Loading...
HomeMy WebLinkAboutMFA2025-002926Marquis a t Silver Oaks AparbrieR(9 a SaWeft Gtoup, tncorpomted AIMACS Tits SurveMs a w e } yJ 4 f8 s z p r 1 i L a t F s s W ,y, ^ �i 6 41 �S..h--_ � Y •� � ---•.� --_ ._._ r ]--_ _ ,*�"[-ems i �_ - - -.- --_ � � � � - a _ (( 1- -- .SL T= - - Mi.` �ld,'4t -m f ni -6n. - `4, _ - _. i^,-` _ _`_ - �Sr _ it r. �rart e i � t a E - p.: E^',^.t}y."+}�rryr��bt:=::s-t...:�,,:�.�,�,.�..,�.=.��.-v-s- 25 25-002925 MARQUIS AT LAKESIDE" ` 3701 GRAPEVINE MILLS PKWY r, CONCRETE REPAIR PARKING LOT ..c 5. _ >F - dYsrtvi JOW .'>.`' a _> _�_ _ - -> -ONF -x- Marqws at S'lver Oaks Apartments ci 0-1 -- ---------- RECEIVED� 7/29,2025 25-002926 "MARQUIS AT LAKESIDE" 3701 GRAPEVINE MILLS PKWY CONCRETE REPAIR PARKING LOT RECEIVED 7Q9!2025 25-002926 "MARQUIS AT LAKESIDE" 3701 GRAPEVINE MILLS PKWY CONCRETE REPAIR PARKING LOT Project Name: Marquis at Silver Oaks Concrete Repairs Project Address: 3701 Grapevine Mills Parkway, Grapevine, TX 76051 Type of Work: Concrete Repairs — Drive Lanes and Curbs Prepared For: City of Grapevine/ Permitting Department Prepared By: 360 Apartment Renovations Date: 7-2;-2025 Project Summary: This scope covers concrete pavement and curb repairs throughout the property. Work includes Z' demolition, preparation, reinforcement, new concrete placement, and striping. All repairs will conform to standard construction practices and city permit requirements. uMEM2zMM= • Total Repair Area: Approximately 3,108 square feet • Total Locations: 7 designated areas • Curb Replacement: Approximately 14 linear feet across 3 locations 1. Site Preparation & Demolition • Saw cut all damaged concrete to create clean, uniform edges. • Remove all broken concrete and dispose of off -site. a Tm�kECEIVED. 7729,12025 . W 25-002926 '11ARQUIS AT LAKESIDE" 3701 GRAPEVINE MILLS PKVVY CONCRETE REPAIR PARKING LOT �MCNDAY SATUPDAVY CN-Y jND WCRK NERMHTTED O'b" S UNC,"'Y I AILL CHANGES PREOU�IE MIPPUVAL OF FiEklSEC, P' 8 1 7� 410, 331 Re -compact and level the existing sub -base where needed to ensure proper load -bearing support. • Drill and epoxy dowels into adjacent vertical concrete surfaces for slab continuity. • Install #4 rebar on 16" centers. supported with rebar chairs to maintain elevation during pour. Aust be 4L�C) 10 '�l 3. Concrete Placement • Pour new concrete in drive lane areas to a ininitnuin depth of 811, usi 2 3,500 PSI readv-inix concrete. • t T se ionns, where needed to shape curbs and pavenient edges. • Apply trowel finish followed by light broom finish for slip resistance and surface consistelicv. ? P ,­- "1 A 11D,V_ Ig 1( • Remove and replace approximately 14 linear feet of damaged concrete curb. • Match existing curb profile and tie into adjacent sections for a seamless finish. 5. Finishing & Striping • Striping will be reapplied to match existing layout, rising traffic -grade paint. • All work areas will be cleaned of debris and opened for use after adequate curing, time. zr