitted and approved plans, the plan reviewer must be contacted, and approval must be obtained. You may contact me at 817-321-4980 for additional assistance. Sincerely, Stanley Mwangi, RS Stanley Mwangi, RS, BSEHS Environmental Health * Approval by this Department is not intended to convey acceptance of any mistake or omission contained within the planning materials. Proper development is the responsibility of the owner and all applicable laws, rules and regulations shall be strictly adhered to. Building Inspection Department Plan Review Comments Letter Box 95104hone: (17) 1-161 Grapevine, Texas 761 : (17) 410-536 NAME OF ..• COMMERCIAL PLAN REVIEWER: W. Scott Leavelle NUMBEROF •` ZONING: OCCUPANT LOAD:•- - • 1 FIRE SPRINKLED: Yes OTAL SQ. FT: Undeterminef • r' + •# UILDING TYPE: . . ■ # i # • W 111# • • • 1 11 11 * • 1 # ` 4 • # GENERAL5. REFERENCE ALL APPLICABLE CODES ON COVER SHEET PER ITEM 4 OF THE •BELOW. PROVIDE6. AND SEALEDFOR PROPOSED FUR DOWN AND *RIFY LOCATIO i i'. s 8. PROVIDE REFERENCED SHEET P4 THAT HAS BEEN EXCLUDED FROM THE PROJECT DOCUMENTS. 10. PROVIDE iING CODE DATA _NT LOAD CALCULATIOWJ -02006 11. PROVIDE .E FRONT ELEVATIONS WITH DIMENSIONSAND 1 . Fire/Life safety document approval by Grapevine Fire Department. 2. ADA/TAS compliance document/inspection a• i i t by others. 3. E-com, info tech, and low voltage document approval by others. t Energy compliancedocumenVinspection approvalby others. County5. Public/semi-public food service and swimming pool document approval by the Tarrant Department. • Specification document approval by others. 7. Floor wall and ceiling finishes shall be in accordance with 2006 IBC chapter 8, table 803.5 and section 1210 as applicable. 8. Egress illuminationbe f •. 106 IBC sectioni• • Exit signand illumination shall be • s 016 IBC sectioni section10. Any glazing subject to human impact loads shall be in accordance with 2006 IBC 1 11. Plumbing trap seals shall be in accordancei• IPC sectionii 12. Plumbing r • exhaust vent terminationsbe in accordance016 IPC outlets shall be in accordanceIi article 210.8(B). 14. Exterior signage is by separate permit application/approval and shall be in accordance • • Ordinance Section •i. L - i 1. COORDINATE ALL FIRE ALARM PLANS, a APPROVALS AND INSPECTIONS WITH THE FIRE MARSHAL, BRYAN PARKER, AT 817-410-4420. 2. THE PROJECT SHALL BE DESIGNED TO COMPLY WITH THE 2015 IECC. VERIFICATIONO COMPLIANCE SHALLBE a, CERTIFIED r CODE INSPECTOR PRIOR ISSUANCE FINALBUILDING APPROVAL it CERTIFICATE.t 3. ALL a FROM CITY APPROVED r, PLANS REQUIRE r REVISED PLANS SUBMITTEDAND ADDITIONAL a THE CITY OF GRAPEVINEi. 1 CODES1 F 19: 1 Q W 0011 Mo A 97-AVIVA's I i! I *01:41FIF-11y I Lei ORAW I all 1 0 1 :1111 W 6119111 a" ED] MR "I MW I I 1Lm 0012,111 W Please review comments and have designers add all review comments, required information and created changes, all clouded within new plan sets. Please provide 3 copies of new full corrected plan sets. Plan size may not exceed 36" in a dimension. A copy of this plan ®© letter shall accompany the "response to comments" sets of drawings. If required, review of response to comments will placed on hold until Planning Services approval has been obtained. JST COMMENTS: 9 City of Grapevine Building Inspection Department Plan Review Comments Letter Box 95104 Phone: (17) 10-161 Grapevine, Texas 7651 : (17) 1 -6 NAME OF --t, - Factoiy DATE: COMMERCIAL PLAN REVIEWER: Scott OCCUPANTNUMBER OF STORIES: One TOTAL SQ. FT: Undetermined ZONING: CC OCCUPANCY: B rrr d_ - -• - ! FIRE SPRINKLED: Yes -TYPE: r r , ► �i f � It f • y ` y, rk4:alj:m toll 111:11'RiN17-1VI&S LOX410111ir 3. PERMITS MAY ONLY BE ISSUED FOR CONSTRUCTIONDOCUMENTS ACCORDANCE WITH 2006 IBC SECTION 106.1. DOCUMENTS ISSUED FOR yNY OTHER PURPOSE NOT BE ACCEPTED. 4. PROVIDE .. f BY f 5. REFERENCE ALL APPLICABLE CODESON • THE GENERAL COMMENTSBELOW. 11 6. PROVIDE f AND SEALED ENGINEERED DESIGNS FOR THE PROPOSED FUR DOWN AND CLARIFY LOCATIONARCHITECTURAL f ■ •-• 1 f i f �i.` r i 8. PROVIDE REFERENCED SHEET P4 THAT HAS BEEN EXCLUDED FRO TYE PROJECT DOCUMENTS. 0 RECEPTACLES9. PROVIDE A COMPLETE POWER PLAN DETAIL WITH LOCATION OF ALL BOTH EXISTING AND PROPOSED. 0. PROVIDE BUILDING CODE DATA WITH OCCUPANT LOAD CALCULATIONS PER TABLE 1001.1.1,1• 11. PROVIDE STORE FRO111T=TATUr,-S�1 114TERIALS. 1 . Fire/Life safety document approval by Grapevine Fire Department. 2. ADA/TAS compliance document/inspection aii • . by others. 3. E-com, info tech, and low voltagedocument approval by others. 4Energy compliancedocument/inspection a•• • . by • j 5. Public/semi-public •i service and swimming pool document approvalby the CountyTarrant ]f'ir i. Specification document approval by others. Floor7. • ceiling finishes shall be in accordancei• IBC chapters ri,` 803.5 and section1 as applicable. Egress8. i be i it 116 IBC section/E 9. Exit sign and illumination shall be in accordance with 2006 IBC section 1011, 10. Any glazing subject to human impact loads shall be in accordance with 2006 IBC section 11. Plumbing trap seals shall be in accordance with 2006 IPC section 1002.4. 12. Plumbing and exhaust vent terminationsbe in accordanceIli IPC section+a and 2006 IMC section802. outlets shall be • •rnce with 2005 NEC article 210.8(B). 14. Exterior signage is by separate permit application/approval and shall be in accordance with Zoning Ordinance Section 60 a , i 1. COORDINATE ALL . ALARMSYSTEM PLANS, APPROVALS ANDINSPECTIONS WITH THE FIRE MARSHAL, B. . PARKER, AT 817-410-4420. 2. THE PROJECT SHALL BE DESIGNED TO COMPLY WITH THE 2015 IECC. VERIFICATION OF COMPLIANCE SHALL BE SUBMITTED TO THE CITY BY A CERTIFIED ENERGY CODE INSPECTOR PRIOR TO THE ISSUANCEOF BUILDING FINAL APPROVAL OR CERTIFICATE OF OCCUPANCY. 3. ALL CHANGES .i APPROVED PLANS ! i 4. THE CITY OF GRAPEVINE IS UNDER THE 2006 1 CODES WITH THE 2015 PLANS SUBMITTED AND ADDITIONAL REVIEW FEES DUE. i i D 0 iw I 19: 1:111:1 :1031 go NOUN FA ILI I Wel wvwxg Eel mr-110 I IS g - 1:8 N :fell Ian ED] M1111-10M 0 R =110 I A101016-1`010111111 WIN= 1 109111MMIN limp Ww"Irk, Please review comments and have designers add all review comments, required information and created changes, all clouded within new plan sets. Please provide 3 copies of new full corrected plan sets. Plan size may not exceed 36" in any 4imension. A copy of this plan review letter shall accompany the "response to comments" sets of drawings. If required, review of response to comments will be placed on hold until Planning Services approval has been obtained. 1010 W18 100141=11 10:19.04 kyl I I a N611011m:49 1 ST COMMENTS: fZRAA-VIWA '11"FATMU 9 Building Inspection-. Plan Review Comments Letter NAME RO - Factory DATE: 8-22-23 ADDRESS 3000 - # 109PERMIT i COMMERCIAL PaScott NUMBER OF STORIES: 1 TOTAL SQ. FT: 1,003 - it -- ■ - r Y • � i i � Y. i No;is • i bylv&A tell!"] C,. PERMITS MAY ONLY BE "ISSUED FOR CONSTRUCTION" DOCUMENTS IN ACCORDANCE i. IBC SECTIONDOCUMENTS ISSUED FOR OTHERANY PURPOSE WILL NOT ACCEPTED. MARK PLANS FOR • • # t Yji� Y ■ ■ - r . - Y ■ REMOVE5. ALL CONTENT BOXESYT REFERENCE THE 2015 IPC ANY, THE 2017 NEC CODES. r ` ♦ Y Y. t - ■ . •. is t PROVIDE SIGNED AND SEALED ENGINEER DESIGNS FOR TAE DRAWINGS.PROPOSED FURR DOWN AND CLARIFY LOCATION ON ARCHITECTURAL 1. Civil document approval by Grapevine Public Works Department. 2. Fire/Life safety document approval by Grapevine-1. Landscape document approval by the GrapevinePlanning Division. table4. ADA/TAS compliance document/inspection approval by others. 5. E-com, info tech, and low voltage document approval by others. 6. Energy compliance document/inspection approval by others. 7. Specification document approval by others. 8. Floor wall and ceiling finishes shall be in accordance with 2006 IBC chapter 8, 80and section 1210 as applicable. 1 Egress.:: in shall be in accordance with 0 / IBC section 1006. 10. Egress doors with access control shall be in accordance with 2006 IBC section is 11. Exit sign and illumination shall be in accordance01 IBC section section12. Any glazing subject to human impact loads shall be in accordance with 2006 IBC !01 13. Plumbing trap seals shallbe in accordance0♦ IPC section00' 14. Plumbing and exhaust vent terminations1` in accordance006 IPC section•Ix and 2006 IMC section802. 15. All mechanical equipment `t' 't to 1- screened from view in accordance with Zoning Ordinance section 16. GFC1 outlets shall be in accordance with 2005 NEC article 210.8(B). 17. Exterior signage is 1'', separate permit application/approval ani shall be in accordance with Zoning Ordinance Section 60 +�7i7IMIM4LIk ii•• x t x x• . x ,••-� , , � i. .:. , : mr-ail, . x s +MAN � � i■ i+ r i x ...I * i! i V A a 9 " As I I I A M101 Please review comments and have designers add all review comments, required information and created changes, all clouded within new plan sets. Please provide 3 copies of new full corrected plan sets. Plan size may not exceed 36" in an dimension. A copy of this plan review letter shall accompany the "response to comments" sets of drawings. If required, review of response to comments will b - placed on hold until Planning Services approval has been obtained. I Z JST COMMENTS: 1'AWW-"G-A61 K, City ofGrapevine Building InspectionDepartment Box 95104 Phone: (17) 1-161 Grapevine, Texas 761 Fax: (17) 41-6 NAME OF PROJECT: Latte Factory DATE: 8-31-3 ADDRESS- 3000 GMP # 109 PERMIT: 2-06 COMMERCIAL PLAN REVIEWER:c II NUMBER OF STORIES: 1 TOTAL S . FT: 1,003 ZONING: cc OCCUPANCY: OCCUPANT: 28 EXIT : 1 FIRE SPRINKLED: S BUILDING TYPE: 1113 ' i `i • i r• : 3. MUST OBTAIN A MALL APPROVAL REVIEW STAMP ON THE PLArIS SUBMITTED. �401&21219-ffll all 1 16A MHUS16191:0LIQUIRIE_- 5. REMOVE THE STAMP AT THE BOTTOM RIGHT HAND CORNER Oft ALL "REPRODUCTION OF PLANS , ..• ■ 6. PROVIDE SIGNED AND SEALED ENGINEER DESIGNS FOR THE PROPOSED . •■•■ FUR. DOWN AND CLARIFY .■ LOCATION _.i ON ARCHITECTURAL DRAWINGS. document approvalby •` ` Public Works-!. 2. Fire/Life safety document approvalGrapevine"i. 3. Landscape document approval by the Grapevine Planning Division. t' ADA/TAS compliance document/inspection a•i • r by others. 5. E-com, info tech, and low voltage document approval by others. t Energy compliance document/inspection approval by others. table7. Specification document approval by others. 8. Floor wall and ceiling finishes shall be in accordance with 2006 IBC chapter 8, 803.5 and section 1210 as applicable. 9. Egress illumination shall be in accordance with 2006 IBC section 1006. 10. Egress doors with access control shall be in accordance with 2006 1 BC section 1008.1.3.4. 11. Exit sign and illumination shall be in accordance016 IBC section section12. Any glazing subject to human impact loads shall be in accordance with 2006 IBC 1• 13. Plumbing trap seals shall be in 2006accordance IPC section 1002.4. section14. Plumbing and exhaust vent terminations shall be in accordance with 2006 1 PC 94 and 2006• 81 15.All mechanical equipment is required to be screened from view in accordance with Zoning Ordinance section 16. GFCI outlets shall be in accordance with 2005 NEC article 210.8(B). 17. Exterior • .• by `i. ` permit application/approval . • shall be in accordance with Zoning Ordinance Section 60. x...i x , #iq Ii 4 Please comm °ytand have designers add all review comments, required information and created changes, all clouded within new plan sets. Please provide 3 copies of new full corrected plan sets. Plan size may not exceed 36" in any 4imension. A copy of this plan review letter shall accompany the "response to comments" sets of drawings. If required, review of response to comments will be placed on hold until Planning Services approval has been obtained. IS COMMENTS: K