Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
74620_10146_061025-25-DM9377-023-FieldDensityT-IH
06/10/2025Report Date:Client:APD Capital, LLC Project: Location: "Proposed Auto Park Dallas" 2101 S Stemmons Fwy, Lewisville, TX 75067 2101 S Stemmons Fwy, Lewisville, Texas 75067 Project #:25-DM9377 FIELD DATA Building Pad Section #6 Test Method:ASTM D-6938 (Nuclear) General Location: Retest Required: Standard Proctor (ASTM D-698)Project Specifications: PROCTORS Test Date Proctor #Test Procedure Soil Description Max. Dry Density (pcf) Optimum Moisture (%) 05/16/2025 004-L1 Standard Proctor (ASTM D698)Brown SANDY CLAY (CL) -Sample# (3)100.0 20.1 FIELD TESTS Test #Date Test Elevation Location Depth (in) Water Content (%)Density (lbs/ft^3)% Compaction % Required Pass/ Fail Comments Field Opt.Wet Dry Max. 1 06/13/2025 7th Lift NE Section of BP Section #6 8.00 23.40 20.10 119.8 97.10 100.00 97.00 95.0 PASS 2 06/13/2025 7th Lift SW Section of BP Section #6 8.00 23.90 20.10 118.0 95.20 100.00 95.00 95.0 PASS 3 06/13/2025 7th Lift Center Section of BP Section #6 8.00 23.50 20.10 119.1 96.40 100.00 96.00 95.0 PASS 4 06/13/2025 8th Lift NW Section of BP Section #6 8.00 23.50 20.10 119.1 96.40 100.00 96.00 95.0 PASS 5 06/13/2025 8th Lift SE Section of BP Section #6 8.00 24.10 20.10 117.6 94.80 100.00 95.00 95.0 PASS 6 06/13/2025 8th Lift Center Section of BP Section #6 8.00 23.40 20.10 118.8 96.30 100.00 96.00 95.0 PASS 7 06/13/2025 9th Lift SW Section of BP Section #6 8.00 24.10 20.10 117.5 94.70 100.00 95.00 95.0 PASS 8 06/13/2025 9th Lift NE Section of BP Section #6 8.00 23.70 20.10 120.6 97.50 100.00 98.00 95.0 PASS 9 06/13/2025 9th Lift Center Section of BP Section #6 8.00 23.90 20.10 118.4 95.60 100.00 96.00 95.0 PASS 10 06/13/2025 10th Lift NW Section of BP Section #6 8.00 23.40 20.10 119.8 97.10 100.00 97.00 95.0 PASS 11 06/13/2025 10th Lift SE Section of BP Section #6 8.00 24.10 20.10 117.5 94.70 100.00 95.00 95.0 PASS 12 06/13/2025 10th Lift Center Section of BP Section #6 8.00 23.20 20.10 120.0 97.40 100.00 97.00 95.0 PASS 13 06/13/2025 11th Lift NE Section of BP Section #6 8.00 22.70 20.10 120.6 98.30 100.00 98.00 95.0 PASS 14 06/13/2025 11th Lift SW Section of BP Section #6 8.00 23.50 20.10 119.1 96.40 100.00 96.00 95.0 PASS 15 06/13/2025 11th Lift Center Section of BP Section #6 8.00 24.10 20.10 118.1 95.20 100.00 95.00 95.0 PASS Report Copied to: Tareq Nimr, Chris Bowles, Momo McCarter, Nicholas Nimiri, Omar Oweis, Matt Zahm/Z Constructors, Tyler George/Z Constructors, Scott Rohne/City of Lewisville, Isidro Abella/City of Lewisville Field Density Testing Report #:023 www.geoscienceinc.com GeoScience Engineers, LLC, 2712 Satsuma Drive, Suite 400 | Dallas | TX 75229 | Phone: 972-488-3500 | Email: info@geoscienceinc.com Page 1 of 2 06/10/2025Report Date:Client:APD Capital, LLC Project: Location: "Proposed Auto Park Dallas" 2101 S Stemmons Fwy, Lewisville, TX 75067 2101 S Stemmons Fwy, Lewisville, Texas 75067 Project #:25-DM9377 Representative/Inspector: Idrees Hussein Notes: As requested, a representative from our company arrived on site as scheduled and performed the above test. These test results apply only to the specific locations noted and do not represent any other location. Reports may not be reproduced except in full, without permission. GeoScience Engineers, LLC CMT Admin Date Signed: 06/13/2025 06:30 PM Field Density Testing Report #:023 www.geoscienceinc.com GeoScience Engineers, LLC, 2712 Satsuma Drive, Suite 400 | Dallas | TX 75229 | Phone: 972-488-3500 | Email: info@geoscienceinc.com Page 2 of 2