HomeMy WebLinkAboutSFRA2025-003648 ECEIVED: 9/26/2025 DATE OF ISSUANCE:
25-003648
2803 HIGHCREST DR
SECOND STORY
PERMIT
'BUILDING PERMIT APPLICATION
(PLEASE PRINT LE91BLY - COMPLETE ENTIRE FOP-Nn
JOB ADDRESS:
LOT: Z4- BLOCK: SUBDIVISION:
BUILDING CONTRACTOR (company name
r eo,J6 T
CUR"NT MAILINqADDRESS:
WAL Fax#
CffY/STATE/ZIP: --PH: #
PROPERTY OWNER: Cqfb SM -9Lk0X--0
CURRENT MAILING A 11DRESS: Z100S Y64ME-0- Dbuf--
CITY/STATE/7JP: 07kAltviic —rx
., i rCDD
FIRE SPRINKLERED? YES NO Ple'
WHAT TRADES WILL BE NEEDED? ems ELECTRIC PLUMBING (-MECHANICAL L,--'
DESCRIPTION OF WORK TO BE DONE: 4mf- Avorgo-i
USE OF BUILDING OR STRUCTURE: i!�En
NAMIE OF BUSINESS. -
Total Square Footage under roof. Square Footage of alteration/addition: %?I 64M6f-"
1 hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance With
State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new biMdings,
alterations and additions)
I hereby certify that plans have been submitted to the Texas Departmentof licensing and Regulation for Accessibility Review.
Control Number: (Not required for I & 2 family dwellings)
I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Gra i evine. I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED SIBILITY BY THE CITY, AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH "Fill-, ,r VAL FROM THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S)
PRINT NAME: Ofti SIGNATURE
PHONE #: Lib W-1c VKS EMAIL:
13 CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL
Construction Tom_
Permit Valuation: $
1 Setbacks
I proval to Issue
OCCU Banc GrDTL.
Fire Sprin1der: YES NO
Front: 410
Electrical
Division:
Building Depth:
Left:
Plumbi
onin —,-1-B,uildin,19
Width:
Rear:
Mechanical
Occupancy Load:
I,Grease Trap
Ri,01t.- 7,
Hoo, d
Plan Review Aeproval.
Date: 1,4q
Building Permit Fee:
Site PI ro A an _p2 val:
Date:
Plan Review Fee:
Fire Department:
Date:
Lot Drainale Fee:
Public Works Dcparttncnt;
Date:
Sewer Availabilitv Rate:
Health_pe2arftnent:
Date:
Water Availability Rate:
Approved for Permit:
Date:
Total Fees:
Lot Drainage Submitted:
Approved:
Total Amount Due:
P.O. SOX9$104. GRAPEVINE, TX76099 (817)41"65 0:FORMS4OSPFIRMMAPPLICATIONS 1102-ROMIMAMA IM7 1- -1 -
ity of Grapevine
Building - Residential
PO Box 95104
Addition
Grapevine, Texas 76099
%
817) 410-3166
Project # 25-003648
Project Description; Construct a 2 -Story Addition (1,799 sf) to
**NO
a.
Existing (3,471 sf) Residence ALTERATION TO
EXISTING STRUCTURE [ELECTRONIC REVIEW]
Issued on: 11119/2025 at 11: 17 AM
ADDRESS
2803 Highcrest Dr,
Grapevine, TX 76051
LEGAL
Western Oaks Blk 3 Lot
24
A 24
S2203
*05629942*
Chris Preston
- Chris Preston
CDP Construction
(940) 464-7830
W:21011 I[4fl 11
1. Building Framing
2. Building Bracing / Sheathing
3. Building Wall Tie Inspection
I
—APPLICANT NAME (individual)
"APPLICANT PHONE NUMBER
APPLICANT E-MAIL
VALUATION
Square Footage
CONSTRUCTION TYPE
OCCUPANCY GROUP
ENERGY REPORT (CITY STAFF USE
ONLY)
DOCUMENT - LOT DRAINAGE PLOT
PLAN (CITY STAFF USE ONLY)
DOCUMENTS - MISC 01
DOCUMENTS - MISC 02
DOCUMENTS - MISC 03
ZONING DISTRICT
APPROVED TO ISSUE ELECTRIC
APPROVED TO ISSUE PLUMBING
APPROVED TO ISSUE MECHANICAL
SETBACK: LEFT
SETBACK:FRONT
SETBACK:REAR
SETBACK: RIGHT
P
�. Building Energy Codg
5. Building Final
Chris Preston
6306759853
520000
1799
VB
R-3
Sladden Residence 2015 IECC
REScheck.pdf, 2803 Highorest Dr -
Energy Code Review Compliance
Letter. pdf
25-003648 - APPROVED LOT
DRAINAGE.pdf
2803 Highcrest Permit Application.pdf
PLANS.pdf
Lot Drainage.pdf
R-1 2.5
YES
YES
YES
8
40
25
8
Page 1/3
MyGov.us 25-003648, 11/19/2025 at 11: 17 AM Issued by: Amanda Robeson
FEE
Building Permit Fee, R-3
(Addition) S
TOTALS
a
.. _ _-- • _ 1 1, ►
TOTAL r' 1
1,799.00 $ 1,799.00 $1,799.00
1,799.00 $ 1,799.00 $ 0.00
I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY AND THAT
THE DESIGN PROFESSIONAL OWNER IS RESPONSIBLE FOR OBTAINING
SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL
Signature
Building Residential Additii 4
Project/1
BUILDING1) ALL work must be done in compliance with the 2021 INTERNATIONAL BUILDING CODE.
** ALL work ISSUED prior to January 1, 2024, must be done in compliance with the 2006 INTERNATIONAL
CODE.
Project ar• ` be '. posted at the ••
NOTES
INSPECTION
METRO (17) 10-010, CUT OFF TIME FOR A.M. INSPECTION IS 7:30 A.M. --- CUT OFF TIME FOR P.M.
INSPECTION IS 1:P.M.
> PERMIT ISSUED IN I APPLICATION I IN THIS OFFICE.
THIS PERMIT SHALL EXPIRE IF WORK IS NOT COMMENCED WITHIN (10DAYS) OF ISSUANCE OR IF
WORK IS SUSPENDED N ON FOR A PERIODF (10 DAYS). THE ISSUANCE OR
__........ _ Page 2/3
MYGOV.US 25-003648, 11/19/2025 at 11:17 AM Issued by: Amanda Robeson
I
Rif
g
2.
0
ms s';'�T r ~ w � ® A
LJ
H
IC
;mco)
221
-T
av
!tJ
JI
m
EASEMENT WITHOUT PRIOR APPROVAL.
MAINTAIN CURRENT DRAINAGE PATTERN.
GRASS/EROSION CONTROL REQUIRED BEFORE FINAL.
Ll
RAI
X- SUL135r2
I 3 I i i i IK
Ll
I 3 I i t t it .-iitJU_'6
- - ill i i it -y IIs16+i ta(3/
III r' ;��M t 1 E IE 0ASIEG !ONTS IN BLUE
II -
a
-r nac 14 NO asacT
DAHED JO',T� 6N GRAY
lilt I 3 1�1 k I;3=• �
Ali
JOGTS D GRAY _ .III,
ARE 16' TJI EGO,i�Ji
INt ':i
y". ,••I 3 1 I it
37/,,6(.I— III ___..__.. _.—. c ----- __ ._------- _._......... _....
Lr—
III '
SUU3512 avx_ - -
FOS 37/16(4
SUR352
n5`, fI :RGYJ REpTO
AFE ib" TA 130's ` F
(2)2 X 11s _ -I
Ilk RE(OW � _ •� - _ -�
9Y THFR3 `
H
a1lz�a'=ILOGI
OUR
FOES THIS IGLOO
SYST
ATEMOTURAL LAMS THE
ESIErvTAUDRNOG,6uT NLTTLIMITEDTOEM
JOISTS TRUSSES AND BEAMSI REMAINS THE SOLE RESPONSIBILITY
OF THE MANUFACTURER OR SUPPLER NSTALLATON SHALL �+ „
THE REOU REYIENTI AMONG OUR
PLANSANDDETAILSI THEMANUFACTURER'SISUPPLIER S PLANS AND -
I DETAILS APPL CABLE CODES AND ACCEPTED ENGINEERING _ _
T/ll%lvlri l.Sl PRACTICES ANY POTENTIAL CONFLICTS SHALL BE BROUGHT TO THE P:J
1S till1N(/FrCTT RED 3� ID7L ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION
TRIA.il JI$$T CORPOPATICIV, ';L. DEIAIL BTLUW AFE PROJECT SEADDEN RESIDENCE DATE 10/27l25 41 -
nPICAI GETAr ORd LS
oA um !l, P 5 3H05L0 0E rrnLOWED IF ADDRESS:
iL _ camo+Tcv; nlarrH GEra;t, E0-27-25
•' - ' ', ElEN rr NC NOICU 2803 HIGHCREST DR.
'+ H, L I ' . : ON ACPIAI- LAY;111T GRAPEVINE, TX
VT
I N,I mmnee, r=axe =• .,da
H "I
b
RAF FLR/I IhL C'L 2I EEcD iAN71LEVER C� Cwmur ER IGg1 F;C4L G!'SSET e=�
(m)
J,�rFATRaTFP 1 ,A"
WRAF' EN IRE THI G W I H HIHIBHAHH
F f
/oT
Io4YCa5:R"ryp0 Q4 GY[GT f,MRtllS
AK�Mi� afN. )�4f
`S r H
j
i
M
m
(�e) STllT3 k AFF�;CATION
i To,-
UTY
28C5 HIGHPANT OR CMPHINE, TA
1604TJ
6
C6P EONSTR'LCn O:v
161 CTJ
U
G7 11 /PY5 .. ...
1612TJ
0
""`" "' SNI ENc TIUK
i 6141J
71
PpFTIER
1 F, 15T,1
1626TJ
6
21
..r.,, SWANVER
,
TOTAL OTY
55
TOTAL LINEAR
Orr T'IPE ICr, it FE
18 iW 422 5 IT;181114
21 ;411 3!4' X 14'
1 20 LVL
3 hL'414-2 +3 IT3237,115
52 (2J1 31'4" X 16"
X 10' LVL
i `GA5725/IA 2
63 (2j i 3 -:.Y 16"
X 14' LVL
i T,,F
B4(2)1 31U, ,t
E" X ?3' LVL
+ "1'.500 .Y 1Y
2 16` TJI _'3G's 1 _^0'
;11,
6 7REATEG 2 X is X I6'
;TUCK J/
OIL
2 14` AMBOARu 1 16'
6 " RMNGnRD x 16'
5F,0 19
A
MATERIALI6TO BE EMPPEG
TOTAL OT
3
_
W/ `ISO FG[URC, PQ
TOT.1L Ll EAR r7
752
A/AxxOry 1 n L Pre
H1 2 1 ;AA" 18" Lv;
H2 ! 1 3,AI_ i1 715_1 i1' L'/!
H3 2 / 314' 11 7/8" 13' L'/C
N4 ! 1 3/1' 111 l 4" 1 14' I L'/L
.-C -
E
LEGEND
TO I MJOIST '
REAM YR HEADER
R
N II All" 1
121
i
`r
'1
�ee
`yRA HAN<FRanmee•:MT TO Jr.-
MINIMUM o ASTFf+FR n"FtiUIRFA1t NT5
qv.
AL
I(i't4) t'AA4RER �'PIf"rVTArIOV
"MIA
SLADDEN RESIDENCE
-- -- -- -- -- -- -- -- -- -- -- -- -- - ---- --
j3
Sheet Sheet Issue Sheet
- 3
Number Sheet Name Daie Number
G0
`COVER SHEET
—' i� •'
1
G i
!CODE SHEET/SPECIFICATIONS
. , " ' _._
jG+� � - _ � -
' . _ -„ _`
- '�•� `�
[ G 2
G 3
[SPECIFICATIONS
j-;_ i
_ _ _iSPECIFGATONS
G4
ISPECIFICATIONS
—
a „
G 5
EXH-1
ISPEC IFICATIONS
DRAINAGE PLAN
S0.0
[GENERAL NOTES
Y _, , a9= •;, :
S0.1
I�TYPICAL FRAMING DETAILS
_
_ ➢
=
S0 2
803
[TYPICAL FRAMING DETAILS
'[TYPICAL FRAMING SCHEDULE
S0 4
'!TYPICAL FRAMING SCHEDULE
S0.5
S-1 -0
['TYPICAL FRAMING SCHEDULE
FOUNDATION PLAN
51.1
S 1.2
FOUNDATION DETAILS
11 ST FLOOR SHEARWALL PLAN
. _... _. ._... _. ._..._
_..._ ._. _._ ._. _........
S1 3
12ND FLOOR SHEARWALL PLAN
S1 4
`1ST FLOOR CEILING & 2ND FLOOR FRAMING PLAN
S1 5
�2N0 FLOOR CEILING FRAMING PLAN
cr
S16
FRAMING PLAN
�,rn• o u ,
All
IROOF
ARCHITECTURAL SITE PLAN
10608/2025
Al2
GROUND LEVEL - DEMOLITION PLAN
O61i 2025
A13
SECOND LEVEL -DEMOLITION PLAN
106/1812025
A2 t
LEVEL- FLOOR PLAN
I06118/2025
A2 2
_GROUND
SECOND LEVEL - FLOOR PLAN
_ _ _
06/i82025
A23
_
_ROOF PLAN
06/18/2025
A3t
GROUND LEVEL- REFLECTED CEILING PLAN
06118/2025
A32
SECOND LEVEL- REFLECTED CEILING PLAN
061IW2025
A41
EXTERIOR ELEVATIONS
06,1812025
A42
EXTERIOR ELEVATIONS
06118/2025
A43
BUILDING SECTIONS
06/18/2025
A5 t
WALL SECTIONS
06,18/2025
A61
INTERIOR ELEVATIONS
06118/2025
A7 1
SECTION DETAILS
06,1812025
A72
SECTION DETAILS
06/1812025
A7 3
SECTION DETAILS
06/18/2025
'', A74
BATHROOM DETAILS
06,18/2025
', El i
GROUND LEVEL -ELECTRICAL PLAN
06/18;2025
Ell
SECOND LEVEL -ELECTRICAL PLAN
06118/2025
06.18/2025
06/18;2025
06/78/2025 = a imammISITUR111011 III
06/18/2025
0611812025
--' —
__
0611812025
06/78/2025
0611812025
06/1812025
06/1812025
-
06118f2025
06;1812025
-S C-_ Tn
061t812025
1 " _ I\ -.
O6/1025
.6122025
�-
0611812025
O6/18I2025
.
06,18l2025
06/18/2025
: ••F'
W
Lf')
W�
x
aIl W F-
Nu W
_Z
�= d
�o
N
No. Description Date
R�pEO gRCy
5 E.a�aa ij,
NjgTP �F S�+pO
COVER SHEET
Date 06/18/2025
G.0
Scale
` SCHE'jL- - cu: Ilnserl s:nn �a,e]
a s�Fe a�l�al
CGR
DITIONS — DESIGN PROFESSIONAL A INSURANCE REQUIREMENTS
ciarfa Fis
imeLness or conf_rtrance f,he Fe W.,'h'2Ne 1%rac rumens f,h oenYc p isi.ns ois cngreeere�J -ha-aTec- in'egnry yu y,
A TFe GO II, or shall �raimain Commeinal General Li yICtiL, lirswance w[h hnii,s no'lessflan
Un
0
x
H
W
_Z
>
W
d
L
j No. Description Date
R�pEO gRCy
NjgTP �F S�+pS
CODE
SfHEET/SPECIFICATIO IS
Date 06/18/2025
G.1
1 PP
PART'a Ek=CUT10N n Fpry
ACIATION
Venfy subs =lsclean FI
B CF..rtllna—XasN nga J�,a R°o ngt es nansure ronbnu°us tlr ageP ne
8^) m
(Inc atlas Acouebcalylfa[antl Penme[eriaolaGon np)
a,AA IIC ra log Ict antl Isola"N stm
ONSIS IF "I
�vn Max
iu[sp.,rlty THD111I" ail
e°s lspe, rs moor. IF
a as MAIN
z;I ro nnie�p9i 3h. ore tlNE,,R rnfabnabaekln,
:rr Whan P6e1:N,ystem ITC a. nc _ DIN,IM, I,— Il,,l a, INntllrea hr r.,A
IN
ar- Exe en He19M1t Mnsml�m nten+ntl Onv+ Nnlshetl GVP Cre ePy urn sPeN ral surtares
1era°
Dt e,arla,
IT —INS, q
I ALLOWANCE
0 leetl°n e.ce of NB 06 per square t, . ms Rd I, -veneer tbnck:nly la p as p3 a vls G 3 rtler cersones)
D lb,Ic peilnsh.,IvnT H I.,IN m_ alas S chz. antl 4 lI
IIS ALIT'' ASSTRANCE
DO ,RVJrtn-1ES, WOOON/ORF ASSOCIATION STANDARDS FOR GRADS OF ARCHITECTURAL AGO —IS
vT FHOR CABINET NOW-UPOSnONM,,MOq? ONSHIF REM^NN OF FIUD TO COUNTERTOP, MOCK- IRA, REMAIN =,APT OF
I GICNAGIANI=FINDS
OTECT FROMSOLAR ECHUREANDMOISTJR=DAll— PROVIDEFORAIRCIRCULATION AROUNDSTACn£11
F PROJECT— NBC
ADITIAT HIALS AND PRODUCTSTO R=V=NT JAMAG_TOz GEv IN'S OR SURFACES
EED
MID AT IL-_'BnST ON=`COAT LOUT=%OIL, TO RAIN, SNOW ON JAMPV=550NS _RMIT VJUn'h TUC
LEI ED, AND HVACv 1=III_
O DO NOT VSTALL FIN15xCCARPENTY, MATRIAL5 THATARE N/P 1115SIDITY TURB DAMAGE)NGE r �OR SOLO CARAG=O
VE NO
AON 'AUCTION BY FI=LDMEASUREM=NTS BEFOREFASRICATION AND 14CO,%.1-
AIPLICAS
4 IN PRODUCT OR
MttEST PRACHEOVE-SPIOR PINT NCAD=ENTR —R=PIF=FOCI STAIN OR-AINT FINISH WH=RE INDICATED 'NINDOWANa DOOR CASIN'_j'.:_
GAD G 8 UP
VD HANDRAIL`SELAC OUIIE oNDPNC ESLSV-OJSTTER E17Ai FORSTAIV_C AS INCIUATTI
HIIIISIDDITIANEI
IS ACT JITABLE SHTLV=G WWATH=S'G AND HOLE
FASTENINGS
14 INSTALLATION
RE ?=11TE WITH
CARS_NT1YWFUH 132 1 IGH GARIFIRRI OFFSET FIR FLUSH I 15TALLAHIN AND 1 6 INCH M—ARM OFFSET FOR
REA
4 AD,NST JOINED' TO' JNIFORNT ASI-ARANCE ADJUST lIOVING OP OPERATING -ARTS TO FRICTIAq SfO(NUU`
Sectlon6]3I36 Sheet Alrb.,Pr
PS,
:IS Win' S, alnecharncally faatenee aM1 em cn cxten..r�alls beNlntl cla g,i 3
Pan I
Ma enzl satfeNtlasaasheette iM5�51ASTM sanJanls
N a°8ama cfrCOA, ELA,t TUtE=.'IHumeWray+ferresd—B cr CcmmeruaPNlzF=' far col:uratuallllght c;mmerclal7
2 21 atenalBarner Mereblanep PF p
sNNene sM1eet In Yas ene.l
hIf 1ASTAn=.'>B
UV reds ancjP
.b il ."
Fasteners
FIa OPSot°1ao�r Ty.�eu=rapeIS_ P p
Y !
O
AW
1 `
X
W
Z
Lu
d
tiL
No. Description Date
R�pEO gRCy
yf.AAo.° Hj, qqyy��
rptgTP �F S�+py P
�B�TP 5
SPECIFICATIONS
DSte 06/18/2025
G.2
_ s3 _ q�w N D ---ism
q TIN 1-mww— I°TS=ate
- - - _ _ - -
- -- - - - - --- "�"�� o7P =cam" - _'�' -
"mQu
- - -- - m� - - -
`;ggnsa - - _ z 5'° - - --- - =i '
auto
s. - _
_ _ - - _ 53 �_ - _ _ - go__ _ _ - ____
_ F S _ - _ _ 35= --_±ten" - - - =_ _--- - _ _--_
-=9 - _ _ - _ - - - _ _ - 'S _ - _
__ - - 1 - d9a Se', _ _ - -
must oil
u
- 3 5 is Sy - - __=_E_ _ _ Rag a_ - - "
S I to- _ _ _aq a_ --
90
is
in
x
_ _ in
also
'NOT
_ _ _
n T _ _ _ - _ _ _ _ _ _ _ _ _ 2
- - __ d7 - rl - __ - Yam- -o> __ - - _-
__ "Z - - _ - - -_-_ - - - _ _ _
5— HN_ - _ - �e - - - - IQ"_ _ - - - - _ _ _
ze- _ _ _ _ _ _ _ _ r��, _
PHU" How is 1
ay 3 _
as
i - --_ o�N -�fi�9 _ _ _ __ - - - - - - - - - -
_ _ _ - _ s - _ IE_, _ - 8
_ - _ �� - _ _ - - _ - - m
Mu
_ - use NEW- - FS _ - - -_-_ _ _
_ �3u _ - _ - _ - a_ `3a a - _ _
3a- - __ a - -oY
am
all ta
_"
c F ah
- - a3
- _ _
g __ _ _ _ _ _ _ _
s� = -
_ - _ - - 5.M
ga � _ _
��c o'
_ _ _ _ _m?g1 _ _ _
WIN - "'HE" �m - '_ ' - - qiA
_ _ _ _ _ A$= _ _ _H8 - _ - y�_� _ __ _ _ _ _ _
-- -- - _-
__ - - - ksa _ -
_ - _ - __ - °E' - a� in
c -yea - __ _
- _ - 'a - - - -' - -
Sc___ - - - __ _ - - - _ 19 _ - - - -
'm�Yz = - - - _ - - --_ A - -
- - - - _ _ Aa __ -3� _
x"'P fl - - - - „ _ ale
_ _ _ `�` - -=2 -
al
ag-
5 � �
n dy9 ECSTF 0 Rei
)DEN
m m90 n DRIVE
EA..
o " o GRAPEVINE, TX 76051
a
H�
�I
� z
m
Y • � mYdy9 a +amTF9mo 0
om
�y
jgv E
—
_E_
CHRISTA SLADDEN
2803 HIGHCREST DRIVE
GRAPEVINE, TX 76051
s
No. Description Date
R�pEO gRCy
5 E.a�aa ij,
NjgTP �F S�+p0
�B�TP 5
SPECIFICATIONS
Mm
€_ Scale
06/18/2025
G.5
1 1 MJNIV�Idl 151 -1 1IM 1- IT I
rR-
HIGHCREST DRIVE
L
I I A, al,
_s89 21151 S IL� GR Ullif" I,' %I E� M P
IF E�
rw�, rc
-cl I -PI T,
LEGEND •
IF IT
E
Know what's below.
7111� T Call before you dig
t
F F @Dast 48 hours prior
NOTES
X
1 to
LU
388 D.A. S
,RTCT
U >
L�t�25, 31-1, 3
EXISTINI RESIDENCE
T
=%. V1
21C, 11ILDREST DRIVE IRT 6_1
ro
C)
II
00
�F S
ADDITION
3 HIGHCREST DRIVE
GRIII bI
111—E-L 171 "'IT' 11
ED IT' TL -1 GRIII b1111I
NOTES
Jl�
—SOLE—E
IF
r4T�T3AjNED PER SECTIQN -
E'RP_
PER SEL
NCE
GTIQN E
4 I
R-T MINI-w ACLEARA PER
DRAINAGE NOTES
'R V`1
12 LIN= DRIT DG 'P FRIPT E'R'1TE`1`T1N i
. .. ....... . ..... .... .
F003 14
C, MONOLITHIC SLAB -ON -GROUND
IRTLT WITH TURNED -DOWN FOOTING
PRTCT Peg NOT TO SCALE
I T'
i
2803 HIGHCREST DRIVE
F
�-F
I -------------------- EXH-1
HIGHCREST DRIVE
Pid�
TI 1 1, I
lffa'—Vj�l
GRAPHIC SCALE
LEGEND
Kroobetele0low,
Call before you dufz
AleOst 48 houi-o prior
NOTES
LU
>
U >
10
Go
NOTES
DRAINAGE NOTES
V,
EXH-1
LU
U)
Lu
Lij
ui
U
0
U)
LU
LLJ
ry,
ui
�-R
HM2.1-H
R
K
2
RE
0
oa
�E
-M
a
Q
'-H
aE
2
-E
M6 .... . E
�E
0
If
.. 2
A
3
a-
H,
-,
- t
rn
-.2 2
,22
t
oEV
0
<
o
A
ES
'E
�;m
g
o 0
&
HN
s,
>
4s
t
4m.
E E
A
4 a E E
s p
Hx
15
2 �
szBE�
a E 12
o �E
-22 2 4 6
—Uw
tE_E' E 2 02Z� E
EE 2�! E -
E
g,
q
0 a
Elz
2 o wl� �2
uS E
M' ll�
H.1 E'
'.E
Z j.jE K�
E... .... �E
EQ .
2
&
s
'E 2 E 6E
E'
E Sa2
�2 . zaE 2 E
E -6 &
N
0
RZ 4
Z of
E.
— -an Z
�z 2 E —2
p
t & ' ] - F "� - �m .6 E
t w
T T
2
2z
Ni 6
o
� - � � g 2
2
va -
T
'E
E
z
�
& 2
E.'
6, a Ea
�2
&
16 1
A
E
.2 >
0
a -0
E
a
F R
-E
g
E E E E �2
�E
F
> 2- &
S
E
Z 22va 0, 6—'E-. Z-a
1 0aEo &
> E E7- E sZ
0 0
8 2 .3,2
M 0-
H
0
8 0
-Eo --E ,f. 4p -E.
tD
See plans foi be down
See plans ra sheathing matenal
(Sampson STH0f45hown l Tle
Sit ffi 9 shall be conbnuoua
tlown shall be securetl to stud -pack
oss entire length of shear wall,
per manufacturer's alowdacaboru -
'�_Ia
lateral Gyp
-Edge N.11119he
may be
-- -
Sheath ng Schedule
nstaown
Iletl over heathng
s
ad or 0131"x 3"
L`4
-
(
1 plans ca l for shear pandls 11 both tl,ecl ohs,
- strap toe dawn shall be securetl to comer stutl
peck Only one be down Is required fo, both
- Intenor Gyp
y__�-_ /
dlrecbans See Details 5.,a6 Tiedoan may be
Sh.."Dg
cer tutl
Installed over sheathing
d stt wean ds Ion
Ie
- - Tdown shalt be tn=telletl to avo,
we - e V post -tension strand, are roc dad all strap location, 1 Y4 x 30'
bar shall be installed per manufacturer's specs.
1 Tie StrapShear Wall Anchor Continuity Blocking for
-- —- - ---_ (B11 Interior Shear Wall
- See plans for sheathang
matenal SheathoS shall be
mare
IengN IT shear wall
o
view
See plans fol he down
(Sane ... TT�KT
,p
.down shall be
secured to stud -pack (see _
- re e, Bolt Embedmdm np
b,'D
1ionsuiacturbe.
i Down pia Ilnches)
'Drell
ids,
pace
entl e A30
poRY - H74---5/a"
Slade all -thread rod with HTT5-KT 518"
- trdpson SET epoxy or -
dpproved equivalent per
he down table.
See plans es embedment
depth of re downs not shown.
2 Bolted
The Down She., Wall Anchor
1- ors-tas may be
Iliad over sheathing
I
"""a
a l ng not
- qured at Subfloor --
I -U edoubleU(
�s ai Te
on
See plan car Tens on T e
strap IS meson MSTC66
--_ _�- ---- - - - mfactu
un) tnslaN per 1
rer's ens[ruc[eans
(A) Typical Shear Wall Strapping Detail
\ S/ Shear Wall Strappino Detail
Te tlown or strap per plan(STHD be -AI atetedownlocatoo
downshownforllushaivepu poses) (HTT edownshownfor
II t ive purpose.)
Double stud added together
w/0131"x3 na at 3'-El.-wall may be
OC siaga-d shear ..It
Alternate tee down may be L,
_loyal and stud of entenor
p,,,dld then,. th[ : shear wall ants double stutls
prsntle at
as a i-Il.d ed
n of concrete calletl tar w/ 0131' x 3" .dads a[
ad toundanon plan. -- -�- 3" O C staggered
Interior/Exterior Shear
5 Wall w/Shared Holdown
These datads may be used at a shared 9etlown honcho.
Gap to allow for continuous
structural sheathing through
full length of wall
Sheath ng th ckne-
laa-tl as
lVell ED,
Addsaawl Stab,.. adhe.sdals
..ling a, manta. ♦ i
spacing, as requaretl S
(A) Continuous Shear Wall
4 Sheathing at Perpendicular Wall
See plan for Tension TIe
- op lS mpsan MST066 - - -
shown) Install Der
ban,reethrO, nst000,ons
Toned, ybe o
tall d haathng - -
Us.F
d an
al
e t tl t
F T
^ - locaton
- _ V
(B) Alternate Offset Shear Wall Strapping Detail
Te down or seen per plan ale -he to tlown locaton
(STHD [e tlown shown for {HTT to tlown shown fo
Illosbabve purposes) Iluslrat" purposed
Nall each member of
it%ple stud pack together --�
w 0131'x 3" Tells at 3" -
O C staggered, - -
Shear wall and stud woo 131"
x 3" _ls at Add,tronal stud added as
3"0C staggered onto and ,'k nailer for m.- gyp board
stutls of adpling shear wall - V
� Shear Walls w/Shared
l n l Holdown at Corner
These deta le may be used at a shared to down cond bon
PRIVATE
4 j
RESIDENCE
- -ADDITION-
-,
Irr;==r„zc,.-':..,ae ,v: s>a s r_.-__ 2803 HIGHCREST DR.
GRAPEVINE, TX
- - I __ _,'N-
Ouilaoker-
L `
i I
2x vertical blockeng en first two cebng
lost 11S at 48" bottom of block gat 4"Fo cfen gyp board to
- Doub,e mp plate Mahe as
onrle-naieo Into"'I'd 'gw'edl
G'r,.o13,x3"nails ar 3"oc NaA S
osngb. k ants each reeling Joist A's^ear walls e�renC s`Dnu21
w12th 1 � 1 xre na I s ahea"119 tC top cf galve end
t '' rail
\ II A-van^alb11k e stutl
1/(4)0 131 x3 face
na is
Double hanz ho'l blocWng between wnllnnous Adach veNcal block
Wit height scuds located at heght of flat telling ioha'z,;11l bbck,ng
beyond Block shall be secured to studs a double plate wIA35
w/(410 131"a3" toe -halls each end As an
alternate wall may be spiced with double plate ' clap'
Iscated at height I' 'I' seating beyond
4-
l r J Gable End Framinq
Note Th s dell repo led tar w ntl speeIs greater than [oomph
only For gable entl walls longer than 24f[ n 130mph Ezp C wand
areas rater to Plan for brae ng ra,h _."s
-- -
See plan for Tenson TIe led nails@2"or. Into
trap 1-paon all header members
MSTC66B5 shown) Bent
Use tl bl I.
too
stud T ,,'
strap secu ,d to beam
See manurecturers nfo
ton �'
for,nsiailat on specs L
4
E-de full he 9ht stud
� each ode aqua{ to hail
- k
?--" a-d maY be Ll
n ued ova it all,me
See plans for
a- of beam.
(O l Alternate Wall Strapping to Beam Detail
of studs 'nte rrupted by
te hopen ag
2x
blocTany
1
10d hall. @8"oc-
10d toe not Jack stud to
header
�
2, top plate typ
I
le
-- ..ad., raw, to header
Ih.dDle
22z stud
Typical Window & Door Header
IF
REVISION
yyg8®q gl
r ��ttd
d l/11 HI
06-78-25
TYPICAL FRAMING
DETAILS
S0.1
PRIVATE
RESIDENCE
- Attach brace he rafler per -
i�Upl'euenecllpn ``,-
Attechce,tngpistbeemta % S h d
Abad
top Plate Per UPlift ^,
Connection Schedule - note caunleellan .Per 1 '-
Ra 1\� dead Connection ej� I -
Schedule
- -Attach rafter to caNng IN. I
pe, bed, G ton �1 a"-pt ch brace to.ding
ached lse.em Per UPl ft
C ton Schedule
-� _ G a
jTh'
Attach Nace Io lop Plate
`utldra da.aGon per Uplift P_,Connectan Schedule -Plate to stud mnneeton-- _-Attach telling lasllbea
per U aft Connectian aahedute l to lop plate per Uplift m
connecuon scnedme.
- - Strap through suM1fioor
r-! ns necessary per Uplift
Connection Schedule 2x4 block
Ad 3 backt rafter Attach block t elmediate rafler
{)(1 nails f� between braces
+
-Stud lotboitom plat¢ 11—MIT to black. i
on (lowerflodo per w/(3p MIT
--I--, uplift connection where. Intermediate Rafter to Purlin Connectlon
- Bottom plate to kandaton
nalleaten per Upth
rf Cannecton Schedule
CONNECTION NOTES
---' i Men(2)mechan,cal fasteners aremstalled Into single as member or single
stud fasteners shall be N.N! on apposite sides of the Plate
2 When more the,(21nechanlcal fasteners aremstar,if on the same side of
the plate, they shall be installed to a double 2x min
3 At iVdeal head., openings or at beams suppomng exte,ian walls above,refer
1. the Uplift Connectors at Openings Schedule
4 An LT512 N MTS12 twist arob may be usetl,, place of an H25A or LSTA9
a .... rise, he, connecting elements are at a 45 degree angle.
5 T-Brace shall be constructed el 2x6's fastened together ,e) 131"x3" nark at
12"o c
11 Tvoical Roof Framina and Bracinq Details
Wild Speec StraP'C011ar rpe 40131x3 Nate per
and Exp Sp—rd Collar T'a Connection
48" O C 3
B
B 48" O C 4
4
Secure.Nevins rafters at -
edges and hips wu, CS22
lap at spa prig per table'.,
B 48" O C
115' C 24"OC 6
B OC
1 120
Alternate 2x Jar spaced and
B 24" O C
C 241OC
de Test
fastened pep table, Ties shall be
5
g 24" C 5
p le e a
In.
located inRid
-
t3o _Ct ___"' o C __- ______ g __
i, At 130 mph eRp C ndgd strap shall be
13 q p or Collar
e
Tie Detail upgraded t, CS20 w110"lap
Blocking required he. rafters or ceding lolsts
nave depth t1 thickness rat" great.' than 5 1 For
antl speeds greater than 1. mph, blocking also
,erlu,red aI braced wail panels or shear walls
where noted on plans Blocking head not be
full -depth but may nave no more than 2"gap at
roof sheathing, except at 2x6 rafters where a 24
Flat block may be usetl
' 1 I Rafters and,ad shall be face
nailed and bath shall be
(.,.,led to top plate pep Uplift
Connection Schedule
Rafter le plate connectan per
Uplift Connector Schedule _ Plate to atutl connector per Usift
(H25A shown( 'i - 3chadul¢(H25A shown)
14 Roof Rafter at Exterior Wall
�.e
or
-- _Cale wfte"lap
12)CS22 w10" lap each
+ tier and, U NO on plan
_
, �a er ` ¢ _
-- 2x 4raclrg on holh
T
lr@' Elevatetl beam Lap
ned.nce I
itlesefied-led
beam at each and
(see plan forsze)
Gelinglost Parallel
l
1
wr141as or
r l - A o le abed beam
EI d b 1 112"
I �.-
12)CS22 w' 8 lap each
U N O on
I ze) Min
Clear
"
.ntl plan
u
- called lost
2,4 (mn)block'ng antl la
�� p¢dpendcu[o w e°rice rem
' a
elevated bm ac eaat each and elevated beam O ewe a
R
O
I A Trip stud pack
C516wr141apor y below elevated beam - Iry
Ca"neclons per Upl fl
Ca^nerlon>Sa—'s
12)CS22 w/ 8" lap } tl
.heh and, U N O Section A -A Section 6-6
a
l B i Perpendicular to Ceiling
Joists
(A 1 Parallel to Ceiling Joists
12 Alternate Roof Framing and Bracirtg_Details(Elevated Beam) _-_........
...........
bplana wall
Ustl a
no[tl fleet onus des red mr .Brig from nq wheriebspecifcaily called ourt o
Secure 2,4 rafter to to darbe, -
J."' @load bearing wall with
Rafter - - 6- led common wile nails
Nerpendiculal --
etl,ng Io,sts 2. brace w/ length ee
aft-2x6@every required, nailed ro each
o+ner raf[e'w,tn s-10tl s Joist arch 2-Ird nails ,
lala
staggered) each
iod na Is@A c
Gyp board Ceiling to Connect 2x6 and
2x4 braces
£aenor Stud Walt
( 8; Alternate
---------------
Secu112112 Brace to load
^.4 Blocking between ceiing Joists
beanng wall top plate with
te mld span of 2x126race - ^
'iy
10 - INI nails each end.
Secure 2x4 blocHng to telling 1
Joists with 2 - Iad nails each
2'•TYP pry•
and, and 112112 brace
4 tOd Add 2rd brace
1
arch - nails
- - hen exterior ..It
-
length exceeds t2 _
2`TYP 1�1 /4"
Ceiling Joists@
Ga o c
VV��
Rafter - -
i i/2°x r69a Metal Tie
- perPdedpcular
Strap@ every other rafter -
w/Min 4aksi yield strength-9fr
�_ .ceiling Joists y�
fastened to rafters and2.12
bracing ,15 rod nails
-- Nail calling last to
2x12 brace said, tad _ Gyp heard
(abroad, ad) each
nails be2'-0" O C C""
2, 12 Brace, flush %,In bottom of ceiling
Exienoi Stud Wall
lolsts spanning between load beanng -
I- walls pa'pentlicular to eAerer stud wall.
(Art
Typical
Raftar per plan -
15 Typical Rafter Tie Detail
Rafter per plan -
-
Nietor beam per plans, face
-I "a.'Irbeamper
pianeface
nailed to the defier per the
r
nailed to the rafler per the
Nailing Schedule Multple
,
Na'tng Schedule Multiple
plies snail be fastened- -
plies snail be 2oeggiensrist -
(4
together
.' wrfh 1" 0 Washers
th1 0 Washers
- - _-- ToP Plate
- T P Plate -
F
-
Add apple Refs as
�
-
Add Nipple rafters as
rega red for nit bear rig plus
Plan View Irequiredf
fall hearing for
tltlt sled hil-de ght
(oats Feeeraltb arerantl
rafter
_
e hadto top plate.
Use
i
(A i Typical �"i Alternate
16 Rafter to Joist Connection at Sloped Ceilinqs
REVISION
a� e®\g11
t �it�l
}f1t�
-1-A1 l/II ``-HI
06-78-25b
TYPICAL FRAMING
DETAILS
S0.2
d®aAyB CD
W o a �k1l z
QW ° Ww Z °~a �-
W U LL
o � w Va d� `�
m
al
.............................................................................
O
2? �4 2 4mM Q
N
a
i
°
:cc
z
�3
2E
sz
z
�J
N mm x x Pqo
-
'O
_- -
oo@J@)@J
_-
- EP E °' - E-_- -- -q
t,
co f
ca
=�m3m
_ NE_ „Ea
Cr
o. o00
-
N=�4
d E nmq _ in ` E�
xET
E-
6 E ^�7 7 Q E E EE �% A o 0000
cc
o .v mrd m o E U)co
Me
4 W q
CL
3Nv a: 3 3NyytEE (� E qN qry 3 v H
C- f Ng_°
O ,nq E=EE�E
N EEEE�Sras
�U
_
U - .` `+�
474'm"
moo �. ry o E Ko
PRIVATE
RESIDENCE
Sheathing Schedule / Shear Connection Schedule
U I�ft Connection Schedule
----------------
Agsheathin9 I
Jtstt°PlateAttachmeni(Fastener5pacing)
ADDITION-
_ 100 mph Ex 8 101 to 115 m h Ex B
` p p p p
110 to 115 m h Ex C
p p
116 to 130 m h Ex C
p p
a —abed g loins, blocking Fastening SIII Plate
En d Sheathin OnentaL°n t (Fastener, Spacing (in-o c } Etlge Field)
Options include one of,he following
Rafter re Odoom wail (3)0131"x3"toenails
H25A+30131"x3"toenails
()
H25A+3013 i"x3"toenails
()
re'd at panel Anchorage (O
I3i"x3'nails or LPT4 clip or Ladder Blocking)
-Plate to slutl -
H2 5A (every+mrtl stud)
H25A (every other stud)
edges
-
Top Plate Bottom Plate
2803 EST DR.
- Throughsutrfloor -
CS22wl8"Lou (every third stud)
CS22wlB"Lap (everythirtlstud)
'�, 8tl,3'a A
3"19'116' 2"/9"/-
GRAPEVINE, TX
- Stud to bottom plate -
H25A(everythird stud)
H2 ON(evene other stud)
'//,6" Onented Strand Boards Vertical or Honzonral Yes 8d, 4'a B
2-ilY118" 2"/10",
Rafter to cerimg past (4)0131"x3"face nails
1610131"x3"far. nails
(8)0131"x3"face nails
(01 or APA Rated Sheathing
Brace to rafter (6)0131"x3"{ace nails
(6)0131"x3"fare nails
(6)0131"x3"fare nails
8d,6"' C
6"124"/48" 6"!24'1-
PrOm1obrace a 13)0131"x3"face .,Is
(3)0131"x3"face nails
(3)0131°x3"face nails
0113" Red or Blue Thermo -ply The ply Vertcal Thermo -ply 1"xl-1/4"xl6gas,aples 33
_
orface antl llT' Gypsum Vemral or yes Gypsum 5tl cooler nails 88
8r,, bt.cia,,drehe, o m H25A
H25A
H25A
Gypsum Wall Board on iniaior face H°naontal 1-1/4" drywall screws 1212
.11 e popcourn, or,
m
-
d -
(}) 0 131"x 3" toe nails
(4) 0 i31"x 3" toe nails
DOW SIS 1/2" °r 1"crownx ifiaa
vr' or ,"Dow Styrofoam sls siucmral � staples, 3 3
7
> e ()0131 31 aria is
Brace to ce I rig to sVbeam n a
+LSTA9 strap
+LBTA9 strap
with G
Insulated Sh H ypsum Vert cal or Horzontal Yes Gypsum D
W II Board t Lace
3"/ 16"130" 3'/16'1-
Typcalceinglositowall connecton y o (5)0131 3 toenals
(5)0131"x3"toe pals
(5)0131"x3 toenals
h e,
nor ,d 4 dry all screws, i2 12
___---
Darme
CI tb c,c9e ad H2 5A
H2 5A
H2 5A
Stled 5tl oler°r It tl 44
Gypsum Wall Board Ven cal or Hor zonal No 1-i14"tlyw ll ews 412 E
4"124"/48" 6'/24"r-
f ppithi, t—I U-
_
---- -__-_- -_--
Single Sided Sd polar or Ilb dnails.44
-
_
. Top plate to stud -
-
-
Gypsum Wall Board Vert cal °r Horizontal N° 1_, 14"dy II ews, 412 F
1h"/46"/96" el'upI-
-Through sub -floor U 8 -
-
-
Perot Flame-7116"Oriented
-Stud to bottom plate al -
-
-
Strand Board IOSB) .,itmin Vertrral Yes ad, 3 3 See Detail8
ad 2,12 header
See Dead 8 See Detail8
Ce sVbea rig )tm,o top place of intenor an H2 5A
H2 5A
(2) H2 5A
exienor-11(supporting 2 braces) a an
Josi to PI Alta h n Sp cng)
_
- Plate to stud a H2 SA
H2 5A
(2) H2 5A
Presc t wall P nel Sheathing Fasten rig B tom PI
BI k 9 eq'd at
Opt elude on f h f II g
- Through sub-Hoor us CS22 who Lop
CS22 who Lap
CS22 w18"Lee or FSC
IB gMethod Oneniation (Fastener. Spa rig[ horag t
panel edges
r0131 r3 nor ISILPT4 cI plLatlder Blocking)
_-St di bottom plate o o H2 5A
(2)H25A
(.2.)H2 ON
per lRC Sectron 602 Founhold n
I
Top Plate Bottom Plate
ffi -
-sue
- 8 tt plate to foundation ii `m
a 2)Fltl%CP ]2
141 FiItIX CPI2
161 HIr.X CP 72
N°mmal t"by 4"c°m—ble diagonal
G
braces let e to the top and bottom plates 2-8tl (2 V2` x 0 131") nails or
Ceiling toisilbeam to top plate efrnienor U 12)H25A
(3)H25A
(3)H25A
angled I6 tI145" 2-16ga wire staples(1314"long, min 2/16"S
and the intendant, N° E
6"I48"/48" 6"/48'1-
and exterior wall (supporting 3+braces)
-Plate to stud (2)H25A
(3)125A
(3)H25A
strap days esappioved from the horizontal nwrtlld),
e(Method l) en stud
r
-Through sutrfloor CS22 w/8"Lap
C516 w112"Lap
C516 w/12"Lap or FSC
7/16°Onenied Strand Board
of gars -a os��
- Stud to bottom plate (2) H2 5A
(4) H2 5A
(4) H2 5A
AD) or APA Rated Sheathing Vemcal Yee 8tl, 6 12 F
a'OlT/48° fi"!q8"1
- Bottom plate to lumberiop
14)Flh %CP'l2
i]I FiItIXCP ]2
171hii:i XCP ]^
(Method 3)
112` or 25132" thick str net,,, iib,pre, d 1 112" galvanized roofing nails.
REVISION
1 H In X-Do 72 "Shots" or equivalent shall have min allowable tension capacity of 1651bs Shots shall be spaced at 2-314" O C wild the first fastener spaced 2" from
stud or post Splif total number of shots equally on both sides of stud or post where possihle Shots called forinthis table shall bean atldRion to other anchorage Called
sheathing Vertical or Honzonral yea 8d common (2 1/2" x 0IT', nails, or 16ga F
(I/2"FlberBrare or "2 Voted] rorrosio aubul staples i l l/2"Iong, min
n el/i6"S
6'/48";48" 6"/48"1-
forrn other notes, schedules, tables or doollsrn the structural drdemgs.
bbbambble) crown width).
2 CS22 w/8" lap may be substituted for LSTA9 and (2)CS22 w/W lap may be substituted for CSi6 wl 171ap
(Method 4) 36
3 Refer to Detail 11 connection notes for connector substitutions at 45 degree angle connections
Uplift Connections at Openings Schedule
1/2" Gypsum Well Board Sd cooler or wallboard nails, ]
(I al'obt°n) Vertical or Honzomel No F
6"148"Ato 6'/48.1-
'A or1-, /4"drywall screws, 1212
Meend 5)
Connection T Hardware Option 1 Hardware Option 2
Type P P
Hardware Option 3
P
Hardware Option 4
P
IOfto Gypsum sheathing 1-Ira"T YPe WTOrS spews.
Top PlatetoJackamer) �'I CS22 w/8"Top CS22 e.,r Lap
CS16 Ml2°Lap
C516w/14"Lap
IExte(Method5ahon) vertical Yes F
(Method 5l
6„/q8":48" 6"/48"1-
Through SubFloor, CS22 w,8"Lap CS22 w18"Lap
Oat 8 w112"Lap
C516 w114"Lap
0113" Red or Blue Thermoply
Jack Stud(s) to art Plate H2 5A (2)H25A
131 H2 5A
(4)H25A
on il2"Gypsum Thermbely 33
nceantl 1"xi-1/4"xl6ga staples
SIIIPlate toFoundation 0HII\6P72 4;Tit 9 GP]2
1prl ilt CP]2
;1b'0?Hh �n�12,2,I1TrIi,oOa`
Weorfa
ll eoartl on intenor face Vernral or Honzonral Yes Gypsum 5d cooler naAs 88 F
(ICC approved prescriptive 1-1/4"drywall screws 12 12
6"/48^148" 6"/48°I-
Wind Speed Exp Opalrg'AT, Ogenng'hIA1h
Cgering 4kh,
0,rirc a"
alternate material)
B
1_100
C eft- 9ft >9ft-1aH
>18ft-26ft
-
112" or 1" DOW Styrofoam SIS Structural
DOW SIS 112- or 1••cr°wnx load
Insulated Sheathing with l l2"Gypsum
Vertical Honzonral Yes staples, 33
B Ot-13ft >13ft-25ft
105
C SH -]H >]ft-15H
-
-
>lat 23ft
-
-
Wa118°ard on mten°rfara or F
(ICC approved prescriptive Gypsum 5d cooler naf, 7 �
1-IA' drywall screws, 12 12
6"148"!48"
- B_-- 611 Ile >I1H-2itt
- ___---
>211t oft
-
eliemete metenel)
110 0 oft -Oft >Tit 14ft
>,4ft-2111
>21ft-281t
1 Braced wall panels shall be a minimum of 40" wide except for Method l which shall be,c,at inuous diagonal brace from top re bottom plate an Method 5 single shod gyp,,, hOh shall bed
B SH-9H >he ten
>18ft-2]i
o{96"w,do , UNO
15 C an- 6H >6H-I2H
,2ft i9ft
19i 25ft
24 , or
d'yl
B 4ft-8fl >8ft-i6H
120
-- ->12ft 24H
-- >24R- 32i
3 For exienor walls, the edge field.titling e9 ve vents II, tths3s,had,[tilt{be comperedo thegeneeialaed,d fell nallrn9 requremenbisrnptheeShemhog
FR-02 The most sinct requrement shall
q Gable end wall rakes shall be fastened w th the more rest/ ct ve edge field nor kng the table or the Sheathing and Cladd rig Attachment Schedule on
old2Claddng A�ttachamor Schedule on Sheet
Sheet FR-0 2
+�'0"'O
_
` ' ��
C he - 5ft > 51, I in
B 4ft-Or >lft-nm
1 if, ,rrt
__-- 141r 21�
t 3F, ---
_ _ _ of
per
Sill Plate Anchorage Schedule
„d r
125
C hH - ad >4ft-thin
195 15i
+ft
P/
B 3f1 6H > Me 12ft
12f Zf
ft
Shear Wall Non Shear W.11
_
F
130
_--
90 100 105 110 115
120 125 130
_
P ''i1
C Ofi 4H -oft-1hH
I6i--
hY
Anchorage Options A B C D E F mph mph mph mph mph
mph mph mph
P
i Shins shallhave inn ans,ole ty ofi651bs Sri
h lib -,
r -
B C B C B C B C B C
B C B C B C
d'
or .I Split)2
nun be of shots equally or both s des of stud or post eh e poss file Shots called tnr r , .,. �. , l
or post ,begot shots too orp st eh
..,. 1 y e 1 r
t o
z^ O anch r bolls - 28" 34" 72' 46" l2' 72" 12" 12" I2" 68" 12" 60" 72' S6" ]0" 50,
64" 4W 58' 44" 54" 40'
d� - -�
m
itotal
othern sr s nihe structural draw rigs
rf, A r-''dq'
Ites
bill mIlml-attals
2 Foru Ift wnnecton re is at covered nos refer to Covered Porto Pos[U IHConnec[on
p qu remen pa p
Tabe
MASA anchors 15" 18" 34 24" 32" 32 12 22" ]2" 58" 12' 50" 66" 46' 60" 42"
52" 38" 48" 36' 44 Or'
3 Uplftmnnect°ns per Table above not lm—ed for headers rip°daIframes Portal frame tlmalred er
Hllb X-CP 72(eneno, walls 5" l" 48' 14' 46" 48""
06-18-25-
4 UpltInmr.t°ns from top plate d°wni, header through apple studs)shali be perthe uplift
5 121CS22 w/8"lap may be substituted for CSi6 w/i41ap
connect er, -1
HHti X-CP ]2l nter or walls) 4" 5" 12" ]" 12" I8 - - -- -- - _-- - -
_ - -- - - -
6 al2x2xi18 w,,be,, may be used as to alternate
i Refer to None Sin Sectron 4,5 o{the General Noles on Skiee,FR-O- i foranehpr bolt insiallapon requirements.
2 Hilt, X-CP 12"shot," or equivalent shall have a min allowable shear value of 2501bs ing Begin spacfasteners 2" from end mud, of shear wall
TYPICAL FRAMING
3 Imeroe shear walls are assumed„have powder actuated at anchorage If 111" a bolts or other embedded bar. ., well be used, either due to bander
contact this.tires prior to concrete placemo l This ra necessary to ensure minimum concrete coverage it required embedment depth of alternate anchorages
preference or local code, the builder shall
SCHEDULES
4 Hilt, X-CP 72"shots" at extent shear walls are requti.d,h addition re 112" $ dreha bolls or MASA specrfied for"non-shear wall"installation
5 DI anchorage shall be the more re and se °f the applicable shear wall antl non -shear wall regwremems
plate
6 For sill plates anchored with MASA anchors, (2) mil, X-CP 72 "shots" shall be placed for each 4'-T baced wall panel sins, ied on the plans,
SOA
Ceiling tests shall be- -
toroadmIn 3" Refer to
Nailing Schedule for t.
fastening to lop plate '
Full depth blocking only rmusetl where ceiling Edge nailing for wall sheathing
)oasts have a depth to thickness ratio greater -tip
than 51 Blocking also required at interior above (sheathing must be Floor Joists -
himmodw all panels ar shear walls Rate, to continuous .. ross sub floor to
Sheathing Schedule for fastening top plate below)
4
17 Ceiling Joists at Interior Wall
Joists Perpendiculai to Wall
-Cldli or (410.I�i' x s' nails unci
(3) 0 131"x3" floor )oasts each 2, ladder block into top
and nails into per plan plate of braced wall panel or
eacI
2x block, typ � shear ,It
L4 1
l
(2) 2.4 (side by older
1 henzontal Iodine, blocking
_ spaced per Shear
( B) Alternate Connected Schedwe
- Calling lash, per Plan
Fasteners along braced ,It
r _ panel or shear wall per
Shear Connected Schedule
(Ai Typical 1�
- -- _--
1
Run board attachment may be,�
- -'
-
emitted ban sheathing
conhnuous a cross the sub floor
Continuous rim
- -
board"'own)or
_
,I
Edge nailing for wall
full depth blocking
- -
sheathing below
between floor
lasts.
C) Alternate Sheathing
Connection
Refer, to Shooting Schedule for
I P4 spai between um boa d ead
Floor Jests
plates above and below (sheathng
'
need not be coot nuous through the
fl
_
and Floor)
Continuous rim
IlikI= _
hownior
-
ti
" I depth
fuldepth blocking
between door
B) Alternate LTP4 Connection
1o'ats
Edge mh'ng tar wall-
'l,i
---
.incomingove ab
Floor Joists
-A35 clip as
Refer to Na'I'ng Schedule for standard nailing
required per
Shear
requnchr s between rim board and plates
above and below (sheathng need not be-
aleSomnnecio
cont nuous through the sub floor)
For braced wall panels and'., shear
-
walls refer to the Sheathing Schedule
for nailing requirements between rim
- Contin...... m
J�
ab
board and plates ove and below
board (shown)
)or
Ell depth blocking ',
I
Edge nah'ng for wall -
JY-
between floor
sheathing below
)oasts
11
(A) TVPICaI Nailed Connection
18 Ceiling Joists at Interior Shear/Braced Wall Panel
Joists pa allel to wall Ladder bleeding only 20 Floor Joist at Bearing Wall
corned ai braced wall panels and shear ..It. ---------
----------
Joisis Perpendicular to Wall
Where floor system rs parallel to wall, rnstallat on s s m tar except that continuous rim board shall be
replaced with minimum double pasts for full bearing
(4) 0 131"x 3" cads
Floor sheathing through each2xladder
block'nto top plate of
Floorio'sts- shear wall
per plan
LPT4 clip Into each block - r l(2) 2x4 (side by side) honzonlal
_ ladder blooking spaced per
Sheathing per plan - Sheathing Schedule
(B) Alternate
Floor sheathing
Fastene s along shear ..It
per Sheathing Schedule
Floor lo'sts per plan
Sh..mmg per plan rr
( A) Typical
19 Floor Joists at Interior Shear/Braced Wall Pane
Joists paallel to shear wall
At as intend, wall,'nstallahon is similar except that sheathing cannot typically be continuous through
the sub floor Where floor systems parallel to wall and )oasts cannot be installed under the wall
blocking shall reinstalled per Detml 21,
Offset plat to allow tot -
plumbing pecouaud, t
i
- Verify permitted
holat,n flip r)dats.
Il S
Full depth ladder blooding not more
than 48 OC w/(3)0131"x3'eno
nor Is each s de
21 Blocking at Plumbing Penetration
Floor Jeri Parallel he Wall
1 At shear walls or braced walls install full depth blocking directly on wall
between latltler blocking for length of shear wall or braced wall Fasten
blan kng per Sheathing SchedulelShear Connection Scheduie.
PRIVATE
Beam per plan Beam par plan. with
RESIDENCE
conhnuous beam two
straps) are still requited
-ADDITION-
1 111
II
Ias
2803 HIGHCREST DR.
- -
o
- Strap per Covered o - Strap per Covered
GRAPEVINE, TX
Patio Post Upiht Patio PostUplift
Connection Table ` Connection Table
Il, _
- Corner Post - Center Post
v-
�A� Beam to Corner
_
Post ( B! Beam to Center Post
22 Covered Patio Beam to Post Connection
N t Th s co ctmay be Nme This t o may be
used in wind speeds 100 mph used in no speeds>100 mph
- Past -- Post
Pastbasep Covered
os p
ing block Pat P tU lift Connection
cure Sepost to bearo
w1(8)toenars 0. 131 "x3o. Sable below (EPB44T
Secure bearing block to -
hhown) Anchor bolt may be
- Treated bearing block c tm place or post
foundallon wlpneumabc
worm,inspired 'orm,
fasteners
(A) Toenalled Connection
( B l Post Base Connection
'
(23) Covered Patio Post to Foundation Connection
Covered Patio Post Upift Connection Table
xs µ r
`eirr,�r�e r�s
<i oft t3am(s) 12ft beam(sl 15ft beams)
Corner Past Center Post Comer Post 1 Center Post Corner Post Center Post
Beam to Post
14)Toenail, CS22 w/6"Lap (5)Toenarls CS22 16' Lap CS22 w/6"Lap CS22 wi6"Lap
REVISION
B Post to Fountlahon
mr5anals EPB44T (8)Toenarls EPB44T EP844T EPB44T
90 mph
Beam to Post
CS22 w46" Lap CS22 wi6" Lap CS22 wi6" Lap CS22 w/6" Lap CS22 wi6' Lap CS22 wi6" Lap
C
Post to Fountlahon
EP844T EP844T EPB44T EPB44T EP844T EPB44T
Beam to Post
CS22 w6' Lap CS22 w/6" Lap CS22 wi6" Lap CS22 w/6" Lap GS22 w/i Lap CS22 wi6" Lap
8 Post IF dater,
(8)Toenails EPB44T EPB44T EPB44T EPB44T EPB44T
100 mph raced, to P st
CS22 w16" Lap CS22 w16' Lap CS22 we" Lap GS22 w16" Lap CS22 w/7" Lap GS22 wiT' Lap
C
Post to Fountlai on
EP844T EP844T EPB44T EPB44T EP844T EP844T
Beam to Post
e
CS22 w16" Lap CS22 wrW Lap CS22 w16" Lap CS22 w/6o Lap CS22 w/6" Lap CS22 w/6" Lap
i l0 mph Post to Ferri
Beam to Post
EPB44T EP844T EPB44T EPB44T EP844T EP844T
CS22 w16" Lap CS22 wi6" Lap GS22 wfP' Lap CS22 W7' Lap CS22 w/8o Lap CS22 wr8" Lap
C
Post to Foundation
EP844T EP844T EP844T EPB44T EP844T ABU44
Beam to Post
CS22 wi6" Lap CS22 wi6" Lap CS22 wi6" Lap CS22 auto Lap CS22 w/7o Lap CS22 WIT' Lap
B
(Post to Foundation
EP844T EP844T EPB44T EPB44T EP844T EP844T
115 mph
Beam to Post
CS22 w17" Lap CS22 w7" Lap CS22 w18" Lap CS22 w/8" Lap CS 16 w110" Lap CSi6 w110" Lap,
C
Post to Foundation
EP844T EP844T EPB44T ABU44 EP844T ABU44 I,
Beam to Post
CS22 wi6" Lap CS22 w/6" Lap CS22 wi6" Lap GS22 w16" Lap CS22 w/8" Lap CS22 wr8" Lap
B
Post to Foundation
EP844T EP644T EPB44T EPB44T EP644T ABU44
120 mPh Bob, to octal
CS22 wr8' Lap CS22 w18' Lap 116 CSIA8u44 Lap CSiEP044TLap CSi Lap
G Post to Fountlaion
EP844T EP044T EP844TLaP
ABU44
B Beam to Post
CS22 wl6" Lap CS22 w/6" Lap CS22 wIT' Lap CS22 w17' Lap CS22 war' Lap CS22 w18" Lap
Post to Foundation
EP844T EP844T EP1344T EP544T EP844T ABU44,,
125 mph
Beam to Post
CS22 w8"Lap CS22 w/B"Lap CS 16 w/10"Lap CS 16 w/10"Lap CS16 w/10"Lap OS16 w110"Lap)
=Earl h/IL. `-_HI
Post to Foundation
EP844T ABU44 EP844T ABU44 EP844T ABU44
8 Beam to Post
CS22 w/7" Lap CS22 w/T Lap CS22 w18" Lap I CS22 w18' Lap CS22 w/10" Lap CS22 w110" Lap
adt
Post to Enunciator,EPB44T
130
EP844T EPB44T 1 EPB44T EP844T ABU44
v k" 4
mph
Beam to Post
CS22 w/8' Lap CS22 tars' Lap CS 16 w111 Lapi,ICS16 w/10" Lap CS16 w/10" Lap CS16 W IV Lap
f
r-„ A i-'
C
Post to Fountlahon
EP844T ABU44 EP844T ',, ABU44 EP844T ABU44
06-78-25
i Toenail ecnnecact, such use 0131"x3"nals
or larger
2 Post bases specified above assume a 4"
solid post, for built-up posts or larger posts a connection with equivalent or greater capacity may be
used
dstraps areacceptable
3 Post caps with an..mas
TYPICAL FRAMING
icapacityasthe
4 Theabove[ableassumesminSPFlumberorequivalent(orpostsandbeamsForcetlaoranylumberwithtles'gnvalueslessihanSPF
rwtiu
SCHEDULES
wn[ac[ the shucMal engineer
5 The above [able assumes a patio depth
of toff 'n conluncbon with the beam lengths specified If any of these dimensions are exceeded
wntac[ the shucMal engineer
S0.5
FOUNDATION PLAN
IT D_ N� TIN �1. IDEI-11 T� I 11F' IL
-11 ll� I—T I I I I O� III$ NIT ll,�D I, I
I IN- F.— DITI. "�A`,DIT 'LZTlF1'T,,l`lIlL'-`
1,0"INH TdIll, IND �--CrAl --
,=T
I DN—S-11111 11T. —1.
I ALL 1—T IAL I I � IIRT'�' � I LD -B
PRIVATE
RESIDENCE
-ADDITION-
2803 HIGHCREST DR.
GRAPEVINE, TX
REVISION
'17
'-71 0
06-78-25
FOUNDATION PLAN
Si.0
"ITT,
I 1�11 T. 1;51
DOWEL SCHEDULE
LYNITH-IR ' ,1 T- RS-
'T" I
ES.- EIP- -11SP E� I ITTI-1- 2 1 D I E T TA I I L T-1-11-ILL 3 1 DE T TA , I I L T11TI-RIII
[TF
'rIRETHII I LIF
F, ,
4 DETAIL
E-TI �1 ST- IS-11 1. IST- T
S111 IDI.TR LITT I I -ITT 11 3TSITIR-
.
ISISEIT IS STILL W�T
LIT S T"�'E'T-.'. fL F SL
P. I.
I -1-SWITI-TI-AT L-I, L1117 �T ITT "I I
11 S11�14 S.T -1
2,
r
1'1�D" T� I -11F
1 N1 LFLIT
SS, N
LL
LlI I -11ILL 14'. L-S SII S111 '1
FSL T' T-1 IT- ILLL
111-EISILL
S1 1 1� 4-1-S T- ITILL - E L D I� 1� L I SE11 AS .-S
P-
'LL - -11 IT 11 T11111AI -
1-1 K T-1111- I 1=11=1 PRI- TI 'CIIIE IT .1 E-' z- PERIMETER BEAM CONNECTION DETAIL ITALL -S
.III "SL D1- TIS 11 LL
IL DETAIL 9 DETAIL
I -SlITTI,
10 DETAIL
PRIVATE
RESIDENCE
-ADDITION-
2803 HIGHCREST DR.
GRAPEVINE, TX
REVISION
xp.
r.
06-78-25
FOUNDATION DETAILS
S1.1
PRIVATE
RESIDENCE
-ADDITION-
2803 HIGHCREST DR.
GRAPEVINE, TX
-T- STIIITII=
REVISION
IF
Xr
l S T FLOOR SHEARWALL PLAN 0648-26
FE D F T 1� 1 ST FLOOR
SHEARWALL PLAN
1-1 --1- -IT- IT-i I'l -D 111- lIr-1 Sl .2
,--,2ND FLOOR SHEARWALL PLAN
PRIVATE
RESIDENCE
-ADDITION-
2803 HIGHCREST DR.
GRAPEVINE, TX
REVISION
06-78-25
2ND FLOOR
SHEARWALL PLAN
S1.3
----------
TK
il _ ,: ! _ - 91i ,-I -ire^m-
v
-XIITIN� N5 T"IR
4 L
A, -
I t If It It II -I
oc
77
- - - - - - - - - -
-g L
1—
t I I
1-17IT KAII TT 115T
-J Lc_. - - -
L
I T� 11-111 - - - - - - - - - - - - - - - - - - -
11-o- TT-12 3D&
v,
- - - - - - - - - - - - - - - -
a.
IL-----------------
-- - - - - - - - - --
L- - - - - - - - - -
1st FLOOR CEILING/ 2ND FLOOR FRAMING PLAN
PRIVATE
RESIDENCE
—ADDITION-
2803 HIGHCREST DR.
GRAPEVINE, TX
REVISION
_d eta
06-78-25
1 ST FLOOR CEILING & 2ND
FLOOR FRAMING PLAN
SlA
PRIVATE
RESIDENCE
,..
.,t-;:- ,:`�-,�<..'-,_,a_
-ADDITION-
,
2803 HIGHCREST DR.
-
GRAPEVINE, TX
Y1,2 -
', ; anv��sare4srw
iL
AT
J—
-
ceu.:.u:.r -sa3a
s
— _—_---
1
'I�7y'�Il�r�1 �oEw,Io
__
I I I 1
--;—
REVISION
.: i—_—! � 1 1—
I I 'III I III ,-�
-IT AE
r-- ----
F_-
'AI, "A, ;
I'I,I
5 5
III ,III IIL
a
3 = 2ND FLOOR CEILING FRAMING PLAN
r„Is A, ^,,,=='=<'EoaA111111,,:,INI—EDIF
--- ---------------------------------------------------
,„w,,
_
0678-25
Los„S-rslsEASE' DI 1.0
2ND FLOOR CEILING
- 11u„°
FRAMING PLAN
Br sNsAIAll r NI-11ALLS-11R151oI11111A'I I =Eros oM , ,=FR ,
S 1.5
PRIVATE
TI
RESIDENCE
-ADDITION-
1 1 1- a.uaE _ __.II` =sn .r..,,..
'LT,: 2803 HIGHCREST DR.
GRAPEVINE, TX
II TJ I
-
I I I I I
I
x � I
1 it II III I u I I I I� �I i \
i 11 t I_
c
„sans„
RAFTERS SUPPORTED
`-- BY WALL&BEAM BELOW EXISTING-
I I I^
REVISI`EO N
—. , I
YI'
RAFTERS SUPPORTED - �L-�- ( (I
BY BEAM BELOW-
-- I
i
ROOF FRAMING PLAN
0648-26
ROOF FRAMING
PLAN
.TIII -lmI-IT S1.6
N,STA G
4 Section Defall -TYPICAL PAVING
- 14" = 1'-0"
soFFIADIN. �Efi G TG IPrG ExIST'l",
R�T 6
o I T, oG
IIiXIs 36AZ*IT - ,
IP
F TO
D_1111— R_FPLAN
3 S.CtlOB Detell-PLANTER
- 3l4" = I'-0"
ST. MAEXISTN T G X ��
I
6G,TGAFT
G�Ri,w,_CIII� ER BARTOCO RUCTaoI
2 GARDEN SEATING AREA
3l8" = V4,
GENERAL NOTES
1. CONTRACTOR SAW CUT EXISTING DRIVE PRIOR TO
DEMOLITION PROVIDE SMOOTH CONCRETE FACE FOR
EXPANSION TO NEW CONCRETE DOWEL EXISTING
CONCRETE INTO NEW CONCRETE FILLJOINTWITH
JOINT SEALANT,
2 CONTRACTOR TO HAUL AWAY ALL DEMOLISHED
CONCRETE
3 STONE THAT MUST BE REMOVED PRIOR TO NEW WORK
SHALL BE RETURNED TO THE OWNER. THE OWNER HAS
THE RIGHT OF REFUSAL IF THE OWNER REFUSES THE
STONE THE CONTRACTOR SHALL DISPOSE OF THE
STONE.
4 CONTRACTOR TO REWORK SPRINKLER SYSTEM IF
REQUIRED
------------
------------
-.-= No. Description Date
xI�TIVG GNVEI PaTx
EX13TI NG STONE BORDER
APT,
Y 3`
� � I
Y I
-- - -- -- - i - -- -- -- -- -- -- -- -- -- -- ---
ARCHITECTURAL SITE PLAN
- 118"= 1'-0"
R�pEO gRCy
5 E.a�aa ij,
NjgTP �F S�+pO
ARCHITECTURAL
SITE PLAN
Date 06/18/2025
A1.1
Scale As indicated
I
\ I
STRU LIEL "111 1 TG
GARAGE
118
PATIO
E111.1Sn _+IS'Ilvc AIX TS
R_aIIAIT SJAFnc- fo3
114
"Ill
nw FINISH
- SHEATTIN 11-
Fxl=rlvGww.tnvD RE
-
IN'. FINISH
n_ 11JAN EXISTING 1003
I.tl
rvlcusIT EXISTING VVIN—u
3[nlo_ TCX AND SHEATH INGFROM ------------ --
e' a t� __—__
roa T __m _--
—----
F_$�
=xnnvcwnunvc=Re=su,vFacz _
Niel fItllSx — —
IM BREAKFAST
�
113
DRrtOEISn-,ilSTivc pcsT All aaas
I
I PANTRY
KITCHEN
�I - --112
EAKIOLISn _'(ISTIVG POST all IAIIS -
1111
El
SJZFAC FCR d LAB=2
D SNEAT IXGrFR _
ExI-TNGwALLAND N=RE,SGRF— F-
NEru F N sn DINING
111
GROUND LEVEL - DEMOLITION
1 r 114 -1'-9' -- -
DEN
09
LAUNDRY
106
STUDY
103
BATHROOM
107 I�CLST CLST
_L05L L102
ENTRY
L 104
PORCH
101 j
No, Description Date
'
�P00 AROy
LIVING — "m--- w2mamim 01111IM11MI
108
o =
------
aJ
GROUND LEVEL
-
DEMOLITION
PLANI
_
h
Dace 06/18/2025
I I v I
A1.2
=
sale 1 /4" = 1. 0..
-L'' 7, y
-
c --
I� 11
--F_lf 1._
- '-Ij
II
1
0aa
II �I r
]J 4'--�'_l1 t'
it
11
II II p IN E1111111
on
-1 II
I F E3 LANs
(-
`� II
FLooa A,�Ervsr
I DErsrn sH aJA�� s i
--H 11.1
CLST
BATH
L2N
11
208
I l j i i n I I-- --
',
II
11
�emxlsx wAu
II I1 I ik IL
SHOWER
O
BEDROOM
05 WATER HEATER R
-]
203 �
DTf=..E i-''^ ,_ [�TiTr'..,.;�.I. �T_�-f.Y'i'- `I
_
1 Ily
i III - LOFT
i Fo�NE
HVAC
DEMOLISH DOOH
206
1 - '
I 202
� 1
I-------------------�-_-� BATH
DEMOLISH =AIL AND DECK
FH 211--
- -
DE-15H—F— t'
CLST
- -
210
-
BEDROOM _ _
209
-
1 SECOND LEVEL -DEMOLITION PLAN
114" = V-0" --
MASTER
BEDROOM
201-- 1
No. Description Date
R�pEO gROy
e c.A„aa q
NjgTP of
SECOND LEVEL -
DEMOLITION
PLAN
Date 06/18/2025
A1.3
scale 1 /4" = 1._0..
PARTITION TYPES
PARTITION TYPE C
PARTITION TYPEA Door Schedule
1, 2 LAYERS AN GYPSUMEOPRENE ISOLATION
XP _ _ _ _ Fmish _
1. 1X4 GYPSUM BOARD 2 7/8" HAT CHANNEL ON NEOPRENE ISOLATION PADS Door Door
2. 2x4 WOOD STUD 3.2"x4"WOOD STUD ?=F scn_outE� aEF scB_ouLE 3_F scn-DUCE Number Type Door Srze Comments
3. 112" GYPSUM BOARD 4 3" ROCKWOOL SAFE N' SOUNDS
5 1/2"AIR GAP \ < < ,01 11 32"x84"
PARTITION TYPE B 6. 5l8" GYPSUM SOO DBREAK XP
] 2"x4" WOOD STUD 102 1 32" x 84:
7.1/2"GYPSUM BOARD 83"ROCKWOOL SAFE'N'SOUND ❑ %/ 103 1 ''32"x84"
2. 2x4 WOOD STUD 9. ,l2" GYPSUM BOARD 104 2 32"
3. SOUND ATTENUATION BATTS w w w 122 1
4.1/2"GYPSUM BOARD
201 1 32" x 84"
202 1 32" x 84"
129 v9 203 3�34"x84"
204 3 34" x 84"
205 1 34"x84" SOLID CORE WOOD
DOOR, DOOR SEAL
IT
(ACOUSTICGEOMETRY
DOOR TYPES TYPE I TYPE 2 TYPE 3 COM)
oaoa FULL LITETool 206 1 32" x 84"
e = Av L = I.v��=Kr oaTa 20] 1 32"x84"Lu
_ =n:MnvuFn,ivaET 208 1 32'x8X' \ r
SISIN sF SEslc rl 209 - - 1 - - 32" x 84" /_ Ln
rwu3 nrocorx ccra '210 2 32"x84" W O
—a=_F-11SNIGSINKSucPLY
LINES IND INs� 11-
EXISTING EN X
GARAGEAS I
- - - - - -- W
H
N�
CARPORT121
_ LAUNDRYFORINADIF Q V�
- = OAL SIZE PATIO 106 1 _Z
„4 N _�
TA iKLEss w: =uj
nvAC UNIT SAT'--V Lov=sra¢ DEN �—
709 V W Q
uPl, Lw�iJ
spoor N
ALIGN BREAKFA T
STORAGE HVAC�
_2- ~_ -
_ oI. 113
119
at3 122 FLoov vG '-'-- BATHROOM
i
\A'
AI - sa MUD ROOM 10] BEST -_.BEST--- '
-- T -Inz LPANTRY - - - - - — - i J2 NO Des ate
1 os
AI ENTRY FLOOGNG-
SUN ROOM w _ 104 I '
'120 [Al IAI - ----� _ ----� -
� IA APORCH
', PATIO KITCHEN 101
T
o / Z.
J< ""ED 4R0
LIVING W�o'� / - �04
T L
08
\- GENERAL NOTES Nt9T sjp9 �tpy
1 ALL INTERIOR WALLS ARE TYPE A UNLESS B OF <
s-.s• T_a. 1-1i2'12 T..1^ T.4^ 2'-11'-- NOTED OTHERWISE A/e�znzs
-1 4'. s" 20'' ' .s-II'' DINING 2 DIMENSIONS ARE FROM FACE OF STUD UNLESS
i - 111 NOTED OTHERWISE
37 / 3 INSULATIONPATCHPATTCHCONTRACTOR TO EAND FILEXISTINGE ALL L ANYHOLESAND
_ REPLACE SEALANT AS NEEDED. PREPARE ATTIC GROUND LEVEL -
TO RECEIVE NEW INSULATION,
- - 4 ALL SLAB ON GRADE SHALL BE FLOOR FLOOR PLAN
STARP AND STAN corvc5_TE TECK --' ! ASSEMBLY ui UNO
Date 06/18/2025
� 41\
A2.1
{^ -------------------------------------------------------------------------------------------------------------------------------------------------------- Scale
As indicated
n _ }
IT 5-
SC 11S, ",A 1 24 - 4
LV, JLDETH
HONT- I� WINDOW TYPES TYPE A TYPE B TYPE C TYPE D TYPE E
Ati Aa l✓ITH TLE ON SGtE/El 5 A �I ss 2 H
\ e=NCH—r 4 TREATMD`IROVRIHEALL—IT- PGNER=D SH— SKYLIGHT
S4• .., --
IT TN
OM1„ W
V ACOUSTICAL
FLOORIVti JVDE LA�ACODSTICL OM1I T1YC
NALLSD TA LED L-A-Sl TOS N
Nu ASS MSLYba ALL WALLS -
s
,T
` - l A6 a ('SLriP O
LOO'�VO �- Z —
wcs a'.a a OOVY W
I A
2,16
1 `
CLOT --- /
217J''0 I Yn 119T
A BATHROOM oomnc �� -
Ab — r- Iar n tl
_ J MUSIC ROOM �� I-14 1 �Jr'1ry�rj�L>r -W�//
� U
', cLsr Q W
BATH
e _
W utLLD _ C ' ` - -
A e LAM HATI e C ICI - -
\ rL00R Nc' ci
114 cLsr MASTER
= M 21
274 �' ---ivc 207 - Q
218 a 205 I BEDROOM r n
pTER HEATER 201 V
HVAC � SHOWER_ WC BEDROOM
v ��'-a��z^ �--------------- -- - --- -- ---.
I 203
_ � f 3���•_ BEDROOM
r 2
V A— ALSO HAUDRAIL. 2p � 212 -
LAPIINATE
ASv DED
BEDROOM IF-1 va ;-�—� '', LOFT
'� '----------------- 219 vvooD LJn¢v 206 HVAC ' \-
wDRKnooM L No. Description Date
a — z1s
BATH - --
211
le, Al Al
`' i DECK
213 a
_SA°S eIt f CI LST _ �pEO gROy
GENERAL NOTES' NtgT epp9 �tpy
�- - 1, ALL INTERIOR WALLS ARE TYPE A UNLESS P OF <
BEDROOM NOTED OTHERWISE. �e�zPzs
2 DIMENSIONS ARE FROM FACE OF STUD UNLESS
NOTED OTHERWISE.
3 CONTRACTOR TO REMOVE ALL EXISTING ATTIC
37 -/ INSULATION PATCH AND FILL ANY HOLES AND SECOND LEVEL
-- - REPLACE SEALANT AS NEEDED, PREPARE ATTTO RECEIVE NEW INSULAT
IC
sTAniPAVJSTAIvcov,RET_�crc— - - 4 CONTRACTORTO PRO DEION, BLOCKING FOR FLOOR PLAN
TOILET ACCESSORIES.
5 ALL SECOND LEVEL FLOOR ASSEMBLIES SHALL
BE FLOOR ASSEMBLY #2 U N.O.
Bate 06/18/2025
A2.2
stale As indicated
"qIS a `rrf mar t JJ - " _ r' y i�°' + -'LI
u a °
n x zr Y
-y r L_ SLJJ_ C IL
r r it hl 1L
�[- r,'Jrr'' I-r f sir J
171
- if ,J FJ--lruurl y=,rr ru➢.
lif I
nr� � trrt J i is2
_ IJ rri } trrt I � ,liar �r—r
i ♦ - L r '� - L f' 4� .z t 3 � -L,L I Intl
—fE_ "r'tirAo:�°r rLri-I
L
J r
f= n ',Ji't ircJr.n�It'➢ t 7 F
y l I -� I �Z 4F a L ,•
r
f L
rr
IJ1T,L
c rrC
fr- II '� 71r r.
uLf�. - J TCjI-r• r InL.-uu J yf uLr u-
1r"r o +I 5 c ,rhi c- rrl �J}r`C t ttt in ,Il r }F Jlr rrc.
rr- r -rr L r - " r�ir ° Jr
�rrI 1Jf L,z�L ,LJ-.I�1LCL rLf !, 4�rT LrL
✓��6 _ t L*- - r ur 1 J r.L_, r _i , utu 1 fC - it 11r Ir ( I,n'
[11 1u,4'in
L ifL I[r r L' _ LJJI IL
rr rrL1fJ'rcl ILL1
Liu-� n
�Asll�utJI,JIPLI� I�JIrrLLrf 'I!-�'s
♦ J rn"- I I�Ju ,
rIL vn ,' rlii
r utr,r nJ➢ nrf
, Ti'u-
� r,�s
i
i^\
R.
f Plan
1/a.._�._p. --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
GENERALNOTIES
1 CONTRACTOR TO REMOVE EXISTING ROOF SHINGLES
ANDUNDERLAYMENT.
2 PROVIDE NEW SELF -ADHERED ROOFING
UNDERLAYMENT CONTINUOUS OVER ROOF DECK.
BASIS OF DESIGN: GRACE VYCOR SELECT
3 PROVIDE POLYMER MODIFIED HIGH IMPACT RATED
ASPHALT SHINGLE CONTINUOUS OVER ROOF DECK.
4 CONTRACTOR TO PROVIDE A MINIMUM OF 7 5 SF OF
ATTIC VENTILATION
5. PROVIDE GUTTER CONTINUOUS AROUND ROOF.
PROFILE TO MATCH EXISTING
W
Liz
W
�p
x
`� w
F—
Nu
W
_Z
�=
d
C:)
W
N
V
No. Description Date
R"p00 A"O
W f.Anaa ?
urn 'A
qTP OF Sit
ROOF PLAN
L.
ar >
Date 06/18/2025
IT
A2.3
1/4"=1._0..
GARAGE
_
CARPORT 11H -
21
- - - - PATIO
— 114
i - - TORAGE BREAKFAST
113
SUN ROOM �I MUDROOM. PANTRY
Q_ o KITCHEN
112
ZNr Der T
= Nn S 11T ---- PATIO
115
DINING
III
GROUND LEVEL REFLECTED CEILING
PLAN
1 1/4" _ 1'_0_------------------
DEN
109
--- _--- BATHROOM
107
LIVING
108
W
> 7
W�
x
all W I-
N
LAUNDRY �}v� W
_Z
N�
T� = d
y
�o
STUDY N
103
CLST CLST
105 F 1-02
No. Description Date
PORCH
101
5 E.a�aa ij,
GROUND LEVEL
REFLECTED
CEILING PLAN
Date 06/18/2025
-1 All
------------------ L - _-- _ Scale
V✓Ai.RFALL SHDV✓E3 H=FlD -- 51ECl ION 61 OVINE - AINi_D lM100J SOFFfr TO �WTGH=kISTING
=nHAJaT FIN
BOLA sK LI,HT uj
— = ,.—=
W
creowv nou vc TrFIcnL < 4 ��//
- - - N x
MUSIC ROOMEl
216 W
- - J Lu
BATHROOM
ciowv Moueuc, - -1 220 - -' - CLST
f_ _f n
°yWi' -1
II d
I _ I
I I
MASTER
1 `-1'18 w' 2T4 - c r�aLD SHOWER 11 BEDROOM
_ uc.i i - - - _ - -2rrA7 W MIR HEA R - 0 V
-_-O
- - i{
e u
snv 245 - L—.—I �J _ 7
c, 'BED�R�gOOM —N:Q -
J J
206
- - - - --
1 No. Description Date
BATH . - -
r,
I1,12 o f 4'-(1 f -)l,:. z,o' zia - ----------------
AFF
TmB
u
Trenv rFam -' - VA—EDC_L Nc
s x;e sOEr1T v-Nr-iv ICAL vuOwN onOLDlvc J C CL3T! REPED ARC
BEDROOM . 1
�eh5
,,;, ; SECOND LEVEL -
r, ✓. REFLECTED
CEILING PLAN
Dace 06/18/2025
SECOND LEVEL - REFLECTED CEILING a i I 3 .I'//
PLAN"1/4-V_o..--------------------------------------------------------------------------------------------------------------------------------------- - �"` -= 3z�>"`� -- scale 1/4..=1._0..
SECOND LEVEL
9' - 4 318"
EXISTING SECOND
LEVEL
GROUND LEVEEVE
L 1
2 PLAN SOUTH ELEVATION
9 1
r`
UT 1 E d -T
U r
- - -
r
-
iu
-�A El - �R - _ -. I
GENERAL NOTES
1 ALL EXISTING WOOD SIDING TO BE PAINTED TO
f _
MATCH NEW SIDING CONTRACTOR TO REMOVE
---
---
ANY CHIPPED OR PEALING PAINT, REPLACE
SEALANT, AND PREP SURFACE FOR NEW
PRIMER AND PAINT
SECOND LEVEL A,
F
E _ 4 318"
---. --�- -;
-----------------------
EXISTING SECOND
'
LEVEL
- -
' -
EXTERIOR FINISH SCHEDULE:
-
-
MODULAR FACE BRICK
_
-
DIMENSIONS 3518" WIDE X 21,W TALL X 7518"LONG
COLOR TBD
- --
GROUND LEVEL
SHIP LAP WOOD SIDING.
— — — — — — — Q, 0„ } DIMENSIONS MATCH EXISTING
PAINT. TBD
I PLAN EAST ELEVATION
1/4" = V-0"
No. Description Date
R�pEO gRCy
e c.a„aa q
NjgTP �F S�+QO
EXTERIOR
ELEVATIONS
Date 06/18/2025
A4.1
scale 1 /4" = 1._0..
4 PLAN NORTH ELEVATION
SPAEEP.=MA, FACTNaET FWEa NDFAIL —ILE610
' STAINED TO
MATCH EXISTING
3 tTYPICAL INTERIOR GUARDRAIL
-
314 7 0"
SP.xc_F4MnwFACTURER /
'FACTORY FINISHED STEEL RAIL
TYPICAL BALCONY GUARDRAIL
3/4" = 1'-0"
EXISTING WOOD LAP SIDING
PAINTED WOOD LAP
SIDING TO MATCH
EXISTING —
SOLDIER COURSE
WITH EVERY 3RD
COURSE CANTED To
MATCH EXISTING
PLAN WEST ELEVATION
114" = 1'-0"
EXISTING BRICK
i r E!
IF
i,J 3 I r
r
I I
i
----------
gl1;t
3
aLL 'II::,:c.
ti
p9c
i
idl.
JI
3=
--=3
\
II
PAINTED WOOD ITAP�
SIDING TO MATCH
EXISTING
/_
_ SECOND �EVEI-t
9'
O
u
— EXISTING SECOND
Q
LEVEL
L
Q
r
SOLDIERCOURSE
WITH EVERY 3RD
COURSE CANTED TO
! 1
W
MATCH EXISTING
r
GROUND LEVEL
e
W
MODULAR FACE BRICK 111
RUNNING BOND TO MATCH
T
y M
0-
EXISTING
u
LQL]
MO
W
N
No. Description Date
----- PAINTED STEEL GUARDRAIL
gRCy
R�pEO
5 E.a�aa ij,
- EXISTING WOOD LAP
SIDING
SECOND LEVEL �
qTP OE Sit
IF - 4 318"
�a�zpzs
EXISTING SECOND
LEVEL r
EXTERIOR
--- EXISTING BRICK ELEVATIONS
GROUND LEVEL
0-0
-------- MODULAR FACE BRICK: 1/4 RUNNING BOND TO MATCH EXISTING
TANKLESS HOT WATER HEATER
Date 06/18/2025
A4.2
Scale As indicated
R roll-la-liali-I
Ar
P
-4�
'Pv
----------- - - — ------- -------------------------------
II III III III
BEDROOM WEI cER---EFEQE Emil -
Lu
2
219 15
zw
SECOND LE EL AIII, uJ "o
----- -- -- ------ --------
9' 4V18T
EXISTING SECOND
LEVEL
91 - w
SUN ROOM
116 U ui
GROUND -.EVEL
:F uj
rn
2, NORTH/SOUTH BUILDING SECTION u 2
1/41� 1 00
�-J
No. Description Date
_R—IL O-J BOTH ---- ---- ---
EXISTING SECOND
LEVEL
WORKROOM
215 CLSI
217
V
SECOND LE EL 'K
SrAiNEJ WOOD STAIRS
9' 4
318" EXISTING SECOND
- LEV I -----BUILDING
--------- -------- --
BUILDING
STORAG- GARAGE SECTIONS
118
,k- GRoUND LEVEL ------ - -- - --
— - — - — - GROUND LEVEL
-d.
Date 06/18/2025
STA R SECTION
EASTMEST BUILDING SECTION
114" = V-W A4.3
scal. As indicated
WALL ASSEMBLIES
WALL ASSEMBLY 91
I WOOD LAP SIDING - MATCH EXISTING
2 AIR BARRIER
3 vD' EXTERIOR SHEATHING - REF STRUCTURAL
4 WOOD STUD - FEE STRUCTURAL
5 BATT INSULATION -R-13
6 112" GYPSUM BOARD
WALL ASSEMBLY#2
1 NOMINAL FACE BRICK MATCHE)GSTING
2 AIR GAP
3 AIR BARRIER
4 ti2" EXTERIOR SHEATHING - BEE STRUCTURAL
5 WOOD STUD - REF STRUCTURAL
6 BATT INSULATION -R-13
7 112" GYPSUM BOARD
FLOOR ASSEMBLIES
FLOOR ASSEMBLY #1
I CONCRETE SLAB -ON -GRADE - REF STRUCTURAL
2 UNDERSLAB VAPOR BARRIER
FLOOR ASSEMBLY #2
1 SUB -FLOOR -REF Sl RUCTURAL
2 JOIST ASSEMBLY -REF STRUCTURAL
3 PROVIDE BATT INSULATION OVER UNCONDITIONED
SPACE
4 112" GYPSUM BOARD- S1e" TYPE X GYPSUM BOARD
ABOVE GARAGE
FLOOR ASSEMBLY#3
1 2" GYPCRETE TOPPING SLAB
2 IA" MAXXON ACOUSTI-MAT
2 JOIST ASSEMBLY - REF STRUCTURAL
3 6" ROCKWOOL SAFE 'N'SOUND
4 50 TYPE X GYPSUM BOARD ABOVE GARAGE
---------------- --
BALCONY ASSEMBLIES CEILING ASSEMBLIES
BALCONY ASSEMBLY #1 CEILING ASSEMBLY #1
1. 1-112" LIGHTWEIGHT CONCRETE TOPPING SLAB 1, 12/2" GYPSUM BOARD
2. 1/4" DRAINAGE MAT 2 2x CEILING JOIST - REF STRUCTURAL
3,60 MIL SELF ADHERED SHEET WATERPROOFING 3 INSULATION- R49
4 PLYWOOD SUB -FLOOR - FEE STRUCTURAL
5. WOOD FLOOR JOISTSREPSTRUCTURAL
EXTERIORASSEMBLY #2
6, SOFFIT PANEL
8'YPSUM SOUNOBREAK XP
G
2 2"x6" CEILING JOISTS
3 6" ROCKWOOL SAFER SOUND
4 1/2" AIR GAP
5 518'. GYPSUM SOUNDBREAK XP
6 21 CEILING JOIST - REF STRUCTURAL
7 INSULATION- R-49
r
T- is
--
-= l
�f
SECOND LEVEL.
V Y - 4 318"
ry
EXISTING SECOND - -- ----
LEVEL
171
4 , Section 4
112" = 1'-0"
100
— — SECOND IEVEI
9'-4318"
EXISTING SECOND
9' 0"
f.
J,3_-
-
6ALCCNY A—U6L 1----
I II
f
1'
T
GROUND LEVEL,I
_ - GROUND LEVEL I► -- _ -- —\'( 0'-0"
2-WALL SECTION i WALL SECTION----------
- 1l2"=1-0 — _
SECOND LEVEL L
9'-43/8" 1
EXISTING SECOND
LEVEL L
9'-0" 1
Lu
W
0LL
Q r X
N
W
< r Z
_ >
�_
uc
N
No, Description Date
4��D ARC'y
5 �b.anaa 9.
Nr4TF OF S�+p"
t /B�TPS
_ __ _-
WALL SECTIONS
Dete 06/18/2025
A5.1
xeie 1 /2" = 1._0"
CI
f I � I
,I- TILT
a r s. EF°.T ti }
"D,",1a a,sN
i
BELT INN—Bj LT
aJA�T�sJ,EaN
I I I I l f
lJLL C:1 ,,_N.sar vV k B LT v ----
BUILT IN NINLE U
FDLLHED TTL. -
EL No��E>
I �
BUII',H BUILT N- �z, BEANE
I!I -
*1
;,,SHOWER -EAST 10 SHOWER -WEST 0 SHOWER -NORTH
1l2"=1'0" -- 1;2"=1'0" - 1(2"=1'0"
LIMB E�TJB sEL NTo1
--_--- - B•OUWE¢ CLOSET 5N_LE
D aoD
S, CLOSET -EAST
- 112" = 7'-0"
2 CLOSET -NORTH
112" = 1'-0"
F
I
` -
AND EVCLOB110.
0
-B cu, 5B uvITB TIs=
X O_
OV IL E1
W r
W
6, BATHROOM -NORTH
112"= V-0" Q
All W F-
Nu W
`_ZJ
CLDS'T SN-LE
AID 1.B = d
�o
0
N
No. Description Date
4 CLOSET -SOUTH
112" = 1'-0"
R�pEO gRCy
5 E.a�aa ij,
OE <�+
INTERIOR
a ELEVATIONS
— -
Date 06/18/2025
A6.1
IT ,
1 /2" = 1._0..
HE„]ER. A=F STRUCT", - - -_ --
ILAS I US TRIP
'EAT"
A FILL FORD D=eNNGWTH-XV NGI.A. DFALANT
-_
OINDOID HEAD AS SCHEDULED
Section Detail - WINDOW HEADIROOF
7 WOOD SIDING
3- = -o.
En
—OD SILAUL
SEALANT
BLOCIII NG AS NE JD
al
11PDovvSILL AS GO DDULEA
NT
DEAL
EDGE LE""
BE METAL I RIP
EDGES T V�EALANi -- - - t
HOMINIMUMOF1'AFaOMCORNE3
FLEXIBLE
ALUNO 'ILL
XTFROR SHE R
S'THG------ Vr --
UGTj1AL
_,wODBSTU _
Cij
FAIL
NI -A--
Seal- Detail - WINDOW SILL WOOD
4 SIDING
, = 1'-0,
aOOO SIDING AS SCHc]JLSo
FLASHING —E
AIREA
RIER
GlIn-16ABSCR H OIED
FILLROJGH, �NIN A
2. YeCO] VETOAM SEA NT
�TJ
I I I I
FAAMIC UPS'
•2 SIT _SUR
GTiUCTURAL
BATT I NSULATION AS SCHEDULED
Section Detail - WINDOW JAMB WOOD
6 ,SIDING
III- EDGE
FLEXIBLEFLASHING
BRIIKASSCHIDULED
INI
COVTINUOUO At.O ,5HEA]AV].1AM8
DAFLASHNG, ITHE FLEXIDENT AT
S BE
ED DDSBEG
'AINT-SCLEFILLOESSLI-IT-L SEA
STRUCTURAL
wINDOW HEAD AS1IRSDJILp -
Section Detail- WINDOW HEADILEVEL
BRICK
3" = 1' 0"
BRICKASSCHE]'JL=D
FLEXIBLE FLASHING 11111-=D 5"MINIMUM IJE EACH JAMB
1^
CAPE
,S_, A MOPE OM L2 M1INEE:
DBARaER
WIND—JAMB—CLE—ED�-
FILL ROJGHO EYING IR IIG
FJAM SEAL4NT 44
t�W00]aTU AALANT
STRUCTORSIL
5 So Von Detail - WINDOW JAMB BRICK
3• = I -0.
IT END LE M NI RL SJOIDD STUD, AM
-ANT
- - -
'-7
u � �
BL CKN-A-NE ] D
I
wINUISS", As scN=DULED
sFALANT
NN]OwFANGEGET
LTFALANT
MAG,RPCO S IDDY,BILL
FLEXIBLE FLASHING IGNT GOULD
ALONG 'ILL
TO
"
METAL FLASHING 'NITHI EDGE
1,2 =IT=RIDBG� ALL-�=F
TJI
..wODD STUD FT J, ND TEF
ST"RAL
FULL NEADXE7PV7NTAT2A'OG
2 Section Detad - WINDOW SILL BRICK
3`=I-0'
TRIMINTTo,N BAR offn
NUIolvs nE �
BATT tus a crnsJHIEDARB
SU
11SR DISTUD FRAMING JREF
STRU1,,TJ1L
B..—ISSUR=TRATE] STUD FRAMIND
SILLGA
L %6LEFANG EXT FILL O FHTAT2I,GC
IF FR CR
EG7 CONDINUCJS ALONG So
DEALANT CANT
i Section Detail - BRICK LEDGE
3" = 1'-on
No. Description Date
R�pEO gRCy
W� o�fiAnao =Rja
NjgTP �F S�Fle
B P5
SECTION DETAILS
Date 06/18/2025
A7.1
SCSI. 3" = 1..0..
9NkCA�E �iGN
3 Plan Detail - SOUND ROOM JAMB
3" = t.-0"
5 Section D0.11- SOUND ROOM HEAD
3"=t-D
N,a• nIP �A>
HATCHANNEi
_
NEoaa_v-
cr=sJNl so�vaeREnH xN
- I _ yyI � - _-
- - - t - '-.�—,-.+—.m+•,�ddd rG—,.. ..
SILL PLAT_
tdE.,Pn-vE t50Lanov tJ
-
-- I _ '
—
ACOJSTIC/LL 5EALANT
RI�,_T_RIscLATIOv,T.
-,
— - --
a s�,w LeNT3� N JV
ESL EIL Y,U
E�oo�d�aTa
t
1
I I
4 Secton Detail - SOUND ROOM SILL
3" = t,_D„
Secton Detail - SKYLIGH'
SILL
3, = ,,_D„
Section Detail -SKYLIGHT JAMB
W
>_ Ln
uj
G�� h
�H X
Ln
�WJ
NTT+ />
uo
0
N
No, Description Date
4��D AR�y
5 �b.anaa 9.
Nr4TF OF S�+p"
�B�TP 5
SECTION DETAILS
Date 06/18/2025
A7.2
scale 3" = V-0"
L%BLOD-C - =ER BTRUCTJRAL
GRADS RED OAK STAIR TREAD
5 1 Secton Detail - STAIR TOP
- 1 1l2" = 1' 0"
5EF-CT GRACE A BEiso FARSL D11-
FED
CKING-PE-11— AT
eLO
FLOORING ASSCH JN EK
Section Detail-STAIRBASE
-- 1 102" = 1' 0"
ALJMINJM76AR t
S=ACER
e_A�e R EBTRJCTJRAL
DER
x A NTEB 0oR B_111 VT
3 ' Section Detail - BALCONY FASCIA
_3"=V_0•
SILL Pill WITH BACKANB ENG
NARP IR SE_4
i �2 tOP ING SLAB - - -
WAi=R CECADT �ROOFO IEN FRAN=
I V-
FlASH1--INCEALANT - _ W
r^
Z
W W
a=BATR R
=xrERo soFrF—Ir W
.Alvr_DWOOD SOFFITRAN-
IS AI Rye o006 SIDI LIVt1 = LU
�—
IF
DA FLASHING
C/1
BRICKMOLDINB - - - -_ — — W
�= d
- _
00
�o
2 Section Detail- BALCONY AT DOOR SILL (14
- - 3" _ 1. 0"
No. Description Date
BaLAnTDFR
:.BeNBLEH FTE
EGENG
<>♦ �'- .
,
W�Nj♦g�mT�pPEEGO./AFng_ aSRa�Cc+y�?pS
mn
zpzS
SECTION DETAILS
I Iii I.
Date 06/18/2025
Section Detail- TUBULARSKYLIGHT A7.3
1 1/2" 1' = -0"
scale As indicated
IS
D-BLE . x sr,o
4 Secton Detail -SHOWER NI(.HF
.. �T ART28
u -vvEu_Jrc
H SST/
_Acre sioE VF rn=e:vUH =RovioE ooJ&LE '-- -
STUDSwH_R_ Lnr_Is sEc— -
TILE ns SCHEJJL=n — - - -- J
K=R01-BOARH x
aA ro W 51 SoNE SEALA T AT-EORo l l
=RE eLeP J KE�J SHnw R TEA � -
t
- Sec9 DetaI- SHOWER SEAT
3 3, = V-p.. - -
W
>_ Ln
wi
G�in
h
�H X
N
W
< r Z
cn C7 >
q= d
uo
0
N
Tito ID 5CHE--D_--
h DISDID No. Description Date
K.IDI eAND'NITH KE ROI.KEREa: a3EFo=nl Eo C-N--Ts -
stuccv_s------
PR SLOP Oh VJ SHJW RTRA� - k
Section Detali - SHOWER WALL
2 3„_V,w
Secllon De.11- SHOWER CURB
BATHROOM
DETAILS
Date 06/18/2025
A7.4
sLaia 3" = 1..0..
f
>\AM'
EL_
31—NECTI-
r
IRCJIT
GROUND LEVEL ELECTRICAL PLAN
1l4" = t'-O"
W
>_ Ln
uJ
G�� h
�H X
Ln
to
W
< r
Z
cn C7 >
W- d
u
a)
W
No, Description Date
U' ex 0
i
N
se
..
GROUND LEVEL -
T„ ..d- =e e< .::.;._Tl-',-
ELECTRICAL
3.
PLAN
,2'
9
Date 06/18l2025
E1.1
neo:e couvr_R oun�r --
aEL--UNT_RGFCI0U-T -
-All—I
T L \ i
"=iC4TF CIRCUIT —
1 SECOND LEVEL- ELECTRICAL PLAN
- 1/4" = 1'-0"
No. Description Date
R�pEO gRCy
5 E.a�aa ij,
NjgTP �F S�+pO
�B�TP 5
SECOND LEVEL -
ELECTRICAL
PLAN
Date 06/18/2025
E1.2
5caie 1 /4" = 1._0..