Loading...
HomeMy WebLinkAboutSFRA2025-0031211000 Buck Dobbs Rd.. Aledo, Texas 76008 817-374-3559 1nfWi-t,NortierI1c.com Initial Report for Foundation Assessment A: Date: August 11. 2025 ''R,01P R E 1 Yl S E ED, AF` Y- 3� L OF F, Attention: Structured Foundation Repair (The Client) P LJ N IS .... . . .......... . . . ........... . ... .... .... .... .... .... .. .. Subject: Foundation Review m 3 8 10 ShadyMeadoxv Dr., Grapevine. Texas Authorization and Scpp Nortier Enaineering, Consultants. LLC'(,NE(*) has been retained by the Client to perforni an evaltiatiou of L the slab on grade foundation system of the 2 story residential home with brick veneer located at the sut�ject address referenced above. This report provides guidance as to whether or not the existing foundation system is in need of repair. The report also proposes a recommended plan if repairs are needed. Conclusions!Specific Recommendation: NEC perfornied a visual evaluation of the foundation for the subj1ect property on 8/ 111/2025. NEC also performed a floor survey using a Zip -level Pro-2000 series. collecting relative floor elevations, to aid in surface topography mapping of the floor(s). Elevations shown are adjusted for the type of flooring encountered to reflect a consistent measuring plane. The map of the existing floor elevations can be seen in the figure attached to this report. Based on review of the foundation, and reasonable professional engineering opinion, we've determined that movement of the foundation has occurred and should be repaired. Although complete levelness cannot be guaranteed. or may not be attainable. the proposed plan should improve the petforniance of the fonlidation. It is recommended that one (1) new pier and drainage improvements be installed as indicated on the figurets) attached to this report. Locations of internal piers [if needed] are intended to be approximate. The Contractor should locate the beanisand place internal piers accordingly. Furthermore. the proposed foundation repairs shall meet or exceed Chapter 4 of the 2021 International Residential Code (IRC), as it relates to foundations and any local applicable amendments to the IRC, This report is solely based on inforniation gathered during our site visit on S/ 1 L/2025, and does not take into consideration any changes in condition of the foundation of soils after the date which the information Maras gathered. F R 0 kl' F`k E G I S T E'RE, D E M G i N E E R 'SITE HKJSPECI`104 AND ro APP'R0V.?-%L- OF KERR "11ORK iS) CM, lipE',"M — — ------- — �N,0 WORK PEF'4,'Nql'� T� ED ON SUNIDAY -- - - - - - - - - - - - - - - - - -- RECEIVED. 815,Q025 25-003121 3810 SHADY MEADOW DRIVE FOUNDATION REPAIR .... ... .. .. 1��S P A G:5- RCLF AS ED FOR CC INCTI RUC-PON V APPR`.',V�P P; 'OJ!� .0 �1$ 4 1000 Buck Dobbs Rd.. Aledo, Texas 76008 81'7-374-3559 1nfWi-t,Nortierllc.coni General Recoiiiiiien,dla,.t,io.i,i.,s.:, It is reconuirended that a guttering system be installed if the house does not have gutters. Installing a guttering- system will direct water away from the foundation and reduce the potential for ground erosion near the foundation footing. It is also recommended that the plumbing systems be checked after any repairs are made to the foundation system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure and cause leaks. It is recommended that soil grading be maintained such that the bottom portion of the foundation is below grade. as per the governing code and a watering system be utilized around the perimeter of the house. Fluctuations in moisture content of the soils near the foundation of the house can cause differential movement, If the moisture content is kept consistent, the potential for differential movement is mitigated. Furthermore. grading around the perimeter of the building should be maintained as sloping away from the foundation at a minimum of 6 inclies, fall within the first 10 feet from the foundation. Stich grading configuration should prevent localized water accumulating around areas of the foundation. Saturated soils decline in bearing capacity and can result in differential movement of the foundation. Limitations: This report is intended for infortnation purposes only. and the sole use of the client and/or horneowner. The scope of this report is limited to the items related to the foundation system only, and it is understood that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of this report does not include judgment on any of the superstructure- detached buildings. retaining or tr privacy walls. concrete reinforcement and/or site drainage, In addition. the scope of this report excludes material and soil satupling/testing procedures and as such were not performed. The report is not to be used by others for any purpose without oiji, Nvritten consent. Compliance with any code or specification other than as expressly noted in this report is specifically excluded. It is the responsibility of any Contractor to abide by any other applicable codes or specifications. No warranty for any repairs. future foundation performance, structure, vegetation. or soils at the subject I I - property are offered by this report, not- does this report imply any liability to NEC. nor Darrel Nortier, PE for any work to be performed as a result of this report. It is understood that soils in this area experience movement due to moisture fluctuations, Such soil movement could cause the foundation to move after the recommended repairs have been made. Any provided floor elevation data and recommended actions are based on soil conditions as they exist at the time of the evaluation. 'INTEC' does not warrant or imply that other problems may not occur in the future. No warranty. expressed or implied. is made or intended and the limit of liability shall be limited to the fee paid for this report at the time of evaluation. Report Prepared by: Noilier En.9ineefirre Cousultaiv. L.Lt Texas Engineering Firm (F- 16800) Zr 8 / I I "1 2 02, -1; Daireel Nortier, RE, Professional Engineer 1 -" s,�7 0 F Two 'Al 1W ,W« ,or ..... 4 71*Z*� Of EEL French Drain (D Pop Up Valve 12"xl2" Collection Box New Pier SP Separation d Photograph Label Oft loft 20ft 0 F 7-t 4 # .... ..... .... EEL RTIER Or . ..... ........ ... 10 04 low - 08/11/25 By. TJ PRW-u-- -SRGINEI) A-11-10 SE-ALIED E77ER FRO- RE.C."SI, EREI E-',NJGN H 'FIR;'V7lN-IG- 1TEE -k. FE ON AMP, PDFROV"M OF PER STI X LATIOi V"!J- L Driveway -0.9 -1.6 -1,9 -2.1 ................... 0.0 -02 -0,5 -1.0 Garage OA 0.0 -05 Zero(g) 44 -09 0,2 1 Zero Conc 0.0 OA 1 -0.8 01 02 42 0-0 -0-2 fp I ,5V7,Iwn7,r*. 1 1, .. Grapevine, Texas 0.1 -0.1 Zero(r) -0.6 PI D A, D -EALED LE G E S! 1A !2 C 0 i F IN i i I G S I T E I r1l Z'S P E C 0; N A i, APPROVAL OF PIER TALLAT'ON V,,NziN COt4PLFT TM� PACE i�ELEASED FOP, CQX�TRJCINON I i y A f 1 X^"I v N i E 9 -, K Ef, 1 0, N -r, Ei V E Ai ALL TNFIZ. RY: AFNCL,,-.-0 f ALL CHANCES MUST BE APPROVED