Loading...
HomeMy WebLinkAboutIA2020-002185 - PERMIT ONLYADDRESS 1102 E Dallas Rd., 215 Grapevine, TX 76051 LEGAL D F W Air Freight Centre Addition Blk n/a Lot 3r S COLLABORATORS •Anna L. Cicur Fast Trak Construction Inc (214) 638-0525 OWNERS •Lrf2 Dallas Logistics I Llc TENANTS •Owens World Air, Inc. INSPECTIONS 17 1. MISC. Building Inspection 2. Building Setback 3. Building Tree Inspection 4. Building Foundation/Footing 5. Paving Inspection 6. Building Bracing / Sheathing 7. Building Framing 8. Building Wall Tie Inspection 9. Building Energy Code 10. Building Termite Verification 11. Final Building C/O Inspection 12. Final Fire Dept Inspection 13. Final Public Works Inspection 14. Landscaping 15. Lot Drainage Inspection 16. Special Inspection 17. Building Final INFORMATION FIELDS * OCCUPANCY GROUP N/A Fire Sprinkler System?N/A APPROVED TO ISSUE PLUMBING NO APPROVED TO ISSUE MECHANICAL NO APPROVED TO ISSUE HOOD NO APPROVED TO ISSUE ELECTRIC NO *SITE PLAN / SPECIAL USE / CU?N/A * ZONING DISTRICT LI * OCCUPANCY LOAD N/A ** NAME OF BUSINESS Owens World Air * CONSTRUCTION TYPE II-B * CONDITIONAL USE REQUIRED?N/A What is use of Building/Structure?Parking Lot VALUATION 35000 Square Footage 784 4) Asbestos Survey NO 2) Accessibility Review NO 1) Certified Energy Code Inspected NO City of Grapevine Building --- Industrial Alteration #20-002185 Project Description: Demo Parking Lot Concrete & Raise Parking Lot - Re-Pour "Owens World Air" Issued on: 06/30/2020 at 9:45 AM by: Guita McIlroy MYGOV.US 20-002185, 06/30/2020 at 9:45 AM Issued by: Guita McIlroy Page 1/2 **APPLICANT PHONE NUMBER 214-638-0525 **APPLICANT NAME John Richardson INFORMATION FIELDS FEE TOTAL PAID DUE *Building Permit Fee (Value)$ 439.75 $ 439.75 $ 439.75 Building Permit, Plan Review $ 285.84 $ 285.84 $ 285.84 TOTALS $ 725.59 $ 725.59 $ 0.00 The granting of this permit does not presume to give authority to violate or cancel the provisions of City, State, or other local laws regulating construction or the performance of construction. All provisions, laws, and ordinances governing this type of work shall be complied with, whether specified or not and shall be enforced at any and all times. MYGOV.US 20-002185, 06/30/2020 at 9:45 AM Issued by: Guita McIlroy Page 2/2