Subject: Structural Engineering Opinion - Initial Onsite Visit
S'raUu n �a I o -n
�4 4
700 Briars Ct, Grapevine, TX 76051
(817)
To Whom It May Concern: aw
Thomas Engineering Consultants JEC) was retained to conduct a review of the proposed limited foundation
repair plan prepared by Atlas Foundation Inc. (the contractor) to determine, in our opinion, if the recommended
remediation plan is a reasonable plan of repair.
The contractor provided a limited repair plan which included the pre -lift elevations and recommended piling
locations for the structure for our review. No other information was provided regarding any exploratory
measures such as soil testing concrete testing, prior engineering reports, prior recommendations for
foundation repairs, or any construction documents relative to this structure, If existing pilings are shown in
the limited repair plan, then their locations were provided by either the homeowner or contractor. Such existing
pilings are approximated and are not certified in any way by TEC. If the reader would like to determine if they
are present, they must contact the homeowner or contractor to obtain an engineering certificate certifying
tweitll
According to the contractor, the foundation system appears to have settled towards the areas whe--�-,-
foundation remediation is recommended which coincides to areas of cosmetic stress. Atlas Foundation Inc.
has included the following items in their recommended limited repair plan:
mnmmmjM�
#
This report provides our reasonable professional opinion of the condition of the foundation on the date of the
inspection and does not take into consideration any changes in the condition of the foundation or soils after
the date. The contents of this report supersede any verbal comments made regarding the structure before,
during or after the inspection.
We recommend pre -lift and post -lift plumbing tests be performed on the sewer and potable plumbing lines.
Any leak found shall be repaired immediately.
PP
1OWDE' Al,,M Sr.ALZ-,L L T,' �R
ROM r;rrG*-9RE0 E'-,NCW"NZER
RECEIVED111712024
C 0 i "," i R"NH N 0 ;;gib TIE 1 N',� S r, E CTl 0 N A ND 24-004069
PR()V,5,L O�'-' MER ',NSTPik LATION WHIEW 700 BRIANA COURT
WORK is CIDNMLE FOUNDATION REPAIR
. ............. .1 . .................. ........ . ... .... .......
I
TEC does not warrant the future performance of the subject foundation. The reader is urged to review this
report in its entirety. The limit of liability is limited to the fee paid for this opinion. No further agreement shall
be made, altered, or varied except by written instrument. This report has been completed to document the
repairs to be implemented by the contractor. Neither Thomas Engineering Consultants nor Thomas A
LaLonde, Jr, P.E., are responsible for liability to the owner or others for acts or omissions of the contractor to
carry out the repairs in accordance with their agreement or for the construction means, methods, techniques,
sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the
warranty of the work they performed in accordance with their agreement.
Please see the attachments for additional information on the recommended repairs as well as the general
recommendations for maintaining foundations in North Texas. If you have any questions or if we can be of
further service, please give us a call. We appreciate the opportunity to serve you.
kg
Thomas A. LaLonde, Jr., P.E., M.ASCE
Registered Professional Engineer
State of Texas #93572
Attachments:
TEC - Disclosure & Disclaimer
TEC - Conditions Observed
TEC - Relative Elevation Survey
Atlas - Limited Repair Plan
Atlas - Combination Piling
Atlas - Concrete Piling
Atlas - Steel Piling
Atlas - Pier and Beam Interior Pier
TEC - General Recommendations for a Foundation Maintenance Program
WSMIM,
I
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due
to expansion, contraction or densification of the soils etc. This soil movement could possibly cause the
foundation to move after the remediation plan within the attached report has been implemented and may
impact the stability of the foundation and cause damage. NO WARRANTY IS EXPRESSED OR IMPLIED BY
THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUNDATION OR THE REPAIRS THERETO.
Diligent foundation maintenance to maintain consistent soil conditions along the perimeter should reduce
further problems after the recommendations within this report have been implemented. However, seasonal
moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it
in danger of further damage.
This report is written for informational purposes only and is not intended to be a detailed technical evaluation
of the property or an inventory of defects. The opinions expressed in this report are based on a visual
evaluation of current conditions observed at the time of the inspection. THERE IS NO WARRANTY,
EXPRESSED OR IMPLIED, CONCERNING THIS ENGINEERING REPORT.
The information in this report supersedes any verbal comments, expressed or implied, made by Thomas
Engineering Consultants or its principals, agents or employees. The client agrees that neither TEC nor its
employees or owners will be responsible for:
1 . Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite
drilling and testing of the recovered samples,
2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the
client; and
1 Any other element such as joists or beams and other structural members that is boxed or otherwise
not readily available to TEC for viewing, and releases TEC from any liability attributable to such
knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent
performance of the structure at the time of this assessment. Compliance with any code or specification other
than as expressly noted is specifically excluded.
V i gm
%411q0qw2*1V M.4
I WIN, I Illy-,
TEC expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE and the client
expressly disclaims that it has contracted for or received any warranty of fitness for a particular purpose with
respect to this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF TEC AND THERE
ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS
AGREEMENT.
Thomas Engineering Consultants Page 4 of 13
a
TEC's inspection of the interior finishes of the subject structure revealed the stresses in the table below. This
inventory of stresses is for informational purposes only and is not intended to provide a detailed inventory of
all defects. Furthermore, these stresses will change as moisture content of the supporting soils beneath the
foundation changes.
PSh�eeroc* observations
X Walls Garage
X Ceiling Garage
X Tape & Bedding Wrinkles Garage
X Repaired Cracks
inventory of stresses is for informational purposes only and is not intended to provide a detailed inventory of
all defects. Furthermore, these stresses will change as moisture content of the supporting soils beneath the
foundation changes.
_!_.BAN I Descrip!jq�..
Bricks & Mortar
X Brick and Mortar Crack
Repaired Cracks
Mortar Line Deflections
Garage and Exterior Doors
Out of Square
Evidence of Movement
Frame Separations
Excessive Caulking
Frieze and Trimboards
X Separated
Excessive Caulking
Comments
North and east sides of the house: hairline
North side of the house
Appear acceptable
Thomas Engineering Consultants Page 5 of 13
Property Address: 700 Briana Ct, Grapevine, TX 76051
TEC - CONDITIONS OBSERVED (con't)
- DRAINAGE A complete drainage assessment of the property was not ordered and is beyond the scope of
this report. No opinion is offered regarding onsite and offsite drainage as it affects or may affect the subject
property. Suggestions, if given, concern the drainage very near the foundation only.
r AA I AN Drainage Corrections Comments
--T-
x other
RETAINING WALL
Assure positive drainage away from the house at all points an4
allow no standing or ponding water near the house.
if any signs of movement are noted by the homeowner, they should contact a structural engineer to further
investigate. If any such retaining walls are present on this property, they were not evaluated by Thomas
Engineering Consultants.
AA I AN I Description
MKNMEEE�= �
X TreesILandscape Noted
X Grade Beam
x I Chimney
1=
i 1W
Yes
Northeast corner of the house: corner pop
North side of the house: hairline crack
If applicable, no opinion is offered as to whether or not correct
tension is on the cables.
Moist due to recent rains or irrigation activity
Wm3mm,
I
TEC — Relative Elevation Survey
(not to scale)
0
PPOVH)E- SiGlIED ANIO' S,'�,,AURV LSTTER
C' 0 H F I R rd i f 4 G S 4 T E 1 NI S P E CIN 0 N A', H D
APPROVAL Or-Pic—R, �NS'C'ALLAIION V0-!FN
0
-n,NNN o
LEGEND
Elevation Basepoint
Relative Floor Elevations in "inches" NOTES
Elevations Measured from Ceiling 1) Elevations are adjusted for variations in floor materials.
Topographic Contour Lines 2) Contour lines are interpolated based on data collected during this investigation
Thomas Engineering Consultants Page 7 of 13
a
•M�
PROVNDE 13iGNED AND SEALED LM-7TiER
FROM GO R,
SITE N'W-"EMNON AND
APPROWkL OF t,71ER IN1,1�,,,TALLATiON V',1WEN
�VORK M CC',MPLETE;:
-04 0,0
Al/d
Garage
1 2 -2,0
NOTE
This drawing is provided for preliminary permitting purposes only and is a limited plan of repair. Additional work may be
needed once the foundation work has begun based on the performance of this limited plan of repair. Thomas Engineering
Consultants has provided review of this limited plan of repair and it is our opinion that it is reasonable and safe for the
structure. If interior piers are shown on this drawing the contractor will place them based on the locations of grade beams, sir u„
plumbing lines and post tension cables, therefore, the locations shown on this map are approximate. The contractor shall
provide the means -and -methods of this installation. Additional repairs may be required upon review of the structure by
Thomas Engineering Consultants. This is a proposed scope of work and has not been completed therefore we do not certify
any existing or proposed foundation repair work on this map at this time. If the reader would like to be certain that any
proposed or existing repairs have been completed they must request an engineering certificate for the subject foundation
work from the foundation repair company,
Thomas Engineering Consultants
Property Address: 700 Briana CL Grapevine, TX 76051
0132��=
Void after
Lifting Foundation
Steel Shims
Concrete Cylinders
Cap Block
Soil
R—, Apig
Steel cap sheet
2-7/8 Cutter steel pipe
2-3/8 Inner Steel pipe
FROM SMOINE'ER
CCWMFV1MMh15 si"PE !NSPZC1'?V4 AiND
s*,Pr,,OVAL OF F"IER WHILH
WORK aS r,,C,1VU.,"TE
... .. . ...... . ....... . ....... .
WS3 U-IMM,
12'LENGTH
6'DIAMETER
PILE SECTION
r 10
Thomas Engineering Consultants
Property Address: 700 Briana Ct, Grapevine, TX 76051
SIDE VIEW
FRONT VIEW
I P I f f I
�;IKXL EJA�S
c 0 14(1 R F
X vvi
CAP
XY
7FI#
['.7M
!'I" Lf NG Ili
P- i i-NG i
4' MAIM,—, I k
plu, SLC I IONS
f PNISILE S T RENG i H
P R0Vr)!' D Rv � VV0
COLW11141-' Of ft" OK
94 SGi 0, Ddl 1 60
REBA", PLAY OR
UROUT IN PLACE,
0 T
Te ric'N"'M AND
FROM, RECl�,T=PED
Rr BAR SWAI
PRL Vi�: U7 LAI E RAL
P.`�IOVAL Df, I ,M , —N
FZ MS TALIA
IWt CWsrLETE
B F. T, V� F H
CYL014DER6, 1,,," IW'
OR L4' SEC F)ONSIL
MAY B� US` D,
Thomas Engineering Consultants
Property Address: 700 Briana Ct, Grapevine, TX 76051
VOID—L—
AFIE
LIFT
BE=#1
I - STEEL SHIMS
_.._.CONCRETE CYLINDERS --
-CONCRETE OR STEEL CAP
STEEL CAP SHEET, _
-'- -2-7,8" OUTER STEEL PIPE-.-....._
=390M
Thomas Engineering Consultants
Property Address: 700 Briana Ct, Grapevine, TX 76051
SONOTUBE DETAIL
(if applicable)
GIRDER i BEAM
SCALE N TS
METAL SHIMS
10" (MIN) SONOTUBE
FILLED WITH 3,000 PSI (MIN) (4) #4 REBAR
GROUND LEVEL #3 STIRRUPS
18" x 24"X12" (MIN) CONCRETE PAD
3,000 PSI (MIN) w4(4) 44 REBAR O,CE W
PAD /BLOCK DETAIL
(if applicable)
SCALE N TS
..............
NOTE MINIMUM PAD DEPTH 24 INCHES
GIRDER) BEAM
METAL SHIMS
8" x 8" (MIN) CMU BLOCK
FILLED WITH GROUT
GROUND LEVEL #5 REBAR - 2 EA
18"x 24" xG" (MIN) CONCRETE PAD
3,000 PSI (MIN) W/(4) #4 REBAR O.0 E.W.
NOTE: MINIMUM PAD DEPTH 24 INCHES
Stab Foundation
700 Briana Ct, Grapevine Texas 76051
Kennedale, Texas 76060
(817) 576-1973
Texas Registered Engineering Firm F-15336
Thomas Engineering Consultants JEC) was retained to visually inspect the foundation repairs completed by
Atlas Foundation Inc. (the contractor) on April 4, 2025. The purpose of the installation according to the
contractor was to provide support and mitigate downward movement in the areas of the foundation where
physical damage was present in conjunction with measured low areas of the foundation system. To the best
of our knowledge, the contractor has performed the limited repairs in substantial conformance with their
provided Limited Repair Plan and our Initial Foundation Repair Consultation Report dated November 6, 2024,
including any approved changes, see attached Limited Repair Plan. It is the opinion of TEC that the foundation
repairs meet or exceed 2021 IRC and the city of Grapevine Amendments. I have not seen the results of the
recommended plumbing tests as outlined in the Initial Foundation Repair Report for the subject property. If
these tests have not been conducted, they should be completed as soon as possible, and any leaks found
should be repaired immediately.
ne lelalrsplel rTIRTMTM vat T-TrK$-M- I 15-ur r F r i t
prior to the repair work. It should, however, be noted that partial repairs modify the basic design of the
foundation and differential movements may occur. Partial repairs are a generally accepted industry practice,
but the possibility of future movement must be recognized. Non -supported areas are not covered against
foundation movements by the contractor's warranty or the repair plan.
Additionally, it is known to all experienced engineers with knowledge of foundation movement causation that
fully underpinning the entire structure is not economically feasible due to the cost vs. benefit and the risk of
resulting damages. Compliance with any code or specification other than those explicitly stated are not
included. The contents of this report supersede any verbal comments made regarding the structure before,
during or after the inspection.
The opinions in this report are based on the experience and judgement of TEC along with the information
provided by the contractor in addition to information collected at the subject property. This report is for
informational purposes only and is not intended to provide a detailed inventory of defects or a technical
evaluation of the structure, drainage system or the overall property. Normal construction standards and
generally accepted allowables have been used for any evaluations made.
ZEMM
I
The contractor provided a Limited Repair Plan that included the pier locations and pre -lift elevations for tM
structure for our review. If existing piers are shown in the Limited Repair Plan, their locations were provided
by the client and are approximated. We do not certify their performance or existence. If the reader would like
to determine if they are present, they must contact the owner or contractor to obtain an engineering certificate
for them. Documents that provide original structural design drawings, design conditions, or "as-builf' drawings
or stab elevations at the time of construction were not available at the time of the inspection. Therefore,
knowledge of interior grade beam locations or other foundation information is unknown.
PrO1►-0 �#'k ".l
[01 MEMO
ifff UP6 4WROR,
drainage away from the structure, material and soil sampling/testing, verification of concrete reinforcement,
knowledge of the location of interior grade beams, boxed structural members not in plain sight or previous
repair work of any kind.
The opinions given in this report are based on the observations made at the time of the visit and in no way
should be considered a solution to possible future foundation movements or problems that may occur for any
reason. No warranty is expressed or implied. Conditions may change that directly affect the drainage, soil
moisture contents, or other factors not evident at the time of the visit. It must be realized that after any
suggested foundation repairs are completed, the house will continue to be subject to the inherent foundation
problems associated with the native soils. Given the expansive soils in this part of the country, movements
neighborhoods. Soil movements can only be controlled and can never be eliminated. Seasonal variations in
the soil moisture contents may result in the formation of new cracks, or in varying length and width of existing
interior and exterior cracks. Furthermore, the client or individual ordering this report agrees that TEC is not
on -site drilling or testing of samples.
,�aTF,#00TIM717Mn4c" pr*)Tme a reak-Wria iwr*1
and is not intended to level the foundation. The contractor determined the amount of elevation correction
needed based on the reaction of the structure during the lift in order to minimize damages and additional
stress. Because the structure has endured pre -repair foundation differential movement, residual differential
elevation and other cosmetic issues may remain following the foundation limited repair, such as interior and
exterior wall distress, door sticking, and doorway leaning.
The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture
content fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls
will surface due to seasonal movement within the soils, whether or not foundation repairs are performed on
this structure. Periodic repair of this type of cracking may be needed. However, if cracks appear to worsen
and there are new indications of foundation movement, we recommend re-evaluating the structure.
EMM-1
I
Performance of different piling types such as steel, concrete, and a combination of steel and concrete will
vary. Generally speaking, the performance of different piling types are a function of piling depth and skin
friction. The deeper the piling is pushed, then the better it will perform. Shallow installations may be acceptapeek
if they are terminated into rock. This information is meant to serve as a guideline and the owner must decide
a reasonable cost/benefit on the property. Piling design is most accurate when based on a site -specific soils
investigation. While such an investigation was not provided and is not a part of this scope of work, we strongly
recommend obtaining this data. If this data is not provided, our piling design is only intended to be a minimum
standard based solely upon average soil conditions in the general location of the property and as such, may
not necessarily provide maximum performance.
TEC does not warrant the future performance of the subject foundation. The reader is urged to review this
report in its entirety. The limit of liability is limited to the fee paid for this opinion. No further agreement shall
be made, altered, or varied except by written instrument. This report has been completed to document the
repairs implemented by the contractor. Neither Thomas Engineering Consultants nor Thomas A LaLonde, Jr,
P.E., are responsible for liability to the owner or others for acts or omissions of the contractor to carry out the
repairs in accordance with their agreement or for the construction means, methods, techniques, sequences,
procedures or the safety precautions incident thereto. The contractor is solely responsible for the warranty of
the work they performed in accordance with their agreement.
This report has been prepared for the exclusive use of the client listed on Page 1. All representation made
herein is for the sole and exclusive use of the client, and no transfer or assignment of this report shall ensue
to the benefit of any other person, firm, or corporation without the expressed written consent of TEC. This
report addresses the results of TEC's work completed to date. Therefore, should additional information
become available, we reserve the right to determine the impact, if any, of the new information on our opinions
and conclusions and to revise our opinions and conclusions if necessary.
Please see the attachments for additional information on the recommended repairs as well as the general
recommendations for maintaining foundations in North Texas. If you have any questions or if we can be of
further service, please give us a call. We appreciate the opportunity to serve you.
NSIMME=
Thomas A. LaLonde, Jr., P.E., M.ASCE
Registered Professional Engineer
State of Texas #93572
Attachments:
TEC - Disclosure & Disclaimer
Atlas - Limited Repair Plan
TEC - Post -Lift Elevation Survey
TEC - General Recommendations for a Foundation Maintenance Program
MMMU,
I
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due
to expansion, contraction or densification of the soils etc. This soil movement could possibly cause the
foundation to move after the remediation plan within the attached report has been implemented and may
impact the stability of the foundation and cause damage. NO WARRANTY IS EXPRESSED OR IMPLIED BY
THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUNDATION OR THE REPAIRS THERETO.
gent foundation maintenance to maintain consistent soil conditions along the perimeter should reduce
further problems after the recommendations within this report have been implemented. However, seasonal
moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it
in danger of further damage.
The information in this report supersedes any verbal comments, expressed or implied, made by Thomas
Engineering Consultants or its principals, agents or employees. The client agrees that neither TEC nor its
employees or owners will be responsible for:
1 . Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite
drilling and testing of the recovered samples,
2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the
client; and
1 Any other element such as joists or beams and other structural members that is boxed or otherwise
not readily available to TEC, for viewing, and releases TEC from any liability attributable to such
knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent
performance of the structure at the time of this assessment. Compliance with any code or specification other
than as expressly noted is specifically excluded.
Fm gm
"I"*M 1160' I 1 01111*1*011*1 F***M* ff-ow, I` 1"Offl, INS%. 4 111"
IN: H 11.1 1 .14 BONN IN 110111,8102111 1011-Al I* WNW 1111J.1111
TEC expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE and the client
expressly disclaims that it has contracted for or received any warranty of fitness for a particular purpose with
respect to this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF TEC AND THERE
ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS
AGREEMENT.
Thomas Engineering Consultants Page 5 of 8
a
"o o
I
1-1
4 z
.... .................. ... ..... I
LEGEND
Elevation Basepoint
Relative Floor Elevations in "inches" NOTES.
Elevations Measured from Ceiling 1) Elevations are adjusted for varrations in floor materials.
'ropographic Contour Lines 21 Contour bay interpolated based on data collected during this investigation.