HomeMy WebLinkAboutMFA2025-002421 (2)1000 Buck Dobbs Rd.. ALL CHANGES REQUIRE Aledo, Texas 76008 APPROVAL OF REVISED CC 817-374-3559 PLANS NORTIER ENGINEERING CONSULTANTS 11C Initial Report for Foundation Assessment Date: June 19. 2025 APPROVED PLANS SHALL BE KEPT ON JOBSITE AT ALL TIMES Attention: Structured Foundation Repair (The Client) Subject: Foundation Review 826 Wildwood Ln., Grapevine, Texas Authorization and Scove: Nortier Engineering Consultants, LLC (NEC) has been retained by the Client to perform an evaluation of the slab on grade foundation system of the 2 story quadplex with brick veneer located at the subject address referenced above. This report provides guidance as to whether or not the existing foundation system is in need of repair. The report also proposes a recommended plan if repairs are needed. Conclusions/Svecific Recommendation: NEC performed a visual evaluation of the foundation for the subject property on 6/19/2025. NEC also performed a floor survey using a Zip -level Pro-2000 series, collecting relative floor elevations, to aid in surface topography mapping of the floor(s). Elevations shown are adjusted for the type of flooring encountered to reflect a consistent measuring plane. The map of the existing floor elevations can be seen in the figure attached to this report. Based on review of the foundation, and reasonable professional engineering opinion, we've determined that movement of the foundation has occurred and should be repaired. Although complete levelness cannot be guaranteed, or may not be attainable. the proposed plan should improve the performance of the foundation. It is recommended that twenty-one (21) piers be installed and polyurethane foam be injected as indicated on the figure(s) attached to this report. Locations of internal piers [if needed] are intended to be approximate. The Contractor should locate the beams and place internal piers accordingly. Furthermore, the proposed foundation repairs shall meet or exceed Chapter 4 of the 2021 International Building Code (IBC), as it relates to foundations and any local applicable amendments to the IBC. This report is solely based on information gathered during our site visit on 6/19/2025. and does not take into consideration any changes in condition of the foundation or soils after the date which the information was gathered. CONTRACTOR SHALL CALL FOR INSPECTIONS: (817) 410-3010 CONTRACTOR REGISTRATION WILL BE REVOKED UPON PERMIT EXPIRATION. CONSTRUCTION HOURS 7:00 A.M. - 7:00 P.M. MONDAY - SATURDAY ONLY NO WORK PERMITTED ON SUNDAY PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE CITY OF GRAPEVINE THIS PAGE RELEASED FOR CONSTRUCTION RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT ALL TIMES. 07/03/2025 BY: ARNOLDO RAMIREZ TSBPE: 1-3898 BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. 1000 Buck Dobbs Rd., Aledo, Texas 76008 817-374-3559 CC C*JNORYT1ERFNG11N11R1N6 CONSULTANTS LLC General Recommendations: It is recommended that a guttering system be installed if the house does not have gutters. Installing a guttering system will direct water away from the foundation and reduce the potential for ground erosion near the foundation footing. It is also recommended that the plumbing systems be checked after any repairs are made to the foundation system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure and cause leaks. It is recommended that soil grading be maintained such that the bottom portion of the foundation is below grade, as per the governing code and a watering system be utilized around the perimeter of the house. Fluctuations in moisture content of the soils near the foundation of the house can cause differential movement. If the moisture content is kept consistent, the potential for differential movement is mitigated. Furthermore, grading around the perimeter of the building should be maintained as sloping away from the foundation at a minimum of 6 inches fall within the first 10 feet from the foundation. Such grading configuration should prevent localized water accumulating around areas of the foundation. Saturated soils decline in bearing capacity and can result in differential movement of the foundation. Limitations: This report is intended for information purposes only, and the sole use of the client and/or homeowner. The scope of this report is limited to the items related to the foundation system only, and it is understood that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of this report does not include judgment on any of the superstructure, detached buildings, retaining or privacy walls, concrete reinforcement and/or site drainage. In addition, the scope of this report excludes material and soil sampling/testing procedures and as such were not performed. The report is not to be used by others for any purpose without our written consent. Compliance with any code or specification other than as expressly noted in this report is specifically excluded. It is the responsibility of any Contractor to abide by any other applicable codes or specifications. No warranty for any repairs, future foundation performance, structure, vegetation, or soils at the subject property are offered by this report, nor does this report imply any liability to NEC, nor Daneel Nortier, PE for any work to be performed as a result of this report. It is understood that soils in this area experience movement due to moisture fluctuations. Such soil movement could cause the foundation to move after the recommended repairs have been made. Any provided floor elevation data and recommended actions are based on soil conditions as they exist at the time of the evaluation. NEC does not warrant or imply that other problems may not occur in the future. No warranty, expressed or implied, is made or intended and the limit of liability shall be limited to the fee paid for this report at the time of evaluation. Report Prepared by: Nortier Engineering Consultants, LLC Texas Engineering Finn (F-16800) 6/19/2025 Daneel Nortier, P.E. Professional Engineer (TX#113157) OF•?-4 ftf i *. ••••9.pt�� / A EEL ORTIER / / ..... ............ i PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE 830 832 I 1.4 0.8 0.9 Polyurethane Foam Injection Zero Zero 0.5 v Minimal New pier r- Stress crack SP Separation i Photograph Label Oft loft 20ft All measurements shown In decimal inches OF' TF-f• s, ..... ..... ......... ofA EEL ORTIER j /jam' 06/19/25 By: DN 826 Wildwood Ln Grapevine, Texas 828 1.0 1.0 0.7 826 0.5 -1.2 -0.7 Zero 15 Zero -0.5 0.1 0.3 -0.5 0.1 1.0 \ 1.5 SP Poor drainage __0171— GRAPF.ti 1`+E r r:, CITY OF GRAPEVINE THIS PAGE RELEASED FOR CONSTRUCTION RELEASE DOES NOT AUf HORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT ALL TIMES. 07/03/2025 BY: ARNOLDO RAMIREZTSBPE: I-W98 BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY, ALL CHANGES MUST BE APPROVED. m rn cc c o 0 4 �.JVCC NRRTIER ENGINEERING CONSULiANiS L1C CITY OF GRAPEVINE THIS PAGE RELEASED FOR CONSTRUCTION RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT ALL TIMES. 07/03/2025 BY: ARNOLDO RAMIREZ TSBPE: 1-3898 BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. NOTES: 1) Piles shall be driven to refusal 2) Foundations supporting a 2 story building shall be supported with double piers as shown, however, a single pier may be used if spacing does not exceed 6'-0" Slab ------------------------------ Reinforcing steel rebar T PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE 1/21/24 Precast Concrete Piling Detail Diagram Not to scale ndation Footing Shims Precast Concrete Block "Top -cap" Solid 6" Diameter by 12" long Precast Concrete Cylinder. A) Single Pier for 1 Story B) Double Pier for 2 Story For normal spacing (See notes for additional information) CC C*jNORYVEREN61NEIRING CONSULTANTS LLC 2 3 CITY OF GRAPEVINE THIS PAGE RELEASED FOR CONSTRUCTION RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT ALL TIMES. 07/03/2025 BY: ARNOLDO RAM IREZ TSBPE: 13898 BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. [� ALL CHANGES MUST BE APPROVED. 1000 Buck Dobbs Rd., Aledo, Texas 76008 CC 817-374-3559 Jy NORTIER ENGINEERING CONSULTANTS LLC Final Evaluation Report for Foundation Repair Date: July 16, 2025 Attention: Structured Foundation Repair (The Client) Subject: Foundation Review 826 Wildwood Ln., Grapevine, Texas Authorization and Scone: Nortier Engineering Consultants, LLC (NEC) has been retained by the Client to perform an evaluation of the slab on grade foundation for a 2 story quadplex located at the subject address in conjunction with foundation repairs performed by the foundation repair Contractor. This report serves as confirmation that repairs have been done, provides information on the post -lift condition of the foundation, and provides our reasonable professional opinion on the repair measures taken to improve the foundation performance. This report does not take into consideration any changes to the condition of the foundation or the surrounding soils after the date the evaluation was performed. Foundation Repair Details: The Contractor installed new concrete piers to which the purpose of the installed piers is to improve the performance of the foundation by providing support at the piered locations in an effort to achieve relative levelness of the slab. The repairs performed conform to Chapter 4 of the 2021 International Building Code (IBC), as it relates to foundations and any local applicable amendments to the IBC. It is understood that absolute levelness may not be achievable after repairs. Data and Observations: NEC performed a visual evaluation of the foundation for the subject property on 7/16/2025. NEC also performed a floor survey using a Zip -level Pro-2000 series, collecting relative floor elevations, to aid in surface topography mapping of the floor(s). Elevations shown are adjusted for the type of flooring encountered to reflect a consistent measuring plane. The map of the post -lift floor elevations can be seen in the figure attached to this report. Based on the data gathered and our professional engineering opinion, the repairs performed by the Contractor have improved the foundation to be within slope tolerances generally accepted as industry standards. 1000 Buck Dobbs Rd., Aledo, Texas 76008 817-374-3559 C j CC *0NORYTIERMINEIRIN6 CONSOLTANTS LLC General Recommendations: It is recommended that a guttering system be installed if the house does not have gutters. Installing a guttering system will direct water away from the foundation and reduce the potential for ground erosion near the foundation footing. It is also recommended that the plumbing systems be checked after any repairs are made to the foundation system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure and cause leaks. It is recommended that soil grading be maintained such that the bottom portion of the foundation is below grade, as per the governing code and a watering system be utilized around the perimeter of the house. Fluctuations in moisture content of the soils near the foundation of the house can cause differential movement. If the moisture content is kept consistent, the potential for differential movement is mitigated. Furthermore, grading around the perimeter of the building should be maintained as sloping away from the foundation at a minimum of 6 inches fall within the first 10 feet from the foundation. Such grading configuration should prevent localized water accumulating around areas of the foundation. Saturated soils decline in bearing capacity and can result in differential movement of the foundation. Limitations: This report is intended for information purposes only, and the sole use of the client and/or homeowner. The scope of this report is limited to the items related to the foundation system only, and it is understood that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of this report does not include judgment on any of the superstructure, detached buildings, retaining or privacy walls, concrete reinforcement and/or site drainage. In addition, the scope of this report excludes material and soil sampling/testing procedures and as such were not performed. The report is not to be used by others for any purpose without our written consent. Compliance with any code or specification other than as expressly noted in this report is specifically excluded. It is the responsibility of any Contractor to abide by any other applicable codes or specifications. No warranty for any repairs, future foundation performance, structure, vegetation, or soils at the subject property are offered by this report, nor does this report imply any liability to NEC, nor Daneel Nortier, PE for any work to be performed as a result of this report. It is understood that soils in this area experience movement due to moisture fluctuations. Such soil movement could cause the foundation to move after the recommended repairs have been made. Any provided floor elevation data and recommended actions are based on soil conditions as they exist at the time of the evaluation. NEC does not warrant or imply that other problems may not occur in the future. No warranty, expressed or implied, is made or intended and the limit of liability shall be limited to the fee paid for this report at the time of evaluation. Report Prepared by: Nortier Engineering Consultants, LLC Texas Engineering Firm (F-16800) 7/ 16/2025 Daneel Nortier, P.E. Professional Engineer (TX#113157) S�P�E OF.TF.jll '••• '••'9dlll / A EEL ORTIER / / .... .. ....... .. / New Pier r- Stress crack SP Separation i Photograph Label 830 832 I 1.3 0.4 0.4 d, Zero Zero 0.3 SP Oft loft 20ft � � 1 AM measurements shown In decimal inches ..OF ' r, - s, ..... .............. / A EEL ORTIER j AV 07/16/25 By: TJ 826 Wildwood Ln Grapevine, Texas 828 0.5 1.7 0.5 -0.5 -0.4 A& 0.9 826 0.5 Zero 15 Zero 0.6 0.4 -0.2 0.1 rn m 0.4 0.8 c 7 0 0 0.6 a 0.7 1.0 \ 1.4 SP Poor drainage CMCC NOREIER ENGINEERING CONSULTANTS LLC 1000 Buck Dobbs Rd., Aledo, Texas 76008 817-374-3559 Date: June 19, 2025 CC 0*JNORYT1ERFNG11N11R1N6 CONSULTANTS LLC Initial Report for Foundation Assessment Attention: Structured Foundation Repair (The Client) Subject: Foundation Review 826 Wildwood Ln., Grapevine, Texas Authorization and Scove: Nortier Engineering Consultants, LLC (NEC) has been retained by the Client to perform an evaluation of the slab on grade foundation system of the 2 story quadplex with brick veneer located at the subject address referenced above. This report provides guidance as to whether or not the existing foundation system is in need of repair. The report also proposes a recommended plan if repairs are needed. Conclusions/Snecific Recommendation: NEC performed a visual evaluation of the foundation for the subject property on 6/19/2025. NEC also performed a floor survey using a Zip -level Pro-2000 series, collecting relative floor elevations, to aid in surface topography mapping of the floor(s). Elevations shown are adjusted for the type of flooring encountered to reflect a consistent measuring plane. The map of the existing floor elevations can be seen in the figure attached to this report. Based on review of the foundation, and reasonable professional engineering opinion, we've determined that movement of the foundation has occurred and should be repaired. Although complete levelness cannot be guaranteed, or may not be attainable, the proposed plan should improve the performance of the foundation. It is recommended that twenty-one (21) piers be installed and polyurethane foam be injected as indicated on the figure(s) attached to this report. Locations of internal piers [if needed] are intended to be approximate. The Contractor should locate the beams and place internal piers accordingly. r p o s oundation repairs shall meet or exceed Chapter 4 of the 2021 International Residential Code (IRC), 0 it relates to foundations and any local applicable amendments to the IRC. REVISE TO BE IN ACCORDANC WITH THE 2021 I.B.C. This report is solely based on information gathered during our site visit on 6/19/2025, and does not take into consideration any changes in condition of the foundation or soils after the date which the information was gathered. RECEIVED_ 6/19/2025 25-002421 "WILDWOOD TERRACE APT" 826 WILDWOOD TERRACE FOUNDATION REPAIR (4-UNIT APT BLDG) 1000 Buck Dobbs Rd., Aledo, Texas 76008 817-374-3559 CC C*JNORYT1ERFNG11N11R1N6 CONSULTANTS LLC General Recommendations: It is recommended that a guttering system be installed if the house does not have gutters. Installing a guttering system will direct water away from the foundation and reduce the potential for ground erosion near the foundation footing. It is also recommended that the plumbing systems be checked after any repairs are made to the foundation system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure and cause leaks. It is recommended that soil grading be maintained such that the bottom portion of the foundation is below grade, as per the governing code and a watering system be utilized around the perimeter of the house. Fluctuations in moisture content of the soils near the foundation of the house can cause differential movement. If the moisture content is kept consistent, the potential for differential movement is mitigated. Furthermore, grading around the perimeter of the building should be maintained as sloping away from the foundation at a minimum of 6 inches fall within the first 10 feet from the foundation. Such grading configuration should prevent localized water accumulating around areas of the foundation. Saturated soils decline in bearing capacity and can result in differential movement of the foundation. Limitations: This report is intended for information purposes only, and the sole use of the client and/or homeowner. The scope of this report is limited to the items related to the foundation system only, and it is understood that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of this report does not include judgment on any of the superstructure, detached buildings, retaining or privacy walls, concrete reinforcement and/or site drainage. In addition, the scope of this report excludes material and soil sampling/testing procedures and as such were not performed. The report is not to be used by others for any purpose without our written consent. Compliance with any code or specification other than as expressly noted in this report is specifically excluded. It is the responsibility of any Contractor to abide by any other applicable codes or specifications. No warranty for any repairs, future foundation performance, structure, vegetation, or soils at the subject property are offered by this report, nor does this report imply any liability to NEC, nor Daneel Nortier, PE for any work to be performed as a result of this report. It is understood that soils in this area experience movement due to moisture fluctuations. Such soil movement could cause the foundation to move after the recommended repairs have been made. Any provided floor elevation data and recommended actions are based on soil conditions as they exist at the time of the evaluation. NEC does not warrant or imply that other problems may not occur in the future. No warranty, expressed or implied, is made or intended and the limit of liability shall be limited to the fee paid for this report at the time of evaluation. Report Prepared by: Nortier Engineering Consultants, LLC Texas Engineering Firm (F-16800) 6/ 19/2025 Daneel Nortier, P.E. Professional Engineer (TX#113157) OF•?-4 ftf / A EEL ORTIER / / ..... ............ i 832 0.8 0.9 Polyurethane Foam Injection Minimal New pier r- Stress crack SP Separation i Photograph Label Oft loft 20ft � � 1 All measurements shown In decimal inches ..OF ' r, - s, ..... .............. / A EEL ORTIER j AV 06/19/25 By: DN 830 1.4 1.0 826 Wildwood Ln Grapevine, Texas 828 1.0 0.7 826 0.5 0.2 m rn m c -0.7 Zero o • o_ Zero 0.0 -0.5 rn m 0.1 0.3 c 7 0 0 -0.5 0- 0.1 / 1.0 \ 1.5 SP Poor drainage CJV :C NOREIER ENGINEERING CON5NL1ANi3 11C Slab Foundation NOTES: 1) Piles shall be driven to refusal 2) Foundations supporting a 2 story building shall be supported with double piers as shown, however, a single pier may be used if spacing does not exceed 6'-0" b Reinforcing steel rebar T i 1/21/24 Precast Concrete Piling Detail Diagram Not to scale ing Nock long Precast Concrete Cylinder. A) Single Pier for 1 Story B) Double Pier for 2 Story For normal spacing (See notes for additional information) CC C*JMORYVEREN61NEIRING CONSULTANTS LLC