HomeMy WebLinkAboutSFRA2025-004187RECEIVED: 10/31/2025 DATE OF ISSUANCE'
25-004187 '
3208 BRIDLE LANE 25-004187
FOUNDATION PERMIT #:
BUILDING PERMIT APPLICATION ELECTRONIC REVIEW
(PLEASE 1'RIM LEGIBLY - COMPLETE ENMRE FOILNO
JOB ADDRESS: 3208 Bridl _ I nnP
SUITE #
LOT: BLOCK: SUBDIVISION:
BUILDING CONTRACTOR (company name): Pinnacle Foundation Repair
CURRENT MAILING ADDRESS: 601 Dickey Fed
crrY/STATE/ZIP: Grand Prairie, TX 75051 PH_ # 972-251-0018 Fax It
PROPERTY OWNER: Steve Allen
CURRENT MAILING ADDRESS: 3208 Bridle Lane
CrrY/STATE/ZIP: Grapevine, TX 76051 PHONE NUMBER: 817-266-2726
PROJECT VALUE: $ 5150.00 FIRE SPRINKLERED? YES NO
WHAT TRADES WILL BE NEEDED? ccrerko s flat alppi ELECTRIC PLUMBING MECHANICAL
DESCRIPTION OF WORK TO BE DONE: Install 7 total pilings
USE OF BUILDING OR STRUCTURE: Residential
NAME OF BUSINESS:
Total Square Footage under roof. 2390 Square Footage of alteration/addition: 200
❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings,
alterations and additions)
❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: (Not required for i & 2 family dwellings)
❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQI.I'IRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROXI THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S). nn`
PRINT NAME: Robby Brown SIGNATURE /t e�3a �2GttIL
PHONE #: 972-251-0018 EMAIL:
R CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Type: V K I Permit Valuation: $ I Setbacks Approval to Issue
Occupancy Group: Z Fire Sprinkler: YES NO I Front: Electrical
Division: Building Depth: 1 Left: Plumbz
Zoning:-'"� . Building Width: I Rear: Mechdnical
Occupancy Load: Grease Trapp Right: Ho6/d
Plan Review Approval: Date: i j (^1 / L I Building Permit Fee: 15e100
Site Plan Approval: Date: Plan Review Fee:
Fire Department: Date: Lot Drainage Fee:
Public Works Department: Date: Sewer Availabilitv Rate:
Health Department: Date: j Water Availability Rate:
Approved for Permit: Date: Total Fees:
Lot Drainage Submitted: Approved: Total Amount Due: 150r"00 I' V
P.D. BOX 95104. GRAPEVINE TX 76048 f617) 410-3165 O:FORMSMSPERMRAPPUGATIONs i/02.RLk,—" A. � 7� 11.2i49
City of Grapevine
Building - Residential
PO Box 95104
Alteration
RAP VISE.
Grapevine, Texas 76099
` r L i %'=
817) 410-3166
Project # 25-004187
Project Description: Install 7 total pilings
[ELECTRONIC
REVIEW)
i
Issued on:11/19/2025 at 3:39 PM
ADDRESS
INSPECTIONS
11
3208 Bridle Ln.
Grapevine, TX 76051
1. MISC. Building Inspection
7. Building Wall Tie Inspection
2. Building Setback
8. Building Termite Verification
LEGAL
3. Building Foundation/Footing
9. Building Energy Code
Carriage Glen Addition
4, Building Pier
10. Lot Drainage Inspection
Bik 4 Lot 3
S
5. Building Framing
11. Building Final
6. Building Bracing / Sheathing
PERMIT HOLDER
Robby Brown
INFORMATION FIELDS
Pinnacle Foundation Rep
air
'APPLICANT NAME (Individual)
Robby Brown
(972) 251-0018
"APPLICANT PHONE NUMBER
9722510018
COLLABORATORS
APPLICANT E-MAIL
• Robby Brown
VALUATION
5150.00
Pinnacle Foundation
Square Footage
2390
Repair
` CONSTRUCTION TYPE
VB
(972) 251-0018
OCCUPANCY GROUP
R-3
OWNERS
DOCUMENTS - MISC 01
c initial report 3208 Bridle Ln
Connie Revocable
25 29.,
10.pdf
Trust Allen -bacon
DOCUMENTS - MISC 02
BUILDING PERMIT APPLICATION.pdf
* ZONING DISTRICT
R-7.5
FEE TOTAL PAID DUE
Building Permit Fee, ($150.00 $ 150.00 $150.00 $ 150.00
Flat Fee) Simple Alteration
TOTALS $150.00 $ 150.00 $ 0.00
READ AND SIGN
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF
MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO
THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN
COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING
CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT
DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR
Page 112
MYGOV.us 25-0D4187, 11?1912025 at 3:39 PM Issued by_ Courtney Cogbum
Adam A. Green, P.E. (rX), MBA
CROSSTOWNAnstm � �a � Fort Worth I HR on Sau Antonio I Wwo (469) 751 7694
rn==to n�nee .our
n,� ��.ERxK.ER.,IKOHEA.�dnoK,RrrEON
PROVIDE SIGNED AND SEALED LETTER
aTr OF ORAPEVIxE
FROM REGISTERED ENGINEER
TNISPADF aGr FASFFt FOR CONSTRxcnox
CONFIRMING SITE INSPECTION AND
mwruCT ADD THE eu ww�toANY R ZONING
Date: November4, 2025 APPROVAL OF PIER INSTALLATION WHEN
oD.I.A.EE
WORK IS COMPLETE
Orr APPROVED PUNS TO BE KEPT ON THE JOB
Attention: Pinnacle Foundation Repair (via email) & Property Owner
SITE ATALL TINES.
11/17/2025 11 20:37 AM
Subject: Pre -Foundation Repair Consultation Report
BY: KELLY TAFT TSBPE: 1-3971
Slab Foundation
3208 Bridle Lane, Grapevine, TX
FURLONG INSPECTION DIRRSIOR
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
Good Afternoon: ALL CMINGES MST BE APPROVED
Crosstown Engineering (CE) was retained to conduct a review of the limited foundation repair plan prepared by
Pinnacle Foundation Repair (the contractor) to determine, in our opinion, if the recommended remediation plan is a
reasonable plan of repair based on the relative elevation map provided.
The contractor provided a limited repair plan that included the pier locations and pre -lift elevations for the structure
for our review. No other information was provided regarding prior engineering reports, recommendations for foun-
dation repairs or construction documents relative to this structure. If existing piers are shown in the limited repair
plan, their locations were provided by the client and are approximated. We do not certify their performance or exist-
ence. If the reader would like to determine if they are present, they most contact the owner or contractor to obtain an
engineering certificate for them. CE has not performed a visual inspection of the structure.
The slab -on -grade foundation has settled towards the areas where piers me located on the limited repair plan and
physical damage is present which indicates a need for remedial measures according to the contractor.
Pinnacle Foundation Repair has recommended performing the following in the approximate locations of the structure
as indicated on the limited repair plan:
• Install 7 total exterior pilings.
• Install 38 LF of 4" PVC surface drain with (7) 1'xl' catch basins and 90 LF of exit line, tunnel under side-
walk and exit to street via core curb (optional).
The foundation repairs are to meet or exceed the 2021 IRC.
Upon review of the elevation drawing and based on the contractor's evaluation of the property, we believe the pro-
posed limited repair plan to be a reasonable and limited repair.
Expectations and Additional Recommendations:
This report provides our reasonable professional opinion of the condition of the foundation on the date of the inspec-
tion by the contractor and is based on the data provided to us and does not take into consideration any changes in the
condition of the foundation or soils after that date. The contents of this report supersede any verbal comments made
regarding the structure before, during or after the inspection. Although document review is an integral part of the
foundation repair process, we recommend obtaining a visual inspection by a licensed engineer. CE can complete this
visual inspection for an additional fee.
This limited repair plan is intended to provide a reasonable repair to improve the performance of the foundation and
is not intended to level the foundation. The contractor shall determine the amount of elevation correction needed
based on the reaction of the structure during the lift in order to minimize damages and additional stress.
Page 1 of 6 - Date: 11/4/2025
ALL CHANGES REQUIRE
CnxcTRucnrw NOOR_c
m�o U NA RSIACAu OR INSPECTORS
APPROVAL OF REVISED
APPROVED PUNssrw-L BE
rw A.rn.-roo v.r.
BB')ataaoSO
KEPT rN JOBSITE AT ALL TIMES
MorvpaV-SATIIRDAV orvEV
PLANS
NO NNORISPERARTnEDONSUPIDAY1
I REPoKEGUPoRPERNITEKPIRATIGN
Adam A. Green, P.E. (rX), MBA
CROSSTOWNArotm I DRIIS I Fort Worth I Ho ton I San Antonio I Wwo (469) 751 7694
SHIMA..ENN� ENGINEERING 1�noN111 �na=to nnn .om
Because the structure has endured pre -repair foundation differential movement, residual differential elevation and
perceptible floor slope or other noticeable issues may remain following the foundation repairs. Damage to the struc-
ture may arise during the foundation repair installation activities.
The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture content
fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls will surface due to
seasonal movement within the soils, even after foundation repair. Periodic repair of this type of cracking may be
needed.
A foundation and yard watering and foundation maintenance program will help control seasonal movement. It is
important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the structure.
In addition, tree and shrub removal or root barrier installations are advisable if trees or bushes are observed to be
close to the foundation. Tree roots can cause "heave" or settlement of the foundation where roots grow and absorb
moisture over time when planted close to the foundation (tree roots extend approximately as far or further than tree
limbs).
Maintaining the soils around the structure to slope away from the foundation to prevent excessive pending near the
foundation in areas that are not already sloping away will help prevent future foundation movement. We recommend
that a full gutter system with gutter extensions be maintained to discharge a minimum of 4 feet from the foundation
(not in landscaped flower beds or any other location that will trap water near the foundation). Ponding new the
foundation can cause "heaving" (upward movement of the foundation), settlement of the foundation due to overly
saturated clays soil or erosion of soil embedment wound the foundation.
If the owner, at any time, observes standing water near the foundation, we recommend that they consult with an
engineer or a drainage contractor immediately.
We recommend pre -lift and post -lift plumbing tests be performed on the sewer and potable plumbing lines. All leaks
shall be repaired immediately.
CITY OF GRAPEVINE
THIS PAGE OR FAFF/1 FpR CONSTRICTION
RELEJ,SE Do
CITY APPROVED PLANS TO BE KEPT ON THE JOB
SITE AT ALL TIMES.
11/17/2025 11:2142 AM
BY: KELLY TAFT TSBPE: 1-3971
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND a N
APPROVAL OF PIER INSTALLATION WHEN r EMENTS OR POOH[ RISNror-wnY
WORK IS COMPLETE
ALL CHANGES MOST BE APPROVED.
Page 2 of 6 - Date: 11/4/2025
Adam A. Green, P.E. (EX), MBA
CROSSTOWNAustin I Dalla I Fort Worth I HEAon I San Antonio I R"azo (469) 7517694
.,RIMINU..NINNEENTNG I NONE A INARDWHONINNE ECIWN .oW W.crnaBtnnnsn�nnnnn�.Com
Disclaimer:
We do not warrant the future performance of the subject foundation and the reader is urged to review the Disclosure
& Disclaimer for other limitations and standard recommendations. The limit of liability is limited to the fee paid for
this opinion. No further agreement shall be made, altered, or varied except by written instrument.
This report has been completed to document the repairs to be implemented by the contractor. Neither Crosstown
Engineering nor Adam Green, P.E., are responsible for liability to the owner or others for acts or omissions of the
contractor to carry out the repairs in accordance with their agreement or for the construction means, methods, tech-
niques, sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the
warranty of the work they performed in accordance with their agreement.
Please see the pier specifications and limited repair plan for more information
Sincerely,
_,-- aN
OF
7E�S 111
Crosstown Land Development Services
0�P`E
. 15
Texas Engineering Firm (F-15944)
I
...EFppMp GREEN
Adam Green, P.E., MBA
Professional Engineer (TX #116597)
11/04/2025 11�9 IN.A ?— =
CITY OF GRAPEVINE
TZS PAGF RFIpe SFO FOR CON ORIIfTON
EASE DOECONFLICT WITH TH E ODE OR ZEDING
ORDINANCE
CITYAAPPROVEDSPILANSa FPT ON THE JOB
SITE AT ACL i
11/17/2025 11:21:48 AM
BY. KELLY TAFT TSBPE: 1-3971
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AN D
.
B—SEuo� NOTAPPLY TO CONSTRUCTO N
APPROVAL OF PIER INSTALLATION WHEN
CASEMENTS OR PBBEe RIONTaC-WAY
WORK IS COMPLETE
ALL CHANGES MOST BE APPROVED.
Page 3 of 6 - Date: 11/4/2025
Adam A. Green, P.E. (EX), MBA
CROSSTOWNAnstm I Dall'S I For Worth I Ho ton I San AmmTio I Wwo (469) 7517694
E,RMURAL ENGINEERING INR,Ea.WNdnoNINK.EERUDN .croasto neerr�.�om
DISCLOSURE & DISCI APYIFR
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due to expansion, con-
traction or densifrcation of the soils etc. This soil movement could possibly cause the foundation to move after the remediation
plan within the attached report has been implemented and may impact the stability of the foundation and cause damage.
NO WARRANTY IS EXPRESSED OR IMPLIED BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUNDA-
TION OR THE REPAIRS THERETO. Diligent foundation maintenance to maintain consistent soil conditions along the perim-
eter should reduce further problems after the recommendations within this report have been implemented. However, seasonal
moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger of further
damage.
REPORT LIMITATIONS
This report is written for informational purposes only and rs not intended to be a detailed technical evaluation of the property or
an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current conditions observed at
the time ofthe inspection. THERE IS NO WARRANTY, EXPRESSED OR IMPLIED, CONCERNING THIS ENGINEERING
REPORT.
The information in this report supersedes any verbal comments, expressed or implied, made by Crosstown Land Development
Services or its principals, agents or employees. The client agrees that neither CLUB nor its employees or owners will be respon-
sible for:
1. Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite drilling and testing of the
recovered samples,
2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the client; and
3. Any other element such as joists or beams and other structural members that is boxed or otherwise not readily available to
CE for viewing, and releases CE from any liability attributable to such knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance of the facility
at the time of this structural survey. Compliance with any code or specification other than as expressly noted is specifically
excluded.
The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and DOES NOT
IMPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN THIS FUTURE.
This report was prepared expressly for the client and expressly for the purposes indicated by the client. Permission for use by
any other person for any purpose, or by the client for different purpose is denied unless otherwise stated in writing by CE.
CE SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIONS BY THE CONTRACTOR OR HIS SUBCONTRACTORS
PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE CONTRACTOR TO PERFORM THE WORK IN
ACCORDANCE WITH THE REPAIR PLAN. CE IS NOT RESPONSIBLE FOR THE CONSTRUCTION MEANS, METH-
ODS, TECHNIQUES, SEQUENCE OR PROCEDURES OR THE PRECAUTIONS INCIDENTAL THERETO.
CE expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE and the client expressly dis-
claims that it has contracted for or received any warranty of fitness for a particular purpose with respect to this report. THE r
REPORT UNDER THIS AGREEMENT IS THIS OPINION OF CE AND THERE ARE NO WARRANTIES THAT EXTEND
BEYOND THE DESCRIPTION ON THIS FACE OF THIS AGREEMENT. ` „ _ ,
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
CRY APPROVED PLANS TO BE KEPT ON THE JOB
SITE AT ALL LIMES
11 r172025 11:21 58 AM
BY: KELLY TAFT TSBPE: 1-3971
Page 4 of 6 - Date: 11/4/2025
DOES NOT APPLY TO CON STRUCTIN
EADENSENTS OR PUBLIC UGHTOC WAY
ALL CHANGES MU AT BE APPROVED.
OMMM�
mmmmm TRANSITION PIER SYSTEM
EXISTING GRADE LEVEL
GRADE BEAM
—�—E it STEEL SHIMS INSTALLED
FOR PRECISE LEVELING
PRE CAST CONCRETE
CYLINDERS 6"X12"
A
CONCRETE CAP
E PROVIDES GREATER
SURFACE AREA
PRE CAST CONCRETE
CYLINDERS 6"X12"
(PRESSED TO POINT OF REFUSAL)
i
a
n IE STEEL CABLE ANCHOR
(PREVENTS HORIZONTAL DISPLACEMENT]
rn
z
a
X \ PROVIDE SIGNED AND SEALED LETTER
`L' STEELTRANSTION PLATE FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION ANO
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
CITY OF GMPE r 3208 BRIDLE LN.
TNISP^A ERELEASEDFORi 14STRU ON 2-7/8" OUTER STEEL PIPE GRAPEVINE, TX
RELE°NFLII WITHTHEBUILENG E°R, 2-3/8"INNER STEEL PIPE
CITY APPF WED PLANS TO DE PTON IE JOE SE'Of 7[1AA�1 J
SITE AT ALL PA ytP WS IAAI
ja
1yl17/2025112'. 32 AP
ppµ10. GREEN . ,1
BY KELLY TAFT TB SET i i71 %q , 1�6597 %WSJ
RICTION REDUCTION PLATE voaizozs %<'`froENSg..
AAAA4�.��:. E�4
_ Crosstown Engineering `
}• + _ Texas Engineering Firm
6119 Greenville Ave, Ste 320
Dallas, TX 75206
BEDROCK
Adam A Green, P.E. (TX), MBA
CROSSTOWNAustin
I Dallas I Fort Worth I Houston jSan Antonio I Warn (M9) 751-7694
ind.NRLLE KnotIXO
oYYv.CrYRPtJwnE1ginrcnng.com
Lunentl
Reel Vansftion Diar ad and per
•optonai vier Qaonolube
I, concreM Dier 0hi px
OplowlccumakaN 0Dnd and block
Q mumpier inhimm PMr 9 reRmw Paint Qspreadfooting
— wood bean, pip
----- not pleb 41111111111111 french do
urfashaim _i exa pipe
�,itchbasi cain
0sump Dump 1F undomfow
WOLF.
emnne,
In.n3n Fsuda«dminw
> rxr catch bnains.4• we
Tunml undersidemlk
[om curb eulto sheet
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
CITY OF GRAPEVINE
TIES TAFF RFI USED FOR CONSTRI ICTION
ORDINANCE
rm APPROVED PLANS TO BE KEPT ON THE JOB,
SITE AT ALL TIMES.
11/17/2025 11:22:48 AM
BY: KELLY TAFT TSBPE: 1-3971
ALL CHANGES MUST BE APPROVED.
PLEASE NOTE:
THIS DRAWING M PROVIDED FOR PRELiMIVi ARY PERMITTING AND CONSTRUCTION PURPOSES
ONLY AND IS A LIMITED PLAN OF REPAIR. ADDITIONAL WORK MAY BE NEEDED ONCE THE
FOUNDATION WORK HAS BEGUN NASED ON THE PER-FORMANCE OF THIS LIMITED PLAN OF
REPAIR- CROSSTOWN ENGH9EERINGHAS PROVIDED REVIEW OF THIS LIMITED PLAN OF REPAIR
AND IT IS OUR OPINION THAT IT IS REASONABLE AND SAFE FOR THIS STRUCTURE.
IF INTERIOR PIERS ARE SHOWN ON THIS DRAWING THE CONTRACTOR WILL PLACE THEM CASED
ON TINE LOCATIONS OF GRADE BEAMS, PLUMBING LINES AND POST TENSION CABLES, THEREFORE,
THE LOCATIONS SHOWN ON TDIS MAP ARE APPROXIMATE. THE CONTRACTOR SHALL PROVIDE
THE MEANS -AND -METHODS OF THIS INSTALLATION. ADDTTIONAL REPAIRS MAY BE REQUIRED
UPON REVIEW OF THE STRUCTURE BY CROSSTOWN ENGINEERING. THIS IS A PROPOSED SCOPE OF
WORK AND DAS NOT BEEN COMPLETED THEREFORE WE DO NOT CERTIFY ANY EXISTING OR
PROPOSED FOUNDATION REPAIR WORK ON THIS MAP AT THIS TEVNE. IF THE READER WOULD LI
TO BE CERTAIN THAT ANY PROPOSED OR EXISTING REPAIRS HAVE BEEN COMPLETED TBEY MUST
REQUEST AN ENGINEERING CERTIFICATE FOR THE SUBIECT FOUNDATION WORK FROM THE
FOUNEATIONREPAIRCOMPANY.
3208 BRIDLE L.N.
GRAPEVINE, TX
SveiE OF T \4
j /Vh/I/fr s91P.��93`ylly
1llµtA OMEEN .•
116597
11/04/2025 ` �°
11�:SYCENS�'O�
d`TfONPI�
Crosstown Engineering
Texas Engineering Firm (F-15944)
6119 Greenville Ave, Ste 320
Dallas, TX 75206