Loading...
HomeMy WebLinkAboutSWP2025-002727In order for TCEC to properly evaluate the Project, Company must attach the following to this completed document: Copy of Company's construction plans, which include the location of (1) the pool, spa, or water feature (including all decking and walkways); (2) all underground electric facilities drawn to scale and clearly marked as either direct buries or in conduit, including primary, secondary, service, and street light facilities ("the Underground Facililies`); (3) the electric motor; and (4) all overhead facilities within forty (40') feet of water's edge ((1), (2), (3), and (4) may be referred to collectively as the "Facilities'); and A copy of the final survey for the property ("Survey") showing the location of all property lines and easements located on the property, in exchange for TCEC's review and requested approval of the Construction Plans, Company certifies that: (a) The Underground Facilities at the Property have been located through the Texas al I and agrees to the 18" buffer on either side; (b) Company has accurately represented on the Construction Plans and the Survey the location of each of the Facilities located through TX811, easements, and property lines located at the Property; (c) TCEC can rely on the information set forth in the Construction Plans and the Surveying in considering Company's request for approval of the Construction Plans; (d) Company will exercise extreme caution consistent with all industry accepted standards and practices when excavating around Facilities, (e) Company has requested TCEC to approve the Construction Plans for the sole purpose of obtaining any necessary municipal approvals and to resolve potential conflicts with existing electric facilities; and (f) Except as set forth in (g)(1) below, Company agrees to indemnify, protect, defend, and hold TCEC harmless from and against any and all damages, claims, judgments, causes of action, suits, liability, or losses ("Claims") arising out of the construction of the Project or the representations made herein by Company, including Claims arising out of the activities set forth in (9)(2) below, fg) In the event TCEC incorrectly identified the location of the Underground Facilities and such identifications were relied on by Company to prepare the Construcfior, Plans: (1) Company shall not be responsible for the damage to the Underground Facihbes: but (2) Company shall be responsible for applicable costs associated with any necessary re-route of the Facilities and atl costs associated with relocation of the Project regardless of the cause or reasons for such re-route or relocation, (h) TCEC will perform the site assessment on each set of plans provided, Locales must be in place at the time of submittal. Applications requiring multiple visits may incur addibunal trip fees. a X* [RECEIVED 715/2025 25,-002,72,7 f, 3509 FERGUSON ROAD is INGROUND SWIN1110ING POOL & SPA Application Application # 33843 Member Name* Chris Snyder Address 3509 Ferguson Rd. City * Grapevine State* TX Zip * 76092 Installing Company* Swan Custorn Pools, LLG Requested By* Eieata Swan Title Office hlanaqer Phone Number* 9403826AO9 Email eleata@sw,3noustompools.corn `Aegirr,ved,nermits will be dellveFel to this mail aildress TX/81 I Locate ID # * 2567161067 Site Survey Dig Tcss Ticket.pdf Pool Plan* Snyder Pool 4 Pool On Survey,pdt Pool Design has been staked on Property?* installer Signature* TCEC Member Signature * &Ilmw C'15�'Yrww 590AW13 2 81MB Yes No I '7 ) V LYOR 13 I �Ni-i �KVI"& 1, 7 "'t, i-' uk- 'C p G F�' s i, \, ^ A P Pv f V A 6- OF R E V I S E D A N S i t i Z M 1 '4 p� wry CLUF a» FCJRHG<P-N i AT- "Au