David, the reaction point of the joist is at the vertical peg. If the rqd end anchorage welds can be achieved in that
area of the seat, the gap is acceptable. Otherwise, a shim plate can be used if necessary.
Hope, AR • newmill.com
LLOYD SMITH, P.E.
Design Engineer
Direct: 870.722.4273
From: Watson, David <David.Watson@newmill.com>
Sent: Friday, October 18, 2024 11:32 AM
To: Smith, Lloyd <Lloyd.Smith@newmill.com>
Cc: Higginbotham, Barry <Barry.Higginbotham@newmill.com>; Burton, Alex <alex.burton@newmill.com>
Subject: FW: Joist seat issue 7124-0100
Lloyd, See below.
Hope, AR • newmill.com
DAVID WATSON
Customer Service Representative
Direct: 870.722.4105
From: Reeves, Chris <chris.reeves@newmill.com>
Sent: Friday, October 18, 2024 11:17 AM
To: Watson, David <David.Watson@newmill.com>
Cc: driddle@wrightengineers.com; Ray McGrew <rmcgrew@mwbuilders.com>
Subject: Fwd: Joist seat issue
2
Watson see below and attached.
Chris Reeves
972-921-0237
Hope, AR • newmill.com
CHRIS REEVES
District Sales Manager
Serving: North Texas
Direct: 972.921.0237
Begin forwarded message:
From: David Riddle <driddle@wrightengineers.com>
Date: October 18, 2024 at 12:10:29 PM EDT
To: "Reeves, Chris" <chris.reeves@newmill.com>
Subject: Joist seat issue
Chris,
We have an issue on one of your projects with joist seats not bearing flat on the bearing angle. This
issue is occurring at all of the joists along the dock side and it appears the joist is only barely
touching at the end.
Your Job number is 7124-0100.
See pictures below.
Have you seen this before? And if so, is the fix to just put a shim plate underneath?
3
4
David Riddle P.E., S.E.
Director at Wright Engineers
8505 Freeport Parkway Suite 525, Irving, TX 75063
972.426.8600, x6012
driddle@wrightengineers.com
Structural engineers licensed in all 50 states
1
Sam Dobbins
From:Sam Dobbins
Sent:Thursday, February 20, 2025 11:20 AM
To:Christopher Lalic
Cc:Austin Shepherd; Jeremy Huffman; Jonathan Proffitt; Lance Flores; Ray McGrew
Subject:FW: [EXTERNAL] RE: 121 Commerce Center - Threaded Rod
Chris,
Please see below in response to the 1” vs ¾” threaded rod condition noted in your report. In addition, the
anchor bolt washers have been replaced with the correct sizes. This should clear up all open items
needed for our final inspection.
Thanks,
SAM DOBBINS
Senior Project Engineer
CERRIS BUILDERS
5633 W Spring Creek Parkway, Suite 200
Plano, TX 75024
O: 469.808.7512 C: 940.531.8286
CERRISBUILDERS.COM
Formerly MW Builders. To learn more, visit here.
From: David Riddle <driddle@wrightengineers.com>
Sent: Thursday, February 20, 2025 11:13 AM
To: Sam Dobbins <sdobbins@cerris.com>
Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Jonathan Proffitt
jproffitt@cerris.com>; Lance Flores <lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com>
Subject: [EXTERNAL] RE: 121 Commerce Center - Threaded Rod
Sam,
The connection is acceptable
David Riddle P.E., S.E.
Director at Wright Engineers
8505 Freeport Parkway Suite 525, Irving, TX 75063
972.426.8600, x6012
driddle@wrightengineers.com
Structural engineers licensed in all 50 states
From: Sam Dobbins <sdobbins@cerris.com>
Sent: Thursday, February 20, 2025 8:09 AM
To: David Riddle <driddle@wrightengineers.com>
Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Jonathan Proffitt
2
jproffitt@cerris.com>; Lance Flores <lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com>
Subject: FW: 121 Commerce Center - Threaded Rod
David,
I wanted to bring this back to the top of your inbox now that you are back from PTO. We replaced the
elecone washers, so this is the final item that we need to get cleared up for our final inspection.
Thanks,
SAM DOBBINS
Senior Project Engineer
CERRIS BUILDERS
5633 W Spring Creek Parkway, Suite 200
Plano, TX 75024
O: 469.808.7512 C: 940.531.8286
CERRISBUILDERS.COM
Formerly MW Builders. To learn more, visit here.
From: Sam Dobbins
Sent: Thursday, February 13, 2025 4:18 PM
To: driddle@wrightengineers.com
Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; 'Jonathan Proffitt'
jproffitt@mwbuilders.com>; Lance Flores <lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com>
Subject: 121 Commerce Center - Threaded Rod
David,
During the structural steel inspection, it was noted that a ¾” threaded rod was used instead of a 1” as
noted in detail 206 on attached sheet S5.01. Due to the placement of the joist seat, the erector used a ¾”
threaded rod to avoid blowing out the edge of the panel. Please advise if this is acceptable or if this will
need to be replaced with a 1” threaded rod.
Thanks,
SAM DOBBINS
Senior Project Engineer
CERRIS BUILDERS
5633 W Spring Creek Parkway, Suite 200
Plano, TX 75024
O: 469.808.7512 C: 940.531.8286
CERRISBUILDERS.COM
Formerly MW Builders. To learn more, visit here.
1
Sam Dobbins
From:Sam Dobbins
Sent:Monday, February 3, 2025 3:11 PM
To:Christopher Lalic
Cc:Austin Shepherd; Jeremy Huffman; Jonathan Proffitt; Lance Flores; Ray McGrew
Subject:FW: [EXTERNAL] RE: 121 Commerce Center - Structural Steel Inspection Follow Up
Chris,
Please see below from the structural engineer approving the edge angle to be installed without the
slotted holes.
Thanks,
SAM DOBBINS
Senior Project Engineer
CERRIS BUILDERS
5633 W Spring Creek Parkway, Suite 200
Plano, TX 75024
O: 469.808.7512 C: 940.531.8286
CERRISBUILDERS.COM
Formerly MW Builders. To learn more, visit here.
From: David Riddle <driddle@wrightengineers.com>
Sent: Monday, February 3, 2025 3:09 PM
To: Sam Dobbins <sdobbins@cerris.com>
Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Lance Flores
lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com>; Jonathan Proffitt <jproffitt@cerris.com>
Subject: [EXTERNAL] RE: 121 Commerce Center - Structural Steel Inspection Follow Up
Sam,
Item #1 is acceptable without the slots.
David Riddle P.E., S.E.
Director at Wright Engineers
8505 Freeport Parkway Suite 525, Irving, TX 75063
972.426.8600, x6012
driddle@wrightengineers.com
Structural engineers licensed in all 50 states
From: David Riddle
Sent: Thursday, January 30, 2025 10:10 AM
To: Sam Dobbins <sdobbins@cerris.com>
Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Lance Flores
2
lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com>; Jonathan Proffitt <jproffitt@cerris.com>
Subject: RE: 121 Commerce Center - Structural Steel Inspection Follow Up
Sam,
I am still working on item 1 the expansion joint slotted holes.
Item 2 welded connection is acceptable in lieu of bolted.
From: Sam Dobbins <sdobbins@cerris.com>
Sent: Wednesday, January 29, 2025 3:53 PM
To: David Riddle <driddle@wrightengineers.com>
Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Lance Flores
lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com>; Jonathan Proffitt <jproffitt@cerris.com>
Subject: Re: 121 Commerce Center - Structural Steel Inspection Follow Up
David,
Have you had a chance to review these items? We would like to get the loop closed on so that we can
finalize our inspection.
Thanks,
SAM DOBBINS
Senior Project Engineer
CERRIS BUILDERS
5633 W Spring Creek Parkway, Suite 200
Plano, TX 75024
O: 469.808.7512 C: 940.531.8286
CERRISBUILDERS.COM
Formerly MW Builders. To learn more, visit here.
From: Sam Dobbins
Sent: Monday, January 27, 2025 9:42:13 AM
To: driddle@wrightengineers.com <driddle@wrightengineers.com>
Cc: Austin Shepherd <AShepherd@cerris.com>; Jeremy Huffman <jhuffman@cerris.com>; Jonathan Proffitt
jproffitt@mwbuilders.com>; Lance Flores <lflores@cerris.com>; Ray McGrew <rmcgrew@cerris.com>
Subject: 121 Commerce Center - Structural Steel Inspection Follow Up
David,
Following up on our phone call, the inspector brought up two items during his last inspection that we
need approval on for him to sign off.
The deck edge angle at the expansion joints on the West side was presumably installed without
slotted holes. During a previous inspection, a different inspector had signed off on all the
overhead steel but did not document the inspection in a report. During the following inspection, a
separate inspector noted the issue with the slotted holes after the roofing was complete. The
condition was able to be fixed on the East side, but the edge angle is inaccessible without tearing
3
out roofing on the West side. Please advise if the current condition of the edge angle on the West
side is acceptable or if roofing will need to be pulled back to fix this item.
On sheet S5.02/234 the angle connecting the column to the panel embed shows to be bolted to
the column. The hole location in the column provided by the manufacturer was incorrect. To
remedy this, the erector welded the angle to the column in lieu of bolting. Please advise if this is
acceptable.
Thanks,
SAM DOBBINS
Senior Project Engineer
CERRIS BUILDERS
5633 W Spring Creek Parkway, Suite 200
Plano, TX 75024
O: 469.808.7512 C: 940.531.8286
CERRISBUILDERS.COM
Formerly MW Builders. To learn more, visit here.
1
Sam Dobbins
From:Sam Dobbins
Sent:Friday, October 18, 2024 2:53 PM
To:Christopher Lalic
Cc:bryanthernandez536@yahoo.com; Bryan Collins; Ronald Yeoman; Ronnie
Yeoman/Alpha Testing, LLC; Austin Shepherd; Jeremy Huffman; Jonathan Proffitt; Lance
Flores; Ray McGrew
Subject:121 Commerce Center
Attachments:RFI #33 - Response.pdf; Joist Drawings.pdf
Chris,
Please see the attached RFI response for the gap in the joist to joist seat connection on the dock side of the
building. Per the engineer and joist manufacturers response as long as they are able to get the required 2.5” of
weld the gap is not an issue.
Thanks,
SAM DOBBINS
Senior Project Engineer
CERRIS BUILDERS
5633 W Spring Creek Parkway, Suite 200
Plano, TX 75024
O: 469.808.7512 C: 940.531.8286
CERRISBUILDERS.COM
Formerly MW Builders. To learn more, visit here.
Backscatter
FG
FGBackscatter3
Date of Asphalt Placement:
Asphalt Temperature (°F):
Ambient Temperature (°F):
93
94
FG
Wet
Density
pcf)
94
Station 14+75
Test Location
Station 15+00
New York, NY 10019
Station 10+50
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Asphalt Nuclear Density
Test Report
153.9
Probe Depth
in.) or
Backscatter
1
Off Genesis Way and Enchanted Way
Work Order Number:
Pavecon
Pavecon
Type B
Max PCF:
Contractor:
Supplier:
Service Date:
92
97
Client:
8/26/2024
Page Number:Grapevine, Texas
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
Project Number:
08/16/2024
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Clear
1443504
Guerrero, Victor
1 of
Technician:
F241078
General Information
Mix Type:
FG
1
Area:S.H Frontage Road- Drive 1; Decel/Turn Lane
Station 10+25
General Location
Field Test Data
Test
No.
N/A
8/16/2024
Minimum Compaction (%):163.5
Lift
4 153.5 94
Station 14+50
Station 9+75 94Backscatter
153.8Backscatter
Remarks:
121 Commerce Center Addition (Lot 1)
Percent
Compaction
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
This report is in general compliance with one or more of the following technical standards: TEX-207-F(08), TEX-227-F(08), D2950-11
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Respectfully Submitted,
6 152.9
BackscatterFG
8
2 152.8Backscatter
153.3
5
Explorer2Model:
Station 10+50
Standard Count:Manufacturer:
BackscatterFGStation10+00
BackscatterFGStation9+00
FGStation14+00
BackscatterFG
153.1
Station 13+75 94
Station 14+25 BackscatterFG
FG
FG
Backscatter
9
Station 13+50
Station 13+25
S.H Frontage Road- Drive 2; Decel/Turn Lane
FG
7 152.5 93
93152.7Backscatter
94
11 153.3
10
13
Backscatter
BackscatterStation9+50
153.9BackscatterFG
153.3 94
94
12
94
153.5Station9+25 BackscatterFG
FG
15
94152.917
Station 8+7516 153.2 94
152.7 93
153.0
Non-compliant results are indicated by an asterisk(*) if applicable.Gauge Information
4884SerialNo.:(M):Instrotek 658(D):2547
BackscatterFG
94
14 94
Inclement weather
Weather:
Scheduled
Service:
A UES engineering representative traveled to the above referenced project to observe ongoing work and perform field services as scheduled.
Area of Work:
of 1
Reason for
Cancellation:
Upon notification of the cancellation, the engineering representative returned to the Fort Worth Office.
Time
Notified:
Grapevine, Texas Page Number:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Cancellation Report
Off Genesis Way and Enchanted Way
Overcast
7/31/2024
Client:
Project:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, New York 10019
7/23/2024
121 Commerce Center Addition (Lot 1)
Service Date:
Report Date:
1427899WorkOrderNumber:
Ronnie Yeoman
Project Manager
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
1
Project Number:F241078
8:30 AM
Technician:Reyes, Ruben
Drilled Piers
Building Pad
Remarks:
UES / Riner Engineering
Contractor was not ready
Weather:
Scheduled
Service:
A UES engineering representative traveled to the above referenced project to observe ongoing work and perform field services as scheduled.
Area of Work:
of 1
Clear
7/31/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Cancellation Report
Grapevine, Texas Page Number:
Ronnie Yeoman
Project Manager
Respectfully Submitted,
1
Reason for
Cancellation:
Upon notification of the cancellation, the engineering representative returned to the Fort Worth Office.
Client:
Project:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
07/23/2024
121 Commerce Center Addition (Lot 1)
Service Date:
Report Date:
1428537WorkOrderNumber:
UES / Riner Engineering
Remarks:
Project Number:F241078
5:55 AM
Technician:Nsikidi, Kiala
Concrete Testing
Slab-on-Grade
Off Genesis Way and Enchanted Way
Time
Notified:
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH AND EAST OF BUILDING 1
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1440843-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/13/2024
Time Placed:N/A
5.5
2.5
84
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:952
Delivery Ticket No.:76870703
147.5
Batch Time:8:17:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:390' S AND 120' E FROM THE NE BUILDING CORNER
PM:RONNIE YEOMAN
Date Issued:10/08/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
430 8/20/2024 7 3103012.562470LABC-1231 8.00 N/A 4.003
431 9/10/2024 28 5227012.564160LABC-1231 8.00 N/A 4.002
432 9/10/2024 28 5145012.564100LABC-1231 8.00 N/A 4.003
433 9/10/2024 28 5038012.564010LABC-1231 8.00 N/A 4.002
434 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4090
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589091
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 2
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH AND EAST OF BUILDING 1
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1440843-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/13/2024
Time Placed:10:30 AM
5.5
2.5
88
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:952
Delivery Ticket No.:91650693
147
Batch Time:9:39:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:360' N AND 100' E FROM THE SE BUILDING CORNER
PM:RONNIE YEOMAN
Date Issued:10/08/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
435 8/20/2024 7 4378012.563490LABC-1231 8.00 N/A 4.003
436 9/10/2024 28 5189012.564130LABC-1231 8.00 N/A 4.002
437 9/10/2024 28 5085012.564050LABC-1231 8.00 N/A 4.002
438 9/10/2024 28 5259012.564190LABC-1231 8.00 N/A 4.002
439 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4120
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589092
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 2
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH AND EAST OF BUILDING 1
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1440843-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/13/2024
Time Placed:5:10 AM
4
5
90
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:952
Delivery Ticket No.:91650646
143.2
Batch Time:4:24:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:40' N AND 120' W OF THE NE BUILDING CORNER
PM:RONNIE YEOMAN
Date Issued:09/10/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
415 8/20/2024 7 5408012.564310LABC-1231 8.00 N/A 4.002
416 9/10/2024 28 6696012.565330LABC-1231 8.00 N/A 4.002
417 9/10/2024 28 6838012.565440LABC-1231 8.00 N/A 4.002
418 9/10/2024 28 6949012.565530LABC-1231 8.00 N/A 4.002
419 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5430
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589088
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH AND EAST OF BUILDING 1
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1440843-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/13/2024
Time Placed:6:30 AM
4
4.5
80
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:952
Delivery Ticket No.:91650660
145
Batch Time:5:57:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:45' N AND 30' E FROM THE NE BUILDING CORNER
PM:RONNIE YEOMAN
Date Issued:09/10/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
420 8/20/2024 7 4455012.563550LABC-1231 8.00 N/A 4.002
421 9/10/2024 28 5224012.564160LABC-1231 8.00 N/A 4.003
422 9/10/2024 28 5458012.564350LABC-1231 8.00 N/A 4.002
423 9/10/2024 28 5275012.564200LABC-1231 8.00 N/A 4.002
424 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4240
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589089
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH AND EAST OF BUILDING 1
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1440843-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/13/2024
Time Placed:8:00 AM
5.5
4.5
82
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:952
Delivery Ticket No.:76870687
146.5
Batch Time:7:18:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:90' S AND 120' E FROM THE NE BUILDING CORNER
PM:RONNIE YEOMAN
Date Issued:09/10/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
425 8/20/2024 7 4331012.563450LABC-1231 8.00 N/A 4.001
426 9/10/2024 28 5471012.564360LABC-1231 8.00 N/A 4.002
427 9/10/2024 28 5081012.564050LABC-1231 8.00 N/A 4.002
428 9/10/2024 28 5164012.564110LABC-1231 8.00 N/A 4.002
429 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4170
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589090
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH AND EAST OF BUILDING 1
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1440843-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/13/2024
Time Placed:N/A
5.5
2.5
84
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:952
Delivery Ticket No.:76870703
147.5
Batch Time:8:17:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:390' S AND 120' E FROM THE NE BUILDING CORNER
PM:RONNIE YEOMAN
Date Issued:09/10/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
430 8/20/2024 7 3103012.562470LABC-1231 8.00 N/A 4.003
431 9/10/2024 28 5227012.564160LABC-1231 8.00 N/A 4.002
432 9/10/2024 28 5145012.564100LABC-1231 8.00 N/A 4.003
433 9/10/2024 28 5038012.564010LABC-1231 8.00 N/A 4.002
434 10/8/2024 56 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4090
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589091
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH AND EAST OF BUILDING 1
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1440843-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/13/2024
Time Placed:10:30 AM
5.5
2.5
88
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:952
Delivery Ticket No.:91650693
147
Batch Time:9:39:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:360' N AND 100' E FROM THE SE BUILDING CORNER
PM:RONNIE YEOMAN
Date Issued:09/10/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
435 8/20/2024 7 4378012.563490LABC-1231 8.00 N/A 4.003
436 9/10/2024 28 5189012.564130LABC-1231 8.00 N/A 4.002
437 9/10/2024 28 5085012.564050LABC-1231 8.00 N/A 4.002
438 9/10/2024 28 5259012.564190LABC-1231 8.00 N/A 4.002
439 10/8/2024 56 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4120
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589092
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 5 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:5:50 AM
7.00
3.5
82
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650820
145
Batch Time:4:50:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:TOP LEFT QUAD. SOUTH ENTRANCE
PM:RONNIE YEOMAN
Date Issued:10/11/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:5409
475 8/23/2024 7 8229028.272910LABC-1231 12.00 N/A 6.002
476 9/13/2024 28 11526028.274080LABC-1231 12.00 N/A 6.002
477 9/13/2024 28 11700028.274140LABC-1231 12.00 N/A 6.002
478 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4110
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589964
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:7:40 AM
7.00
3.5
82
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650840
145
Batch Time:6:42:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:140'N OF S END APPROACH, 20'SW OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:10/11/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
483 8/23/2024 7 8011028.272830LABC-1231 12.00 N/A 6.002
484 9/13/2024 28 11409028.274040LABC-1231 12.00 N/A 6.003
485 9/13/2024 28 11502028.274070LABC-1231 12.00 N/A 6.002
486 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4060
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589966
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:9:00 AM
6.50
3.5
95
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650855
144
Batch Time:8:34:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:120'N, 70'W OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:10/11/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
487 8/23/2024 7 5995028.272120LABC-1231 12.00 N/A 6.002
488 9/13/2024 28 11495028.274070LABC-1231 12.00 N/A 6.003
489 9/13/2024 28 11505028.274070LABC-1231 12.00 N/A 6.002
490 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4070
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589967
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:10:00 AM
7.25
3.7
89
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650858
145
Batch Time:8:56:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:250'N, 50'W OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:10/11/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
491 8/23/2024 7 6038028.272140LABC-1231 12.00 N/A 6.002
492 9/13/2024 28 11633028.274110LABC-1231 12.00 N/A 6.002
493 9/13/2024 28 11529028.274080LABC-1231 12.00 N/A 6.003
494 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4100
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589968
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S6
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:11:20 AM
7.00
3.5
94
96
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650867
145
Batch Time:10:12:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:68'W OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:10/11/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
495 8/23/2024 7 5837028.272060LABC-1231 12.00 N/A 6.002
496 9/13/2024 28 11862028.274200LABC-1231 12.00 N/A 6.002
497 9/13/2024 28 11655028.274120LABC-1231 12.00 N/A 6.003
498 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4160
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589969
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 5 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:5:50 AM
7.00
3.5
82
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650820
145
Batch Time:4:50:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:TOP LEFT QUAD. SOUTH ENTRANCE
PM:RONNIE YEOMAN
Date Issued:09/17/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:5409
475 8/23/2024 7 8229028.272910LABC-1231 12.00 N/A 6.002
476 9/13/2024 28 11526028.274080LABC-1231 12.00 N/A 6.002
477 9/13/2024 28 11700028.274140LABC-1231 12.00 N/A 6.002
478 10/11/2024 56 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4110
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589964
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:6:45 AM
7.00
3.3
82
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650832
145
Batch Time:6:07:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:30'N OF S END APPROACH, 100'W OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:09/14/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
479 8/23/2024 7 8697028.273080LABC-1231 12.00 N/A 6.002
480 9/13/2024 28 12165028.274300LABC-1231 12.00 N/A 6.003
481 9/13/2024 28 12620028.274460LABC-1231 12.00 N/A 6.002
482 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4380
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589965
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:7:40 AM
7.00
3.5
82
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650840
145
Batch Time:6:42:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:140'N OF S END APPROACH, 20'SW OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:09/17/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
483 8/23/2024 7 8011028.272830LABC-1231 12.00 N/A 6.002
484 9/13/2024 28 11409028.274040LABC-1231 12.00 N/A 6.003
485 9/13/2024 28 11502028.274070LABC-1231 12.00 N/A 6.002
486 10/11/2024 56 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4060
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589966
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:9:00 AM
6.50
3.5
95
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650855
144
Batch Time:8:34:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:120'N, 70'W OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:09/17/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
487 8/23/2024 7 5995028.272120LABC-1231 12.00 N/A 6.002
488 9/13/2024 28 11495028.274070LABC-1231 12.00 N/A 6.003
489 9/13/2024 28 11505028.274070LABC-1231 12.00 N/A 6.002
490 10/11/2024 56 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4070
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589967
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:10:00 AM
7.25
3.7
89
95
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650858
145
Batch Time:8:56:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:250'N, 50'W OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:09/17/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
491 8/23/2024 7 6038028.272140LABC-1231 12.00 N/A 6.002
492 9/13/2024 28 11633028.274110LABC-1231 12.00 N/A 6.002
493 9/13/2024 28 11529028.274080LABC-1231 12.00 N/A 6.003
494 10/11/2024 56 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4100
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589968
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 5 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PARKING LOT, E SIDE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1442397-S6
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/16/2024
Time Placed:11:20 AM
7.00
3.5
94
96
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91650867
145
Batch Time:10:12:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:68'W OF ENCHANTMENT
PM:RONNIE YEOMAN
Date Issued:09/14/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
495 8/23/2024 7 5837028.272060LABC-1231 12.00 N/A 6.002
496 9/13/2024 28 11862028.274200LABC-1231 12.00 N/A 6.002
497 9/13/2024 28 11655028.274120LABC-1231 12.00 N/A 6.003
498 10/11/2024 56 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4160
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 589969
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 6 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:6:00 AM
5.00
4.0
83
91
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650896
147.6
Batch Time:5:17:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:150'N 20'W OF SE CORNER
PM:RONNIE YEOMAN
Date Issued:10/15/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
509 8/27/2024 7 3174012.562530LABC-1231 8.00 N/A 4.005
510 9/17/2024 28 5257012.564190LABC-1231 8.00 N/A 4.002
511 9/17/2024 28 5393012.564290LABC-1231 8.00 N/A 4.002
512 9/17/2024 28 5297012.564220LABC-1231 8.00 N/A 4.002
513 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4230
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590410
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:8:03 AM
4.50
4.0
88
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650912
147.4
Batch Time:7:15:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:30'N 10'W OF SE CORNER
PM:RONNIE YEOMAN
Date Issued:10/15/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
519 8/27/2024 7 3213012.562560LABC-1231 8.00 N/A 4.003
520 9/17/2024 28 5302012.564220LABC-1231 8.00 N/A 4.003
521 9/17/2024 28 5238012.564170LABC-1231 8.00 N/A 4.003
522 9/17/2024 28 5155012.564100LABC-1231 8.00 N/A 4.003
523 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4160
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590412
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:8:43 AM
5.00
4.3
87
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650918
147.1
Batch Time:7:53:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:APPROACH 20'S OF NE CORNER
PM:RONNIE YEOMAN
Date Issued:10/15/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
524 8/27/2024 7 3103012.562470LABC-1231 8.00 N/A 4.003
525 9/17/2024 28 5080012.564040LABC-1231 8.00 N/A 4.002
526 9/17/2024 28 5107012.564070LABC-1231 8.00 N/A 4.002
527 9/17/2024 28 5269012.564200LABC-1231 8.00 N/A 4.003
528 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4100
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590413
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:5:04 AM
1.50
3.5
94
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650894
147.2
Batch Time:4:34:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:200'N 50'W OF SE CORNER
PM:RONNIE YEOMAN
Date Issued:09/19/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
504 8/27/2024 7 3341012.562660LABC-1231 8.00 N/A 4.003
505 9/17/2024 28 7523012.565990LABC-1231 8.00 N/A 4.002
506 9/17/2024 28 7058012.565620LABC-1231 8.00 N/A 4.002
507 9/17/2024 28 7144012.565690LABC-1231 8.00 N/A 4.003
508 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5770
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590409
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:5:04 AM
1.50
3.5
94
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650894
147.2
Batch Time:4:34:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:200'N 50'W OF SE CORNER
PM:RONNIE YEOMAN
Date Issued:09/09/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
504 8/27/2024 7 3341012.562660LABC-1231 8.00 N/A 4.003
505 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
506 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
507 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
508 10/15/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590409
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:6:00 AM
5.00
4.0
83
91
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650896
147.6
Batch Time:5:17:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:150'N 20'W OF SE CORNER
PM:RONNIE YEOMAN
Date Issued:09/09/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
509 8/27/2024 7 3174012.562530LABC-1231 8.00 N/A 4.005
510 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
511 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
512 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
513 10/15/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590410
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:7:00 AM
4.00
4.1
85
92
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:76870755
147.4
Batch Time:6:17:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:75'N 35'W OF SE CORNER
PM:RONNIE YEOMAN
Date Issued:08/27/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
514 8/27/2024 7 4643012.563700LABC-1231 8.00 N/A 4.002
515 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
516 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
517 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
518 10/15/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590411
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:8:03 AM
4.50
4.0
88
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650912
147.4
Batch Time:7:15:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:30'N 10'W OF SE CORNER
PM:RONNIE YEOMAN
Date Issued:08/27/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
519 8/27/2024 7 3213012.562560LABC-1231 8.00 N/A 4.003
520 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
521 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
522 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
523 10/15/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590412
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:8:43 AM
5.00
4.3
87
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650918
147.1
Batch Time:7:53:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:APPROACH 20'S OF NE CORNER
PM:RONNIE YEOMAN
Date Issued:08/27/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
524 8/27/2024 7 3103012.562470LABC-1231 8.00 N/A 4.003
525 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
526 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
527 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
528 10/15/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590413
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 5 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1444436-S6
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/20/2024
Time Placed:11:00 AM
5.50
4.5
99
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91650927
147.4
Batch Time:10:12:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:APPROACH 20'N OF THE SE CORNER
PM:RONNIE YEOMAN
Date Issued:08/27/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
529 8/27/2024 7 3754012.562990LABC-1231 8.00 N/A 4.003
530 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
531 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
532 9/17/2024 28 012.560LABC-1231 8.00 N/A 4.00
533 10/15/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 590414
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 6 of 6
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH EAST SECTION OF PARKING LOT, POUR 4
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1447501-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/26/2024
Time Placed:8:30 AM
5
4
84
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:91490544
141.2
Batch Time:7:18:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:140'N 30'E OF SW CORNER OF POUR 4
PM:RONNIE YEOMAN
Date Issued:09/23/2024
Specified Strength:4000
Results Specification
3-5
3-6
N/A
35-90
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
599 9/2/2024 7 3840012.563060LABC-1231 8.00 N/A 4.002
600 9/23/2024 28 4879012.563880LABC-1231 8.00 N/A 4.003
601 9/23/2024 28 4919012.563920LABC-1231 8.00 N/A 4.003
602 9/23/2024 28 4968012.563960LABC-1231 8.00 N/A 4.003
603 10/21/2024 56 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is NOT compliant with project specifications
CC:
3920
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 591462
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH EAST SECTION OF PARKING LOT, POUR 4
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1447501-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/26/2024
Time Placed:7:20 AM
6
5.5
84
92
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:91490535
140.4
Batch Time:6:32:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:100'N 25'E OF SW CORNER OF POUR 4
PM:RONNIE YEOMAN
Date Issued:10/21/2024
Specified Strength:4000
Results Specification
3-5
3-6
N/A
35-90
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
594 9/2/2024 7 3900012.563110LABC-1231 8.00 N/A 4.002
595 9/23/2024 28 4994012.563980LABC-1231 8.00 N/A 4.003
596 9/23/2024 28 5113012.564070LABC-1231 8.00 N/A 4.002
597 9/23/2024 28 5082012.564050LABC-1231 8.00 N/A 4.003
598 10/21/2024 56 5418012.564310LABC-1231 8.00 N/A 4.002
Average 28-day Compressive Strength is compliant with project specifications
CC:
4030
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 591461
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 2
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH EAST SECTION OF PARKING LOT, POUR 4
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1447501-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/26/2024
Time Placed:8:30 AM
5
4
84
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:91490544
141.2
Batch Time:7:18:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:140'N 30'E OF SW CORNER OF POUR 4
PM:RONNIE YEOMAN
Date Issued:10/21/2024
Specified Strength:4000
Results Specification
3-5
3-6
N/A
35-90
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
599 9/2/2024 7 3840012.563060LABC-1231 8.00 N/A 4.002
600 9/23/2024 28 4879012.563880LABC-1231 8.00 N/A 4.003
601 9/23/2024 28 4919012.563920LABC-1231 8.00 N/A 4.003
602 9/23/2024 28 4968012.563960LABC-1231 8.00 N/A 4.003
603 10/21/2024 56 5072012.564040LABC-1231 8.00 N/A 4.002
Average 28-day Compressive Strength is NOT compliant with project specifications
CC:
3920
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 591462
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 2
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH EAST SECTION OF PARKING LOT, POUR 4
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1447501-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/26/2024
Time Placed:5:15 AM
4
3
84
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:91490515
145.6
Batch Time:4:27:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:10'N 10'E OF SW CORNER OF POUR 4
PM:RONNIE YEOMAN
Date Issued:09/03/2024
Specified Strength:4000
Results Specification
3-5
3-6
N/A
35-90
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
584 9/2/2024 7 4775012.563800LABC-1231 8.00 N/A 4.002
585 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
586 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
587 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
588 10/21/2024 56 012.560LABC-1231 8.00 N/A 4.00
Notes:Notified Foreman Victor with Pavecon of temp being over 90, notified Victor of Slump being over 5 (Victor advised he would except up
to a 6 slump).Super Attendant was not on job site. Holcim acceptable temp is 100.
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 591459
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 4
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH EAST SECTION OF PARKING LOT, POUR 4
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1447501-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/26/2024
Time Placed:6:10 AM
6
5.5
84
94
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:91490522
140.4
Batch Time:4:57:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:5'N 20'E OF SW CORNER OF POUR 4
PM:RONNIE YEOMAN
Date Issued:09/04/2024
Specified Strength:4000
Results Specification
3-5
3-6
N/A
35-90
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
589 9/2/2024 7 3950012.563140LABC-1231 8.00 N/A 4.002
590 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
591 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
592 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
593 10/21/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 591460
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 4
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH EAST SECTION OF PARKING LOT, POUR 4
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1447501-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/26/2024
Time Placed:7:20 AM
6
5.5
84
92
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:91490535
140.4
Batch Time:6:32:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:100'N 25'E OF SW CORNER OF POUR 4
PM:RONNIE YEOMAN
Date Issued:09/03/2024
Specified Strength:4000
Results Specification
3-5
3-6
N/A
35-90
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
594 9/2/2024 7 3900012.563110LABC-1231 8.00 N/A 4.002
595 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
596 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
597 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
598 10/21/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 591461
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 4
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: NORTH EAST SECTION OF PARKING LOT, POUR 4
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1447501-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:8/26/2024
Time Placed:8:30 AM
5
4
84
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:91490544
141.2
Batch Time:7:18:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:140'N 30'E OF SW CORNER OF POUR 4
PM:RONNIE YEOMAN
Date Issued:09/03/2024
Specified Strength:4000
Results Specification
3-5
3-6
N/A
35-90
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
599 9/2/2024 7 3840012.563060LABC-1231 8.00 N/A 4.002
600 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
601 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
602 9/23/2024 28 012.560LABC-1231 8.00 N/A 4.00
603 10/21/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 591462
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 4
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: TURNING LANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1454602-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/6/2024
Time Placed:5:05 AM
5.00
3.5
70
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Bruner, Yusuf
Plant Number:955e
Delivery Ticket No.:91491063
144
Batch Time:4:14:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:9913HA-3
Break
Type:
Sample Location:15'N 28'NW OF NWC HAMPTON INN 1750 ST HWY 121
PM:RONNIE YEOMAN
Date Issued:09/14/2024
Specified Strength:3000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
659 9/13/2024 7 4757012.563790LABC-1231 8.00 N/A 4.003
660 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
661 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
662 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
663 11/1/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 592867
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 3
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: TURNING LANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1454602-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/6/2024
Time Placed:6:20 AM
5.00
3.0
74
85
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Bruner, Yusuf
Plant Number:955E
Delivery Ticket No.:91491072
144
Batch Time:5:44:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:9913HA-3
Break
Type:
Sample Location:75'N 28'NW OF NWC HAMPTON INN 1750 ST HWY 121
PM:RONNIE YEOMAN
Date Issued:09/14/2024
Specified Strength:3000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
664 9/13/2024 7 6022012.564790LABC-1231 8.00 N/A 4.003
665 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
666 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
667 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
668 11/1/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 592868
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 3
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: TURNING LANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1454602-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/6/2024
Time Placed:8:05 AM
5.00
3.0
74
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Bruner, Yusuf
Plant Number:955E
Delivery Ticket No.:91491089
144
Batch Time:7:32:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:9913HA-3
Break
Type:
Sample Location:260'N 28'NW OF NWC HAMPTON INN 1750 ST HWY 121
PM:RONNIE YEOMAN
Date Issued:09/14/2024
Specified Strength:3000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
669 9/13/2024 7 5039012.564010LABC-1231 8.00 N/A 4.003
670 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
671 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
672 10/4/2024 28 012.560LABC-1231 8.00 N/A 4.00
673 11/1/2024 56 012.560LABC-1231 8.00 N/A 4.00
CC:
0
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 592869
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 3
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: AREA 5 ON WEST SIDE OF JOB SITE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1455815-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/11/2024
Time Placed:N/A
N/A
N/A
N/A
N/A
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:N/A
Delivery Ticket No.:N/A
N/A
Batch Time:N/A
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:N/A
PM:RONNIE YEOMAN
Date Issued:11/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
N/A
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
739 9/18/2024 7 4789012.563810LABC-1231 8.00 N/A 4.002
740 10/9/2024 28 5973012.564760LABC-1231 8.00 N/A 4.003
741 10/9/2024 28 5800012.564620LABC-1231 8.00 N/A 4.003
742 10/9/2024 28 5672012.564520LABC-1231 8.00 N/A 4.003
743 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4630
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594876
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: AREA 5 ON WEST SIDE OF JOB SITE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1455815-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/11/2024
Time Placed:8:45 AM
6
5
72
90
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:955a
Delivery Ticket No.:91491267
145.6
Batch Time:7:08:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:30'N 10'W OF NW CORNER BLDG 4
PM:RONNIE YEOMAN
Date Issued:10/09/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Drizzle
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
709 9/18/2024 7 3925012.563120LABC-1231 8.00 N/A 4.003
710 10/9/2024 28 5479012.564360LABC-1231 8.00 N/A 4.002
711 10/9/2024 28 5562012.564430LABC-1231 8.00 N/A 4.002
712 10/9/2024 28 5482012.564360LABC-1231 8.00 N/A 4.003
713 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4380
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594234
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 2
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: AREA 5 ON WEST SIDE OF JOB SITE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1455815-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/11/2024
Time Placed:10:15 AM
5.5
5
71
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:955A
Delivery Ticket No.:91651366
145.2
Batch Time:9:31:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:50'N 30'W OF NW CORNER OF BLDG 4
PM:RONNIE YEOMAN
Date Issued:10/09/2024
Specified Strength:4000
Results Specification
3-5
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Drizzle
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
714 9/18/2024 7 4762012.563790LABC-1231 8.00 N/A 4.003
715 10/9/2024 28 5410012.564310LABC-1231 8.00 N/A 4.002
716 10/9/2024 28 5552012.564420LABC-1231 8.00 N/A 4.002
717 10/9/2024 28 5737012.564570LABC-1231 8.00 N/A 4.002
718 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4430
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594241
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 2
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: W SIDE PARKING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1457995
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/11/2024
Time Placed:7:27 AM
7.25
4.0
70
85
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Eaton, Robert
Plant Number:956
Delivery Ticket No.:76871038
144.3
Batch Time:6:10:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:440'S 120'W FROM NWC OF OFFICE BUILDING
PM:RONNIE YEOMAN
Date Issued:10/09/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Cloudy
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
674 9/18/2024 7 5338012.564250LABC-1231 8.00 N/A 4.003
675 10/9/2024 28 6061012.564830LABC-1231 8.00 N/A 4.002
676 10/9/2024 28 6290012.565010LABC-1231 8.00 N/A 4.002
677 10/9/2024 28 6307012.565020LABC-1231 8.00 N/A 4.002
678 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4950
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 593747
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: W SIDE PARKING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1457995
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/11/2024
Time Placed:7:27 AM
7.25
4.0
70
85
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Eaton, Robert
Plant Number:956
Delivery Ticket No.:76871038
144.3
Batch Time:6:10:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:440'S 120'W FROM NWC OF OFFICE BUILDING
PM:RONNIE YEOMAN
Date Issued:10/09/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Cloudy
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
674 9/18/2024 7 5338012.564250LABC-1231 8.00 N/A 4.003
675 10/9/2024 28 6061012.564830LABC-1231 8.00 N/A 4.002
676 10/9/2024 28 6290012.565010LABC-1231 8.00 N/A 4.002
677 10/9/2024 28 6307012.565020LABC-1231 8.00 N/A 4.002
678 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4950
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 593747
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 7
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:SIDEWALK
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458040
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/12/2024
Time Placed:5:45 AM
5.50
4.0
69
80
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91651404
145
Batch Time:4:32:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5177
Break
Type:
Sample Location:80' SOUTHBOUND ENCHANTMENT WAY
PM:RONNIE YEOMAN
Date Issued:10/10/2024
Specified Strength:3000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
679 9/19/2024 7 3749012.562980LABC-1231 8.00 N/A 4.002
680 10/10/2024 28 6812012.565420LABC-1231 8.00 N/A 4.003
681 10/10/2024 28 6693012.565330LABC-1231 8.00 N/A 4.003
682 10/10/2024 28 6932012.565520LABC-1231 8.00 N/A 4.003
683 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5420
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 593939
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 7
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:5:29 AM
4.00
3.0
67
84
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651432
147.2
Batch Time:N/A
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:2'S 5'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
684 9/20/2024 7 5566012.564430LABC-1231 8.00 N/A 4.002
685 10/11/2024 28 7231012.565760LABC-1231 8.00 N/A 4.003
686 10/11/2024 28 7222012.565750LABC-1231 8.00 N/A 4.003
687 10/11/2024 28 7241012.565770LABC-1231 8.00 N/A 4.003
688 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5760
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594169
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 7
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:6:00 AM
4.00
3.2
67
83
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651079
148.8
Batch Time:5:12:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:10'S 55'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
689 9/20/2024 7 5330012.564240LABC-1231 8.00 N/A 4.002
690 10/11/2024 28 6486012.565160LABC-1231 8.00 N/A 4.003
691 10/11/2024 28 6236012.564960LABC-1231 8.00 N/A 4.002
692 10/11/2024 28 6362012.565070LABC-1231 8.00 N/A 4.003
693 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5060
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594170
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 7
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:8:15 AM
5.00
6.3
70
82
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651441
147.6
Batch Time:6:47:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:40'S 25'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
694 9/20/2024 7 5252012.564180LABC-1231 8.00 N/A 4.002
695 10/11/2024 28 6112012.564870LABC-1231 8.00 N/A 4.002
696 10/11/2024 28 6097012.564850LABC-1231 8.00 N/A 4.003
697 10/11/2024 28 6084012.564840LABC-1231 8.00 N/A 4.003
698 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4850
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594171
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 5 of 7
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:9:37 AM
7.50
7.0
75
86
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651089
148
Batch Time:8:25:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:70'S 35'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
699 9/20/2024 7 4382012.563490LABC-1231 8.00 N/A 4.003
700 10/11/2024 28 5609012.564470LABC-1231 8.00 N/A 4.003
701 10/11/2024 28 5384012.564290LABC-1231 8.00 N/A 4.002
702 10/11/2024 28 5481012.564360LABC-1231 8.00 N/A 4.002
703 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4370
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594172
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 6 of 7
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:10:34 AM
6.50
4.3
80
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651454
148.2
Batch Time:9:36:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:100'S 30'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/30/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
704 9/20/2024 7 3925012.563120LABC-1231 8.00 N/A 4.001
705 10/11/2024 28 5718012.564550LABC-1231 8.00 N/A 4.002
706 10/11/2024 28 5522012.564400LABC-1231 8.00 N/A 4.002
707 10/11/2024 28 5659012.564510LABC-1231 8.00 N/A 4.002
708 11/8/2024 56 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4490
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594173
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 7 of 7
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:SIDEWALK
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458040
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/12/2024
Time Placed:5:45 AM
5.50
4.0
69
80
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Alvarado, Henry
Plant Number:952
Delivery Ticket No.:91651404
145
Batch Time:4:32:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5177
Break
Type:
Sample Location:80' SOUTHBOUND ENCHANTMENT WAY
PM:RONNIE YEOMAN
Date Issued:10/10/2024
Specified Strength:3000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
679 9/19/2024 7 3749012.562980LABC-1231 8.00 N/A 4.002
680 10/10/2024 28 6812012.565420LABC-1231 8.00 N/A 4.003
681 10/10/2024 28 6693012.565330LABC-1231 8.00 N/A 4.003
682 10/10/2024 28 6932012.565520LABC-1231 8.00 N/A 4.003
683 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5420
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 593939
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:10:34 AM
6.50
4.3
80
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651454
148.2
Batch Time:9:36:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:100'S 30'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:11/08/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
704 9/20/2024 7 3925012.563120LABC-1231 8.00 N/A 4.001
705 10/11/2024 28 5718012.564550LABC-1231 8.00 N/A 4.002
706 10/11/2024 28 5522012.564400LABC-1231 8.00 N/A 4.002
707 10/11/2024 28 5659012.564510LABC-1231 8.00 N/A 4.002
708 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4490
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594173
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:5:29 AM
4.00
3.0
67
84
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651432
147.2
Batch Time:N/A
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:2'S 5'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
684 9/20/2024 7 5566012.564430LABC-1231 8.00 N/A 4.002
685 10/11/2024 28 7231012.565760LABC-1231 8.00 N/A 4.003
686 10/11/2024 28 7222012.565750LABC-1231 8.00 N/A 4.003
687 10/11/2024 28 7241012.565770LABC-1231 8.00 N/A 4.003
688 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5760
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594169
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:6:00 AM
4.00
3.2
67
83
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651079
148.8
Batch Time:5:12:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:10'S 55'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
689 9/20/2024 7 5330012.564240LABC-1231 8.00 N/A 4.002
690 10/11/2024 28 6486012.565160LABC-1231 8.00 N/A 4.003
691 10/11/2024 28 6236012.564960LABC-1231 8.00 N/A 4.002
692 10/11/2024 28 6362012.565070LABC-1231 8.00 N/A 4.003
693 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5060
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594170
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:8:15 AM
5.00
6.3
70
82
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651441
147.6
Batch Time:6:47:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:40'S 25'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
694 9/20/2024 7 5252012.564180LABC-1231 8.00 N/A 4.002
695 10/11/2024 28 6112012.564870LABC-1231 8.00 N/A 4.002
696 10/11/2024 28 6097012.564850LABC-1231 8.00 N/A 4.003
697 10/11/2024 28 6084012.564840LABC-1231 8.00 N/A 4.003
698 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4850
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594171
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:9:37 AM
7.50
7.0
75
86
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651089
148
Batch Time:8:25:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:70'S 35'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/12/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
699 9/20/2024 7 4382012.563490LABC-1231 8.00 N/A 4.003
700 10/11/2024 28 5609012.564470LABC-1231 8.00 N/A 4.003
701 10/11/2024 28 5384012.564290LABC-1231 8.00 N/A 4.002
702 10/11/2024 28 5481012.564360LABC-1231 8.00 N/A 4.002
703 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4370
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594172
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1458041-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:9/13/2024
Time Placed:10:34 AM
6.50
4.3
80
88
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:James, Mark
Plant Number:952
Delivery Ticket No.:91651454
148.2
Batch Time:9:36:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:100'S 30'E OF N BOUND SERVICE RD APPROACH
PM:RONNIE YEOMAN
Date Issued:10/30/2024
Specified Strength:4000
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
704 9/20/2024 7 3925012.563120LABC-1231 8.00 N/A 4.001
705 10/11/2024 28 5718012.564550LABC-1231 8.00 N/A 4.002
706 10/11/2024 28 5522012.564400LABC-1231 8.00 N/A 4.002
707 10/11/2024 28 5659012.564510LABC-1231 8.00 N/A 4.002
708 11/8/2024 56 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4490
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 594173
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 5 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:SIDEWALK
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1470563
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:10/2/2024
Time Placed:7:34 AM
5.25
4.5
64
76
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Eaton, Carson
Plant Number:955e
Delivery Ticket No.:91492359
145.7
Batch Time:6:47:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5277
Break
Type:
Sample Location:250'S 20'W OF SW CORNER OF BUILDING
PM:RONNIE YEOMAN
Date Issued:11/27/2024
Specified Strength:3500
Result
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
749 10/9/2024 7 2926012.562330LABC-1231 8.00 N/A 4.002
750 10/30/2024 28 4699012.563740LABC-1231 8.00 N/A 4.003
751 10/30/2024 28 4739012.563770LABC-1231 8.00 N/A 4.003
752 10/30/2024 28 4522012.563600LABC-1231 8.00 N/A 4.003
753 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
3700
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 597574
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:SIDEWALK
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1470563
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:10/2/2024
Time Placed:7:34 AM
5.25
4.5
64
76
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Eaton, Carson
Plant Number:955e
Delivery Ticket No.:91492359
145.7
Batch Time:6:47:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5277
Break
Type:
Sample Location:250'S 20'W OF SW CORNER OF BUILDING
PM:RONNIE YEOMAN
Date Issued:11/01/2024
Specified Strength:3500
Results
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
749 10/9/2024 7 2926012.562330LABC-1231 8.00 N/A 4.002
750 10/30/2024 28 4699012.563740LABC-1231 8.00 N/A 4.003
751 10/30/2024 28 4739012.563770LABC-1231 8.00 N/A 4.003
752 10/30/2024 28 4522012.563600LABC-1231 8.00 N/A 4.003
753 11/27/2024 56 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
3700
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 597574
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 2
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: W SIDE OF JOB SITE NEAR HWY 121
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1481757-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:10/21/2024
Time Placed:9:45 AM
4.5
4
82
82
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Mendoza, Andrew
Plant Number:956
Delivery Ticket No.:76871423
0
Batch Time:8:57:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:5409
Break
Type:
Sample Location:80'S 20'W OF SW CORNER OF BUILDING
PM:RONNIE YEOMAN
Date Issued:12/16/2024
Specified Strength:4000
Result Specification
1-6
2-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
787 10/28/2024 7 2586012.562060LABC-1231 8.00 N/A 4.003
788 11/18/2024 28 5513012.564390LABC-1231 8.00 N/A 4.002
789 11/18/2024 28 5194012.564140LABC-1231 8.00 N/A 4.003
790 11/18/2024 28 5096012.564060LABC-1231 8.00 N/A 4.003
791 HOLD HOLD 012.560LABC-1231 8.00 N/A 4.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4200
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 600909
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Inclement weather
Weather:
Scheduled
Service:
A UES engineering representative traveled to the above referenced project to observe ongoing work and perform field services as scheduled.
Area of Work:
of 1
Clear
11/26/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Cancellation Report
Grapevine, Texas Page Number:
Ronnie Yeoman
Project Manager
Respectfully Submitted,
1
Reason for
Cancellation:
Upon notification of the cancellation, the engineering representative returned to the Fort Worth Office.
Client:
Project:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
11/08/2024
121 Commerce Center Addition (Lot 1)
Service Date:
Report Date:
1489512WorkOrderNumber:
UES / Riner Engineering
Remarks:
Project Number:F241078
5:10 AM
Technician:Bruner, Yusuf
Concrete Testing
Paving
Off Genesis Way and Enchanted Way
Time
Notified:
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: FIRELANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1493374-S1
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:11/12/2024
Time Placed:5:00 AM
3.75
3.7
52
86
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Everly, Keishawn
Plant Number:952
Delivery Ticket No.:91652999
141.2
Batch Time:4:21:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:AEA
Break
Type:
Sample Location:15'S 75'E OF NE CORNER
PM:RONNIE YEOMAN
Date Issued:12/11/2024
Specified Strength:4000
Result Specification
3-5
3-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
857 11/19/2024 7 12198028.274310LABC-1231 12.00 N/A 6.001
858 12/10/2024 28 16867028.275970LABC-1231 12.00 N/A 6.001
859 12/10/2024 28 15935028.275640LABC-1231 12.00 N/A 6.003
860 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5800
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604737
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: FIRELANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1493374-S2
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:11/12/2024
Time Placed:6:20 AM
3.75
3.8
50
77
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Everly, Keishawn
Plant Number:952
Delivery Ticket No.:91653008
141.6
Batch Time:5:50:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:AEA
Break
Type:
Sample Location:50'N OF NE CORNER
PM:RONNIE YEOMAN
Date Issued:12/11/2024
Specified Strength:4000
Result
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
861 11/19/2024 7 12201028.274320LABC-1231 12.00 N/A 6.002
862 12/10/2024 28 16585028.275870LABC-1231 12.00 N/A 6.001
863 12/10/2024 28 16181028.275720LABC-1231 12.00 N/A 6.001
864 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5800
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604738
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 2 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: FIRELANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1493374-S3
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:11/12/2024
Time Placed:8:00 AM
4.5
4.2
50
70
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Everly, Keishawn
Plant Number:952
Delivery Ticket No.:91653020
140
Batch Time:7:29:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:AEA
Break
Type:
Sample Location:45'N 60' W FROM THE NE CORNER
PM:RONNIE YEOMAN
Date Issued:12/11/2024
Specified Strength:4000
Result Specification
3-5
3-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
866 11/19/2024 7 10355028.273660LABC-1231 12.00 N/A 6.003
867 12/10/2024 28 13636028.274820LABC-1231 12.00 N/A 6.001
868 12/10/2024 28 13719028.274850LABC-1231 12.00 N/A 6.001
869 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
4840
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604739
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 3 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: FIRELANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1493374-S4
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:11/12/2024
Time Placed:10:00 AM
4
4
66
75
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Everly, Keishawn
Plant Number:952
Delivery Ticket No.:91653036
142.4
Batch Time:9:21:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:AEA
Break
Type:
Sample Location:40'N FROM THE NW CORNER
PM:RONNIE YEOMAN
Date Issued:12/11/2024
Specified Strength:4000
Result Specification
3-5
3-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
871 11/19/2024 7 12403028.274390LABC-1231 12.00 N/A 6.002
872 12/10/2024 28 14579028.275160LABC-1231 12.00 N/A 6.001
873 12/10/2024 28 15377028.275440LABC-1231 12.00 N/A 6.002
874 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5300
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604740
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 4 of 5
Concrete Compression Test
Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:PAVING: FIRELANE
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1493374-S5
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:11/12/2024
Time Placed:12:18 PM
4
3.9
74
80
Date Received:N/A
Concrete Supplier:HOLCIM
Submitted By:Everly, Keishawn
Plant Number:952
Delivery Ticket No.:91653057
144.8
Batch Time:11:48:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
CYLINDER COMPRESSION TEST RESULTS
ASTM C-231)
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:ASTM C-31
Mix ID:AEA
Break
Type:
Sample Location:65'N 65'E NW CORNER
PM:RONNIE YEOMAN
Date Issued:12/11/2024
Specified Strength:4000
Result Specification
3-5
3-6
N/A
N/A
N/A
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
876 11/19/2024 7 13412028.274740LABC-1231 12.00 N/A 6.002
877 12/10/2024 28 16559028.275860LABC-1231 12.00 N/A 6.001
878 12/10/2024 28 16996028.276010LABC-1231 12.00 N/A 6.001
879 HOLD HOLD 028.270LABC-1231 12.00 N/A 6.00
Average 28-day Compressive Strength is compliant with project specifications
CC:
5940
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 604741
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 5 of 5
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ
13
D): 2453 (M):464StandardCount:
117.4
114.1
115.3
27.5 94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
91.6 25.9
92.1
D.5/18 FG-11.0 1 6
B.5/18 FG-11.0 1 6
114.8
4921
General Location
Area:Building Pad
96121.4
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:1 of 1
28.7
29.1
1395465
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/21/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
1 6
Clear
90.5 26.1 92
26.4 93
93
27.2
96
93
95
90.8
11 D.5/18.5 FG-11.0 1 6
12 E.5/18.5 FG-11.0 1 6
114.9 91.5 25.6
3 C.5/18.5 FG-11.5 1 6
2 B.5/18.5 FG-11.5 1 6
113.6 90.6
1 A.5/18.5 FG-11.5 1 6
10 C.5/18.5 FG-11.0 1 6
6 120.1
119.3 92.7
93.0
118.9 93.5
9 B.5/18.5 FG-11.0 1 6
8 A.5/18.5 FG-11.0 1
7 D.5/18 FG-11.5
6 B.5/18 FG-11.5 1
119.1
115.1 90.4 27.3 92
92
93.8 27.0 96
25.4
6
4 D.5/18.5 FG-11.5 1 6
5 E.5/18.5 FG-11.5 1 6
94
95
95
28.295119.4
118.0
116.5 91.9 26.8
94.0 25.5
93.1
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
FG-9.5 1 6
Respectfully Submitted,
FG-9.5
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ
13
122.9 100.7 22.0 96
D): 2437 (M):455StandardCount:
123.9
121.6
121.9
26.2 93
15 A.5/18.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.7 22.3
98.2
D.5/18 FG-10.0 1 6
B.5/18 FG-10.0 1 6
123.0
4923
General Location
Area:Building Pad
96118.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:1 of 4
23.8
25.4
1395466
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/22/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:5/29/2024
1 6
Clear
97.3 25.0 92
23.7 94
92
24.1
95
95
92
99.4
11 D.5/18.5 FG-10.0 1 6
12 E.5/18.5 FG-10.0 1 6
121.3 97.2 24.8
3 C.5/18.5 FG-10.5 1 6
2 B.5/18.5 FG-10.5 1 6
122.8 99.1
1 A.5/18.5 FG-10.5 1 6
10 C.5/18.5 FG-10.0 1 6
6 122.6
123.2 99.5
97.8
120.5 97.1
9 B.5/18.5 FG-10.0 1 6
8 A.5/18.5 FG-10.0 1
7 D.5/18 FG-10.5
6 B.5/18 FG-10.5 1
121.2
120.3 96.9 24.2 92
94
96.8 25.2 92
23.9
6
4 D.5/18.5 FG-10.5 1 6
5 E.5/18.5 FG-10.5 1 6
93
94
93
25.693123.3
122.7
122.4 98.0 24.9
100.1 22.6
98.2
Client:GTIS Acquisitions, LLC Service Date:05/22/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:5/29/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1395466
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:2 of 4
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
25.1
16 B.5/18.5 FG-9.5 1 6 122.7 98.3 24.8 93
92
18 D.5/18.5 FG-9.5 1 6 123.3 99.4
17 C.5/18.5 FG-9.5 1 6 121.2 96.9
98.6 23.5 94
24.0 94
9319E.5/18.5 FG-9.5 1 6 121.6 97.5 24.7
122.6
20 B.5/18 FG-9.5 1 6 121.8
92
99.8 22.8 95
22 A.5/18.5 FG-9.0 1 6
21 D.5/18 FG-9.5 1 6
122.0 97.1 25.6
123.7
24 C.5/18.5 FG-9.0 1 6
23 B.5/18.5 FG-9.0 1 6 99.5 24.3 94
123.3 100.5 22.7 95
26 E.5/18.5 FG-9.0 1 6
25 D.5/18.5 FG-9.0 1 6 98.2 25.8 93
122.4 99.6 22.9 95
123.5
28 D.5/18 FG-9.0 1 6
27 B.5/18 FG-9.0 1 6 100.3 22.2 95
122.5 99.0 23.7 94
122.6
30 B.5/18.5 FG-8.5 1 6
29 A.5/18.5 FG-8.5 1 6 97.3 27.0 92
121.3 98.5 23.1 94
123.6
D): 2437 (M):455
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:05/22/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:5/29/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1395466
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:3 of 4
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
23.5
31 C.5/18.5 FG-8.5 1 6 120.7 97.5 23.8 93
94
33 E.5/18.5 FG-8.5 1 6 121.1 98.3
32 D.5/18.5 FG-8.5 1 6 122.5 99.2
96.9 25.9 92
23.2 93
9634B.5/18 FG-8.5 1 6 123.2 100.6 22.5
122.2
35 D.5/18 FG-8.5 1 6 122.0
92
98.0 24.7 93
37 B.5/18.5 FG-8.0 1 6
36 A.5/18.5 FG-8.0 1 6
122.4 97.1 26.1
122.3
39 D.5/18.5 FG-8.0 1 6
38 C.5/18.5 FG-8.0 1 6 99.4 23.0 94
120.8 97.9 23.4 93
41 B.5/18 FG-8.0 1 6
40 E.5/18.5 FG-8.0 1 6 96.8 26.3 92
123.1 100.3 22.7 95
122.3
43 A.5/18.5 FG-7.5 1 6
42 D.5/18 FG-8.0 1 6 99.4 24.8 94
123.6 97.2 27.2 92
124.1
45 C.5/18.5 FG-7.5 1 6
44 B.5/18.5 FG-7.5 1 6 99.5 23.6 94
122.4 98.9 23.8 94
123.0
D): 2437 (M):455
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:05/22/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:5/29/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1395466
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:4 of 4
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
24.3
46 D.5/18.5 FG-7.5 1 6 122.3 97.3 25.7 92
93
48 B.5/18 FG-7.5 1 6 123.6 100.2
47 E.5/18.5 FG-7.5 1 6 121.8 98.0
98.5 23.8 94
23.4 95
9449D.5/18 FG-7.5 1 6 123.5 99.5 24.1
123.3
50 A.5/18.5 FG-7.0 1 6 121.9
94
97.2 26.9 92
52 C.5/18.5 FG-7.0 1 6
51 B.5/18.5 FG-7.0 1 6
123.2 99.3 24.1
123.4
54 E.5/18.5 FG-7.0 1 6
53 D.5/18.5 FG-7.0 1 6 99.9 23.5 95
123.7 100.8 22.7 96
56 D.5/18 FG-7.0 1 6
55 B.5/18 FG-7.0 1 6 97.2 26.3 92
122.2 98.6 23.9 94
122.8
D): 2437 (M):455
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
FG-5.5 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ
13
121.1 98.5 22.9 94
D): 2436 (M):467StandardCount:
122.5
122.9
123.0
26.5 92
15 A.5/18.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.6 23.5
96.8
D.5/18 FG-6.0 1 6
B.5/18 FG-6.0 1 6
123.5
4923
General Location
Area:Building Pad
96118.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:1 of 3
23.6
26.1
1395467
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/23/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:5/29/2024
1 6
Clear
98.2 25.2 93
22.8 96
93
24.0
94
95
95
100.6
11 D.5/18.5 FG-6.0 1 6
12 E.5/18.5 FG-6.0 1 6
121.5 98.3 23.6
3 C.5/18.5 FG-6.5 1 6
2 B.5/18.5 FG-6.5 1 6
122.3 97.9
1 A.5/18.5 FG-6.5 1 6
10 C.5/18.5 FG-6.0 1 6
6 122.2
123.8 100.2
96.9
124.6 100.5
9 B.5/18.5 FG-6.0 1 6
8 A.5/18.5 FG-6.0 1
7 D.5/18.5 FG-6.5
6 B.5/18 FG-6.5 1
124.0
123.2 99.1 24.3 94
93
99.4 24.7 94
24.9
6
4 D.5/18.5 FG-6.5 1 6
5 E.5/18.5 FG-6.5 1 6
93
95
92
25.592121.5
121.9
121.9 97.7 24.8
98.5 23.8
96.8
Client:GTIS Acquisitions, LLC Service Date:05/23/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:5/29/2024
New York, NY 10019 Weather:Clear
Work Order Number:1395467
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
23.0
16 B.5/18.5 FG-5.5 1 6 121.1 96.8 25.1 92
94
18 D.5/18.5 FG-5.5 1 6 120.9 98.0
17 C.5/18.5 FG-5.5 1 6 122.3 99.4
97.3 24.5 92
23.4 93
9219E.5/18.5 FG-5.5 1 6 121.8 96.9 25.7
123.9
20 B.5/18 FG-5.5 1 6 121.1
96
99.4 24.6 94
22 A.5/18.5 FG-5.0 1 6
21 D.5/18 FG-5.5 1 6
127.2 100.9 26.1
122.6
24 C.5/18.5 FG-5.0 1 6
23 B.5/18.5 FG-5.0 1 6 97.0 26.4 92
122.6 98.2 24.8 93
26 E.5/18.5 FG-5.0 1 6
25 D.5/18.5 FG-5.0 1 6 99.5 23.9 94
121.8 99.1 22.9 94
123.3
28 D.5/18 FG-5.0 1 6
27 B.5/18 FG-5.0 1 6 98.2 25.4 93
123.2 100.7 22.3 96
123.1
30 B.5/18.5 FG-4.5 1 6
29 A.5/18.5 FG-4.5 1 6 99.4 22.6 94
121.6 98.8 23.1 94
121.9
D): 2436 (M):467
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:05/23/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:5/29/2024
New York, NY 10019 Weather:Clear
Work Order Number:1395467
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:3 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
24.9
31 C.5/18.5 FG-4.5 1 6 121.6 98.4 23.6 93
93
33 E.5/18.5 FG-4.5 1 6 122.2 99.0
32 D.5/18.5 FG-4.5 1 6 121.8 97.5
99.3 22.8 94
23.4 94
9234B.5/18 FG-4.5 1 6 122.2 96.9 26.1
121.4
35 D.5/18 FG-4.5 1 6 121.9
95
98.7 23.0 94
37 B.5/18.5 FG-4.0 1 6
36 A.5/18.5 FG-4.0 1 6
122.4 100.2 22.2
121.9
39 D.5/18.5 FG-4.0 1 6
38 C.5/18.5 FG-4.0 1 6 96.9 25.8 92
122.0 98.3 24.1 93
41 B.5/18 FG-4.0 1 6
40 E.5/18.5 FG-4.0 1 6 97.9 25.5 93
122.0 96.8 26.0 92
122.9
42 D.5/18 FG-4.0 1 6 98.1 25.393122.9
D): 2436 (M):467
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
FG-2.5 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ
13
122.6 98.8 24.1 94
D): 2456 (M):438StandardCount:
121.9
123.4
123.3
25.0 93
15 A.5/18.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
101.0 22.1
97.5
D.5/18 FG-3.0 1 6
B.5/18 FG-3.0 1 6
123.4
4923
General Location
Area:Building Pad
96118.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:1 of 3
24.0
22.6
1395468
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/24/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:5/31/2024
1 6
Clear
98.2 25.7 93
24.3 94
93
25.2
93
96
93
99.3
11 D.5/18.5 FG-3.0 1 6
12 E.5/18.5 FG-3.0 1 6
123.3 98.3 25.4
3 C.5/18.5 FG-3.5 1 6
2 B.5/18.5 FG-3.5 1 6
123.0 96.9
1 A.5/18.5 FG-3.5 1 6
10 C.5/18.5 FG-3.0 1 6
6 122.2
122.1 98.5
99.7
123.2 98.4
9 B.5/18.5 FG-3.0 1 6
8 A.5/18.5 FG-3.0 1
7 D.5/18 FG-3.5
6 B.5/18 FG-3.5 1
122.3
123.4 100.5 22.8 95
92
99.0 23.5 94
26.9
6
4 D.5/18.5 FG-3.5 1 6
5 E.5/18.5 FG-3.5 1 6
92
94
95
23.294122.1
122.0
122.6 96.8 26.7
97.9 24.6
99.1
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
Client:GTIS Acquisitions, LLC Service Date:05/24/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:5/31/2024
New York, NY 10019 Weather:Clear
Work Order Number:1395468
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
24.6
16 B.5/18.5 FG-2.5 1 6 123.3 100.2 23.1 95
94
18 D.5/18.5 FG-2.5 1 6 122.7 97.5
17 C.5/18.5 FG-2.5 1 6 122.9 98.6
100.8 22.3 96
25.8 93
9419E.5/18.5 FG-2.5 1 6 122.1 98.5 24.0
122.2
20 B.5/18 FG-2.5 1 6 123.3
93
97.9 24.8 93
22 A.5/18.5 FG-2.0 1 6
21 D.5/18 FG-2.5 1 6
123.0 98.1 25.4
118.9
24 C.5/18.5 FG-2.0 1 6
23 B.5/18.5 FG-2.0 1 6 97.4 22.1 92
123.0 99.0 24.2 94
26 E.5/18.5 FG-2.0 1 6
25 D.5/18.5 FG-2.0 1 6 98.8 23.8 94
123.4 97.3 26.8 92
122.3
28 D.5/18 FG-2.0 1 6
27 B.5/18 FG-2.0 1 6 100.4 23.5 95
123.1 96.9 27.0 92
124.0
30 B.5/18.5 FG-1.5 1 6
29 A.5/18.5 FG-1.5 1 6 98.2 22.7 93
120.4 97.6 23.4 93
120.5
D): 2456 (M):438
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
Client:GTIS Acquisitions, LLC Service Date:05/24/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:5/31/2024
New York, NY 10019 Weather:Clear
Work Order Number:1395468
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:3 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
26.8
31 C.5/18.5 FG-1.5 1 6 123.4 99.2 24.4 94
92
33 E.5/18.5 FG-1.5 1 6 123.3 99.7
32 D.5/18.5 FG-1.5 1 6 122.7 96.8
98.4 26.4 93
23.7 95
9334B.5/18 FG-1.5 1 6 122.0 97.5 25.1
123.3
35 D.5/18 FG-1.5 1 6 124.4
92
100.6 22.6 96
37 B.5/18.5 FG-1.0 1 6
36 A.5/18.5 FG-1.0 1 6
123.0 96.8 27.1
123.7
39 D.5/18.5 FG-1.0 1 6
38 C.5/18.5 FG-1.0 1 6 99.5 24.3 94
122.4 97.3 25.8 92
41 B.5/18 FG-1.0 1 6
40 E.5/18.5 FG-1.0 1 6 97.3 26.3 92
124.1 100.1 24.0 95
122.9
42 D.5/18 FG-1.0 1 6 96.9 27.292123.3
D): 2456 (M):438
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
Remarks:Test results on this report meet project specification.
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:10071 Manufacturer:Humboldt Model:H5001 EZ (D): 2998 (M):337StandardCount:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
4921
General Location
Area:Building Pad
96121.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Off Genesis Way and Enchanted Way Technician:Byusa, Jean Joel
Grapevine, Texas Page Number:1 of 1
1399090
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/25/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/3/2024
New York, NY 10019 Weather:Clear
96
96
25.7
25.2
117.7 94.1 25.1
3 10' S and 25' E from NW Corner of Office Building FG-3.0 1 6
2 10' S and 40' E from NW Corner of Office Building FG-3.0 1 6
118.5 93.9
1 10' S and 55' E from NW Corner of Office Building FG-3.0 1 6
8 30' S and 10' E from NW Corner of Office Building FG-4.0 1
4 10' S and 10' E from NW Corner of Office Building FG-3.0
6
7 30' S and 25' E from NW Corner of Office Building FG-4.0 1 6
5 30' S and 55' E from NW Corner of Office Building FG-4.0 1 6
118.4
119.1 94.5 26.0 96
96
94.5 25.3 96
26.2
6 30' S and 40' E from NW Corner of Office Building FG-4.0 1 6
117.3
118.3 94.1
93.7
96
96
25.495117.1
118.0 93.9 25.7
93.416
25.994115.5 91.716
117.2
95
93.2 25.7 95
25.3
4 30' S and 10' E from NW Corner of Office Building Pad FG-3.0
116.2 92.8 25.2
3 30' S and 25' E from NW Corner of Office Building Pad FG-3.0 1 6
2 30' S and 40' E from NW Corner of Office Building Pad FG-3.0 1 6
117.2 93.5
1 30' S and 55' E from NW Corner of Office Building Pad FG-3.0 1 6
Clear
95
1399385
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/27/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Byusa, Jean Joel
Grapevine, Texas Page Number:1 of 1
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
General Location
Area:Building Pad
96121.0
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:10071 Manufacturer:Humboldt Model:H5001 EZ (D): 3006 (M):342StandardCount:
Remarks:
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
94
95
26.894116.8
118.0
116.3 90.6 28.4
93.3 26.5
92.116
92
6 E.3/16 530.2 1 6
116.8
117.3 92.5
92.7
118.2
115.9 90.3 28.3 92
93
94.1 25.6 96
27.0
4 C.5/16 530.2
10 B.5/16 530.7 1 6
6
7 E.7/16 530.2 1 6
5 D.5/16 530.2 1 6
116.6 91.4
9 A.7/16 530.7 1 6
8 A.3/16 530.7 1
115.1 90.0 27.9
3 B.5/16 530.2 1 6
2 A.7/16 530.2 1 6
115.3 90.8
1 A.3/16 530.2 1 6
11 C.5/16 530.7 1 6
12 D.5/16 530.7 1 6
Clear
92.5 27.0 94
25.9 95
92
27.6
95
94
93
93.0
26.8
26.0
1399513
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/29/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 2
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
General Location
Area:Building Pad
96121.4
91.9 26.7
94.0
E.7/16 530.7 1 6
E.3/16 530.7 1 6
117.1
25.5 96
15 A.3/16
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
116.2 91.6 26.9 93
D): 2262 (M):725StandardCount:
118.0
117.5
116.4
14
Remarks:
531.2 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2262 (M):725
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
93.9 25.4 96
117.7 93.0 26.6 95
117.8
28 E.7/16 531.7 1 6
27 E.3/16 531.7 1 6
90.4 29.0 92
117.0 91.5 27.9 93
116.6
26 D.5/16 531.7 1 6
25 C.5/16 531.7 1 6
90.9 28.0 93
116.9 91.7 27.5 94
117.3 91.6 28.1
116.4
24 B.5/16 531.7 1 6
23 A.7/16 531.7 1 6
116.7
20 E.3/16 531.2 1 6 116.9
93
90.6 28.8 92
22 A.3/16 531.7 1 6
21 E.7/16 531.2 1 6
19 D.5/16 531.2 1 6 118.4 94.1 25.8
91.2 28.2 93
25.6 96
96
18 C.5/16 531.2 1 6 117.9 93.9
17 B.5/16 531.2 1 6 117.6 93.1 26.3
16 A.7/16 531.2 1 6 117.0 91.8 27.4 94
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:Clear
Work Order Number:1399513
Client:GTIS Acquisitions, LLC Service Date:05/29/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
96
95
26.895118.6
118.4
123.6 101.2 22.1
94.2 25.7
93.516
96
6 E.3/16 532.2 1 6
123.5
117.8 93.9
100.5
117.1
117.7 92.3 27.5 94
93
92.0 27.3 94
28.1
4 C.5/16 532.2
10 B.5/16 532.7 2 6
6
7 E.7/16 532.2 1 6
5 D.5/16 532.2 1 6
121.5 96.6
9 A.7/16 532.7 2 6
8 A.3/16 532.7 2
116.9 91.4 27.9
3 B.5/16 532.2 1 6
2 A.7/16 532.2 1 6
116.3 90.8
1 A.3/16 532.2 1 6
11 C.5/16 532.7 2 6
12 D.5/16 532.7 2 6
Light Rain
98.4 25.0 93
25.8 94
93
25.8
96
92
92
99.1
25.5
22.9
1399514
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:5/30/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
97.2 26.2
99.6
E.7/16 532.7 2 6
E.3/16 532.7 2 6
124.7
22.7 95
15 A.3/16
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
123.8 98.7 25.4 94
D): 2277 (M):723StandardCount:
122.2
123.0
122.7
14
Remarks:
533.2 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2277 (M):723
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
92.7 25.9 95
117.8 93.3 26.3 95
116.7
30 A.7/16 534.2 1 6
29 A.3/16 534.2 1 6
98.6 24.1 94
123.1 97.2 26.6 92
122.4
28 E.7/16 533.7 2 6
27 E.3/16 533.7 2 6
99.4 24.8 94
123.5 100.8 22.5 96
124.1
26 D.5/16 533.7 2 6
25 C.5/16 533.7 2 6
100.7 22.3 96
123.7 100.3 23.3 95
122.3 98.0 24.8
123.2
24 B.5/16 533.7 2 6
23 A.7/16 533.7 2 6
122.5
20 E.3/16 533.2 2 6 122.2
93
97.6 25.5 93
22 A.3/16 533.7 2 6
21 E.7/16 533.2 2 6
19 D.5/16 533.2 2 6 123.2 99.7 23.6
97.1 25.9 92
24.5 94
95
18 C.5/16 533.2 2 6 123.5 99.2
17 B.5/16 533.2 2 6 122.8 98.5 24.7
16 A.7/16 533.2 2 6 122.0 96.8 26.0 92
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:Light Rain
Work Order Number:1399514
Client:GTIS Acquisitions, LLC Service Date:5/30/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2277 (M):723
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
35 E.7/16 534.2 1 6 116.6
34 E.3/16 534.2 1 6 116.6 90.5 28.8
91.1 28.0 93
27.5 94
92
33 D.5/16 534.2 1 6 117.7 92.3
32 C.5/16 534.2 1 6 117.4 93.0 26.2
31 B.5/16 534.2 1 6 116.8 91.9 27.1 94
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:Light Rain
Work Order Number:1399514
Client:GTIS Acquisitions, LLC Service Date:5/30/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
95
95
28.693116.8
117.9
118.1 94.0 25.6
91.5 28.8
90.816
96
6 E.3/16 534.7 1 6
118.0
117.8 93.5
93.5
117.7
117.5 93.0 26.3 95
92
92.2 27.7 94
29.0
4 C.5/16 534.7
10 B.5/16 535.2 1 6
6
7 E.7/16 534.7 1 6
5 D.5/16 534.7 1 6
118.4 94.4
9 A.7/16 535.2 1 6
8 A.3/16 535.2 1
117.5 93.7 25.4
3 B.5/16 534.7 1 6
2 A.7/16 534.7 1 6
116.5 90.3
1 A.3/16 534.7 1 6
11 C.5/16 535.2 1 6
12 D.5/16 535.2 1 6
Overcast
90.7 28.2 93
26.3 95
96
25.4
93
94
96
93.3
26.0
26.2
1399516
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/1/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
92.1 27.5
92.8
E.7/16 535.2 1 6
E.3/16 535.2 1 6
117.8
26.7 95
15 A.3/16
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
123.2 97.1 26.9 92
D): 2290 (M):726StandardCount:
117.6
116.3
117.4
14
Remarks:
535.7 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2290 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
100.4 23.6 95
123.1 100.6 22.4 96
124.1
30 A.7/16 536.7 2 6
29 A.3/16 536.7 2 6
99.0 24.5 94
123.0 98.3 25.1 93
123.3
28 E.7/16 536.2 2 6
27 E.3/16 536.2 2 6
96.4 27.0 92
123.2 98.8 24.7 94
122.4
26 D.5/16 536.2 2 6
25 C.5/16 536.2 2 6
96.9 26.4 92
122.5 97.6 25.5 93
123.0 98.2 25.3
122.5
24 B.5/16 536.2 2 6
23 A.7/16 536.2 2 6
122.4
20 E.3/16 535.7 2 6 123.2
93
96.5 26.8 92
22 A.3/16 536.2 2 6
21 E.7/16 535.7 2 6
19 D.5/16 535.7 2 6 122.3 98.4 24.3
100.8 22.2 96
25.0 93
93
18 C.5/16 535.7 2 6 122.4 97.9
17 B.5/16 535.7 2 6 123.4 100.5 22.8
16 A.7/16 535.7 2 6 123.8 99.3 24.7 94
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:Overcast
Work Order Number:1399516
Client:GTIS Acquisitions, LLC Service Date:6/1/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2290 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
99.6 22.9 95
122.7 96.9 26.6 92
122.4
45 B.5/16 537.7 2 6
44 A.7/16 537.7 2 6
100.8 22.1 96
122.9 99.9 23.0 95
123.1
43 A.3/16 537.7 2 6
42 E.7/16 537.2 2 6
98.1 25.8 93
123.3 98.3 25.4 93
123.4
41 E.3/16 537.2 2 6
40 D.5/16 537.2 2 6
99.9 22.8 95
123.8 97.4 27.1 92
122.3 98.6 24.0
122.7
39 C.5/16 537.2 2 6
38 B.5/16 537.2 2 6
122.4
35 E.7/16 536.7 2 6 123.3
94
97.0 26.2 92
37 A.7/16 537.2 2 6
36 A.3/16 537.2 2 6
34 E.3/16 536.7 2 6 123.2 98.8 24.7
100.0 23.3 95
24.5 94
94
33 D.5/16 536.7 2 6 123.9 99.5
32 C.5/16 536.7 2 6 122.6 96.7 26.8
31 B.5/16 536.7 2 6 123.1 100.9 22.0 96
92
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:Overcast
Work Order Number:1399516
Client:GTIS Acquisitions, LLC Service Date:6/1/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/1/2024
Work Order Number:1399516
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
New York, NY 10019 Weather:Overcast
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 C.5/16 537.7 2 6 123.3 99.7 23.7 95
93
48 E.3/16 537.7 2 6 123.7 99.4
47 D.5/16 537.7 2 6 123.4 98.3 25.5
50 A.3/16 538.2 2 6
24.4 94
49 E.7/16 537.7 2 6 123.9
123.4 101.0 22.2 96
100.5 23.3 95
52 B.5/16 538.2 2 6
51 A.7/16 538.2 2 6
122.4 98.1 24.8 93
96.6 25.992121.6
54 D.5/16 538.2 2 6
53 C.5/16 538.2 2 6
122.1 97.7 25.0 93
99.8 23.695123.4
56 E.7/16 538.2 2 6
55 E.3/16 538.2 2 6
123.6 100.9 22.5 96
100.3 22.995123.3
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2290 (M):726
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
96
96
25.796117.7
117.2
122.8 98.5 24.7
92.1 27.3
93.616
94
6 E.3/16 538.7 1 6
123.3
118.2 94.2
100.8
117.0
117.2 92.7 26.4 95
94
91.4 28.0 93
26.9
4 C.5/16 538.7
10 B.5/16 539.2 2 6
6
7 E.7/16 538.7 1 6
5 D.5/16 538.7 1 6
122.4 97.2
9 A.7/16 539.2 2 6
8 A.3/16 539.2 2
118.1 93.8 25.9
3 B.5/16 538.7 1 6
2 A.7/16 538.7 1 6
116.7 92.0
1 A.3/16 538.7 1 6
11 C.5/16 539.2 2 6
12 D.5/16 539.2 2 6
Partly Cloudy
99.2 24.3 94
22.1 96
96
25.9
94
95
92
100.9
25.5
22.3
1401154
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/3/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
99.7 23.5
98.3
E.7/16 539.2 2 6
E.3/16 539.2 2 6
123.2
25.6 93
15 A.3/16
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
122.4 98.8 23.9 94
D): 2286 (M):730StandardCount:
123.5
123.3
123.1
14
Remarks:
539.7 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2286 (M):730
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
100.5 23.6 95
123.7 101.0 22.5 96
124.2
30 A.7/16 540.7 2 6
29 A.3/16 540.7 2 6
98.4 25.1 93
123.4 98.9 24.8 94
123.1
28 E.7/16 540.2 2 6
27 E.3/16 540.2 2 6
99.7 22.8 95
123.6 101.2 22.1 96
122.4
26 D.5/16 540.2 2 6
25 C.5/16 540.2 2 6
99.3 24.7 94
122.2 98.6 23.9 94
122.3 97.8 25.0
123.8
24 B.5/16 540.2 2 6
23 A.7/16 540.2 2 6
122.9
20 E.3/16 539.7 2 6 123.6
93
97.2 26.4 92
22 A.3/16 540.2 2 6
21 E.7/16 539.7 2 6
19 D.5/16 539.7 2 6 123.2 98.2 25.5
100.3 23.2 95
24.6 94
93
18 C.5/16 539.7 2 6 123.4 99.0
17 B.5/16 539.7 2 6 123.5 100.1 23.4
16 A.7/16 539.7 2 6 122.4 96.6 26.7 92
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Partly Cloudy
Work Order Number:1401154
Client:GTIS Acquisitions, LLC Service Date:6/3/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2286 (M):730
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
96.9 25.8 92
122.1 98.0 24.6 93
121.9
44 A.7/14.7 530.7 2 6
43 A.3/14.7 530.7 2 6
92.2 27.4 94
118.1 92.5 27.7 94
117.5
42 E.7/14.7 530.2 1 6
41 E.3/14.7 530.2 1 6
91.6 28.5 93
117.8 93.3 26.3 95
117.7
40 D.5/14.7 530.2 1 6
39 C.5/14.7 530.2 1 6
94.1 25.6 96
117.3 92.9 26.3 95
116.8 90.3 29.4
118.2
38 B.5/14.7 530.2 1 6
37 A.7/14.7 530.2 1 6
35 E.7/16 540.7 2 6 123.7
9236A.3/14.7 530.2 1 6
34 E.3/16 540.7 2 6 122.8 99.9 22.9
101.4 22.0 96
23.9 94
95
33 D.5/16 540.7 2 6 122.3 98.7
32 C.5/16 540.7 2 6 122.8 99.8 23.0
31 B.5/16 540.7 2 6 123.4 100.9 22.3 96
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Partly Cloudy
Work Order Number:1401154
Client:GTIS Acquisitions, LLC Service Date:6/3/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/3/2024
Work Order Number:1401154
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Partly Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
45 B.5/14.7 530.7 2 6 123.3 97.4 26.6 92
95
47 D.5/14.7 530.7 2 6 123.0 99.1
46 C.5/14.7 530.7 2 6 122.7 99.6 23.2
49 E.7/14.7 530.7 2 6
24.1 94
48 E.3/14.7 530.7 2 6 123.2
123.2 98.2 25.5 93
99.8 23.4 95
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2286 (M):730
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
532.2 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
118.1 93.2 26.7 95
D): 2294 (M):728StandardCount:
122.2
123.2
123.2
24.8 93
15 A.3/14.7
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.2 24.2
97.9
E.7/14.7 531.7 2 6
E.3/14.7 531.7 2 6
122.4
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 6
1401155
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/4/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
99.9 23.3 95
24.1 94
93
26.4
96
94
92
98.6
26.5
25.0
11 C.5/14.7 531.7 2 6
12 D.5/14.7 531.7 2 6
123.2 98.3 25.3
3 B.5/14.7 531.2 2 6
2 A.7/14.7 531.2 2 6
123.5 99.0
1 A.3/14.7 531.2 2 6
122.0 96.5
9 A.7/14.7 531.7 2 6
8 A.3/14.7 531.7 2
4 C.5/14.7 531.2
10 B.5/14.7 531.7 2 6
6
7 E.7/14.7 531.2 2 6
5 D.5/14.7 531.2 2 6
123.1
122.5 98.5 24.4 94
94
99.7 23.5 95
24.7
92
6 E.3/14.7 531.2 2 6
122.8
122.8 97.1
98.2
92
93
26.792122.1
123.1
121.9 96.8 25.9
100.8 22.1
96.426
Client:GTIS Acquisitions, LLC Service Date:6/4/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1401155
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 6
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
28.4
16 A.7/14.7 532.2 1 6 118.3 94.3 25.5 96
93
18 C.5/14.7 532.2 1 6 117.3 93.0
17 B.5/14.7 532.2 1 6 117.5 91.5
91.2 27.9 93
26.1 95
9519D.5/14.7 532.2 1 6 117.3 92.8 26.4
118.7
20 E.3/14.7 532.2 1 6 116.6
92
94.5 25.6 96
22 A.3/14.7 532.7 1 6
21 E.7/14.7 532.2 1 6
116.3 90.3 28.8
116.0
24 B.5/14.7 532.7 1 6
23 A.7/14.7 532.7 1 6 90.9 27.6 93
116.7 91.7 27.3 94
26 D.5/14.7 532.7 1 6
25 C.5/14.7 532.7 1 6 94.2 25.7 96
117.5 93.1 26.2 95
118.4
28 E.7/14.7 532.7 1 6
27 E.3/14.7 532.7 1 6 91.8 26.9 94
116.6 90.4 29.0 92
116.5
30 A.7/14.7 533.2 1 6
29 A.3/14.7 533.2 1 6 91.6 28.3 93
118.4 94.4 25.4 96
117.5
D): 2294 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:6/4/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1401155
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 6
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
27.0
31 B.5/14.7 533.2 1 6 117.0 90.6 29.1 92
94
33 D.5/14.7 533.2 1 6 117.9 93.3
32 C.5/14.7 533.2 1 6 116.7 91.9
90.4 28.9 92
26.4 95
9334E.3/14.7 533.2 1 6 116.8 91.5 27.7
123.6
35 E.7/14.7 533.2 1 6 116.5
96
99.5 24.2 94
37 A.7/14.7 533.7 2 6
36 A.3/14.7 533.7 2 6
123.5 100.8 22.5
123.2
39 C.5/14.7 533.7 2 6
38 B.5/14.7 533.7 2 6 98.3 25.3 93
123.4 98.1 25.8 93
41 E.3/14.7 533.7 2 6
40 D.5/14.7 533.7 2 6 99.6 23.3 95
123.7 99.2 24.7 94
122.8
43 A.3/14.7 534.2 2 6
42 E.7/14.7 533.7 2 6 100.7 22.4 96
123.3 98.8 24.8 94
123.3
45 B.5/14.7 534.2 2 6
44 A.7/14.7 534.2 2 6 99.8 22.9 95
123.6 100.9 22.5 96
122.7
D): 2294 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2294 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
123.2 99.5 23.8 94
100.6 22.496123.1
60 C.5/14.7 535.2 2 6
59 B.5/14.7 535.2 2 6
121.5 97.5 24.6 93
96.9 25.992122.0
58 A.7/14.7 535.2 2 6
57 A.3/14.7 535.2 2 6
122.6 98.7 24.2 94
99.1 23.994122.8
56 E.7/14.7 534.7 2 6
55 E.3/14.7 534.7 2 6
123.7 99.4 24.4 94
98.8 24.694123.1
54 D.5/14.7 534.7 2 6
53 C.5/14.7 534.7 2 6
93
52 B.5/14.7 534.7 2 6
51 A.7/14.7 534.7 2 6
124.3 100.5 23.7 95
100.7 22.296123.1
50 A.3/14.7 534.7 2 6
25.2 93
49 E.7/14.7 534.2 2 6 122.4
123.1 99.8 23.3 95
97.5 25.5
92
48 E.3/14.7 534.2 2 6 122.9 98.2
47 D.5/14.7 534.2 2 6 122.6 97.0 26.4
46 C.5/14.7 534.2 2 6 123.3 100.3 22.9 95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 6
Work Order Number:1401155
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/4/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/4/2024
Work Order Number:1401155
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 6
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
61 D.5/14.7 535.2 2 6 123.4 100.5 22.8 95
96
63 E.7/14.7 535.2 2 6 123.4 100.2
62 E.3/14.7 535.2 2 6 123.7 101.3 22.1
65 A.7/14.7 535.7 2 6
23.2 95
64 A.3/14.7 535.7 2 6 123.8
123.3 98.1 25.7 93
99.4 24.5 94
67 C.5/14.7 535.7 2 6
66 B.5/14.7 535.7 2 6
123.2 99.0 24.4 94
100.1 23.795123.8
69 E.3/14.7 535.7 2 6
68 D.5/14.7 535.7 2 6
124.4 101.5 22.6 96
97.7 25.393122.4
71 A.3/14.7 536.2 2 6
70 E.7/14.7 535.7 2 6
122.9 100.0 22.9 95
98.3 25.293123.1
73 B.5/14.7 536.2 2 6
72 A.7/14.7 536.2 2 6
123.0 99.4 23.7 94
97.7 25.393122.4
75 D.5/14.7 536.2 2 6
74 C.5/14.7 536.2 2 6
123.9 101.2 22.4 96
100.6 22.296122.9
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2294 (M):728
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2294 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
123.5 100.1 23.4 95
99.8 23.195122.9
90 E.5/14.7 537.2 2 6
89 D.5/14.7 537.2 2 6
124.1 101.5 22.3 96
100.3 23.595123.9
88 C.5/14.7 537.2 2 6
87 B.5/14.7 537.2 2 6
123.8 99.3 24.7 94
98.2 25.393123.0
86 A.7/14.7 537.2 2 6
85 A.3/14.7 537.2 2 6
123.4 99.8 23.6 95
98.2 25.493123.1
84 E.7/14.7 536.7 2 6
83 E.3/14.7 536.7 2 6
92
82 D.5/14.7 536.7 2 6
81 C.5/14.7 536.7 2 6
124.2 101.1 22.8 96
100.7 22.496123.3
80 B.5/14.7 536.7 2 6
24.5 94
79 A.7/14.7 536.7 2 6 122.5
123.9 100.5 23.3 95
97.1 26.2
95
78 A.3/14.7 536.7 2 6 122.9 98.7
77 E.7/14.7 536.2 2 6 123.5 99.9 23.6
76 E.3/14.7 536.2 2 6 123.0 98.0 25.5 93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:6 of 6
Work Order Number:1401155
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/4/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
538.7 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
116.5 91.7 27.0 94
D): 2279 (M):732StandardCount:
117.8
117.2
118.0
26.4 95
15 A.3/14.7
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
93.8 25.8
93.2
E.7/14.7 538.2 1 6
E.3/14.7 538.2 1 6
118.0
4921
General Location
Area:Building Pad
96121.4
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 6
1401156
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/5/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
91.1 28.7 93
25.9 96
96
26.6
94
96
95
93.7
26.5
28.4
11 C.5/14.7 538.2 1 6
12 D.5/14.7 538.2 1 6
118.1 94.1 25.5
3 B.5/14.7 537.7 1 6
2 A.7/14.7 537.7 1 6
117.7 93.6
1 A.3/14.7 537.7 1 6
117.7 93.0
9 A.7/14.7 538.2 1 6
8 A.3/14.7 538.2 1
4 C.5/14.7 537.7
10 B.5/14.7 538.2 1 6
6
7 E.7/14.7 537.7 1 6
5 D.5/14.7 537.7 1 6
117.7
118.1 93.3 26.6 95
96
92.5 27.2 94
25.7
94
6 E.3/14.7 537.7 1 6
117.1
117.4 92.8
91.2
95
93
25.496118.4
117.6
116.9 91.9 27.2
92.4 27.3
94.416
Client:GTIS Acquisitions, LLC Service Date:6/5/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1401156
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 6
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
28.6
16 A.7/14.7 538.7 1 6 118.0 94.1 25.4 96
94
18 C.5/14.7 538.7 1 6 117.3 93.1
17 B.5/14.7 538.7 1 6 117.9 91.7
90.2 27.7 92
26.0 95
9419D.5/14.7 538.7 1 6 117.2 92.6 26.6
117.8
20 E.3/14.7 538.7 1 6 115.2
95
91.7 28.5 94
22 A.3/14.7 539.2 1 6
21 E.7/14.7 538.7 1 6
116.8 92.8 25.9
115.6
24 B.5/14.7 539.2 1 6
23 A.7/14.7 539.2 1 6 90.7 27.5 93
116.2 91.5 27.0 93
26 D.5/14.7 539.2 1 6
25 C.5/14.7 539.2 1 6 94.4 25.5 96
117.3 93.0 26.1 95
118.5
28 E.7/14.7 539.2 1 6
27 E.3/14.7 539.2 1 6 93.6 25.5 96
118.7 94.4 25.7 96
117.5
30 A.7/14.7 539.7 2 6
29 A.3/14.7 539.7 2 6 98.3 25.8 93
123.1 98.8 24.6 94
123.7
D): 2279 (M):732
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:6/5/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1401156
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 6
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
22.7
31 B.5/14.7 539.7 2 6 123.4 100.8 22.4 96
95
33 D.5/14.7 539.7 2 6 123.0 98.7
32 C.5/14.7 539.7 2 6 122.6 99.9
99.1 24.6 94
24.6 94
9634E.3/14.7 539.7 2 6 123.0 100.6 22.3
122.4
35 E.7/14.7 539.7 2 6 123.5
95
97.5 25.5 93
37 A.7/14.7 540.2 2 6
36 A.3/14.7 540.2 2 6
124.8 100.3 24.4
122.7
39 C.5/14.7 540.2 2 6
38 B.5/14.7 540.2 2 6 96.6 27.0 92
123.4 97.4 26.7 92
41 E.3/14.7 540.2 2 6
40 D.5/14.7 540.2 2 6 98.6 24.8 94
123.3 99.0 24.5 94
123.1
43 A.3/14.7 540.7 2 6
42 E.7/14.7 540.2 2 6 100.2 23.6 95
122.7 96.8 26.8 92
123.8
45 B.5/14.7 540.7 2 6
44 A.7/14.7 540.7 2 6 97.3 27.1 92
123.4 98.8 24.9 94
123.7
D): 2279 (M):732
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2279 (M):732
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
122.9 99.9 23.0 95
98.9 24.294122.8
59 B.5/13.2 530.7 2 6
58 A.7/13.2 530.7 2 6
122.9 98.5 24.8 94
97.6 25.193122.1
57 A.3/13.2 530.7 2 6
56 E.7/13.2 530.2 2 6
123.7 101.3 22.1 96
100.7 22.396123.2
55 E.3/13.2 530.2 2 6
54 D.5/13.2 530.2 2 6
123.1 99.8 23.3 95
99.5 24.294123.6
53 C.5/13.2 530.2 2 6
52 B.5/13.2 530.2 2 6
93
51 A.7/13.2 530.2 2 6
50 A.3/13.2 530.2 2 6
123.1 97.9 25.7 93
100.2 23.695123.8
22.4 96
49 E.7/14.7 540.7 2 6 122.7 97.7 25.6
94
48 E.3/14.7 540.7 2 6 123.4 100.8
47 D.5/14.7 540.7 2 6 122.8 98.6 24.5
46 C.5/14.7 540.7 2 6 122.6 97.4 25.9 92
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 6
Work Order Number:1401156
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/5/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/5/2024
Work Order Number:1401156
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 6
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
60 C.5/13.2 530.7 2 6 123.7 101.1 22.4 96
95
62 E.3/13.2 530.7 2 6 123.8 98.4
61 D.5/13.2 530.7 2 6 123.8 100.5 23.2
64 A.3/13.2 531.2 2 6
25.8 93
63 E.7/13.2 530.7 2 6 122.8
123.4 100.1 23.3 95
97.8 25.6 93
66 B.5/13.2 531.2 2 6
65 A.7/13.2 531.2 2 6
122.8 99.4 23.5 94
98.0 25.293122.7
68 D.5/13.2 531.2 2 6
67 C.5/13.2 531.2 2 6
122.3 96.5 26.7 92
101.1 22.296123.5
70 E.7/13.2 531.2 2 6
69 E.3/13.2 531.2 2 6
122.2 97.5 25.3 93
96.8 26.592122.5
72 A.7/13.2 531.7 2 6
71 A.3/13.2 531.7 2 6
121.9 98.8 23.4 94
97.0 26.092122.2
74 C.5/13.2 531.7 2 6
73 B.5/13.2 531.7 2 6
121.7 99.0 22.9 94
96.6 26.992122.6
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2279 (M):732
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2279 (M):732
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
97.7 24.893121.984E.7/13.2 532.2 2 6
123.8 101.2 22.3 96
99.7 23.595123.1
83 E.3/13.2 532.2 2 6
82 D.5/13.2 532.2 2 6
96
81 C.5/13.2 532.2 2 6
80 B.5/13.2 532.2 2 6
122.7 98.6 24.4 94
97.5 25.793122.6
79 A.7/13.2 532.2 2 6
23.2 95
78 A.3/13.2 532.2 2 6 123.6
122.8 99.1 23.9 94
101.0 22.4
94
77 E.7/13.2 531.7 2 6 123.7 100.4
76 E.3/13.2 531.7 2 6 124.0 99.5 24.6
75 D.5/13.2 531.7 2 6 122.9 97.9 25.5 93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:6 of 6
Work Order Number:1401156
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/5/2024
93
96
28.593117.3
117.4
117.8 93.1 26.5
92.0 27.6
91.316
95
6 E.3/13.2 532.7 1 6
118.0
116.4 91.6
93.8
116.4
117.1 90.6 29.3 92
94
90.3 28.9 92
27.4
4 C.5/13.2 532.7
10 B.5/13.2 533.2 1 6
6
7 E.7/13.2 532.7 1 6
5 D.5/13.2 532.7 1 6
116.9 91.8
9 A.7/13.2 533.2 1 6
8 A.3/13.2 533.2 1
116.8 90.5 29.1
3 B.5/13.2 532.7 1 6
2 A.7/13.2 532.7 1 6
117.0 91.8
1 A.3/13.2 532.7 1 6
11 C.5/13.2 533.2 1 6
12 D.5/13.2 533.2 1 6
Clear
91.5 28.1 93
29.3 92
92
27.3
94
92
94
90.4
27.1
25.8
1401157
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/6/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 5
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
General Location
Area:Building Pad
96121.4
90.2 28.9
91.9
E.7/13.2 533.2 1 6
E.3/13.2 533.2 1 6
116.9
27.6 94
15 A.3/13.2
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
117.2 91.3 28.4 93
D): 2255 (M):733StandardCount:
117.3
117.2
116.3
14
Remarks:
533.7 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2255 (M):733
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
93.9 25.6 96
117.0 91.8 27.4 94
117.9
30 A.7/13.2 534.7 1 6
29 A.3/13.2 534.7 1 6
90.2 29.0 92
117.6 93.2 26.2 95
116.4
28 E.7/13.2 534.2 1 6
27 E.3/13.2 534.2 1 6
91.6 27.7 93
115.6 90.7 27.5 93
117.0
26 D.5/13.2 534.2 1 6
25 C.5/13.2 534.2 1 6
93.2 26.3 95
117.6 93.8 25.4 96
116.5 91.9 26.8
117.7
24 B.5/13.2 534.2 1 6
23 A.7/13.2 534.2 1 6
118.0
20 E.3/13.2 533.7 1 6 117.3
94
94.0 25.5 96
22 A.3/13.2 534.2 1 6
21 E.7/13.2 533.7 1 6
19 D.5/13.2 533.7 1 6 117.9 92.5 27.5
91.7 27.9 94
26.7 95
94
18 C.5/13.2 533.7 1 6 118.0 93.1
17 B.5/13.2 533.7 1 6 116.7 90.6 28.8
16 A.7/13.2 533.7 1 6 117.5 92.3 27.3 94
92
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 5
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Work Order Number:1401157
Client:GTIS Acquisitions, LLC Service Date:6/6/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2255 (M):733
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
99.0 24.6 94
123.8 101.4 22.1 96
123.4
45 B.5/13.2 535.7 2 6
44 A.7/13.2 535.7 2 6
99.5 24.6 94
123.4 100.6 22.7 96
124.0
43 A.3/13.2 535.7 2 6
42 E.7/13.2 535.2 2 6
97.5 26.4 93
124.1 97.2 27.7 92
123.2
41 E.3/13.2 535.2 2 6
40 D.5/13.2 535.2 2 6
98.6 25.0 94
123.4 98.9 24.8 94
124.2 97.1 27.9
123.3
39 C.5/13.2 535.2 2 6
38 B.5/13.2 535.2 2 6
123.8
35 E.7/13.2 534.7 1 6 117.7
92
101.3 22.2 96
37 A.7/13.2 535.2 2 6
36 A.3/13.2 535.2 2 6
34 E.3/13.2 534.7 1 6 118.0 92.4 27.7
93.5 25.9 95
26.3 95
94
33 D.5/13.2 534.7 1 6 117.3 92.9
32 C.5/13.2 534.7 1 6 117.9 93.1 26.6
31 B.5/13.2 534.7 1 6 116.7 90.8 28.5 93
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 5
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Work Order Number:1401157
Client:GTIS Acquisitions, LLC Service Date:6/6/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/6/2024
Work Order Number:1401157
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 5
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 C.5/13.2 535.7 2 6 122.7 96.9 26.6 92
93
48 E.3/13.2 535.7 2 6 122.9 96.8
47 D.5/13.2 535.7 2 6 123.4 98.2 25.7
50 A.3/13.2 536.2 2 6
27.0 92
49 E.7/13.2 535.7 2 6 123.5
122.9 99.6 23.4 95
97.4 26.8 92
52 B.5/13.2 536.2 2 6
51 A.7/13.2 536.2 2 6
123.5 99.9 23.6 95
98.3 25.593123.4
54 D.5/13.2 536.2 2 6
53 C.5/13.2 536.2 2 6
123.8 100.9 22.7 96
100.7 22.596123.4
56 E.7/13.2 536.2 2 6
55 E.3/13.2 536.2 2 6
122.7 99.0 23.9 94
98.6 24.694122.9
58 A.7/13.2 536.7 2 6
57 A.3/13.2 536.7 2 6
123.8 98.4 25.8 93
97.3 26.992123.5
60 C.5/13.2 536.7 2 6
59 B.5/13.2 536.7 2 6
123.1 100.9 22.0 96
99.1 24.794123.6
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2255 (M):733
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2255 (M):733
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
99.5 24.594123.970E.7/13.2 537.2 2 6
123.9 101.3 22.3 96
98.6 24.694122.9
69 E.3/13.2 537.2 2 6
68 D.5/13.2 537.2 2 6
94
67 C.5/13.2 537.2 2 6
66 B.5/13.2 537.2 2 6
122.7 97.6 25.7 93
98.0 24.993122.4
65 A.7/13.2 537.2 2 6
25.1 93
64 A.3/13.2 537.2 2 6 122.6
122.4 99.6 22.9 95
98.7 24.2
96
63 E.7/13.2 536.7 2 6 122.8 98.2
62 E.3/13.2 536.7 2 6 123.6 101.0 22.4
61 D.5/13.2 536.7 2 6 123.9 101.5 22.1 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 5
Work Order Number:1401157
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/6/2024
96
93
25.696118.1
117.3
123.8 101.2 22.3
92.0 27.5
94.016
96
6 E.3/13.2 537.7 1 6
123.6
118.0 94.1
98.4
118.2
118.0 91.6 28.8 93
94
93.5 26.4 95
27.3
4 C.5/13.2 537.7
10 B.5/13.2 538.2 2 6
6
7 E.7/13.2 537.7 1 6
5 D.5/13.2 537.7 1 6
123.4 99.1
9 A.7/13.2 538.2 2 6
8 A.3/13.2 538.2 2
117.7 92.9 26.7
3 B.5/13.2 537.7 1 6
2 A.7/13.2 537.7 1 6
116.9 91.8
1 A.3/13.2 537.7 1 6
11 C.5/13.2 538.2 2 6
12 D.5/13.2 538.2 2 6
Clear
99.8 23.4 95
26.0 92
95
24.5
94
95
94
96.7
25.4
25.6
1401158
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/7/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
100.5 22.9
98.6
E.7/13.2 538.2 2 6
E.3/13.2 538.2 2 6
121.8
24.7 94
15 A.3/13.2
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
122.4 97.8 25.2 93
D): 2262 (M):736StandardCount:
123.0
123.2
123.5
14
Remarks:
538.7 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2262 (M):736
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
96.8 26.6 92
123.8 98.4 25.8 93
122.5
30 A.7/13.2 539.7 2 6
29 A.3/13.2 539.7 2 6
100.7 22.7 96
123.3 99.9 23.4 95
123.6
28 E.7/13.2 539.2 2 6
27 E.3/13.2 539.2 2 6
97.7 25.7 93
123.0 98.5 24.9 94
122.8
26 D.5/13.2 539.2 2 6
25 C.5/13.2 539.2 2 6
97.2 26.1 92
123.0 98.0 25.5 93
123.8 101.2 22.3
122.6
24 B.5/13.2 539.2 2 6
23 A.7/13.2 539.2 2 6
123.6
20 E.3/13.2 538.7 2 6 123.4
96
99.8 23.8 95
22 A.3/13.2 539.2 2 6
21 E.7/13.2 538.7 2 6
19 D.5/13.2 538.7 2 6 122.8 98.7 24.4
99.4 24.1 94
22.3 96
94
18 C.5/13.2 538.7 2 6 123.4 100.9
17 B.5/13.2 538.7 2 6 123.3 100.6 22.6
16 A.7/13.2 538.7 2 6 122.0 96.9 25.9 92
96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Work Order Number:1401158
Client:GTIS Acquisitions, LLC Service Date:6/7/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2262 (M):736
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
100.3 23.4 95
123.8 99.4 24.5 94
123.8
45 B.5/13.2 540.7 2 6
44 A.7/13.2 540.7 2 6
100.5 23.8 95
123.9 101.4 22.2 96
124.4
43 A.3/13.2 540.7 2 6
42 E.7/13.2 540.2 2 6
98.1 25.9 93
122.7 96.6 27.0 92
123.5
41 E.3/13.2 540.2 2 6
40 D.5/13.2 540.2 2 6
98.9 24.0 94
123.8 99.2 24.8 94
123.4 98.3 25.5
122.6
39 C.5/13.2 540.2 2 6
38 B.5/13.2 540.2 2 6
124.4
35 E.7/13.2 539.7 2 6 123.9
93
99.5 25.0 94
37 A.7/13.2 540.2 2 6
36 A.3/13.2 540.2 2 6
34 E.3/13.2 539.7 2 6 123.0 96.9 26.9
101.0 22.7 96
22.5 96
92
33 D.5/13.2 539.7 2 6 123.4 100.7
32 C.5/13.2 539.7 2 6 122.8 98.8 24.3
31 B.5/13.2 539.7 2 6 123.4 98.2 25.7 93
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Work Order Number:1401158
Client:GTIS Acquisitions, LLC Service Date:6/7/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/7/2024
Work Order Number:1401158
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 C.5/13.2 540.7 2 6 123.5 100.9 22.4 96
94
48 E.3/13.2 540.7 2 6 124.3 101.2
47 D.5/13.2 540.7 2 6 123.6 99.3 24.5
22.8 96
49 E.7/13.2 540.7 2 6 122.5 97.8 25.3 93
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2262 (M):736
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
531.2 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
118.3 94.0 25.8 96
D): 2270 (M):731StandardCount:
117.4
118.1
117.0
28.7 93
15 A.3/11.8
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
91.8 27.5
91.2
E.7/11.8 530.7 1 6
E.3/11.8 530.7 1 6
117.6
4921
General Location
Area:Building Pad
96121.4
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
1401159
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/8/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
93.3 26.6 95
25.5 96
94
25.4
94
94
96
93.7
29.9
28.6
11 C.5/11.8 530.7 1 6
12 D.5/11.8 530.7 1 6
117.1 92.6 26.5
3 B.5/11.8 530.2 1 6
2 A.7/11.8 530.2 1 6
117.2 92.0
1 A.3/11.8 530.2 1 6
117.8 93.9
9 A.7/11.8 530.7 1 6
8 A.3/11.8 530.7 1
4 C.5/11.8 530.2
10 B.5/11.8 530.7 1 6
6
7 E.7/11.8 530.2 1 6
5 D.5/11.8 530.2 1 6
117.8
117.9 91.5 28.8 93
94
93.4 26.1 95
27.4
94
6 E.3/11.8 530.2 1 6
117.4
117.7 90.6
91.3
92
93
25.696118.1
117.7
117.6 92.3 27.4
92.2 27.7
94.016
Client:GTIS Acquisitions, LLC Service Date:6/8/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Work Order Number:1401159
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
28.3
16 A.7/11.8 531.2 1 6 118.1 93.2 26.7 95
93
18 C.5/11.8 531.2 1 6 117.8 93.9
17 B.5/11.8 531.2 1 6 117.5 91.6
94.1 25.9 96
25.4 96
9319D.5/11.8 531.2 1 6 116.7 90.8 28.5
117.9
20 E.3/11.8 531.2 1 6 118.5
95
92.5 27.5 94
22 A.3/11.8 531.7 1 6
21 E.7/11.8 531.2 1 6
117.2 92.7 26.4
118.3
24 B.5/11.8 531.7 1 6
23 A.7/11.8 531.7 1 6 94.3 25.5 96
117.3 91.6 28.1 93
26 D.5/11.8 531.7 1 6
25 C.5/11.8 531.7 1 6 91.9 27.7 94
116.8 90.4 29.2 92
117.4
28 E.7/11.8 531.7 1 6
27 E.3/11.8 531.7 1 6 92.5 28.0 94
117.6 92.2 27.6 94
118.4
30 A.7/11.8 532.2 1 6
29 A.3/11.8 532.2 1 6 93.7 26.0 96
118.1 93.1 26.8 95
118.1
D): 2270 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:6/8/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
Work Order Number:1401159
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
27.5
31 B.5/11.8 532.2 1 6 117.7 91.4 28.8 93
94
33 D.5/11.8 532.2 1 6 117.9 93.3
32 C.5/11.8 532.2 1 6 117.3 92.0
91.8 27.3 94
26.4 95
9634E.3/11.8 532.2 1 6 117.7 93.6 25.7
118.0
35 E.7/11.8 532.2 1 6 116.9
96
92.3 27.8 94
37 A.7/11.8 532.7 1 6
36 A.3/11.8 532.7 1 6
118.2 94.2 25.5
118.2
39 C.5/11.8 532.7 1 6
38 B.5/11.8 532.7 1 6 93.4 26.6 95
117.8 93.8 25.6 96
41 E.3/11.8 532.7 1 6
40 D.5/11.8 532.7 1 6 92.5 27.7 94
117.4 91.3 28.6 93
118.1
43 A.3/11.8 533.2 1 6
42 E.7/11.8 532.7 1 6 93.6 25.8 96
117.7 92.4 27.4 94
117.7
45 B.5/11.8 533.2 1 6
44 A.7/11.8 533.2 1 6 93.5 26.7 95
117.8 93.9 25.5 96
118.5
D): 2270 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2270 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
125.2 98.4 27.2 93
99.9 23.395123.2
56 E.7/11.8 533.7 2 6
55 E.3/11.8 533.7 2 6
123.0 100.6 22.3 96
100.3 23.595123.9
54 D.5/11.8 533.7 2 6
53 C.5/11.8 533.7 2 6
94
52 B.5/11.8 533.7 2 6
51 A.7/11.8 533.7 2 6
122.3 96.5 26.7 92
98.6 24.494122.7
50 A.3/11.8 533.7 2 6
28.9 93
49 E.7/11.8 533.2 1 6 117.4
123.7 101.3 22.1 96
91.9 27.7
94
48 E.3/11.8 533.2 1 6 118.1 91.6
47 D.5/11.8 533.2 1 6 117.8 92.5 27.4
46 C.5/11.8 533.2 1 6 118.0 94.0 25.5 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Work Order Number:1401159
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/8/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
535.2 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
118.1 93.5 26.3 95
D): 2281 (M):727StandardCount:
117.0
117.8
117.8
27.6 94
15 A.3/11.8
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
93.9 25.5
91.7
E.7/11.8 534.7 1 6
E.3/11.8 534.7 1 6
117.0
4921
General Location
Area:Building Pad
96121.4
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
1404475
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/10/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
92.5 27.3 94
28.4 93
96
28.4
95
96
93
91.1
26.4
28.2
11 C.5/11.8 534.7 1 6
12 D.5/11.8 534.7 1 6
118.3 94.1 25.7
3 B.5/11.8 534.2 1 6
2 A.7/11.8 534.2 1 6
118.0 93.8
1 A.3/11.8 534.2 1 6
116.8 91.0
9 A.7/11.8 534.7 1 6
8 A.3/11.8 534.7 1
4 C.5/11.8 534.2
10 B.5/11.8 534.7 1 6
6
7 E.7/11.8 534.2 1 6
5 D.5/11.8 534.2 1 6
117.9
117.8 92.3 27.6 94
96
93.2 26.5 95
25.8
94
6 E.3/11.8 534.2 1 6
117.0
118.1 93.4
91.3
95
93
25.496117.9
117.8
116.7 91.8 27.1
93.0 26.7
94.016
Client:GTIS Acquisitions, LLC Service Date:6/10/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1404475
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
28.2
16 A.7/11.8 535.2 1 6 116.8 90.3 29.4 92
93
18 C.5/11.8 535.2 1 6 116.0 90.7
17 B.5/11.8 535.2 1 6 117.4 91.6
92.0 27.3 94
27.9 93
9219D.5/11.8 535.2 1 6 116.1 90.1 28.9
116.4
20 E.3/11.8 535.2 1 6 117.1
95
90.9 28.0 93
22 A.3/11.8 535.7 1 6
21 E.7/11.8 535.2 1 6
118.1 93.3 26.6
118.3
24 B.5/11.8 535.7 1 6
23 A.7/11.8 535.7 1 6 93.8 26.1 96
117.8 93.0 26.7 95
26 D.5/11.8 535.7 1 6
25 C.5/11.8 535.7 1 6 90.9 27.7 93
117.6 92.6 27.0 94
116.1
28 E.7/11.8 535.7 1 6
27 E.3/11.8 535.7 1 6 92.9 26.5 95
117.8 93.3 26.3 95
117.5
30 A.7/11.8 536.2 1 6
29 A.3/11.8 536.2 1 6 90.8 28.6 93
116.8 90.5 29.1 92
116.8
D): 2281 (M):727
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
If applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:6/10/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1404475
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
27.2
31 B.5/11.8 536.2 1 6 118.2 93.5 26.4 95
94
33 D.5/11.8 536.2 1 6 117.2 91.8
32 C.5/11.8 536.2 1 6 117.4 92.3
91.9 26.9 94
27.7 94
9634E.3/11.8 536.2 1 6 117.6 93.7 25.5
123.7
35 E.7/11.8 536.2 1 6 116.6
92
101.2 22.2 96
37 A.7/11.8 536.7 2 6
36 A.3/11.8 536.7 2 6
122.3 96.4 26.9
123.9
39 C.5/11.8 536.7 2 6
38 B.5/11.8 536.7 2 6 99.5 24.5 94
123.1 98.7 24.7 94
41 E.3/11.8 536.7 2 6
40 D.5/11.8 536.7 2 6 98.2 23.1 93
123.1 99.6 23.6 95
120.9
43 A.3/11.8 537.2 2 6
42 E.7/11.8 536.7 2 6 100.7 22.8 96
123.1 99.7 23.5 95
123.7
45 B.5/11.8 537.2 2 6
44 A.7/11.8 537.2 2 6 98.1 25.2 93
122.9 98.8 24.4 94
122.8
D): 2281 (M):727
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2281 (M):727
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
122.5 97.5 25.6 93
98.9 24.794123.3
56 E.7/11.8 537.7 2 6
55 E.3/11.8 537.7 2 6
122.3 98.5 24.2 94
99.3 24.594123.6
54 D.5/11.8 537.7 2 6
53 C.5/11.8 537.7 2 6
95
52 B.5/11.8 537.7 2 6
51 A.7/11.8 537.7 2 6
123.5 96.9 27.4 92
97.4 26.992123.6
50 A.3/11.8 537.7 2 6
26.8 92
49 E.7/11.8 537.2 2 6 123.2
125.3 98.3 27.5 93
99.8 23.4
95
48 E.3/11.8 537.2 2 6 122.6 96.7
47 D.5/11.8 537.2 2 6 124.1 100.4 23.6
46 C.5/11.8 537.2 2 6 124.9 98.3 27.1 93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Work Order Number:1404475
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/12/2024
New York, NY 10019 Weather:Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/10/2024
94
92
28.992115.6
117.7
118.1 91.6 28.9
93.1 26.4
89.716
93
6 E.3/11.8 538.2 1 6
116.6
117.0 91.8
90.0
117.2
117.2 91.5 28.1 93
93
91.7 27.8 94
28.3
4 C.5/11.8 538.2
10 B.5/11.8 538.7 1 6
6
7 E.7/11.8 538.2 1 6
5 D.5/11.8 538.2 1 6
118.3 94.2
9 A.7/11.8 538.7 1 6
8 A.3/11.8 538.7 1
116.9 90.5 29.2
3 B.5/11.8 538.2 1 6
2 A.7/11.8 538.2 1 6
116.6 90.9
1 A.3/11.8 538.2 1 6
11 C.5/11.8 538.7 1 6
12 D.5/11.8 538.7 1 6
Partly Cloudy
93.9 25.8 96
29.4 92
92
25.6
95
95
96
89.9
27.5
29.5
1404476
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/11/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
93.3 26.7
91.8
E.7/11.8 538.7 1 6
E.3/11.8 538.7 1 6
116.3
27.5 94
15 A.3/11.8
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
123.9 101.3 22.3 96
D): 2266 (M):729StandardCount:
117.0
118.1
118.2
14
Remarks:
Test results on this report meet project specifications.
539.2 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2266 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
If applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
100.1 23.5 95
123.6 99.8 23.8 95
123.6
30 A.7/11.8 540.2 2 6
29 A.3/11.8 540.2 2 6
100.9 22.7 96
124.0 101.5 22.2 96
123.8
28 E.7/11.8 539.7 2 6
27 E.3/11.8 539.7 2 6
98.6 24.1 94
123.9 101.2 22.4 96
122.4
26 D.5/11.8 539.7 2 6
25 C.5/11.8 539.7 2 6
97.2 26.5 92
123.2 98.0 25.7 93
123.4 100.3 23.0
123.0
24 B.5/11.8 539.7 2 6
23 A.7/11.8 539.7 2 6
122.5
20 E.3/11.8 539.2 2 6 122.7
95
98.9 23.9 94
22 A.3/11.8 539.7 2 6
21 E.7/11.8 539.2 2 6
19 D.5/11.8 539.2 2 6 123.7 100.7 22.8
98.7 24.3 94
22.4 96
96
18 C.5/11.8 539.2 2 6 123.7 101.1
17 B.5/11.8 539.2 2 6 123.8 99.4 24.5
16 A.7/11.8 539.2 2 6 123.5 100.2 23.3 95
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:Partly Cloudy
Work Order Number:1404476
Client:GTIS Acquisitions, LLC Service Date:6/11/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2266 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
96.9 26.7 92
123.0 97.6 26.0 93
122.8
44 A.7/10.2 530.2 2 6
43 A.3/10.2 530.2 2 6
100.2 23.895124.042E.7/11.8 540.7 2 6
100.4 23.0 95
123.6 100.6 22.9 96
123.5
41 E.3/11.8 540.7 2 6
40 D.5/11.8 540.7 2 6
98.1 25.6 93
123.8 101.4 22.1 96
123.5 99.2 24.5
123.2
39 C.5/11.8 540.7 2 6
38 B.5/11.8 540.7 2 6
124.2
35 E.7/11.8 540.2 2 6 123.1
94
100.5 23.6 95
37 A.7/11.8 540.7 2 6
36 A.3/11.8 540.7 2 6
34 E.3/11.8 540.2 2 6 123.3 99.2 24.3
99.9 23.2 95
22.7 96
94
33 D.5/11.8 540.2 2 6 123.7 100.8
32 C.5/11.8 540.2 2 6 124.1 101.3 22.5
31 B.5/11.8 540.2 2 6 122.7 99.1 23.8 94
96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:Partly Cloudy
Work Order Number:1404476
Client:GTIS Acquisitions, LLC Service Date:6/11/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/11/2024
Work Order Number:1404476
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:Partly Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
45 B.5/10.2 530.2 2 6 123.6 99.2 24.6 94
93
47 D.5/10.2 530.2 2 6 122.7 98.8
46 C.5/10.2 530.2 2 6 122.7 97.6 25.7
49 E.7/10.2 530.2 2 6
24.2 94
48 E.3/10.2 530.2 2 6 123.3
124.0 101.2 22.5 96
98.4 25.3 93
51 A.7/10.2 530.7 2 6
50 A.3/10.2 530.7 2 6
123.7 100.5 23.1 95
99.7 23.695123.2
53 C.5/10.2 530.7 2 6
52 B.5/10.2 530.7 2 6
123.5 99.4 24.2 94
98.9 24.594123.1
55 E.3/10.2 530.7 2 6
54 D.5/10.2 530.7 2 6
123.5 98.3 25.6 93
100.8 22.796123.7
56 E.7/10.2 530.7 2 6 101.0 22.396123.5
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2266 (M):729
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
93
96
25.596118.0
117.3
123.4 99.5 24.0
91.2 28.6
94.016
94
6 E.3/10.2 531.2 1 6
123.6
117.1 90.9
101.1
117.5
118.0 93.4 26.3 95
94
91.5 28.4 93
27.2
4 C.5/10.2 531.2
10 B.5/10.2 531.7 2 6
6
7 E.7/10.2 531.2 1 6
5 D.5/10.2 531.2 1 6
123.6 99.1
9 A.7/10.2 531.7 2 6
8 A.3/10.2 531.7 2
118.1 93.2 26.7
3 B.5/10.2 531.2 1 6
2 A.7/10.2 531.2 1 6
117.8 92.6
1 A.3/10.2 531.2 1 6
11 C.5/10.2 531.7 2 6
12 D.5/10.2 531.7 2 6
Clear
98.8 24.4 94
23.9 94
95
24.7
93
95
94
99.3
28.8
22.3
1404477
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/12/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 5
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
100.2 23.5
98.0
E.7/10.2 531.7 2 6
E.3/10.2 531.7 2 6
123.0
25.0 93
15 A.3/10.2
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
117.3 91.6 28.1 93
D): 2280 (M):728StandardCount:
122.5
122.9
123.7
14
Remarks:
Test results on this report meet project specifications.
532.2 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2280 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
91.5 28.8 93
116.8 91.1 28.2 93
117.9
30 A.7/10.2 533.2 1 6
29 A.3/10.2 533.2 1 6
92.6 27.7 94
117.5 93.0 26.3 95
118.3
28 E.7/10.2 532.7 1 6
27 E.3/10.2 532.7 1 6
93.7 25.8 96
118.1 93.2 26.7 95
117.9
26 D.5/10.2 532.7 1 6
25 C.5/10.2 532.7 1 6
92.1 27.0 94
118.2 94.1 25.6 96
117.7 93.5 25.9
117.0
24 B.5/10.2 532.7 1 6
23 A.7/10.2 532.7 1 6
117.7
20 E.3/10.2 532.2 1 6 117.6
95
93.3 26.1 95
22 A.3/10.2 532.7 1 6
21 E.7/10.2 532.2 1 6
19 D.5/10.2 532.2 1 6 117.4 91.9 27.7
92.4 27.3 94
28.6 93
94
18 C.5/10.2 532.2 1 6 117.8 91.6
17 B.5/10.2 532.2 1 6 118.5 94.5 25.4
16 A.7/10.2 532.2 1 6 117.3 92.0 27.5 94
96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 5
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:Clear
Work Order Number:1404477
Client:GTIS Acquisitions, LLC Service Date:6/12/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2280 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
98.8 24.5 94
123.1 99.1 24.2 94
123.0
45 B.5/10.2 534.2 2 6
44 A.7/10.2 534.2 2 6
99.2 24.7 94
123.3 98.4 25.3 93
123.7
43 A.3/10.2 534.2 2 6
42 E.7/10.2 533.7 2 6
98.0 25.6 93
123.1 100.8 22.1 96
123.1
41 E.3/10.2 533.7 2 6
40 D.5/10.2 533.7 2 6
101.0 22.3 96
123.6 100.1 23.5 95
122.8 97.7 25.7
123.5
39 C.5/10.2 533.7 2 6
38 B.5/10.2 533.7 2 6
122.6
35 E.7/10.2 533.2 1 6 117.1
93
96.7 26.8 92
37 A.7/10.2 533.7 2 6
36 A.3/10.2 533.7 2 6
34 E.3/10.2 533.2 1 6 117.6 91.3 28.8
90.5 29.4 92
25.5 96
93
33 D.5/10.2 533.2 1 6 118.1 94.1
32 C.5/10.2 533.2 1 6 117.9 92.9 26.9
31 B.5/10.2 533.2 1 6 118.2 93.4 26.6 95
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 5
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:Clear
Work Order Number:1404477
Client:GTIS Acquisitions, LLC Service Date:6/12/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/12/2024
Work Order Number:1404477
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 5
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 C.5/10.2 534.2 2 6 123.1 98.2 25.4 93
95
48 E.3/10.2 534.2 2 6 122.0 97.7
47 D.5/10.2 534.2 2 6 122.8 99.6 23.3
50 A.3/10.2 534.7 2 6
24.9 93
49 E.7/10.2 534.2 2 6 123.3
123.7 99.3 24.6 94
98.1 25.7 93
52 B.5/10.2 534.7 2 6
51 A.7/10.2 534.7 2 6
122.8 96.9 26.7 92
96.7 26.592122.3
54 D.5/10.2 534.7 2 6
53 C.5/10.2 534.7 2 6
123.2 99.2 24.2 94
98.0 25.393122.8
56 E.7/10.2 534.7 2 6
55 E.3/10.2 534.7 2 6
123.4 99.0 24.6 94
99.9 23.095122.9
58 A.7/10.2 535.2 2 6
57 A.3/10.2 535.2 2 6
123.2 97.0 27.0 92
96.6 26.792122.4
60 C.5/10.2 535.2 2 6
59 B.5/10.2 535.2 2 6
123.5 99.3 24.4 94
98.1 25.593123.1
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2280 (M):728
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2280 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
100.3 22.995123.370E.7/10.2 535.7 2 6
123.9 100.5 23.3 95
99.6 23.095122.5
69 E.3/10.2 535.7 2 6
68 D.5/10.2 535.7 2 6
95
67 C.5/10.2 535.7 2 6
66 B.5/10.2 535.7 2 6
122.0 97.7 24.9 93
99.5 24.294123.6
65 A.7/10.2 535.7 2 6
25.6 93
64 A.3/10.2 535.7 2 6 122.9
123.4 100.7 22.5 96
99.8 23.1
94
63 E.7/10.2 535.2 2 6 123.6 98.4
62 E.3/10.2 535.2 2 6 123.5 99.3 24.4
61 D.5/10.2 535.2 2 6 123.0 97.0 26.8 92
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 5
Work Order Number:1404477
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/19/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/12/2024
96
96
23.695123.8
124.1
123.4 100.0 23.4
99.4 24.8
100.216
95
6 E.3/10.2 536.2 1 6
123.7
123.6 101.2
100.8
122.3
123.2 98.3 25.3 93
93
98.5 24.2 94
25.0
4 C.5/10.2 536.2
10 B.5/10.2 536.7 1 6
6
7 E.7/10.2 536.2 1 6
5 D.5/10.2 536.2 1 6
124.3 99.5
9 A.7/10.2 536.7 1 6
8 A.3/10.2 536.7 1
123.6 99.1 24.7
3 B.5/10.2 536.2 1 6
2 A.7/10.2 536.2 1 6
122.4 97.9
1 A.3/10.2 536.2 1 6
11 C.5/10.2 536.7 1 6
12 D.5/10.2 536.7 1 6
Clear
97.7 25.7 93
22.8 96
94
24.9
94
96
94
100.9
22.1
22.7
1404478
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/13/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 5
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4923
General Location
Area:Building Pad
96118.0
101.3 22.4
99.8
E.7/10.2 536.7 1 6
E.3/10.2 536.7 1 6
123.9
22.9 95
15 A.3/10.2
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
123.1 99.7 23.5 95
D): 2248 (M):732StandardCount:
122.7
122.8
124.0
14
Remarks:Test results on this report meet project specifications.
537.2 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2248 (M):732
Remarks: Test results on this report meet project specifications.
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
99.9 23.1 95
123.5 98.4 25.5 93
123.0
30 A.7/10.2 538.2 1 6
29 A.3/10.2 538.2 1 6
98.7 24.5 94
123.1 100.7 22.2 96
122.9
28 E.7/10.2 537.7 1 6
27 E.3/10.2 537.7 1 6
97.0 26.6 92
121.5 96.5 25.9 92
122.8
26 D.5/10.2 537.7 1 6
25 C.5/10.2 537.7 1 6
100.3 23.7 95
122.6 96.7 26.8 92
123.4 98.9 24.8
124.1
24 B.5/10.2 537.7 1 6
23 A.7/10.2 537.7 1 6
124.0
20 E.3/10.2 537.2 1 6 123.6
94
101.0 22.8 96
22 A.3/10.2 537.7 1 6
21 E.7/10.2 537.2 1 6
19 D.5/10.2 537.2 1 6 123.5 99.4 24.2
100.2 23.4 95
22.5 96
94
18 C.5/10.2 537.2 1 6 123.6 100.9
17 B.5/10.2 537.2 1 6 122.9 98.6 24.6
16 A.7/10.2 537.2 1 6 123.4 100.1 23.3 95
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 5
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Work Order Number:1404478
Client:GTIS Acquisitions, LLC Service Date:6/13/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2248 (M):732
Remarks: Test results on this report meet project specifications.
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
97.1 26.0 92
123.4 98.3 25.5 93
122.3
45 B.5/10.2 539.2 1 6
44 A.7/10.2 539.2 1 6
99.5 24.5 94
123.5 97.7 26.4 93
123.9
43 A.3/10.2 539.2 1 6
42 E.7/10.2 538.7 1 6
98.4 25.1 93
123.5 99.0 24.7 94
123.1
41 E.3/10.2 538.7 1 6
40 D.5/10.2 538.7 1 6
99.8 23.6 95
122.1 97.0 25.9 92
123.5 99.3 24.4
123.4
39 C.5/10.2 538.7 1 6
38 B.5/10.2 538.7 1 6
123.3
35 E.7/10.2 538.2 1 6 123.5
94
98.1 25.7 93
37 A.7/10.2 538.7 1 6
36 A.3/10.2 538.7 1 6
34 E.3/10.2 538.2 1 6 122.9 99.6 23.4
99.0 24.7 94
22.3 96
95
33 D.5/10.2 538.2 1 6 123.3 100.8
32 C.5/10.2 538.2 1 6 122.3 97.6 25.3
31 B.5/10.2 538.2 1 6 123.9 99.2 24.9 94
93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 5
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Work Order Number:1404478
Client:GTIS Acquisitions, LLC Service Date:6/13/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/13/2024
Work Order Number:1404478
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 5
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 C.5/10.2 539.2 1 6 123.8 100.9 22.7 96
93
48 E.3/10.2 539.2 1 6 121.8 97.5
47 D.5/10.2 539.2 1 6 123.1 98.1 25.5
50 A.3/10.2 539.7 1 6
24.9 93
49 E.7/10.2 539.2 1 6 122.4
122.2 96.9 26.1 92
97.8 25.2 93
52 B.5/10.2 539.7 1 6
51 A.7/10.2 539.7 1 6
123.1 99.2 24.1 94
96.7 26.392122.1
54 D.5/10.2 539.7 1 6
53 C.5/10.2 539.7 1 6
124.0 101.2 22.5 96
99.4 24.494123.7
56 E.7/10.2 539.7 1 6
55 E.3/10.2 539.7 1 6
123.6 100.2 23.4 95
100.5 23.295123.8
58 A.7/10.2 540.2 1 6
57 A.3/10.2 540.2 1 6
122.6 97.6 25.6 93
101.1 22.296123.5
60 C.5/10.2 540.2 1 6
59 B.5/10.2 540.2 1 6
123.1 98.7 24.7 94
99.0 24.594123.3
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2248 (M):732
Remarks: Test results on this report meet project specifications.
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2248 (M):732
Remarks: Test results on this report meet project specifications.
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
100.4 23.595124.070E.7/10.2 540.7 1 6
122.8 97.7 25.7 93
99.2 24.694123.6
69 E.3/10.2 540.7 1 6
68 D.5/10.2 540.7 1 6
92
67 C.5/10.2 540.7 1 6
66 B.5/10.2 540.7 1 6
123.1 100.6 22.4 96
97.1 26.592122.8
65 A.7/10.2 540.7 1 6
23.5 94
64 A.3/10.2 540.7 1 6 122.6
122.9 97.5 26.0 93
96.8 26.7
96
63 E.7/10.2 540.2 1 6 122.5 99.2
62 E.3/10.2 540.2 1 6 123.8 100.9 22.7
61 D.5/10.2 540.2 1 6 123.3 100.3 22.9 95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 5
Work Order Number:1404478
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/13/2024
93
94
25.293122.2
122.8
122.5 97.3 25.9
97.0 26.6
97.616
92
6 E.7/9.0 530.2 1 6
122.9
123.0 98.1
99.0
123.0
122.8 98.5 24.7 94
93
98.8 24.5 94
25.5
4 D.5/9.0 530.2
10 D.5/9.0 530.7 1 6
6
7 A.5/9.0 530.7 1 6
5 E.3/9.0 530.2 1 6
122.9 97.7
9 C.5/9.0 530.7 1 6
8 B.5/9.0 530.7 1
123.2 97.2 26.7
3 C.5/9.0 530.2 1 6
2 B.5/9.0 530.2 1 6
123.4 98.3
1 A.5/9.0 530.2 1 6
11 E.3/9.0 530.7 1 6
12 E.7/9.0 530.7 1 6
Clear
99.4 24.5 94
24.8 94
92
25.8
92
94
93
99.1
25.4
24.1
1404479
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/14/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 6
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4923
General Location
Area:Building Pad
96118.0
98.6 23.9
99.8
B.5/9.0 531.2 1 6
A.5/9.0 531.2 1 6
123.7
23.4 95
15 C.5/9.0
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
122.4 96.9 26.3 92
D): 2260 (M):730StandardCount:
123.2
123.8
122.2
14
Remarks:Test results on this report meet project specifications.
531.2 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2260 (M):730
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
99.6 23.6 95
122.5 99.7 22.9 95
123.1
30 E.7/9.0 532.2 1 6
29 E.3/9.0 532.2 1 6
101.1 22.3 96
123.2 98.2 25.5 93
123.6
28 D.5/9.0 532.2 1 6
27 C.5/9.0 532.2 1 6
99.5 24.6 94
123.9 100.4 23.4 95
124.0
26 B.5/9.0 532.2 1 6
25 A.5/9.0 532.2 1 6
98.3 25.0 93
122.8 98.9 24.2 94
121.5 96.6 25.8
122.9
24 E.7/9.0 531.7 1 6
23 E.3/9.0 531.7 1 6
122.9
20 B.5/9.0 531.7 1 6 122.8
92
97.1 26.6 92
22 D.5/9.0 531.7 1 6
21 C.5/9.0 531.7 1 6
19 A.5/9.0 531.7 1 6 122.8 98.7 24.4
99.6 23.3 95
25.3 93
94
18 E.7/9.0 531.2 1 6 122.8 98.0
17 E.3/9.0 531.2 1 6 122.8 97.4 26.1
16 D.5/9.0 531.2 1 6 123.6 99.9 23.7 95
92
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 6
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Work Order Number:1404479
Client:GTIS Acquisitions, LLC Service Date:6/14/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2260 (M):730
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
98.4 25.0 93
123.6 100.2 23.4 95
123.0
45 C.5/9.0 533.7 1 6
44 B.5/9.0 533.7 1 6
99.3 24.8 94
121.6 96.6 25.9 92
123.9
43 A.5/9.0 533.7 1 6
42 E.7/9.0 533.2 1 6
98.0 25.7 93
123.1 100.1 23.0 95
123.2
41 E.3/9.0 533.2 1 6
40 D.5/9.0 533.2 1 6
99.9 23.6 95
122.8 98.2 25.1 93
123.6 99.4 24.3
123.5
39 C.5/9.0 533.2 1 6
38 B.5/9.0 533.2 1 6
123.6
35 E.3/9.0 532.7 1 6 122.4
94
100.9 22.5 96
37 A.5/9.0 533.2 1 6
36 E.7/9.0 532.7 1 6
34 D.5/9.0 532.7 1 6 122.7 97.7 25.6
97.0 26.2 92
25.2 93
93
33 C.5/9.0 532.7 1 6 122.8 98.1
32 B.5/9.0 532.7 1 6 123.1 100.8 22.1
31 A.5/9.0 532.7 1 6 123.5 99.2 24.5 94
96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 6
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Work Order Number:1404479
Client:GTIS Acquisitions, LLC Service Date:6/14/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/14/2024
Work Order Number:1404479
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 6
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 D.5/9.0 533.7 1 6 122.5 96.7 26.7 92
92
48 E.7/9.0 533.7 1 6 122.9 98.8
47 E.3/9.0 533.7 1 6 122.4 97.0 26.2
50 B.5/9.0 534.2 1 6
24.4 94
49 A.5/9.0 534.2 1 6 122.5
122.2 96.9 26.1 92
97.5 25.6 93
52 D.5/9.0 534.2 1 6
51 C.5/9.0 534.2 1 6
123.8 99.2 24.8 94
98.1 25.593123.1
54 E.7/9.0 534.2 1 6
53 E.3/9.0 534.2 1 6
122.5 98.6 24.2 94
96.8 25.992121.9
56 B.5/9.0 534.7 1 6
55 A.5/9.0 534.7 1 6
122.5 98.9 23.9 94
97.7 25.093122.1
58 D.5/9.0 534.7 1 6
57 C.5/9.0 534.7 1 6
122.6 96.5 27.0 92
100.3 23.395123.7
60 E.7/9.0 534.7 1 6
59 E.3/9.0 534.7 1 6
123.3 98.9 24.7 94
98.3 25.193123.0
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2260 (M):730
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2260 (M):730
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
123.6 100.9 22.5 96
100.5 23.695124.2
75 C.5/9.0 536.2 1 6
74 B.5/9.0 536.2 1 6
122.3 98.5 24.2 94
98.0 25.993123.4
73 A.5/9.0 536.2 1 6
72 E.7/9.0 535.7 1 6
124.3 100.4 23.8 95
98.9 24.094122.6
71 E.3/9.0 535.7 1 6
70 D.5/9.0 535.7 1 6
123.3 98.1 25.7 93
98.4 25.393123.3
69 C.5/9.0 535.7 1 6
68 B.5/9.0 535.7 1 6
94
67 A.5/9.0 535.7 1 6
66 E.7/9.0 535.2 1 6
123.3 100.7 22.4 96
101.1 22.796124.0
65 E.3/9.0 535.2 1 6
26.5 92
64 D.5/9.0 535.2 1 6 122.9
123.6 100.3 23.2 95
98.6 24.6
95
63 C.5/9.0 535.2 1 6 122.8 97.1
62 B.5/9.0 535.2 1 6 123.3 99.9 23.4
61 A.5/9.0 535.2 1 6 123.6 101.2 22.1 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 6
Work Order Number:1404479
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/14/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/14/2024
Work Order Number:1404479
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:6 of 6
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
76 D.5/9.0 536.2 1 6 122.9 96.9 26.8 92
93
78 E.7/9.0 536.2 1 6 123.3 99.0
77 E.3/9.0 536.2 1 6 123.0 98.1 25.4
80 B.5/9.0 536.7 1 6
24.5 94
79 A.5/9.0 536.7 1 6 123.2
122.6 97.9 25.2 93
97.3 26.6 92
82 D.5/9.0 536.7 1 6
81 C.5/9.0 536.7 1 6
124.2 101.4 22.5 96
100.2 23.495123.6
84 E.7/9.0 536.7 1 6
83 E.3/9.0 536.7 1 6
123.2 98.0 25.7 93
99.5 24.194123.5
86 B.5/9.0 537.2 1 6
85 A.5/9.0 537.2 1 6
122.5 97.3 25.9 92
97.6 25.593122.5
88 D.5/9.0 537.2 1 6
87 C.5/9.0 537.2 1 6
122.3 98.5 24.2 94
99.6 23.395122.8
90 E.7/9.0 537.2 1 6
89 E.3/9.0 537.2 1 6
123.1 97.7 26.0 93
97.1 26.892123.1
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2260 (M):730
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
95
93
25.796117.9
118.6
122.9 98.1 25.3
93.5 26.8
93.816
93
6 E.7/9.0 537.7 1 6
122.0
123.6 100.2
97.5
118.2
117.6 92.4 27.3 94
95
94.1 25.6 96
26.4
4 D.5/9.0 537.7
10 D.5/9.0 538.2 2 6
6
7 A.5/9.0 538.2 2 6
5 E.3/9.0 537.7 1 6
122.8 97.8
9 C.5/9.0 538.2 2 6
8 B.5/9.0 538.2 2
117.3 91.5 28.2
3 C.5/9.0 537.7 1 6
2 B.5/9.0 537.7 1 6
117.8 93.2
1 A.5/9.0 537.7 1 6
11 E.3/9.0 538.2 2 6
12 E.7/9.0 538.2 2 6
Clear
100.3 23.7 95
22.4 96
93
25.6
95
94
93
101.1
23.4
25.1
1408287
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/15/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
99.4 24.2
99.5
B.5/9.0 538.7 2 6
A.5/9.0 538.7 2 6
123.7
24.5 94
15 C.5/9.0
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
123.8 100.4 23.3 95
D): 2282 (M):732StandardCount:
123.9
124.1
123.5
14
Remarks:Test results on this report meet project specifications.
538.7 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2282 (M):732
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
93.4 26.1 95
116.2 91.3 27.3 93
117.8
30 E.7/9.0 539.7 1 6
29 E.3/9.0 539.7 1 6
91.1 27.5 93
116.3 92.0 26.4 94
116.2
28 D.5/9.0 539.7 1 6
27 C.5/9.0 539.7 1 6
93.5 26.0 95
116.9 92.2 26.8 94
117.8
26 B.5/9.0 539.7 1 6
25 A.5/9.0 539.7 1 6
93.3 26.6 95
118.0 94.0 25.5 96
118.2 92.7 27.5
118.1
24 E.7/9.0 539.2 1 6
23 E.3/9.0 539.2 1 6
117.7
20 B.5/9.0 539.2 1 6 118.0
95
93.1 26.4 95
22 D.5/9.0 539.2 1 6
21 C.5/9.0 539.2 1 6
19 A.5/9.0 539.2 1 6 116.5 91.0 28.0
91.7 28.7 94
24.8 94
93
18 E.7/9.0 538.7 2 6 124.2 99.5
17 E.3/9.0 538.7 2 6 123.0 98.9 24.4
16 D.5/9.0 538.7 2 6 123.3 100.8 22.3 96
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Work Order Number:1408287
Client:GTIS Acquisitions, LLC Service Date:6/15/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2282 (M):732
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
101.4 22.196123.842E.7/9.0 540.7 2 6
99.1 24.5 94
123.9 101.2 22.4 96
123.4
41 E.3/9.0 540.7 2 6
40 D.5/9.0 540.7 2 6
100.9 22.2 96
123.6 100.2 23.4 95
123.0 97.9 25.6
123.3
39 C.5/9.0 540.7 2 6
38 B.5/9.0 540.7 2 6
122.3
35 E.3/9.0 540.2 2 6 123.1
93
96.6 26.6 92
37 A.5/9.0 540.7 2 6
36 E.7/9.0 540.2 2 6
34 D.5/9.0 540.2 2 6 122.9 100.7 22.0
98.1 25.5 93
24.6 94
96
33 C.5/9.0 540.2 2 6 123.6 99.2
32 B.5/9.0 540.2 2 6 122.9 98.8 24.4
31 A.5/9.0 540.2 2 6 123.1 99.0 24.3 94
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Clear
Work Order Number:1408287
Client:GTIS Acquisitions, LLC Service Date:6/15/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
93
95
23.295122.7
122.9
123.2 99.2 24.2
97.8 25.7
99.626
94
6 E.7/8.0 530.2 2 6
123.0
123.3 98.0
99.6
122.5
123.3 100.7 22.4 96
94
97.5 25.6 93
24.5
4 D.5/8.0 530.2
10 D.5/8.0 530.7 2 6
6
7 A.5/8.0 530.7 2 6
5 E.3/8.0 530.2 2 6
122.9 96.9
9 C.5/8.0 530.7 2 6
8 B.5/8.0 530.7 2
123.9 101.3 22.3
3 C.5/8.0 530.2 2 6
2 B.5/8.0 530.2 2 6
123.8 99.4
1 A.5/8.0 530.2 2 6
11 E.3/8.0 530.7 2 6
12 E.7/8.0 530.7 2 6
Partly Cloudy
100.1 23.7 95
25.5 96
96
26.8
93
95
92
94.1
25.8
23.5
1408289
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/17/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
100.4 23.3
92.3
B.5/8.0 531.2 1 6
A.5/8.0 531.2 1 6
118.1
27.6 94
15 C.5/8.0
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
117.8 92.5 27.4 94
D): 2250 (M):726StandardCount:
117.8
123.8
123.8
14
Remarks:Test results on this report meet project specifications.
531.2 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2250 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
93.4 26.4 95
117.6 92.6 27.0 94
118.1
30 E.7/8.0 532.2 1 6
29 E.3/8.0 532.2 1 6
90.6 28.9 92
115.6 91.9 25.8 94
116.8
28 D.5/8.0 532.2 1 6
27 C.5/8.0 532.2 1 6
91.8 27.2 94
117.4 93.2 26.0 95
116.8
26 B.5/8.0 532.2 1 6
25 A.5/8.0 532.2 1 6
93.8 25.4 96
117.5 92.3 27.3 94
118.1 93.1 26.8
117.6
24 E.7/8.0 531.7 1 6
23 E.3/8.0 531.7 1 6
117.7
20 B.5/8.0 531.7 1 6 117.5
95
93.7 25.6 96
22 D.5/8.0 531.7 1 6
21 C.5/8.0 531.7 1 6
19 A.5/8.0 531.7 1 6 117.6 92.5 27.1
92.9 26.5 95
25.7 96
94
18 E.7/8.0 531.2 1 6 117.7 93.6
17 E.3/8.0 531.2 1 6 117.9 93.4 26.2
16 D.5/8.0 531.2 1 6 117.1 91.3 28.3 93
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Partly Cloudy
Work Order Number:1408289
Client:GTIS Acquisitions, LLC Service Date:6/17/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2250 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
99.1 24.0 94
122.7 99.8 22.9 95
122.9
45 C.5/8.0 533.7 2 6
44 B.5/8.0 533.7 2 6
100.8 22.3 96
122.5 97.7 25.4 93
123.3
43 A.5/8.0 533.7 2 6
42 E.7/8.0 533.2 2 6
99.2 24.2 94
124.2 101.3 22.6 96
123.2
41 E.3/8.0 533.2 2 6
40 D.5/8.0 533.2 2 6
99.9 23.3 95
123.0 98.0 25.5 93
123.2 99.3 24.1
123.2
39 C.5/8.0 533.2 2 6
38 B.5/8.0 533.2 2 6
124.1
35 E.3/8.0 532.7 2 6 123.1
94
101.2 22.6 96
37 A.5/8.0 533.2 2 6
36 E.7/8.0 532.7 2 6
34 D.5/8.0 532.7 2 6 122.8 98.5 24.7
99.7 23.5 95
24.4 94
94
33 C.5/8.0 532.7 2 6 123.3 99.1
32 B.5/8.0 532.7 2 6 123.5 98.3 25.6
31 A.5/8.0 532.7 2 6 123.9 100.9 22.8 96
93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Partly Cloudy
Work Order Number:1408289
Client:GTIS Acquisitions, LLC Service Date:6/17/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2250 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
123.4 100.2 23.2 95
99.2 24.194123.1
60 E.7/8.0 534.7 2 6
59 E.3/8.0 534.7 2 6
122.4 96.7 26.6 92
100.6 22.796123.4
58 D.5/8.0 534.7 2 6
57 C.5/8.0 534.7 2 6
123.7 101.0 22.5 96
99.3 24.494123.5
56 B.5/8.0 534.7 2 6
55 A.5/8.0 534.7 2 6
123.1 98.2 25.4 93
99.7 23.495123.0
54 E.7/8.0 534.2 2 6
53 E.3/8.0 534.2 2 6
96
52 D.5/8.0 534.2 2 6
51 C.5/8.0 534.2 2 6
123.6 99.4 24.3 94
100.3 23.595123.9
50 B.5/8.0 534.2 2 6
25.5 93
49 A.5/8.0 534.2 2 6 123.2
123.1 99.5 23.7 94
100.7 22.3
92
48 E.7/8.0 533.7 2 6 123.0 98.0
47 E.3/8.0 533.7 2 6 122.7 97.1 26.4
46 D.5/8.0 533.7 2 6 122.5 96.8 26.6 92
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Work Order Number:1408289
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Partly Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/17/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:Test results on this report meet project specifications.
536.2 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
118.2 93.5 26.4 95
D): 2275 (M):731StandardCount:
118.2
118.1
118.2
25.5 96
15 C.5/8.0
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
94.1 25.6
94.2
B.5/8.0 536.2 1 6
A.5/8.0 536.2 1 6
116.9
4921
General Location
Area:Building Pad
96121.4
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 4
1408290
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/18/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Cloudy
93.9 25.8 96
27.2 94
96
26.2
95
96
95
91.9
29.1
28.4
11 E.3/8.0 535.7 1 6
12 E.7/8.0 535.7 1 6
117.9 94.0 25.4
3 C.5/8.0 535.2 1 6
2 B.5/8.0 535.2 1 6
116.9 92.7
1 A.5/8.0 535.2 1 6
117.9 93.4
9 C.5/8.0 535.7 1 6
8 B.5/8.0 535.7 1
4 D.5/8.0 535.2
10 D.5/8.0 535.7 1 6
6
7 A.5/8.0 535.7 1 6
5 E.3/8.0 535.2 1 6
117.9
117.7 93.8 25.5 96
95
92.3 27.7 94
26.1
94
6 E.7/8.0 535.2 1 6
116.8
116.8 90.5
91.0
92
93
27.994117.5
117.8
116.9 91.7 27.5
93.3 26.3
91.916
Client:GTIS Acquisitions, LLC Service Date:6/18/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1408290
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
26.3
16 D.5/8.0 536.2 1 6 117.5 92.7 26.8 95
95
18 E.7/8.0 536.2 1 6 117.7 93.8
17 E.3/8.0 536.2 1 6 117.7 93.2
92.2 27.4 94
25.5 96
9619A.5/8.0 536.7 1 6 118.3 94.1 25.7
116.7
20 B.5/8.0 536.7 1 6 117.5
95
90.6 28.8 92
22 D.5/8.0 536.7 1 6
21 C.5/8.0 536.7 1 6
117.7 93.3 26.1
116.9
24 E.7/8.0 536.7 1 6
23 E.3/8.0 536.7 1 6 91.7 27.5 94
117.3 91.2 28.6 93
26 B.5/8.0 537.2 2 6
25 A.5/8.0 537.2 2 6 97.3 26.0 92
122.0 96.9 25.9 92
122.6
28 D.5/8.0 537.2 2 6
27 C.5/8.0 537.2 2 6 99.4 24.7 94
124.1 100.5 23.5 95
124.0
30 E.7/8.0 537.2 2 6
29 E.3/8.0 537.2 2 6 101.2 22.3 96
123.8 99.5 24.4 94
123.8
D): 2275 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:6/18/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1408290
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
25.7
31 A.5/8.0 537.7 2 6 123.8 101.3 22.2 96
93
33 C.5/8.0 537.7 2 6 122.3 99.7
32 B.5/8.0 537.7 2 6 123.2 98.0
97.6 25.5 93
22.7 95
9434D.5/8.0 537.7 2 6 123.1 99.0 24.3
123.3
35 E.3/8.0 537.7 2 6 122.5
96
100.3 22.9 95
37 A.5/8.0 538.2 2 6
36 E.7/8.0 537.7 2 6
123.7 101.1 22.4
123.2
39 C.5/8.0 538.2 2 6
38 B.5/8.0 538.2 2 6 98.8 24.7 94
122.8 97.1 26.5 92
41 E.3/8.0 538.2 2 6
40 D.5/8.0 538.2 2 6 98.5 24.3 94
125.5 100.2 25.2 95
122.4
43 A.5/8.0 538.7 2 6
42 E.7/8.0 538.2 2 6 99.3 24.6 94
123.2 100.6 22.5 96
123.7
45 C.5/8.0 538.7 2 6
44 B.5/8.0 538.7 2 6 97.5 25.8 93
122.9 97.3 26.3 92
122.7
D): 2275 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/18/2024
Work Order Number:1408290
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/21/2024
New York, NY 10019 Weather:Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 4
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 D.5/8.0 538.7 2 6 122.5 98.6 24.2 94
94
48 E.7/8.0 538.7 2 6 123.6 100.8
47 E.3/8.0 538.7 2 6 123.8 99.2 24.8
22.6 96
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2275 (M):731
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:Test results on this report meet project specifications.
535.7 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
118.0 94.1 25.4 96
D): 2254 (M):729StandardCount:
123.7
122.4
122.5
25.8 93
15 A.3/6.7
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
96.8 26.6
98.3
E.7/6.7 535.2 2 6
E.3/6.7 535.2 2 6
122.6
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 7
1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
97.6 25.4 93
25.2 93
94
22.4
95
92
95
97.9
26.8
26.7
11 C.5/6.7 535.2 2 6
12 D.5/6.7 535.2 2 6
117.5 92.0 27.7
3 B.5/6.7 534.7 1 6
2 A.7/6.7 534.7 1 6
116.3 90.3
1 A.3/6.7 534.7 1 6
123.0 100.5
9 A.7/6.7 535.2 2 6
8 A.3/6.7 535.2 2
4 C.5/6.7 534.7
10 B.5/6.7 535.2 2 6
6
7 E.7/6.7 534.7 1 6
5 D.5/6.7 534.7 1 6
118.0
118.1 93.2 26.7 95
92
94.0 25.5 96
28.8
95
6 E.3/6.7 534.7 1 6
123.3
118.4 93.4
97.3
95
92
25.596117.8
117.1
122.9 99.7 23.3
92.8 26.2
93.916
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 7
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
25.6
16 A.7/6.7 535.7 1 6 117.5 92.4 27.2 94
96
18 C.5/6.7 535.7 1 6 117.9 93.3
17 B.5/6.7 535.7 1 6 118.1 94.0
92.6 27.5 94
26.4 95
9319D.5/6.7 535.7 1 6 117.3 91.6 28.1
117.3
20 E.3/6.7 535.7 1 6 118.1
92
93.0 26.1 95
22 A.3/6.7 536.2 2 6
21 E.7/6.7 535.7 1 6
122.2 96.8 26.2
122.6
24 B.5/6.7 536.2 2 6
23 A.7/6.7 536.2 2 6 97.5 25.7 93
122.6 97.8 25.4 93
26 D.5/6.7 536.2 2 6
25 C.5/6.7 536.2 2 6 99.9 23.1 95
122.7 96.8 26.8 92
123.0
28 E.7/6.7 536.2 2 6
27 E.3/6.7 536.2 2 6 98.7 24.4 94
124.0 99.5 24.6 94
122.8
30 A.7/6.7 536.7 1 6
29 A.3/6.7 536.7 1 6 93.8 25.5 96
117.0 91.9 27.3 94
117.7
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 7
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
29.7
31 B.5/6.7 536.7 1 6 117.6 93.2 26.2 95
92
33 D.5/6.7 536.7 1 6 116.8 92.0
32 C.5/6.7 536.7 1 6 117.4 90.5
91.4 28.7 93
27.0 94
9534E.3/6.7 536.7 1 6 117.9 93.2 26.5
123.7
35 E.7/6.7 536.7 1 6 117.6
94
101.2 22.2 96
37 A.7/6.7 537.2 2 6
36 A.3/6.7 537.2 2 6
123.3 99.1 24.4
123.7
39 C.5/6.7 537.2 2 6
38 B.5/6.7 537.2 2 6 100.9 22.6 96
123.6 101.3 22.0 96
41 E.3/6.7 537.2 2 6
40 D.5/6.7 537.2 2 6 100.2 23.5 95
123.8 99.4 24.5 94
123.7
43 A.3/6.7 537.7 2 6
42 E.7/6.7 537.2 2 6 100.3 23.3 95
123.4 100.6 22.7 96
123.7
45 B.5/6.7 537.7 2 6
44 A.7/6.7 537.7 2 6 100.8 23.0 96
122.8 98.9 24.2 94
124.0
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 7
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
46 C.5/6.7 537.7 2 6 123.3 97.8 26.1 93
94
48 E.3/6.7 537.7 2 6 122.7 97.6
47 D.5/6.7 537.7 2 6 122.6 99.5 23.2
50 A.3/6.7 538.2 2 6
25.7 93
49 E.7/6.7 537.7 2 6 122.6
123.3 100.2 23.1 95
98.5 24.5 94
52 B.5/6.7 538.2 2 6
51 A.7/6.7 538.2 2 6
123.4 100.1 23.3 95
99.4 24.694123.9
54 D.5/6.7 538.2 2 6
53 C.5/6.7 538.2 2 6
123.8 101.1 22.5 96
99.6 23.195122.6
56 E.7/6.7 538.2 2 6
55 E.3/6.7 538.2 2 6
123.1 99.3 24.0 94
100.6 22.796123.4
58 A.7/6.7 538.7 2 6
57 A.3/6.7 538.7 2 6
122.7 96.8 26.8 92
100.4 23.495123.9
60 C.5/6.7 538.7 2 6
59 B.5/6.7 538.7 2 6
123.2 99.1 24.3 94
97.4 25.992122.6
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2254 (M):729
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 7
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
61 D.5/6.7 538.7 2 6 122.6 98.6 24.3 94
94
63 E.7/6.7 538.7 2 6 122.6 98.1
62 E.3/6.7 538.7 2 6 123.9 99.5 24.5
65 A.7/6.7 539.2 2 6
25.0 93
64 A.3/6.7 539.2 2 6 123.8
123.3 100.9 22.2 96
100.4 23.3 95
67 C.5/6.7 539.2 2 6
66 B.5/6.7 539.2 2 6
122.5 97.9 25.1 93
96.8 26.892122.7
69 E.3/6.7 539.2 2 6
68 D.5/6.7 539.2 2 6
123.2 98.4 25.2 93
97.7 24.893121.9
71 A.3/6.7 539.7 2 6
70 E.7/6.7 539.2 2 6
123.7 100.1 23.6 95
98.8 24.794123.2
73 B.5/6.7 539.7 2 6
72 A.7/6.7 539.7 2 6
122.6 96.9 26.5 92
101.2 22.196123.6
75 D.5/6.7 539.7 2 6
74 C.5/6.7 539.7 2 6
122.8 98.1 25.2 93
97.3 25.992122.5
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2254 (M):729
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
122.4 99.6 22.9 95
100.9 22.496123.5
90 E.5/6.7 540.7 2 6
89 D.5/6.7 540.7 2 6
123.6 101.2 22.1 96
99.2 24.594123.5
88 C.5/6.7 540.7 2 6
87 B.5/6.7 540.7 2 6
122.7 99.7 23.1 95
100.2 23.695123.8
86 A.7/6.7 540.7 2 6
85 A.3/6.7 540.7 2 6
124.4 101.4 22.7 96
100.5 23.095123.6
84 E.7/6.7 540.2 2 6
83 E.3/6.7 540.2 2 6
95
82 D.5/6.7 540.2 2 6
81 C.5/6.7 540.2 2 6
123.2 99.2 24.2 94
98.5 24.494122.5
80 B.5/6.7 540.2 2 6
24.5 94
79 A.7/6.7 540.2 2 6 122.8
123.6 99.0 24.8 94
99.6 23.3
95
78 A.3/6.7 540.2 2 6 122.9 98.7
77 E.7/6.7 539.7 2 6 123.2 100.1 23.1
76 E.3/6.7 539.7 2 6 123.3 100.7 22.4 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:6 of 7
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
92.0 27.394117.1104E.7/5.2 530.7 1 6
117.5 92.7 26.7 95
93.8 25.696117.8
103 E.3/5.2 530.7 1 6
102 D.5/5.2 530.7 1 6
117.6 92.9 26.6 95
92.6 27.594118.1
101 C.5/5.2 530.7 1 6
100 B.5/5.2 530.7 1 6
117.5 91.5 28.4 93
93.4 26.095117.7
99 A.7/5.2 530.7 1 6
98 A.3/5.2 530.7 1 6
94
97 E.7/5.2 530.2 1 6
96 E.3/5.2 530.2 1 6
118.3 94.0 25.8 96
92.8 26.395117.2
95 D.5/5.2 530.2 1 6
25.8 96
94 C.5/5.2 530.2 1 6 117.0
118.3 92.6 27.7 94
91.9 27.3
96
93 B.5/5.2 530.2 1 6 117.9 93.7
92 A.7/5.2 530.2 1 6 118.0 94.1 25.4
91 A.3/5.2 530.2 1 6 117.9 93.2 26.5 95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:7 of 7
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
95
92
25.596117.8
117.1
122.9 99.7 23.3
92.8 26.2
93.916
95
6 E.3/6.7 534.7 1 6
123.3
118.4 93.4
97.3
118.0
118.1 93.2 26.7 95
92
94.0 25.5 96
28.8
4 C.5/6.7 534.7
10 B.5/6.7 535.2 2 6
6
7 E.7/6.7 534.7 1 6
5 D.5/6.7 534.7 1 6
123.0 100.5
9 A.7/6.7 535.2 2 6
8 A.3/6.7 535.2 2
117.5 92.0 27.7
3 B.5/6.7 534.7 1 6
2 A.7/6.7 534.7 1 6
116.3 90.3
1 A.3/6.7 534.7 1 6
11 C.5/6.7 535.2 2 6
12 D.5/6.7 535.2 2 6
Mostly Cloudy
97.6 25.4 93
25.2 93
94
22.4
95
92
95
97.9
26.8
26.7
1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 7
105.3
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown and Brown Sandy Clay 39
98.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4921
4 92
General Location
Area:Building Pad
96
96218.0
1 21.4
3
96.8 26.6
98.3
E.7/6.7 535.2 2 6
E.3/6.7 535.2 2 6
122.6
25.8 93
15 A.3/6.7
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
118.0 94.1 25.4 96
D): 2254 (M):729StandardCount:
123.7
122.4
122.5
14
Remarks:Test results on this report meet project specifications.
535.7 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
93.8 25.5 96
117.0 91.9 27.3 94
117.7
30 A.7/6.7 536.7 1 6
29 A.3/6.7 536.7 1 6
98.7 24.4 94
124.0 99.5 24.6 94
122.8
28 E.7/6.7 536.2 2 6
27 E.3/6.7 536.2 2 6
99.9 23.1 95
122.7 96.8 26.8 92
123.0
26 D.5/6.7 536.2 2 6
25 C.5/6.7 536.2 2 6
97.5 25.7 93
122.6 97.8 25.4 93
122.2 96.8 26.2
122.6
24 B.5/6.7 536.2 2 6
23 A.7/6.7 536.2 2 6
117.3
20 E.3/6.7 535.7 1 6 118.1
92
93.0 26.1 95
22 A.3/6.7 536.2 2 6
21 E.7/6.7 535.7 1 6
19 D.5/6.7 535.7 1 6 117.3 91.6 28.1
92.6 27.5 94
26.4 95
93
18 C.5/6.7 535.7 1 6 117.9 93.3
17 B.5/6.7 535.7 1 6 118.1 94.0 25.6
16 A.7/6.7 535.7 1 6 117.5 92.4 27.2 94
96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 7
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Work Order Number:1408292
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
100.8 23.0 96
122.8 98.9 24.2 94
124.0
45 B.5/6.7 537.7 2 6
44 A.7/6.7 537.7 2 6
100.3 23.3 95
123.4 100.6 22.7 96
123.7
43 A.3/6.7 537.7 2 6
42 E.7/6.7 537.2 2 6
100.2 23.5 95
123.8 99.4 24.5 94
123.7
41 E.3/6.7 537.2 2 6
40 D.5/6.7 537.2 2 6
100.9 22.6 96
123.6 101.3 22.0 96
123.3 99.1 24.4
123.7
39 C.5/6.7 537.2 2 6
38 B.5/6.7 537.2 2 6
123.7
35 E.7/6.7 536.7 1 6 117.6
94
101.2 22.2 96
37 A.7/6.7 537.2 2 6
36 A.3/6.7 537.2 2 6
34 E.3/6.7 536.7 1 6 117.9 93.2 26.5
91.4 28.7 93
27.0 94
95
33 D.5/6.7 536.7 1 6 116.8 92.0
32 C.5/6.7 536.7 1 6 117.4 90.5 29.7
31 B.5/6.7 536.7 1 6 117.6 93.2 26.2 95
92
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
92 96
9296DarkBrownandBrownSandyClay392318.0 105.3 4
Material Description/Classification PI
Dark Brown Clay with Sand 38
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 21.4 98.0 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 7
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Work Order Number:1408292
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
123.2 99.1 24.3 94
97.4 25.992122.6
60 C.5/6.7 538.7 2 6
59 B.5/6.7 538.7 2 6
122.7 96.8 26.8 92
100.4 23.495123.9
58 A.7/6.7 538.7 2 6
57 A.3/6.7 538.7 2 6
123.1 99.3 24.0 94
100.6 22.796123.4
56 E.7/6.7 538.2 2 6
55 E.3/6.7 538.2 2 6
123.8 101.1 22.5 96
99.6 23.195122.6
54 D.5/6.7 538.2 2 6
53 C.5/6.7 538.2 2 6
94
52 B.5/6.7 538.2 2 6
51 A.7/6.7 538.2 2 6
123.4 100.1 23.3 95
99.4 24.694123.9
50 A.3/6.7 538.2 2 6
25.7 93
49 E.7/6.7 537.7 2 6 122.6
123.3 100.2 23.1 95
98.5 24.5
94
48 E.3/6.7 537.7 2 6 122.7 97.6
47 D.5/6.7 537.7 2 6 122.6 99.5 23.2
46 C.5/6.7 537.7 2 6 123.3 97.8 26.1 93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:4 of 7
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2254 (M):729
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
122.8 98.1 25.2 93
97.3 25.992122.5
75 D.5/6.7 539.7 2 6
74 C.5/6.7 539.7 2 6
122.6 96.9 26.5 92
101.2 22.196123.6
73 B.5/6.7 539.7 2 6
72 A.7/6.7 539.7 2 6
123.7 100.1 23.6 95
98.8 24.794123.2
71 A.3/6.7 539.7 2 6
70 E.7/6.7 539.2 2 6
123.2 98.4 25.2 93
97.7 24.893121.9
69 E.3/6.7 539.2 2 6
68 D.5/6.7 539.2 2 6
95
67 C.5/6.7 539.2 2 6
66 B.5/6.7 539.2 2 6
122.5 97.9 25.1 93
96.8 26.892122.7
65 A.7/6.7 539.2 2 6
25.0 93
64 A.3/6.7 539.2 2 6 123.8
123.3 100.9 22.2 96
100.4 23.3
94
63 E.7/6.7 538.7 2 6 122.6 98.1
62 E.3/6.7 538.7 2 6 123.9 99.5 24.5
61 D.5/6.7 538.7 2 6 122.6 98.6 24.3 94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:5 of 7
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:6 of 7
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9623DarkBrownandBrownSandyClay3918.0 105.3 4 92
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
76 E.3/6.7 539.7 2 6 123.3 100.7 22.4 96
95
78 A.3/6.7 540.2 2 6 122.9 98.7
77 E.7/6.7 539.7 2 6 123.2 100.1 23.1
80 B.5/6.7 540.2 2 6
24.5 94
79 A.7/6.7 540.2 2 6 122.8
123.6 99.0 24.8 94
99.6 23.3 95
82 D.5/6.7 540.2 2 6
81 C.5/6.7 540.2 2 6
123.2 99.2 24.2 94
98.5 24.494122.5
84 E.7/6.7 540.2 2 6
83 E.3/6.7 540.2 2 6
124.4 101.4 22.7 96
100.5 23.095123.6
86 A.7/6.7 540.7 2 6
85 A.3/6.7 540.7 2 6
122.7 99.7 23.1 95
100.2 23.695123.8
88 C.5/6.7 540.7 2 6
87 B.5/6.7 540.7 2 6
123.6 101.2 22.1 96
99.2 24.594123.5
90 E.5/6.7 540.7 2 6
89 D.5/6.7 540.7 2 6
122.4 99.6 22.9 95
100.9 22.496123.5
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2254 (M):729
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/20/2024
Work Order Number:1408292
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:6/26/2024
New York, NY 10019 Weather:Mostly Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:7 of 7
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 1 Dark Brown Clay with Sand 38 21.4 98.0
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
91 A.3/5.2 530.2 1 6 117.9 93.2 26.5 95
96
93 B.5/5.2 530.2 1 6 117.9 93.7
92 A.7/5.2 530.2 1 6 118.0 94.1 25.4
95 D.5/5.2 530.2 1 6
25.8 96
94 C.5/5.2 530.2 1 6 117.0
118.3 92.6 27.7 94
91.9 27.3 94
97 E.7/5.2 530.2 1 6
96 E.3/5.2 530.2 1 6
118.3 94.0 25.8 96
92.8 26.395117.2
99 A.7/5.2 530.7 1 6
98 A.3/5.2 530.7 1 6
117.5 91.5 28.4 93
93.4 26.095117.7
101 C.5/5.2 530.7 1 6
100 B.5/5.2 530.7 1 6
117.6 92.9 26.6 95
92.6 27.594118.1
103 E.3/5.2 530.7 1 6
102 D.5/5.2 530.7 1 6
117.5 92.7 26.7 95
93.8 25.696117.8
104 E.7/5.2 530.7 1 6 92.0 27.394117.1
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2254 (M):729
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
531.2 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
122.6 96.6 26.9 92
D): 2288 (M):734StandardCount:
123.3
123.3
122.8
22.9 95
15 C.5/1.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.7 23.2
100.3
B.5/1.5 531.2 1 6
A.5/1.5 531.2 1 6
123.1
4923
General Location
Area:Building Pad
96118.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
1417125
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/29/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
99.4 24.0 94
23.3 95
96
22.5
92
95
96
99.8
26.6
24.5
11 E.3/1.5 530.7 1 6
12 E.7/1.5 530.7 1 6
123.7 101.1 22.4
3 C.5/1.5 530.2 1 6
2 B.5/1.5 530.2 1 6
124.1 100.5
1 A.5/1.5 530.2 1 6
124.3 101.5
9 C.5/1.5 530.7 1 6
8 B.5/1.5 530.7 1
4 D.5/1.5 530.2
10 D.5/1.5 530.7 1 6
6
7 A.5/1.5 530.7 1 6
5 E.3/1.5 530.2 1 6
123.5
123.2 99.1 24.3 94
95
100.3 23.1 95
23.5
93
6 E.7/1.5 530.2 1 6
122.8
124.6 98.4
98.6
93
94
22.296123.8
122.8
123.9 98.2 26.2
96.7 27.0
101.316
Client:GTIS Acquisitions, LLC Service Date:6/29/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Work Order Number:1417125
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296LightReddishBrownClay432521.1 99.4 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
25.4
16 D.5/1.5 531.2 2 6 119.3 93.8 27.2 94
96
18 E.7/1.5 531.2 2 6 119.5 94.5
17 E.3/1.5 531.2 2 6 119.3 95.1
94.2 26.6 95
26.5 95
9319A.5/1.5 531.7 2 6 118.1 92.0 28.4
118.8
20 B.5/1.5 531.7 2 6 119.3
94
95.0 25.1 96
22 D.5/1.5 531.7 2 6
21 C.5/1.5 531.7 2 6
118.5 93.1 27.3
119.9
24 E.7/1.5 531.7 2 6
23 E.3/1.5 531.7 2 6 95.5 25.5 96
118.1 91.3 29.4 92
26 B.5/1.5 532.2 2 6
25 A.5/1.5 532.2 2 6 91.5 29.6 92
119.0 92.9 28.1 93
118.6
28 D.5/1.5 532.2 2 6
27 C.5/1.5 532.2 2 6 93.8 27.7 94
118.6 93.0 27.5 94
119.8
30 E.7/1.5 532.2 2 6
29 E.3/1.5 532.2 2 6 93.3 27.3 94
119.6 95.2 25.6 96
118.8
D): 2288 (M):734
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2288 (M):734
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
114.8 92.1 24.7 99
91.6 25.298114.7
45 E.5/13.5 FG 3 6
44 E.5/12.5 FG 3 6
114.0 89.7 27.1 96
89.0 28.395114.2
43 E.5/11.5 FG 3 6
42 D.5/13.5 FG 3 6
114.2 90.0 26.9 97
90.2 27.097114.6
41 D.5/12.5 FG 3 6
40 D.5/11.5 FG 3 6
114.1 89.6 27.3 96
88.8 28.295113.8
39 C.5/13.5 FG 3 6
38 C.5/12.5 FG 3 6
98
37 C.5/11.5 FG 3 6
36 B.5/13.5 FG 3 6
114.8 92.2 24.5 99
89.8 26.696113.7
35 B.5/12.5 FG 3 6
24.4 99
34 B.5/11.5 FG 3 6 115.7
116.9 91.8 27.3 98
91.5 26.5
97
33 A.5/13.5 FG 3 6 114.4 92.0
32 A.5/12.5 FG 3 6 115.1 90.1 27.7
31 A.5/11.5 FG 3 6 113.8 89.7 26.9 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
2 2 95 100
96
3 06L Light Brown/Tan Clay 13 26.3 93.2
2 5 Light Reddish Brown Clay 43 21.1 99.4 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Work Order Number:1417125
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/29/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
531.2 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
122.6 96.6 26.9 92
D): 2288 (M):734StandardCount:
123.3
123.3
122.8
22.9 95
15 C.5/1.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.7 23.2
100.3
B.5/1.5 531.2 1 6
A.5/1.5 531.2 1 6
123.1
4923
General Location
Area:Building Pad
96118.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
1417125
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:6/29/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
99.4 24.0 94
23.3 95
96
22.5
92
95
96
99.8
26.6
24.5
11 E.3/1.5 530.7 1 6
12 E.7/1.5 530.7 1 6
123.7 101.1 22.4
3 C.5/1.5 530.2 1 6
2 B.5/1.5 530.2 1 6
124.1 100.5
1 A.5/1.5 530.2 1 6
124.3 101.5
9 C.5/1.5 530.7 1 6
8 B.5/1.5 530.7 1
4 D.5/1.5 530.2
10 D.5/1.5 530.7 1 6
6
7 A.5/1.5 530.7 1 6
5 E.3/1.5 530.2 1 6
123.5
123.2 99.1 24.3 94
95
100.3 23.1 95
23.5
93
6 E.7/1.5 530.2 1 6
122.8
124.6 98.4
98.6
93
94
22.296123.8
122.8
123.9 98.2 26.2
96.7 27.0
101.316
Client:GTIS Acquisitions, LLC Service Date:6/29/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Work Order Number:1417125
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
9296LightReddishBrownClay432521.1 99.4 4
General Location
Area:Building Pad
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
25.4
16 D.5/1.5 531.2 2 6 119.3 93.8 27.2 94
96
18 E.7/1.5 531.2 2 6 119.5 94.5
17 E.3/1.5 531.2 2 6 119.3 95.1
94.2 26.6 95
26.5 95
9319A.5/1.5 531.7 2 6 118.1 92.0 28.4
118.8
20 B.5/1.5 531.7 2 6 119.3
94
95.0 25.1 96
22 D.5/1.5 531.7 2 6
21 C.5/1.5 531.7 2 6
118.5 93.1 27.3
119.9
24 E.7/1.5 531.7 2 6
23 E.3/1.5 531.7 2 6 95.5 25.5 96
118.1 91.3 29.4 92
26 B.5/1.5 532.2 2 6
25 A.5/1.5 532.2 2 6 91.5 29.6 92
119.0 92.9 28.1 93
118.6
28 D.5/1.5 532.2 2 6
27 C.5/1.5 532.2 2 6 93.8 27.7 94
118.6 93.0 27.5 94
119.8
30 E.7/1.5 532.2 2 6
29 E.3/1.5 532.2 2 6 93.3 27.3 94
119.6 95.2 25.6 96
118.8
D): 2288 (M):734
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2288 (M):734
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
114.8 92.1 24.7 99
91.6 25.298114.7
45 E.5/13.5 FG 3 6
44 E.5/12.5 FG 3 6
114.0 89.7 27.1 96
89.0 28.395114.2
43 E.5/11.5 FG 3 6
42 D.5/13.5 FG 3 6
114.2 90.0 26.9 97
90.2 27.097114.6
41 D.5/12.5 FG 3 6
40 D.5/11.5 FG 3 6
114.1 89.6 27.3 96
88.8 28.295113.8
39 C.5/13.5 FG 3 6
38 C.5/12.5 FG 3 6
98
37 C.5/11.5 FG 3 6
36 B.5/13.5 FG 3 6
114.8 92.2 24.5 99
89.8 26.696113.7
35 B.5/12.5 FG 3 6
24.4 99
34 B.5/11.5 FG 3 6 115.7
116.9 91.8 27.3 98
91.5 26.5
97
33 A.5/13.5 FG 3 6 114.4 92.0
32 A.5/12.5 FG 3 6 115.1 90.1 27.7
31 A.5/11.5 FG 3 6 113.8 89.7 26.9 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad
2 2 95 100
96
3 06L Light Brown/Tan Clay 13 26.3 93.2
2 5 Light Reddish Brown Clay 43 21.1 99.4 4 92
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Work Order Number:1417125
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/29/2024
93
95
24.294123.6
123.5
118.2 92.1 28.3
99.1 24.6
99.516
93
6 E.7/1.5 532.7 1 6
119.7
119.4 92.7
94.5
123.7
123.0 100.6 22.3 96
95
101.2 22.2 96
23.5
4 D.5/1.5 532.7
10 D.5/1.5 533.2 2 6
6
7 A.5/1.5 533.2 2 6
5 E.3/1.5 532.7 1 6
118.4 91.7
9 C.5/1.5 533.2 2 6
8 B.5/1.5 533.2 2
122.9 97.8 25.7
3 C.5/1.5 532.7 1 6
2 B.5/1.5 532.7 1 6
123.7 100.2
1 A.5/1.5 532.7 1 6
11 E.3/1.5 533.2 2 6
12 E.7/1.5 533.2 2 6
Clear
93.7 27.0 94
26.2 95
93
29.1
94
93
92
94.4
28.8
26.7
1417126
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/1/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4923
4 92
General Location
Area:Building Pad (A-F/1.0-2.0)
96
96221.1
1 18.0
5
92.4 27.9
95.4
B.5/1.5 533.7 2 6
A.5/1.5 533.7 2 6
119.1
25.4 96
15 C.5/1.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
119.7 95.3 25.6 96
D): 2240 (M):734StandardCount:
119.6
119.0
118.2
14
Remarks:
533.7 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2240 (M):734
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
91.3 29.0 92
119.4 93.6 27.6 94
117.8
30 E.7/1.5 534.7 2 6
29 E.3/1.5 534.7 2 6
91.0 29.2 92
118.5 92.4 28.2 93
117.6
28 D.5/1.5 534.7 2 6
27 C.5/1.5 534.7 2 6
94.2 26.4 95
119.7 95.5 25.3 96
119.1
26 B.5/1.5 534.7 2 6
25 A.5/1.5 534.7 2 6
91.8 28.9 92
119.3 93.7 27.3 94
118.7 93.1 27.5
118.3
24 E.7/1.5 534.2 2 6
23 E.3/1.5 534.2 2 6
118.6
20 B.5/1.5 534.2 2 6 118.8
94
92.6 28.1 93
22 D.5/1.5 534.2 2 6
21 C.5/1.5 534.2 2 6
19 A.5/1.5 534.2 2 6 118.4 92.8 27.6
94.1 26.3 95
29.5 92
93
18 E.7/1.5 533.7 2 6 118.5 91.5
17 E.3/1.5 533.7 2 6 119.7 93.7 27.8
16 D.5/1.5 533.7 2 6 117.9 91.2 29.3 92
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad (A-F/1.0-2.0)
92 96
9296LightReddishBrownClay432521.1 99.4 4
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Work Order Number:1417126
Client:GTIS Acquisitions, LLC Service Date:7/1/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/1/2024
Work Order Number:1417126
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
9625LightReddishBrownClay4321.1 99.4 4 92
General Location
Area:Building Pad (A-F/1.0-2.0)
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
31 A.5/1.5 535.2 2 6 118.9 93.4 27.3 94
96
33 C.5/1.5 535.2 2 6 119.3 95.0
32 B.5/1.5 535.2 2 6 119.9 95.6 25.4
35 E.3/1.5 535.2 2 6
25.6 96
34 D.5/1.5 535.2 2 6 119.7
119.0 92.5 28.6 93
94.4 26.8 95
36 E.7/1.5 535.2 2 6 92.9 28.393119.2
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2240 (M):734
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
536.7 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
123.6 100.9 22.5 96
D): 2251 (M):731StandardCount:
121.9
122.9
123.1
25.0 93
15 C.5/1.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.1 24.2
97.5
B.5/1.5 536.7 1 6
A.5/1.5 536.7 1 6
122.9
4923
General Location
Area:Building Pad (A-F/1.0-2.0)
96118.0
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
1417220
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/2/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
98.6 24.6 94
23.3 95
94
22.6
95
94
96
99.7
25.8
25.3
11 E.3/1.5 536.2 1 6
12 E.7/1.5 536.2 1 6
123.5 99.2 24.5
3 C.5/1.5 535.7 1 6
2 B.5/1.5 535.7 1 6
123.1 97.9
1 A.5/1.5 535.7 1 6
124.2 101.3
9 C.5/1.5 536.2 1 6
8 B.5/1.5 536.2 1
4 D.5/1.5 535.7
10 D.5/1.5 536.2 1 6
6
7 A.5/1.5 536.2 1 6
5 E.3/1.5 535.7 1 6
123.0
123.4 99.3 24.3 94
93
98.3 25.1 93
25.7
95
6 E.7/1.5 535.7 1 6
122.8
122.8 97.6
98.0
93
93
26.692122.5
122.8
124.1 100.5 23.5
99.7 23.2
96.816
Client:GTIS Acquisitions, LLC Service Date:7/2/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Work Order Number:1417220
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
General Location
Area:Building Pad (A-F/1.0-2.0)
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
22.1
16 D.5/1.5 536.7 1 6 123.6 99.3 24.5 94
96
18 E.7/1.5 536.7 1 6 123.6 100.2
17 E.3/1.5 536.7 1 6 123.7 101.3
99.0 24.2 94
23.4 95
9619A.5/1.5 537.2 1 6 124.0 101.1 22.7
123.2
20 B.5/1.5 537.2 1 6 123.0
96
98.2 25.5 93
22 D.5/1.5 537.2 1 6
21 C.5/1.5 537.2 1 6
123.4 100.8 22.4
122.2
24 E.7/1.5 537.2 1 6
23 E.3/1.5 537.2 1 6 97.7 25.1 93
124.0 100.3 23.6 95
26 B.5/1.5 537.7 1 6
25 A.5/1.5 537.7 1 6 98.1 25.7 93
122.4 96.9 26.3 92
123.3
28 D.5/1.5 537.7 1 6
27 C.5/1.5 537.7 1 6 97.4 25.9 92
123.1 98.3 25.2 93
122.6
30 E.7/1.5 537.7 1 6
29 E.3/1.5 537.7 1 6 99.1 24.8 94
124.2 100.4 23.7 95
123.7
D): 2251 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2251 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
98.7 24.094122.442E.7/1.5 538.7 1 6
123.5 99.4 24.2 94
100.1 23.195123.2
41 E.3/1.5 538.7 1 6
40 D.5/1.5 538.7 1 6
123.6 100.7 22.7 96
98.4 25.593123.5
39 C.5/1.5 538.7 1 6
38 B.5/1.5 538.7 1 6
95
37 A.5/1.5 538.7 1 6
36 E.7/1.5 538.2 1 6
123.7 99.9 23.8 95
98.2 25.193122.8
35 E.3/1.5 538.2 1 6
24.8 94
34 D.5/1.5 538.2 1 6 123.7
123.3 100.6 22.6 96
100.3 23.3
94
33 C.5/1.5 538.2 1 6 124.2 99.5
32 B.5/1.5 538.2 1 6 123.1 98.8 24.6
31 A.5/1.5 538.2 1 6 123.6 101.0 22.4 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad (A-F/1.0-2.0)
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Work Order Number:1417220
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/2/2024
95
96
25.995119.4
118.2
118.7 93.5 26.9
92.4 27.9
94.816
94
6 E.7/1.5 539.2 1 6
119.4
120.1 94.7
95.3
119.4
118.8 93.3 27.3 94
96
94.6 26.2 95
25.2
4 D.5/1.5 539.2
10 D.5/1.5 539.7 1 6
6
7 A.5/1.5 539.7 1 6
5 E.3/1.5 539.2 1 6
119.9 95.4
9 C.5/1.5 539.7 1 6
8 B.5/1.5 539.7 1
118.8 93.5 27.1
3 C.5/1.5 539.2 1 6
2 B.5/1.5 539.2 1 6
119.8 95.7
1 A.5/1.5 539.2 1 6
11 E.3/1.5 539.7 1 6
12 E.7/1.5 539.7 1 6
Clear
94.7 26.6 95
28.0 93
94
25.7
93
96
96
92.2
26.8
25.3
1417221
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/3/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
105.3
Material Information Laboratory Data
43LightReddishBrownClay
Dark Brown and Brown Sandy Clay 39
99.4
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4925
2 2 95
General Location
Area:Building Pad (A-F/1.0-2.0)
96
100218.0
1 21.1
3
95.1 25.5
93.2
B.5/1.5 540.2 1 6
A.5/1.5 540.2 1 6
118.0
27.0 94
15 C.5/1.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
120.0 94.9 26.4 95
D): 2262 (M):728StandardCount:
118.4
119.9
119.4
14
Remarks:
540.2 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2262 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
103.0 17.3 98
119.9 101.3 18.4 96
120.8
29 Storm Drain Line A at Station 4+50 FG-1.0 2 6
28 Storm Drain Line A at Station 7+25 FG-1.5 2 6
101.7 18.6 97
121.2 104.1 16.4 99
120.6
27 Storm Drain Line A at Station 4+25 FG-1.5 2 6
26 Storm Drain Line B at Station 2+50 FG-1.0 2 6
120.8 103.2 17.19825StormDrainLineBatStation1+25 FG-1.5 2 6
Utility Backfill/Paving Area
95.7 25.5 96
119.2 94.6 26.0 95
118.5 93.2 27.1
120.1
24 E.7/1.5 540.7 1 6
23 E.3/1.5 540.7 1 6
119.6
20 B.5/1.5 540.7 1 6 120.0
94
95.1 25.8 96
22 D.5/1.5 540.7 1 6
21 C.5/1.5 540.7 1 6
19 A.5/1.5 540.7 1 6 119.7 95.5 25.3
94.9 26.4 95
27.2 94
96
18 E.7/1.5 540.2 1 6 118.8 93.4
17 E.3/1.5 540.2 1 6 118.6 93.0 27.5
16 D.5/1.5 540.2 1 6 120.2 94.9 26.7 95
94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad (A-F/1.0-2.0)
92 96
2 95100DarkBrownandBrownSandyClay392318.0 105.3 -2
Material Description/Classification PI
Light Reddish Brown Clay 43
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 5 21.1 99.4 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Work Order Number:1417221
Client:GTIS Acquisitions, LLC Service Date:7/3/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/3/2024
Work Order Number:1417221
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 5 Light Reddish Brown Clay 43 21.1 99.4
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
10023DarkBrownandBrownSandyClay3918.0 105.3 -2 2 95
General Location
Area:Utility Backfill/Paving Area
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
30 Storm Drain Line A at Station 7+50 FG-1.0 2 6 121.1 104.2 16.2 99
95
32 Storm Drain Line C at Station 2+50 FG-1.5 2 6 120.0 102.1
31 Storm Drain Line C at Station 5+50 FG-1.5 2 6 120.2 100.3 19.8
34 Storm Drain Line C at Station 1+25 FG-1.0 2 6
17.5 97
33 Storm Drain Line C at Station 4+25 FG-1.0 2 6 119.4
119.8 99.9 19.9 95
100.6 18.7 96
35 Plumbing A.4/11.4 FG-2.0 1 6
Utility Backfill/Building
118.8 93.0 27.7 94
37 Plumbing A.4/11.3 FG-1.5 1 6
36 Plumbing A.4/18.4 FG-2.0 1 6
119.5 95.3 25.4 96
92.1 28.893118.6
39 Plumbing A.4/11.4 FG-1.0 1 6
38 Plumbing A.4/18.3 FG-1.5 1 6
118.7 94.0 26.3 95
94.2 26.595119.2
40 Plumbing A.4/18.4 FG-1.0 1 6 95.6 25.196119.6
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2262 (M):728
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
95
98
24.599114.5
113.8
114.5 89.8 27.5
89.5 27.2
92.016
96
6 A.5/8.5 Final 1 6
114.0
113.9 88.9
91.1
114.4
113.7 90.2 26.0 97
98
89.6 27.7 96
25.4
4 A.5/6.5 Final
10 B.5/4.5 Final 1 6
6
7 A.5/9.5 Final 1 6
5 A.5/7.5 Final 1 6
114.4 90.5
9 B.5/3.5 Final 1 6
8 A.5/10.5 Final 1
113.7 91.0 24.9
3 A.5/5.5 Final 1 6
2 A.5/4.5 Final 1 6
114.6 91.4
1 A.5/3.5 Final 1 6
11 B.5/5.5 Final 1 6
12 B.5/6.5 Final 1 6
Cloudy
91.7 25.3 98
27.8 95
98
26.4
96
99
97
88.3
28.1
25.1
1419908
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:07/05/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
Material Information Laboratory Data
13LightBrownandTanClay 93.2
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
2 29506L
General Location
Area:Building Pad (A-F/3-11)
100126.3
91.9 24.7
88.8
B.5/8.5 Final 1 6
B.5/7.5 Final 1 6
112.8
28.0 95
15 B.5/9.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
114.6 90.6 26.5 97
D): 2245 (M):733StandardCount:
113.7
114.9
114.6
14
Remarks:
Final 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
96
95
22.296124.0
123.4
123.3 100.7 22.4
100.2 23.2
101.516
96
6 E/9- South FG-2.5 1 6
123.3
124.3 101.3
99.8
123.8
123.3 100.6 22.6 96
94
99.5 24.4 94
24.1
4 E/10- South FG-2.5
10 E/6- South FG-2.5 1 6
6
7 E/8- North FG-2.5 1 6
5 E/9- North FG-2.5 1 6
123.8 99.4
9 E/6- North FG-2.5 1 6
8 E/8- South FG-2.5 1
123.6 100.3 23.2
3 E/10- North FG-2.5 1 6
2 E/11- South FG-2.5 1 6
123.2 99.3
1 E/11- North FG-2.5 1 6
11 E/5- North FG-2.5 1 6
12 E/5- South FG-2.5 1 6
Cloudy
99.2 24.6 94
23.9 94
95
24.5
95
96
94
99.3
22.7
23.5
1424299
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/17/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4923
General Location
Area:Building Pad Footings
96118.0
101.1 22.3
98.7
E/4- South FG-2.5 1 6
E/4- North FG-2.5 1 6
123.0
24.0 94
15 E/3- North
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
123.6 100.4 23.1 95
D): 2278 (M):728StandardCount:
122.4
123.6
123.6
14
Remarks:
FG-2.5 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2278 (M):728
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
99.9 22.9 95
123.6 100.3 23.2 95
122.8
29 Plumbing A.4/4 FG-3.0 1 6
28 Plumbing A.4/9 FG-3.5 1 6
99.1 24.6 94
124.4 101.4 22.7 96
123.5
27 Plumbing A.4/3 FG-3.5 1 6
26 Plumbing A.4/10 FG-4.0 1 6
122.6 98.0 25.19325PlumbingA.4/4 FG-4.0 1 6
Utility Backfill/Building
100.8 22.6 96
124.0 101.3 22.4 96
122.4 97.9 25.0
123.6
24 D/2- South FG-2.5 1 6
23 D/2- North FG-2.5 1 6
123.2
20 D/4- South FG-2.5 1 6 124.0
93
100.1 23.1 95
22 D/3- South FG-2.5 1 6
21 D/3- North FG-2.5 1 6
19 D/4- North FG-2.5 1 6 122.7 98.6 24.4
99.4 24.7 94
25.2 93
94
18 E/2- South FG-2.5 1 6 122.3 97.7
17 E/2- North FG-2.5 1 6 122.9 99.7 23.3
16 E/3- South FG-2.5 1 6 123.9 100.9 22.8 96
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad Footings
92 96
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Cloudy
Work Order Number:1424299
Client:GTIS Acquisitions, LLC Service Date:7/17/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/17/2024
Work Order Number:1424299
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Cloudy
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
General Location
Area:Utility Backfill/Building
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
30 Plumbing A.4/10 FG-3.0 1 6 122.8 99.7 23.2 95
94
32 Plumbing A.4/9 FG-2.5 1 6 123.6 100.8
31 Plumbing A.4/3 FG-2.5 1 6 123.7 99.4 24.4
34 Plumbing A.4/10 FG-2.0 1 6
22.6 96
33 Plumbing A.4/4 FG-2.0 1 6 122.6
123.5 100.8 22.5 96
97.7 25.5 93
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:(D): 2278 (M):728
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
97
96
22.696123.9
116.5
116.7 95.9 21.7
94.7 23.0
101.116
96
5 Sanitary Sewer Line S-2 at Station 1+75 FG-6.5 2 6
115.7
116.4 96.6
95.2
123.0
95
98.6 24.7 94
23.5
4 D/11- South FG-2.5
9 Sanitary Sewer Line S-2 at Station 1+75 FG-4.5 2 6
6
6 Sanitary Sewer Line S-2 at Station 2+75 FG-6.0 2 6
Utility Backfill/Paving Area
117.2 98.0
8 Sanitary Sewer Line S-2 at Station 2+75 FG-5.0 2 6
7 Sanitary Sewer Line S-2 at Station 1+75 FG-5.5 2
123.1 100.6 22.4
3 D/11- North FG-2.5 1 6
2 D/10- South FG-2.5 1 6
123.1 99.7
1 D/10- North FG-2.5 1 6
10 Sanitary Sewer Line S-2 at Station 2+75 FG-4.0 2 6
11 Sanitary Sewer Line S-2 at Station 1+75 FG-3.5 2 6
Clear
95.1 21.3 96
22.0 96
96
19.6
95
97
99
95.3
20.5
21.5
1424301
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/19/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 2
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4923
2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
96.7 20.6
94.8
Sanitary Sewer Line S-2 at Station 1+75 FG-2.5 2 6
Sanitary Sewer Line S-2 at Station 2+75 FG-3.0 2 6
116.3
22.9 95
14 Sanitary Sewer Line S-2 at Station 2+75
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
12
118.4 98.8 19.8 99
D): 2266 (M):733StandardCount:
116.5
115.4
116.6
13
Remarks:
FG-2.0 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2266 (M):733
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
16 Sanitary Sewer Line S-2 at Station 2+75 FG-1.0 2 6 116.8 95.3 22.6
15 Sanitary Sewer Line S-2 at Station 1+75 FG-1.5 2 6 117.1 96.4 21.5 97
96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Utility Backfill/Paving Area
92 96
2 95100LightReddishBrownClay432521.1 99.4 -2
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Clear
Work Order Number:1424301
Client:GTIS Acquisitions, LLC Service Date:7/19/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
97
96
22.696123.9
116.5
116.7 95.9 21.7
94.7 23.0
101.116
96
5 Sanitary Sewer Line S-2 at Station 1+75 FG-6.5 2 6
115.7
116.4 96.6
95.2
123.0
95
98.6 24.7 94
23.5
4 D/11- South FG-2.5
9 Sanitary Sewer Line S-2 at Station 1+75 FG-4.5 2 6
6
6 Sanitary Sewer Line S-2 at Station 2+75 FG-6.0 2 6
Utility Backfill/Paving Area
117.2 98.0
8 Sanitary Sewer Line S-2 at Station 2+75 FG-5.0 2 6
7 Sanitary Sewer Line S-2 at Station 1+75 FG-5.5 2
123.1 100.6 22.4
3 D/11- North FG-2.5 1 6
2 D/10- South FG-2.5 1 6
123.1 99.7
1 D/10- North FG-2.5 1 6
10 Sanitary Sewer Line S-2 at Station 2+75 FG-4.0 2 6
11 Sanitary Sewer Line S-2 at Station 1+75 FG-3.5 2 6
Clear
95.1 21.3 96
22.0 96
96
19.6
95
97
99
95.3
20.5
21.5
1424301
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/19/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 2
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
4923
2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
96.7 20.6
94.8
Sanitary Sewer Line S-2 at Station 1+75 FG-2.5 2 6
Sanitary Sewer Line S-2 at Station 2+75 FG-3.0 2 6
116.3
22.9 95
14 Sanitary Sewer Line S-2 at Station 2+75
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
12
118.4 98.8 19.8 99
D): 2266 (M):733StandardCount:
116.5
115.4
116.6
13
Remarks:
FG-2.0 2 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2266 (M):733
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
16 Sanitary Sewer Line S-2 at Station 2+75 FG-1.0 2 6 116.8 95.3 22.6
15 Sanitary Sewer Line S-2 at Station 1+75 FG-1.5 2 6 117.1 96.4 21.5 97
96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Utility Backfill/Paving Area
92 96
2 95100LightReddishBrownClay432521.1 99.4 -2
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Clear
Work Order Number:1424301
Client:GTIS Acquisitions, LLC Service Date:7/19/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:(D): 2266 (M):729StandardCount:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
2 29506L
General Location
Area:Building Pad
100126.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
13LightBrownandTanClay 93.2
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
1437621
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:8/7/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:8/20/2024
New York, NY 10019 Weather:Clear
98114.2 91.3 25.1
3 E.5/16 FG 1 6
2 E.5/14 FG 1 6
114.6 92.2
1 E.5/12 FG 1 6
4 E.5/18 FG
113.6
99
89.8 26.5 96
24.3
25.298114.2 91.216
125.3 110.0 13.9
99
98
104.1 18.0
115.7
115.9 100.0 15.9
101.2
95
96
13.4 *100127.3
99
110.0
108.3 12.8
116.8 103.7 12.6 *
FG 1 6
111.1 14.0
112.3
12.5 *98123.8
3 200'N x 75'E From SEC of Building Pad FG 1 6
119.3
122.2
122.8
126.7
4 275'N x 75'E From SEC of Building Pad FG 1 6
5 345'N x 75'E From SEC of Building Pad FG 2
12 765'N x 75'E From SEC of Building Pad FG 1
10 645'N x 75'E From SEC of Building Pad FG 2 6
6
9 565'N x 75'E From SEC of Building Pad FG 2 6
6 380'N x 75'E From SEC of Building Pad FG 2 6
7 460'N x 75'E From SEC of Building Pad FG 2 6
8 500'N x 75'E From SEC of Building Pad FG 2 6
6
2 180'N x 75'E From SEC of Building Pad
1439644
3
6
116.8 100.5 16.2
98
111.1 11.4 *99
106.1 12.4 *
100+
14.3
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:08/09/2024
787 Seventh Avenue, 50th Floor Report Date:8/28/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Eaton, Robert
New York, NY 10019 Weather:Overcast
Work Order Number:
952
2 2953
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
1
2 18.0
15.8 112.1 -2 2
105.3
15BrownClayeySand
Dark Brown and Brown Sandy Clay 39
Percent
Compaction
12.9 *100
95
15 765'N x 120'E From SEC of Building Pad
795'N x 120'E From SEC of Building Pad FG 2 6
795'N x 75'E From SEC of Building Pad FG 1 6
98
100+
112.5
1 120'N x 75'E From SEC of Bulding Pad FG 1
General Location
Area:Firelane E of Office/Warehouse
562
Remarks: All field densities that failed to meet minimum specifications were reworked, retested, and passed on the same day prior to techncian leaving the site.
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:12039 Manufacturer:Troxler Model:3411B
13
134.1 114.4 17.2 100+
127.0
FG 1
123.8
115.2 103.5 11.3 *
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 725'N x 75'E From SEC of Building Pad FG 2 6
Respectfully Submitted,
Standard Count:(D): 1131 (M):
Respectfully Submitted,
Ronnie Yeoman
Project Manager
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Remarks:
103.9 17.0 99
122.5 105.0 16.7 100
121.6
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:12039 Manufacturer:Troxler Model:3411B Standard Count:(D): 1131 (M):562
29 Retest of Test # 6 FG 2 10
30 Retest of Test # 7 FG 2 11
111.9 14.8 100
104.3 16.299121.2
128.5
25 135'N x 120'E From SEC of Building Pad FG 2 6
26 Retest of Test # 2 FG 1 7
28 Retest of Test # 5 FG 2 9
27 Retest of Test # 4 FG 1 8
104.1 16.0 99
127.5 110.8 15.1 99
120.8
104.0 16.1 99
113.1 14.2 100+129.2
120.7
21 380'N x 120'E From SEC of Building Pad FG 1 6
22 345'N x 120'E From SEC of Building Pad FG 2 6
24 175'N x 120'E From SEC of Building Pad FG 1 6
23 275'N x 120'E From SEC of Building Pad FG 2 6
111.9 14.1 100
123.7 106.6 16.0 100+
127.7
100
106.0 16.4 100+
100
19 500'N x 120'E From SEC of Building Pad FG 2 6 123.4
16.0
20 460'N x 120'E From SEC of Building Pad FG 1 6
16.4
127.7 112.1 13.9
100+
18 565'N x 120'E From SEC of Building Pad FG 2 6 122.3 105.1
17 645'N x 120'E From SEC of Building Pad FG 2 6 123.2 106.2
16 725'N x 120'E From SEC of Building Pad FG 1 6 127.2 111.2 14.4 99
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Firelane E of Office/Warehouse
39 18.0 105.3 -2 2 95
Material Description/Classification PI
Brown Clayey Sand 15
2 3
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 2 15.8 112.1 -2 2
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
95
Dark Brown and Brown Sandy Clay
Material Information Laboratory Data Project Specifications
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Eaton, Robert
Grapevine, Texas Page Number:2 of 3
Work Order Number:1439644
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:8/28/2024
New York, NY 10019 Weather:Overcast
Client:GTIS Acquisitions, LLC Service Date:08/09/2024
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
Standard Count:(D): 1131 (M):562
Remarks:
Serial No:12039 Manufacturer:Troxler Model:3411B
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
45
44
43
42
41
40
39
38
37
100
36
35 Retest of Test # 13 FG 1 6 130.6 111.7 16.9
2 6 120.8
99
34 Retest of Test # 12 FG 1 6 128.7 110.5 16.5 99
33 Retest of Test # 11 FG 2 6 122.5 104.7 17.0
103.7 16.59832RetestofTest # 10 FG
31 Retest of Test # 8 FG 2 6 122.6 104.9
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
16.9 100
General Location
Area:Firelane E of Office/Warehouse
2 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3 -2 2 95
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 2 Brown Clayey Sand 15 15.8 112.1
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
2 2 95
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Eaton, Robert
Grapevine, Texas Page Number:3 of 3
Work Order Number:1439644
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:8/28/2024
New York, NY 10019 Weather:Overcast
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:08/09/2024
Respectfully Submitted,
Standard Count:(D):2547 (M):
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 200' N and 120' E from SE Corner of Building FG 1 6
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4884 Manufacturer:Instrotek Model:Explorer 2
13
126.0 107.0 17.8 95
120.4
FG 1
118.5
126.7 110.0 15.2
General Location
Area:Paving; East of Building, North and South Third
658
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Percent
Compaction
18.2 97
96
15 SE Approach at Tie-in ; North Half
SE Approach at Tie-in ; South Half FG 1 6
NE Approach at Tie-in ; North Half FG 2 6
98
98
101.9
1 90' S and 100' E from NE Corner of Building FG 2
2 18.0
1 15.8 112.1 -2 2
105.4
15BrownClayeySand
Dark Brown and Brown Sandy Clay 29
952
2 2953
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Material Description/Classification PI
Material Information Laboratory Data
787 Seventh Avenue, 50th Floor Report Date: 8/26/2024
Grapevine, Texas Page Number: 1 of
Project:121 Commerce Center Addition (Lot 1)Project Number: F241078
Off Genesis Way and Enchanted Way Technician: Guerrero, Victor
New York, NY 10019 Weather: Clear
Work Order Number:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date: 08/16/2024
1443751
2
6
125.9 107.2 17.4
97
100.5 17.9 95
109.4 16.2
98
17.4
6
9 100' N and 120' E from SE Corner of Building FG 1 6
6 50' N and 80' E from SE Corner of Building FG 1 6
7 50' N and 120' E from SE Corner of Building FG 1 6
8 100' N and 80' E from SE Corner of Building FG 1 6
6
128.1 109.9 16.6
108.5
12 NE Approach at Tie-in ; South Half FG 2
10 200' N and 80' E from SE Corner of Building FG 1 6
4 200' S and 80' E from NE Corner of Building FG 1 6
5 200' S and 120' E from NE Corner of Building FG 1
2 120' S and 80' E from NE Corner of Building FG 2 6
3 120' S and 120' E from NE Corner of Building FG 1 6
127.1
127.2
127.3 108.6 17.2
110.1 15.5
98126.0 109.3 15.3
97
126.9
130.4 112.2 16.2
108.1
100
96
17.197127.1
98
101.5 17.796119.5
119.5 102.2 16.9
Work Order Number: 1443751
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date: 8/26/2024
New York, NY 10019 Weather: Clear
Client:GTIS Acquisitions, LLC Service Date: 08/16/2024
Material Information Laboratory Data Project Specifications
Project:121 Commerce Center Addition (Lot 1)Project Number: F241078
Off Genesis Way and Enchanted Way Technician: Guerrero, Victor
Grapevine, Texas Page Number: 2 of 2
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 29
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
2 3 18.0 105.4 -2 2
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
95
General Location
Area:S.H Frontage Road- Drive 3; NW Approach Fill
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
16 NW Approach; North Half FG-2.0 2 6 121.6 102.5 18.6 97
9817NWApproach; North Half FG-2.0 2 6 122.9 103.3 19.0
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4884 Manufacturer:Instrotek Model:Explorer 2 Standard Count:(D):2547 (M):658
Remarks:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Respectfully Submitted,
Ronnie Yeoman
Project Manager
100
95.3 20.197114.52AreaBetweenMiddleEntranceandCornerentrancefromNBSRFG16
3 Area closest to First entrance from NBSR FG 1 6
118.4 96.7 22.4
118.1 97.9 20.6
6
1451677
1
99
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date: 8/29/2024
787 Seventh Avenue, 50th Floor Report Date: 9/13/2024
Grapevine, Texas Page Number: 1 of
Project:121 Commerce Center Addition (Lot 1)Project Number: F241078
Off Genesis Way and Enchanted Way Technician: Ulate, Andrew
New York, NY 10019 Weather: Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand951121.4 98.0 -2 2
Percent
Compaction
1 Area close to middle entrance to B1 from NBSR FG 1
General Location
Area:North West parking lot between building 1(B1) and North Bound service road (NBSR)
465
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4458 Manufacturer:Instrotek Model:
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D):2336 (M):
95.2 21.097115.22WaterlineC-2 Station 2+83.89 FG-3.5 1 6
113.2 93.0 21.76
1463004
1
95
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:09/19/2024
787 Seventh Avenue, 50th Floor Report Date:9/24/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Macias, Jose
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand951121.4 98.0 -2 2
Percent
Compaction
1 Waterline C-2 Station 2+83.89 FG-4.0 1
General Location
Area:Utilities
477
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:733 Manufacturer:Humboldt Model:5001EZ
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 2011 (M):
22.798118.2
97
95.9 22.998117.9
117.9 95.5 23.5
98117.8 95.7 23.1
2 Station 1+38.62 water line C-2 FG 1 6
3 Station 2+51.63 water line C-2 FG-1.0 1 6
4 Station 2+51.63 water line C-2 FG 1 6
5 Station 7+99.23 Water Line C-2 FG-1.0 1
119.8 97.3 23.1
117.3 94.9 23.6
96.3
6
6 Station 7+99.23 Water Line C-2 FG 1 6
6
1467134
1
99
97
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date: 09/26/2024
787 Seventh Avenue, 50th Floor Report Date: 9/30/2024
Grapevine, Texas Page Number: 1 of
Project:121 Commerce Center Addition (Lot 1)Project Number: F241078
Off Genesis Way and Enchanted Way Technician: Rosse, Joel
New York, NY 10019 Weather: Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand951121.4 98.0 0 4
Percent
Compaction
1 Station 1+38.62 water line C-2 FG-1.0 1
General Location
Area:Utilities
716
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4300 Manufacturer:Instrotek Model:Xplorer 2
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D):2285 (M):
99
97
19.099124.5
95
106.7 16.195123.9
123.8
123.2
119.6 100.6 18.9
105.1 17.2
99125.1 104.7 19.5
96
122.0
122.5 104.0 17.8
101.9
2 75' S and 20' E from NE Corner of Building SG 1 6
3 75' S and 30' E from NE Corner of Building SG 1 6
4 75' S and 10' E from NE Corner of Building FG-4.0 2 6
5 75' S and 20' E from NE Corner of Building FG-4.0 2
126.7 111.3 13.8
125.8 106.8 17.8
104.6
12 75' S and 30' E from NE Corner of Building FG-2.0 2
10 75' S and 10' E from NE Corner of Building FG-2.0 2 6
6
9 75' S and 30' E from NE Corner of Building FG-3.0 2 6
6 75' S and 30' E from NE Corner of Building FG-4.0 2 6
7 75' S and 10' E from NE Corner of Building FG-3.0 2 6
8 75' S and 20' E from NE Corner of Building FG-3.0 2 6
6
1482072
2
6
121.2 101.4 19.5
99
104.9 19.3 100
104.4 18.6
100
19.7
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/21/2024
787 Seventh Avenue, 50th Floor Report Date:11/1/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Lujan, Jacob
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
15BrownClayeySand
Dark Brown and Brown Sandy Clay 39
952
2 2953
100
100218.0
1 15.8 112.1 -2 2
105.3
Percent
Compaction
19.8 95
96
15 75' S and 30' E from NE Corner of Building
75' S and 20' E from NE Corner of Building FG-1.0 2 6
75' S and 10' E from NE Corner of Building FG-1.0 2 6
99
99
100.4
1 75' S and 10' E from NE Corner of Building SG 1
General Location
Area:NE Ramp
644
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:33700 Manufacturer:Troxler Model:3430
13
118.6 100.5 18.0 95
120.3
FG-1.0 2
125.1
124.6 103.9 19.9
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 75' S and 20' E from NE Corner of Building FG-2.0 2 6
Respectfully Submitted,
Standard Count:(D): 1723 (M):
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
Standard Count:(D): 1723 (M):644
Remarks:
Serial No:33700 Manufacturer:Troxler Model:3430
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
2 6 119.9
961875' S and 30' E from NE Corner of Building FG 2 6 121.0 101.5 19.2
101.3 18.4961775' S and 20' E from NE Corner of Building FG
16 75' S and 10' E from NE Corner of Building FG 2 6 120.5 100.4
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
20.0 95
General Location
Area:NE Ramp
10023DarkBrownandBrownSandyClay3918.0 105.3 -2 2 95
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 2 Brown Clayey Sand 15 15.8 112.1
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
2 2 95 100
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Lujan, Jacob
Grapevine, Texas Page Number:2 of 2
Work Order Number:1482072
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:11/1/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/21/2024
100
99
21.998116.1
97
95.6 21.998115.6
115.5
121.3 97.0 22.8
95.6 23.1
96114.4 93.8 22.5
99
121.5
121.9 97.9 22.7
97.3
2 Ne Corner of Building 20' W FG-1.0 1 8
3 ES of Building 10' W of of Building north entrance FG-1.0 1 8
4 ES of Building 20' W of Building north entrance FG-1.0 1 8
5 ES of Building 30' W of Building north entrance FG-1.0 1
115.2 94.7 22.0
115.4 95.3 22.3
96.1
8
9 Northside of Building 50' E FG-1.0 1 8
6 ES of Building 50' W of Building north entrance FG-1.0 1 8
7 Northside of Building 10' E FG-1.0 1 8
8 Northside of Building 30' E FG-1.0 1 8
8
1483645
1
97
98
22.1
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/22/2024
787 Seventh Avenue, 50th Floor Report Date:11/1/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 95100121.4 98.0 0 4
Percent
Compaction
1 Ne Corner of Building 10' W FG-1.0 1
General Location
Area:NE corner of building /eastside of Building/Northside of building
405
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 2876 (M):
98
98
23.998119.3
99
96.1 24.398120.3
118.9
119.9
119.4 95.7 22.6
96.9 22.6
98118.8 95.8 22.7
98
120.4
120.7 96.5 23.1
96.3
2 F/15 FG-4.0 1 6
3 F/13 FG-4.0 1 6
4 F/11 FG-4.0 1 6
5 F/9 FG-4.0 1
120.4 96.2 23.5
120.9 97.1 23.7
96.2
12 F/15 FG-2.0 1
10 F/9 FG-3.0 1 6
6
9 F/11 FG-3.0 1 6
6 F/17 FG-3.0 1 6
7 F/15 FG-3.0 1 6
8 F/13 FG-3.0 1 6
6
1483647
1
6
120.4 96.3 24.3
98
96.4 24.3 98
95.1 23.4
99
21.9
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/24/2024
787 Seventh Avenue, 50th Floor Report Date:11/1/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38Darkbrownclaywithsand951100121.4 98.0 0 4
Percent
Compaction
22.6 99
98
15 F/9
F/11 FG-2.0 1 6
F/13 FG-2.0 1 6
97
97
96.6
1 F/17 FG-4.0 1
General Location
Area:Leaveouts
417
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
13
120.0 96.4 23.5 98
120.1
FG-2.0 1
119.9
119.3 95.3 24.3
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 F/17 FG-2.0 1 6
Respectfully Submitted,
Standard Count:(D): 2876 (M):
22.599120.9
98
96.2 23.198120.5
98119.6 95.6 23.1
2 F/15 FG-1.0 1 6
3 F/13 FG-1.0 1 6
4 F/11 FG-1.0 1 6
5 F/9 FG-1.0 1
119.8 95.9 22.3
120.2 96.0 22.8
96.7
6
6
1483648
1
98
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/25/2024
787 Seventh Avenue, 50th Floor Report Date:11/1/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownclaywithsand951100121.4 98.0 0 4
Percent
Compaction
1 F/17 FG-1.0 1
General Location
Area:Leaveouts
411
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 2866 (M):
94
93
27.096120.9
93
93.2 26.994118.3
117.3
119.5
117.1 91.5 28.0
94.1 27.0
95120.1 94.8 26.7
92
116.5
118.6 93.1 27.4
92.5
2 B.9/18.9 FG-1.5 1 6
3 A.1/18 FG-1.5 1 6
4 E.2/18.9 FG-1.0 1 6
5 B.9/18.9 FG-1.0 1
119.8 95.7 25.2
117.2 92.1 27.2
95.2
10 B.9/18.9 FG 1 6
6
9 E.2/18.9 FG 1 6
6 A.1/18 FG-1.0 1 6
7 E.2/18.9 FG-0.5 1 6
8 B.9/18.9 FG-0.5 1 6
6
1487727
1
96
93.5 25.5
95
25.9
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/29/2024
787 Seventh Avenue, 50th Floor Report Date:11/11/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Macias, Jose
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
43LightReddishBrownClay92596121.1 99.4 4
Percent
Compaction
94
1 E.2/18.9 FG-1.5 1
General Location
Area:Leaveouts: Main Building Pad
479
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:733 Manufacturer:Humboldt Model:5001EZ
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 2000 (M):
97
98
22.098118.5
100
96.6 22.097117.9
113.2
121.2
116.5 97.1 20.0
98.9 22.5
99119.8 98.3 21.9
98
116.5
115.9 96.6 20.0
97.3
2 20' S and 25' E from NE Corner of Building SG 1 6
3 10' S and 25' E from NE Corner of Building SG 1 6
4 30' S and 25' E from NE Corner of Building FG-4.0 1 6
5 20' S and 25' E from NE Corner of Building FG-4.0 1
115.6 94.6 22.2
121.3 99.1 22.4
97.1
12 5' S and 25' E from NE Corner of Building FG-2.0 1
10 25' S and 25' E from NE Corner of Building FG-2.0 1 6
6
9 5' S and 25' E from NE Corner of Building FG-3.0 1 6
6 10' S and 25' E from NE Corner of Building FG-4.0 1 6
7 25' S and 25' E from NE Corner of Building FG-3.0 1 6
8 15' S and 25' E from NE Corner of Building FG-3.0 1 6
6
1487729
3
6
114.5 95.2 20.3
95
95.3 20.0 96
94.8 19.4
99
19.7
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/30/2024
787 Seventh Avenue, 50th Floor Report Date:11/11/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Lujan, Jacob
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
43LightReddishBrownClay955100121.1 99.4 -2 2
Percent
Compaction
19.2 100
96
15 5' S and 25' E from NE Corner of Building
15' S and 25' E from NE Corner of Building FG-1.0 1 6
25' S and 25' E from NE Corner of Building FG-1.0 1 6
98
95
99.0
1 30' S and 25' E from NE Corner of Building SG 1
General Location
Area:SE Building Ramp
648
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:33700 Manufacturer:Troxler Model:3430
13
117.0 97.1 20.5 98
118.0
FG-1.0 1
114.4
117.2 97.4 20.3
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 15' S and 25' E from NE Corner of Building FG-2.0 1 6
Respectfully Submitted,
Standard Count:(D): 1720 (M):
Respectfully Submitted,
Ronnie Yeoman
Project Manager
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:33700 Manufacturer:Troxler Model:3430 Standard Count:(D): 1720 (M):648
97
20.1
20.0
97
18 5' S and 25' E from NE Corner of Building FG 1 6 115.3 96.1
17 15' S and 25' E from NE Corner of Building FG 1 6 115.9 96.5
16 25' S and 25' E from NE Corner of Building FG 1 6 113.6 94.9 19.7 95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:SE Building Ramp
Material Description/Classification PI
Light Reddish Brown Clay 43
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 5 21.1 99.4 -2 2
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
95 100
Material Information Laboratory Data Project Specifications
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Lujan, Jacob
Grapevine, Texas Page Number:2 of 3
Work Order Number:1487729
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:11/11/2024
New York, NY 10019 Weather:Clear
Client:GTIS Acquisitions, LLC Service Date:10/30/2024
Respectfully Submitted,
Ronnie Yeoman
Project Manager
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:33700 Manufacturer:Troxler Model:3430 Standard Count:(D): 1720 (M):648
97.5 22.1 93
92
22 A.2/18 FG 1 6 119.0
22.0
21.8
94
21 A.2/16 FG 1 6 117.3 96.3
20 A.2/14 FG 1 6 119.9 98.3
19 A.2/12 FG 1 6 118.2 97.1 21.7 93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Leave Outs S Wall Of Building
Material Description/Classification PI
Reddish Brow Sandy Clay 38
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 4 17.5 104.6 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
Material Information Laboratory Data Project Specifications
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Lujan, Jacob
Grapevine, Texas Page Number:3 of 3
Work Order Number:1487729
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:11/11/2024
New York, NY 10019 Weather:Clear
Client:GTIS Acquisitions, LLC Service Date:10/30/2024
98
91.4 25.493114.62F/7 FG-0.5 1 6
3 F/7 FG 2 6
115.2 91.1 26.4
117.7 96.9 21.5
6
1487730
1
93
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/31/2024
787 Seventh Avenue, 50th Floor Report Date:11/11/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Eaton, Robert
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand
Dark Brown Clay with Sand 39
921
0 4951
96
100221.4
1 21.4 98.0 4
99.0
Percent
Compaction
1 F/7 FG-1.0 1
General Location
Area:Leaveouts
417
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:13159 Manufacturer:Troxler Model:3411B
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 1322 (M):
Respectfully Submitted,
Standard Count:(D): 2232 (M):
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4456 Manufacturer:Instrotek Model:
General Location
Area:Building Pad Leaveouts
745
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
93
1 F/8.5 FG-3.0 1
96115.8 112.1415BrownClayeySand922
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
787 Seventh Avenue, 50th Floor Report Date:11/11/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Syed, Komail
New York, NY 10019 Weather:Clear
Work Order Number:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/01/2024
1487731
1
94
104.2 24.1
93
24.4
6
9 F/8.5 FG-1.0 1 6
6 F/9.5 FG-2.0 1 6
7 F/8.5 FG-1.5 1 6
8 F/9.5 FG-1.5 1 6
6
129.1 104.4 23.7
104.9
10 F/9.5 FG-1.0 1 6
4 F/9.5 FG-2.5 1 6
5 F/8.5 FG-2.0 1
2 F/9.5 FG-3.0 1 6
3 F/8.5 FG-2.5 1 6
129.3
129.6
129.4 103.7 24.8
104.4 24.1
93129.5 104.1 24.4
93
129.5
129.2 103.8 24.5
104.1
93
93
23.594129.6
93
105.8 22.594129.6
129.7 105.7 22.7
94
94
23.793121.1
93
98.2 23.393121.1
122.0
121.3
122.2 99.4 22.9
98.1 23.6
93121.0 98.3 23.1
94
122.0
121.5 98.5 23.3
99.5
2 Leaveouts - F/18.5 FG-2.5 1 6
3 Leaveouts - F/18.5 FG-2.0 1 6
4 Leaveouts - F/18.5 FG-1.5 1 6
5 Leaveouts - F/18.5 FG-1.0 1
121.4 98.6 23.1
121.1 97.7 23.9
97.9
12 Leaveouts - E/19 FG-2.0 1
10 Leaveouts - E/19 FG-2.5 1 6
6
9 Leaveouts - D/19 FG-2.5 1 6
6 Leaveouts - C/19 FG-3.0 1 6
7 Leaveouts - D/19 FG-3.0 1 6
8 Leaveouts - E/19 FG-3.0 1 6
6
1487739
1
121.8 98.8 23.3
94
98.7 23.1 94
99.1 23.1
93
22.6
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:10/28/2024
787 Seventh Avenue, 50th Floor Report Date:11/1/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Syed, Komail
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39DarkBrownandBrownSandyClay92396118.0 105.3 4
Percent
Compaction
23.6 94
94Leaveouts - E/19 FG-1.5 1 6
Leaveouts - D/19 FG-1.5 1 6
94
94
98.5
1 Leaveouts - F/18.5 FG-3.0 1
General Location
Area:Building Pad Leaveouts
747
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4456 Manufacturer:Instrotek Model:
13 121.7
121.5
122.2 99.4 22.9
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 Leaveouts - D/19 FG-2.0 1 6
Respectfully Submitted,
Standard Count:(D): 2236 (M):
Respectfully Submitted,
Standard Count:(D): 2875 (M):
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
General Location
Area:Leaveouts
408
Remarks:
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
1 F/7 FG-3.0 1
96121.4 98.0438Darkbrownclaywithsand921
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
787 Seventh Avenue, 50th Floor Report Date:11/5/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Heavy Rain
Work Order Number:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/4/2024
1489977
1
956
116.7 92.1 26.1
92.94F/1 FG-3.0 1 6
2 F/5 FG-3.0 1 6
3 F/3 FG-3.0 1 6
25.595116.9
94
92.4 25.494116.8
117.0 93.2 25.5
Respectfully Submitted,
Standard Count:(D): 2867 (M):
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 E/1 FG-1.0 1 6
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
117.0
117.2 92.7 25.7
General Location
Area:Leaveouts
409
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
95
95
1 A/1 FG-2.0 1
96121.4 98.0438Darkbrownclaywithsand921
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
787 Seventh Avenue, 50th Floor Report Date:11/6/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Clear
Work Order Number:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/5/2024
1489978
1
96
92.5 26.0 94
92.9 25.9
95
26.4
6
9 C/1 FG-1.0 1 6
6 F/1 FG-2.0 1 6
7 A/1 FG-1.0 1 6
8 B/1 FG-1.0 1 6
6
117.9 92.8 25.7
91.9
12 F/1 FG-1.0 1
10 D/1 FG-1.0 1 6
4 D/1 FG-2.0 1 6
5 E/1 FG-2.0 1
2 B/1 FG-2.0 1 6
3 C/1 FG-2.0 1 6
117.4
118.2
117.2 92.9 25.4
93.4 25.7
95117.9 92.9 25.9
95
116.8
117.4 92.2 26.3
92.2
94
94
26.294116.8
95
92.5 26.894117.3
118.3 93.8 25.4
25.593116.1
94
93.6 25.294117.22A/6 FG-1.0 1 6
3 A/4 FG-1.0 1 6
4 A/3 FG-1.0 1 6
116.7 92.8 25.8
117.5 93.2 26.1
92.5
6
1489979
1
93
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/06/2024
787 Seventh Avenue, 50th Floor Report Date:11/26/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Lujan, Jacob
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
43LightReddishBrownClay92596121.1 99.4 4
Percent
Compaction
1 A/8 FG-1.0 1
General Location
Area:Leave Outs
640
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:33700 Manufacturer:Troxler Model:3430
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 1715 (M):
Respectfully Submitted,
Standard Count:(D):1352 (M):
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:13160 Manufacturer:Troxler Model:
General Location
Area:Tilt Wall Panels (Exterior) Backfill
690
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
1 3' S and 10' E from SW Corner of Building FG-3.0 1
96121.1 99.4443LightReddishBrownClay925
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Material Description/Classification PI
Material Information Laboratory Data
787 Seventh Avenue, 50th Floor Report Date: 11/26/2024
Grapevine, Texas Page Number: 1 of
Project:121 Commerce Center Addition (Lot 1)Project Number: F241078
Off Genesis Way and Enchanted Way Technician: Rosse, Joel
New York, NY 10019 Weather: Mostly Cloudy
Work Order Number:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date: 11/08/2024
1489980
1
936
2 3' S and 50' E from SW Corner of Building FG-3.0 1 6 93.9 25.394117.7
116.1 92.8 25.1
93
93
20.794126.9
94
104.9 20.694126.5
126.8
126.4
127.0 104.7 21.3
104.2 21.3
93126.4 104.4 21.1
93
126.4
126.7 104.8 20.9
104.4
2 B.5/1 FG-2.5 1 6
3 C.5/1 FG-2.5 1 6
4 E/1 FG-2.5 1 6
5 A.5/1 FG-2.0 1
126.6 104.7 20.9
127.0 105.5 20.4
105.1
12 E/1 FG-1.5 1
10 B.5/1 FG-1.5 1 6
6
9 A.5/1 FG-1.5 1 6
6 B.5/1 FG-2.0 1 6
7 C.5/1 FG-2.0 1 6
8 E/1 FG-2.0 1 6
6
1489981
2
6
127.0 105.5 20.4
93
104.7 21.1 93
104.4 21.5
93
21.1
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/08/2024
787 Seventh Avenue, 50th Floor Report Date:11/26/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Syed, Komail
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
15BrownClayeySand92296115.8 112.1 4
Percent
Compaction
20.6 94
94
15 C.5/1
B.5/1 FG-1.0 1 6
A.5/1 FG-1.0 1 6
93
93
105.4
1 A.5/1 FG-2.5 1
General Location
Area:Moisture Conditioning - Outside of the Building Pad
752
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4456 Manufacturer:Instrotek Model:
13
127.1 105.1 20.9 94
127.1
FG-1.0 1
126.8
126.7 104.2 21.6
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
6
11 C.5/1 FG-1.5 1 6
Respectfully Submitted,
Standard Count:(D): 2236 (M):
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
Standard Count:(D): 2236 (M):752
Remarks:
Serial No:4456 Manufacturer:Instrotek Model:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
9320E/1 FG-0.5 1 6 126.6 104.2 21.5
1 6 126.7
93
19 C.5/1 FG-0.5 1 6 126.5 104.4 21.2 93
18 B.5/1 FG-0.5 1 6 126.9 104.8 21.1
104.4 21.49317A.5/1 FG-0.5
16 E/1 FG-1.0 1 6 126.8 104.9
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
20.9 94
General Location
Area:Moisture Conditioning - 5' Outside of the Building Pad
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 2 Brown Clayey Sand 15 15.8 112.1
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Syed, Komail
Grapevine, Texas Page Number:2 of 2
Work Order Number:1489981
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:11/26/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/08/2024
Respectfully Submitted,
Standard Count:(D): 2854 (M):
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
General Location
Area:Leaveouts: Exterior of Building
408
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
1 A/4 FG-2.0 1
96121.4 98.0 0438DarkBrownclaywithsand921
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
787 Seventh Avenue, 50th Floor Report Date:12/3/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Clear
Work Order Number:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/13/2024
1494576
1
93
95
23.1
6
6 A/14 FG-2.0 1 6
7 A/16 FG-2.0 1 6
8 A/18 FG-2.0 1 6
6
116.4 91.7 22.3
93.64A/10 FG-2.0 1 6
5 A/12 FG-2.0 1
2 A/6 FG-2.0 1 6
3 A/8 FG-2.0 1 6
117.2 92.8 22.2
95117.7 93.0 21.7
115.9
116.4 91.5 22.9
91.2
93
93
22.796118.3
94
92.0 21.994116.8
115.9 90.9 22.2
18.696119.7
95
99.8 18.295118.8
96120.3 101.2 19.1
2 25' E from Center of parking Pad FG 1 6
3 25' S from Center of parking Pad FG 1 6
4 25' N from Center of parking Pad FG 1 6
5 Center of south parking Pad FG 1
119.6 100.3 18.6
119.3 100.4 18.8
100.8
6
6
1494578
1
95
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/15/2024
787 Seventh Avenue, 50th Floor Report Date:11/26/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
39Darkbrownandbrownsandyclay953100118.0 105.3 0 4
Percent
Compaction
1 25' W from Center of parking Pad FG 1
General Location
Area:Paving
407
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9941 Manufacturer:Humboldt Model:5001EZ
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 2862 (M):
14.598126.2
98
109.8 15.398126.6
99126.8 110.9 14.3
2 180' N and 20' E from SW Corner of Parking FG 1 6
3 270' N and 40' E from SW Corner of Parking FG 1 6
4 360' N and 40' E from SW Corner of Parking FG 1 6
5 430' N and 40' E from SW Corner of Parking FG 1
127.9 111.4 14.8
127.6 109.3 16.7
110.2
6
6
1504217
1
99
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:11/25/2024
787 Seventh Avenue, 50th Floor Report Date:12/3/2024
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Iyamuremye, Yassin
New York, NY 10019 Weather:Clear
Work Order Number:
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
15BrownClayeySand952115.8 112.1 -2 2
Percent
Compaction
1 90' N and 30' E from SW Corner of Parking FG 1
General Location
Area:Paving
403
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:9942 Manufacturer:Humboldt Model:5001EZ
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
Respectfully Submitted,
Standard Count:(D): 3188 (M):
Technician:Iyamuremye, Yassin
DraftStartTime:
Stop Time:
Respectfully Submitted,
Ronnie Yeoman
Project Manager
Lunch Hrs:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Alpha Testing, LLC
Total Hrs:0
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:Manufacturer:Model:Standard Count:(D):(M):
29
30
25
26
28
27
21
22
24
23
19
20
18
17
16
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:
Material Description/Classification PI
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Material Information Laboratory Data Project Specifications
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Iyamuremye, Yassin
Grapevine, Texas Page Number:2 of 4
Work Order Number:1504217
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:
New York, NY 10019 Weather:
Client:GTIS Acquisitions, LLC Service Date:11/25/2024
Technician:Iyamuremye, Yassin
DraftStartTime:
Stop Time:
Respectfully Submitted,
Ronnie Yeoman
Project Manager
Lunch Hrs:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Alpha Testing, LLC
Total Hrs:0
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:Manufacturer:Model:Standard Count:(D):(M):
44
45
40
41
43
42
36
37
39
38
34
35
33
32
31
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:
Material Description/Classification PI
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Material Information Laboratory Data Project Specifications
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Iyamuremye, Yassin
Grapevine, Texas Page Number:3 of 4
Work Order Number:1504217
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:
New York, NY 10019 Weather:
Client:GTIS Acquisitions, LLC Service Date:11/25/2024
Technician:Iyamuremye, Yassin
DraftStartTime:
Stop Time:
Respectfully Submitted,
Ronnie Yeoman
Project Manager
Lunch Hrs:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Alpha Testing, LLC
Total Hrs:0
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:Manufacturer:Model:Standard Count:(D):(M):
59
60
55
56
58
57
51
52
54
53
49
50
48
47
46
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:
Material Description/Classification PI
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Material Information Laboratory Data Project Specifications
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Iyamuremye, Yassin
Grapevine, Texas Page Number:4 of 4
Work Order Number:1504217
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:
New York, NY 10019 Weather:
Client:GTIS Acquisitions, LLC Service Date:11/25/2024
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
5001EZ
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D):409StandardCount:Serial No:9941 Manufacturer:Humboldt Model:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
M):2857
General Location
Material Description/Classification PI
43LIGHTREDDISHBROWNCLAY -2 2 95
Area:RETAINING WALL
100121.1 99.4
1516761
1
Material Information Laboratory Data Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Grapevine, Texas Page Number:1 of
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:12/18/2024
787 Seventh Avenue, 50th Floor Report Date:12/26/2024
New York, NY 10019 Weather:Clear
97
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Mitchell, Ebony
Work Order Number:
96.9
1 SE Corner of Building 10' N FG-3.0 1 6
1 6
115.9 96.4 22.2
3 SE Corner of Building 10' N FG-2.0 1 6
2 SE Corner of Building 40' N FG-3.0 1 6
116.9 96.6
4 SE Corner of Building 40' N FG-2.0
116.8
97
97.2 21.9 98
22.4
21.797116.6
Building Services Department
The City of Grapevine  P.O. Box 95104  Grapevine, Texas 76099
 (817) 410-3165  (817) 410-3166
www.grapevinetexas.gov
C:FORMS-1\BSENERGYCODERELATED\EnergyCodeInspectionCertificate
3-07 REV: 2-16, 5-17,1/24
ENERGY CODE INSPECTION CERTIFICATION FORM
Date: _______________________ Permit / Project Number: _____________________
Project Name: __________________________________________________________
Address of Inspection: ___________________________________________________
Name of Company Performing Inspection: ____________________________________
Name of Certified Inspector Performing Inspection: _____________________________
ICC Energy Code Inspector Certification Number: ______________________________
In accordance with State Law (Senate Bill 5 enacted by the 77th Legislature of the State
of Texas), I hereby certify that I have inspected the above referenced structure and that
it complies with all energy code provisions prescribed by State of Texas laws and any
amendments adopted by the State of Texas and / or the City of Grapevine.
Signature of Inspector
Code Solutions Inc.
Tim A. Fleming
1000357-77-78-79
3-25-2025 23-004309
121 Commerce Center (Shell Building)
1800 North State Hwy 121
Tim Fleming Digitally signed by Tim Fleming
Date: 2025.03.25 15:45:06 -05'00'
Building Services Department
The City of Grapevine  P.O. Box 95104  Grapevine, Texas 76099
 (817) 410-3165  (817) 410-3166
www.grapevinetexas.gov
C:FORMS-1\BSENERGYCODERELATED\EnergyCodeInspectionCertificate
3-07 REV: 2-16, 5-17,1/24
ENERGY CODE INSPECTION CERTIFICATION FORM
Date: _______________________ Permit / Project Number: _____________________
Project Name: __________________________________________________________
Address of Inspection: ___________________________________________________
Name of Company Performing Inspection: ____________________________________
Name of Certified Inspector Performing Inspection: _____________________________
ICC Energy Code Inspector Certification Number: ______________________________
In accordance with State Law (Senate Bill 5 enacted by the 77th Legislature of the State
of Texas), I hereby certify that I have inspected the above referenced structure and that
it complies with all energy code provisions prescribed by State of Texas laws and any
amendments adopted by the State of Texas and / or the City of Grapevine.
Signature of Inspector
Code Solutions Inc.
Tim A. Fleming
1000357-77-78-79
3-25-2025 24-004016
121 Commerce Center SSpec Office TI
1800 North State Hwy 121 Suite 101
Tim Fleming Digitally signed by Tim Fleming
Date: 2025.03.25 15:44:29 -05'00'
Project Manager
Respectfully Submitted,
Ronnie Yeoman
Passing 1¾" Sieve:60%Passing #4 Sieve:
66%
1 100%
Test Information
Test
No.
61%85%C.6/11.5
C.6/12.5
PercentPassingTestLocation
Project:
Report Date:
Weather:
Client:
2
Technician Reyes, RubenOffGenesisWayandEnchantedWay
Grapevine, Texas
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Date of Treatment:6/20/2024 6/24/2024DateofFinalMix:
General Information
General Location:
LimeSlurryTypeofTreatment:
Building Pad
06/24/2024ServiceDate:
Work Order Number:
Project Number:
Page Number:of
3 100%86%
2 100%88%
4
9 100%
C.6/17.5
C.6/18.5
D.5/11.5
90%C.6/14.5
5
6
100%
100%
D.5/15.5
11
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
100%13 86%64%
Non-compliant results are represented by an asterisk(*) if applicable.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Remarks:
UES / Riner Engineering
12 100%
70%91%
10 100%89%
C.6/15.5
87%66%D.5/14.5
8 100%
7
64%
100%
86%
F241078
Clear
7/19/2024
1413992
100%
63%
68%
121 Commerce Center Addition (Lot 1)
4Sieve1¾" Sieve ¾" Sieve
85%Passing ¾" Sieve:100%
Specification Information
1
65%
88%67%
D.5/12.5
D.5/13.5
C.6/13.5
62%85%
100%
68%
C.6/16.5
87%
85%
65%
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
Non-compliant results are represented by an asterisk(*) if applicable.
Remarks:
70%24 E.5/18.5 100%89%
67%
23 E.5/17.5 100%90%69%
22 E.5/16.5 100%88%
64%
21 E.5/15.5 100%87%63%
20 E.5/14.5 100%86%
66%
19 E.5/13.5 100%86%62%
18 E.5/12.5 100%85%
65%
17 E.5/11.5 100%89%68%
16 D.5/18.5 100%85%
71%
15 D.5/17.5 100%86%65%
14 D.5/16.5 100%89%
Test Information
Test
No.Test Location Percent Passing
1¾" Sieve ¾" Sieve #4 Sieve
Specification Information
Passing 1¾" Sieve:100%Passing ¾" Sieve:85%Passing #4 Sieve:60%
General Information
General Location:Building Pad
Type of Treatment:Lime Slurry Date of Treatment:6/20/2024 Date of Final Mix:6/24/2024
Off Genesis Way and Enchanted Way Technician Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
Work Order Number: 1413992
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
Client:GTIS Acquisitions, LLC Service Date:06/24/2024
Project Manager
Respectfully Submitted,
Ronnie Yeoman
60%Passing #4 Sieve:
67%
1 100%
Test Information
Test
No.
65%89%A.5/11.5
A.5/12.5
PercentPassingTestLocation
Project:
Report Date:
Weather:
Client:
2
Technician Reyes, RubenOffGenesisWayandEnchantedWay
Grapevine, Texas
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
6/25/2024ServiceDate:
Work Order Number:
Project Number:
Page Number:of
3 100%85%
2 100%
Date of Treatment:6/22/2024 6/25/2024DateofFinalMix:
General Information
General Location:
LimeSlurryTypeofTreatment:
Building Pad
Passing 1¾" Sieve:
4
9 100%
A.5/17.5
A.5/18.5
B.5/11.5
88%A.5/14.5
5
6
100%
100%
87%
B.5/15.5
11
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
100%13 89%69%
Non-compliant results are represented by an asterisk(*) if applicable.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Remarks:
UES / Riner Engineering
12 100%
68%90%
10 100%91%
A.5/15.5
88%65%B.5/14.5
8 100%
7
90%
F241078
Clear
7/19/2024
1414267
100%
60%
66%
121 Commerce Center Addition (Lot 1)
4Sieve1¾" Sieve ¾" Sieve
85%Passing ¾" Sieve:100%
Specification Information
1
69%
85%
65%
B.5/12.5
B.5/13.5
A.5/13.5
71%89%
100%
69%
A.5/16.5
86%
88%
67%
68%
100%
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
Non-compliant results are represented by an asterisk(*) if applicable.
Remarks:
64%24 C.4/18.5 100%86%
62%
23 C.4/17.5 100%86%65%
22 C.4/16.5 100%86%
60%
21 C.4/15.5 100%88%66%
20 C.4/14.5 100%85%
64%
19 C.4/13.5 100%85%61%
18 C.4/12.5 100%88%
70%
17 C.4/11.5 100%86%63%
16 B.5/18.5 100%90%
69%
15 B.5/17.5 100%87%66%
14 B.5/16.5 100%91%
Test Information
Test
No.Test Location Percent Passing
1¾" Sieve ¾" Sieve #4 Sieve
Specification Information
Passing 1¾" Sieve:100%Passing ¾" Sieve:85%Passing #4 Sieve:60%
General Information
General Location:Building Pad
Type of Treatment:Lime Slurry Date of Treatment:6/22/2024 Date of Final Mix:6/25/2024
Off Genesis Way and Enchanted Way Technician Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
Work Order Number: 1414267
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
Client:GTIS Acquisitions, LLC Service Date:6/25/2024
Project Manager
Respectfully Submitted,
Ronnie Yeoman
Project:
Report Date:
Weather:
Client:
2
Technician Reyes, RubenOffGenesisWayandEnchantedWay
Grapevine, Texas
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/1/2024ServiceDate:
Work Order Number:
Project Number:
Page Number:of
3 100%86%
2 100%
Date of Treatment:6/27/2024 7/1/2024DateofFinalMix:
General Information
General Location:
LimeSlurryTypeofTreatment:
Building Pad (C.5-F/3-11)
Passing 1¾" Sieve:60%
9 100%
C.6/9.5
C.6/10.5
D.5/3.5
Passing #4 Sieve:
68%
1 100%
Test Information
Test
No.
65%88%C.6/3.5
C.6/4.5
PercentPassingTestLocation
86%C.6/6.5
5
6
100%
100%
88%
4
D.5/7.5
11
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
100%13 85%63%
Non-compliant results are represented by an asterisk(*) if applicable.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Remarks:
UES / Riner Engineering
12 100%
71%92%
10 100%89%
C.6/7.5
87%64%D.5/6.5
8 100%
7
85%
F241078
Clear
7/19/2024
1418179
100%
63%
64%
121 Commerce Center Addition (Lot 1)
4Sieve1¾" Sieve ¾" Sieve
85%Passing ¾" Sieve:100%
Specification Information
1
62%
90%
66%
D.5/4.5
D.5/5.5
C.6/5.5
67%89%
100%
69%
C.6/8.5
91%
87%
69%
65%
100%
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
Non-compliant results are represented by an asterisk(*) if applicable.
Remarks:
67%24 E.5/10.5 100%89%
68%
23 E.5/9.5 100%87%65%
22 E.5/8.5 100%88%
69%
21 E.5/7.5 100%86%64%
20 E.5/6.5 100%90%
67%
19 E.5/5.5 100%85%60%
18 E.5/4.5 100%88%
69%
17 E.5/3.5 100%86%65%
16 D.5/10.5 100%89%
66%
15 D.5/9.5 100%85%61%
14 D.5/8.5 100%87%
Test Information
Test
No.Test Location Percent Passing
1¾" Sieve ¾" Sieve #4 Sieve
Specification Information
Passing 1¾" Sieve:100%Passing ¾" Sieve:85%Passing #4 Sieve:60%
General Information
General Location:Building Pad (C.5-F/3-11)
Type of Treatment:Lime Slurry Date of Treatment:6/27/2024 Date of Final Mix:7/1/2024
Off Genesis Way and Enchanted Way Technician Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
Work Order Number: 1418179
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/1/2024
64%
B.5/4.5
B.5/5.5
A.5/5.5
66%88%
100%
68%
A.5/8.5
86%
88%
63%
65%
100%
89%
F241078
Clear
7/19/2024
1419347
100%
68%
66%
121 Commerce Center Addition (Lot 1)
4Sieve1¾" Sieve ¾" Sieve
85%Passing ¾" Sieve:100%
Specification Information
1
70%
85%
100%
60%86%
10 100%89%
A.5/7.5
90%69%B.5/6.5
8 100%
7
B.5/7.5
11
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
100%13 92%71%
Non-compliant results are represented by an asterisk(*) if applicable.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Remarks:
UES / Riner Engineering
12
87%A.5/6.5
5
6
100%
100%
85%
4
9 100%
A.5/9.5
A.5/10.5
B.5/3.5
Passing #4 Sieve:
62%
1 100%
Test Information
Test
No.
64%86%A.5/3.5
A.5/4.5
PercentPassingTestLocation
Work Order Number:
Project Number:
Page Number:of
3 100%89%
2 100%
Date of Treatment:6/28/2024 7/3/2024DateofFinalMix:
General Information
General Location:
LimeSlurryTypeofTreatment:
Building Pad (A-C.5/3-11)
Passing 1¾" Sieve:60%
Project:
Report Date:
Weather:
Client:
2
Technician Reyes, RubenOffGenesisWayandEnchantedWay
Grapevine, Texas
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/3/2024ServiceDate:
Project Manager
Respectfully Submitted,
Ronnie Yeoman
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/3/2024
Work Order Number: 1419347
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/19/2024
New York, NY 10019 Weather:Clear
Off Genesis Way and Enchanted Way Technician Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
General Information
General Location:Building Pad (A-C.5/3-11)
Type of Treatment:Lime Slurry Date of Treatment:6/28/2024 Date of Final Mix:7/3/2024
Test Information
Test
No.Test Location Percent Passing
1¾" Sieve ¾" Sieve #4 Sieve
Specification Information
Passing 1¾" Sieve:100%Passing ¾" Sieve:85%Passing #4 Sieve:60%
66%
15 B.5/9.5 100%86%63%
14 B.5/8.5 100%88%
62%
17 C.4/3.5 100%87%65%
16 B.5/10.5 100%87%
61%
19 C.4/5.5 100%89%69%
18 C.4/4.5 100%85%
67%
21 C.4/7.5 100%85%62%
20 C.4/6.5 100%89%
64%
23 C.4/9.5 100%86%60%
22 C.4/8.5 100%88%
63%24 C.4/10.5 100%87%
Non-compliant results are represented by an asterisk(*) if applicable.
Remarks:
Respectfully Submitted,
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Project Manager
Respectfully Submitted,
Ronnie Yeoman
Project:
Report Date:
Weather:
Client:
1
Technician Reyes, RubenOffGenesisWayandEnchantedWay
Grapevine, Texas
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Field Gradation
Test Report
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/10/2024ServiceDate:
Work Order Number:
Project Number:
Page Number:of
3 100%89%
2 100%
Date of Treatment:7/8/2024 7/10/2024DateofFinalMix:
General Information
General Location:
LimeSlurryTypeofTreatment:
Building Pad (A-F/1-3)
Passing 1¾" Sieve:60%
9 100%
D.5/1.5
D.5/2.5
E.5/1.5
Passing #4 Sieve:
66%
1 100%
Test Information
Test
No.
63%87%A.5/1.5
A.5/2.5
PercentPassingTestLocation
86%B.5/2.5
5
6
100%
100%
85%
4
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
This report is in general compliance with one or more of the following technical standards: Tex-101-E Part III
Non-compliant results are represented by an asterisk(*) if applicable.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Remarks:
UES / Riner Engineering
10 100%89%
C.5/1.5
8 100%
7
87%
F241078
Clear
7/26/2024
1421662
100%
68%
61%
121 Commerce Center Addition (Lot 1)
4Sieve1¾" Sieve ¾" Sieve
85%Passing ¾" Sieve:100%
Specification Information
1
62%
85%
60%
E.5/2.5
B.5/1.5
67%88%
67%
C.5/2.5
86%
85%
64%
62%
100%
Grout Prism Compression
Test Report
5058 Brush Creek Rd
Fort Worth, TX 76119
817-496-5600
UES Professional Solutions 44, LLC
TBPELS #813 / TBPG #50341
FIELD DATA
Placement Location:DUMPSTER AREA 1 AND ELECTRICAL ROOM 1 (COURSES 1-9)
Project Desc:121 COMMERCE CENTER ADDITION (LOT 1)
OFF GENESIS WAY AND ENCHANTED WAY
Our Report #:F241078-1500737
GTIS ACQUISITIONS, LLC
787 SEVENTH AVENUE, 50TH FLOOR
NEW YORK, NY 10019
KYLEROBERSONATTN:
Date Placed:11/19/2024
Time Placed:10:45 AM
8.50
N/A
64
72
Date Received:N/A
Concrete Supplier:ONSITE
Submitted By:Kemble, Robert
Plant Number:1
Delivery Ticket No.:N/A
N/A
Batch Time:10:40:00 AM
Tested For:
Lab
No.:
Cure
Type:
Date
Tested:
Age
Days):
Max
Load:
Area:
Sq. In.PSI:
Cap
Spec:
PRISM COMPRESSION TEST RESULTS
Avg.
Length
Avg.
Width
Avg Depth/
Diameter
Cast By:UES
Cured Specification:3
Mix ID:N/A
Break
Type:
Sample Location:NORTH EAST CORNER OF DUMPSTER AREA, COURSE 7
PM:RONNIE YEOMAN
Date Issued:12/18/2024
Specified Strength:2000
Result
Air Content:
Ambient Temp (F):
Concrete Temp (F):
Unit Weight:
Slump (ASTM C-143):
Weather:
Wind:
Clear
Initial Curing Method:Protected Area, Covered with Lid
Final Curing Method:Moist Room
Truck Number:N/A
895 11/26/2024 7 4245011.323750LABC-617 6.72 3.34 3.39
896 11/26/2024 7 4426011.563830LABC-617 6.67 3.37 3.43
897 12/17/2024 28 6972011.396120LABC-617 6.71 3.35 3.40
898 12/17/2024 28 6825011.535920LABC-617 6.70 3.37 3.42
Average 28-day Compressive Strength is compliant with project specifications
CC:
6020
Respectfully Submitted By:__________________________________________________________ of UES
Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 605958
Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec
This report is in general compliance with one or more of the following technical standards:
ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231
Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
This report shall not be reproduced except in full, without the prior written approval of UES.
Page 1 of 1
Code Solutions Inc.
Code Consulting
March 25, 2025
Mr. Guarav Sahay
GITS HWY 121 SPE LP c/o GTIS Partners, LLC
787 7th Ave., 50th Floor
New York, NY 10019
RE: 121 Commerce Spec Office TABS2025003203
1800 State Hwy 121, Suite 101
Grapevine, TX 76501
INSPECTION COMPLETED – NO VIOLATIONS
Dear Mr. Sahay:
We are pleased to inform you that the referenced facility has been inspected and found
to be in substantial compliance with provisions of the Texas Government Code, Chapter
469.
The inspection results will be forwarded to the Texas Department of Licensing and
Regulation for issuance of the final approval letter. For newly constructed buildings and
facilities, the Department will provide a Notice of Substantial Compliance (Certificate) to
the owner up on receipt of a completed Notice of Substantial Compliance Request
Form.
This determination is applicable only to ensuring compliance with Texas Government
Code, Chapter 469 and does not address the requirements of the Americans with
Disabilities Act (ADA), (P.L. 101-336), or any other federal, state, or local requirement. For
information on the ADA, call the ADA Hotline, (800) 949-4232 or the United States
Department of Justice at (202) 514-0301.
If you have any questions concerning the results of the inspection, or the requirements of
the Architectural Barriers Act, or if you are not the owner of record for this facility, contact
Tim Fleming at 817-379-1129. Please reference the TABS project number in all future
correspondence pertaining to this project.
Sincerely,
Tim A. Fleming
Tim A. Fleming
Registered Accessibility Specialist RAS# 144
The review of these documents for this project by Code Solutions Inc. for the Texas Department of Licensing and Regulation (TDLR), Austin, Texas, is based on a
best efforts endeavor following certification by ICBO/ICC and instruction by TDLR. This review in no way warrants complete compliance to the Texas Accessibility
Standards. The building owner, and the design professionals agree that Code Solutions Incorporated’s limit of liability for any claim against it for services
performed under this agreement shall be the total of fees paid to Code Solutions Inc. pursuant to this agreement.
P.O. Box 1657. BRIDGEPORT, TX 76426
817-379-1129
Connie.fleming@verizon.net
Texas Accessibility Standards Inspection Report:
Inspection Report TDLR Project No. TABS2025003203
Article 9102, T.C.S. RAS Project No. 24-131
Texas Accessibility Standards Page #1
Project: 121 Commerce Spec Office Facility: 121 Commerce Center
Address: 1800 State Hwy 121, Suite 101 City: Grapevine, TX 76501
Owner: GITS HWY 121 SPE LP c/o GTIS Partners, LLC
787 7th Ave., 50th Floor
New York, NY 10019
Inspector: Tim A. Fleming, RAS #144 Date of Inspection: 3-25-2025
Project Scope: 201 New Construction
Project Description: Construction or spec office improvements and limited dock
equipment, with mechanical, plumbing and electrical, and life safety. 3,084 SQ FT.
Owner Funded.
Inspection Approval
Site Photo
Code Solutions Inc.
Code Consulting
March 25, 2025
INSPECTION COMPLETED – NO VIOLATIONS
Mr. Gaurav Sahay
GTIS Highway 121 SPE LP c/o GTIS Partners, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
RE: 121 Commerce Center TABS2024005870
1800 State Highway 121
Grapevine, TX 76051
Dear Mr. Sahay:
We are pleased to inform you that the referenced facility has been inspected and found
to be in substantial compliance with provisions of the Texas Government Code, Chapter
469.
The inspection results will be forwarded to the Texas Department of Licensing and
Regulation for issuance of the final approval letter. For newly constructed buildings and
facilities, the Department will provide a Notice of Substantial Compliance (Certificate) to
the owner up on receipt of a completed Notice of Substantial Compliance Request Form.
This determination is applicable only to ensuring compliance with Texas Government
Code, Chapter 469 and does not address the requirements of the Americans with
Disabilities Act (ADA), (P.L. 101-336), or any other federal, state, or local requirement. For
information on the ADA, call the ADA Hotline, (800) 949-4232 or the United States
Department of Justice at (202) 514-0301.
If you have any questions concerning the results of the inspection, or the requirements of
the Architectural Barriers Act, or if you are not the owner of record for this facility, contact
Tim Fleming at 817-379-1129. Please reference the TABS project number in all future
correspondence pertaining to this project.
Sincerely,
Tim A. Fleming
Tim A. Fleming
Registered Accessibility Specialist RAS# 144
The review of these documents for this project by Code Solutions Inc. for the Texas Department of Licensing and Regulation (TDLR), Austin, Texas, is based on a
best efforts endeavor following certification by ICBO/ICC and instruction by TDLR. This review in no way warrants complete compliance to the Texas Accessibility
Standards. The building owner, and the design professionals agree that Code Solutions Incorporated’s limit of liability for any claim against it for services performed
under this agreement shall be the total of fees paid to Code Solutions Inc. pursuant to this agreement.
P.O. Box 1657. BRIDGEPORT, TX 76426
817-379-1129
Connie.fleming@verizon.net
Texas Accessibility Standards Inspection Report:
Inspection Report TDLR Project No. TABS2024005870
Article 9102, T.C.S. RAS Project No. 23-175
Texas Accessibility Standards Page #1
Project: 121 Commerce Center Facility: 121 Commerce Center
Address: 1800 State Highway 121 City: Grapevine, TX 76051
Owner: Mr. Gaurav Sahay
GTIS Highway 121 SPE LP c/o GTIS Partners, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Inspector: Tim A. Fleming, RAS #144 Date of Inspection: 3-25-2025
Project Scope: 201 New Construction
Project Description: Construction of shell spec office, and associated site improvements.
Inspection Approval
Site Photo
June 5, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Mr. Kyle Roberson
Re: Lime Stabilized Cap
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1400281
A Lime Series test using ASTM D-4318 Method B was performed on a single sample obtained from the
building pad area.
Based on visual observation of the exposed building pad and results of the above described lime series, it
is recommended the building pad cap be mechanically lime stabilized with a minimum 6% hydrated lime.
Based on a dry unit soil weight of 100pcf, this percent equates to:
27 lbs. of hydrated lime per square yard for 6” thick compacted thickness.
We appreciate the opportunity to be of service on this project. If we can be of further assistance, please
contact us.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman Jeromi C. Kelsey, PE
Project Manager CMT Department Manager - Fort Worth
June 5, 2024
CLIENT:
GTIS Acquisitions, LLC
New York, NY
LABORATORY TEST:
LIME SERIES DATA
FIGURE - 1
PROJECT NAME:
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES PROJECT NO.:
F241078-1400281
DATE:
06/04/2024
2 of 3
PI LIME SERIES
0
5
10
15
20
25
30
35
40
0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10%
PERCENT LIME ADDED
PI
SOIL SAMPLE DATA
DESCRIPTION: Dark Brown Sandy Clay
LOCATION: Moisture Conditioning, Section 1
LIQUID LIMIT: 42
PLASTICITY INDEX : 25
PI LIME SERIES DATA
PERCENT
LIME 0 2 4 6 8 10
PI 25 20 14 10 7 4
CLIENT:
GTIS Acquisitions, LLC
New York, NY
LABORATORY TEST:
LIME SERIES DATA
FIGURE - 1
PROJECT NAME:
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES PROJECT NO.:
F241078-1400281
DATE:
06/04/2024
3 of 3
RESULTS OF LABORATORY TESTS
SAMPLE NO. LIQUID LIMIT PLASTICITY INDEX SULFATE CONTENT (ppm)
1 42 25 1,000
LOCATION AND DESCRIPTION
1 Moisture Conditioning, Section 1
Dark Brown Sandy Clay
05/13/24
CLASSIFICATION:
SAMPLE LOCATION:
TEST METHOD:ASTM D698-B
TESTED FOR:SOIL ID NUMBER:2
112.1 PCF
15.8 %
LIQUID LIMIT:30
PROJECT:PLASTIC LIMIT:15
PLASTICITY INDEX:
41%
Respectfully Submitted,
Ronnie Yeoman
Project Manager
UES / Alpha Testing, LLC
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of UES. The use of our
name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813 On-site Stockpile
MAXIMUM DRY UNIT WEIGHT:
FINER THAN NO. 200 SIEVE:
OPTIMUM MOISTURE CONTENT:
MATERIAL DESCRIPTION:
SC
OUR REPORT NO.:
15
GTIS Acquisitions, LLC
New York, New York
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
F241078-1391479-2
Brown Clayey Sand
95
100
105
110
115
120
125
130
2%3%8%13%18%23%28%33%
DR
Y
U
N
I
T
W
E
I
G
H
T
l
b
s
c
u
f
t
MOISTURE CONTENT
MOISTURE DENSITY RELATIONSHIP
05/13/24
CLASSIFICATION:
SAMPLE LOCATION:
TEST METHOD:ASTM D698-B
TESTED FOR:SOIL ID NUMBER:3
105.3 PCF
18.0 %
LIQUID LIMIT:59
PROJECT:PLASTIC LIMIT:20
PLASTICITY INDEX:
69%
Respectfully Submitted,
Ronnie Yeoman
Project Manager
UES / Alpha Testing, LLC
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of UES. The use of our
name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813 On-site Stockpile
MAXIMUM DRY UNIT WEIGHT:
FINER THAN NO. 200 SIEVE:
OPTIMUM MOISTURE CONTENT:
MATERIAL DESCRIPTION:
CH
OUR REPORT NO.:
39
GTIS Acquisitions, LLC
New York, New York
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
F241078-1391479-3
Dark Bown and Brown Sandy Clay
88
93
98
103
108
113
118
123
1%6%11%16%21%26%31%36%
DR
Y
U
N
I
T
W
E
I
G
H
T
l
b
s
c
u
f
t
MOISTURE CONTENT
MOISTURE DENSITY RELATIONSHIP
06/13/24
CLASSIFICATION:
SAMPLE LOCATION:
TEST METHOD:ASTM D698-B
TESTED FOR:SOIL ID NUMBER:5
99.4 PCF
21.1 %
LIQUID LIMIT:66
PROJECT:PLASTIC LIMIT:23
PLASTICITY INDEX:
86%
Respectfully Submitted,
Ronnie Yeoman
Project Manager
UES / Alpha Testing, LLC
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of UES. The use of our
name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813 Building Pad, Grid #11
MAXIMUM DRY UNIT WEIGHT:
FINER THAN NO. 200 SIEVE:
OPTIMUM MOISTURE CONTENT:
MATERIAL DESCRIPTION:
CH
OUR REPORT NO.:
43
GTIS Acquisitions, LLC
New York, New York
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
F241078-1407544
Light Reddish Brown Clay
82
87
92
97
102
107
112
117
4%9%14%19%24%29%34%39%
DR
Y
U
N
I
T
W
E
I
G
H
T
l
b
s
c
u
f
t
MOISTURE CONTENT
MOISTURE DENSITY RELATIONSHIP
06/24/24
CLASSIFICATION:
SAMPLE LOCATION:
TEST METHOD:ASTM D698-B
TESTED FOR:SOIL ID NUMBER:06L
93.2 PCF
26.3 %
LIQUID LIMIT:41
PROJECT:PLASTIC LIMIT:28
PLASTICITY INDEX:
N/A
Respectfully Submitted,
Ronnie Yeoman
Project Manager
UES / Alpha Testing, LLC
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of UES. The use of our
name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813 Building Pad, A-F/14-16
MAXIMUM DRY UNIT WEIGHT:
FINER THAN NO. 200 SIEVE:
OPTIMUM MOISTURE CONTENT:
MATERIAL DESCRIPTION:
Lime Treated
OUR REPORT NO.:
13
GTIS Acquisitions, LLC
New York, New York
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
F241078-1414220-1
Light Brown and Tan Clay
76
81
86
91
96
101
106
111
9%14%19%24%29%34%39%44%
DR
Y
U
N
I
T
W
E
I
G
H
T
l
b
s
c
u
f
t
MOISTURE CONTENT
MOISTURE DENSITY RELATIONSHIP
06/24/24
CLASSIFICATION:
SAMPLE LOCATION:
TEST METHOD:ASTM D698-B
TESTED FOR:SOIL ID NUMBER:07L
95.9 PCF
23.5 %
LIQUID LIMIT:27
PROJECT:PLASTIC LIMIT:24
PLASTICITY INDEX:
N/A
Respectfully Submitted,
Ronnie Yeoman
Project Manager
UES / Alpha Testing, LLC
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of UES. The use of our
name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813 Building Pad, A-F/17-19
MAXIMUM DRY UNIT WEIGHT:
FINER THAN NO. 200 SIEVE:
OPTIMUM MOISTURE CONTENT:
MATERIAL DESCRIPTION:
Lime Treated
OUR REPORT NO.:
3
GTIS Acquisitions, LLC
New York, New York
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
F241078-1414220-2
Dark Brown Clay
78
83
88
93
98
103
108
113
6%11%16%21%26%31%36%41%
DR
Y
U
N
I
T
W
E
I
G
H
T
l
b
s
c
u
f
t
MOISTURE CONTENT
MOISTURE DENSITY RELATIONSHIP
96
97
26.397114.7
115.1
114.7 91.9 24.8
91.8 25.4
90.816
99
6 C.5/7.5 Final 1 6
114.7
114.3 89.5
90.6
113.8
114.6 92.0 24.6 99
97
88.9 28.0 95
26.8
4 C.5/5.5 Final
10 D.5/3.5 Final 1 6
6
7 C.5/8.5 Final 1 6
5 C.5/6.5 Final 1 6
112.7 88.4
9 C.5/10.5 Final 1 6
8 C.5/9.5 Final 1
113.7 88.7 28.2
3 C.5/4.5 Final 1 6
2 C.5/3.5 Final 1 6
114.1 90.0
1 B.5/10.5 Final 1 6
11 D.5/4.5 Final 1 6
12 D.5/5.5 Final 1 6
Partly Cloudy
91.7 25.3 98
24.6 99
95
27.5
98
96
95
92.0
27.7
26.6
1420578
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/8/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 2
Material Information Laboratory Data
13LightBrownandTanClay 93.2
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
2 29506L
General Location
Area:Building Pad (A-F/3-11)
100126.3
89.6 27.8
92.2
D.5/7.5 Final 1 6
D.5/6.5 Final 1 6
114.6
24.3 99
15 D.5/8.5
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
114.4 90.7 26.1 97
D): 2260 (M):730StandardCount:
114.6
114.9
114.5
14
Remarks:
Final 1 6
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Respectfully Submitted,
D): 2260 (M):730
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
89.3 26.7 96
114.1 90.7 25.8 97
113.1
27 Plumbing A.4/18.4 Final 1 6
26 Plumbing A.4/11.4 Final 1 6
90.4 26.597114.425E.5/10.5 Final 1 6
91.5 25.3 98
113.4 88.6 28.0 95
113.3 89.5 26.6
114.6
24 E.5/9.5 Final 1 6
23 E.5/8.5 Final 1 6
114.9
20 E.5/5.5 Final 1 6 114.8
96
92.1 24.8 99
22 E.5/7.5 Final 1 6
21 E.5/6.5 Final 1 6
19 E.5/4.5 Final 1 6 113.3 89.3 26.9
92.3 24.4 99
26.4 97
96
18 E.5/3.5 Final 1 6 114.4 90.5
17 D.5/10.5 Final 1 6 113.6 88.7 28.1
16 D.5/9.5 Final 1 6 114.7 91.6 25.2 98
95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Building Pad (A-F/3-11)
95 100
Material Description/Classification PI
Light Brown and Tan Clay 13
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 06L 26.3 93.2 -2 2
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Partly Cloudy
Work Order Number:1420578
Client:GTIS Acquisitions, LLC Service Date:7/8/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:(D): 2266 (M):735StandardCount:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
4923
2 2 95
General Location
Area:Utility Backfill/Building Pad
96
100226.3
1 18.0
06L
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
93.2
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Brown and Tan Clay 13
105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
1421213
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/9/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
96
95
24.6
25.4
123.8 101.2 22.3
3 Plumbing E.4/18.6 FG-1.5 1 6
2 Plumbing A.5/18.6 FG-2.0 1 6
124.1 100.4
1 Plumbing E.5/18.6 FG-2.0 1 6
8 Plumbing A.4/18.6 Final 2
4 Plumbing A.4/18.6 FG-1.5
6
7 Plumbing E.4/18.6 Final 2 6
5 Plumbing E.5/18.6 FG-1.0 1 6
123.6
123.4 100.2 23.2 95
95
99.3 24.5 94
23.6
6 Plumbing A.5/18.6 FG-1.0 1 6
114.0
114.8 92.1
90.9
99
98
22.796123.8
122.3 99.6 22.8
100.916
97
98
19.895120.4
120.8
121.6 104.4 16.5
101.6 18.9
100.516
99
6 Storm Drain Line A- Station 1+40 FG-2.5 1 6
120.5
120.1 102.0
103.1
120.7
119.6 101.9 17.4 97
99
101.1 19.4 96
16.2
4 Storm Drain Line A- Station 1+45 FG-3.0
10 Storm Drain Line A- Station 1+40 FG-1.5 1 6
6
7 Storm Drain Line A- Station 3+50 FG-2.0 1 6
5 Storm Drain Line A- Station 4+00 FG-2.5 1 6
119.6 101.8
9 Storm Drain Line A- Station 4+00 FG-1.5 1 6
8 Storm Drain Line A- Station 1+45 FG-2.0 1
120.2 100.3 20.0
3 Storm Drain Line A- Station 3+50 FG-3.0 1 6
2 Storm Drain Line A- Station 1+40 FG-3.5 1 6
121.4 104.5
1 Storm Drain Line A- Station 4+00 FG-3.5 1 6
11 Storm Drain Line A- Station 3+50 FG-1.0 1 6
12 Storm Drain Line A- Station 1+45 FG-1.0 1 6
Clear
101.3 19.0 96
95
17.5
96
96
97
17.7
16.9
1421663
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/10/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
Material Information Laboratory Data
39DarkBrownandBrownSandyClay 105.3
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
2 2953
General Location
Area:Utilities/Paving Area
100118.0
101.5 18.6
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:(D): 2242 (M):727StandardCount:
120.5
120.4
Remarks:
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
FG-2.5 1 6
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
122.8 100.5 22.2 95
D): 2255 (M):726StandardCount:
124.0
123.4
122.7
23.6 95
15 D/16- North
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
97.7 25.6
100.3
E/16- South FG-2.5 1 6
E/16- North FG-2.5 1 6
123.7
4923
2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
1423017
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/11/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
101.1 22.1 96
24.2 95
95
22.0
93
93
96
99.6
24.2
22.4
11 C/17- North FG-2.5 1 6
12 C/17- South FG-2.5 1 6
123.1 99.8 23.3
3 D/18- North FG-2.5 1 6
2 E/18- South FG-2.5 1 6
123.5 100.7
1 E/18- North FG-2.5 1 6
123.6 101.3
9 D/17- North FG-2.5 1 6
8 E/17- South FG-2.5 1
4 D/18- South FG-2.5
10 D/17- South FG-2.5 1 6
6
7 E/17- North FG-2.5 1 6
5 C/18- North FG-2.5 1 6
122.7
124.0 100.4 23.5 95
96
98.6 24.4 94
22.6
94
6 C/18- South FG-2.5 1 6
123.5
122.7 98.8
100.9
94
96
24.794124.1
122.9
123.5 99.2 24.5
97.9 25.5
99.516
Client:GTIS Acquisitions, LLC Service Date:7/11/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
Work Order Number:1423017
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
2 95100LightReddishBrownClay432521.1 99.4 -2
General Location
Area:Building Pad Footings
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
22.1
16 D/16- South FG-2.5 1 6 123.6 99.3 24.5 94
96
18 C/16- South FG-2.5 1 6 124.2 100.5
17 C/16- North FG-2.5 1 6 123.6 101.2
101.4 22.3 96
23.6 95
9619E/15- North FG-2.5 1 6 123.5 100.8 22.5
124.1
20 E/15- South FG-2.5 1 6 124.0
95
99.4 24.8 94
22 D/15- South FG-2.5 1 6
21 D/15- North FG-2.5 1 6
123.6 100.2 23.4
122.7
24 C/15- South FG-2.5 1 6
23 C/15- North FG-2.5 1 6 99.7 23.1 95
124.4 101.5 22.6 96
26 E/14- South FG-2.5 1 6
25 E/14- North FG-2.5 1 6 98.9 24.1 94
122.2 97.8 24.9 93
122.7
28 D/14- South FG-2.5 1 6
27 D/14- North FG-2.5 1 6 99.6 23.3 95
123.8 100.8 22.8 96
122.8
30 C/14- South FG-2.5 1 6
29 C/14- North FG-2.5 1 6 101.3 22.4 96
122.3 98.6 24.0 94
124.0
D): 2255 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2255 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
98.5 19.699117.842StormDrainLineA-5 at Station 6+30 FG-1.0 2 6
117.2 96.8 21.1 97
95.5 22.696117.1
41 Storm Drain Line A-5 at Station 3+30 FG-1.0 2 6
40 Storm Drain Line A-5 at Station 6+00 FG-1.5 2 6
117.6 97.7 20.4 98
96.2 21.497116.8
39 Storm Drain Line A-5 at Station 3+00 FG-1.5 2 6
38 Storm Drain Line A-5 at Station 6+30 FG-2.0 2 6
99
37 Storm Drain Line A-5 at Station 3+30 FG-2.0 2 6
36 Storm Drain Line A-5 at Station 6+00 FG-2.5 2 6
117.6 95.8 22.8 96
97.1 20.398116.8
35 Storm Drain Line A-5 at Station 3+00 FG-2.5 2 6
19.7 99
34 Storm Drain Line A-5 at Station 6+30 FG-3.0 2 6 117.1
118.1 99.2 19.1 100
98.0 19.5
97
33 Storm Drain Line A-5 at Station 3+30 FG-3.0 2 6 118.0 98.6
32 Storm Drain Line A-5 at Station 6+00 FG-3.5 2 6 116.8 96.5 21.0
31 Storm Drain Line A-5 at Station 3+00 FG-3.5 2 6 118.0 97.9 20.5 98
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Utility Backfill/Paving Area
10025LightReddishBrownClay4321.1 99.4 -2 2 95
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Work Order Number:1423017
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/11/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
D): 2253 (M):731StandardCount:
123.2
123.8
122.7
23.1 95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.9 22.8
100.1
C/12- South FG-2.5 1 6
C/12- North FG-2.5 1 6
123.7
4923
2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
1423919
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/13/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
99.4 24.5 94
22.0 96
95
23.7
95
95
95
101.4
24.6
22.3
11 B/12- North FG-2.5 1 6
12 B/12- South FG-2.5 1 6
123.7 100.4 23.2
3 B/17- North FG-2.5 1 6
2 B/18- South FG-2.5 1 6
123.6 100.1
1 B/18- North FG-2.5 1 6
124.3 100.5
9 B/14- North FG-2.5 1 6
8 B/15- South FG-2.5 1
4 B/17- South FG-2.5
10 B/14- South FG-2.5 1 6
6
7 B/15- North FG-2.5 1 6
5 B/16- North FG-2.5 1 6
123.8
122.4 97.6 25.4 93
95
99.5 24.4 94
23.5
95
6 B/16- South FG-2.5 1 6
123.9
123.6 99.2
101.3
94
96
22.196123.6
123.1
122.6 99.7 23.0
100.2 22.9
101.216
Client:GTIS Acquisitions, LLC Service Date:7/13/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
Work Order Number:1423919
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
2 95100LightReddishBrownClay432521.1 99.4 -2
General Location
Area:Utility Backfill/Paving Area
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
21.6
15 Storm Drain Line D-1 at Station 2+40 FG-3.5 2 6 117.1 97.9 19.6 98
97
17 Storm Drain Line D-1 at Station 2+40 FG-3.0 2 6 116.7 95.4
16 Storm Drain Line D-1 at Station 2+40 FG-3.5 2 6 117.3 96.5
95.8 22.1 96
22.3 96
9818StormDrainLineD-1 at Station 2+40 FG-3.0 2 6 116.9 97.0 20.5
117.0
19 Storm Drain Line D-1 at Station 2+40 FG-2.5 2 6 117.0
97
96.3 21.5 97
21 Storm Drain Line D-1 at Station 2+40 FG-2.0 2 6
20 Storm Drain Line D-1 at Station 2+40 FG-2.5 2 6
117.4 96.9 21.2
117.4
23 Storm Drain Line D-1 at Station 2+40 FG-1.5 2 6
22 Storm Drain Line D-1 at Station 2+40 FG-2.0 2 6 98.5 19.2 99
116.2 94.5 23.0 95
25 Storm Drain Line D-1 at Station 2+40 FG-1.0 2 6
24 Storm Drain Line D-1 at Station 2+40 FG-1.5 2 6 95.6 22.5 96
117.7 96.7 21.7 97
117.1
26 Storm Drain Line D-1 at Station 2+40 FG-1.0 2 6 97.1 20.398116.8
28 Plumbing A.6/1.8 FG-3.5 1 6
27 Plumbing A.6/1.8 FG-4.0 1 6 97.5 25.6 93
123.0 99.8 23.2 95
122.5
D): 2253 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2253 (M):721
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
24.2 94
96
33 Plumbing A.6/1.8 FG-1.0 1 6 123.2 99.2
32 Plumbing A.6/1.8 FG-1.5 1 6 123.4 100.6 22.7
31 Plumbing A.6/1.8 FG-2.5 1 6 122.6 97.8 25.4 93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Utility Backfill/Building
10025LightReddishBrownClay4321.1 99.4 -2 2 95
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Work Order Number:1423919
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/13/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
13
D): 2253 (M):731StandardCount:
123.2
123.8
122.7
23.1 95
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.9 22.8
100.1
C/12- South FG-2.5 1 6
C/12- North FG-2.5 1 6
123.7
4923
2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 3
1423919
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/13/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
99.4 24.5 94
22.0 96
95
23.7
95
95
95
101.4
24.6
22.3
11 B/12- North FG-2.5 1 6
12 B/12- South FG-2.5 1 6
123.7 100.4 23.2
3 B/17- North FG-2.5 1 6
2 B/18- South FG-2.5 1 6
123.6 100.1
1 B/18- North FG-2.5 1 6
124.3 100.5
9 B/14- North FG-2.5 1 6
8 B/15- South FG-2.5 1
4 B/17- South FG-2.5
10 B/14- South FG-2.5 1 6
6
7 B/15- North FG-2.5 1 6
5 B/16- North FG-2.5 1 6
123.8
122.4 97.6 25.4 93
95
99.5 24.4 94
23.5
95
6 B/16- South FG-2.5 1 6
123.9
123.6 99.2
101.3
94
96
22.196123.6
123.1
122.6 99.7 23.0
100.2 22.9
101.216
Client:GTIS Acquisitions, LLC Service Date:7/13/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
Work Order Number:1423919
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 3
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
2 95100LightReddishBrownClay432521.1 99.4 -2
General Location
Area:Utility Backfill/Paving Area
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
21.6
15 Storm Drain Line D-1 at Station 2+40 FG-3.5 2 6 117.1 97.9 19.6 98
97
17 Storm Drain Line D-1 at Station 2+40 FG-3.0 2 6 116.7 95.4
16 Storm Drain Line D-1 at Station 2+40 FG-3.5 2 6 117.3 96.5
95.8 22.1 96
22.3 96
9818StormDrainLineD-1 at Station 2+40 FG-3.0 2 6 116.9 97.0 20.5
117.0
19 Storm Drain Line D-1 at Station 2+40 FG-2.5 2 6 117.0
97
96.3 21.5 97
21 Storm Drain Line D-1 at Station 2+40 FG-2.0 2 6
20 Storm Drain Line D-1 at Station 2+40 FG-2.5 2 6
117.4 96.9 21.2
117.4
23 Storm Drain Line D-1 at Station 2+40 FG-1.5 2 6
22 Storm Drain Line D-1 at Station 2+40 FG-2.0 2 6 98.5 19.2 99
116.2 94.5 23.0 95
25 Storm Drain Line D-1 at Station 2+40 FG-1.0 2 6
24 Storm Drain Line D-1 at Station 2+40 FG-1.5 2 6 95.6 22.5 96
117.7 96.7 21.7 97
117.1
26 Storm Drain Line D-1 at Station 2+40 FG-1.0 2 6 97.1 20.398116.8
28 Plumbing A.6/1.8 FG-3.5 1 6
27 Plumbing A.6/1.8 FG-4.0 1 6 97.5 25.6 93
123.0 99.8 23.2 95
122.5
D): 2253 (M):731
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
Ronnie Yeoman
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project Manager
UES / Riner Engineering
Respectfully Submitted,
D): 2253 (M):721
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
24.2 94
96
33 Plumbing A.6/1.8 FG-1.0 1 6 123.2 99.2
32 Plumbing A.6/1.8 FG-1.5 1 6 123.4 100.6 22.7
31 Plumbing A.6/1.8 FG-2.5 1 6 122.6 97.8 25.4 93
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
General Location
Area:Utility Backfill/Building
10025LightReddishBrownClay4321.1 99.4 -2 2 95
Max Dry
Weight
pcf)
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 Dark Brown and Brown Sandy Clay 39 18.0 105.3
Mat.
No.
Proctor
Report No.Material Description/Classification PI
Optimum
Moisture
4 92 96
Material Information Laboratory Data Project Specifications
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:3 of 3
Work Order Number:1423919
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
787 Seventh Avenue, 50th Floor Report Date:7/26/2024
New York, NY 10019 Weather:Clear
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:7/13/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
12
D): 2251 (M):726StandardCount:
123.8
123.3
123.5
22.9 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
99.9 23.6
100.7Plumbing-A.4/4 FG-1.0 1 6
4923
2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 2
1424300
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/18/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Clear
98.9 24.7 94
95
22.3
95
95
96
22.2
24.5
10 Plumbing-A.4/4 FG-1.5 1 6
11 Plumbing-A.4/4 FG-1.0 1 6
123.4 100.2 23.2
3 D/6- North FG-2.5 1 6
2 D/5- South FG-2.5 1 6
122.6 98.6
1 D/5- North FG-2.5 1 6
123.8 101.2
Utility Backfill/Building
8 D/9- South FG-2.5 1
4 D/6- South FG-2.5
9 Plumbing-A.4/4 FG-1.5 1 6
6
7 D/9- North FG-2.5 1 6
5 D/8- North FG-2.5 1 6
122.9
123.8 100.9 22.7 96
94
99.1 24.0 94
24.3
6 D/8- South FG-2.5 1 6
123.5
123.8 101.3
99.2
96
94
23.994123.2
122.8 99.6 23.3
99.416
Client:GTIS Acquisitions, LLC Service Date:7/18/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Clear
Work Order Number:1424300
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:2 of 2
Material Description/Classification PI
Dark Brown and Brown Sandy Clay 39
Material Information Laboratory Data Project Specifications
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
1 3 18.0 105.3 4
Mat.
No.
Proctor
Report No.
Optimum
Moisture
Max Dry
Weight
pcf)
92 96
2 95100LightReddishBrownClay432521.1 99.4 -2
General Location
Area:Utility Backfill/Paving Area
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
21.3
13 Sanitary Sewer Line S-1 at Station 1+50 FG-6.0 2 6 117.7 98.7 19.2 99
97
15 Sanitary Sewer Line S-1 at Station 1+50 FG-5.0 2 6 116.1 96.0
14 Sanitary Sewer Line S-1 at Station 2+25 FG-5.5 2 6 117.4 96.8
95.5 22.5 96
20.9 97
9816SanitarySewerLineS-1 at Station 2+25 FG-4.5 2 6 117.5 97.9 20.0
117.1
17 Sanitary Sewer Line S-1 at Station 1+50 FG-4.0 2 6 117.0
99
96.6 21.2 97
19 Sanitary Sewer Line S-1 at Station 1+50 FG-3.0 2 6
18 Sanitary Sewer Line S-1 at Station 2+25 FG-3.5 2 6
117.0 98.0 19.4
116.8
21 Sanitary Sewer Line S-1 at Station 1+50 FG-2.0 2 6
20 Sanitary Sewer Line S-1 at Station 2+25 FG-2.5 2 6 97.2 20.2 98
117.1 96.3 21.6 97
23 Sanitary Sewer Line S-1 at Station 1+50 FG-1.0 2 6
22 Sanitary Sewer Line S-1 at Station 2+25 FG-1.5 2 6 95.2 22.5 96
117.0 96.8 20.9 97
116.6
D): 2251 (M):726
Remarks:
Gauge Information
Non-compliant results are indicated by an asterisk(*)
if applicable.
Serial No:4457 Manufacturer:Instrotek Model:Standard Count:
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
UES / Riner Engineering
Ronnie Yeoman
Project Manager
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4457 Manufacturer:Instrotek Model:
12
D): 2275 (M):729StandardCount:
115.3
118.0
117.6
21.4 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
97.8 20.2
95.0StormDrainLineDatStation2+25 FG-1.0 2 6
4923
2 2 95
General Location
Area:Building Pad Footings
96
100221.1
1 18.0
5
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
99.4
Material Information Laboratory Data
39DarkBrownandBrownSandyClay
Light Reddish Brown Clay 43
105.3
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
1428191
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/20/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Clear
98.7 19.6 99
96
20.4
95
98
98
19.3
10 Storm Drain Line D at Station 2+25 FG-2.0 2 6
11 Storm Drain Line D at Station 1+25 FG-1.5 2 6
123.9 101.2 22.4
3 C/3- North FG-2.5 1 6
2 C/2- South FG-2.5 1 6
122.9 98.8
1 C/2- North FG-2.5 1 6
117.0 97.2
8 Storm Drain Line D at Station 2+25 FG-3.0 2 6
7 Storm Drain Line D at Station 1+25 FG-3.5 2
4 C/3- South FG-2.5
9 Storm Drain Line D at Station 1+25 FG-2.5 2 6
6
Utility Backfill/Paving Area
5 C/4- North FG-2.5 1 6
123.5
123.6 100.7 22.7 96
94
98.3 25.6 93
24.4
96
6 C/4- South FG-2.5 1 6
118.0 98.9 99
24.194123.5
123.7
115.6 95.4 21.2
100.2 23.5
99.516
07/25/24
CLASSIFICATION:
SAMPLE LOCATION:
TEST METHOD:ASTM D698-C
TESTED FOR:SOIL ID NUMBER:08F
117.3 PCF
11.5 %
LIQUID LIMIT:36
PROJECT:PLASTIC LIMIT:34
PLASTICITY INDEX:
9%
Respectfully Submitted,
Ronnie Yeoman
Project Manager
UES / Alpha Testing, LLC
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of UES. The use of our
name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813 On-site Stockpile
MAXIMUM DRY UNIT WEIGHT:
FINER THAN NO. 200 SIEVE:
OPTIMUM MOISTURE CONTENT:
MATERIAL DESCRIPTION:
Flexible Base
OUR REPORT NO.:
2
GTIS Acquisitions, LLC
New York, New York
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
F241078-1431036
Gray Flexible Base
100
105
110
115
120
125
130
135
6%-1%4%9%14%19%24%29%
DR
Y
U
N
I
T
W
E
I
G
H
T
l
b
s
c
u
f
t
MOISTURE CONTENT
MOISTURE DENSITY RELATIONSHIP
113.9
98
88.9 28.1 95
24.7
113.0 90.2 25.3
3 D.4/15.5 FG 1 6
2 C.8/15.5 FG 1 6
113.6 91.1
1 C.3/15.5 FG 1 6
Cloudy
97
1431520
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:07/26/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
Material Information Laboratory Data
13LightBrownandTanClay 93.2
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
2 29506L
General Location
Area:Building Pad
100126.3
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4453 Manufacturer:Instrotek Model:(D): 2270 (M):731StandardCount:
Remarks:
Respectfully Submitted,
Ronnie Yeoman
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:4453 Manufacturer:Instrotek Model:
13
D): 2262 (M):727StandardCount:
119.9
119.3
118.9
25.8 96
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
94.2 26.2
95.3
B/9-South FG-2.5 1 6
B/9-North FG-2.5 1 6
119.7
4925
General Location
Area:Building Pad Footings
96121.1
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
43LightReddishBrownClay 99.4
Off Genesis Way and Enchanted Way Technician:Reyes, Ruben
Grapevine, Texas Page Number:1 of 1
1432424
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:7/27/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:7/31/2024
New York, NY 10019 Weather:Mostly Cloudy
93.6 27.5 94
25.2 96
96
25.7
96
95
96
95.6
27.3
27.9
11 B/8- North FG-2.5 1 6
12 B/8- South FG-2.5 1 6
119.9 95.6 25.4
3 B/3- North FG-2.5 1 6
2 B/2- South FG-2.5 1 6
119.2 94.4
1 B/2- North FG-2.5 1 6
119.4 95.0
9 B/6- North FG-2.5 1 6
8 B/5- South FG-2.5 1
4 B/3- South FG-2.5
10 B/6- South FG-2.5 1 6
6
7 B/5- North FG-2.5 1 6
5 B/4- North FG-2.5 1 6
118.8
118.4 93.3 26.9 94
95
93.5 27.1 94
26.3
95
6 B/4- South FG-2.5 1 6
118.4
118.4 93.0
92.6
94
93
26.595119.9
119.7
119.7 94.7 26.4
95.3 25.6
94.816
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Project Manager
UES / Riner Engineering
Ronnie Yeoman
14
Remarks:
Respectfully Submitted,
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:2486 Manufacturer:Humboldt Model:5001EZ
13
D): 2453 (M):464StandardCount:
117.4
114.1
115.3
27.5 94
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
Percent
Compaction
91.6 25.9
92.1
D.5/18 FG-11.0 1 6
B.5/18 FG-11.0 1 6
114.8
4921
General Location
Area:Building Pad
96121.4
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.Material Description/Classification PI
Material Information Laboratory Data
38DarkBrownClaywithSand 98.0
New York, NY 10019 Weather:
Off Genesis Way and Enchanted Way Technician:Torres, Jorge
Grapevine, Texas Page Number:1 of 1
28.7
29.1
1395465
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Client:GTIS Acquisitions, LLC Service Date:05/21/2024
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Work Order Number:
787 Seventh Avenue, 50th Floor Report Date:6/6/2024
1 6
Clear
90.5 26.1 92
26.4 93
93
27.2
96
93
95
90.8
11 D.5/18.5 FG-11.0 1 6
12 E.5/18.5 FG-11.0 1 6
114.9 91.5 25.6
3 C.5/18.5 FG-11.5 1 6
2 B.5/18.5 FG-11.5 1 6
113.6 90.6
1 A.5/18.5 FG-11.5 1 6
10 C.5/18.5 FG-11.0 1 6
6 120.1
119.3 92.7
93.0
118.9 93.5
9 B.5/18.5 FG-11.0 1 6
8 A.5/18.5 FG-11.0 1
7 D.5/18 FG-11.5
6 B.5/18 FG-11.5 1
119.1
115.1 90.4 27.3 92
92
93.8 27.0 96
25.4
6
4 D.5/18.5 FG-11.5 1 6
5 E.5/18.5 FG-11.5 1 6
94
95
95
28.295119.4
118.0
116.5 91.9 26.8
94.0 25.5
93.1
11.8 98129.0
99
115.8 11.699129.2
130.7 116.2 12.5
114.6 11.5
98128.3 115.0 11.6
FG 1 6
3 Sta 14+00 FG 1 6
127.8
130.0 116.6 11.5
115.4
12
10
4 Sta. 14+50 FG 1 6
5 Sta. 15+00 FG 1
6
9
6 Sta. 15+30 FG 1 6
7
8
6
2 Sta. 13+50
1442224
1
99
98
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
In-Place Nuclear Density
Test Report
Client:GTIS Acquisitions, LLC Service Date:08/14/2024
787 Seventh Avenue, 50th Floor Report Date:
Grapevine, Texas Page Number:1 of
Project:121 Commerce Center Addition (Lot 1)Project Number:F241078
Off Genesis Way and Enchanted Way Technician:Eaton, Robert
New York, NY 10019 Weather:Clear
Work Order Number:
9808F
Project Specifications
Mat.
No.
Optimum
Moisture
Max Dry
Weight
pcf)
Proctor
Report No.
Moisture
Min. (%) Max.
Compaction
Min. (%) Max.
Material Description/Classification PI
Material Information Laboratory Data
1 11.5 117.3 04FlexBase
Percent
Compaction
15
1 Sta. 13+00 FG 1
General Location
Area:North Bound Service Road Decel Lane
558
Remarks:
Field Test Data
Test
No.
Test Location
Lift/
Depth
Mat.
No.
Probe
Depth
in.)
Wet
Density
pcf)
Dry
Density
pcf)
Percent
Moisture
14
Gauge Information
Non-compliant results are indicated by an asterisk(*) if
applicable.
Serial No:12039 Manufacturer:Troxler Model:3411B
13
UES / Alpha Testing, LLC
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
This report is in general compliance with one or more of the following technical standards: D6938-15
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Ronnie Yeoman
Project Manager
11
Respectfully Submitted,
Standard Count:D):1130 (M):
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
07/09/2024
7/26/2024
Clear
1420996
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Time Concrete was Placed
Time Drilling was Completed 9:00 AM 11:00 AM 12:41 PM
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)
Stirrup Size (#)
Vertical Bar Size (#)
Number of Vertical Bars (each)
21.50
35.00
13.50
22.00
31.00
31.00
WetWetWet
Cased Depth (ft.)
45.00 35.00
Casing Diameter (in.)
0.000.00
Test Piers Only. Water was observed in all 3 test piers. Water in Pier #1 was noted at around 17' and was entering the pier at a substantial rate. Water was noted around 20' on test pier 2 & 3 at a slowerrateRemarks:
Project Manager
only accumulating approxametly less than 2 inches. All piers were backfilled upon completion.
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
F.2/16.5
Building Pad
F.2/5.5
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:Maxon Drilling
D/12.5
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
9.00
0.00
45.00
45.00
0.00
24 3624
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
NoNE
10.40
36
99.40
E/13
3636
99.40
36
99.40
95.60
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
95.60
21.30
31.70
10.00
10.00
3.80
32.00
10.50
21.50
10.00 10.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
D/13
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
B/13
Building Pad
C/13
Technician:
Page Number: 1 of 1
Reyes, Ruben
E.3/19, C.4/19, A/16.6 and A/13.4 (24" Piers) were drilled and backfilled due to excessive water in the hole. Recommend them to be cased.Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
28.20
NoNE
27.00 27.90
NoNECasingDiameter (in.)
3.803.80 3.80
NoNE
Dry
NoNE
27.80
Dry
NoNE
Dry
NoNE
NoNE
26.00 27.00 27.60
95.60
20.50
30.80
10.00
10.30
95.60
21.60
31.60
27.80
Dry
Vertical Bar Size (#)8 8 8 8
Number of Vertical Bars (each)15 15 15 15
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12
Stirrup Size (#)3 3 3 3
Time Drilling was Completed 9:24 AM 9:48 AM 10:12 AM 10:39 AM
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 11:45 AM 11:51 AM 12:50 PM 12:56 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/10/2024
7/26/2024
Clear
1421660
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25
12.10 12.10
12.00
36.60
98.00
24
99.40
24
A/14.4
2424
99.40
24
99.40
24
98.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
24.00
99.40
98.00
22.60
34.70
12.00
13.00
3.40
37.00
13.60
23.40
12.00 12.00
99.40
96.00
21.50
33.60
12.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
A/14.7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/15.7 A/13.5A/13.8
Building Pad
A/15.3
Technician:
Page Number: 1 of 1
Reyes, Ruben
A.2/18.5 (24" Pier) was drilled and backfilled due to excessive water in the hole.Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
35.60
24
34.60 33.30
26
1.40
35.20
Dry
26
25
Casing Diameter (in.)
1.401.40 1.40 3.40
29.00 35.10
26
Dry
26
30.20
Dry
26
25
35.50
Dry
25
Dry
26
24
34.40 30.50 33.00
98.00
23.20
36.00
12.00
12.80
96.00
21.80
34.80
31.40
Dry
6 6
12.60
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 8 8 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 11:05 AM 12:10 PM 1:41 PM 2:24 PM 3:08 PM 3:48 PM
4:19 PM 4:28 PM
YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 12:50 PM 1:03 PM 2:00 PM 2:43 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/11/2024
7/26/2024
Clear
1422248
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
22
12.90 15.20
12.00
37.40
98.00
24
99.40
24
A/11.6
2424
99.40
24
99.40
24
98.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
21.20
99.40
98.00
21.60
34.50
12.00
12.30
3.40
34.60
12.60
22.00
12.00 12.00
99.40
96.00
22.10
37.30
12.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
A/12.3
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/13 A/10.6A/11.3
Building Pad
A/12.6
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
33.20
25
33.40 33.10
26
1.40
36.00
Dry
26
25
Casing Diameter (in.)
1.401.40 1.40 3.40
36.00 36.00
26
Dry
26
33.90
Dry
26
24
32.00
Dry
24
Dry
26
22
31.90 33.20 32.90
98.00
22.20
34.80
12.00
12.60
96.00
22.30
34.60
31.20
Dry
6 6
16.20
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 8 8 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 10:00 AM 10:39 AM 11:41 AM 1:23 PM 2:36 PM 3:22 PM
3:52 PM 4:06 PM
YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 11:50 AM 12:04 PM 1:56 PM 2:10 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/12/2024
7/26/2024
Clear
1423258
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/12/2024
7/26/2024
Clear
1423258-Rev.1
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 11:50 AM 12:04 PM 1:56 PM 2:10 PM
Yes Yes Yes Yes
Time Drilling was Completed 10:00 AM 10:39 AM 11:41 AM 1:23 PM 2:36 PM 3:22 PM
3:52 PM 4:06 PM
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 8 8 8
98.00
22.20
34.80
12.00
12.60
96.00
22.30
34.60
31.20
Dry
6 6
16.20
36.00 36.00
26
Dry
26
33.90
Dry
26
24
32.00
Dry
24
Dry
26
22
31.90 33.20 32.90
Cased Depth (ft.)
33.20
25
33.40 33.10
26
1.40
36.00
Dry
26
25
Casing Diameter (in.)
1.401.40 1.40 3.40
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/13 A/10.6A/11.3
Building Pad
A/12.6
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:MaxonDrillingMWBuilders
A/12.3
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
98.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
21.20
99.40
98.00
21.60
34.50
12.00
12.30
3.40
34.60
12.60
22.00
12.00 12.00
99.40
96.00
22.10
37.30
14.00
24
99.40
24
A/11.6
2424
99.40
24
99.40
24
37.40
98.00
12.90 15.20
16.00
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25
10.00
24
99.40
D/7
3636
99.40
24
99.40
95.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
95.60
28.40
38.40
12.00
10.30
3.80
37.40
16.10
21.30
12.00 12.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
E/7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A.1/9.4
Building Pad
A.2/10
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
33.00
28
35.90 34.60
38CasingDiameter (in.)
1.404.40 3.80
26
Dry
38
34.10
Dry
29
Dry
26
24
35.00 34.90 34.80
98.00
20.90
37.30
12.00
16.40
95.60
28.70
39.00
35.20
Dry
Vertical Bar Size (#)6 6 8 8
Number of Vertical Bars (each)8 8 15 15
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12
Stirrup Size (#)3 3 3 3
Time Drilling was Completed 8:51 AM 12:56 PM 10:25 AM 11:33 AM
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 9:25 AM 3:46 PM 2:26 PM 2:53 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/15/2024
7/26/2024
Clear
1424308
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/15/2024
7/26/2024
Clear
1424308- Rev. 1
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 9:25 AM 3:46 PM 2:26 PM 2:53 PM
Yes Yes
Time Drilling was Completed 8:51 AM 12:56 PM 10:25 AM 11:33 AM
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12
Stirrup Size (#)3 3 3 3
Vertical Bar Size (#)6 6 8 8
Number of Vertical Bars (each)8 8 15 15
98.00
20.90
37.30
16.00
16.40
95.60
28.70
39.00
35.20
Dry
26
Dry
38
34.10
Dry
29
Dry
26
24
35.00 34.90 34.80
Cased Depth (ft.)
33.00
28
35.90 34.60
38CasingDiameter (in.)
1.404.40 3.80
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A.1/9.4
Building Pad
A.2/10
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:MaxonDrillingMWBuilders
E/7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
95.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
95.60
28.40
38.40
10.00
10.30
3.80
37.40
16.10
21.30
16.00 10.00
24
99.40
D/7
3636
99.40
24
99.40
10.00
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
24
10.10 12.50
12.00
35.50
96.00
24
99.40
24
C/7
3636
99.40
24
99.40
24
98.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
21.40
99.40
95.60
26.60
36.70
10.00
10.40
3.80
36.40
14.60
21.80
14.00 10.00
99.40
98.00
21.70
34.20
12.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
B/7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/8.7 A/7.4A/7.7
Building Pad
A/8.4
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
35.00
28
32.70 32.90
38
3.40
32.10
Dry
26
24
Casing Diameter (in.)
3.401.40 3.80 1.40
32.90 32.30
26
Dry
38
32.80
Dry
26
25
34.00
Dry
29
Dry
26
25
33.00 34.80 32.30
96.00
23.60
36.10
12.00
12.50
95.60
28.10
38.50
34.70
Dry
6 6
14.10
Vertical Bar Size (#)6 6 8 8
Number of Vertical Bars (each)8 8 15 15 8 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 11:22 AM 12:11 PM 8:00 AM 9:10 AM 12:49 PM 2:35 PM
2:55 PM 3:07 PM
YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 1:22 PM 1:35 PM 10:00 AM 10:16 AM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/16/2024
7/26/2024
Clear
1424309
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
24
9.30 9.40
10.00
37.70
96.00
24
99.40
24
D.7/19
2424
99.40
24
99.40
24
96.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
27.50
99.40
94.00
27.70
37.00
9.00
10.10
3.40
34.50
7.20
27.30
7.00 9.00
99.40
94.00
28.10
37.50
9.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
E.3/19
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
F/19 C.7/19D.3/19
Building Pad
E.7/19
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
31.10
25
33.00 31.60
26
3.40
34.30
Wet
26
25
Casing Diameter (in.)
3.403.40 5.40 5.40
32.00 34.20
26
Wet
26
32.10
Wet
26
24
31.00
Wet
24
Wet
26
25
32.90 34.50 31.50
96.00
28.30
36.40
7.00
8.10
96.00
28.00
38.10
34.70
Wet
6 6
10.20
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 8 8 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 8:02 AM 8:42 AM 11:48 AM 12:25 PM 2:44 PM 3:19 PM
4:00 PM 4:26 PM
YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 10:25 AM 11:03 AM 1:36 PM 1:58 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/17/2024
7/26/2024
Cloudy
1424310
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/18/2024
7/29/2024
Partly Cloudy
1424311
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 9:50 AM 9:44 AM 1:46 PM 2:23 PM
Yes Yes Yes
Time Drilling was Completed 7:24 AM 8:23 AM 10:38 AM 12:12 PM 1:25 PM
3:26 PM
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12
Stirrup Size (#)3 3 3 3 3
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 8 8
96.00
27.60
39.00
11.00
11.40
96.00
42.00
53.00
49.60
Wet
6
33.80
26
Wet
26
34.30
Wet
26
25
33.40
Wet
25
Wet
26
24
35.50 49.50 36.80
Cased Depth (ft.)
33.90
24
35.60 37.30
26CasingDiameter (in.)
3.403.40 1.40 4.40
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
C.4/19 A.3/19
Building Pad
B.8/19
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:MaxonDrillingMWBuilders
B.4/19
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
96.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
98.00
27.00
38.70
11.00
11.00
3.40
37.30
10.40
26.90
10.00 11.00
99.40
95.00
27.20
38.70
11.00
24
99.40
A.8/19
2424
99.40
24
99.40
24
11.70 11.50
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
24
24
99.40
24
99.40
96.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
36.50
9.30
27.20
9.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A.1/19.1
Building Pad
A.2/18.5
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
33.10 44.70
Casing Diameter (in.)
1.403.40
26
32.60
Wet Wet
26
28
44.20
98.00
37.00
46.10
9.00
9.10
Vertical Bar Size (#)6 6
Number of Vertical Bars (each)8 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12
Stirrup Size (#)3 3
Time Drilling was Completed 7:38 AM 11:15 AM
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 2:05 PM 1:15 PM
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/19/2024
7/31/2024
Clear
1424312
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/22/2024
7/31/2024
Cloudy
1427898
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 11:38 AM 12:11 PM
Time Drilling was Completed 8:54 AM 10:56 AM
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12
Stirrup Size (#)3 3
Vertical Bar Size (#)6 6
Number of Vertical Bars (each)8 8
95.00
29.00
43.40
13.00
14.40
26
36.70
Wet Wet
26
28
38.50
Cased Depth (ft.)
37.20 39.00
Casing Diameter (in.)
4.401.40
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/17.6
Building Pad
A.1/18.2
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:MaxonDrillingMWBuilders
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
98.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
38.60
11.30
27.30
11.00
24
99.40
24
99.40
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25
5.50 5.60
24
99.40
A.2/19
1824
99.40
24
99.40
18
96.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
97.40
27.10
32.60
9.00
9.10
3.40
36.70
9.70
27.00
9.00 5.00
99.40
97.40
26.80
32.40
5.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
A/16.3
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/17.2 A/19
Building Pad
A/16.6
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
33.30
28
45.20 30.60
26CasingDiameter (in.)
1.403.40 2.00 2.00
29.90
26
Wet
20
30.40
Wet
20
28
32.80
Wet
25
Wet
26
24
44.70 29.70 30.10
98.00
37.20
46.60
9.00
9.40
96.00
24.50
33.60
30.20
Wet
6VerticalBarSize (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 6 6
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12
Stirrup Size (#)3 3 3 3 3
Time Drilling was Completed 9:29 AM 10:33 AM 11:15 AM 1:04 PM 1:51 PM
2:39 PM
YesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 11:43 AM 11:25 AM 2:20 PM 2:48 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/24/2024
7/31/2024
Cloudy
1427900
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
28
9.50 9.90
9.00
30.70
98.00
18
99.40
24
A/6.5
2424
99.40
18
99.40
24
97.40
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
21.50
99.40
98.00
21.20
30.70
9.00
9.70
1.40
33.10
6.10
27.00
5.00 9.00
99.40
96.00
21.60
31.50
9.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
A/7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/18.7 A/5.6A/6.1
Building Pad
A/18.3
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
31.10
24
32.20 29.30
26
1.40
29.30
Dry
26
24
Casing Diameter (in.)
2.002.00 1.40 3.40
27.60 28.80
20
Dry
26
28.10
Dry
26
25
30.60
Wet
25
Wet
20
28
31.70 29.50 28.80
97.40
29.00
34.20
5.00
5.20
98.00
21.70
31.40
30.00
Dry
6 6
9.20
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)6 6 8 8 8 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 7:53 AM 8:35 AM 9:40 AM 11:13 AM 1:29 PM 2:00 PM
3:30 PM 3:40 PM
YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 10:43 AM 10:20 AM 12:58 PM 1:11 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/25/2024
7/31/2024
Clear
1427901
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
7/26/2024
7/31/2024
Cloudy
1427902
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 11:54 AM 12:03 PM 2:56 PM 12:18 PM
Yes Yes Yes Yes Yes Yes
Time Drilling was Completed 8:13 AM 9:18 AM 12:55 PM 9:55 AM 10:20 AM 10:46 AM 11:04 AM 11:34 AM
12:54 PM 12:38 PM 3:06 PM 3:09 PM
Length of Vertical Bars (ft.)26.70
Stirrup Spacing (in.)12 12 12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3 3 3
8 8
Vertical Bar Size (#)
27.20
666666
Number of Vertical Bars (each)6 6 6 8 8 8
97.40
21.30
26.80
5.00
5.50
97.40
20.70
26.20
24.20
Wet
6 6
9.00
9.70
28.00 27.50
20
Dry
26
26.50
Dry
26
25
25.60
Wet
28
Wet
20
28
24.30 23.70 25.50
Cased Depth (ft.)
26.10
24
24.80 28.00
20
1.40
28.00
Dry
26
24
Casing Diameter (in.)
2.002.00 1.40 3.40
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/10.5 A/4.3A/4.7
Building Pad
A/10
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:MaxonDrillingMWBuilders
A/9.4
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
A/3.7 A/3.3
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
97.40 98.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
19.70
99.40
98.00
20.00
29.40
5.00
5.50
2.00
28.10
7.00
21.10
5.00 9.009.00
99.40
96.00
20.30
29.90
9.00
18 24
99.40 99.40
24
A/5.2
2418
99.40
18
99.40
24 24
29.40
99.40
30.60
98.0098.00
29.10
9.40 9.20
21.00 19.90
9.60
9.00
9.60
29.20 27.70
1.40 1.40
26 26
Dry
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
28 24 25
Dry
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Alpha Testing, LLC
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
22'
5.30 9.10
11.00
33.30
92.70
24"
99.40
24"
A/1.5
18"18"
99.40
24"
99.40
24"
95.90
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
22.30
99.40
96.80
22.20
27.50
5.00
6.60
2.20
38.30
9.30
29.00
9.00 5.00
99.40
94.90
23.10
32.20
9.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MAXONDRILLINGMWBUILDERS
A/1.8
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/2.8 A.3/1A/1
BUILDING PAD / PIERS
A/2.4
Technician:
Page Number: 1 of 1
Alvarado, Henry
Pier bottoms were wet but within the 2" ACItoleranceRemarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
34.80
21'
32.00 24.90
20"
6.70
26.60
Wet
26"
22'
Casing Diameter (in.)
1.503.50 2.60 4.50
28.60 26.00
26"
Wet
20"
27.70
Wet
26"
22'
33.60
Wet
21'
Wet
26"
22'
31.30 25.00 24.00
97.90
21.80
33.50
11.00
11.70
97.20
21.30
27.90
25.70
Wet
6 6
11.00
Vertical Bar Size (#)6 6 5 5
Number of Vertical Bars (each)8 8 6 6 8 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12"12"12"12"12"12'
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 8:30 AM 9:30 AM 10:30 AM 11:00 AM 12:45 PM 1:45 PM
2:00 PM 2:30 PM
YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 10:15 AM 10:45 AM 12:50 PM 1:15 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
07/29/2024
Clear
1431794
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
07/30/2024
8/9/2024
Clear
1431795
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 10:00 AM 10:30 AM 11:15 AM 11:45 AM
Yes Yes Yes Yes Yes Yes
Time Drilling was Completed 7:50 AM 8:30 AM 9:05 AM 9:40 AM 11:30 AM 12:25 PM 2:30 PM 3:00 PM
2:00 PM 2:30 PM 4:30 PM 5:00 PM
Length of Vertical Bars (ft.)27.80
Stirrup Spacing (in.)12"12"12"12"12"12"12"12"
Stirrup Size (#)3 3 3 3 3 3 3 3
8 8
Vertical Bar Size (#)
29.00
666556
Number of Vertical Bars (each)8 8 6 6 8 8
97.80
22.60
31.70
9.00
9.10
96.90
22.70
28.10
25.60
Dry
6 6
10.00
29.60 26.60
26"
Dry
18"
29.90
Dry
24"
22'
27.60
Dry
21'
Dry
26"
21'
29.60 24.20 25.10
Cased Depth (ft.)
28.20
21'
30.10 25.50
18"
6.00
27.20
Dry
24"
22'
Casing Diameter (in.)
1.60
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
A/1.9 B.4/1A.9/1
Building Pad
A/1.6
Technician:
Page Number: 1 of 1
Alvarado, Henry
Drilling Contractor:MaxonDrillersMWBuilders
A/1.1
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
B.9/1
11.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
94.90 93.90
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
22.20
99.40
96.90
22.10
28.00
5.00
5.40
2.50
32.70
11.50
21.20
11.00 11.005.00
99.40
95.90
22.40
33.40
11.00
24"24"
99.40 99.40
24"
A.4/1
18"18"
99.40
24"
99.40
24"
C.4/1
24"
33.20
99.40
34.00
95.6093.40
33.70
5.90 10.20
22.90 23.50
11.00
11.00
4.50 5.50 3.802.50 3.50
24"24"
11.10
28.50 29.90
Dry Dry
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
22'22'22'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
07/31/2024
8/9/2024
Partly Cloudy
1431796
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 10:45 AM 10:45 AM 3:20 PM 1:30 PM
Yes Yes Yes Yes
Time Drilling was Completed 7:50 AM 8:40 AM 2:10 PM 11:00 AM 11:40 AM 1:30 PM
2:00 PM 3:00 PM
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12"12"12"12"12"12"
Stirrup Size (#)3 3 3 3 3 3
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 8 8 8
93.90
22.70
32.70
10.00
10.00
93.70
22.10
31.80
26.10
Dry
6 6
24.60 26.80
26"
Dry
26"
25.10
Dry
26"
22'
28.60
Dry
21' 6"
Dry
26"
22'
26.60 26.20 25.30
Cased Depth (ft.)
29.00
22'
27.20 25.40
26"
3.70
27.20
Dry
26"
22'
Casing Diameter (in.)
5.50
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
C.8/1 E.2/1E.6/1
Building Pad
D.3/1
Technician:
Page Number: 1 of 1
Alvarado, Henry
Drilling Contractor:MaxomDrillersMWBuilders
D.7/1
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
9.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
95.70
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
99.40
21.90
99.40
95.70
21.80
29.10
9.00
9.70
5.70
32.70
10.20
22.50
10.00 7.00
99.40
95.70
21.10
28.80
7.00
24"
99.40
24"
F/1
24"24"
99.40
24"
99.40
24"
30.90
95.70
7.30 7.70
9.00
3.70 3.70 3.70
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
22'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
08/01/2024
8/9/2024
Clear
1431797
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 10:00 AM 10:30 AM 11:45 AM 12:30 PM
Yes Yes Yes Yes Yes Yes Yes Yes
Time Drilling was Completed 7:30 AM 8:10 AM 9:30 AM 10:00 AM
3:45 PM 4:15 PM
10:50 AM 11:20 AM 12:35 PM 1:05 PM
1:25 PM 1:50 PM 2:45 PM 3:10 PM
12"12"
1:50 PM 2:20 PM
Length of Vertical Bars (ft.)27.20
Stirrup Spacing (in.)12"12"12"12"12"12"12"12"
Stirrup Size (#)3 3 3 3 3 3 3 3 3 3
8 8 6 6
Vertical Bar Size (#)
27.90
655666
23.20
5
23.10
Number of Vertical Bars (each)6 6 8 8 6 6
5
91.30
20.10
25.10
5.00
5.00
94.00
22.00
29.10
28.10
Dry
5 5
8.00 5.00 5.00
23.00 23.20
20"
Dry
26"
24.10
Dry
20"
21
23.00
Dry
21
Dry
20"
20
21.00 27.00 26.00
Cased Depth (ft.)
22.00
21.6
21.40 27.10
26"
1.50
23.70
Dry
20"
20.6
Casing Diameter (in.)
3.70
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
G/1.6 F.5/1.6F.5/1.4
Building Pad
G/1.4
Technician:
Page Number: 1 of 1
Alvarado, Henry
Drilling Contractor:MaxonDrillersMWBuilders
F/1.2
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
F/2.2
5.10
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
91.30 94.50
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
95.00
20.10
95.00
94.50
19.30
27.60
7.00
7.10
1.00
25.70
5.50
20.20
5.00 8.008.00
95.00
93.50
20.30
25.60
5.00
18"24"
95.00 95.00
18"
F/1.6
24"24"
95.00
18"
95.00
18"
F/2.8 F.1/1.4 F.1/1.6
24"18"18"
25.20
95.00 95.00 95.00
93.50
28.60
94.50 93.5093.50
29.60 25.60 25.40
8.30 8.40 6.20 5.10
20.40 21.20 19.40 20.30
5.30
5.00
3.70 0.50 0.50 1.50 1.500.50 1.50
26"26"20"20"
8.20
28.10 29.10 24.10 23.90
Dry Dry Dry Dry
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
20 21.6 21 21 21
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
08/02/2024
8/9/2024
Clear
1431798
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 9:59 AM 10:13 AM 11:20 AM 11:29 AM
Yes Yes Yes Yes
Time Drilling was Completed 7:19 AM 7:58 AM 10:23 AM 10:50 AM 12:08 PM 1:13 PM
2:06 PM 2:18 PM
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 8 8 8
95.00
22.17
30.25
8.00
8.08
95.00
21.42
29.58
29.08
Wet
6 6
8.25
28.25 29.00
25
Wet
25
29.17
Wet
25
22
27.83
Wet
22
Wet
25
22
29.00 28.17 28.67
Cased Depth (ft.)
28.92
22
29.75 29.75
25
0.50
29.75
Wet
25
22
Casing Diameter (in.)
0.500.50
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
F/3.2 F/5.8F/5.2
Building Exterior
F/3.8
Technician:
Page Number: 1 of 1
Sirat, Barakatullah
Drilling Contractor:MaxonMWBuilders
F/4.2
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
Client:
Project:
Measured Depth From Ground Level
To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
95.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
95.50
22.00
95.50
95.00
21.50
30.25
8.00
8.16
0.50
29.42
8.09
21.33
8.00 8.00
95.50
95.00
21.33
29.67
8.00
24
95.50
24
F/4.8
2424
95.50
24
95.50
24
30.25
95.00
0.50 0.50
8.75 8.34
8.00
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
22
Instrument Used:
COMBINED FLATNESS F-NUMBER (FF)
Specified Limits:
BASED UPON THE NUMBER OF SAMPLES TAKEN, THERE IS A 90% CERTAINTY THAT THE ACTUAL F-NUMBERS OF THE SURFACE SURVEYED WILL FALL
WITHIN THE RANGES WHICH FOLLOW THE RESPECTIVE ESTIMATED FLATNESS AND LEVELNESS F-NUMBERS.
52.07
45.85
UES / Riner Engineering
Combined Overall:
COMBINED LEVELNESS F-NUMBER (FL)
FL - SPECIFIED OVERALL VALUE:35
50
Value Results:
DIPSTICK 2272", MANUFACTURED BY FACE TECHNOLOGIES
Respectfully Submitted,
08/02/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
This report is in general compliance with one or more of the following technical standards: C31-15, C39-16, C138-16, C143-15, C172-14, C173-16, C231-14, C293-15, C617-15, C1064-12, C1231-15
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
35
FL - MINIMUM OVERALL VALUE:
Approximate Area:
ASTM Standard:
29,700
ASTM E 1155
Work Order Number:
Project Number:
Technician:
Page Number:
Sampling Method:
FF - MINIMUM OVERALL VALUE:
25
Remarks:
121 Commerce Center Addition (Lot 1)
Service Date:Client:
Off Genesis Way and Enchanted Way
Clear
8/9/2024
F241078
1434572
1
POINT ELEVATIONS WERE MEASURED AT REGULAR 12 INCH INTERVALS ALONG STRAIGHT LINES UP TO 106 FEET IN
LENGTH. THE ELEVATION DIFFERENCES BETWEEN ALL ADJACENT READING POINTS, THE ARITHMETIC DIFFERENCES
BETWEEN ALL ADJACENT 12 INCH ELEVATION DIFFERENCES, AND THE ELEVATION DIFFERENCES BETWEEN ALL POINTS
SEPARATED 10 FEET WERE THEN CALCULATED. ESTIMATES OF THE FLOOR'S FLATNESS AND LEVELNESS F-NUMBERS
FF AND FL) WERE OBTAINED THROUGH A STATISTICAL ANALYSIS OF THESE CALCULATED PROFILE VALUES. SEE
ATTACHED REPORTS FOR INDIVIDUAL MEASUREMENT LINE RESULTS.
8/2/2024DateofPlacement:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Report of Floor Flatness
Observation
FLOOR SURFACE ANALYSIS
Location Surveyed:Slab at C-E/8-12
Martinez, Austin
FF - SPECIFIED OVERALL VALUE:
of1Grapevine, Texas
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
8/5/2024
8/9/2024
Clear
1435921
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 10:48 AM 10:57 AM 11:26 AM 12:12 PM
Yes Yes Yes Yes Yes Yes Yes
Time Drilling was Completed 8:33 AM 9:19 AM 9:58 AM 10:32 AM
3:54 PM
11:57 AM 12:46 PM 1:19 PM 1:55 PM
12:22 PM 1:58 PM 2:07 PM 3:43 PM
12
2:50 PM
Length of Vertical Bars (ft.)31.30
Stirrup Spacing (in.)12 12 12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3 3 3 3
8 8 8
Vertical Bar Size (#)
32.10
666666
31.50
6
Number of Vertical Bars (each)8 8 8 8 8 8
95.00
22.80
31.00
8.00
8.20
95.00
23.00
31.50
31.10
Wet
6 6
8.00 8.00
8.50
30.00 29.60
26
Wet
26
30.50
Wet
26
26
30.00
Wet
25
Wet
26
26
30.10 30.60 31.60
Cased Depth (ft.)
30.50
24
30.60 32.10
26
0.40
30.10
Wet
26
25
Casing Diameter (in.)
0.400.40 0.40 0.40
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
F/6.3 F/8.7F/8.3
Building Pad
F/6.7
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:MaxonDrillingMWBuilders
F/7.3
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
F/9.3 F/9.7 F/10.3
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
95.00 95.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
95.40
22.00
95.40
95.00
24.20
32.50
8.00
8.50
0.40
30.90
9.00
21.90
8.00 8.008.00
95.40
95.00
22.80
30.90
8.00
24 24
95.40 95.40
24
F/7.7
2424
95.40
24
95.40
24 24 24
30.50
95.40 95.40
32.20
95.00 95.0095.00
33.00
8.30 8.60 8.60
23.80 24.40 23.80
8.10
8.00
8.40
31.80 32.60 32.00
0.40 0.40 0.40
32.40
26 26 26
Wet
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25 26 25 26
Wet Wet
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
25 26
26
Wet
7.10
29.30
4.40
8.70
26.60
6.00
5.00
32.20 33.70
94.00
24 24
95.40 99.40
18
F/18.3
2424
99.40
24
95.40
18
95.00 95.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
95.40
27.00
99.40
95.00
26.90
35.60
8.00
8.00
4.40
30.00
8.90
21.10
8.00 7.008.00
95.40
94.00
24.10
30.10
5.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
F/17.7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
F/18.7
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
F/13.7 F.9/17.7F.9/17.5
Building Pad
F/14.3
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
29.60
26
28.60 31.20
26
1.40
30.80
Wet
20
27
Casing Diameter (in.)
0.400.40 4.40 1.40
28.20 30.30
26
Wet
26
28.70
Wet
20
28
29.10
Wet
24
Wet
26
25
28.10 29.20 33.70
95.00
20.60
29.00
8.00
8.40
95.00
26.10
34.10
29.70
Wet
6 6
5.20
Vertical Bar Size (#)6 6 6 6 6
Number of Vertical Bars (each)8 8 8 6 6 8
3
8
Length of Vertical Bars (ft.)31.80
Stirrup Spacing (in.)12 12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 8:30 AM 9:11 AM 10:03 AM 10:50 AM 1:53 PM 2:31 PM 3:19 PM
3:25 PM 3:36 PM 4:12 PM
Yes YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 10:47 AM 10:57 AM 11:06 AM 12:11 PM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
8/7/2024
8/20/2024
Clear
1435923
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
26
8.20 8.50
8.00
29.00
94.00
24
95.40
24
F/15.3
2424
99.40
24
95.40
24
95.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
95.40
20.80
99.40
95.00
20.80
29.00
8.00
8.10
4.40
31.80
9.00
22.80
9.00 8.00
95.40
94.00
21.00
29.50
8.00
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
Drilling Contractor:MaxonDrillingMWBuilders
F/14.7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
F/17.3 F/16.3F/15.7
Building Pad
F/16.7
Technician:
Page Number: 1 of 1
Reyes, Ruben
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
Cased Depth (ft.)
31.40
24
32.40 24.60
26
1.40
27.60
Wet
26
24
Casing Diameter (in.)
0.400.40 4.40 1.40
28.60 28.10
26
Wet
26
28.10
Wet
26
25
29.90
Wet
26
Wet
26
25
31.90 28.80 28.10
95.00
22.80
32.80
8.00
10.00
95.00
21.60
29.70
25.30
Wet
6 6
8.20
Vertical Bar Size (#)6 6 6 6
Number of Vertical Bars (each)8 8 8 6 6 8
Length of Vertical Bars (ft.)
Stirrup Spacing (in.)12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3
Time Drilling was Completed 7:36 AM 8:16 AM 9:40 AM 10:21 AM 12:12 PM 12:45 PM
1:27 PM 1:38 PM
YesYesConcretePlacedSameDay (Yes or
No)
Yes Yes
Time Concrete was Placed 8:55 AM 9:05 AM 10:57 AM 11:02 AM
Yes Yes
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
8/8/2024
8/20/2024
Clear
1435924
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
8/6/2024
8/20/2024
Clear
1435922
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Weather:
Work Order Number:
Concrete Placed Same Day (Yes or
No)
Yes Yes
Time Concrete was Placed 11:00 AM 11:09 AM 12:54 PM 1:02 PM
Yes Yes Yes Yes Yes Yes Yes Yes
Time Drilling was Completed 7:36 AM 8:13 AM 8:54 AM 12:15 PM
4:21 PM 4:35 PM
12:50 PM 9:43 AM 10:23 AM 1:41 PM
2:44 PM 11:21 AM 11:33 AM 2:52 PM
12 12
2:35 PM 3:32 PM
Length of Vertical Bars (ft.)26.00
Stirrup Spacing (in.)12 12 12 12 12 12 12 12
Stirrup Size (#)3 3 3 3 3 3 3 3 3 3
8 8 6 6
Vertical Bar Size (#)
27.80
666666
30.10
6
28.10
Number of Vertical Bars (each)8 8 8 6 6 8
6
95.00
24.10
33.00
8.00
8.90
95.00
23.00
31.50
31.10
Wet
6 6
8.00 5.00 5.00
5.00
28.70 26.40
26
Wet
20
24.20
Wet
20
27
30.40
Wet
26
Wet
26
24
32.10 30.60 28.90
Cased Depth (ft.)
30.90
28
32.60 24.40
26
0.40
31.90
Wet
26
25
Casing Diameter (in.)
0.400.40 5.40 5.40
Remarks:
Project Manager
Ronnie Yeoman
Respectfully Submitted,
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
Service Date:
Report Date:
F/10.7 F/12.3F.3/17.7
Building Pad
F/11.3
Technician:
Page Number: 1 of 1
Reyes, Ruben
Drilling Contractor:MaxonDrillingMWBuilders
F/11.7
Off Genesis Way and Enchanted Way
Grapevine, Texas
F241078
General Contractor:
Pier Identification
121 Commerce Center Addition (Lot 1)Project Number:
F/12.7 F/13.3 F.6/17.5 F.6/17.7
Client:
Project:
Measured Depth From Ground
Level To Top Of Concrete (ft.)
Required Penetration (ft.)
Actual Penetration (ft.)
Pier Diameter (in.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
Building/Structure Identification
95.00 95.00
Condition of Bottom (Wet or Dry)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
95.40
27.30
99.40
94.00
21.40
29.80
8.00
8.50
0.40
31.30
8.30
23.00
8.00 8.005.00
99.40
94.00
21.30
29.60
5.00
24 24
95.40 95.40
24
F.3/17.5
1824
95.40
24
95.40
18 24 18 18
32.30
95.40 97.40 97.40
94.00
31.90
95.00 94.0095.00
28.70 32.00
8.40 8.20 6.00 5.00
26.50 20.50 28.00 27.00
8.30
8.00
5.40
31.50 28.30 30.60 28.60
0.40 0.40 3.40 3.40
34.00
26 26 20 20
Wet
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
UES / Riner Engineering
Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
26 25 25 28 28
Wet Wet Wet
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
September 20, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1463853
UES arrived on site to perform a Pre-Construction Meeting for the above referenced project. Results of the
inspection are as follows:
I Pre-Construction Meeting – 9/20/2024
A UES arrived on site to attend a structural pre-construction meeting. Personnel from MW
Builders and Busy B’s Steel Erectors were in attendance. Topic discussed included
inspection scheduling, structural steel drawings and notes, welder qualifications
requirements, high strength bolting requirements and RFI requirements if steel connections
cannot not be completed per the contract drawing and have to be field modified.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Chris Lalic
CWI#16010691
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1395721
1
Torres, JorgeTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Remarks:
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
05/21/2024
F241078
Off Genesis Way and Enchanted Way
of
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Clear
6/3/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
A-F/18-19
Project Manager
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Respectfully Submitted,
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Respectfully Submitted,
Project Manager
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Partly Cloudy
6/12/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Remarks:
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
06/03/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/14.0-15.3
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1402028
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1403058
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
6/5/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/12.5-14.0
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Cloudy
6/12/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Respectfully Submitted,
Project Manager
Remarks:
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Respectfully Submitted,
Project Manager
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Clear
6/12/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Remarks:
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
06/08/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/11.0-12.5
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1404890
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Respectfully Submitted,
Test results on this report meet project specifications.
Project Manager
Remarks:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Partly Cloudy
6/19/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Client:
The technician observed proof rolling operations of the subgrade for the following area.
6/11/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/9.5-11.0
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1406504
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Service Date:
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1408285
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
6/14/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/8.5-9.5
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Clear
6/21/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Project Manager
Remarks:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Respectfully Submitted,
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1409566
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
6/17/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/7.5-8.5
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Partly Cloudy
6/21/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Project Manager
Remarks:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Respectfully Submitted,
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1411144
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
6/19/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/6.0-7.5
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Clear
6/26/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Project Manager
Remarks:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Respectfully Submitted,
Test results on this report meet project specifications.
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1412299
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
6/20/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/4.5-6.0
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Partly Cloudy
6/26/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Project Manager
Remarks:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Respectfully Submitted,
Test results on this report meet project specifications.
Proof Rolling
Observation Report
Grapevine, Texas Page Number:
1417683
1
Reyes, RubenTechnician:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
1
121 Commerce Center Addition (Lot 1)
Service Date:Client:
The technician observed proof rolling operations of the subgrade for the following area.
6/29/2024
F241078
Off Genesis Way and Enchanted Way
of
Building Pad: A-F/1.0-2.0
Any soft areas where rutting or pumping occurred was removed and replaced with suitable fill.
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Project:
Report Date:
Weather:Clear
7/19/2024
The UES Technician traveled to the above referenced site to observe on-going work and perform field testing as requested.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Work Order Number:
Project Number:
New York, NY 10019
Project Manager
Remarks:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
UES / Riner Engineering
Respectfully Submitted,
S0.04
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
12/18/2023
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Syed, Komail
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1490354
1 of 1
Clear
11/11/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Dumpster Pad NE corner of Building Pad
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
11/01/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
S0.06
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
N/A
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Lujan, Jacob
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1491980
1 of 1
Clear
11/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Leave Outs A/11-A/19, A/19-F/19, F/11-F19
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S0.06
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
11/06/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
This image cannot currently be displayed.
Grade Beam / Column Size
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
08/14/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Tilt Walls 21-52
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
PD-2
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1442387
1 of 1
Clear
8/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
5/22/2024
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Eaton, Robert
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
PNL-4 - PNL-8
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
PNL-10
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
5/22/2024
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Vasquez, David
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1450444
1 of 1
Clear
9/13/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Tilt Wall Panels (11 Panels): P59-P69 on Block 1, Lot 1
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
08/28/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
X
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X
Cable/Tendon Count & Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
PNL-1 to PNL-14
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
5/22/2024
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Guerrero, Victor
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1461457
1 of 1
Clear
9/24/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Tilt Wall Panels 1, 2, 3, 5, 41, 42, 43, 44, 45, 55, 56, 57, 89, 90, 98, 102 and 103
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
N/A
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
09/16/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
108
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
12/18/2023
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Mitchell, Ebony
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1498018
1 of 1
Clear
11/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S4.01
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
11/15/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
X
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
C15.0
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Grade Reinforcement
Number of Reinforcement
N/A
4/26/2024
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Proper Placement
Reinforcement Tied Properly
X
X
1 of 1
Clear
8/28/2024
Off Genesis Way and Enchanted Way
F241078
Technician:Mendoza, Andrew
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving: Firelane North and East of Building
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
08/13/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
1440847
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
Page Number:
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Item Observed
Bar Length & Spacing
UES / Riner Engineering
Correct
X
X
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Grade Beam / Column Size
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Correct Splicing
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Sheathing
X
X
X
X
Grade Beam / Column Size
Proper Cover
Proper Support
Dowels in Place
Respectfully Submitted,
Remarks:
Item Observed
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/ACorrectNotCorrect
Reinforcement Clean
Form Clean
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
Project Manager
UES / Riner Engineering
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
EAST SIDE PARKING LOT, S. APPROACHMENT, S.B. ENCHANTMENT WAY,NB.300' +/-
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
Correct Splicing
Correct
X
X
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
8/15/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, New York 10019
Work Order Number:
Project Number:
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Detail Sheet:•
Plan Sheet:
Grapevine, Texas Page Number:
1442393
1 of 1
Clear
8/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:Alvarado, Henry
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
C 15.0
C 15.0
11/13/2023
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct Item Observed
Stirrup Size
Drawings Approved
Observation Information
X
X
S0.05
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
11/17/2023
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
McClure, Zachary
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1447504
1 of 1
Clear
9/9/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving on the East end of the building West from Enchanted Way
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
8/23/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
S-6
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
5/6/2024
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Kemble, Robert
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1450451
1 of 1
Partly Cloudy
9/9/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Two TxDOT turn in lanes off the East side of Frontage Rd. The South West Corner and the Mid-West Side of Project
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S-6
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
08/27/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
X
Item Observed
X
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X
Cable/Tendon Count & Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Sheathing
X
X
X
X
Grade Beam / Column Size
Proper Cover
Proper Support
Dowels in Place
Respectfully Submitted,
Remarks:
Item Observed
Bar Length & Spacing
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/ACorrectNotCorrect
Reinforcement Clean
Form Clean
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
Project Manager
UES / Riner Engineering
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Sidewalk
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
Correct Splicing
Correct
X
X
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
9/11/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, New York 10019
Work Order Number:
Project Number:
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Detail Sheet:•
Plan Sheet:
Grapevine, Texas Page Number:
1458038
1 of 1
Clear
9/24/2024
Off Genesis Way and Enchanted Way
F241078
Technician:Mendoza, Andrew
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
C15.0
C17.7
1/9/2020
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct Item Observed
Stirrup Size
Drawings Approved
Observation Information
X
X
Grade Beam / Column Size
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
09/12/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving: Parking lot on the westside area 6 pour #6
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1458039
1 of 1
Overcast
9/24/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
4/26/2024
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Henn, Michael
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
C15, C15.1
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
Grade Beam / Column Size
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X
Cable/Tendon Count & Spacing
X
Cable/Tendon Drape
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
10/21/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving: West Side of Building
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1482869
1 of 1
Clear
11/1/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
4/26/2024
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Rosse, Joel
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
C15.0
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
Remarks:
Project Number:F241078
1:30 PM
Technician:Mitchell, Ebony
Reinforcing Steel Inspection
Leaveouts
Off Genesis Way and Enchanted Way
Time
Notified:
UES / Riner Engineering
Client:
Project:
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
11/4/2024
121 Commerce Center Addition (Lot 1)
Service Date:
Report Date:
1489509WorkOrderNumber:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Cancellation Report
Grapevine, Texas Page Number:
Ronnie Yeoman
Project Manager
Respectfully Submitted,
1
Reason for
Cancellation:
Upon notification of the cancellation, the engineering representative returned to the Fort Worth Office.
Contractor was not ready
Weather:
Scheduled
Service:
A UES engineering representative traveled to the above referenced project to observe ongoing work and perform field services as scheduled.
Area of Work:
of 1
Clear
11/11/2024
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
C15.0
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
4/26/2024
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Rosse, Joel
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1501436
1 of 1
Clear
11/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving: South end of the building
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
11/22/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X
Cable/Tendon Count & Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
C15.1
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
4/26/2024
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Iyamuremye, Yassin
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1504218
1 of 1
Clear
12/3/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving East side phase 1
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
11/25/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
X
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
C15.0
Sheathing
X
X
X
Cable/Tendon Count &
Spacing
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
PT Drawings
X
Cable/Tendon Drape
X
Respectfully Submitted,
N/A
X
Correct Splicing
Correct
X
X
Grade Beam / Column Size
Bar Length & Spacing
X
X
X
Project Manager
UES / Riner Engineering
Remarks:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving on the eastside of loading dock
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
Observation Information
X
1
Clear
12/5/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)Project:
Item Observed
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
Drawings Approved
Size of Reinforcement
X
X
X
Stirrup Spacing
Not Correct Not Correct
Reinforcement Clean
Form Clean
Item ObservedCorrectN/A
C15.0
12/18/2023
Henn, Michael
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas Page Number:
1506117
1 of
Date:
12/02/2024ServiceDate:Client:GTIS Acquisitions, LLC
S4.02/112-114
2/18/2023
Alvarado, Henry
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas Page Number:
1442803
1 of
Date:
X
X
X
Stirrup Spacing
Not Correct Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
Drawings Approved
Observation Information
X
1
Clear
8/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
08/16/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
PIER CAPS WEST SIDE OF PAD, 1/D.2,D.6, B.4,B.9, A.5,-A.9
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Ronnie Yeoman
Project Manager
UES / Riner Engineering
Remarks:
Item Observed
Bar Length & Spacing
X
X
Size of Reinforcement
N/A N/A
X
Correct Splicing
Correct
X
X
Respectfully Submitted,
Grade Beam / Column Size
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
PT Drawings
X
Cable/Tendon Drape
X
S4.02,S4.03
X
Sheathing
X
X
Cable/Tendon Count &
Spacing
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
S4.02
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
12/19/2023
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Syed, Komail
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1465782
1 of 1
Clear
9/30/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Pier Caps: A/1, A/1.5, A/2, A/11.8, A/12.2, A/12.6, A/18.1, A/18.5, A/19
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S1.02
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
09/23/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
S4.01 and S4.02
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
12/18/2023
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Kemble, Robert
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1450144
1 of 1
Partly Cloudy
9/9/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Pier Caps, 12 Pier Caps, North (1/A-F) and West Side (10-19/A) of Building Pad
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S1.01
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
08/27/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
X
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X
Cable/Tendon Count & Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
117 Ramp section
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
12/18/2024
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Mitchell, Ebony
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1485288
1 of 1
Clear
11/1/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S4.02
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
10/24/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
C15.0
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
11/13/2023
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Syed, Komail
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1509326
1 of 1
Clear
12/17/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Sidewalk on North Side of the Building (Along Genesis Way)
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
12/06/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
C15.0
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
11/12/2024
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Iyamuremye, Yassin
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1510877
1 of 1
Clear
12/17/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Paving around Sidewalk: Genesis Way
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
12/09/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
X
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
PNL-1/PNL-14
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
7/2/2024
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Kemble, Robert
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1447505
1 of 1
Clear
9/9/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
East Side of Slab-on-Grade, Second Lift, Sections 64-91
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S1.0
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
08/26/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
X
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X
Cable/Tendon Count & Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
Grade Beam / Column Size
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X Cable/Tendon Count &
Spacing
X
Cable/Tendon Drape
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
01/14/2025ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Slab-on-Grade: F/19
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
S0.06
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1525904
1 of 1
Cloudy
1/28/2025
Off Genesis Way and Enchanted Way
F241078
Technician:
12/18/2023
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Karege, Patrick
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
S0.06
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Inspector’s Signature: Teresa Medina
Project Manager
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
PRELIMINARY REPORT OF
STRUCTURAL STEEL INSPECTION
Client: GTIS Acquisitions, LLC Date: 10/18/2024
PM: R YEOMAN
Project: 121 Commerce Center Addition (Lot 1) Project No: F241078
WO 1481756
Page No: 1 of 2
Service: Perform Structural Steel Inspection as detailed below:
Drawings Utilized: Structural
Locations and Items Inspected:
A representative of UES arrived on site to perform a Visual Structural Steel Inspection /Reinspection for
the above referenced project. Results of the inspection are as follows:
Discrepancies, if any, are noted in BOLD
1) Welder Qualifications were reviewed for compliance AWS D1.1
2) Joist Girder to Column Welded Connections, Joist Girder to Panel Welded Connections and Joist to
Joist Girder Welded Connections - lines A to F & 19 to 13 – sheets S2.02 & S2.01
A) Re-inspected item 1(B) from report 1477185 referencing the joist to joist girder welded
connections. Reference details 211/S5.01 and 209/S5.01. Bolts were not installed in slotted holes in the
joist seats. Per the ERECTOR NOTE on joist drawing sheet J1.0, bolts are required in joist seats with
slotted holes. When bolts cannot be installed, or are removed, additional weld must be placed in slotted
holes. At reinspected locations - additional welds have been added at the joist seats as required. This
clears item 1(B) from report 1477185.
B) Joist girder to column welded connections in the lines 14 to 18 & B to E were inspected per
detail 209/S5.01. At inspected locations , the joist girder to column connections appeared to be per detail
and visually acceptable.
C) Joist girder to panel connections in lines 19 & B to E were inspected per detail 207/S5.01.
Inspected joist girder to panel embed appeared to be completed per detail and visually acceptable.
NOTE(1): The ¾”x6”x6” joist girder stabilizer plates – lines 19 & B to E were not installed at time
of inspection. See detail 207/S5.01
NOTE(2): The welding of the deck support angles in lines 19 & A to F, lines 19 to 13 & F and lines
A & 13 to 19 was incomplete at time of inspection. Work was in progress. See details 202/S5.01,
203/S5.01, 205/S5.01, 213/S5.01 and 214/S5.01.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
NOTE(3): The bridging terminations along line 19 were incomplete at time of inspection.
Reference New Millennium sheet J2.3 and detail 202/S5.01.
3) Precast Panel to Foundation Welded Connections – lines F to A & 1, lines A & 1 to 19, lines 19 & A
to F and lines F & 1 to 19 - sheets S1.01 & S1.02
A) Connections were inspected /reinspected per details 103/S4.01 and 101/S4.01. Panel
P101 was missing a connection plate on one side . The pier embed is misaligned and this
connection will require an RFI. Panel 92 – lines 1&A – is missing (1) of (2) connections plates . It
was noted on 10/14/24 that the connections plates for panels P24, P23, P25 and P51 have been
spliced. The spliced connection plates at panel P23 have been addressed. The spliced
connections plates for panels P24, P25 and P51 still requir e corrective action. The non-compliant
welds for the connections plate at panel P3 have been repaired. The missing connections plates
for panel P11 and P12 (noted on report 1477185) have been added . See item 2(A) on report
1477185.
4) HSS(10”x10) Colum to Column Sleeve Welded Connections – lines 8 to 18 & A to F – sheets S1.01
and S1.02
A) Inspected connections in the referenced lines have been completed per the contract drawing
and details. Reference details 102/S4.01, 10/S0.04 and detail “A” on sheet AR102.
5) Joist To Precast Panel Welded Connections - lines A to F & 19 to 13 – sheets S2.02 & S2.01 – item
1(A) – item 1(A) – Report 1477185
A Along lines F & 18 to 13 – the joist to joist seat connections were inspected per detail 205/S5.01.
Reference erection detail 2/E3002. The inspected joists were not fully bearing on the joist seats at the
precast panel along line F. Gaps were visible. Pe r RFI #33 – “The reaction point of the joist is at the
vertical peg. If the required end anchorage welds can be achieved in that area of the seat, the gap
acceptable. Otherwise, a shim plate can be used if necessary.” RFI response is attached to this report.
It was noted that bolts were not installed in slotted holes of the joist seats. Per the ERECTOR
NOTE on the joist drawing, bolts are required in joist seats with slotted holes. When bolts cannot
be installed, or are removed, additional weld must be placed in slotted holes. See attached detail.
6) Joist To Precast Panel Welded Connections – Panel P34 & P34 – sheets S2.02 & S2.01 – item1(C)
item 1(C) – Report 1477185
A) The joist seat to precast panel at panel joist connection at panels P35 & P34 – was
incomplete at time of inspection. The seat was not welded, and anchor bolts were not installed.
Slotted holes in the joist seat hit at the panel joint. See detail 206/S5.01.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Inspector’s Signature: Teresa Medina
Project Manager
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
PRELIMINARY REPORT OF
STRUCTURAL STEEL INSPECTION
Client: GTIS Acquisitions, LLC Date: 10/14/2024
PM: R YEOMAN
Project: 121 Commerce Center Addition (Lot 1) Project No: F241078
WO 1477185
Page No: 1 of 14
Service: Perform Structural Steel Inspection as detailed below:
Drawings Utilized: Structural
Locations and Items Inspected:
A representative of UES arrived on site to perform a Visual Structural Steel Inspection for the above
referenced project. Results of the inspection are as follows:
Discrepancies, if any, are noted in BOLD
1) Joist To Precast Panel Welded Connections and Joist to Joist Girder Welded Connections lines A to
F & 19 to 13 – sheets S2.02 & S2.01
A Along lines F & 18 to 13 – the joist to joist seat connections were inspected per detail
205/S5.01. Reference erection detail 2/E3002. The inspected joists were not fully bearing on the
joist seats at the precast panel along line F. Gaps were visible. Bolts were not installed in
slotted holes of the joist seats. Per the ERECTOR NOTE on the joist drawing, bolts are required
in joist seats with slotted holes. When bolts cannot be installed, or are removed, additional
weld must be placed in slotted holes. Refer bearing issue to EOR. See attached pictures for
clarification.
B) Joist to joist girder welded connections were inspected per details 211/S5.01 and
209/S5.01. Bolts were not installed in slotted holes in the joist seats. Per the ERECTOR NOTE
on the joist drawing, bolts are required in joist seats with slotted holes. When bolts cannot be
installed, or are removed, additional weld must be placed in slotted holes. See attached picture
for clarification
C) The joist seat to precast panel at panel joist connection at panels P35 & P34 – was
incomplete at time of inspection. The seat was not welded, and anchor bolts were not installed.
Slotted holes in the joist seat hit at panel joint. See attached pictures for clarification. See detail
206/S5.01.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
2) Precast Panel to Foundation Welded Connections – lines F to A & 1 , A & 1 to 19 and lines 19 & A to F –
sheets S1.01 & S1.02
A) Connections were inspected per details 103/S4.01 and 101/S4.01. Panel P101 was missing a
connection plate on one side, The welds for the connections plate for panel P3 were slagged over and
the weld at foundation did not appear to be 6” long. Panel P11 was missing the connection plate on
one side. Panel P12 was missing the connection plate on one side. It was noted that the connections
plates for panel P24, P23, P25 and P51 had been spliced. See attached pictures.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Inspector’s Signature: Teresa Medina
Project Manager
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
PRELIMINARY REPORT OF
STRUCTURAL STEEL INSPECTION
Client: GTIS Acquisitions, LLC Date: 10/28/2024
PM: R YEOMAN
Project: 121 Commerce Center Addition (Lot 1) Project No: F241078
WO 1485293
Page No: 1 of 3
Service: Perform Structural Steel Inspection as detailed below:
Drawings Utilized: Structural
Locations and Items Inspected:
A representative of UES arrived on site to perform a Visual Structural Steel Inspection/Reinspection
for the above referenced project. Results of the inspection are as follows:
Discrepancies, if any, are noted in BOLD
NOTE(1): The ¾”x6”x6” joist girder stabilizer plates – lines 19 & B to E and lines 1 & B to E
were not installed at time of inspection. See detail 207/S5.01 and NOTE(1) from report dated
10/18/24.
NOTE(2): The welding of the deck support angles in lines 1 & A to F, lines 1 to 7 & F and lines
1 to 7 & A was incomplete at time of inspection. Work was in progress. See details 202/S5.01,
203/S5.01, 205/S5.01, 213/S5.01 and 214/S5.01.
NOTE(3): The bridging terminations along line 19 and along line 1 were incomplete at time of
inspection. See NOTE(3) from report dated 10/18/24
NOTE(4): The deck support angles at the expansion joint in lines 7/A and 7/F have not been
installed per details 216/S5.01 and 217/S5.01. Deck ledger angles do not have long slotted
holes in them. Screw anchors, in what appears to be standard size holes, were used to attach
the angles to the precast panels. Details call for long slotted holes in the deck ledger angle and
diameter threaded studs welded to the precast panel embeds. Refer to EOR.
NOTE(5): The joist seat to precast panel at panel joist welded connection - panels P34 & P34 -
is incomplete. See detail 206/S5.01, item 1(C) from report dated 10/18/24 and item 1(C) from
report dated 10/14/24
NOTE(6): A325 bolted connections, diagonal brace welded connections, column anchor bolt
connections, beam to panel connections, and joist girder to beam connections (sliding side
and fixed side) at the expansion joints in lines 7 and 13 need to be inspected.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
1) HSS(10”x10) Colum to Column Sleeve Welded Connections – lines 2 to 8 & B to E – sheet S1.01
A) Inspected connections in the referenced lines have been completed per the contract drawing
and details. Reference details 102/S4.01, 10/S0.04 and detail “A” on sheet AR102.
2) Joist To Precast Panel Welded Connections - lines A to F & 7 to 1 – sheets S2.02 & S2.01 – item
1(A) – item 1(A) – Report 1477185
A The joist to joist seat and joist seat to panel welded connections in the referenced lines were
inspected per the structural drawings and RFI #33. *It was noted that bolts were not installed in
joist seats fabricated with slotted holes. Per the ERECTOR NOTE on the joist drawing, bolts are
required in joist seats with slotted holes. When bolts cannot be installed, or are removed,
additional weld must be placed in slotted holes. Additional weld was being added in the slotted
holes at time of inspection. Other than noted above, inspected connections along line A & 1 to 7
were welded out per plan and the inspected connections along lines F & 1 to 7 were welded per plan
and were compliant per RFI #33
3) Joist to Joist Girder , Joist Girder to Column and Joist Girder to Panel Welded Connections – lines
A to F & 1 to 7
A) The joist to joist girder welded connections in the referenced lines were inspected per the
contract drawings. Bolts were not installed in slotted holes in the joist seats. Per the ERECTOR NOTE
on joist drawing sheet J1.0, bolts are required in joist seats with slotted holes. When bolts cannot be
installed, or are removed, additional weld must be placed in slotted holes. At inspected locations -
additional welds have been added at the joist seats as required.
B) Joist girder to column welded connections in the lines 2 to 7 & B to E were inspected per
detail 209/S5.01. At inspected locations, the joist girder to column connections appeared to be per
detail and visually acceptable.
C) Joist girder to panel connections in lines 19 & B to E were inspected per details 208/S5.01
and 207/S5.01. Inspected joist girder to panel embed connections appeared to be completed per detail
and were visually acceptable.
4) Type 1.5 Roof Decking – lines 7 to 13 & A to F – sheets S2.02, D2.1, D2.2 and D1.0
A) The fastening of the roof decking in the referenced lines was inspected per the schedule on
NEW MILLENNIUM sheet D1.0. Inspected decking was fastened to the steel supports with HILTI
powder actuated fasteners on a 36/7 pattern. Inspected side laps were fastened with TEK screw on
24” centers max.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Inspector’s Signature: Teresa Medina
Project Manager
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
PRELIMINARY REPORT OF
STRUCTURAL STEEL INSPECTION
Client: GTIS Acquisitions, LLC Date: 10/18/2024
PM: R YEOMAN
Project: 121 Commerce Center Addition (Lot 1) Project No: F241078
WO 1481756
Page No: 1 of 2
Service: Perform Structural Steel Inspection as detailed below:
Drawings Utilized: Structural
Locations and Items Inspected:
A representative of UES arrived on site to perform a Visual Structural Steel Inspection /Reinspection for
the above referenced project. Results of the inspection are as follows:
Discrepancies, if any, are noted in BOLD
1) Welder Qualifications were reviewed for compliance AWS D1.1
2) Joist Girder to Column Welded Connections, Joist Girder to Panel Welded Connections and Joist to
Joist Girder Welded Connections - lines A to F & 19 to 13 – sheets S2.02 & S2.01
A) Re-inspected item 1(B) from report 1477185 referencing the joist to joist girder welded
connections. Reference details 211/S5.01 and 209/S5.01. Bolts were not installed in slotted holes in the
joist seats. Per the ERECTOR NOTE on joist drawing sheet J1.0, bolts are required in joist seats with
slotted holes. When bolts cannot be installed, or are removed, additional weld must be placed in slotted
holes. At reinspected locations - additional welds have been added at the joist seats as required. This
clears item 1(B) from report 1477185.
B) Joist girder to column welded connections in the lines 14 to 18 & B to E were inspected per
detail 209/S5.01. At inspected locations , the joist girder to column connections appeared to be per detail
and visually acceptable.
C) Joist girder to panel connections in lines 19 & B to E were inspected per detail 207/S5.01.
Inspected joist girder to panel embed appeared to be completed per detail and visually acceptable.
NOTE(1): The ¾”x6”x6” joist girder stabilizer plates – lines 19 & B to E were not installed at time
of inspection. See detail 207/S5.01
NOTE(2): The welding of the deck support angles in lines 19 & A to F, lines 19 to 13 & F and lines
A & 13 to 19 was incomplete at time of inspection. Work was in progress. See details 202/S5.01,
203/S5.01, 205/S5.01, 213/S5.01 and 214/S5.01.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
NOTE(3): The bridging terminations along line 19 were incomplete at time of inspection.
Reference New Millennium sheet J2.3 and detail 202/S5.01.
3) Precast Panel to Foundation Welded Connections – lines F to A & 1, lines A & 1 to 19, lines 19 & A
to F and lines F & 1 to 19 - sheets S1.01 & S1.02
A) Connections were inspected /reinspected per details 103/S4.01 and 101/S4.01. Panel
P101 was missing a connection plate on one side . The pier embed is misaligned and this
connection will require an RFI. Panel 92 – lines 1&A – is missing (1) of (2) connections plates . It
was noted on 10/14/24 that the connections plates for panels P24, P23, P25 and P51 have been
spliced. The spliced connection plates at panel P23 have been addressed. The spliced
connections plates for panels P24, P25 and P51 still requir e corrective action. The non-compliant
welds for the connections plate at panel P3 have been repaired. The missing connections plates
for panel P11 and P12 (noted on report 1477185) have been added . See item 2(A) on report
1477185.
4) HSS(10”x10) Colum to Column Sleeve Welded Connections – lines 8 to 18 & A to F – sheets S1.01
and S1.02
A) Inspected connections in the referenced lines have been completed per the contract drawing
and details. Reference details 102/S4.01, 10/S0.04 and detail “A” on sheet AR102.
5) Joist To Precast Panel Welded Connections - lines A to F & 19 to 13 – sheets S2.02 & S2.01 – item
1(A) – item 1(A) – Report 1477185
A Along lines F & 18 to 13 – the joist to joist seat connections were inspected per detail 205/S5.01.
Reference erection detail 2/E3002. The inspected joists were not fully bearing on the joist seats at the
precast panel along line F. Gaps were visible. Pe r RFI #33 – “The reaction point of the joist is at the
vertical peg. If the required end anchorage welds can be achieved in that area of the seat, the gap
acceptable. Otherwise, a shim plate can be used if necessary.” RFI response is attached to this report.
It was noted that bolts were not installed in slotted holes of the joist seats. Per the ERECTOR
NOTE on the joist drawing, bolts are required in joist seats with slotted holes. When bolts cannot
be installed, or are removed, additional weld must be placed in slotted holes. See attached detail.
6) Joist To Precast Panel Welded Connections – Panel P34 & P34 – sheets S2.02 & S2.01 – item1(C)
item 1(C) – Report 1477185
A) The joist seat to precast panel at panel joist connection at panels P35 & P34 – was
incomplete at time of inspection. The seat was not welded, and anchor bolts were not installed.
Slotted holes in the joist seat hit at the panel joint. See detail 206/S5.01.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Inspector’s Signature: Teresa Medina
Project Manager
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
PRELIMINARY REPORT OF
STRUCTURAL STEEL INSPECTION
Client: GTIS Acquisitions, LLC Date: 10/28/2024
PM: R YEOMAN
Project: 121 Commerce Center Addition (Lot 1) Project No: F241078
WO 1485293
Page No: 1 of 3
Service: Perform Structural Steel Inspection as detailed below:
Drawings Utilized: Structural
Locations and Items Inspected:
A representative of UES arrived on site to perform a Visual Structural Steel Inspection/Reinspection
for the above referenced project. Results of the inspection are as follows:
Discrepancies, if any, are noted in BOLD
NOTE(1): The ¾”x6”x6” joist girder stabilizer plates – lines 19 & B to E and lines 1 & B to E
were not installed at time of inspection. See detail 207/S5.01 and NOTE(1) from report dated
10/18/24.
NOTE(2): The welding of the deck support angles in lines 1 & A to F, lines 1 to 7 & F and lines
1 to 7 & A was incomplete at time of inspection. Work was in progress. See details 202/S5.01,
203/S5.01, 205/S5.01, 213/S5.01 and 214/S5.01.
NOTE(3): The bridging terminations along line 19 and along line 1 were incomplete at time of
inspection. See NOTE(3) from report dated 10/18/24
NOTE(4): The deck support angles at the expansion joint in lines 7/A and 7/F have not been
installed per details 216/S5.01 and 217/S5.01. Deck ledger angles do not have long slotted
holes in them. Screw anchors, in what appears to be standard size holes, were used to attach
the angles to the precast panels. Details call for long slotted holes in the deck ledger angle and
diameter threaded studs welded to the precast panel embeds. Refer to EOR.
NOTE(5): The joist seat to precast panel at panel joist welded connection - panels P34 & P34 -
is incomplete. See detail 206/S5.01, item 1(C) from report dated 10/18/24 and item 1(C) from
report dated 10/14/24
NOTE(6): A325 bolted connections, diagonal brace welded connections, column anchor bolt
connections, beam to panel connections, and joist girder to beam connections (sliding side
and fixed side) at the expansion joints in lines 7 and 13 need to be inspected.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
1) HSS(10”x10) Colum to Column Sleeve Welded Connections – lines 2 to 8 & B to E – sheet S1.01
A) Inspected connections in the referenced lines have been completed per the contract drawing
and details. Reference details 102/S4.01, 10/S0.04 and detail “A” on sheet AR102.
2) Joist To Precast Panel Welded Connections - lines A to F & 7 to 1 – sheets S2.02 & S2.01 – item
1(A) – item 1(A) – Report 1477185
A The joist to joist seat and joist seat to panel welded connections in the referenced lines were
inspected per the structural drawings and RFI #33. *It was noted that bolts were not installed in
joist seats fabricated with slotted holes. Per the ERECTOR NOTE on the joist drawing, bolts are
required in joist seats with slotted holes. When bolts cannot be installed, or are removed,
additional weld must be placed in slotted holes. Additional weld was being added in the slotted
holes at time of inspection. Other than noted above, inspected connections along line A & 1 to 7
were welded out per plan and the inspected connections along lines F & 1 to 7 were welded per plan
and were compliant per RFI #33
3) Joist to Joist Girder , Joist Girder to Column and Joist Girder to Panel Welded Connections – lines
A to F & 1 to 7
A) The joist to joist girder welded connections in the referenced lines were inspected per the
contract drawings. Bolts were not installed in slotted holes in the joist seats. Per the ERECTOR NOTE
on joist drawing sheet J1.0, bolts are required in joist seats with slotted holes. When bolts cannot be
installed, or are removed, additional weld must be placed in slotted holes. At inspected locations -
additional welds have been added at the joist seats as required.
B) Joist girder to column welded connections in the lines 2 to 7 & B to E were inspected per
detail 209/S5.01. At inspected locations, the joist girder to column connections appeared to be per
detail and visually acceptable.
C) Joist girder to panel connections in lines 19 & B to E were inspected per details 208/S5.01
and 207/S5.01. Inspected joist girder to panel embed connections appeared to be completed per detail
and were visually acceptable.
4) Type 1.5 Roof Decking – lines 7 to 13 & A to F – sheets S2.02, D2.1, D2.2 and D1.0
A) The fastening of the roof decking in the referenced lines was inspected per the schedule on
NEW MILLENNIUM sheet D1.0. Inspected decking was fastened to the steel supports with HILTI
powder actuated fasteners on a 36/7 pattern. Inspected side laps were fastened with TEK screw on
24” centers max.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
CONTINUATION STRUCTURAL STEEL INSPECTION
Inspector’s Signature:
Client/Contractor Copied
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or
observed, and are not indicative of the qualities of apparently identical or similar specimens.
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
September 20, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1463853
UES arrived on site to perform a Pre-Construction Meeting for the above referenced project. Results of the
inspection are as follows:
I Pre-Construction Meeting – 9/20/2024
A UES arrived on site to attend a structural pre-construction meeting. Personnel from MW
Builders and Busy B’s Steel Erectors were in attendance. Topic discussed included
inspection scheduling, structural steel drawings and notes, welder qualifications
requirements, high strength bolting requirements and RFI requirements if steel connections
cannot not be completed per the contract drawing and have to be field modified.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Chris Lalic
CWI#16010691
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
October 18, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1481756
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Welder Qualifications were reviewed for compliance AWS D1.1
II Joist Girder to Column Welded Connections, Joist Girder to Panel Welded Connections and Joist to
Joist Girder Welded Connections - lines A to F & 19 to 13 – sheets S2.02 & S2.01
A Re-inspected item 1(B) from report 1477185 referencing the joist to joist girder welded
connections. Reference details 211/S5.01 and 209/S5.01. Bolts were not installed in slotted
holes in the joist seats. Per the ERECTOR NOTE on joist drawing sheet J1.0, bolts are
required in joist seats with slotted holes. When bolts cannot be installed, or are removed,
additional weld must be placed in slotted holes. At re-inspected locations - additional welds
have been added at the joist seats as required. This clears item 1(B) from report 1477185.
B Joist girder to column welded connections in the lines 14 to 18 & B to E were inspected per
detail 209/S5.01. At inspected locations, the joist girder to column connections appeared to
be per detail and visually acceptable.
C Joist girder to panel connections in lines 19 & B to E were inspected per detail 207/S5.01.
Inspected joist girder to panel embed appeared to be completed per detail and visually
acceptable.
NOTE(1): The ¾”x6”x6” joist girder stabilizer plates – lines 19 & B to E were not installed at
time of inspection. See detail 207/S5.01
NOTE(2): The welding of the deck support angles in lines 19 & A to F, lines 19 to 13 & F and
lines A & 13 to 19 was incomplete at time of inspection. Work was in progress. See details
202/S5.01, 203/S5.01, 205/S5.01, 213/S5.01 and 214/S5.01
NOTE(3): The bridging terminations along line 19 were incomplete at time of inspection.
Reference New Millennium sheet J2.3 and detail 202/S5.01.
III Precast Panel to Foundation Welded Connections – lines F to A & 1, lines A & 1 to 19, lines 19 & A
to F and lines F & 1 to 19 - sheets S1.01 & S1.02
A Connections were inspected/re-inspected per details 103/S4.01 and 101/S4.01. Panel
P101 was missing a connection plate on one side. The pier embed is misaligned and
this connection will require an RFI. Panel 92 – lines 1&A – is missing (1) of (2)
connections plates. It was noted on 10/14/24 that the connections plates for panels
P24, P23, P25 and P51 have been spliced. The spliced connection plates at panel P23
have been addressed. The spliced connections plates for panels P24, P25 and P51
still require corrective action. The non-compliant welds for the connections plate at
panel P3 have been repaired. The missing connections plates for panel P11 and P12
noted on report 1477185) have been added. See item 2(A) on report 1477185.
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
IV HSS(10”x10) Colum to Column Sleeve Welded Connections – lines 8 to 18 & A to F – sheets S1.01
and S1.02
A Inspected connections in the referenced lines have been completed per the contract drawing
and details. Reference details 102/S4.01, 10/S0.04 and detail “A” on sheet AR102.
V Joist To Precast Panel Welded Connections - lines A to F & 19 to 13 – sheets S2.02 & S2.01 – item
1(A) – item 1(A) – Report 1477185
A Along lines F & 18 to 13 – the joist to joist seat connections were inspected per detail
205/S5.01. Reference erection detail 2/E3002. The inspected joists were not fully bearing on
the joist seats at the precast panel along line F. Gaps were visible. Per RFI #33 – “The
reaction point of the joist is at the vertical peg. If the required end anchorage welds can be
achieved in that area of the seat, the gap acceptable. Otherwise, a shim plate can be used
if necessary.” RFI response is attached to this report.*It was noted that bolts were not
installed in slotted holes of the joist seats. Per the ERECTOR NOTE on the joist
drawing, bolts are required in joist seats with slotted holes. When bolts cannot be
installed, or are removed, additional weld must be placed in slotted holes. See
attached detail.
VI Joist To Precast Panel Welded Connections – Panel P34 & P34 – sheets S2.02 & S2.01 – item1(C)
item 1(C) – Report 1477185
A The joist seat to precast panel at panel joist connection at panels P35 & P34 – was
incomplete at time of inspection. The seat was not welded, and anchor bolts were not
installed. Slotted holes in the joist seat hit at the panel joint. See detail 206/S5.01.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Chris Lalic
CWI#16010691
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
October 21, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1482870
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Joist Bridging Welded Connections, Precast Panel to Foundation Welded Connections, Deck
Support Angles Welded Connections, and Joist Seat Welded Connections – lines A to F & 13 -19.
A The joist bridging welded connections were inspected per the provided contract drawings.
No noted discrepancies at time of inspection.
B The deck support angles in the referenced lines were inspected per the detail sheet S5.01.
No noted discrepancies at time of inspection. This clears note (2) from report 1481756.
C Joist seat welded connections were inspected per RFI #33. No noted discrepancies at time
of inspection.
D Precast Panel to foundation welded connections – panels P23 & P24 (see item 3(A) from
report 1481756) were repaired and visually acceptable at time of inspection.
II The Roof Decking was incomplete and still in progress.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
October 22, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1483753
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Decking and Precast Panel to Foundation Welded Connections lines A to F & 13 to 19.
A The fastening of the decking was inspected per sheet D1.0. The decking was fastened with
HILTI screws on a 36/7 pattern. Inspected side laps were fastened with (3) TEK screws per
span. Any discrepancies found during the inspection were addressed during the inspection.
B The precast panel to foundation welded connections was inspected per the contract
drawings. The following were found to be visually acceptable at time of inspection: panels
P92, P25, P51, and P53. Panel 101 was inspected per the fix provided by RFI #35. No
discrepancies were noted at time of inspection. This clears item #3(A) from report 1481756.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
October 28, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1485293
UES arrived on site to perform a Visual Structural Steel Inspection/Re-inspection for the above referenced
project. Results of the inspection are as follows:
NOTE(1): The ¾”x6”x6” joist girder stabilizer plates –lines 19 & B to E and lines 1 & B to E
were not installed at time of inspection. See detail 207/S5.01 and NOTE(1) from report dated
10/18/24.
NOTE(2): The welding of the deck support angles in lines 1 & A to F, lines 1 to 7 & F and lines
1 to 7 & A was incomplete at time of inspection. Work was in progress. See details 202/S5.01,
203/S5.01, 205/S5.01, 213/S5.01 and 214/S5.01.
NOTE(3): The bridging terminations along line 19 and along line 1 were incomplete at time of
inspection. See NOTE(3) from report dated 10/18/24
NOTE(4): The deck support angles at the expansion joint in lines 7/A and 7/F have not been
installed per details 216/S5.01 and 217/S5.01. Deck ledger angles do not have long slotted
holes in them. Screw anchors, in what appears to be standard size holes, were used to attach
the angles to the precast panels. Details call for long slotted holes in the deck ledger angle
and ¾” diameter threaded studs welded to the precast panel embeds. Refer to EOR.
NOTE(5): The joist seat to precast panel at panel joist welded connection - panels P34 & P34
is incomplete. See detail 206/S5.01, item 1(C) from report dated 10/18/24 and item 1(C) from
report dated 10/14/24
NOTE(6): A325 bolted connections, diagonal brace welded connections, column anchor bolt
connections, beam to panel connections, and joist girder to beam connections (sliding side
and fixed side) at the expansion joints in lines 7 and 13 need to be inspected.
I HSS(10”x10) Colum to Column Sleeve Welded Connections – lines 2 to 8 & B to E – sheet S1.01
A Inspected connections in the referenced lines have been completed per the contract drawing
and details. Reference details 102/S4.01, 10/S0.04 and detail “A” on sheet AR102.
II Joist To Precast Panel Welded Connections - lines A to F & 7 to 1 – sheets S2.02 & S2.01 – item
1(A) – item 1(A) – Report 1477185
A The joist to joist seat and joist seat to panel welded connections in the referenced lines were
inspected per the structural drawings and RFI #33.*It was noted that bolts were not
installed in joist seats fabricated with slotted holes. Per the ERECTOR NOTE on the
joist drawing, bolts are required in joist seats with slotted holes. When bolts cannot
be installed, or are removed, additional weld must be placed in slotted holes.
Additional weld was being added in the slotted holes at time of inspection.Other than
noted above, inspected connections along line A & 1 to 7 were welded out per plan and the
inspected connections along lines F & 1 to 7 were welded per plan and were compliant per
RFI #33.
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
III Joist to Joist Girder, Joist Girder to Column and Joist Girder to Panel Welded Connections – lines A
to F & 1 to 7
A The joist to joist girder welded connections in the referenced lines were inspected per the
contract drawings. Bolts were not installed in slotted holes in the joist seats. Per the
ERECTOR NOTE on joist drawing sheet J1.0, bolts are required in joist seats with slotted
holes. When bolts cannot be installed, or are removed, additional weld must be placed in
slotted holes. At inspected locations - additional welds have been added at the joist seats as
required.
B Joist girder to column welded connections in the lines 2 to 7 & B to E were inspected per
detail 209/S5.01. At inspected locations, the joist girder to column connections appeared to
be per detail and visually acceptable.
C Joist girder to panel connections in lines 19 & B to E were inspected per details 208/S5.01
and 207/S5.01. Inspected joist girder to panel embed connections appeared to be completed
per detail and were visually acceptable.
IV Type 1.5 Roof Decking – lines 7 to 13 & A to F – sheets S2.02, D2.1, D2.2 and D1.0
A The fastening of the roof decking in the referenced lines was inspected per the schedule on
NEW MILLENNIUM sheet D1.0. Inspected decking was fastened to the steel supports with
HILTI powder actuated fasteners on a 36/7 pattern. Inspected side laps were fastened with
TEK screw on 24” centers max.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Chris Lalic
CWI#16010691
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
November 1, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1490667
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Framing – Deck Angle Welded Connections – lines A & 1 to 7
A Inspected deck edge angle welded connections per sheet S5.01 – detail 202. Any
discrepancies noted were addressed at time of inspection.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
November 1, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1490667
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Framing – Deck Angle Welded Connections – lines A & 1 to 7
A Inspected deck edge angle welded connections per sheet S5.01 – detail 202. Any
discrepancies noted were addressed at time of inspection.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
November 1, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1490667
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Framing – Deck Angle Welded Connections – lines A & 1 to 7
A Inspected deck edge angle welded connections per sheet S5.01 – detail 202. Any
discrepancies noted were addressed at time of inspection.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
November 5, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1491921
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Decking - lines A to F & 1 to 7.
A The fastening of the decking was inspected per the New Millennium deck fastening schedule.
The decking was fastened with HILTI powder actuated fasteners on a 36/7 pattern. Inspected
side laps were fastened with (3) TEK screws per span. Any discrepancies found during the
inspection were addressed during the inspection.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Not Correct
Reinforcement Clean
Form Clean
Item Observed x
Proper Placement
Reinforcement Tied Properly
Grade Reinforcement
Number of Reinforcement
X
X
N/A
11/13/2023
X
X
Size of Reinforcement
N/A
Date:
X
X
X
Stirrup Spacing
Not Correct
Bruner, Yusuf
The representative observed the reinforcing steel related items for the following area:
A UES engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
Detail Sheet:•
Plan Sheet:
Grapevine, Texas
Report Date:
Weather:
121 Commerce Center Addition (Lot 1)
Page Number:
1513691
1 of 1
Clear
12/26/2024
Off Genesis Way and Enchanted Way
F241078
Technician:
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Sidewalk: Northbound Service Road
The representative utilized the following provided project plans to perform the observation:
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016)
Drawings Approved
Observation Information
X
X
C15.0
UES / Riner Engineering
Project:
5058 Brush Creek Rd
Fort Worth, TX 76119
www.TeamUES.com
TBPELS Firm No. 813
Reinforcing Steel
Observation Report
12/12/2024ServiceDate:Client:GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Work Order Number:
Project Number:
Correct Splicing
Correct
X
X
Item Observed
Bar Length & Spacing
Respectfully Submitted,
Remarks:
Ronnie Yeoman
Project Manager
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
Sheathing
X
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings
X
Cable/Tendon Count & Spacing
X
Cable/Tendon Drape
X
Grade Beam / Column Size
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
December 20, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1517918
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Decking – Riser Room - lines 19/F to E.7/F.
A The fastening of the decking was inspected per sheets – S5.01. Inspected decking was
fastened to the steel supports with 5/8” puddle welds on a 36/7 pattern. Inspected decking
side laps appeared to be fastened with TEK screws as per plan.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
December 20, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1517918
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Decking – Riser Room - lines 19/F to E.7/F.
A The fastening of the decking was inspected per sheets – S5.01. Inspected decking was
fastened to the steel supports with 5/8” puddle welds on a 36/7 pattern. Inspected decking
side laps appeared to be fastened with TEK screws as per plan.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
December 20, 2024
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1517918
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
I Roof Decking – Riser Room - lines 19/F to E.7/F.
A The fastening of the decking was inspected per sheets – S5.01. Inspected decking was
fastened to the steel supports with 5/8” puddle welds on a 36/7 pattern. Inspected decking
side laps appeared to be fastened with TEK screws as per plan.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Teresa Medina
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
January 16, 2025
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1528313
UES arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results
of the inspection are as follows:
RE-INSPECTION of OPEN STRUCTURAL STEEL ITEMS NOTED ON REPORT F241078/1485293
10/28/2024)
NOTE(1): The ¾”x6”x6” joist girder stabilizer plates – lines 19 & B to E and lines 1 & B to E have
been installed. See detail 207/S5.01. This clears NOTE(1) from the report dated 10/18/24 and
NOTE(1) from report 1485293 (10/28/24).
NOTE(2): The welding of the deck support angles in lines 1 & A to F, lines 1 to 7 & F and lines 1 to
7 & A was inspected and cleared on report 1490667. See details 202/S5.01, 203/S5.01, 205/S5.01,
213/S5.01 and 214/S5.01. This clears NOTE(2) from report 1485293
NOTE(3): The bridging terminations along line 19 and along line 1 have been completed per plan.
This clears NOTE(3) from report dated 10/18/24 and NOTE(3) from report 1485293 (10/28/24)
NOTE(4): The deck support angles at the expansion joint in lines 7/A and 7/F and 13/A and
13/F have not been installed per details 216/S5.01 and 217/S5.01. Deck ledger angles do not
have long slotted holes in them. Screw anchors, in what appears to be standard size holes,
were used to attach the angles to the precast panels. Details call for long slotted holes in the
deck ledger angle and ¾” diameter threaded studs welded to the precast panel embeds. Refer
to EOR. See NOTE(4) from report 1485293 (10/28/24)
NOTE(5): The joist seat to precast panel at panel joist welded connection at panels P34 &
P35 - is incomplete. Joist is welded to one panel as per plan. On the non-welded side, 1”
diameter threaded rods are not welded to an embed. No anchors are installed on the non-
welded side of the joist seat. See detail 206/S5.01, item 1(C) from report dated 10/18/24 and
item 1(C) from report dated 10/14/24 and NOTE (5) from report 1485293 (10/28/24).
NOTE(6): The A325 bolted connections, diagonal brace welded connections, column anchor
bolt connections, beam to panel connections, and joist girder to beam connections (sliding
side and fixed side) at the expansion joints in lines 7 and 13 were inspected per the contract
drawings. Non-compliant issue found during the inspection are as follows - In line 7 – the
bolted connections for the joist girder to columns connections on the sliding have not been
tack welded as per detail. See detail 227/S502 – note (7). The column anchor bolt connections
are not ready for inspection. Remedial work on anchor bolt connections that are below flush
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
nut needs to be completed, and the fix used needs to be approved by the EOR. The welding
contractor used ELCONE nuts to correct the below flush nut anchor bolt connections but they
also torch cut oversized holes in the column baseplates were the below flush nut anchor bolt
connections occurred. See details 104/S4.01 and 20/S0.04 and attached picture for
clarification. NOTE(6) from report 1485293 remains open.
I StoreFront/Canopy Steel – Northwest, Northeast, and West – sheets S2.03 & S5.02
A Welded connections for the referenced framing were inspected per RUSSELVILE
STEEL COMPANY, INC sheets E6000, E6001, the RFI response concerning the column
connections at roof level and the structural sheets. At inspected locations, the angle
to panel embed welded connections and angle to column welded connections were
not welded out per the typical details provided for other similar connections. Weld
details/weld requirements were not shown on the details provide to UES. Structural
Steel Note(6) on sheet S0.01 refers this issue to AISC table J2.4. Per AWS - if the fillet
weld length is not explicitly shown it is to be understood that the weld should be
applied to the full length of the joint. Require clarification on weld requirements.
Additionally, it was noted that there was some damage/gouging caused to the HSS
columns for the West Canopy – lines A & 9 to 11 – when the HSS(12”x6”) beams (HI
LOW) were cut free and moved to a different elevation.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Chris Lalic
CWI#16010691
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
Figure 1 - Torch Cut Oversized Holes in column baseplates at expansion joint
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
January 23, 2025
GTIS Acquisitions, LLC
787 Seventh Avenue, 50th Floor
New York, NY 10019
Attention: Kyle Roberson
Re: Field Inspection of Structural Steel
121 Commerce Center Addition (Lot 1)
Grapevine, Texas
UES Report No. F241078-1531823
UES arrived on site to perform a Visual Structural Steel Inspection/Re-Inspection for the above referenced
project. Results of the inspection are as follows:
RE-INSPECTION of OPEN STRUCTURAL STEEL ITEMS NOTED ON REPORT F241078/1485293
10/28/2024) AND REPORT F241078/1528313 (1/16/2025)
I *NOTE(1): Re-inspected NOTE(4) from report 1528313 (1/16/25) and NOTE(4) from report
1485293 (10/28/24) - referencing the deck support angles at the expansion joints in lines 7/A,
7/F, 13/A and 13/F. In lines F/7 and F/13, the welding contractor slotted the holes in the deck
edge angle with a torch and the angles and anchor bolts at these locations are now in general
compliance with the contract drawings. In lines 13/A and 13/F, the angles are installed vertical
leg up. The anchor bolts for the deck support angle are covered over with roof material and
UES cannot confirm that the anchor bolts for the edge angle are installed in slotted holes. See
details 216/S5.01 and 217/S5.01. Refer to EOR
II *NOTE(2): Re-inspected NOTE(5) from report 1528313, NOTE(5) from report 1485393, item 1(C)
from the report dated 10/18/24, and item 1(C) from report dated 10/14/24 – referencing the joist
seat to precast panel at panel joint welded connection at panels P34 & P35. The welding
contractor has installed (2) ¾” diameter anchors on the non-welded side. Per detail 206/S5.01
anchors should be 1” diameter. Will require EOR approval on the use of smaller diameter
anchors.
III NOTE(6): The A325 bolted connections, diagonal brace welded connections, column anchor bolt
connections, beam to panel connections, and joist girder to beam connections (sliding side and fixed
side) at the expansion joints in lines 7 and 13 were inspected per the contract drawings on 1/16/25.
Non-compliant issues found during the inspection, and noted by NOTE(6) on report 1528313, are as
follows:
In line 7 – the bolted connections for the joist girder to columns connections on the sliding
side have not been tack welded as per detail. See detail 227/S502 – note (7). This issue was re-
inspected on 1/23/2025 and found to be compliant.
The column anchor bolt connections are not ready for inspection. Remedial work on
anchor bolt connections that are below flush nut needs to be completed, and the fix used
needs to be approved by the EOR. The welding contractor used ELCONE nuts to correct the
below flush nut anchor bolt connections but they also torch cut oversized holes in the column
baseplates where the below flush nut anchor bolt connections occurred. See details 104/S4.01
and 20/S0.04. Issues regarding the column anchor bolt connections described by NOTE(6) on
report 1528313 remain open.
Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with
express approval of UES. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,
and are not indicative of the qualities of apparently identical or similar specimens.
IV StoreFront/Canopy Steel – Northwest, Northeast, and West – sheets S2.03 & S5.02
A Re-inspected item 1(A) from report 1528313 - referencing the canopy framing welded
connections. It was noted during today’s inspection that the (6”x4”) angle to precast
panel embed welded connections have not been welded out as per details 1 & 2 on
sheet E2004 Connections are to be welded all the way around with ¼” fillet welds.
Additionally, the angle to column connections were to be bolted with ½” diameter
A307 thru-bolts. As built - the angles have been welded to the columns in lieu of
bolting. See details 1 & 2 on sheet E2004 and referenced detail 233/S5.02. Field
modifications for the angle to column connections will require EOR approval and the
missing welds for the angle precast panel connections need to be added and
inspected. The noted damage/gouging caused to the HSS columns for the West
Canopy – lines A & 9 to 11 – where the HSS(12”x6”) beams (HI & LOW) were cut free
and moved to a different elevation - appears to have been addressed.
Discrepancies, if any, are noted above in bold.
INSPECTOR:
Chris Lalic
CWI#16010691
We are pleased to be of service on this project and if you have any questions, please contact our office.
Sincerely,
UES Professional Solutions 44, LLC
Formerly Alpha Testing)
Ronnie Yeoman
Project Manager
DATE:
SAMPLE
NO.
1 Building Pad, A-F/13.0-14.5
4,139 PPM
Respecfully Submitted,
Project Manager
UES / Alpha Testing, LLC
Environmental Consulting & Permit Support | Geotechnical Engineering | Materials Testing & Special Inspections | Geophysical Technologies
Ronnie Yeoman
SPECIFICATIONS:
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of UES. The use of our name
and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
SAMPLE LOCATION AND MATERIAL DESCRIPTION
5058 Brush Creek Road
Fort Worth, Texas 76119
Geotechnical | Construction Materials | Environmental
www.TeamUES.com
TBPELS Firm No. 813
REPORT OF
SOLUBLE SULFATE CONTENT
TESTED FOR:GTIS Acquisitions, LLC
OUR REPORT NO.:
06/01/24
F241078-1404482
Tex 145-E Part II
New York, New York
Page 1 of 1
PROJECT:121 Commerce Center Addition (Lot 1)
Grapevine, Texas
TEST METHOD:
SOLUBLE SULFATE CONTENT
Dark Brown Sandy Clay