Loading...
HomeMy WebLinkAbout94251218.0015.2025-06-03.Reinforcing Steel ObservationsREINFORCING STEEL OBSERVATIONS REPORT Report Number:94251218.0015 Service Date:06/03/25 1801 Handley Ederville Rd Report Date:06/06/25 Fort Worth, TX 76118-7102 Task:Concrete & Reinforcing Steel Observations and Testing 817-268-8600 Reg No: F-3272 Client Project Sawyers Construction, Inc (TX)121 Community Park Attn: Randy Sawyers 2701 Ira E Woods Avenue 2307 Oak Lane Grapevine, TX Suite 210 Grand Prairie, TX 75051 Project Number: 94251218 Services: Reinforcing steel (rebar) placement observation. Terracon Rep.: Sean Miller Reported To:Greg Sutheimer with Sawyer Construction Contractor:Sanchez Concrete Report Distribution: (1) Sawyers Construction, Inc (TX), Randy Sawyers (1) Sawyers Construction, Inc (TX), Brandy Altonji (1) Sawyers Construction, Inc (TX), Maribel Cortez Reviewed By:____________________________________ Doyle Mackey Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM022, 04-29-22 Rev.7 Page 1 of 1 General Information Greg Sutheimer with Sawyer Construction requested Terracon to be on site for reinforcing steel observation of the following elements: light pole bases. These elements are being constructed by Sanchez Concrete. The results of observation(s) for today were reported to Greg Sutheimer with Sawyer Construction. The construction documents referenced for this observation include: Structural plans dated 5/15/2025. Reinforcing Steel Terracon observed reinforcing steel detailed below for the following items (as applicable): grade, configuration, size, lap length, quantity, spacing, tying, clearances, steel condition and embedded items. Element Location Referenced Documents Status Comments Pier (1) Pickleball court light pole bases Structural Plans Page SD- 01, Dated 05/15/2025 Complies Compliance Statement Based on our observations, reinforcing steel at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications. Exhibit 1801 Handley Ederville Rd Fort Worth, TX 76118-7102 817-268-8600 terracon.com 121 Community Park Reinforcing Steel Observations A-1 Report Number: 94251218.0015 Service Date: 06/03/2025 Employee: Miller, Sean Scale: Refer to Drawing Test Retested / Accepted Deviation