Loading...
HomeMy WebLinkAboutCU2025-44GREAT WOLF ADDN OF GRA P E V I N E 16157 GRAPE V I N E STATIO N 16075A 18.486 @ .91 @ .85 @ 1.4922 @ 1.068 @.98 @ .84 @ 3.507 AC 1.054 @ 1R 1 1 3 COPPELL RD E N O R T H W E S T H W Y ( L O O P 3 8 2 ) TR 2A1B1 2R 2R 1R 1R 2 3R 7 6 5R 2 3 4 444342 45414039383736353446333231 1R1 3R1 3R2 3R3 4 2RA 10.16 @ 1 .99 @ SUNSH I N E HARBO R 40930 J A GREEN AIR CA R G O DIST CE N T E R 16191 AIRPOR T CROSS I N G JV WE L L S 193 5.139 @ 1R 22.33 @ GRAPE V I N E STATIO N 16075A GREATWOLFADDN OF GRA P E V I N E 16157 1A20.100 @ 1.2954 @ 13.55 @ 1A 2A 2 SPECTR U M GRAPE V I N E STATIO N CONDO 39818C PCD R-MF BP R-7.5 CC LI BP Grapevine GIS CU25-44; Sunbelt Rentals 1035 Texan Trail 0 150 300 450 600 Feet ² Date Prepared: 11/11/2025 This data has been compiled by the City of Grapevine IT/GIS department. Various official and unofficial sources were used to gather this information. Every effort was made to ensure the accuracy of this data, however, no guarantee is given or implied as to the accuracy of said data. SUBJECT PROPERTY CU25-44 – 1st Review Memo 1 Email a PDF of the revised plans by November 14, 2025, at 12:00 p.m. to emarohnic@grapevinetexas.gov and atriplett@grapveinetexas.gov. Verify that all text is legible on an 11”x 17” sheet. Do not reproduce final copies requested below prior to Planning Staff approval. PROJECT DESCRIPTION: CU25-44; submitted by McAdams Co. for property located at 1035 Texan Trail, platted as Block 2, Lo t 2A, Airport Crossing JV Wells Addition. This site was previously approved for a z one change Z23-01 from “CC”, Community Commercial District to “BP”, Business Par k District, a conditional use permit CU23-05 (Ord. 2023-19) to allow the sale and rental of heavy machinery and equipment, and a planned development overlay PD 23-01 to deviate from, but not be limited to, building encroachment and paving within the required front yard. This request is specifically to allow the addition of a 2,400 sq. Ft. prefabricated partially enclosed metal storage building on an exi sting concrete pad and to add additional paving. The property is zoned “BP”, Business Park District and is owned by Sunbelt Rentals, Inc. PLANNING SERVICES Master Site Plan – Sheet # Sheet No. Not Provided P1. Purpose Statement: State the size of the semi-enclosed mental structure within purpose statement. P2. Title block: Correct total land area in square feet P3. Drawing: Label semi-enclosed building’s height in feet. P4. Drawing: Label setback between proposed semi-enclosed building and nearest southern property line. P5. Drawing: Acknowledge through a note on the drawing that Per Sec. 32.M.7.f, "repair and maintenance must occur within a fully enclosed building." It must be understood that no repair/maintenance of heavy machinery and equipment shall occur within this new building since it is only partially enclosed. P6. Drawing: Label southern most building immediately adjacent to Oncor substation. P7. Data Table: Clearly state total impervious surface / open space calculations before and after proposed concrete paving. P8. Data Table: Clearly state total building coverage calculations before and after proposed accessory storage building. P9. Data Table: State the maximum building coverage and maximum impervious surface percentages, and minimum open space requirements, per the zoning ordinance and any approved modifications from previous CUP and PD overlay. CU25-44 NOVEMBER 7, 2025 SUNBELT RENTALS 1035 TEXAN TRAIL BLOCK 2, LOT 2A, AIRPORT CROSSING JV WELLS ADDITION CU25-44 – 1st Review Memo 2 P10. Data Table: This calculation (57.34% of lot) cannot be correct based on building coverage and hardscape SF. P11. Data Table: Per Sec. 32.F.3., non-vehicular open space cannot include areas used for parking, loading, storage, or vehicular use. The "Open Space" percentage should only include areas that meet this requirement. P12. Data Table: State if this was permitted through previous approval to exceed the standard 30% requirement found in Sec. 32.M.7.a, and if so, what the maximum percentage approved was. P13. Data Table: Impervious surface area calculations - based on the calculations provided, staff believe it’s actually around 50% instead of what is provided 57%. P14. Data Table: Provide non-vehicular open space calculation. Dimensional Control Site Plan – Sheet # Architectural Site Sheet A P15. Purpose Statement: State the size of the semi-enclosed mental structure within purpose statement. P16. Title block: Correct total land area in square feet P17. Drawing: Label southernmost building immediately adjacent to Oncor substation. P18. Indicate if any changes are proposed to outdoor overhead lighting (photometric plan) through a note. Dimensional Control Site Plan – Sheet # Architectural Site Sheet B P19. Purpose Statement: State the size of the semi-enclosed mental structure within purpose statement. P20. Title block: Correct total land area in square feet P21. Drawing: Label southernmost building immediately adjacent to Oncor substation. P22. Indicate if any changes are proposed to outdoor overhead lighting (photometric plan) through a note. Landscape Plan – Sheet # Needs to be provided or an inset/detail NOTE: Light fixtures excluding accent lighting of architectural building features and lighting of public art or public monuments shall be mounted no higher than the highest point of the primary structure on the property. In no case shall light poles be greater than 30 feet in height. P23. Provide a landscape sheet (Focused) or provide an inset of the area where the proposed semi-enclosed mental structure is proposed. Label existing ground cover type, plants, bushes and trees that will be removed or where they will be mitigate onsite. Provide the required landscape plan notes, data tables, etc. utilizing the checklist within the conditional use packet. CU25-44 – 1st Review Memo 3 Building Elevations – Sheet # Needs to be provided or an inset/detail P24. Provide an elevation sheet (Focused) or provide an inset of the proposed semi- enclosed mental structure is proposed. Label all dimensions and provide material finishes. Provide the required elevation plan notes, data tables, etc. utilizing the checklist within the conditional use packet. PUBLIC WORKS Contact Paul Lee - Civil Engineer, Elizabeth Reynold EIT or Cristin Turner (Platting) – Civil Engineer at 817.410.3000 for the following comments: · There are outstanding punch list items in the field related to existing scope of work. Need to finish out to occupy their building. BUILDING SERVICES Contact Larry Gray – Building Services at 817.410.3163 or lgray@grapevinetexas.gov to discuss the following: · Provide 2-D elevations for the building. FIRE MARSHALL Contact Sam Daniel - Fire Department at 817.410.4421 or sdaniel@grapevinetexas.gov for the following comments: · No comments. PARKS Contact Kathy Nelson – Capital Improvements Program Manager at 817.410.3394 or knelson@grapevinetexas.gov to discuss the following: · No comments. ____________________________________________________________________ Email a PDF of the revised final plans by November 14, 2025, at 12:00 p.m. to emarohnic@grapevinetexas.gov and atriplett@grapveinetexas.gov. Verify that all text is legible on an 11”x 17” sheet. Do not reproduce final copies requested below prior to Planning Staff approval. Please direct all questions to Erica Marohnic at (8l7) 410-3155 or Albert Triplett at (817) 410-3151. A A GMGM G M G M Appr o x i m a t e L o c a t i o n City o f G r a p e v i n e V. 14 3 1 8 , p . 9 8 QUIT C L A I M E S M T State o f T e x a s V. 14 9 3 4 , P . 2 8 8 BLDG 2 (CLIMATE CONTROL) 22,017 SF FF= 605.0' BLDG 1 (OFFICE) 41,790 SF FF= 605.0' BL D G 3 (C E N T R A L SE R V I C E ) 12 , 1 8 1 S F FF = 5 9 5 . 0 ' BL D G 4 (P H V A C ) 13 , 6 3 3 S F FF = 5 9 5 . 5 ' MASTER SITE PLAN SPEC21084 PROJECT SITE The purpose of CU25-44 is a conditional use permit to allow the addition of pavement and riprap around the inlets in the gravel storage yard for erosion control purposes, as well as the addition of a covered storage area on the container charging area in the southeast corner of the site. 4400 State Highway 121, Suite 800 Lewisville, Texas 75056 phone 972. 436. 9712 fax 972. 436. 9715 TBPE: 19762 TBPLS: 10194440 www.mcadamsco.com The John R. McAdams Company, Inc. STANDARD NOTES ·Refuse disposal areas shall be landscaped and screened from view in accordance with the Zoning Ordinance. ·Mechanical and electrical equipment including air conditioning units, shall be designed, installed, and operated to minimize noise impact on surrounding property. All such equipment shall be screened from public view in accordance with the Zoning Ordinance. ·Open storage, where permitted, shall be screened in accordance with the Zoning Ordinance. ·The masonry requirements of Section 54 of the Zoning Ordinance shall be met. ·Illuminated signage was included in the determination of the site illumination levels. ·Outdoor lighting shall comply with illumination standards within Section 55 of the Zoning Ordinance unless specifically excepted. ·Proposed ground signage shall meet the minimum requirements of Section 60 of the Zoning Ordinance and is contingent upon approval of a separate building permit with Building Services. ·All onsite electrical conductors associated with new construction shall be located underground. ·Uses shall conform in operation, location, and construction to the following performance standards in Section 55 of the Zoning Ordinance: noise, smoke and particulate matter, odorous matter, fire or explosive hazard material, toxic and noxious matter, vibration, and/or other performance standards. ·All requirements of the City of Grapevine soil erosion control ordinance shall be met during the period of construction. ·Light poles including the base may not exceed 30 feet in height. ·All lighting shall be recessed to avoid glare and not exceed 3.0 foot candles. SF for 22.32 acres is 972,259.2 SF Please clearly state total impervious surface / open space calculations before and after proposed concrete paving. Please clearly state total building coverage calculations before and after proposed accessory storage building. label covered building with SF and height label this building Per Sec. 32.M.7.f, "repair and maintenance must occur within a fully enclosed building." It must be understood that no repair/maintenance of heavy machinery and equipment shall occur within this new building since it is only partially enclosed. label this setback line State the maximum building coverage and maximum impervious surface percentages, and minimum open space requirements, per the zoning ordinance and any approved modifications from previous CUP and PD overlay. This calculation (57.34% of lot) cannot be correct based on building coverage and hardscape SF. Per Sec. 32.F.3., nonvehicular open space cannot include areas used for parking, loading, storage, or vehicular use. The "Open Space" percentage should only include areas that meet this requirement. Impervious surface calculations appear incorrect. Combining building coverage (76,967 SF) + hardscape (414,810 SF) equals 491,777 SF. This equals is 50.58% of a 972,259.2 SF lot. State if this was permitted through previous approval to exceed the standard 30% requirement found in Sec. 32.M.7.a, and if so, what the maximum percentage approved was. State size of semi-enclosed structure in purposed statement. A A GM G M G M Appr o x i m a t e L o c a t i o n City o f G r a p e v i n e V. 14 3 1 8 , p . 9 8 QUIT C L A I M E S M T State o f T e x a s V. 14 9 3 4 , P . 2 8 8 BLDG 2 (CLIMATE CONTROL) 22,017 SF FF= 605.0' BLDG 1 (OFFICE) 41,790 SF FF= 605.0' ARCHITECTURAL SITE SHEET A SPEC21084 PROJECT SITE The purpose of CU25-44 is a conditional use permit to allow the addition of pavement and riprap around the inlets in the gravel storage yard for erosion control purposes, as well as the addition of a covered storage area on the container charging area in the southeast corner of the site. 4400 State Highway 121, Suite 800 Lewisville, Texas 75056 phone 972. 436. 9712 fax 972. 436. 9715 TBPE: 19762 TBPLS: 10194440 www.mcadamsco.com The John R. McAdams Company, Inc. STANDARD NOTES ·Refuse disposal areas shall be landscaped and screened from view in accordance with the Zoning Ordinance. ·Mechanical and electrical equipment including air conditioning units, shall be designed, installed, and operated to minimize noise impact on surrounding property. All such equipment shall be screened from public view in accordance with the Zoning Ordinance. ·Open storage, where permitted, shall be screened in accordance with the Zoning Ordinance. ·The masonry requirements of Section 54 of the Zoning Ordinance shall be met. ·Illuminated signage was included in the determination of the site illumination levels. ·Outdoor lighting shall comply with illumination standards within Section 55 of the Zoning Ordinance unless specifically excepted. ·Proposed ground signage shall meet the minimum requirements of Section 60 of the Zoning Ordinance and is contingent upon approval of a separate building permit with Building Services. ·All onsite electrical conductors associated with new construction shall be located underground. ·Uses shall conform in operation, location, and construction to the following performance standards in Section 55 of the Zoning Ordinance: noise, smoke and particulate matter, odorous matter, fire or explosive hazard material, toxic and noxious matter, vibration, and/or other performance standards. ·All requirements of the City of Grapevine soil erosion control ordinance shall be met during the period of construction. ·Light poles including the base may not exceed 30 feet in height. ·All lighting shall be recessed to avoid glare and not exceed 3.0 foot candles. L E G E N D GMGM Appr o x i m a t e L o c a t i o n City o f G r a p e v i n e V. 14 3 1 8 , p . 9 8 QUIT C L A I M E S M T State o f T e x a s V. 14 9 3 4 , P . 2 8 8 BL D G 3 (C E N T R A L SE R V I C E ) 12 , 1 8 1 S F FF = 5 9 5 . 0 ' BL D G 4 (P H V A C ) 13 , 6 3 3 S F FF = 5 9 5 . 5 ' ARCHITECTURAL SITE SHEET B SPEC21084 PROJECT SITE The purpose of CU25-44 is a conditional use permit to allow the addition of pavement and riprap around the inlets in the gravel storage yard for erosion control purposes, as well as the addition of a covered storage area on the container charging area in the southeast corner of the site. 4400 State Highway 121, Suite 800 Lewisville, Texas 75056 phone 972. 436. 9712 fax 972. 436. 9715 TBPE: 19762 TBPLS: 10194440 www.mcadamsco.com The John R. McAdams Company, Inc. PAVING SPECIFICATIONS: STANDARD NOTES ·Refuse disposal areas shall be landscaped and screened from view in accordance with the Zoning Ordinance. ·Mechanical and electrical equipment including air conditioning units, shall be designed, installed, and operated to minimize noise impact on surrounding property. All such equipment shall be screened from public view in accordance with the Zoning Ordinance. ·Open storage, where permitted, shall be screened in accordance with the Zoning Ordinance. ·The masonry requirements of Section 54 of the Zoning Ordinance shall be met. ·Illuminated signage was included in the determination of the site illumination levels. ·Outdoor lighting shall comply with illumination standards within Section 55 of the Zoning Ordinance unless specifically excepted. ·Proposed ground signage shall meet the minimum requirements of Section 60 of the Zoning Ordinance and is contingent upon approval of a separate building permit with Building Services. ·All onsite electrical conductors associated with new construction shall be located underground. ·Uses shall conform in operation, location, and construction to the following performance standards in Section 55 of the Zoning Ordinance: noise, smoke and particulate matter, odorous matter, fire or explosive hazard material, toxic and noxious matter, vibration, and/or other performance standards. ·All requirements of the City of Grapevine soil erosion control ordinance shall be met during the period of construction. ·Light poles including the base may not exceed 30 feet in height. ·All light fixtures shall be recessed to prevent glare. L E G E N D Agenda item # III. B. CU25-44.4sprc 1 TO: SITE PLAN REVIEW COMMITTEE MEMBERS FROM: ALBERT L. TRIPLETT, JR. PLANNER II DATE: DECEMBER 3, 2025 SUBJECT: CONDITIONAL USE REQUEST CU25-44; SUNBELT RENTALS, 1035 TEXAN TRAIL RECOMMENDATION Staff recommends the Site Plan Review Committee (SPRC) consider the proposed changes to conditional use permit CU24-48A (Ord. 2024-107) to allow two monument signs to exceed maximum height and effective area requirements along Texan Trail. This request is specifically to allow the addition of a 2,400 sq. ft. prefabricated partially enclosed metal storage building on an existing concrete pad and to add additional paving. The property is zoned “BP”, Business Park District and is platted as Block 2, Lot 2A, Airport Crossing JV Wells Addition REQUEST The applicant requests to amend the previously approved site plan of CU24-48A to allow the addition of pavement and riprap around the inlets in the gravel storage yard adjacent to Buildings 3 and 4 for erosion control purposes, and the addition of a 18-foot tall, 40' x 60', 2,400 sq. ft. prefabricated partially enclosed metal storage building on an existing concrete pad near the southeast corner of the site. BACKGROUND INFORMATION The subject property and the surrounding area to the north, south and east were zoned “I-2”, Heavy Industrial District prior to the 1984 City-wide rezoning. The property to the west was zoned “C-2”, Community Business District prior to the 1984 City-wide rezoning. • On January 18, 2005, City Council approved zone change Z04-16 (Ord. 2005-004) to rezone 41.235 acres from “PID”, Planned Industrial Development District to “CC”, Community Commercial District for future development. • On March 21, 2023, City Council approved zone change Z23-02 (Ord. 2023-017) to rezone 23.320 acres from “CC”, Community Commercial District to “BP”, Business Park District for the development of an integrated commercial office- warehouse development with outside storage and display areas, a conditional use permit CU23-05 (Ord. 2023-018) to allow sales and rental of heavy equipment and machinery, and a planned development overlay PD23-01 (Ord. 2023-019) to deviate from but not be limited to building encroachment and paving within the required front yard of the “BP”, Business Park District Agenda item # III. B. CU24-44.4sprc 2 • On January 21, 2025, City Council approved CU24-48A (Ord. 24-107) to amend the previously approved site plan CU23-05 (Ord. 2023-018) to allow sales and rental of heavy equipment and machinery. The request was specifically to allow monument signs proposed along Texan Trail to exceed maximum height and effective area requirements. /em Planning Services The City of Grapevine P.O. Box 95104 Grapevine, Texas 76099 (817) 410-3155 https://bit.ly/GrapevinePlanning December 4, 2025 McAdams ATTN: Darren Andrews 4400 State Highway 121, Suite 800 Lewisville, TX 75056 Re: GRAPEVINE FILE # CU25-44 [Sunbelt Rental] To Whom It May Concern, This letter is to verify that your request for a conditional use permit located at 1035 Texan Trail, platted as Block 2, Lot 2A, Airport Crossing JV Wells Addition, to allow the addition of a 2,400 sq. ft. prefabricated partially enclosed metal storage building on an existing concrete pad and to add additional paving around existing drainage inlets adjacent to Buildings 3 and 4 for erosion control purposes was approved by the Site Plan Review Committee on December 3, 2025. A copy of the approved site plan is enclosed. Any changes to a site plan or elevations approved with a conditional use or a special use (no matter how minor or major) can only be approved by city council through the public hearing process. No Conditional Use Permit shall be valid for a period longer than one (1) year from the date on which the City Council grants the Conditional Use, unless within such one (1) year period: (1) a Building Permit is obtained and the erection or alteration of a structure is started, or (2) an Occupancy Permit is obtained and a use commenced. The City Council may grant one additional extension not exceeding one (1) year, upon written application, without notice or hearing. No additional extension shall be granted without complying with the notice and hearing requirements for an initial application for a Conditional Use Permit. Your next milestones in the development review process are to obtain civil construction drawing approval from Public Works and Building Permit approval with the Building Services Department. For questions related to this process, please reach out to the following individuals to coordinate: Planning Services The City of Grapevine P.O. Box 95104 Grapevine, Texas 76099 (817) 410-3155 https://bit.ly/GrapevinePlanning · Public Works – Paul Lee at (817) 410-3144 or plee@grapevinetexas.gov · Building Permits – Larry Gray at (817) 410-3163 or lgray@grapevinetexas.gov Building Permit applications are accepted at any point in the development review process but will not be released until any associated zoning cases or site plans are approved, civil engineering plans are approved, and any required plats are approved and filed. Please do not hesitate to contact us if we may be of further assistance (817) 410-3155. Sincerely, Erica Marohnic, AICP Director, Planning Services cc: Sunbelt Rentals ATTN: Jason Tieman 1799 Innovation Point Fort Mill, SC 29715