HomeMy WebLinkAboutItem 11 - Guaranteed Maximum PriceMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: BRUNO RUMBELOW, CITY MANAGER
MEETING DATE: SEPTEMBER 16, 2025
SUBJECT: APPROVAL OF GUARANTEED MAXIMUM PRICE CONTRACT AND
OWNER COSTS FOR THE WATER AND WASTEWATER TREATMENT
PLANT ADMINISTRATION BUILDING IMPROVEMENTS PROJECT
RECOMMENDATION: City Council to consider approval of a Guaranteed Maximum Price (GMP)
contract for the renovations and new construction associated with the
Water and Wastewater Treatment Plant Administration Building
Improvements Project with Fransen Pittman Construction and approval of
owner contingency and an ordinance appropriating the funds.
FUNDING SOURCE: Upon approval of the attached appropriation ordinance, funds from the
sale of bonds and associated interest will be available in the Utility
Enterprise Fund in a total amount not to exceed $20,750,000.
BACKGROUND: This project includes construction of two new administration buildings, one
at the Water Treatment Plant and one at the Wastewater Treatment Plant.
In addition, the proposed project includes new maintenance facilities at
both sites.
The project development history includes:
• A 2022 Space Utilization Study conducted by Freese and Nichols, Inc.
identified significant modernization needs at both facilities.
• The 2023 retention of Freese and Nichols, Inc as the design firm for the
project.
• The 2024 Request for Qualifications for the Construction Manager at
Risk (CMAR).
• The selection of Fransen Pittman Construction, by a seven -member
staff panel, was based on their fee structure, financial stability,
qualifications, and resource availability.
Fransen Pittman, a firm based in Colorado with a DFW office located in
Southlake, Texas, has previously completed the City Hall Renovation and
is currently managing construction for the Convention and Visitors Bureau
(CVB) Project at the Golf Course.
Project Cost Breakdown
Guaranteed Maximum Price Administration Buildings (Construction):
$14,710,526
Guaranteed Maximum Price WWTP Maintenance Building (Construction):
$2,379,231 Guaranteed Maximum Price WTP Maintenance Building
(Construction): $2,381,013
Total GMP to Fransen Pittman Construction: $19,470,770
Furniture, Fixtures & Equipment (FF&E): $937,798
Contingency: $341,432
Total requested cost $20,750,000
Staff expects the project to start in October of this year with an anticipated
18-month construction schedule.
Staff recommends approval
FRANSEN
PITTMAN
EXPECT PRECISION
8/28/2025
Grapevine WTP & WWTP Admin Improvements
Estimate Summary
Item No:
ITEM DESCRIPTION
Total Amounts
1
General Conditions
$
1,233,311
2
WT Admin / WWT Admin
$
13,477,215
3
WT Maintenance Shop
$
2,381,013
4
WWT Maintenance Shop
$
2,379,231
Total
$
19,470,770
3 FRANSEN
PITTMAN
EXPECT PRECISION
Grapevine WTP & WWTP Admin Improvements
Allowances
Location
ITEM DESCRIPTION
Allowance Amount
WTP
Shoring for Basement Excavation
$
75,000
WTP
Rock Excavation
$
75,000
WTP/WWTP
Dewatering
$
10,000
WTP/WWTP
Wind and Weather Protection Allowance
$
25,000
WTP
Lab Equipment
$
300,000
WWTP
Lab Equipment
$
100,000
WTP
Sampling Wall Mock -Up / Install
$
15,000
WTP
SCADA Connections
$
10,000
WWTP
SCADA Connections
$
10,000
8/28/2025
FRANSEN August 28, 2025
PITTMAN
EXPECT PRECISION
Pricing Clarifications for
Grapevine WTP & WWTP Admin Improvements GMP
Division One
1 Utility development fees are to be paid direct between provider and the City. No costs for ONCOR or ATMOS gas are
included.
2 It is assumed that the structural engineer of record will provide all structural engineering, no structural engineering
services included.
3 Tax exempt project.
4 Permit and plan review fees are to be waived for this City project. Fees are excluded.
5 All ONCOR work and associated costs are assumed to be by Owner. le. electrical transformer, high voltage lines,
and primary feeders.
6 Any utility fees for usage/consumptions during construction are to be paid directly by owner.
7 All third party testing/special inspections will be procured, contracted and managed by Owner
Division Two
1 Removal, remediation, and haul off of buried debris, contaminated soils, and/or hazardous materials is excluded.
2 An Allowance is included for removal, excavation and/or trenching of rock or any material that cannot be removed with
conventional excavation equipment. This includes but is not limited to excavation work that requires chipping, drilling,
splitting, or hammering.
3 WTP Admin building slab on grade includes select fill to top of limestone extending 5' beyond slab on grade limits per
geotech pages 10 and 14.
4 WTP Maintenance shop building slab includes select fill to top of limestone extending 5' beyond slab on grade limits
per geotech pages 10 and 14.
5 WTP electrical pad includes select fill to top of limestone extending 5' beyond slab on grade limits.
6 Asphalt paving at WTP and WWTP sites include 12" of type A flexbase over 6" scarified and compacted subgrade
extending 12" beyond area of pavement.
1 of 5
FRANSEN
PITTMAN
EXPECT PRECISION
August 28, 2025
7 Concrete paving at WTP and WWTP sites includes scarifying and recompacting 6" of grade per C001.
8 WWTP Admin building includes 12" voids and no other soil remediation is included.
9 WWTP Maintenance shop building slab on grade includes 5' select fill cap extending 5' beyond slab limits per geotech
page 10.
10 WTP site includes minor resodding of disturbed landscape.
11 At WTP maintenance shop we have included an 8" CMU masonry retaining wall with a concrete footer.
12 We have not included any termite or pest control.
13 C002 has a note that mentions upgrading the south side fence along the property line to the airport and location and
scope is unknown. This is not included.
14 One MAX 2200 Pro Slide gate operator for new chain -link slide gate at the North access at WWTP is included.
Division Three
Fransen Pittman does not warrant slabs -on -grade and slabs cast on metal decking against cracking that only affect
the aesthetic characteristics of the floor.
2 Special coatings and/or special floor preparations required for concrete due to moisture or ph conditions are excluded
from the Scope of Work.
3 Wet concrete curing methods and materials are excluded. Concrete to be cured utilize a spray applied curing
compound.
4 All mud slabs are excluded with exception of inclusion at WWTP admin building.
Division Four
1 We have included 1-1/2" rigid insulation at CMU exterior wall systems.
2 We have not included masonry water repellant.
2 of 5
FRANSEN
PITTMAN
EXPECT PRECISION
Division Five
1 AESS or NOMMA finish requirements on steel are not included.
2 AISC fabricator and erector are not included.
3 Steel roof access ladders are included in lieu of aluminum.
August 28, 2025
4 1.5" type b decking is included at the following locations: WWT reinforced laundry room area and WWT maintenance
PPE storage, restroom and IT room. No topping slab is included at these locations.
5 Railing at interior stair at WT is included as painted steel pipe with picket style guard rails as shown on AA405.
Division Seven
1 Building envelop testing and/or third party consultation is not included.
2 We have not included spray insulation underneath level 2 balcony at WTP admin building as it is not shown.
3 We have included Westile Bison ScrewJack Pedestals at WTP Admin balcony and WWTP Admin patio.
Division Eiaht
1 Impact resistant rated materials are not included.
Division Nine
Floor covering prices do not include special high moisture and/or excessive alkalinity adhesives or special floor
preparations.
3 Wall assembly construction is based on the partition wall types indicated on the drawings not a different wall assembly
to meets certain STC requirements. Estimate has not included costs to test STC ratings of walls.
4 Drywall finish is included as a level 4 smooth finish at new walls and ceilings.
5 Walk off mats are only available in standard sizes. We have included standard size that best fits location per plans.
6 8" 18 gauge steel joists at the WWT reinforced laundry area and WWT maintenance PPE storage, restroom and IT
room. No topping slab is included at these locations.
3of5
FRANSEN
PITTMAN
EXPECT PRECISION
August 28, 2025
Division Ten
1 Lockers shown on detail VA503 appear to be setting directly on the concrete slab. No base is shown.
2 Signage is included as follows: code required interior signage, plastic laminate raised text with window for insert.
Exterior is non-lite cast aluminum standard depth and clear anodized finish with Helvetica font.
Division Twelve
Window blinds are included as (22) each at WT Administration and (30) each at WWT Administration.
2 Window blind for window type C5 at WWT conference room has been split amongst the top and bottom portions
3 Window blinds are not included for the upper windows at window type A3 on the 2nd level stairs at WT Administration.
4 Window blinds in the maintenance shops building are not included.
5 Control room consoles are included per description in the estimate by Evan's Consoles.
Division Fifteen
1 The permanent heating/cooling equipment provided as part of the Scope of Work may be used by Fransen Pittman
for construction heating/cooling prior to Substantial Completion of the Project. Proper equipment maintenance, as
recommended by the manufacturer, shall be implemented by Fransen Pittman. The warranty period on equipment
shall begin when such equipment is put into use during construction.
2 Cleaning existing ductwork is not included. There is minimal ductwork that is existing to remain and the existing
condition of the ductwork is unknown.
3 Fire sprinkler coverage under any canopies is not shown and is not included.
4 Fire pumps are not included.
5 Temporary stand pipes for fire suppression systems are not included.
4 of 5
FRANSEN
PITTMAN
EXPECT PRECISION
August 28, 2025
6 Wet and dry fire sprinkler coverage is included only for the areas inside of the dashed lines at the Water Treatment
Plant. It is assumed that all other areas do not require fire sprinkler coverage.
7 New HVAC equipment is included as BACNET capable per the equipment schedules. New HVAC equipment will be
controlled by standalone thermostats. A BMS is understood to be future scope and is not included.
8 Roof mounted equipment is to be installed with factory insulated curbs per the drawing details.
9 All ductwork at exposed ceilings is included as galvanized with 1" internal Liner.
Division Sixteen
1 Existing to remain building and site lighting will be as -is condition. No costs to replace existing lighting lamps or other
hardware pieces.
2 Fire Alarm is a deferred submittal and final design and cost will be determined by the AHJ.
3 An allowance for design build lightning protection is included at both WT and WWT administration buildings only.
4 Schneider Electric will provide new cameras that are compatible to the existing Video Expert by Motorola/Pelco VMS
not a Panasonic VMS system that was specified.
5 A similar Security Expert SEC system will be used to manage the intercommunications and duress system in lieu of
the specified Inovonics Duress system.
6 Removal of existing overhead power poles and lines is not included. ONCOR has stated that there are 2 poles that
they do not own and appear to be supporting tele/data connections. This scope of work will need to be defined.
7 Path of egress smoke detection is not required by code and is not included.
5 of 5
Fmmm Pittman General Contractors
8/28/2025 428 PM
Grapevine WTP & WWTP Admin Improvements
FRANSEN GMP Estimate
PITTMAN
EXPECT PRECISION
ESTIMATE DATE: 08/28/25
BUILDING AREA IN SQ FT: 24320
DRAWINGS PREPARED BY: Freese & Nichols
DRAWINGS ARE DATED:
7/18/2025
00
General Conditions
1,233,311
$50.71
6.3%
01 02
General Requirements, Existing Conditions, Site Work
2,951,558
$121.36
15.2%
31 32 33 34
03
Concrete
1,696,420
$69.75
8.7%
04
Masonry
2,010,080
$82.65
10.3%
05
Metals
1,180,284
$48.53
6.1 %
06
Carpentry
107,954
$4.44
0.6%
07
Moisture Protection
852,262
$35.04
4.4%
08
Doors, Windows & Glass
701,976
$28.86
3.6%
09
Finishes
800,502
$32.92
4.1%
10
Specialties
218,877
$9.00
1.1 %
11
Equipment
560,723
$23.06
2.9%
12
Furnishings
460,089
$18.92
2.4%
13
Special Construction
0
$0.00
0.0%
14
Conveying Systems
118,474
$4.87
0.6%
212223
Mechanical
2,571,562
$105.74
13.2%
26 27 28
Electrical & Low Voltage
2,535,132
$104.24
13.0%
DIRECT COST
17,999,204
$740.10
92.44%
State & Local Tax (consumables only)
8.25%
39,709
$1.63
0.20%
- SalesTax Allowance
LS
Exempt
$0.00
0.00%
Permit & Plan Review Fee Allowance
LS
Waived by City
$0.00
0.00%
Project Fee
2.40%
467,304
$19.21
2.40%
Construction Contingency
2.50%
486,775
$20.02
2.50%
Escalation Contingency
0.00%
Excluded
$0.00
0.00%
Liability Insurance
1.41 %
273,568
$11.25
1.41 %
Builder's Risk Insurance
0.21 %
41,648
$1.71
0.21 %
Preconstruction Fee
LS
20,000
$0.82
0.10%
Performance and Payment Bond
LS
142,562
$5.86
0.73%
i
TOTAL COST
$19,470,770
$800.61
100.0%
Pagc 1
8/28/2025 428 PM
Division 00 General Conditions
011101
01 11 03
01 11 06
01 11 07
01 11 00
101 10 00 ADMINISTRATIVE REQUIREMENTS
Superintendent x2
Construction Manager - Removed for Other Staffing
Project Engineer
Project Coordinator
Project Manager
54.0 Wks
0.0 Wks
40.5 Wks
20.0 Wks
54.0 Wks
633,398
Clarification
163,392
48,771
308,599
$26.04
$6.72
$2.01
$12.69
3.3%
0.8%
0.3%
1.6%
1 12 00 FIELD OFFICE EXPENSES M
No
011201
Courier
54 Wks
1,080
$0.04
0.0%
011202
Reproductions/Reprographics
54 Wks
2,700
$0.11
0.0%
01 1203
Progress photographs - superintendent to use company issued iPhone
Clar
Clarification
$0.00
0.0%
01 1204
Field Office Equipment x2
54 Wks
7,695
$0.32
0.0%
01 1205
Field Office Supplies x2
54 Wks
7,695
$0.32
0.0%
01 1206
Textura - put this in div. 02 means and methods - no line item on proposal form
Clar
Clarification
$0.00
0.0%
01 15 00 INSURANCE (indirect costs - see summary page for insurances)
1 21 00, 0122 00 TEMPORARY FACILITIES
i
01 21 01
Jobsite telephone/Sup. Cell phone/Radios
12 Mo
3,741
$0.15
0.0%
0121 02
Electrical, Gas, Water Consumption Costs By Owner
Excl
Excluded
$0.00
0.0%
012103
Temporary Water
Excl
Excluded
$0.00
0.0%
01 21 04
Portable chemical toilets x2
12 Mo
5,094
$0.21
0.0%
012106
JobsiteIT
Excl
Excluded
$0.00
0.0%
01 22 01
Office trailer
12 Mo
45,021
$1.85
0.2 %
01 22 02
Job sign
Excl
Excluded
$0.00
0.0%
01 2204
Temporary job fence - to be cost of the work as required
Clar
Clarification
$0.00
0.0%
01 2205
Temporary storage - to be cost of the work as required
Clar
Clarification
$0.00
0.0%
01 2207
Safety supplies/First Aid x2
Excl
Excluded
$0.00
0.0%
01 2208
Water.. ice and cups
12 Mo
2,725
$0.11
0.0%
01 25 00 TRASH
I 01 2501
IDumpster - for GC Work - additional dumpsters to be in cost of work as required
4 Ea
3,400
$0.14
0.0%
DIVISION 1 TOTALS
1,233,311
$50.71
6.3%
Ngc 2
Fran- Pittman General Contractors
8/28/2025 428 PM
Division 2 Site Work
ITEM
EM DESCRIPTION
02 32 00 Geotechnical Investigation
QUAN UNIT
TOTAL
1
Investigation and Report - Freese and Nichols Report - By Owner
By Owner
2
�e.oteclnical
inspections and Testing
FCLAR
R
By Owner
3
/ Potholing - Freese and Nichols - By Owner
R
By Owner
02 32 00
Geotechnical Investigation
0
02 41 16
Structure Demolition
1
Structure Demolition Pkg Budget 2A - WTP Admin
1 LS
52,681
2
Existing Lift Demo
INCL
Included
3
Exterior Wall Demo
INCL
IIncluded
4
Concrete Stair and Landing Demo
INCL
Included
5
Bathroom Door, Walls, and Fixtures Demo
INCL
IIncluded
6
Interior Door and Side Window Demo
INCL
IIncluded
7
Structure Demolition Pkg Budget 2A - WTP Shop
EXCL
(Excluded
8
Existing Maintenance Shop Demo - By Owner
EXCL
(Excluded
9
Structure Demolition Pkg Budget 2A - W WTP Admin
1 LS
1 34,701
10
Misc. Demo from Building Remains
INCL
IIncluded
11
Existing Buildings Demo - By Owner
EXCL
(Excluded
12
South Entry Gate Paving Demo
INCL
IIncluded
13
South Entry Gate Fence, Column, Gate Demo
INCL
IIncluded
14
Structure Demolition Pkg Budget 2A - W WTP Shop
1 LS
12,103
15
Existing Building Demo
INCL
IIncluded
16
Site and Pavement Demo
INCL
Included
0241 16
Structure Demolition
99,485
02 58 00
Asbestos Abatement
1
Asbestos Abatement Pkg Budget 2A - WTP Admin
1 LS
3,276
2
Tan Caulking at Door Frames Demo/Dispose
INCL
Ilncluded
3
Asbestos Abatement Pkg Budget 2A - W WTP Admin
1 LS
3,617
4
Windows Demo/Dispose
INCL
Included
02 58 00
Asbestos Abatement
6,893
31 00 00
Earthwork
1
Earthwork Pkg 2B - WTP Admin
1 LS
279,472
2
Basement Excavation and Export
INCL
IIncluded
3
Undercut Pad Up to 6' and Export
INCL
IIncluded
4
Select Fill to Top of Limestone Extending 5' Beyond Slab
INCL
IIncluded
5
Fine Grading
INCL
IIncluded
6
6" Scarify and Recompact Pavement Prep
INCL
IIncluded
7
12" Type A Flexbase at Asphalt
INCL
IIncluded
8
Asphalt Pavement Demo
INCL
IIncluded
9
Saw Cut and Demo Curb
INCL
IIncluded
10
Concrete Flatwork Demo
INCL
IIncluded
11
Selective Tree Removal
INCL
IIncluded
12
Strip Existing Vegetation and Haul Off
INCL
IIncluded
13
Select Fill Cap at Admin Pad
INCL
IIncluded
14
Shoring at Basement
1 ALLOW 75,000
15
Rock Excavating Allowance
1 ALLOW 75,000
16
Earthwork Pkg 2B - WTP Shop
1 LS
42,623
17
Select Fill to Top of Limestone Extending 5' Beyond Slab
INCL
IIncluded
18
Fine Grading
INCL
IIncluded
19
6" Scarify and Recompact Pavement Prep
INCL
IIncluded
20
12" Type A Flexbase at Asphalt
INCL
IIncluded
21
Saw Cut and Demo Curb
INCL
IIncluded
22
Strip Existing Vegetation and Haul Off
INCL
IIncluded
23
Select Fill Cap at Shop Pad
INCL
IIncluded
24
Earthwork Pkg 2B - W WTP Admin
1 LS
347,807
25
Excavate Grade and Allow for 12" Void Forms Beneath Building Slab
INCL
IIncluded
26
Pad Prep
INCL
IIncluded
27
Fine Grading
INCL
IIncluded
28
6" Scarify and Recompact Pavement Prep
INCL
IIncluded
29
12" Type A Flexbase at Asphalt
INCL
IIncluded
30
Asphalt Pavement Demo Per Plans
INCL
IIncluded
31
Saw Cut and Demo Curb
INCL
IIncluded
32
Selective Tree Removal
INCL
IIncluded
33
Strip Existing Vegetation and Haul Off
INCL
IIncluded
34
Concrete Flatwork Demo
INCL
IIncluded
35
Earthwork Pkg 2B - W WTP Shop
1 LS
117,928
36
Undercut Pad Up to 5' and Export
INCL
IIncluded
37
Pad Prep
INCL
IIncluded
38
Fine Grading
INCL
IIncluded
39
6" Scarify and Recompact Pavement Prep
INCL
IIncluded
40
12" Type A Flexbase at Asphalt
INCL
IIncluded
41
Asphalt Pavement Demo
INCL
IIncluded
42
Saw Cut and Demo Curb
INCL
IIncluded
43
5' Select Fill Cap at Shop Pad
INCL
IIncluded
44
Temporary Job Fence
1,350 LF
6,750
31 0000
Earthwork
944,581
$ PER % OF
S.F. TTL
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$2.17 0.3%
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$1.43 0.2%
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.50 0.1
$0.00 0.0
$0.00 0.0
$4.09 0.5
$0.13 0.0%
$0.00 0.0
$0.15 0.0%
$0.00 0.0
$0.28 0.0
$11.49 1.4%
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$3.08 0.4
$3.08 0.4
$1.75 0.2%
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$14.30 1.8%
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$4.85 0.6
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.28 0.0
$38.84 4.9
Fmnsen Pittman General Contractors
Division 2 Site Work
8/28/2025 428 PM
I., AlNo- ITEM DESCRIPTION
31 10 00 Survey -Site
QUAN UNIT
ITEM
TOTAL
1 Survey
1 LS
34,728
2 Control Verification and Calculations
INCL
Included
3 Building Envelope/Corner Layout
INCL
IIncluded
4 Erosion Control
INCL
Included
5 Gridline Layout
INCL
Included
31 1000 Survey - Site
34,728
31 1100 Site - Civil
1 Civil Design Coordination and Point Calculation
1 LS
3,392
2 Potholing, utility verification, early site confirmation
1 LS
3,392
31 11 00 Site - Civil
6,784
3123 19 Dewatering
Dewatering (construction or permanent) is included only as a part of this allowance; permanent filtration
systems or temporary construction filtration systems for storm water removal or any other dewatering
1 systems are only included as a part of this allowance. Ground water testing, filtration, pumping and
1 ALLOW
10,000
ground water sediment control is only included as a part of this allowance.
312319 Dewatering
10,000
3125 00 Erosion/Sedimentation Control (SWMP)
1 Vehicle Tracking Control
1 LS
6,850
4 Inlet Protection
32 CMH
3,495
5 Concrete Washout
4 EA
11,390
7 Maintain Erosion Control
12 MON
33,479
8 Remove Erosion Control
4 EA
5,390
9 Dumpster
10 EA
8,500
31 2500 Erosion/Sedimentation Control (SWMP)
69,104
31 25 01 Stormwater Inspection & Audit
1 13rd Party Inspections & Audits
12 IMON
1 8,106
31 2501 Stormwater Inspection & Audit
8,106
32 17 23 Pavement Markings
1 Pavement Markings Pkg 2C - WTP Admin
1 LS
4,600
2 Pavement Markings Pkg 2C - WTP Shop
INCL
Included
3 Pavement Markings Pkg 2C - WWTP Admin
1 LS
5,511
4 Pavement Markings Pkg 2C - WWTP Shop
INCL
Included
5 Stalls per Plan Layout
INCL
IIncluded
6 ADA Blue Box with White Stencil per ADA Code
INCL
IIncluded
7 Fire Lane No Parking Stencil per City Code
INCL
IIncluded
8 No Parking Stencil per TAS Code
INCL
IIncluded
9 ADA Signage per TAS Code
INCL
IIncluded
10 Wheel Stops Excluded
EXCL
Excluded
32 17 23 Pavement Markings
10,111
32 1313 Site Paving
1 Site Paving Pkg 2C - WTP Admin
1 LS
104,336
2 Asphalt Paving at Entry Drive
INCL
IIncluded
3 Ribbon Curb Throughout
INCL
IIncluded
4 4" Sidewalk
INCL
IIncluded
5 Drive Path to T Filters
INCL
IIncluded
6 Light Pole Bases
INCL
IIncluded
7 Site Paving Pkg 2C - WTP Shop
1 LS
139,961
8 6" Concrete Paving at Building Entry and Parking
INCL
IIncluded
9 Ribbon Curb Throughout
INCL
IIncluded
10 Light Pole Bases
INCL
IIncluded
11 Retaining Wall Footer and CMU Block Wall with Average Height of 2'
INCL
IIncluded
12 Site Paving Pkg 2C - WWTP Admin
1 LS
203,192
13 Asphalt Paving at Admin Parking
INCL
IIncluded
14 Paving, Curb, and Gutter at Cart Perth
INCL
IIncluded
15 4" Sidewalk
INCL
IIncluded
16 South Entry Gate Paving Expansion
INCL
IIncluded
17 Ribbon Curb Throughout
INCL
IIncluded
19 Site Paving Pkg 2C - WWTP Shop
1 LS
118,933
20 Paving at Building Perimeter
INCL
IIncluded
21 4" Sidewalk
INCL
IIncluded
22 Ribbon Curb Throughout
INCL
IIncluded
23 Area at Animal Shelter Parking for Recycling Containers
INCL
Included
32 13 13 Site Paving
566,422
$ PER % OF
S.F. TTL
$1.43 0.2%
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$1.43 0.2%
$0.14 0.0%
$0.14 0.0%
$0.28 0.0
$0.41 0.1
$0.41 0.1
$0.28 0.0
$0.14 0.0%
$0.47 0.1
$1.38 0.2%
$0.22 0.0
$0.35 0.0
$2.84 0.4
$0.33 0.0
$0.33 0.0
$0.19 0.0%
$0.00 0.0
$0.23 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.42 0.1
$4.29 0.5
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$5.75 0.7
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$8.35 1.0%
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$4.89 0.6
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$23.29 2.9
I
8/28/2025 428 PM
Division 2 Site Work
ITEM
ITEM DESCRIPTION
32 31 00 Fences &Gates
QUAN UNIT
TOTAL
1 Fence & Gates Pkg 2G - WWTP Admin
1 LS
1 142,747
Included
2 South Entry New Gate, Reuse Existing Fence Panels, New Columns, Reuse Existing Operator INCL
3 North Entry New Gate, New Operator and Posts, Chain -link with Barbwire 8' Overall Height
INCL
Included
Included
4 Admin Building New 8' Heigh Ornamental Fence and (1) Pedestrian Gate with Panic Hardware 200 LF
3231 00 Fences & Gates
142,747
32 32 00 Retaining Walls
1
Retaining Wall Included at WTP Maintenance Shop Reference 32 13 13 Site Paving
Clar
Clarification
2
No Retaining Wall Included at WWTP Admin Building
Clar
IClarification
32 32 00 Retaining Walls
0
32 90 00 Landscaping
1 Landscaping & Design Build Irrigation Pkg 2F - WTP Admin
1 LS
26,857
2 Fine Grading, Bermuda Sod, and Temporary Irrigation at Disturbed Areas Only
INCL
IIncluded
3 Landscaping & Design Build Irrigation Pkg 2F - WWTP Admin
1 LS
71,417
4 Trees, Shrubs, and Groundcovering per Landscape Plans
INCL
IIncluded
5 Fine Grading, Bermuda Sod, and Temporary Irrigation Per Landscape Plans
INCL
IIncluded
6 Landscaping & Design Build Irrigation Pkg 2F - WWTP Shop
EXCL
lExcluded
32 90 00 Landscaping
98,274
12 93 00 Site Furnishings
1 Site Furnishings Pkg 2F - WTP Admin
1 LS
10,000
2 Site Furnishings Pkg 2F - WTP Shop (Assumed None Required)
EXCL
(Excluded
3 Site Furnishings Pkg 2F - WWTP Admin
1 LS
1 7,500
4 Site Furnishings Pkg 2F - WWTP Shop (Assume None Required)
EXCL
lExcluded
12 93 00 Site Furnishings
17,500
33 1000 Utilities
1 Site Utilities Pkg 2B - WTP Admin
1 LS
315,623
2 Remote FDC
INCL
IIncluded
3 Site Utilities Pkg 2B - WTP Shop
1 LS
83,143
4 Site Utilities Pkg 2B - WWTP Admin
1 LS
314,729
5 Remote FDC
INCL
IIncluded
6 Site Utilities Pkg 2B - WWTP Shop
1 LS
92,234
33 10 00 Utilities
805,729
02 99 01 General Requirements
1
Textura Invoicing Setup Fee
1 LS
5,280
2
Jobsite Technology and Tool Boxes
12 MON
69,464
02 99 01 General Requirements
74,744
02 99 02 Material Handling
1 Material Handling Equipment for Sites
6 IMON
1 31,350
02 99 02 Material Handling
31,350
02 99 04 Wind and Weather Protection Allowance
Wind and Weather protection allowance is to include all temporary heating needs for interior / exterior
trades, all temporary wind and weather protection for interior / exterior trades and all snow/water removal
1 or protection (this includes all concrete blankets and skin tenting and includes all FP labor, materials,
1 ALLOW 25,000
equipment, tools and subcontractor -help). This also includes any necessary Fire Watch needs for the
project.
02 99 04 Wind and Weather Protection Allowance
25,000
DIVISION
2 TOTALS 2,951,558
$ PER % OF
S.F. TTL
$5.87 0.7
$0.00 0.0
$0.00 0.0
$0.00 0.0
$5.87 0.7
$0.00 0.0
$0.00 0.0
$0.00 0.0
$1.10 0.1
$0.00 0.0
$2.94 0.4
$0.00 0.0
$0.00 0.0
$0.00 0.0
$4.04 0.5
$0.41 0.1
$0.00 0.0
$0.31 0.0
$0.00 0.0
$0.72 0.1
$12.98 1.6%
$0.00 0.0
$3.42 0.4
$12.94 1.6%
$0.00 0.0
$3.79 0.5
$33.13 4.1
$0.22 0.0
$2.86 0.4
$3.07 0.4
$1.29 0.2/
$1.29 0.2%
$1.03 0.1
$1.03 0.1
$121.36 15.2%
Page 5
Fmnsen Pittman General Contractors
8/28/2025 428 PM
Division 3 Concrete
03 11 00 Turnkey Concrete
$ PER
S.F.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Turnkey Concrete Pkg 3A - WTP Admin
Basement
Drilled Piers
Concrete Beams per Plans
Concrete Columns Up to 11' Height with Pilaster and Footing
12" Basement Wall (16" at Open Pit Area)
12" Basement Wall at Elevator Pit
12" Concrete Slab
Level
12" Void Forms
Concrete Beams per Plans
6" Concrete Slab
12" Concrete Slab
Deck Shoring
Concrete at Ramp
Concrete Curb at Perimeter
Pads for Lab Equipment and Electrical Equipment
Level
12x24 Concrete Beam
3" Concrete Slab on Deck
Site
Transformer Pad
Bollard Install
Turnkey Concrete Pkg 3A - WTP Shop
Concrete Curb at Perimeter
Concrete Grade Beams
8" Concrete Slab on Grade
Mechanical Pads
Turnkey Concrete Pkg 3A - W WTP Admin
Drilled Piers
18x24 Concrete Beam w/ Void Forms
8" Concrete Slab w/ Void Forms
12" x 10 Tall Concrete Wall
Shoring at Concrete Wall
Mud Slab Under Void Forms
Concrete Stair, Foundations, and Landings to Maintenance Shop
Concrete Curb at Perimeter
Turnkey Concrete Pkg 3A - W WTP Shop
Concrete Curb at Perimeter
Concrete Grade Beams
8" Concrete Slab on Grade
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
714,347
$29.37
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6.35
$0.00
$0.00
$0.00
$0.00
$27.02
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7.00
$0.00
$0.00
$0.00
IIncluded
Included
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
154,536
IIncluded
IIncluded
IIncluded
IIncluded
657,224
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
IIncluded
170,313
IIncluded
IIncluded
Included
03 11 00
Turnkey Concrete
1,696,420
$69.75
DIVISION 3 TOTALS
1,696,420
$69.75
%OF
TTL
3.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.8
0.0
0.0
0.0
0.0
3.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.9
0.0
0.0
0.0
8.7
8.7
8/28/2025 428 PM
Division 4 Masonry
DESCRIPTION
04 22 00 Concrete Unit Masonry
QUAN UNIT
ITEM
TOTALITEM
$ PER
S.F.
% OF
TTL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Masonry Pkg 4A - WTP Admin
Cast Stone Sill (Match Existing as Close as Possible)
Standard 12" CMU at Basement
Standard 8" CMU
Brick Veneer Infill at Existing (Match Existing as Close as Possible)
Standard Brick Veneer Masonry
Rigid Insulation
Masonry Pkg 4A - WTP Shop
Standard 12" CMU
Standard Brick Veneer Masonry
Glass Block
Rigid Insulation
Masonry Pkg 4A - W WTP Admin
Standard 8" CMU
Standard Brick Veneer Masonry
Rigid Insulation
Brick Columns at South Entry
Monument Sign
Masonry Pkg 4A - W WTP Shop
Standard 12" CMU
Standard Brick Veneer Masonry
Glass Block
Rigid Insulation
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
4 EA
INCL
1 LS
INCL
INCL
INCL
INCL
437,150
$17.97
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$24.90
$0.00
$0.00
$0.00
$0.00
$18.15
$0.00
$0.00
$0.00
$0.00
$0.00
$21.63
$0.00
$0.00
$0.00
$0.00
2.2
0.0%
0.0
0.0%
0.0
0.0
0.0%
3.1
0.0%
0.0
0.0%
0.0%
2.3
0.0%
0.0
0.0%
0.0
0.0%
2.7
0.0%
0.0
0.0%
0.0%
IIncluded
Included
Included
Included
Included
Included
605,487
Included
Included
Included
IIncluded
441,341
IIncluded
IIncluded
IIncluded
Included
IIncluded
526,101
IIncluded
IIncluded
IIncluded
IIncluded
04 22 00
Concrete Unit Masonry
2,010,080
$82.65
10.3
DIVISION 4 TOTALS 2,010,080 I $82.65 10.3%
M
8/28/2025 428 PM
Division 5 Steel
DESCRIPTION
05 12 00 Structural Steel
QUAN UNIT
ITEM
TOTALITEM
$ PER
S.F.
% OF
TTL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Structural Steel & Joist Pkg 5A - WTP Admin
Joist and Decking
Wide Flange Beams
Misc. Support Steel
Steel Lintels
Hoist Beam and Pit Ladder
Roof Access and Cross Over Ladders (hot dipped galvanized)
Operable Partition Support
Overhead Door Support
Elevator Guide Rails
Bollards
Steel Stairs, Landing, Railing, and Wall Railing
Aluminum and Cable Railings Pkg 5A - WTP Admin
Ramp Railing at South Entry
Railing at North Entry
Removeable Railing at Pit
Balcony Railing
Structural Steel & Joist Pkg 5A - WTP Shop
Joist and Decking
Wide Flange Beams
Misc. Support Steel
Steel Lintels
Roof Access Ladder (hot dipped galvanized)
Overhead Door Support
Bollards
Structural Steel & Joist Pkg 5A - WWTP Admin
Joist and Decking
Wide Flange Beams
Misc. Support Steel
Steel Lintels
Roof Access Ladder (hot dipped galvanized)
Generator Gate Enclosure Pairs
Aluminum and Cable Railings Pkg 5A - WWTP Admin
Cable Railings at Concrete Stair to Maintenance Shop
Cable Patio Railing
Structural Steel & Joist Pkg 5A - WWTP Shop
Joist and Decking
Misc. Support Steel
Steel Lintels
Roof Access Ladder (hot dipped galvanized)
Overhead Door Support
Bollards
Canopies Pkg 5A - WTP Admin
Canopies Pkg 5A - WTP Shop
Canopies Pkg 5A - WWTP Admin
Canopies Pkg 5A - WWTP Shop
Covered Parking Pkg 5A at WWTP Shop
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
1 LS
1 LS
1 LS
1 LS
310,025
$12.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2.03
$0.00
$0.00
$0.00
$0.00
$5.84
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$8.67
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1.56
$0.00
$0.00
$5.30
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3.79
$0.76
$2.14
$0.88
$4.80
1.6
0.0%
0.0%
0.0%
0.0%
0.0
0.0
0.0%
0.0%
0.0%
0.0%
0.0%
0.3
0.0
0.0%
0.0%
0.0%
0.7
0.0%
0.0%
0.0%
0.0%
0.0
0.0%
0.0%
1.1
0.0%
0.0%
0.0%
0.0%
0.0
0.0
0.2
0.0
0.0%
0.7
0.0%
0.0%
0.0%
0.0
0.0%
0.0%
0.5
0.1
0.3
0.1
0.6%
Included
Included
Included
Included
Included
Included
IIncluded
Included
Included
Included
IIncluded
49,432
IIncluded
IIncluded
IIncluded
IIncluded
142,140
IIncluded
IIncluded
IIncluded
IIncluded
Included
IIncluded
IIncluded
210,884
IIncluded
IIncluded
IIncluded
IIncluded
Included
IIncluded
37,982
IIncluded
IIncluded
128,991
IIncluded
IIncluded
IIncluded
Included
IIncluded
IIncluded
92,272
18,512
51,975
21,353
116,719
05 1200
Structural Steel
1,180,284
$48.53
6.1
DIVISION 5 TOTALS 1,180,284 I $48.53 6.1
8/28/2025 428 PM
Division 6 Woods & Plastics
DESCRIPTION
06 40 00 Finish Carp/Arch Woodwork
QUAN UNIT
ITEM
TOTALM
$ PER
S.F.
% OF
TTL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Cabinetry & Millwork Pkg 6B - WTP Admin
Rest Room A101 B AND a207 - P-lam Cabinets w/ Quartz Countertops
Shower/ Lockers A102C, A102D, A102E - Reference Division 10
Break Room A108 - P-lam Cabinets w/ Quartz Countertops (Includes Uppers)
Laboratory Al 10 - Reference Division 12
Water Quality Tech Office At 11 - Reference Division 12
Windowsill Corian w/ Plywood
Cabinetry & Millwork Pkg 6B - WTP Shop
Rest Room B105 - P-lam Cabinets w/ Quartz Countertops
Maintenance Staff B103 - P-lam Cabinets w/ Quartz (Includes Uppers)
Windowsill Corian w/ Plywood
Cabinetry & Millwork Pkg 6B - W WTP Admin
Rest Room C109 - P-lam Cabinets w/ Quartz Countertops
Break Room C112 - P-lam Cabinets w/ Quartz (Includes Uppers)
Laundry C114 - P-lam Cabinets w/ Quartz Countertops
Laboratory C116 - Reference Division 12
Shower / Lockers C117A, C117B, C117C, C117D - Reference Division 10
Windowsill Corian w/ Plywood
Cabinetry & Millwork Pkg 613 - W WTP Shop
Rest Room D100B - P-lam Cabinets w/ Quartz Countertops
Quartz Countertops Included as Specified
Plastic Laminate Budget Based on Standard Colors
Cabinets w/ Sinks to be ADA Compliant
1 LS
INCL
EXCL
INCL
EXCL
EXCL
INCL
1 LS
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
EXCL
EXCL
INCL
1 LS
INCL
Clar
Clar
Clar
43,773
$1.80
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.56
$0.00
$0.00
$0.00
$1.91
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.18
$0.00
$0.00
$0.00
$0.00
$4.44
0.2
0.0
0.0%
0.0
0.0
0.0
0.0
0.1
0.0
0.0
0.0
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.6
Included
(Excluded
Included
I Excluded
I Excluded
IIncluded
13,580
Included
Included
IIncluded
46,333
Included
Included
Included
I Excluded
(Excluded
IIncluded
4,268
Included
(Clarification
IClarification
Clarification
06 40 00 Finish Carp/Arch Woodwork
107,954
DIVISION 6 TOTALS 107,954 I $4.44 0.6%
11,,,< y
8/28/2025 428 PM
Division 7 Thermal & Moisture Protection
Er.M 7....,PT,ON
ITEM
$ PER
% OF
QUAN UNIT
TOTAL
S.F.
TTL
07 10 00 Dampproofing & Waterproofing
1
Dampproofing, Waterproofing, and Joint Sealants Pkg 7A - WTP Admin
1 LS
108,909
$4.48
0.6
2
Blind Side Sheet WP at Basement Walls
INCL
IIncluded
$0.00
0.0%
3
Elevator Pit Slab and Walls Sheet WP
INCL
$0.00
0.0%
Included
4
Fluid Applied Air Barrier WP at Masonry
INCL
$0.00
0.0
IIncluded
5
Masonry Flashing
INCL
$0.00
0.0%
IIncluded
6
Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
7
Joint Sealants at Dissimilar Materials
INCL
$0.00
0.0
Included
8
Paving and Slab Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
9
Dampproofing, Waterproofing, and Joint Sealants Pkg 7A - WTP Shop
1 LS
86,199
$3.54
0.4
10
Fluid Applied Air Barrier WP at Masonry
INCL
$0.00
0.0%
IIncluded
11
Masonry Flashing
INCL
$0.00
0.0%
IIncluded
12
Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
13
Joint Sealants at Dissimilar Materials
INCL
$0.00
0.0
Included
14
Paving and Slab Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
15
Dampproofing, Waterproofing, and Joint Sealants Pkg 7A - W WTP Admin
1 LS
90,018
$3.70
0.5
16
Fluid Applied Air Barrier WP at Masonry
INCL
$0.00
0.0
IIncluded
17
Masonry Flashing
INCL
$0.00
0.0%
IIncluded
18
Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
19
Joint Sealants at Dissimilar Materials
INCL
$0.00
0.0
Included
20
Paving and Slab Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
21
Dampproofing, Waterproofing, and Joint Sealants Pkg 7A - W WTP Shop
1 LS
67,037
$2.76
0.3
22
Fluid Applied Air Barrier WP at Masonry
INCL
$0.00
0.0%
IIncluded
23
Masonry Flashing
INCL
$0.00
0.0%
IIncluded
24
Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
25
Joint Sealants at Dissimilar Materials
INCL
$0.00
0.0
Included
26
Paving and Slab Expansion and Control Joints
INCL
$0.00
0.0
IIncluded
27
Spray Insulation Excluded
EXCL
$0.00
0.0%
(Excluded
lExcluded
28 Masonry Water Repellant Excluded EXCL
$0.00
0.0
07 10 00
Dampproofing & Waterproofing
352,163
$14.48
1.8%
07 50 00 Flat Roofing
1
Mod Bitumen Roofing Pkg 7C - WTP Admin
1 LS
98,106
$4.03
0.5
2
2 Ply Mod Bit Low Roof and High Roof
INCL
IIncluded
$0.00
0.0
3
Coping Cap
INCL
IIncluded
$0.00
0.0%
4
Roof Walk Pads
INCL
IIncluded
$0.00
0.0%
5
Patching Roofing from Demo
INCL
IIncluded
$0.00
0.0%
6
Downspouts
INCL
IIncluded
$0.00
0.0%
7
Roof Hatch
INCL
IIncluded
$0.00
0.0%
8
Pavers at Level 2 Balcony
INCL
Included
$0.00
0.0
9
Mod Bitumen Roofing Pkg 7C - WTP Shop
1 LS
116,187
$4.78
0.6
10
2 Ply Mod Bit Roof
INCL
IIncluded
$0.00
0.0
11
Coping Cap
INCL
IIncluded
$0.00
0.0%
12
Roof Walk Pads
INCL
IIncluded
$0.00
0.0%
13
Roof Hatch
INCL
IIncluded
$0.00
0.0%
14
Downspouts
INCL
IIncluded
$0.00
0.0%
15
Mod Bitumen Roofing Pkg 7C - WWTP Admin
1 LS
181,245
$7.45
0.9
16
2 Ply Mod Bit Roof
INCL
IIncluded
$0.00
0.0
17
Coping Cap
INCL
IIncluded
$0.00
0.0%
18
Roof Walk Pads
INCL
IIncluded
$0.00
0.0%
19
Roof Hatch
INCL
IIncluded
$0.00
0.0%
20
Downspouts
INCL
IIncluded
$0.00
0.0%
21
Pavers at Patio
INCL
IIncluded
$0.00
0.0
22
Mod Bitumen Roofing Pkg 7C - W WTP Shop
1 LS
104,562
$4.30
0.5
23
2 Ply Mod Bit Roof
INCL
IIncluded
$0.00
0.0
24
Coping Cap
INCL
IIncluded
$0.00
0.0%
25
Roof Walk Pads
INCL
IIncluded
$0.00
0.0%
26
Roof Hatch
INCL
IIncluded
$0.00
0.0%
27
Downspouts
INCL
Included
$0.00
0.0%
07 50 00
Flat Roofing
500,100
$20.56
2.6
DIVISION 7 TOTALS 852,262 $35.04 4.4%
8/28/2025 428 PM
Division 8 Doors & Windows
ITEM
$ PER
% OF
DESCRIPTION
TOTALITEM
QUAN UNIT
S.F.
TTL
08 10 00 Doors & Frames
1
Doors & Hardware Pkg 8A - WTP Admin
1 LS 109,007
$4.48
0.6
2
Hollow Metal Frames
27 EA IIncluded
$0.00
0.0
3
Hardware
1 LS Included
$0.00
0.0%
4
Hollow Metal Doors
6 LEAFS Included
$0.00
0.0
5
Wood Doors
21 LEAFS Included
$0.00
0.0%
6
Doors & Hardware Pkg 8A - WTP Shop
1 LS 49,291
$2.03
0.3
7
Hollow Metal Frames
9 EA Included
$0.00
0.0
8
Hardware
1 LS Included
$0.00
0.0%
10
Hollow Metal Doors
7 LEAFS Included
$0.00
0.0
11
Doors & Hardware Pkg 8A - W WTP Admin
1 LS 104,041
$4.28
0.5
12
Hollow Metal Frames
27 EA Included
$0.00
0.0
13
Hardware
1 LS Included
$0.00
0.0%
14
Hollow Metal Doors
2 LEAFS Included
$0.00
0.0
15
Wood Doors
25 LEAFS Included
$0.00
0.0%
16
Doors & Hardware Pkg 8A - W WTP Shop
1 LS 45,899
$1.89
0.2
17
Hollow Metal Frames
7 EA Included
$0.00
0.0
18
Hardware
1 LS Included
$0.00
0.0%
19
Hollow Metal Doors
7 LEAFS Included
$0.00
0.0
20
Installation
INCL Included
$0.00
0.0%
21
Hollow Metal Frames to be Standard 16ga Factory Primed
Clar (Clarification
$0.00
0.0
22
Hollow Metal Doors to be Standard 18ga Factory Primed
Clar IClarification
$0.00
0.0
23
Wood Doors to be Standard Plain Sliced Maple Non Exotic Species
Clar IClarification
$0.00
0.0
24
Standard Hardware Includes Hinges, Cylindrical Locksets, Levers in Standard Finishes
Clar Clarification
$0.00
0.0
25
Unload & Protect
50 CMH 6,711
$0.28
0.0
26
Sort & Distribute
80 CMH 11,938
$0.49
0.1
27
Final Adjustment of Hardware
100 CMH 13,922
1 $0.57
$14.01
0.1
1.8
08 1000 Doors & Frames 340,810
08 33 23 OH Coiling Doors/Grilles
1
Overhead Door Pkg 8B - WTP Admin
1 LS 9,960
$0.41
0.1
2
Cornell Cookson Model ESD20 10'-0 Ht x 10'-0 W and MGH Operator
1 EA Included
$0.00
0.0
3
Overhead Door Pkg 8B - WTP Shop
1 LS 48,848
$2.01
0.3
4
Cornell Cookson Model ESD20 12'-0 Ht x 12'-0 W and MGH Operator
3 EA Included
$0.00
0.0
5
Overhead Door Pkg 8B - W WTP Admin (None Shown)
EXCL Excluded
$0.00
0.0
6
Overhead Door Pkg 8B - W WTP Shop
1 LS 57,769
$2.38
0.3
7
Cornell Cookson Model ESD20 16'-0 Ht x 12'-0 W and MGH Operator
3 EA Included
$0.00
$4.79
0.0
0.6
08 33 23 OH Coiling Doors/Grilles 116,577
08 80
00 Glazing
1
Glazing Pkg 8C - WTP Admin
1 LS 105,743
$4.35
0.5
2
Glass Window Types
272 SF IIncluded
$0.00
0.0%
3
Storefront Doors and Lites A105B, A106A, A106B
3 LEAFS Included
$0.00
0.0
4
Storefront Hardware
3 EA IIncluded
$0.00
0.0%
5
Narrow and Half Lites
1 LS Included
$0.00
0.0
6
Glazing Pkg 8C - WTP Shop
1 LS 30,086
$1.24
0.2
7
Glass Window Types
32 SF IIncluded
$0.00
0.0%
8
Narrow and Half Lites
1 LS Included
$0.00
0.0
9
Glazing Pkg 8C - W WTP Admin
1 LS 106,209
$4.37
0.5
10
Storefront Doors, Lites, and Transoms at C100A, C1008, C100C, C112B, C118A, C118B
6 LEAFS Included
$0.00
0.0
11
Storefront Hardware
6 EA IIncluded
$0.00
0.0%
12
Glass Window Types
SF IIncluded
$0.00
0.0%
13
Glazing Pkg 8C - W WTP Shop
1 LS 2,552
$0.10
0.0
14
Narrow and Half Lites
1 LS Included
$0.00
0.0
15
1" IGU at Exterior w/ Aluminum Frame
Clar IClarification
$0.00
0.0
16
1/2" Clear Tempered w/ U Channel Frame at Interior Glass
Clar (Clarification
$0.00
0.0
17
Based on Kawneer Series System or Similar
Clar IClarification _1
$0.00
0.0
08 80 00
Glazing
244,590
$10.06
1.3
DIVISION 8 TOTALS 701,976 $28.86 3.6%
P""' II
Fransen Pittman General Contractors
Division 9 Finishes
8282025 428 PM
$ PER %OF
S.F. TTL
09 06 00 Temp. Prot. For New/Existing Finishes
1
Daily Site Clean Up and Protection of Finishes
2
Final Clean Up
3
Construction Debris Haul Off - Dumpsters
0906 00
Temp. Prot. For New/Existing Finishes
CN27171765
Gypsum Board Assemblies I
1
Drywall/Framing Pkg 9A - WTP Admin
2
Drywall and Metal Stud Framing
3
Insulation
4
Tile Backerboard
5
FRP at Janitor
6
FRP 2x2 Ceiling Tile or Similar
7
Blocking for Accessories
8
Plywood at OF Room
9
Armstrong Formation Ceiling Cloud
10
Drywall/Framing Pkg 9A - WTP Shop
11
Drywall and Metal Stud Framing
12
Insulation
13
Tile Backerboard
14
FRP 2x2 Ceiling Tile or Similar
15
Blocking for Accessories
16
Plywood at OF Room
17
Rigid Insulation and Plywood at E3 and F3 Walls
18
Drywall/Framing Pkg 9A - WWTP Admin
19
Drywall and Metal Stud Framing
20
Insulation
21
Tile Backerboard
22
FRP at Janitor
23
FRP 2x2 Ceiling Tile or Similar
24
Blocking for Accessories
25
Plywood at OF Room
26
Armstrong Formation Ceiling Cloud
27
Light Gauge Joist Framing above Laundry Room
28
Drywall/Framing Pkg 9A - W WTP Shop
29
Drywall and Metal Stud Framing
30
Insulation
31
Tile Backerboard
32
FRP at Janitor
33
FRP 2x2 Ceiling Tile or Similar
34
Blocking for Accessories
35
Plywood at OF Room
36
Light Gauge Joist Framing above PPE Storage, Restroom, and IT Room
37
Install Hollow Metal Frames Only
38
Basement Walls to be Exposed with No Drywall Framing
0921 16 Gypsum Board Assemblies
09 01 60 Flooring Prep
1 IFloorcore testing for chemical content and moisture content- Existing Slab at WTP
0901 60 Flooring Prep
09 60 00 Flooring
1 Flooring Pkg 9B - WTP Admin
2 Floor Tile at Restrooms, Showers, Lockers
3 Wall Tile at Restrooms, Showers, Fountain Wall, Breakroom Backsplash
Sealed Concrete at Basement, Fire Riser, Janitor, Elec/Mechanical, IT Room, Stair, Mud Room,
4 Vestibule, Conference, Break Room, Control Room, Water Quality Tech Office, Corridor, Filter Control,
Storages, Water Plant Officer Office, Chief Plant Officer Office, Copy/Storage
5 Epoxy Flooring at Mini Lab, Laboratory
6 Flooring Pkg 9B - WTP Shop
7 Sealed Concrete at Equipment Storage, Maintenance Shop, Maintenance Staff, OF Room
8 Floor Tile at Restroom
9 Wall Tile at Restroom, Breakroom Backsplash
10 Flooring Pkg 9B - W WTP Admin
11 Floor Tile at Restrooms, Showers, Lockers, Laundry, Mud Room
12 Wall Tile at Restrooms, Showers, Fountain Wall, Breakroom Backsplash
Sealed Concrete at Vestibule, Storages, Conference Room, Offices, Break Room, Control Room, Lab
13 Office, Shared Offices, Corridor, Laundry, Janitor, Fire Riser, Electrical, IT Room, Mud Room, Incubator
Room
14 Epoxy Flooring at Laboratory, Incubator Room
15 Flooring Pkg 9B - W WTP Shop
16 Sealed Concrete at Maintenance Shop, Equipment PPE Storage, IT Room, Enclosed Vehicle Storage
17 Floor Tile at Restroom
18 Wall Tile at Restroom
19 Walk Off Mats
20 Includes Crack Isolation Membrane at Floor Tile and Waterproof Membrane at Showers Only
21 Rubber Base Per Finish Schedule
09 60 00 Flooring
540 �CMH 58,981 $2.43 0.3%
1 LS 13,376 $0.55 0.1
20 EA 20,500 $0.84 0.1
92,857 $3.82 0.5%
1 LS 130,294
$5.36
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
1 LS 27,700
$1.14
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
1 LS 122,999
$5.06
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
1 LS 20,621
$0.85
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
Clar IClarification
$0.00
Clar Clarification
$0.00
301,614
$12.40
0.7
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.1
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.6%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.1
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
1.5%
3,000 $0.12 0.0%
3,000 $0.12 0.0%
1 LS 79,285
$3.26
INCL IIncluded
$0.00
INCL Included
$0.00
INCL Included
$0.00
INCL Included
$0.00
1 LS 16,465
$0.68
INCL IIncluded
$0.00
INCL IIncluded
$0.00
INCL Included
$0.00
1 LS 85,939
$3.53
INCL Included
$0.00
INCL IIncluded
$0.00
INCL Included
$0.00
INCL IIncluded
$0.00
1 LS 15,205
$0.63
INCL IIncluded
$0.00
INCL IIncluded
$0.00
INCL Included
$0.00
INCL IIncluded
$0.00
Clar Clarification
$0.00
Clar Clarification
$0.00
196,894
$8.10
0.4%
0.0
0.0%
0.0%
0.0%
0.1
0.0
0.0
0.0%
0.4
0.0%
0.0
0.0%
0.0
0.1
0.0%
0.0
0.0%
0.0
0.0%
0.0
Fransen Pittman General Contractors 8282025 428 PM
Division 9 Finishes
fi&
$ PER %OF
.. _ S.F. TTL
01 Painting
1 Painting Pk
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
g 9E - WTP Admin
Paint Interior CMU Walls
Paint HIM Frames and HIM Doors
Paint Louver
Tape, Bed, Paint Walls (Level 4 Finish)
Paint Access Ladder
Paint Bollards
Paint Stair Railing (Metal Only)
Paint Exposed Deck and Exposed Duct
Painting Pkg 9E - WTP Shop
Paint Interior CMU Walls
Paint HIM Frames and HIM Doors
Tape, Bed, Paint Walls (Level 4 Finish)
Paint Access Ladder
Paint Bollards
Paint Exposed Deck and Exposed Duct
Painting Pkg 9E - WWTP Admin
Paint Interior CMU Walls
Paint HIM Frames and HIM Doors
Paint Louver
Tape, Bed, Paint Walls (Level 4 Finish)
Paint Access Ladder
Paint Exposed Deck and Exposed Duct
Painting Pkg 9E - WWTP Shop
Paint Interior CMU Walls
Paint HIM Frames and HIM Doors
Tape, Bed, Paint Walls (Level 4 Finish)
Paint Access Ladder
Paint Bollards
Paint Exposed Deck and Exposed Duct
High Performance Coating Excluded
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
1 LS
INCL
INCL
INCL
INCL
INCL
INCL
EXCL
67,422
Included
$2.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1.57
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2.42
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1.71
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.3%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.3%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Included
Included
Included
Included
Included
Included
Included
38,275
Included
Included
Included
Included
Included
Included
58,970
Included
Included
Included
Included
Included
Included
41,470
Included
Included
Included
Included
Included
Included
Excluded
099100
Painting
206,137
$8.48
1.1%
09 99 01 Flooring Stipulations
1
2
3
Fransen Pittman cannot warrant any flooring product without first verifying the substrate material is free
of defects, including but not limited to high moisture content or chemical composition compatibility with
floor coverings and adhesives.
Flooring is installed based on the results of manufacturer required testing at the time of installation.
Fransen Pittman cannot provide a warranty if a product failure occurs and subsequent test results differ
from testing at the time of installation.
Fransen Pittman can only provide a warranty based on the installer and manufacturer's warranty. If the
specified warranty differs from the warranty provided by the manufacturer of the approved product, the
manufacturers warranty prevails.
Clar
Clar
Clar
Clarification
$0.00
$0.00
$0.00
0.0%
0.0%
0.0%
Clarification
Clarification
09 99 01
Flooring Stipulations
DIVISION 9 TOTALS
0
800,502
$0.00
$32.92
0.0%
4.1%
Um
Fransen Pittman General Contractors
8282025 428 PM
Division 10 Specialties
$ PER %OF
LI
NjdjjjjjjW ITEM DESCRIPTION QUAN UNIT S.F. TTL
10 11 00 Visual Display Surfaces
1
Glass Marker Boards Pkg 10B - WTP Admin -By Owner if Required
CLAR By Owner
$0.00
0.0%
2
Glass Marker Boards Pkg 10B - WTP Shop -By Owner if Required
CLAR �By Owner
$0.00
0.0%
3
Glass Marker Boards Pkg 10B - W WTP Admin - By Owner if Required
CLAR By Owner
$0.00
0.0%
4
Glass Marker Boards Pkg 10B - W WTP Shop -By Owner if Required
CLAR By Owner
$0.00
0.0%
1011 00 Visual Display Surfaces 0
$0.00
0.0%
10 12 00 Flag Pole
1 Flag Pole - Excluded 1 1 ILS
lExcluded
$0.00
0.0%
10 12 00 Flag Pole 0
$0.00
0.0%
10 14 00 Building Signage is
1 Signage Pkg - WTP Admin 1 LS 17,835
$0.73
0.1%
2 Signage Pkg - WTP Shop 1 LS 8,081
$0.33
0.0%
3 Signage Pkg - W WTP Admin 1 LS 21,124
$0.87
0.1%
4 Signage Pkg - W WTP Shop 1 LS 5,945
$0.24
0.0%
5 Monument Sign - W WTP Admin 1 LS 8,334
$0.34
0.0%
10 14 00 Building Signage 61,319
$2.52
0.3%
10 21 13 Metal Toilet Compartments
1 None Shown - Excluded I IEXCL
lExcluded
$0.00
0.0%
1021 13 Metal Toilet Compartments 0
$0.00
0.0%
10 28 13 Toilet Accessories
1 Restroom Accessories Pkg 10B - WTP Admin 1 LS 11,025
$0.45
0.1%
2 Paper Towel/Waste Dispenser Combo 9 EA Included
$0.00
0.0%
3 Soap Dispenser 9 EA Included
$0.00
0.0%
4 Toilet Paper Holder 5 EA Included
$0.00
0.0%
5 Toilet Seat Cover Dispenser 5 EA Included
$0.00
0.0%
6 36" Grab Bar 5 EA Included
$0.00
0.0%
7 42" Grab Bar 5 EA Included
$0.00
0.0%
8 Framed Mirror 24x30 5 EA Included
$0.00
0.0%
9 Mop Holder w/ Shelf 1 EA Included
$0.00
0.0%
10 Towel Bar 3 EA Included
$0.00
0.0%
11 Shower Rod and Curtain 3 EA Included
$0.00
0.0%
12 ADA Shower Seat 3 EA Included
$0.00
0.0%
13 ADA Two Way Grab Bar 3 EA Included
$0.00
0.0%
14 Coat Hook 4 EA Included
$0.00
0.0%
15 Restroom Accessories Pkg 10B - WTP Shop 1 LS 2,286
$0.09
0.0%
16 Paper Towel/Waste Dispenser Combo 1 EA Included
$0.00
0.0%
17 Soap Dispenser 1 EA Included
$0.00
0.0%
18 Toilet Paper Holder 1 EA Included
$0.00
0.0%
19 Toilet Seat Cover Dispenser 1 EA Included
$0.00
0.0%
20 36" Grab Bar 1 EA Included
$0.00
0.0%
21 42" Grab Bar 1 EA Included
$0.00
0.0%
22 Framed Mirror 24x30 1 EA Included
$0.00
0.0%
23 Coat Hook 1 EA Included
$0.00
0.0%
24 Restroom Accessories Pkg 10B - WWTP Admin 1 LS 12,103
$0.50
0.1%
25 Paper Towel/WasteDispenser Combo 5 EA Included
$0.00
0.0%
26 Soap Dispenser 5 EA Included
$0.00
0.0%
27 Toilet Paper Holder 5 EA Included
$0.00
0.0%
28 Toilet Seat Cover Dispenser 5 EA Included
$0.00
0.0%
29 36" Grab Bar 5 EA Included
$0.00
0.0%
30 42" Grab Bar 5 EA Included
$0.00
0.0%
31 Framed Mirror 24x30 5 EA Included
$0.00
0.0%
32 Mop Holder w/ Shelf 1 EA Included
$0.00
0.0%
33 Towel Bar 5 EA Included
$0.00
0.0%
34 Shower Rod and Curtain 4 EA Included
$0.00
0.0%
35 ADA Shower Seat 4 EA Included
$0.00
0.0%
36 ADA Two Way Grab Bar 4 EA Included
$0.00
0.0%
37 Coat Hook 5 EA Included
$0.00
0.0%
38 Restroom Accessories Pkg 10B - W WTP Shop 1 LS 2,286
$0.09
0.0%
39 Paper Towel/Waste Dispenser Combo 1 EA Included
$0.00
0.0%
40 Soap Dispenser 1 EA Included
$0.00
0.0%
41 Toilet Paper Holder 1 EA Included
$0.00
0.0%
42 Toilet Seat Cover Dispenser 1 EA Included
$0.00
0.0%
43 36" Grab Bar 1 EA Included
$0.00
0.0%
44 42" Grab Bar 1 EA Included
$0.00
0.0%
45 Framed Mirror 24x30 1 EA Included
$0.00
0.0%
46 Coat Hook 1 EA Included
$0.00
0.0%
47 ASI Spec or Similar CLAR Clarification
$0.00
0.0%
1028 13 Toilet Accessories 27,700
$1.14
0.1%
10 22 26 Operable Partitions
1
Operable Partitions Pkg 10B at WTP Admin
1
LS 22,480
$0.92
0.1%
2
Moderco Model #842 Standard Vinyl Wall Finish or Similar with Pocket Door
CLAR Clarification
$0.00
0.0%
10 22 26 Operable Partitions 22,480
$0.92
0.1%
Fransen Pittman General Contractors 8282025 428 PM
Division 10 Specialties
01
$ PER %OF
- - _ S.F. TTL
11 Wall and Door Protection
1 Wall Protection Pkg 108 -WTP
dmin
1 LS
1,765
$0.07
0.0%
all Protection Pkg 10B -WTP Shop
2 We
1 LS
919
$0.04
0.0%
3 Wall Protection Pkg 10B - WWTP Admin
1 LS
1,009
$0.04
0.0%
4 Wall Protection Pkg 10B -WWTP Shop (None Included)
EXCL
Excluded
$0.00
0.0%
5 Stainless Steel 2" x 2" x 8' L Corner Guards
CLAR
Clarification
$0.00
0.0%
10 26 00 Wall and Door Protection
3,693
$0.15
0.0%
10 41 16 Emergency Key Cabinets
1 Knox Box Pkg 10B - WTP Admin
1 LS
1,250
$0.05
0.0%
2 Knox Box Pkg 10B - WTP Shop
1 LS
1,250
$0.05
0.0%
3 Knox Box Pkg 10B - W WTP Admin
1 LS
1,250
$0.05
0.0%
4 Knox Box Pkg 10B - WWTP Shop
1 LS
1,250
$0.05
0.0%
1041 16 Emergency Key Cabinets
5,000
$0.21
0.0%
10 43 16 Expansion Joint Covers
1 Expansion Joint Covers Pkg 10B - WTP Admin
1 LS
5,000
$0.21
0.0%
2 Nystrom Expansion Joint Covers at Floor and Wall
30 LF
Included
$0.00
0.0%
10 43 16 Expansion Joint Covers
5,000
$0.21
0.0%
10 44 00 Fire Protection Specialties
1 Fire Extinguishers & Cabinets Pkg 106 - WTP Admin
1 LS
3,560
$0.15
0.0%
2 FE & Semi Recessed Stainless Steel Cabinet
8 EA
Included
$0.00
0.0%
3 Fire Extinguishers & Cabinets Pkg 10B - WTP Shop
1 LS
1,804
$0.07
0.0%
4 FE & Brackets
5 EA
Included
$0.00
0.0%
5 Fire Extinguishers & Cabinets Pkg 10B - WWTP Admin
1 LS
2,220
$0.09
0.0%
6 FE & Semi Recessed Stainless Steel Cabinet
4 EA
Included
$0.00
0.0%
7 Fire Extinguishers & Cabinets Pkg 10B - WWTP Shop
1 LS
1,654
$0.07
0.0%
a FE & Brackets
5 EA
Included
$0.00
0.0%
9 Activar Ambassador Series Cabinet or Similar
CLAR
Clarification
$0.00
0.0%
1104400 Fire Protection Specialties
9,238
$0.38
0.0%
1051 00 Lockers & Benches
1 Lockers Pkg 6B - WTP Admin
1 LS
36,722
$1.51
0.2%
2 Metal Lockers 24" x 24" x 72" - Space Saver Freestyle Lockers
14 EA
Included
$0.00
0.0%
3 Lockers Pkg 6B - WWTP Admin
1 LS
47,725
$1.96
0.2%
4 Metal Lockers 24" x 24" x 72" - Space Saver Freestyle Lockers
17 EA
Included
$0.00
0.0%
1051 00 Lockers & Benches
84,447
$3.47
0.4%
DIVISION 10 TOTALS 218,877 I $9.00 1.1%
Division 11 Equipment
8/28/2025 428 PM
11 31 00 Appliances
1
Appliances Pkg 11C - WTP Admin
2
Water Tech Office
3
True Refrigeration Reach In Fridge True T-43-HC 47"
4
Scotsman Undercounter Unit CU3030
5
Break Room
6
Ice Machine - Hoshizaki DCM-500BAH-OS
7
Range - GE Model #PSS93YPFS
8
Refrigerator - GE Model # GFE26JYMFS
9
Dishwasher- GE Model #GDT226SSLSS
10
Microwave - By Owner
11
Garbage Disposal
12
Appliances Pkg 11C - WTP Shop
13
Refrigerator- GE Model # GFE26JYMFS
14
Microwave - By Owner
15
Garbage Disposal
16
Appliances Pkg 11 C - WWTP Admin
17
Ice Machine - Hoshizaki DCM-500BAH-OS
18
Range - GE Model #PGS930YPFS
19
Refrigerator- GE Model # GFE26JYMFS
20
Dishwasher- GE Model #GDT226SSLSS
21
Microwave - By Owner
22
Garbage Disposal
23
Washer- Speed Queen LFNE5BSP115T W01
24
Dryer - Speed Queen LDEE5BGS173TW01
25
Appliances Pkg 11C - WWTP Shop (None Included)
26
Appliances Specs/Quantities Listed per Equipment Matrix Received 06/30/25
27
All Other Appliances are Budgeted Until Specification Received
11 31 00
Appliances
11 5300
Laboratory Equipment
1
Incubator Pkg 11F - WWTP Admin
2
Cold Room Model #LAB-G1 NN 8x14
3
Virtual Touchscreen
4
Viewport Window 14"x14"
5
GFCI Duplex
6
Freight to Jobsite
7
Access Into Building and Installation Coordination
8
Commissioning and Owner Training
9
WTP Lab Equipment
10
WWTP Lab Equipment
11 5300
Laboratory Equipment
$ PER % OF
S.F. TTL
1 LS
1 LS
1 EA
1 EA
1 LS
1 EA
1 EA
1 EA
1 EA
EXCL
1 EA
1 LS
1 EA
EXCL
1 EA
1 LS
1 EA
1 EA
1 EA
2 EA
EXCL
1 EA
2 EA
2 EA
EXCL
Clar
Clar
31,791
Included
$1.31 0.2%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0
$0.00 0.0%
$0.13 0.0
$0.00 0.0%
$0.00 0.0
$0.00 0.0%
$1.18 0.1
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
$0.00 0.0%
1 $0.00 0.0%
$2.61 0.3
Included
Included
Included
Included
Included
Included
Included
Excluded
Included
3,045
Included
Excluded
Included
28,588
Included
Included
Included
Included
lExcluded
(Included
Included
Included
I Excluded
(Clarification
IClarification
63,424
1 LS
88,843
$3.65
0.5
INCL
Included
$0.00
0.0%
INCL
Included
$0.00
0.0%
INCL
Included
$0.00
0.0%
INCL
Included
$0.00
0.0%
INCL
Included
$0.00
0.0%
1 LS
8,456
$0.35
0.0
INCL
Included
$0.00
0.0%
1 ALLOW
300,000
$12.34
1.5%
1 ALLOW
100,000
$4.11
$20.45
0.5%
2.6%
497,299
DIVISION 11 TOTALS 560,723 $23.06 2.9%
Fmnsen Pittman General Contractors
8/28/2025 428 PM
Division 12 Furnishings
GNP
12 20 00 Window Treatments
1 Window Treatments Pkg 12A - WTP Admin
1 LS
6,681
2 Hunter Douglas 1" Cordless Aluminum Blinds
22 EA
IIncluded
3 Window Treatments Pkg 12A - WTP Shop (None Included)
EXCL
Not Included
8,383
4 Window Treatments Pkg 12A - WWTP Admin 1 LS
5 Hunter Douglas 1" Cordless Aluminum Blinds
30 EA
Included
Not Included
9 Window Treatments Pkg 12A - WWTP Shop (None Included) EXCL
12 20 00 Window Treatments
15,064
12 3100 Mfg & Specialty Casework
1 Lab Casework Pkg 12C - WTP Admin
1 LS
89,032
2 Lab A110 & Water Quality Tech Office A111
INCL
Included
3 Powder Coat Steel Casework with Phenolic SPC Chem Sinks and Countertops
INCL
Included
5 Lab Casework Pkg 12C - WWTP Admin
1 LS
164,098
6 Lab C116
INCL
Included
7 Powder Coat Steel Casework with Phenolic SPC Chem Sinks and Countertops
INCL
Included
8 Fume Hood FH-1 Labconco or Equal
INCL
IIncluded
1231 00 Mfg & Specialty Casework
253,130
1251 00 Furniture
1 Control Room Consoles Pkg 12D - WTP Admin
1 LS
108,739
2 Control Room A109
INCL
IIncluded
3 Console A - Large (SitStand w/ 7 Monitor Capability)
INCL
Included
4 Console B - Large (Sit/Stand w/ 7 Monitor Capability)
INCL
Included
5 Millwork, Delivery, Offloading, Install
INCL
IIncluded
6 Control Room Consoles Pkg 12D - WWTP Admin
1 LS
83,156
7 Control Room C113
INCL
IIncluded
8 Console A - NextGen 46" x 72" Sit/Stand Dual Monitor
INCL
Included
9 Console B - NextGen 46" x 72" SitStand Dual Monitor
INCL
Included
10 Console C - NextGen 46" x 72" Sit/Stand Dual Monitor
INCL
Included
11 Console D - NextGen 46" x 72" SitStand Dual Monitor
INCL
Included
12 Millwork, Delivery, Offloading, Install
INCL
IIncluded
1251 00 Furniture
191,895
DIVISION 12 TOTALS
460,089
$ PER % OF
S.F. TTL
$0.27 0.0
$0.00 0.0
$0.34 0.0
$0.00 0.0
$0.00 0.0
$0.62 0.1
$3.66 0.5
$0.00 0.0
$0.00 0.0
$6.75 0.8
$0.00 0.0
$0.00 0.0
$0.00 0.0
$10.41 1.3%
$4.47 0.6
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$3.42 0.4
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$0.00 0.0
$7.89 1.0%
$18.92 2.4%
Division 14 Conveying Systems
8/28/2025 428 PM
14 20 00 Elevators
1
Elevator Pkg 14A at WTP Admin
1 LS
2
Cab Finishes and Flooring
INCL
3
TKE EOX Machine Room -Less
CLAR
4
2,1001b Capacity, 150 FPM, 3 Stops
CLAR
5
12-Month Maintenance and Service Period
INCL
6
Platform for Installation and Pre -Inspection Requirements
1 LS
14 20 00
Elevators
DIVISION 14 TOTALS
$ PER % OF
S.F. TTL
108,674
$4.47
0.6
;luded
$0.00
0.0%
arification
$0.00
0.0%
arification
$0.00
0.0%
:luded
$0.00
0.0%
9,800 1
$0.40
0.1
118,474
$4.87
0.6
118,474 I $4.87 0.6
8/28/2025 428 PM
Division 15 Mechanical
ITEM
$ PER
% OF
ITEM DESCRIPTION
QUAN UNIT
TOTAL
S.F.
TTL
21 0000 Fire Suppression
1 Fire Protection Systems Pkg 15B - WTP Admin
1 LS
85,616
$3.52
0.4
2 Fire Protection Systems Pkg 15B - WTP Shop (Not Required)
EXCL
Excluded
$0.00
0.0
3 Fire Protection Systems Pkg 15B - W WTP Admin
1 LS
43,406
$1.78
0.2
4 Fire Protection Systems Pkg 15B - W WTP Shop (Not Required)
EXCL
Excluded
$0.00
0.0
5 Lift and Site Access
1 LS
3,600
$0.15
0.0
21 0000 Fire Suppression
132,622
$5.45
0.7
22 00 00 Plumbing
1 Plumbing Pkg 15A - WTP Admin
1 LS
330,575
$13.59
1.7
2 Sampling Wall Mock Up / Install Allowance
1 ALLOW
15,000
$0.62
0.1
3 Plumbing Pkg 15A - WTP Shop
1 LS
102,935
$4.23
0.5
4 Plumbing Pkg l5A-WWTPAdmin
1 LS
440,465
$18.11
2.3%
5 Gas Line from Meter to Building
INCL
Included
$0.00
0.0
6 Plumbing Pkg l5A-WWTPShop
1 LS
105,085
$4.32
0.5%
22 00 00 Plumbing
994,060
$40.87
5.1
23 00 00 HVAC
1 Mechanical Pkg 15A - WTP Admin
1 LS
595,510
$24.49
3.1
2 Mechanical Pkg 15A - WTP Shop
1 LS
90,025
$3.70
0.5
3 Mechanical Pkg 15A - W WTP Admin
1 LS
657,510
$27.04
3.4
4 Mechanical Pkg 15A - WWTP Shop
1 LS
86,220
$3.55
0.4
5 Site and Lift Access
1 LS
10,250
$0.42
0.1
6 All Controls and BACNET Excluded
EXCL
Excluded
$0.00
0.0
7 Includes Stand Alone T Stats
CLAR
Clarification
$0.00
0.0
8 Test and Balance Included
CLAR
Included
$0.00
0.0
23 00 00 HVAC
1,439,515
$59.19
7.4
21 9901 Mechanical Systems Coordinator
mm
1 1 Mechanical Systems Coordinator
40 iHours
I 5,365
$0.22
0.0
21 9901 Mechanical Systems Coordinator
5,365
$0.22
0.0
DIVISION 15 TOTALS 2,571,562 I $105.74 13.2%
Fmn- Pittman General Contractors
8/28/2025 428 PM
Division 16 Electrical
ITEM
LINE
ITEM DESCRIPTION
26 00 00 Electrical
QUAN UNIT
TOTAL
Electrical Pkg 16A - WTP Admin
1 LS
459,299
2 SCADA Connections Allowance
1 ALLOW
10,000
3 Lightning Protection
1 LS
16,524
4 Electrical Pkg 16A - WTP Shop
1 LS
214,056
5 Electrical Pkg 16A - WWTP Admin
1 LS
848,704
6 SCADA Connections Allowance
1 ALLOW
10,000
7 Lightning Protection
1 LS
20,196
8 300kwGenerator
CLAIR
(Clarification
9 Electrical Pkg 16A - WWTP Shop
1 LS
184,965
10 Fire Alarm Pkg 15B - WTP Admin
1 LS
34,820
11 Fire Alarm Pkg 15B - WTP Shop
1 LS
20,700
12 Fire Alarm Pkg 15B - WWTP Admin
1 LS
29,140
13 Fire Alarm Pkg 15B - WWTP Shop
1 LS
19,980
14 Fire Alarm Sensors Include Dual Smoke/CO2 Sensors
CLAR
(Clarification
15 Based on Providing Vigilante Fire Alarm System
CLAR
Clarification
26 00 00 Electrical
1,868,384
27 00 00 Communications
1
Structured Cabling Pkg 16B - WTP Admin
1
LS
43,089
2
Structured Cabling Pkg 16B - WTP Shop
1
LS
33,122
3
Structured Cabling Pkg 16B - WWTP Admin
1
LS
83,253
4
Structured Cabling Pkg 16B - WWTP Shop
1
LS
7,973
27 00 00 Communications
167,437
28 13 00 Access Control and Security Cameras
1 Access Control and Security Pkg 16B - WTP Admin
1 LS
216,868
2 Access Control and Security Pkg 16B - WTP Shop
1 LS
40,800
3 Access Control and Security Pkg 16B - WWTP Admin
1 LS
190,642
4 North Gate - Add New Pedestal, Control Keypad/CR, Intercom Station, 270 Deg Camera
INCL
Included
5 South Entry Gate - Rework Existing Equipment for New Location
INCL
Included
6 Access Control and Security Pkg 16B - WWTP Shop
1 LS
51,000
7 By Schneider Electric
CLAR
Clarification
281300 Access Control and Security Cameras
499,310
DIVISION 16 TOTALS
2,535,132
$ PER % OF
S.F. TTL
$18.89 2.4%
$0.41 0.1
$0.68 0.1
$8.80 1.1
$34.90 4.4
$0.41 0.1
$0.83 0.1
$0.00 0.0
$7.61 0.9
$1.43 0.2%
$0.85 0.1
$1.20 0.1
$0.82 0.1
$0.00 0.0
$0.00 0.0
$76.83 9.6
$1.77 0.2%
$1.36 0.2%
$3.42 0.4
$0.33 0.0
$6.88 0.9
$8.92 1.1
$1.68 0.2%
$7.84 1.0%
$0.00 0.0
$0.00 0.0
$2.10 0.3%
$0.00 0.0
$20.53 2.6
$104.24 13.0%
Page 20
AMENDMENT No.2
WHEREAS, the City of Grapevine (CITY) and Freese and Nichols, Inc,
(ENGINEER) made and entered into an engineering services contract, (the
CONTRACT) which was authorized by City Council on the 7th day of
November, 2023 in the amount of $2,130,000 (1,933,081 with 10%
contingency);
WHEREAS, the CONTRACT was subsequently revised by: Amendment 1. in
the amount $120,000 ($108,448 with a 10% contingency) which was
authorized by City Council. on August 20,2024 for (WWTP Generator,
Secondary North Gate and WWTP Conceptual Design of two -building scheme;
and
WHEREAS, the CONTRACT involves engineering services, as attached,
for the following project:
WATER TREATMENT AND WASTEWATER TREATMENT ADMINISTRATION FACILITIES
IMPROVEMENTS; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated March 13, 2025 and a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional Construction Services to be performed by Engineer
totals $129,000. (See Attached Funding Breakdown Sheet, Page -3- )
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $2,379,000.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
City of Grapevine
Professional Services Agreement Amendment Template
City Attorney Release January 2020
Page 1 of 3
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Grapevine
Bruno Rumbelow
City Manager
DATE:
APPROVAL RECOMMENDED:
Bryan Beck, P.E.
Director, Public Works Department
ATTEST:
Tara Brooks
City Secretary
City of Grapevine
Professional Services Agreement Amendment Template
City Attorney Release January 2020
Page 2 of 3
ENGINEER
Freese and Nichols, Inc.
Vimal Nair, P.E.
Principal
DATE:
City Council Date:
FUNDING BREAKDOWN SHEET
Purchase Order No.
Summary of Original Contract, Amendment No 1. & Amendment No. 2
Department Fund -Account -Center Amount
201-48830-155-851-
000078 & 201-48830- Water Treatment and Wastewater Treatment 1,933,081
155-851-000079 Administration Facilities Improvements
201-44830-155- WWTP Admin Building Emergency Generator I $17, 835
851-000079
201-44830-155- WWTP Secondary Gate Entrance $21, 986
851-000079
201-44830-155- WWTP Conceptual Design of two -building $68, 627
851-CO0079 scheme
201-48830-155-851-
000078 & 201-48830-
155-851-000079 ConstructionServices $129, 000
Subtotal: $2,170,529
Contingency: $208,471
Total: $2,379,000
City of Grapevine
Professional Services Agreement Amendment Template
City Attorney Release January 2020
Page 3 of 3
ATTACHMENT A
SCOPE OF SERVICES FOR:
CONSTRUCTION PHASE SERVICES FOR THE WATER TREATMENT PLANT AND
WASTEWATER TREATMENT PLANT
ADMINISTRATION FACILITY IMPROVEMENTS
Overall Task Order Summary:
The scope of work is for Freese and Nichols Inc. (FNI) to provide PART TIME construction phase services
on the Project for the City of Grapevine (Client). Assumptions include:
1. 54 week construction duration beginning October 2025
2. City is providing day-to-day inspection effort
3. City and/or CMAR are providing construction materials testing
AK I IUL '1 . CwpE OF WORK
PROJECT UNDERSTANDING
The scope of work is to supplement the original design contract that FNI is currently completing. This
amendment will provide PART TIME construction phase services on:
Water Treatment Plant Administration Buildink;
The Water Treatment Administration Building improvements will include a 3 level addition to the
existing filter building. The roof structure will consist of a metal deck and steel roof joists, while the floor
framing will be a composite deck over steel beams. The walls will be CMU with a brick veneer. The
foundation design is based on the geotechnical report but is to be a drilled pier foundation with
concrete walls for the basement walls.
No structural modification will be made to the existing filter building except when connecting to the new
building. Work in the existing filter control room is not in scope.
Water Treatment Plant Maintenance Building
The new Maintenance building will consist of a CMU structure with a flat roof system over a metal deck
and steel roof joists. The foundation is designed based on the recommendations in the geotechnical
report but is to be a slab on ground foundation.
Wastewater Treatment Plant Administration Building,
The existing Administration/Operations building will be demolished. Client is responsible for relocating
the existing wood framed city owned buildings located north of the GRACE center, prior to construction
of the new Wastewater Treatment Administration Building which will consist of a single -level building
made up of CMU walls and a flat roof. Roof framing will consist of a metal deck and steel roof joists.
Building design will include the installation of concrete or CMU walls for retaining the soil at the sloping
topography for the foundation. It is assumed that there will be no additional retaining walls required
around the building. A performance specification will also be provided for the canopy at plant level.
Page 1 of 6
March 13, 2025
Grapevine WTP and WWTP Facility Improvements Construction Phase Services — SOW
March 13, 2025
Wastewater Treatment Plant Maintenance Buildin!
The new Maintenance building will consist of a CMU structure with a flat roof system over a metal deck
and steel roof joists. The foundation is designed based on the recommendations in the geotechnical
report but is to be a slab on ground foundation.
BASIC SERVICES
Task 1.0 Construction Phase Services
A. Upon beginning the construction phase services in October 2025, FNI will proceed with the
performance of construction phase general representation and part time construction
management services as described below. In performing these services, it is understood that
FNI does not guarantee the CMAR's performance, nor is FNI responsible for the supervision
of the CMAR's operation and employees. FNI shall not be responsible for the means,
methods, techniques, sequences or procedures of construction selected by the CMAR, or
any safety precautions and programs relating in any way to the condition of the premises,
the work of the CMAR or any Subcontractor. FNI shall not be responsible for the acts or
omissions of any person (except its own employees or agents) at the Project site or
otherwise performing any of the work of the Project.
Freese and Nichols, Inc. (FNI) will staff the project in the field as follows:
• Part-time Senior Construction Manager:
o Average of 2 hours per week for 54 weeks (108 hours)
o Senior construction manager will support as needed in the field and for issue
resolution.
Part-time Construction Manager:
o Average 8 hours per week for 54 weeks (432 hours)
o Construction manager will make one site visit per week and support items
shown in scope below.
B. The primary roles and responsibilities of the Construction Manager are as follows
1. Attend the pre -construction conference with the CMAR.
Establish communication procedures with the Client and CMAR and Engineering Team
with the Engineer of Record (EOR). Submit site visit reports of construction progress.
Reports will describe construction progress in general terms and include progress
photographs that include location and description of what is pictured. Any non-
conforming work will be documented and elevated to the Inspector, Engineering Team
and CMAR for corrective action. 54 visits total per the 8 hour per week budget. Visits
will be utilized when needed and not necessarily each week depending on work onsite
to be viewed.
3. Assist the EOR's Engineering Team in the submittal process workflow using PMIS
system.
Page 2of6
Grapevine WTP and WWTP Facility Improvements Construction Phase Services — SOW
March 13, 2025
4. Assist with the processing/review of the Payment Requests and supporting
documentation submitted by CMAR. Work with inspection staff to verify quantities.
5. Using the PMIS RFI process, work with the EOR's Team on interpretation of the drawings
and specifications for Client and CMAR.
6. Assist the EOR's Team in change modifications to the Contract Documents including
review of pricing and backup documentation.
7. Assist the Client and FOR with the final review of the Project for conformance with the
design concept of the Project and general compliance with the Construction Contract
Documents. Assist with preparation of a list of deficiencies to be corrected by the
CMAR before recommendation of final payment. Assist the City in obtaining legal
releases, permits, warranties, spare parts, and keys from the CMAR. Review and
comment on the certificate of completion and the recommendation for final payment
to the CMAR.
8. Conference and Meetings: As needed, attend meetings (such as monthly progress
meetings or job conferences) with the CMAR, FOR and Client.
9. Liaison:
a. Serve as the EOR's liaison with the CMAR, working principally through the
CMAR's superintendent and assist in understanding the intent of the Contract
Documents (per the EOR); and assist the FOR in serving as the Client's liaison
with the CMAR when CMAR's operations affect Client's on -site operations.
b. Assist in obtaining from Client additional details or information, when required
for proper execution of the Work.
10. Review of Work, Rejection of Work, Inspections and Testing: It is understood that this
scope is for part-time coverage of work onsite so there will be potential for work to be
performed without observation.
a. During site visits, conduct on -site observations of the Work in progress and
work conducted in between site visits to determine if the Work is in general
proceeding in accordance with the Contract Documents.
Produce site visit reports that detail work ongoing/observed, any completed
work reviewed, issues, photographic documentation, testing observed and
work that does not conform to the contract documents. File reports in the
PMIS system and notify EOR, CMAR, and Client when uploaded.
11. Certificates, Maintenance and Operation Manuals: During the course of the Work,
assist the team to confirm that certificates, maintenance and operation manuals and
other data required to be assembled and furnished by CMAR are applicable to the items
actually installed and in accordance with the Contract Documents, and have this
material delivered to Engineer for review and forwarding to Client prior to final
payment for the Work.
12. Completion:
Page 3 of 6
Grapevine WTP and WWTP Facility Improvements Construction Phase Services —SOW
March 13, 2025
a. Before Client issues a Certificate of Substantial Completion, assist with the
production and submission to CMAR of a list of observed items requiring
completion or correction.
b. Work with Inspection Staff and CMAR to confirm that CMAR has performed
inspections required by laws or regulations, ordinances, codes or order
applicable to the Work, including but not limited to those to be performed by
public agencies having jurisdiction over the Work.
c. Participate in a final inspection in the company of EOR, Client and CMAR and
prepare a final list of items to be completed or corrected.
d. Along with the Inspector, observe whether all items on final list have been
completed or corrected and corrections are adequate for acceptance.
13. Limitations of Authority of Part Time Construction Manager:
a. Shall not authorize any deviation from the Contract Documents or substitution
of materials or equipment (including "or -equal" items).
b. Shall not exceed limitations of EOR's authority as set forth in Agreement or the
Contract Documents.
c. Shall not undertake any of the responsibilities of CMAR, Subcontractor,
Suppliers, or CMAR's superintendent.
d. Shall not advise on, issue directions relative to or assume control over any
aspect of the means, methods, techniques, sequences or procedures of
construction unless such advice or directions are specifically required by the
Contract Documents.
e. Shall not advise on, issue directions regarding or assume control over safety
precautions and,programs in connection with the Work or any activities or
operations of Client or CMAR.
f. Shall not participate in specialized field or laboratory tests or inspections
conducted by others, except as specifically authorized by EOR.
C. ASSUMPTIONS:
1. Construction duration of 54 weeks.
2. Construction phase services will not be needed on weekends or conduct nighttime
work.
3. Construction Management staff will not provide technical review. The FOR will process
all submittals in the project PMIS.
4. CMAR will provide a construction trailer on -site for the FNI construction staff to work
in and hold meetings as needed.
5. Construction Materials Testing is contracted directly with the Client OR under the
Page 4 of 6
Grapevine WTP and WWTP Facility Improvements Construction Phase Services —SOW
March 13, 2025
contracts of the CMAR.
6. City will be providing inspection staff for the project. These individuals will be handling:
a. Day-to-day inspection needs onsite.
b. Quantity calculations to verify pay applications submitted by the CMAR.
c. Observation, documentation and notification of non -conforming work.
Coordination of corrective actions and verification of the work plan to fix the
issues observed.
d. Coordination of the testing laboratory onsite for any CMT needs. Ensuring
documentation of testing (passing and failing) are in the PMIS system for the
project record.
e. Preparing documentation of contract modifications for the project. Receiving
and evaluating notices of CMAR claims and review of pricing, backup and
associated documentation. Negotiate with the CMAR for any pricing for
contract changes.
f. Manage the final review of the project files, punchlist, and corrective action to
any punchlist items for project closeout.
g. Monitor CMAR production/maintenance of red -line drawings in the field and
provide them to the FOR for record drawing production at the end of the
project.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
A. Additional Services not included in the existing Scope of Services — Client and FNI agree that
the following services are beyond the Scope of Services described in the tasks above.
However, FNI can provide these services, if needed, upon Client's written request. Any
additional amounts paid to FNI because of any material change to the Scope of the Project
shall be agreed upon in writing by both parties before the services are performed. These
additional services include the following:
1. Services beyond the duration of the assumed construction durations noted within.
2. Performance of materials testing or specialty testing services.
3. Services necessary due to the default of the CMAR.
4. Services related to damages caused by fire, flood, earthquake or other acts of God.
5. Services related to warranty claims, enforcement and inspection after final completion.
6. Services related to Survey Construction Staking
7. Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by Client.
Page 5 of 6
Grapevine WTP and WWTP Facility Improvements Construction Phase Services —SOW
March 13, 2025
ADDITIONAL SERVICES
Client may authorize the FOR to provide additional services related to the Project but not specifically
enumerated herein. Compensation for any of the ADDITIONAL SERVICES authorized by Client shall be
based on the actual labor hours and expenses incurred in performing the work, in accordance with
ARTICLE III. No work will be performed under this item without prior written authorization of Client.
ARTICLE II COMPENSATION
Construction Phase Basic Services S129.000
Total
$129,000
*Fee will be billed within the cost plus maximum amount shown at hourly rates. It is anticipated that
the FNI CM representatives will average the 8 hours weekly towards the project but that some weeks
will be higher/lower depending on work occurring onsite. FNI's staff will manage the effort towards the
8 hours per week average and will notify the City of any higher/lower than expected burn rates through
our monthly reporting.
Page 6 of 6
ORDINANCE NO.2025-056
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS, AUTHORIZING THE
APPROPRIATION OF REVENUE IN THE AMOUNT OF
$20,621,000 IN THE UTILITY ENTERPRISE FUND
RECEIVED FROM THE SALE OF BONDS AND INCLUDING
INTEREST ACCRUED AND AUTHORIZING THE
APPROPRIATION OF $20,621,000 IN THE UTILITY
ENTERPRISE FUND FOR EXPENDITURES ASSOCIATED
WITH THE WATER AND WASTEWATER TREATMENT
PLANT IMPROVEMENT PROJECT; DECLARING AN
EMERGENCY AND PROVIDING AN EFFECTIVE DATE
WHEREAS, the City of Grapevine has received funds from the sale of bonds
approved in 2024 and accrued interest for the Water and Wastewater Treatment Plant
Administration Building Improvements Project; and
WHEREAS, all constitutional and statutory prerequisites for the approval of this
ordinance have been met, including but not limited to the Open Meetings Act and Chapter
211 of the Local Government Code; and
WHEREAS, the City Council deems the adoption of this ordinance to be in the best
interests of the health, safety, and welfare of the public.
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF GRAPEVINE, TEXAS:
Section 1. That all matters stated hereinabove are found to be true and
correct and are incorporated herein by reference as if copied in their entirety.
Section 2. That the City Council hereby authorizes an amount of
$20,621,000 revenue be appropriated in the Utility Enterprise Fund based on receipts
of funds from the approved sale of bonds and accrued interest.
Section 3. That the City Council hereby authorizes an amount of
$20,621,000 for expenditures be appropriated in the Utility Enterprise Fund associated
with the Water and Wastewater Treatment Plant Administration Building Improvements
Project.
Section 4. That the terms and provisions of this ordinance shall be
deemed to be severable, and that if the validity of any section, subsection, word,
sentence, or phrase shall be held to be invalid, it shall not affect the remaining part of
this ordinance.
Section 5. That the fact that the present ordinances and regulations of
the City of Grapevine, Texas, are inadequate to properly safeguard the health, safety,
morals, peace and general welfare of the inhabitants of the City of Grapevine, Texas,
creates an emergency for the immediate preservation of the public business, property,
health, safety and general welfare of the public which requires that this ordinance shall
become effective from and after the date of its final passage, and it is accordingly so
ordained.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS on this the 16th day of September, 2025.
APPROVED:
William D. Tate
Mayor
ATTEST:
Tara Brooks
City Secretary
APPROVED AS TO FORM:
Matthew C.G. Boyle
City Attorney
Ordinance No. 2025-056 2