Loading...
HomeMy WebLinkAboutCOMA2025-004201RECEIVED: 11 /04/2025 25-004201 "AMERICAN AIRLINES DFW DATE OF ISSUANCE,:, r. n 1 )n*)S 754 PORT AMERICA PL #250CILITY^ 25-00 �%' • �V ADDING 2 RTU'S PERMIT #: BUILDING PERMIT APPLICATION ELECTRONIC REVIEW (PLEASE PRINT LEGIBLY — COMPLETE ENTIRE FORM) JOB ADDRESS: 754 Portamerica Place SUITE # 250 LOT: BLOCK: SUBDIVISION: BUILDING CONTRACTOR (company name): Fast-Trak Construction CURRENT MAILING ADDRESS: 2380 Dean Way Suite 160 CITY/STATE/ZIP: Southlake TX 76092 PH: # 214-638-0525 Fax # PROPERTY OWNER: American Airlines CURRENT MAILING ADDRESS: I Skyview Drive CITY/STATE/ZIP: Fort Worth, TX 76155 PHONE NUMBER: PROJECT VALUE: $ 200,000.00 FIRE SPRINKLERED? YES X NO WHAT TRADES WILL BE NEEDED? (Check ones that apply) ELECTRIC X PLUMBING X MECHANICAL X DESCRIPTION OF WORK TO BE DONE: Addition of (2) RTU, conditioning the WH USE OF BUILDING OR STRUCTURE: Storage and Distribution NAME OF BUSINESS• DFW- IT Storage and Distribution Total Square Footage under roof: 80,000sf Square Footage of alteration/addition: 70,000sf ❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings, alterations and additions) ❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: (Not required for 1 & 2 family dwellings) ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINT NAME: Chad Barton SIGNATURE ChacZ 3ato-w PHONE #: 817-929-2202 EMAIL: ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL THE FOLLOWING IS TO BE COMPLETED BY Construction Type: $ Permit Valuation: $ Occupanc Division: Group: , %$—� Fire Sprinkler: YES Building Depth: Zoning: P w I Building Width: Occupanc} Load: Plan Review Approval Site Plan Approval: Fire Department: Public Works Department: Health Department: Approved for Permit: Lot Drainage Submitted: THE BUILDING INSPECTION DEPARTMENT j Setbacks Approval to Issue 1m NO I Front: Electrical ✓ I m Left: I Plumbing Rear: Mechanical j/ m Grease Trap Right: I Hood x Date: s/2,T— I Buildini,. Permit Fee: 1875.00 � j Date: ) Plan Review Fee: 1218.75 I m Date: Date: Date: Date: Approved: Lot Drainage Fee: D Sewer Availability Rate: Water Availability Rate: I m Total Fees: 3093.75 Total Amount Due: 1875.00 PLAN REVIEW INVOICED 11/04/25 N ReN � P.O. BOX 95104, GRAPEVINE, TX 76099 (617) 410-3165 O:FORMSIDSPERMITAPPLICATIONS 1/92-v.1 !0 ,5/-06�S,2107,11/09,4/1 19 City of Grapevine Building _ Commercial PO Box 95104 Alteration 1VT Grapevine, Texas 76099 817) 410-3166 Project # 25-004201 Project Description: Adding (2) RTU's to provide HVAC to the WH space "American Airlines DFW- IT Storage & Distribution Facility" [ELECTRONIC REVIEW] Issued on: 12/01/2025 at 1:54 PM ADDRESS INSPECTIONS 2 754 Portamerica PI., 250 Grapevine, TX 76051 1. Final Fire Dept Inspection 2. Building Final LEGAL INFORMATION FIELDS Metroplace #1 Addition **APPLICANT NAME (Individual) Chad Barton Blk 2 Lot 2 "APPLICANT PHONE NUMBER 8179292202 PERMIT HOLDER APPLICANT E-MAIL Chad Barton Fast-Trak Construction "NAME OF BUSINESS DFW- IT Storage & Distribution Facility (214) 638-0525 VALUATION 200000 Square Footage 80000 COLLABORATORS • Chad Barton What is use of Building/Structure? Storage and distribution of IT equipment for DFW Airpart- Fast-Trak Construction (214) 638-0525 * CONSTRUCTION TYPE 11-B * OCCUPANCY GROUP B/S-1 OWNERS DOCUMENTS - MISC 01 BUILDING PERMIT APPLICATION.pdf • B9 Sequoia Port America Owner 2025.10.06_AA-DFW CP28 DOCUMENTS - MISC 02 RELOCATION-HVAC UPGRADES_100 CD_DRAWINGS.pdf TENANTS * ZONING DISTRICT PiD • Brian Acosta American Airlines, Inc. APPROVED TO ISSUE ELECTRIC YES (404) 680-9676 APPROVED TO ISSUE MECHANICAL YES Fire Sprinkler System? YES FEE TOTAL PAID DUE `Building Permit Fee (Value) $ 1.875.00 $ 1.875.00 $ 1.875.00 Building Permit, Plan Review $ 1,218.75 $ 1218.75 $ 1,218.75 TOTALS $ 3,093.75 $ 3,093.75 $ 0.00 READ AND SIGN I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO Page 112 MYGOV.US 25-004201. 52V;2a25 al 1:54 PM Issued by: Courtney Cogburn ADDRESS 754 Portamerica Pl., 250 Grapevine, TX 76051 LEGAL Metroplace #1 Addition Blk 2 Lot 2 PERMIT HOLDER Chad Barton Fast-Trak Construction (214) 638-0525 COLLABORATORS •Chad Barton Fast-Trak Construction (214) 638-0525 •Chris Hoover 24 HOUR LTD (214) 630-3000 OWNERS •B9 Sequoia Port America Owner TENANTS •Brian Acosta American Airlines, Inc. (404) 680-9676 INSPECTIONS 2 1. Mechanical Duct 2. Mechanical Final INFORMATION FIELDS **APPLICANT NAME (Individual)Chad Barton **APPLICANT PHONE NUMBER 8179292202 VALUATION 203000 Square Footage 10000 Is Duct Work Being Installed?YES DOCUMENTS - MISC 01 2025.10.06_AA-DFW_CP28 RELOCATION-HVAC UPGRADES_100 CD_DRAWINGS.pdf FEE TOTAL PAID DUE Mechanical Permit Fee {Value}$ 1,342.00 $ 1,342.00 $ 1,342.00 TOTALS $ 1,342.00 $ 1,342.00 $ 0.00 READ AND SIGN I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. I FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. December 03, 2025 Signature Date City of Grapevine PO Box 95104 Grapevine, Texas 76099 817) 410-3166 Mechanical Permit {VALUE} Project # 25-004058 Project Description: RTU placement and installation. Conditioning WH space. "American Airlines, Inc." Issued on: 12/03/2025 at 10:14 AM MYGOV.US 25-004058, 12/03/2025 at 10:14 AM Issued by: Courtney Cogburn Page 1/2 PROJECT LOCATION 754 PORT AMERICA PL, SUITE 250 GRAPEVINE, TX 76051 Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com STATE: ENGINEERING CERTIFICATE OF AUTHORIZATION ENG. ENTITY ID # EXP. American Airlines DFW - IT Storage & Distribution Facility FS B 2 0 2 5 - 0 1 4 - 0 0 D F W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DFW International Airport, Texas 100% CONSTRUCTION DOCUMENTS OCTOBER 06, 2025 F-1281908/31/2026 TEXAS HVAC Upgrades SCALE:NTS VICINITY MAP1 N A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 1 : 3 6 : 5 2 P M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 2 5 0 1 4 0 0 - A A C P 2 8 - A - 2 4 . r v t EMM CYS ASM SHEET INDEX G-002 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E OCTOBER 06, 2025 AAW 10 0 % C O N S T R U C T I O N D O C U M E N T S FSB2025-014-00 Engineering CoA - F-12819 Exp. 08/31/2026 HV A C U p g r a d e s SHEET INDEX NUMBER TITLE GENERAL G-001 COVER SHEET G-002 SHEET INDEX MECHANICAL M-001 LEGEND & ABBREVIATIONS M-002 SPECIFICATIONS MH101 MECHANICAL HVAC PLAN MR101 MECHANICAL ROOF PLAN M-501 MECHANICAL DETAILS M-701 MECHANICAL SCHEDULES ELECTRICAL E-001 LEGEND & ABBREVIATIONS E-002 ELECTRICAL SPECIFICATIONS EP101 ELECTRICAL INTERIOR POWER PLAN EP102 ELECTRICAL ROOF POWER PLAN EP701 PANEL SCHEDULES DESCRIPTION DATE A-1 888 IN/IN INxIN IN ø ACCESS DOOR # ACCESS DOOR # # AS AA SS AA AS AA SS AA SA RA OA EA A AIR ABV ABOVE ACC AIR COOLED CONDENSER ACCU AIR COOLED CONDENSING UNIT ADJ ADJUSTABLE AFF ABOVE FINISHED FLOOR AFMS AIR FLOW MONITORING STATION AHU AIR HANDLING UNIT ALT ALTERNATE AMP AMPERE APD AIR PRESSURE DROP APPD APPROVED APPROX APPROXIMATE ARCH ARCHITECT / ARCHITECTURAL AS AIR SEPARATOR ASSY ASSEMBLY ATT ATTENUATOR AUTO AUTOMATIC AUX AUXILIARY AVG AVERAGE BAS BUILDING AUTOMATION SYSTEM BD BOILER BLOWDOWN BDD BACKDRAFT DAMPER BFP BACKFLOW PREVENTER BAL BALANCE BFF BELOW FINISHED FLOOR BFW BOILER FEEDWATER BFP BOILER FEEDWATER PUMP BHP BRAKE HORSEPOWER BLR BOILER BLW BELOW BOP BOTTOM OF PIPE BOT BOTTOM BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR BYP BYPASS CAP CAPACITY CC COOLING COIL CD CONDENSATE DRAIN CFM CUBIC FEET PER MINUTE CF*CHEMICAL FEED CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED CH CHILLER CHEM CHEMICAL CL CENTER LINE CLG CEILING / COOLING CO CLEANOUT COMP COMPRESSOR CONT CONTINUE / CONTINUOUS CONN CONNECT COORD COORDINATE CORR CORRIDOR CTRL CONTROL CUP CENTRAL UTILITY PLANT DA DEAERATOR Db DECIBEL DB DRY BULB DDC DIRECT DIGITAL CONTROL DEG (°)DEGREE DEMO DEMOLITION / DEMOLISH DEPT DEPARTMENT DIV DIVISION DN DOWN DP DEW POINT DPS DIFFERENTIAL PRESSURE SWITCH DPT DIFFERENTIAL PRESSURE TRANSMITTER EA EACH / EXHAUST AIR EAT ENTERING AIR TEMPERATURE ECON ECONOMIZER EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EFF EFFICIENCY EL ELEVATION ELEC ELECTRIC ESP EXTERNAL STATIC PRESSURE EST ESTIMATE ET EXPANSION TANK EVAP EVAPORATE / EVAPORATIVE EWT ENTERING WATER TEMPERATURE EXH EXHAUST EXIST EXISTING EXT EXTERIOR / EXTERNAL F FAHRENHEIT FF FINISHED FLOOR FC FAIL CLOSED FCU FAN COIL UNIT FD FIRE DAMPER / FLOOR DRAIN FFA FROM FLOOR ABOVE FFB FROM FLOOR BELOW FG FLUE GAS EXHAUST FL FAIL LAST FIP FAIL IN PLACE FLA FULL LOAD AMPS FLEX FLEXIBLE FLR FLOOR FO FAIL OPEN FM FLOW METER FPM FEET PER MINUTE FPS FEET PER SECOND FREQ FREQUENCY FS FLOW SWITCH / FLOOR SINK FSTAT FREEZESTAT FT FOOT / FEET G GAS GA GAGE / GAUGE GAL GALLON GALV GALVANIZED GPH GALLONS PER HOUR GPM GALLONS PER MINUTE GV GRAVITY VENTILATOR HB HOSE BIBB HC HEATING COIL HORZ HORIZONTAL HP HORSEPOWER HR HOUR HT HEIGHT HVAC HEATING, VENTILATING, AND AIR-CONDITIONING HW HOT WATER / HEATING WATER HWP HEATING WATER PUMP HWR HEATING WATER RETURN HWS HEATING WATER SUPPLY Hz HERTZ I/O INPUT/OUTPUT IAH INTAKE AIR HOOD ID INSIDE DIAMETER IH INTAKE HOOD IN INCH / INCHES IN WC INCHES WATER COLUMN INFO INFORMATION IPLV INTEGRATED PART LOAD VALUE ISO ISOMETRIC KW KILOWATT KWH KILOWATT HOUR LAT LEAVING AIR TEMPERATURE LBS POUNDS LF LINEAR FEET (FOOT) LRA LOCKED ROTOR AMPS LV LOUVER LWT LEAVING WATER TEMPERATURE MAINT MAINTENANCE MAU MAKE UP AIR UNIT MAX MAXIMUM MBH THOUSAND BTU PER HOUR MCA MINIMUM CIRCUIT AMPS MD MOTORIZED CONTROL DAMPER MED MEDIUM MECH MECHANICAL MEZZ MEZZANINE MFG MANUFACTURING MFR MANUFACTURER MIN MINIMUM MOD MODULATING MS MILLISECOND MW MILLIWATT N/A NOT APPLICABLE NAT NATURAL NC NOISE CRITERIA NEG NEGATIVE NIC NOT IN CONTRACT NO NUMBER NOM NOMINAL NTS NOT TO SCALE NPSH NET POSITIVE SUCTION HEAD OA OUTSIDE AIR OBD OPPOSED BLADE DAMPER OD OUTSIDE DAMPER OFCI OWNER FURNISHED, CONTRACTOR INSTALLED OPT OPTION / OPTIONAL ORIG ORIGINAL OZ OUNCE PD PRESSURE DROP PN PART NUMBER PRELIM PRELIMINARY PRV PRESSURE REDUCING VALVE PS PRESSURE SWITCH PSI POUNDS PER SQUARE INCH PSIA PSI ABSOLUTE PSIG PSI GAGE PVC POLYVINYL CHLORIDE QA QUALITY ASSURANCE QTY QUANTITY R THERMAL RESISTANCE RA RETURN AIR RAT RETURN AIR TEMPERATURE RAF RETURN AIR FAN RAH RELIEF AIR HOOD REF REFERENCE REQD REQUIRED RET RETURN REV REVISE / REVISION RF RETURN FAN RH RELATIVE HUMIDITY RHC REHEAT COIL RL REFRIGERANT LIQUID RPM REVOLUTIONS PER MINUTE RS REFRIGERANT SUCTION RV RELIEF VALVE / RELIEF VENT SA SUPPLY AIR SAT SUPPLY AIR TEMPERATURE SD SMOKE DAMPER SECT SECTION SF SQUARE FEET SF SUPPLY FAN SPEC SPECIFICATION SPLY SUPPLY SPRV STEAM PRESSURE REDUCING CONTROL VALVE SRV SAFETY VALVE OR SAFETY RELIEF VALVE SQ SQUARE SS SANITARY SEWER / STAINLESS STEEL ST STEAM TRAP SP STATIC PRESSURE STD STANDARD STOR STORAGE STRU STRUCTURAL SUT SURGE TANK SYS SYSTEM TD TEMPERATURE DIFFERENCE TDH TOTAL DYNAMIC HEAD TEMP TEMPERATURE TFA TO FLOOR ABOVE TFB TO FLOOR BELOW TFD TO FLOOR DRAIN THRU THROUGH TK TANK TP TOTAL PRESSURE TR TEMPERATURE RISE TSTAT THERMOSTAT TYP TYPICAL UH UNIT HEATER UNO UNLESS NOTED OTHERWISE V VOLT VAR VARIES VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VEL VELOCITY VENT VENTILATION / VENTILATOR VERT VERTICAL VF VENTILATION FAN VFD VARIABLE FREQUENCY DRIVE VOL VOLUME VP VELOCITY PRESSURE W WATT W/WITH W/O WITHOUT WB WET BULB WC WATER COLUMN WG WATER GAUGE WT WEIGHT DEVICE TYPE, REFER TO SCHEDULE FOR FACE AND INLET/OUTLET SIZE DEVICE AIRFLOW (CFM) RECTANGULAR DUCT ROUND DUCT OR PIPE FD FIRE DAMPER FSD FIRE AND SMOKE DAMPER SD SMOKE DAMPER CD CONTROL DAMPER BDD BACK DRAFT DAMPER AMS AIRFLOW MEASURING STATION C CONTROLLER CO2 ZONE CARBON DIOXIDE SENSOR D DAMPER MOTOR DM ELECTRICAL DEMAND METER DPS DIFFERENTIAL PRESSURE SHEET DPT DIFFERENTIAL PRESSURE TRANSMITTER EPB EMERGENCY PUSH BUTTON SWITCH FS FLOW SENSING SWITCH FM FLOW METER H DUCT HUMIDITY SENSOR HC ZONE HUMIDITY M ELECTRIC MOTOR MS MOTOR STARTER PT PRESSURE TRANSMITTER S SWITCH SD SMOKE DETECTOR SPT DUCT STATIC PRESSURE TRANSMITTER T DUCT TEMPERATURE SENSOR TC ZONE THERMOSTAT TS ZONE TEMPERATURE SENSOR TS TIMER SWITCH TT TEMPERATURE TRANSMITTER V VIBRATION SWITCH VFD VARIABLE FREQUENCY DRIVE W WATT TRANSDUCER WB DEW POINT (WET BULB) NO ARROWS INDICATE 4-WAY FLOW PATTERN ROUND DUCT, ROUND PRESSURE TAP ROUND DUCT, ROUND LOW-LOSS TAP RECTANGULAR DUCT, BEVELED TAP RECTANGULAR, ROUND AND OVAL END CAP DUCTWORK SYMBOLS MECHANICAL CALLOUTS DIFFUSERS, REGISTERS & GRILLES: DUCT & PIPE TYPES: DAMPER TYPES: FIRE & SMOKE CONTROL DEVICES AUTOMATIC & MANUALLY ACTUATED DEVICES CONTROL DEVICES FLEXIBLE DUCT OVAL DUCTOVAL DUCT ROUND DUCT, ROUND CONICAL TAP RECTANGULAR DUCT, ROUND CONICAL TAP RECTANGULAR DUCT, ROUND HIGH EFFICIENCY TAKE-OFF (HETO) TAP DOMESTIC HOT WATER RETURND-HWR DOMESTIC HOT WATER - 140FD-HW (140F) DOMESTIC HOT WATER D-HW DOMESTIC COLD WATER D-CW CONDENSER WATER RETURNCWR CONDENSER WATER SUPPLYCWS STEAM CONDENSATE - PUMPEDPC CONDENSATE DRAINCD COMPRESSED AIRCA CHILLED WATER RETURNCHR CHILLED WATER SUPPLYCHS SANITARY - VENTV SANITARY - GREASEGW SANITARYSS PROPANE (LIQUID)LPG (L) PROPANE (VAPOR)LPG NATURAL GASG HEATING WATER RETURNHWR HEATING WATER SUPPLYHWS STEAM - # INDICATES PRESSURES(#) STORM DRAINSD STORM DRAIN OVERFLOWOSD CHEMICAL FEEDCF NON-POTABLE WATERNPW SYSTEM ABBREVIATIONS STEAM CONDENSATE - # INDICATES PRESSURESC EXISTING TO REMAIN DEMOLISHED IN CURRENT PHASE NEW IN CURRENT PHASE DEMOLITION SYMBOLS CONNECT TO EXISTING EXTENT OF DEMOLITION (DEMOLISH BETWEEN / BEYOND) ∠ ° ø ϕ Ø % ANGLE DEGREE DIAMETER PHASE ROUND PERCENT TEXT SYMBOLS SINGLE LINE PIPE SYMBOLS ELBOW, RISER DOWN ELBOW, RISER UP ELBOW, RISE OR DROP ELBOW, 45° RISER OR DROP TEE UP TEE DOWN TEE TOP CONNECTION TEE BOTTOM CONNECTION TEE SIDE CONNECTION CROSS DIRECTION OF FLOW CONCENTRIC REDUCER ECCENTRIC REDUCER UNION BLIND FLANGE PIPE CAP FLEXIBLE CONNECTOR EXPANSION JOINT ANCHOR PIPE SLEEVE THROUGH WALL AIR SEPARATOR BALL VALVE BUTTERFLY VALVE CALIBRATED MANUAL BALANCING VALVE CHECK VALVE GLOBE VALVE 3-WAY GLOBE VALVE PLUG VALVE NEEDLE VALVE 2-WAY CONTROL VALVE 3-WAY CONTROL VALVE AUTOMATIC FLOW LIMITING VALVE SOLENOID VALVE ANGLE PATTERN GATE VALVE PILOT-OPERATED PRESSURE REGULATOR SELF-CONTAINED PRESSURE REGULATOR WYE STRAINER WYE BLOWDOWN STRAINER W/GATE VALVE DOUBLE CHECK BACK FLOW PREVENTER REDUCED PRESSURE BACKFLOW PREVENTER W/STRAINER COMBINATION VALVE INCLUDING: ISOLATION VALVE, STRAINER, DIELECTRIC UNION, P/T PORT & DRAIN COMBINATION VALVE INCLUDING: DIELECTRIC UNION, AIR VENT & P/T PORT COMBINATION VALVE INCLUDING: ISOLATION VALVE, UNION, P/T PORT, AND AUTOMATIC FLOW LIMITING VALVE AUTOMATIC AIR VENT AUTOMATIC CONDENSATE DRAIN, COMPRESSED AIR PUMP PUMP SUCTION DIFFUSER WITH INTERGRAL STRAINER PRESSURE GAUGE (WITH GAUGE COCK) TEST PLUG THERMOMETER THERMOWELL MANUAL AIR VENT PLUG MANUAL AIR VENT VALVE ELBOW, 90° TRIPLE DUTY VALVE SUPPLY AIR DUCT RETURN AIR DUCT OUTDOOR AIR DUCT (UNCONDITIONED OA) EXHAUST AIR DUCT DUCT SYSTEM ABBREVIATIONS A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. S. T. U. MECHANICAL PLANS AND SECTIONS ARE INTENDED TO ILLUSTRATE THE SCOPE OF WORK ACCURATELY; HOWEVER, THEY ARE STILL DIAGRAMMATIC IN NATURE. REPRESENTATIONS OF EQUIPMENT, VALVES, FITTINGS, ETC. SHOWN ON THESE DRAWINGS MAY NOT REFLECT THE LOOK OR SIZE OF THE ACTUAL MATERIALS SPECIFIED. MECHANICAL DRAWINGS DO NOT SHOW ALL MINOR ITEMS THAT MUST BE INSTALLED. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR A FULLY FUNCTIONING SYSTEM COMPLIANT WITH ALL APPLICABLE CODES AND REGULATIONS. PLAN AND SECTION DRAWINGS DO NOT SHOW ALL REQUIRED BRANCH PIPING OR VALVES AND ACCESSORIES. REFER TO FLOW DIAGRAMS, DETAILS, AND PROJECT SPECIFICATIONS FOR REQUIRED PIPING, VALVES, AND ACCESSORIES. SECTION DRAWINGS DO NOT SHOW ALL REQUIRED WORK IN THE AREA THEY ARE CUT. SECTION DRAWINGS ARE PROVIDED TO ILLUSTRATE ONLY CERTAIN CONDITIONS THAT MAY BE TOO CONGESTED TO SUFFICIENTLY ILLUSTRATE IN A PLAN VIEW. MECHANICAL DRAWINGS DO NOT SHOW ALL REQUIRED OFFSETS IN PIPING AND DUCTWORK REQUIRED FOR INSTALLATION COORDINATED WITH ALL OTHER DISCIPLINES SUCH AS STRUCTURAL STEEL. THE CONTRACTOR SHALL PROVIDE ELBOWS IN PIPING AND DUCTWORK, ONLY WHEN ABSOLUTELY REQUIRED, TO AVOID CONFLICT WITH OTHER MECHANICAL COMPONENTS OR WORK OF OTHER TRADES. OFFSETS SHALL USE ELBOWS OF LEAST DEGREE TURN AS POSSIBLE. COORDINATE WITH GENERAL CONTRACTOR TO PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO PERMIT SERVICE ACCESS FOR DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR FOR INSTALLATION. ALL DUCT SIZES INDICATED REPRESENT INSIDE CLEAR DIMENSIONS. CONTRACTOR SHALL ADJUST SHEET METAL SIZE TO ACCOUNT FOR LINER THICKNESS WHEN LINER IS REQUIRED PER THE CONTRACT DOCUMENTS. MODIFY ROUTING OF PIPING AT EQUIPMENT CONNECTION POINTS FROM THAT SHOWN TO MATCH ACTUAL LOCATION OF CONNECTION POINTS FOR SPECIFIC EQUIPMENT PURCHASED. CONNECT ALL EQUIPMENT IN ACCORDANCE WITH EQUIPMENT MANUFACTURER’S INSTRUCTIONS. PIPING, DUCTWORK, AND EQUIPMENT HANGERS AND SUPPORTS SHALL NOT INTERFERE WITH OPERATION AND MAINTENANCE OF EQUIPMENT. ALL DEMOLISHED MATERIALS SHALL BE OFFERED TO THE OWNER FOR FIRST RIGHT OF REFUSAL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ANY MATERIAL NOT SELECTED BY THE OWNER SHALL BE REMOVED FROM THE PROPERTY AND DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, BACKDRAFT DAMPERS, COILS, AND OTHER ITEMS LOCATED IN THE DUCTWORK THAT REQUIRE SERVICE AND/OR INSPECTION. PROVIDE ALL 90-DEGREE RECTANGULAR ELBOWS WITH TURNING VANES UNLESS OTHERWISE INDICATED. TURNING VANES SHALL BE SINGLE WALL FOR DUCTS UP TO 48 INCHES WIDE OR 2,500 FPM AND DOUBLE WALL FOR DUCTS WITH LARGER DIMENSIONS OR HIGHER VELOCITY. RUNS OF FLEXIBLE DUCT SHALL ONLY BE USED BETWEEN GRILLE/REGISTER/DIFFUSER (GRD) CONNECTIONS AND ITS ASSOCIATED BRANCH DUCT. INLET DUCT CONNECTED TO GRILLES, REGISTERS, AND DIFFUSERS SHALL MAINTAIN MINIMUM 3 EQUIVALENT DIAMETER STRAIGHT RUN WHERE FEASIBLE UNLESS INDICATED OTHERWISE. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 3 FT. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS, HUMIDISTATS, AND OTHER WALL-MOUNTED CONTROLLERS 4'-0" (CENTERLINE) ABOVE THE FINISHED FLOOR. NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE SPECIFIED LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR MINIMUM ACCEPTABLE ACCURACY. NOTIFY ENGINEER IN ADVANCE OF ANY SUCH DEVICES WHOSE PROPOSED LOCATION DOES NOT MEET THE MANUFACTURER ’S MINIMUM REQUIREMENTS. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' APPROVED SUBMITTALS. COORDINATE AND PROVIDE ALL PIPING AND DUCT TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL PIPING AND DUCT DIMENSIONS BEFORE FABRICATION. INSTALL PIPING SO ALL VALVES, PIPING SPECIALTIES, AND OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE. ALL SERVICE ISOLATION VALVES SHALL BE SUITABLE FOR DEAD- END SERVICE AND INSTALLED SUCH THAT VALVE MAY REMAIN IN SERVICE WHEN EQUIPMENT PIPING IS EVACUATED OR REMOVED. ALL FLUE PIPES FROM GAS-FIRED EQUIPMENT AND ASSOCIATED DIRECT VENT COMBUSTION AIR PIPES (IF USED) SHALL BE SIZED BY THE GAS-FIRED EQUIPMENT MANUFACTURER BASED ON THE SPECIFIC PIPE ROUTING AND ELEVATIONS FOR THIS PROJECT. LIKEWISE, THE MATERIALS OF ALL FLUE PIPING AND DIRECT VENT COMBUSTION AIR PIPING SHALL BE AS REQUIRED BY THE MANUFACTURER OF THE GAS-FIRED EQUIPMENT THE PIPING IS CONNECTED TO. FLUE PIPING SHALL BE INSTALLED PER CODE. MANUFACTURERS' NAMES, MODEL NUMBERS, OR SPECIFIC PRODUCT LINES LISTED IN THE DRAWINGS ARE GIVEN ONLY TO INDICATE THE BASIS OF DESIGN. UNLESS OTHERWISE INDICATED IN SPECIFICATIONS, ANY PRODUCT MEETING THE REQUIREMENTS OF THE CONTRACT DOCUMENTS MAY BE SUBMITTED FOR APPROVAL. A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 2 : 1 8 : 5 5 P M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - M - 2 4 . r v t SIB APC CLF LEGEND & ABBREVIATIONS OCTOBER 06, 2025 M-001 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW 10 0 % C O N S T R U C T I O N D O C U M E N T S FSB2025-014-00 Engineering CoA - F-12819 Exp. 08/31/2026 HV A C U p g r a d e s GENERAL NOTESMECHANICAL LEGENDMECHANICAL ABBREVIATIONS DESCRIPTION DATE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 1. 1. 2. 3. A. 4. 5. 6. 7. 8. HVAC GENERAL CONDITIONS PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AND AS SPECIFIED AND REQUIRED BY CODE. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, ELECTRICAL, CONTROLS WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS. CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS ISSUED, INCLUDING THOSE OUTSIDE THEIR SPECIFIC DISCIPLINE, PRIOR TO SUBMITTING BIDS AND THROUGHOUT PROJECT. MATERIALS PURCHASED AND WORK THAT REQUIRE CHANGES DUE TO LACK OF REVIEW SHALL NOT BE SUBJECT TO CHANGE ORDERS AND SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION OF PIPE OR DUCT UP-AND DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL PIPING AND DUCT TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL PIPING AND DUCT DIMENSIONS BEFORE FABRICATION. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE AND THE ELECTRICAL SPECIFICATIONS. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR FOR INSTALLATION. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM A METAL DECK. SUPPORT SECURELY FROM STRUCTURE. PRODUCT DATA SUBMITTALS SHALL BE REQUIRED FOR ALL CONTRACTOR FURNISHED AND INSTALLED EQUIPMENT AND MATERIALS. AN UPDATED SET OF REDLINE DRAWINGS INDICATING CONTRACTOR FIELD CHANGES AND NOTES SHALL BE ON KEPT ON-SITE AT ALL TIMES READY FOR REVIEW. THESE DRAWINGS SHOULD BE UPDATED DAILY BUT A MINIMUM OF ONCE A WEEK SHALL BE REQUIRED. AFTER PROJECT COMPLETION THESE DRAWINGS SHALL BE SUBMITTED TO OWNER AND ENGINEER . HVAC DEMOLITION ALL DEMOLISHED MATERIALS SHALL BE OFFERED TO THE OWNER FOR FIRST RIGHT OF REFUSAL. ANY MATERIAL NOT SELECTED BY THE OWNER SHALL BE REMOVED FROM THE PROPERTY AND PROPERLY DISPOSED OFF. HVAC DUCTWORK PROVIDE SHOP DRAWING SUBMITTALS FOR DUCTWORK. SUBMITTALS SHALL INCLUDE AT A MINIMUM DUCT SIZES, ELEVATIONS, AND ROUTING. ANY DEVIATIONS FROM CONTRACT DOCUMENTS SHALL BE CLOUDED. ALL DUCTWORK SHALL BE GALVANIZED STEEL, MINIMUM 26 GAUGE. INSTALLATION ALL DUCT SYSTEMS SHALL CONFORM TO "SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE THIRD EDITION (2005)" IN IT'S ENTIRETY. PROVIDE ALL 90-DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS OTHERWISE INDICATED. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH TURNING VANES. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENT FOR THESE ITEMS. ALL DUCT SIZES INDICATED REPRESENT INSIDE CLEAR DIMENSIONS. CONTRACTOR SHALL ADJUST SHEET METAL SIZE TO ACCOUNT FOR LINER THICKNESS WHEN LINER IS REQUIRED PER THE CONTRACT DOCUMENTS. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN THE DUCTWORK THAT REQUIRE SERVICE AND/OR INSPECTION. 9. 10. A. A. B. C. D. A. B. C. A. B. C. D. E. F. 1. A. B. 2. 3. 4. 5. A. B. C. 1. A. 2. 3. 4. 5. A. B. C. A. PROVIDE ACCESS DOORS IN DUCTWORK FOR THE OPERATION, ADJUSTMENT, AND MAINTENANCE OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED TO BOTH THE EQUIPMENT AND THE DUCT. DUCTWORK INSULATION 1.SUBMITTALS PRODUCT DATA 2.INSULATION SCHEDULE INDOOR SUPPLY DUCT: 1-1/2 INCH, R-6 MIN INDOOR RETURN DUCT: NONE OUTDOOR SUPPLY AND RETURN DUCT: 2 INCH, R-8 MIN. DUCTWORK IN ATTIC OR UNCONDITIONED SPACE SHALL BE TREATED AS OUTDOOR DUCTWORK. 4.RECTANGULAR DUCT ALL RECTANGULAR DUCTWORK SHALL BE EXTERNALLY INSULATED USING EITHER DUCT WRAP OR RIGID BOARD INSULATION. DUCT WRAP: DUCTWORK SHALL BE EXTERNALLY INSULATED USING RESIN BONDED FIBERGLASS BLANKET WITH A FOIL SCRIM KRAFT FACING (FSK). PRODUCT SHALL BE EQUIVALENT TO JOHNS MANVILLE MICROLITE FSK. RIGID BOARD: DUCTWORK SHALL BE EXTERNALLY INSULATED USING RIGID INSULATION BOARD MADE FROM INORGANIC GLASS FIBERS BONDED TOGETHER WITH THERMOSETTING RESIN. BOARDS SHALL BE FURNISHED WITH FSK FACING. PRODUCT SHALL BE EQUIVALENT TO JOHNS MANVILLE 800 SERIES SPIN-GLAS TYPE 812. 5.INSTALLATION FOLLOW MANUFACTURERS INSTALLATION INSTRUCTIONS FOR ALL INSULATION PRODUCTS. COMPLETELY COVER DUCT DESIGNATED TO RECEIVE INSULATION. INSULATION DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED. ALL SEAL TEARS, PUNCTURES, AND OTHER PENETRATIONS OF THE VAPOR BARRIER SHALL BE REPAIRED IN ACCORDANCE WITH MANUFACTURERS DIRECTIONS TO PROVIDE A VAPOR TIGHT SYSTEM. ALL SEAMS SHALL BE TIGHTLY SEALED USING FSK TAPE. PROTECT OPEN DUCTWORK DURING CONSTRUCTION WITH SURFACE SHIELD DUCT PROTECTION FILM, 3MM THICK. GRILLES, REGISTERS, AND DIFFUSERS (GRD) SUBMITTALS PRODUCT DATA: INDICATE MATERIALS OF CONSTRUCTION, FINISH, MOUNTING DETAILS, AND PERFORMANCE DETAILS. GRD SCHEDULE: INDICATE DRAWING DESIGNATION, QUANTITY, MODEL NUMBER, SIZE, AND ACCESSORIES FURNISHED. GRD'S SHALL MATCH PERFORMANCE INDICATED ON DRAWING SCHEDULES. MANUFACTURER SHALL BE TITUS OR PRICE. SUPPLY DIFFUSERS SHALL HAVE EITHER A FACTORY FURNISHED OR FIELD INSTALLED INSULATION BLANKET GRD'S SHOWN ON FLOOR PLANS SHALL HAVE NECK SIZES EQUAL TO ASSOCIATED BRANCH DUCT. INSTALLATION INSTALL GRD'S LEVEL AND PLUMB. INSTALL GRD'S WITH AIRTIGHT CONNECTIONS TO DUCTS AND TO ALLOW SERVICE AND MAINTENANCE OF DAMPERS (WHERE REQUIRED) WHERE ARCHITECTURAL FEATURES OR OTHER ITEMS CONFLICT WITH INDICATED INSTALLATION LOCATION, NOTIFY ARCHITECT FOR A DETERMINATION OF FINAL LOCATION. HVAC PIPING SUBMITTALS PRODUCT DATA: INDICATE MATERIALS OF CONSTRUCTION AND JOINING METHOD. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE. NATURAL GAS PIPING MATERIAL: SCHEDULE 40 BLACK STEEL JOINING METHOD: THREADED OR WELDED FOR PLENUM USE FINISH: PAINT NATURAL GAS PIPE TO MATCH EXISTING PIPE. 6.CONDENSATE PIPING MATERIAL: TYPE L COPPER 1. A. 2. 1. A. B. C. D. E. 1. 2. 3. 1. 2. 3. 4. 1. A. B. C. D. PIPING INSULATION ALL PIPING SHALL BE INSULATED ACCORDING TO THE FOLLOWING SCHEDULE: CONDENSATE DRAIN (COLD): 1 INCH ALL PIPING INSULATION SHALL BE PRE-FORMED FIBERGLASS WITH ALL-SERVICE JACKETING WITH SELF SEALING LAPS (ASJ-SSL) AND REINFORCED VAPOR BARRIER. PRODUCT SHALL BE EQUAL TO JOHNS MANVILLE MICRO-LOK. HVAC PIPING ACCESSORIES VALVES BALL VALVES: BALL VALVES SHALL BE USED FOR PIPING 2 IN. AND SMALLER. VALVES SHALL BE FULL PORT, BRASS, RATED FOR 250 PSI RATING, 1/4 TURN (90°) SHUTOFF, AND LOCKING LEVER HANDLE. PRODUCT SHALL BE EQUIVALENT TO NIBCO. VALVES SHALL BE INSTALLED WITHIN 3 FT. OF ALL BRANCH TAKE-OFFS AND AT ALL EQUIPMENT CONNECTIONS. VALVES SHALL BE PROVIDED WITH BRASS VALVE TAGS INDICATING SYSTEM AND VALVE NUMBER. COORDINATE WITH OWNER FOR VALVE TAG STYLE. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR PIPING ON THE EQUIPMENT SIDE OF THE VALVE IS REMOVED. ALL HVAC PIPING AND ASSOCIATED INSULATION SHALL BE INSTALLED WITH PIPING LABELS IN ACCORDANCE WITH ANSI A13.1. PIPING LABEL SHALL INCLUDE SYSTEM, FLOW DIRECTION ARROW, AND PIPE SIZE. ALL CONNECTIONS MADE BETWEEN DIFFERENT METALS (E.G. STEEL TO COPPER) SHALL USE A DIELECTRIC UNION FITTING. PROVIDE FLEX CONNECTORS IN ALL PIPING SYSTEMS CONNECTED TO EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION EXCEPT WATER COILS. FLEX CONNECTORS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS. TESTING, ADJUSTING, AND BALANCING (TAB) TAB SHALL BE PERFORMED IN ACCORDANCE WITH "NEBB PROCEDURAL STANDARD FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS (2015)" IN ITS ENTIRETY. ADDITIONAL SPECIFICATION REQUIREMENTS ARE INDICATED IN APPENDIX B OF THIS STANDARD AND SHALL BE ADHERED TO. ALL NEW AIRSIDE SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH NEBB STANDARDS AND BY A NEBB CERTIFIED PROFESSIONAL. WHEN CONNECTING TO EXISTING SYSTEMS, PRIOR TO START OF CONSTRUCTION, TAB CONTRACTOR SHALL PERFORM PRE-CONSTRUCTION TESTING AND RECORD RESULTS IN PRE- CONSTRUCTION TAB REPORT. PRIOR TO ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION, THE TAB CONTRACTOR THAT PERFORMED THE PRE-CONSTRUCTION TESTING SHALL BE RE-ENGAGED TO PERFORM POST-CONSTRUCTION TESTING, ADJUSTING, AND BALANCING OF THE SYSTEMS SUCH THAT IT IS OPERATING AT THE DESIGN PERFORMANCE. ALL RESULTS AND REPORTS SHALL BE DELIVERED TO OWNER, ARCHITECT, AND ENGINEER WITHIN 7 DAYS AFTER TESTING IS COMPLETED. ALL MEASURED QUANTITIES SHALL BE ADJUSTED TO BE WITHIN +/-10% OF DESIGN PARAMETERS. CLOSE OUT DOCUMENTS AFTER ISSUANCE OF SUBSTANTIAL COMPLETION, CONTRACTORS SHALL SUBMIT TWO HARD COPIES AND DIGITAL FILES OF CLOSE OUT DOCUMENTS TO OWNER, ARCHITECT, AND ENGINEER. DIGITAL FILES SHALL BE ISSUED IN PDF FORMAT FOR ALL DOCUMENTS BESIDES DRAWINGS, WHICH MAY BE EITHER IN PDF FORMAT OR AUTOCAD FORMAT. HARD COPIES SHALL BE PRODUCED IN AN APPROPRIATELY SIZED 3 RING BINDER, LABELED AND INDEXED WITH SECTION DIVIDERS. THE CLOSE OUT DOCUMENTATION SHALL INCLUDE AT A MINIMUM: ALL INSTALLATION, OWNERS, AND MAINTENANCE (IOM) MANUALS. ALL TRAINING MATERIALS. ALL APPROVED SUBMITTALS. REDLINE/RECORD DRAWINGS. DIVISION 23 SPECIFICATIONS A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 7 / 2 0 2 5 9 : 1 0 : 5 2 A M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - M - 2 4 . r v t SIB APC CLF SPECIFICATIONS OCTOBER 06, 2025 M-002 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW 10 0 % C O N S T R U C T I O N D O C U M E N T S FSB2025-014-00 Engineering CoA - F-12819 Exp. 08/31/2026 HV A C U p g r a d e s DESCRIPTION DATE T T 1 1 A A 2 2 B B C C MH101 2 S-1 1000 S-1 1000 S-1 1000 S-1 1000 S-1 1000 S-1 1000 S-1 1000 S-1 1000 2 2 1 TO RTU-1 TO RTU-2 WAREHOUSE 125 CORRIDOR 114 RESTOOM 122 SHOWER 122A PANTRY 116 MEN 118 WOMEN 120 MECH 121 ELEC. 124 OFFICE 104 OFFICE 106 OFFICE 108 OFFICE 110 REPAIR 112 REPAIR 111 IMAGING STATION 109 OPEN WORK 113 CONF. 102 SECURITY 101 LOBBY 100 IMAGE TESTING 103 LAPTOP REPAIR 105 DESKTOP REPAIR 107 CORRIDOR 119 BREAKROOM 115 ELEV 117 3 1 1/2" CD co 1" CD 1" CD 1" CD1 1/2" CD 6 6 ROOF129'-6"ROOF129'-6"ROOF129'-6" RTU-1 24 x 2 4 S A 24x27 RA 1 2 1" CD 4' M I N . F R O M D E C K 3' - 0 " 1 1/4" G (<2PSI) SHEET KEYNOTES A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: GENERAL SHEET NOTES Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 2 : 1 8 : 5 7 P M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - M - 2 4 . r v t SIB APC CLF MECHANICAL HVAC PLAN OCTOBER 06, 2025 MH101 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW 10 0 % C O N S T R U C T I O N D O C U M E N T S FSB2025-014-00 Engineering CoA - F-12819 Exp. 08/31/2026 HV A C U p g r a d e s SCALE: N 1/8" = 1'-0" MECHANICAL HVAC PLAN1 KEY VALUE DESCRIPTION 1 ADJUST SUPPLY DIFFUSER GRILLE HORIZONTALLY TO DEFLECT AIR TOWARD FLOOR AT 30° ANGLE (TYP. ALL SUPPLY DIFFUSERS). 2 INSTALL 1/4" GALVANIZED HARDWARE CLOTH ON RETURN DUCT OPENING. INTERNALLY LINE RETURN DUCT WITH 1" FIBERGLASS DUCT LINER. 3 ROUTE CONDENSATE DRAIN DOWN WITHIN STRUCTURE. TERMINATE WITH 2" AIR GAP IN MECH ROOM 121. 6 CONNECT TO CONDENSATE DRAIN CONNECTION AT THE BOTTOM OF RTU. A. B. C. REFER TO SHEET M-001 FOR GENERAL NOTES APPLICABLE TO ALL SHEETS. CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. INSTALL DUCTWORK, PIPING, AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER ’S RECOMMENDATIONS. SCALE: 1/4" = 1'-0" ELEVATION VIEW RTU INSTALL2 DESCRIPTION DATE 1 1 A A 2 2 B B C C MH101 2 RTU-1 RTU-25 5 8 8 1 1/4" G (<2PSI) 2" G (<2PSI) 1 1/4" G (<2PSI) 7 4 9 9 SHEET KEYNOTES A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: GENERAL SHEET NOTES Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 2 : 5 8 : 3 3 P M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - M - 2 4 . r v t SIB APC CLF MECHANICAL ROOF PLAN OCTOBER 06, 2025 MR101 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW 10 0 % C O N S T R U C T I O N D O C U M E N T S FSB2025-014-00 Engineering CoA - F-12819 Exp. 08/31/2026 HV A C U p g r a d e s SCALE: N 1/8" = 1'-0" MECHANICAL ROOF PLAN1 A. B. C. D. REFER TO SHEET M-001 FOR GENERAL NOTES APPLICABLE TO ALL SHEETS. CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. COORDINATE FINAL EQUIPMENT, PIPING AND DUCTWORK LOCATION ACCORDING TO FIELD CONDITIONS PRIOR TO COMMENCING WORK. INSTALL DUCTWORK, PIPING, AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER ’S RECOMMENDATIONS. DESCRIPTION DATE KEY VALUE DESCRIPTION 4 PROVIDE FLEX CONNECTOR ACROSS BUILDING EXPANSION JOINT. 5 REMOVE EXISTING ROOF MEMBRANE TO THE EXTENT NECESSARY TO INSTALL NEW EQUIPMENT CURB. REROOF AROUND CURB COORDINATE WITH LANDLORD PRIOR COMMENCING ROOF WORK TO MAINTAIN ANY EXISTING WARRANTIES. REFER TO SHEET M-501 FOR STRUCTURAL CURB, JOIST REINFORCEMENT, AND CURB INSTALLATION DETAIL. 7 CONNECT GAS PIPE TO GAS METER ON SIDE OF BUILDING AND PAINT NEW GAS PIPE TO MATCH ADJACENT GAS PIPES. FIELD VERIFY THE CORRECT GAS METER FOR THE TENANT SPACE. COORDINATE WITH GAS UTILITY PROVIDER TO MODIFY/REPLACE GAS METER AS NECESSARY. 8 REFER TO SHEET M-501 FOR TYPICAL GAS CONNECTION DETAIL. 9 PROVIDE A CRICKET FOR EQUIPMENT CURB ON THIS END. G GAS PRESSURE REGULATOR SET FOR 0.3 PSI OUTLET. REFER EQUIPMENT SCHEDULES FOR LOAD. PROVIDE UN-INTERRUPTED UPSTREAM AND DOWNSTREAM DIAMETERS IAW REGULATOR MANUFACTURERS RECOMMENDATIONS. GAS PRESSURE REGULATOR MAY BE OMITTED IF PRESSURE AT METER IS WITHIN SPECIFIED RANGE. PLUG VALVE EQUIPMENT REFER PLANS FOR SIZE AND CONTINUATION UNION (TYP.) DIRT LEG (LINE SIZE) MINIMUM 3" DEEP STRAINER PRESSURE TEST PORT (TYPICAL) L2x2x3/16 NS AND FS P L2x2x1/8 NS & FS TOP CHORD LOAD BOTTOM CHORD LOAD 1. 2. 3. 4. 5. NOTES: REINFORCEMENT REQUIRED FOR ALL LOADS NOT LOCATED WITHIN X" OF JOIST PANEL JOINT. X = 3" FOR JOIST, 6" FOR JOIST GIRDERS REINFORCEMENT NOT REQUIRED FOR P ≤ 100LB DO NOT DRILL MOUNTING HOLES IN BOTTOM CHORD OF JOIST WITHOUT WRITTEN APPROVAL OF JOIST MANUFACTURER THE MATERIAL SHALL CONFORM TO ASTM A36/A36M – STANDARD SPECIFICATION FOR CARBON STRUCTURAL STEEL ALL STEEL SUPPLIED MUST BE NEW, FREE FROM DEFECTS, AND SUITABLE FOR STRUCTURAL FABRICATION 3/16 TYPICAL 3/16 TYPICALP 1. ALTERNATIVE TO JOIST REINFORCEMENT: AS AN ALTERNATIVE, PROVIDE A CUSTOM CURB WITH JOIST SPACING COORDINATED SUCH THAT THE LONG EDGES OF THE NEW EQUIPMENT CURB BEAR DIRECTLY OVER THE JOISTS. SUPPORTING MEMBER OPENIN G SUPPORTING MEMBER L4x3x1/4 LLV FOR SPANS ≤ 4'-0" L5x3x1/4 LLV FOR SPANS > 4'-0" < 6'-0" L6x4x3/8 LLV FOR SPANS > 5'-0" < 8'-0" L5x3x1/4 LLV FOR SPANS ≤ 5'-0" 1. 2. 3. 4. NOTES: DECK TO BE FASTENED TO ALL ANGLES. PROVIDE ANGLE FRAME FOR ALL OPENINGS LARGER THAN 6" IN ANY DIRECTION. THE MATERIAL SHALL CONFORM TO ASTM A36/A36M – STANDARD SPECIFICATION FOR CARBON STRUCTURAL STEEL ALL STEEL SUPPLIED MUST BE NEW, FREE FROM DEFECTS, AND SUITABLE FOR STRUCTURAL FABRICATION L3x3x1/4x0'-4" (WELD TO SUPPORTING MEMBER) WELD ALL EXPOSED SURFACES TYPICAL FOR ROOF OPENING FRAMES INSTALLED AFTER STEEL DECK IS IN PLACE TYP FOR ROOF OPENING FRAMES INSTALLED BEFORE STEEL DECK IS IN PLACE 3/16 3/16TYP 3/16 3/16 TYP 1/4 MECHANICAL EQUIPMENT CONTINUOUS SEAL STRIP BY CURB MANUFACTURER COUNTER FLASHING FLASHING ROOF CONSTRUCTION STEEL FRAMING COORDINATE SIZE AND LOCATION OF OPENINGS WITH MECHANICAL EQUIPMENT AND FLOOR PLANS. DO NOT CUT STRUCTURAL MEMBERS. ROOF SURFACE CURB STRUCTURE INSULATED ROOF CURB ASSEMBLY ATTACH EQUIPMENT TO CURB PER CURB MFR INSTRUCTIONS ATTACH CURB TO STRUCTURE PER CURB MFR INSTRUCTIONS MI N . 8 " F R O M F I N I S H E D RO O F S U R F A C E , I N C L U D I N G AN Y C R I C K E T S 1. 2. 3. NOTE: REFER TO DETAIL 4 AND 5 ON THIS SHEET FOR DETAILED STRUCTURAL SUPPORT FRAMING. CONTRACTOR SHALL VERIFY THE EXISTING MODIFIED BITUMEN ROOF MEMBRANE AND GRANULAR CAP SHEET, AS WELL AS ANY APPLICABLE MANUFACTURER OR INSTALLER WARRANTIES, PRIOR TO PERFORMING ANY REQUIRED ROOF MODIFICATIONS FOR THE INSTALLATION OF NEW MECHANICAL UNITS. IF THE EXISTING ROOFING SYSTEM IS CURRENTLY UNDER WARRANTY, THE CONTRACTOR SHALL COORDINATE ALL NECESSARY REQUIREMENTS WITH THE ENTITY HOLDING THE WARRANTY BEFORE PROCEEDING WITH THE WORK. IF THE EXISTING ROOF IS NOT UNDER WARRANTY, THE CONTRACTOR SHALL MATCH THE EXISTING ROOFING ASSEMBLY AND INSTALL ALL NEW MATERIALS, INCLUDING REQUIRED SEALANTS, FLASHINGS AND COUNTER FLASHINGS, IN ACCORDANCE WITH THE MANUFACTURER’S STANDARD DETAILS AND WRITTEN REQUIREMENTS TO ENSURE A WATERTIGHT INSTALLATION. THE CONTRACTOR SHALL PROVIDE A ONE-YEAR INSTALLATION WARRANTY AND OBTAIN A TWENTY-YEAR MANUFACTURER ’S WARRANTY FOR ALL ROOF WORK INCLUDED IN THIS SCOPE. FINISHED ROOF SURFACE ROOF MOUNTED PIPE PROVIDE MANUFACTURER'S OPTIONAL SUPPORT PAD AT EACH PILLOWBLOCK PIPESTAND 1. NOTES: SUPPORT SHALL NOT RESTRICT THERMAL EXPANSION AND CONTRACTION OF PIPE TO PREVENT DAMAGE TO THE ROOF MEMBRANE. MOUNTING C-CHANNEL PILLOW BLOCK TYPE OR THREADED ROD TYPE PRE- ENGINEERED PIPE SUPPORT PIPE CLAMP ACCESSORY. LOCATE PIPE CLAMPS BASED ON PIPE ANCHOR LOCATION AND PIPE SUPPORT MANUFACTURER'S RECOMMENDATIONS A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 2 : 1 8 : 5 8 P M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - M - 2 4 . r v t SIB APC CLF MECHANICAL DETAILS OCTOBER 06, 2025 M-501 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW 10 0 % C O N S T R U C T I O N D O C U M E N T S FSB2025-014-00 Engineering CoA - F-12819 Exp. 08/31/2026 HV A C U p g r a d e s SCALE:NTS TYPICAL GAS CONNECTION DETAIL1 SCALE:NTS TYPICAL JOIST REINFORCEMENT DETAIL4 SCALE:NTS TYPICAL ROOF FRAMED OPENING DETAIL5 SCALE:NTS TYPICAL EQUIPMENT CURB DETAIL2 SCALE:NTS TYPICAL GAS PIPE ROOF SUPPORT3 DESCRIPTION DATE A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 7 / 2 0 2 5 9 : 2 2 : 3 9 A M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - M - 2 4 . r v t SIB APC CLF MECHANICAL SCHEDULES OCTOBER 06, 2025 M-701 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW 10 0 % C O N S T R U C T I O N D O C U M E N T S FSB2025-014-00 Engineering CoA - F-12819 Exp. 08/31/2026 HV A C U p g r a d e s 1.AIR DEVICES SHALL HAVE MANUFACTURER'S STANDARD CONSTRUCTION WITH FACTORY WHITE FINISH. COORDINATE MOUNTING FRAME REQUIREMENTS WITH OTHER TRADES PRIOR TO ORDERING ANY DEVICE. AIR DISTRIBUTION DEVICE SCHEDULE MARK MANUFACTURER MODEL DESCRIPTION SIZE NECK CFM RANGE NC LEVEL NOTES S-1 TITUS-HVAC TVM - 4 DISCHARGE OUTLETS HIGH CAPACITY VENTILATION SUPPLY MODULE 4000 CFM 24" X 24"1000 <45 ALL 9.PROVIDE UNIT WITH 15 AMP, 115V FACTORY INSTALLED FIELD WIRED SERVICE OUTLET. 8.THE UNIT SHALL BE PROVIDED WITH A REFRIGERANT DETECTION SYSTEM (RDS) AND MITIGATION RESPONSE, PER UL SAFETY STANDARD 60335-2-40. 7.PROVIDE UNIT CAPABLE OF REDUNDANT AUTOMATIC GAS VALVE WITH MANUAL SHUT-OFF, ELECTRONIC FLAME SENSOR AND DIRECT SPARK IGNITION. 6.UNIT SHALL BE INSTALLED WITH FACTORY CONTROLS AND A PROGRAMMABLE 24-HOUR THERMOSTAT WITH LED SCREEN. 5.PROVIDE UNIT WITH SCROLL COMPRESSORS AND CRANK CASE HEATERS. 4.PROVIDE UNIT WITH 12" CURB, CRICKETS AND HAIL GUARDS. 3.PROVIDE UNIT IN DOWNFLOW AND BOTTOM CONDENSATE DRAIN CONFIGURATION 2.PROVIDE UNIT WITH FACTORY INSTALLED ECONOMIZER AND BAROMETRIC RELIEF DAMPER. 1.PROVIDE UNIT WITH MANUFACTURER INSTALLED DISCONNECT. ROOFTOP UNIT SCHEDULE (RTU) MARK WEIGHT (LBS) NOMINAL TONS OF COOLING SUPPLY COOLING SECTION DATA HEATING SECTION DATA ELECTRICAL DATA BASIS OF DESIGN NOTESCFM OA (CFM) ESP (IN. WG)HP MEDIUM EAT DB / WB (°F) SENSIBLE CAPACITY (MBH) TOTAL CAPACITY (MBH) LAT DB / WB (°F) EFFICIENCY (IEER) AMBIENT DB / WB (°F) MEDIUM INPUT (MBH) OUTPUT (MBH) BURNER EFFICIENCY (%) EAT / LAT (°F)STAGES AMBIENT DESIGN DB VOLTAGE PHASE HZ FLA MCA MOCP MANUFACTURER MODEL RTU-1 1,208 10 4,000 250 0.5 3.0 DX 80.0 / 65.0 99.3 120.3 56.0 / 54.6 14.6 105.0 / 75.0 NAT. GAS 180.0 144.0 81.0 60.0 / 93.3 2 20.0 208 3 60 44.4 49.0 60.0 LENNOX LGX120S5M ALL RTU-2 1,208 10 4,000 250 0.5 3.0 DX 80.0 / 65.0 99.3 120.3 56.0 / 54.6 14.6 105.0 / 75.0 NAT. GAS 180.0 144.0 81.0 60.0 / 93.3 2 20.0 208 3 60 44.4 49.0 60.0 LENNOX LGX120S5M ALL DESCRIPTION DATE AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AIC AMPERE INTERRUPTING CAPACITY AL ALUMINUM AOR ARCHITECT OF RECORD BCT BONDING CONDUCTOR FOR TELECOMMUNICATIONS BKR BREAKER BOF BOTTOM OF FIXTURE BSC BARE STRANDED CONDUCTOR CB CIRCUIT BREAKER CCT CIRCUIT CFCI CONTRACTOR FURNISHED / CONTRACTOR INSTALLED CKT CIRCUIT CLG CEILING CM CIRCUIT MONITOR CNTRL CONTROL CONC CONCRETE CONN CONNECTION CR CONTROL RELAY CU COPPER D DEDICATED EG EQUIPMENT GROUND EMCS ENERGY MANAGEMENT CONTROL SYSTEM EMGB EQUIPMENT MAIN GROUNDING BUSBAR EOR ENGINEER OF RECORD EP EXPLOSION PROOF EWC ELECTRIC WATER COOLER EXIST EXISTING FA FIRE ALARM FACP FIRE ALARM CONTROL PANEL FO FIBER OPTIC FVNR FULL VOLTAGE NON REVERSING GB GROUND BUSBAR GFI GROUND FAULT INTERRUPTER GND GROUND HH HANDHOLE HC HORIZONTAL CROSS - CONNECTION IDF INTERMEDIATE DISTRIBUTION FRAME IG ISOLATED GROUND LC LIGHTING CONTACTOR LPS LIGHTNING PROTECTION SYSTEM LSIG "LONG TIME, SHORT TIME, INSTANTANEOUS AND GROUND FAULT PICKUPS" MAG MAGNETIC MC MAIN CROSS - CONNECTION MCB MAIN CIRCUIT BREAKER MCC MOTOR CONTROL CENTER MCP MOTOR CIRCUIT PROTECTOR MDF MAIN DISTRIBUTION FRAME MH MANHOLE MLO MAIN LUGS ONLY MM MULTI MODE MT'D MOUNTED NA NOT APPLICABLE NEC NATIONAL ELECTRICAL CODE NEUT NEUTRAL NF NON FUSED NFPA NATIONAL FIRE PROTECTION ASSOCIATION NL NIGHT LIGHT NIC NOT IN CONTRACT NIPRNET NON - CLASSIFIED INTERNET PROTOCOL ROUTER NETWORK NTS NOT TO SCALE OSP OUTSIDE PLANT OFOI OWNER FURNISHED / OWNER INSTALLED OFCI OWNER FURNISHED / CONTRACTOR INSTALLED P POLE PBB PRIMARY BUS BAR PH PHASE PC PART CIRCUIT PF POWER FACTOR PIR PASSIVE INFRARED PIV POST INDICATOR VALVE PNL PANELBOARD PR PAIR PTT PUSH TO TEST PVC POLYVINYL CHLORIDE RE:REFERENCE RECEPT RECEPTACLE RGSC RIGID GALVANIZED STEEL CONDUIT S.A.SURGE ARRESTOR SBB SECONDARY BUS BAR SCH SCHEDULE SIPRNET SECRET INTERNET PROTOCOL ROUTER NETWORK SM SINGLE MODE SPECS SPECIFICATIONS SP SURGE PROTECTED SPD SURGE PROTECTION DEVICE SS STAINLESS STEEL TBB TELECOMMUNICATION BONDING BACKBONE TGB TELECOMMUNICATIONS GROUNDING BUSBAR TDB TOP OF DUCT BANK THERM THERMAL TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR TR TELECOMMUNICATIONS ROOM TSP TWISTED SHIELDED PAIR TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR TYP TYPICAL USB UNIVERSAL SERIAL BUS UNO UNLESS NOTED OTHERWISE UTP UNSHIELDED TWISTED PAIR VFD VARIABLE FREQUENCY DRIVE WP WEATHER PROOF Ø PHASE XFMR TRANSFORMER 2S2W "TWO SPEED, TWO WINDING" 3P30A "THREE POLE 30A" ELECTRICAL ABBREVIATIONS POWER RECEPTACLE - DUPLEX RECEPTACLE - DUPLEX - COUNTER TOP RECEPTACLE - DUPLEX - GROUND FAULT INTERRUPTER RECEPTACLE - DUPLEX - COUNTER TOP / GROUND FAULT INTERRUPTER RECEPTACLE - DUPLEX - WEATHERPROOF RECEPTACLE - DUPLEX - WEATHERPROOF / GROUND FAULT INTERRUPTER RECEPTACLE - DUPLEX - SURGE PROTECTOR RECEPTACLE - DUPLEX - ISOLATED GROUND RECEPTACLE - DUPLEX - CEILING-MOUNTED RECEPTACLE - DUPLEX - FLOOR-MOUNTED RECEPTACLE - DUPLEX - HALF-SWITCHED RECEPTACLE - DUPLEX - HIGH VOLTAGE RECEPTACLE - SPECIAL PURPOSE RECEPTACLE - SIMPLEX RECEPTACLE - SIMPLEX - FLOOR-MOUNTED RECEPTACLE - QUADRUPLEX RECEPTACLE - QUADRUPLEX - CEILING-MOUNTED RECEPTACLE - QUADRUPLEX - FLOOR-MOUNTED MOTOR CONNECTION PUSH BUTTON - (1) SINGLE BUTTON PUSH BUTTON - (2) TWO BUTTON PUSH BUTTON - (3) THREE BUTTON POWER POLE TELE-POWER POLE METER AND SOCKET BASE MOTOR STARTER - MANUAL PILOT LIGHT SWITCH TV OUTLET JUNCTION BOX MOTOR STARTER - MAGNETIC VARIABLE FREQUENCY DRIVE LIGHTING WALL WASHER ROUND FIXTURE - RECESSED ROUND FIXTURE - RECESSED EMERGENCY ROUND FIXTURE - SURFACE ROUND FIXTURE - SURFACE EMERGENCY ROUND FIXTURE - SUSPENDED TRACK LIGHT RECTANGULAR FIXTURE - WALL-MOUNTED RECTANGULAR FIXTURE - WALL-MOUNTED EMERGENCY STRIP LIGHT STRIP LIGHT - EMERGENCY RECTANGULAR FIXTURE - RECESSED RECTANGULAR FIXTURE - SUSPENDED RECTANGULAR FIXTURE - SUSPENDED EMERGENCY RECTANGULAR FIXTURE - SURFACE EMERGENCY RECTANGULAR FIXTURE - SURFACE WALL-MOUNTED FIXTURE EXIT LIGHT - WALL-MOUNTED EXIT LIGHT - END-MOUNTED EXIT LIGHT - CEILING-MOUNTED LIGHTING CONTACTOR MOTION DETECTOR - CEILING-MOUNTED POWER PACK LIGHTING CONTROL RELAY SWITCH - (1) SINGLE POLE SWITCH - (3) THREE WAY SWITCH - (4) FOUR WAY SWITCH - DIMMER SWITCH - MOTION DETECTOR SWITCH - WEATHER PROOF SWITCH - KEY-OPERATED EMERGENCY LIGHT - TWO HEADS WITH INTEGRAL BATTERY FLOOD LIGHT SITE POLE LIGHT FIXTURE BOLLARD LIGHT FIXTURE PIT LIGHT TELECOMMUNICATIONS JUNCTION BOX - DATA OUTLET - TELEPHONE OUTLET - TELEPHONE - PUBLIC OUTLET - TELEPHONE - WALL OUTLET - TELEPHONE / DATA OUTLET - DATA OUTLET - TELEPHONE / DATA - FLOOR-MOUNTED OUTLET - DATA - FLOOR-MOUNTED OUTLET - TELEPHONE / DATA - CEILING-MOUNTED SPEAKER SPEAKER - WALL-MOUNTED OUTLET - DATA - CEILING-MOUNTED AMPLIFIER FLOOR BOX TIME CLOCK WIRELESS ROUTER TV ANTENNA ANTENNA CLOCK - (1) SINGLE SIDED CLOCK - (2) DOUBLE SIDED LADDER RACK MICROPHONE BUZZER TV OUTLET INFRARED MOTION SENSOR CLOSED CIRCUIT TV CAMERA BALANCED MAGNETIC SWITCH BREAK GLASS SENSOR CLOSED CIRCUIT TV MONITOR CONTROL MODULE CARD READER DURESS ALARM PUSH BUTTON DIGITAL METER DOOR LOCK EXIT PUSH BUTTON INTERCOM PUSH BUTTON FOR TWO-WAY COMMUNICATIONS KEY PAD WITH ARM / DISARM MAGNETIC SWITCH SECURITY MOTION DETECTOR REQUEST-TO-EXIT PUSH BUTTON SECURITY CONTROL CONSOLE SECURITYGROUNDING / LIGHTNING PROTECTION AIR TERMINAL GROUND ROD, 3/4" X 10' LONG GROUND TEST WELL ACCESSIBLE CONNECTION STATIC GROUND RECEPTACLE PANELBOARD - 208/120V PANELBOARD - 480/277V DOOR CONTACT DISCONNECT SWITCH - FURNISHED WITH EQUIPMENT DISCONNECT SWITCH - FUSED DISCONNECT SWITCH - UNFUSED FLOOR BOX MOTOR STARTER - COMBINATION PHOTOCELL RECTANGULAR FIXTURE - RECESSED EMERGENCY OUTLET - TELEPHONE - FLOOR-MOUNTED WALL-MOUNTED FIXTURE - EMERGENCY ELECTRICAL LEGEND SCHEMATIC CONTACT - NORMALLY CLOSED CONTACT - NORMALLY OPEN CONTACT COIL LIGHTING FIXTURE CONTACT COIL - MOTOR OVERLOAD RELAY BATTERY LIMIT SWITCH - NORMALLY OPEN LIMIT SWITCH - NORMALLY CLOSED CONTACT COIL - SOLENOID FUSE TIME CLOCK MOTOR RELAY SWITCH - ON/OFF PUSH BUTTON - NORMALLY OPEN PUSH BUTTON - NORMALLY CLOSED SOLENOID OUTLET - DATA - SIPRNET OUTLET - DATA - INTRANET OUTLET - TELEPHONE / DATA - NIPRNET A. LEGEND NOTES: NOT ALL SYMBOLS SHOWN ON THIS LEGEND ARE USED IN THIS PROJECT. SG + - C M S L R ON OFF TC FB J M P PP C GFI C GFI IG SP WP GFI WP TV EB LC MD P PC 3 4 DM K MD WP A C CC FB MP IN S P W N S S TP TC TV W BMS BG CR CCTV CM DM DC DL DA EP IR IC K S SCC MD RTE J D VFD GROUND BAR DS DAYLIGHT SENSOR RECEPTACLE - DUPLEX - FULL-SWITCHED ML MAG LOCK WIRELESS ACCESS POINTWAP NEW EQUIPMENT/ITEM ELECTRICAL LINE STYLES EXISTING EQUIPMENT/ITEM TO REMAIN EXISTING EQUIPMENT/ITEM TO BE DEMOLISHED BRANCH CIRCUIT TICK MARKS DENOTE NUMBER OF CONDUCTORS ( ) DENOTES CURRENT-CARRYING CONDUCTOR ( ) DENOTES EQUIPMENT GROUND CONDUCTOR ELECTRICAL CIRCUITING LINES STYLES HOME-RUN ARROWS NUMBER OF ARROWHEADS DENOTE NUMBER OF CIRCUITS PC CONDUIT TURNING UP PARTIAL CIRCUIT CONDUIT TURNING DOWN CONDUIT ELEVATION CHANGE CONDUIT SEAL A. B. C. ELECTRICAL INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2020 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC) AS WELL AS ALL OTHER APPLICABLE STATE AND LOCAL CODES. WHERE CONFLICTS ARISE, THE MOST STRINGENT REQUIREMENT SHALL TAKE PRECEDENCE. DO NOT SHARE NEUTRALS BETWEEN CIRCUITS. DRAWINGS ARE ONLY AN APPROXIMATION OF EXISTING CONDITIONS. CONTRACTOR TO VISIT SITE AND FIELD VERIFY ALL ELECTRICAL SYSTEMS ASSOCIATED TO SCOPE PRIOR TO BID. A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 1 0 : 2 6 : 0 3 A M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - E - 2 4 . r v t JSR JSR MAP LEGEND & ABBREVIATIONS OCTOBER 06, 2025 E-001 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW FSB2025-014-00 HV A C U p g r a d e s GENERAL NOTES DESCRIPTION DATE Engineering CoA - F-12819 Exp. 08/31/2026 10 0 % C O N S T R U C T I O N D O C U M E N T S 1. A. B. C. D. E. A. a. b. c. d. e. f. g. A. A. B. A. B. C. D. E. F. A. B. C. D. E. F. G. H. i. A. B. C. D. a. E. F. ELECTRICAL SPECIFICATIONS CODES & STANDARDS ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL APPLICABLE CODES, SPECIFICATIONS, LOCAL ORDINANCES, INDUSTRY STANDARDS, FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS, AND UTILITY COMPANY REGULATIONS. IN NO CASE WILL WORK OR MATERIALS INFERIOR TO THESE SPECIFICATIONS BE ACCEPTED EVEN IF PERMITTED BY CODES. ALL REFERENCES TO THE NATIONAL ELECTRICAL CODE OR NEC ARE REFERENCED TO THE LATEST EDITION ADOPTED BY THE LOCAL CODE ENFORCEMENT AGENCY. IN CASE OF DIFFERENCE BETWEEN BUILDING CODES, SPECIFICATIONS, STATE LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDS, FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS, UTILITY COMPANY REGULATIONS, AND THE CONTRACT DOCUMENTS, THE MOST STRINGENT SHALL GOVERN. NON-COMPLIANCE: SHOULD THE CONTRACTOR PERFORM ANY WORK THAT DOESN'T COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE BUILDING CODES, SPECIFICATIONS, STATE LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDS, FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS, UTILITY COMPANY REGULATIONS, AND THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL BEAR ALL COSTS ARISING IN CORRECTING THE DEFICIENCIES. ALL ELECTRICAL, TELECOMM, AND SECURITY MATERIALS & EQUIPMENT SHALL BE UL LISTED FOR ITS INTENDED PURPOSE. INSTALLATION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE NECA STANDARDS. 2. SUBMITTALS: THE CONTRACTOR SHALL PROVIDE SUBMITTALS WITH PRODUCT SELECTIONS CLEARLY INDICATED FOR ALL MATERIALS TO BE USED ON PROJECT, INCLUDING BUT NOT LIMITED TO: 26 05 19 - LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 26 - GROUNDING AND BONDING OF ELECTRICAL SYSTEMS 26 05 29 - HANGARS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 33.13 - CONDUIT FOR ELECTRICAL SYSTEMS 26 05 33.16 - BOXES FOR ELECTRICAL SYSTEMS 26 05 56 - IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 24 16 – PANELBOARDS 3.LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES: ALL CONDUCTORS FOR FEEDERS AND BRANCH CIRCUITS SHALL BE INSTALLED IN CONDUIT AND SHALL BE 600 VOLT, THHN/THWN-2, COPPER, UNLESS NOTED OTHERWISE ON THE DRAWINGS. BRANCH CIRCUIT WIRING SHALL BE #12 AWG MINIMUM, UNLESS NOTED OTHERWISE. UTILIZE SOLID CONDUCTORS FOR #12 AND SMALLER. ELECTRICAL PLAN ROUTING OF CIRCUITS IS DIAGRAMMATIC IN NATURE AND DOES NOT INDICATE VERTICAL OR HORIZONTAL BENDS AND RISERS REQUIRED FOR PROPER INSTALLATION. COORDINATE ALL ROUTING WITH ARCHITECTURAL OBSTRUCTIONS AND MECHANICAL EQUIPMENT. 4.GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: EQUIPMENT: ALL ELECTRICAL EQUIPMENT AND FIXTURES SHALL BE GROUNDED BY USE OF A GREEN EQUIPMENT GROUNDING CONDUCTOR (EGC) CONNECTED FROM THE EQUIPMENT FRAME, MOTOR FRAME, OR FIXTURE HOUSING BACK TO THE GROUNDING BUS IN THE PANELBOARD FROM WHICH THE EQUIPMENT RECEIVES ITS POWER. THE EQUIPMENT GROUNDING CONDUCTOR SHALL BE SIZED IN ACCORDANCE WITH NEC ARTICLE 250.122 AND SHALL BE ROUTED IN THE SAME RACEWAY WITH THE CORRESPONDING POWER CIRCUIT. WHERE CIRCUIT CONDUCTORS ARE INCREASED IN SIZE TO PREVENT EXCESSIVE VOLTAGE DROP, THE EQUIPMENT GROUNDING CONDUCTOR SHALL BE INCREASED IN SIZE PROPORTIONATELY IN ACCORDANCE WITH NEC ARTICLE 250.122 (B). DEVICES: GROUNDING OF DEVICES SHALL BE BY MEANS OF A COMMON EGC ATTACHED TO THE GROUNDING TERMINALS OF ALL DEVICES SERVED BY A COMMON BRANCH CIRCUIT, ROUTED IN THE SAME RACEWAY WITH THE BRANCH CIRCUIT TO THE PANELBOARD GROUNDING BUS. 5. HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PROVIDE PRODUCTS LISTED, CLASSIFIED, AND LABELED AS SUITABLE FOR PURPOSE INTENDED. CONDUITS STRAPS SHALL BE STEEL 1-HOLE OR 2-HOLE TYPE. CONDUIT CLAMPS SHALL BE BOLTED. METAL STRUT CHANNEL SHALL BE GALVANIZED STEEL 12 GAUGE, 1-5/8 INCH WIDE BY 13/16 INCH HIGH MINIMUM. HANGER RODS SHALL BE THREADED, ZINC-PLATED STEEL, MANUFACTURER RATED TO SUPPORT WITH INTENDED WEIGHT, MINIMUM SIZE 3/8 INCHES. ANCHORS AND FASTENERS CONCRETE: USE PRESET CONCRETE INSERTS, EXPANSION ANCHORS, OR SCREW ANCHORS . SOLID OR GROUT-FILLED MASONRY: USE EXPANSION ANCHORS OR SCREW ANCHORS . HOLLOW MASONRY: USE TOGGLE BOLTS . HOLLOW STUD WALLS: USE TOGGLE BOLTS . STEEL: USE BEAM CLAMPS, MACHINE BOLTS, OR WELDED THREADED STUDS . SHEET METAL: USE SHEET METAL SCREWS . WOOD: USE WOOD SCREWS . PLASTIC AND LEAD ANCHORS ARE NOT PERMITTED. POWDER-ACTUATED FASTENERS ARE NOT PERMITTED. 6.CONDUIT FOR ELECTRICAL SYSTEMS: CONDUIT SIZE SHALL BE A MINIMUM OF 3/4". PROVIDE PULL BOXES IN ALL CONDUIT RUNS THAT EXCEED 100' AND/OR MORE THAN 3 90-DEGREE BENDS. THE CONDUIT SYSTEM SHALL CONSIST OF GALVANIZED ELECTRICAL METALLIC TUBING (EMT), GALVANIZED RIGID METAL CONDUIT (RMC) , AND LIQUID TIGHT FLEXIBLE METAL CONDUIT (LFMC) INSTALLED AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE. ELECTRICAL PLAN ROUTING OF CIRCUITS IS DIAGRAMMATIC IN NATURE AND DOES NOT INDICATE VERTICAL OR HORIZONTAL BENDS AND RISERS REQUIRED FOR PROPER INSTALLATION. COORDINATE ALL ROUTING WITH ARCHITECTURAL OBSTRUCTIONS AND MECHANICAL EQUIPMENT. EMT CONDUIT FITTINGS SHALL BE STEEL COMPRESSION TYPE. INSTALL EMT SYSTEMS AS REQUIRED FOR THE SYSTEMS BEING INSTALLED. EMT SHALL BE PROHIBITED IN THE FOLLOWING LOCATIONS: WHERE EMT IS NOT PERMITTED BY THE NEC. INSTALL PULL STRING IN ALL EMPTY CONDUITS. CONDUIT(S) PENETRATING FIRE RATED WALLS SHALL BE SEALED WITH APPROPRIATE FIRE RATED MATERIAL, UL 1479 LISTED FOR ITS INTENDED PURPOSE. A. B. C. D. A. a. b. c. d. e. B. a. b. c. A. B. C. A. B. C. D. E. F. G. A. 7. BOXES FOR ELECTRICAL SYSTEMS: DO NOT USE BOXES AND ASSOCIATED ACCESSORIES FOR APPLICATIONS OTHER THAN AS PERMITTED BY NFPA 70. ALL BOXES SHALL HAVE A MINIMUM DEPTH OF 2-1/8". PROVIDE ALL BOXES, FITTINGS, SUPPORTS, AND ACCESSORIES REQUIRED FOR A COMPLETE RACEWAY SYSTEM AND ACCOMMODATE DEVICES AND EQUIPMENT TO BE INSTALLED. PROVIDE GROUNDING TERMINALS WITHIN BOXES WHERE EQUIPMENT GROUNDING CONDUCTORS TERMINATE. 8.IDENTIFICATION FOR ELECTRICAL SYSTEMS: USE IDENTIFICATION NAMEPLATE TO IDENTIFY EACH PIECE OF ELECTRICAL DISTRIBUTIONS AND CONTROL EQUIPMENT AND ASSOCIATED SECTIONS, COMPARTMENTS, AND COMPONENTS SUCH AS SWITCHGEAR, SWITCHBOARDS, MOTOR CONTROL CENTERS, PANELBOARDS, TRANSFORMERS, ENCLOSED SWITCHES, ENCLOSED CIRCUIT BREAKERS, ENCLOSED MOTOR CONTROLLERS, AND BUSWAY. IDENTIFY AMPERE RATING, VOLTAGE, AND PHASE. IDENTIFY POWER SOURCE AND CIRCUIT NUMBER. INCLUDE LOCATION WHEN NOT WITHIN SIGHT OF EQUIPMENT. IDENTIFY MAIN AND TIE DEVICES. IDENTIFY LOADS SERVED FOR EACH BRANCH DEVICE. IDENTIFY SPARES AND SPACES. USE WIRE AND CABLE MARKERS TO IDENTIFY CIRCUIT NUMBER OR DESIGNATION INDICATED FOR POWER, CONTROL, AND INSTRUMENTATION CONDUCTORS AND CABLES AT THE FOLLOWING LOCATIONS: AT EACH SOURCE AND LOAD CONNECTION. WITHIN BOXES WHEN MORE THAN ONE CIRCUIT IS PRESENT. WITHIN ENCLOSURES WHEN CONDUCTORS AND CABLES ENTER OR LEAVE THE ENCLOSURE. 9. PANELBOARDS: NEW BREAKERS SHALL MATCH EXISTING PANELBOARD UL LISTING. NEW BREAKER SHORT CIRCUIT RATINGS SHALL MATCH THE RATING OF THE EXISTING PANELBOARD. PANELS SHALL REMAIN FULLY RATED. SERIES RATING IS NOT ACCEPTABLE. NEW BREAKER CAPACITY, VOLTAGE, AND PHASE SHALL BE AS INDICATED ON THE DRAWINGS. 10. TESTING: CONTRACTOR SHALL EMPLOY QUALIFIED/CERTIFIED PERSONNEL TO PERFORM ALL REQUIRED TESTS AND INSPECTIONS. CONTRACTOR SHALL INSPECT ALL EXPOSED SECTIONS OF CONDUCTORS AND CABLES FOR PHYSICAL DAMAGE AND CORRECT CONNECTION. CONTRACTOR SHALL TEST ALL BOLTED CONNECTIONS FOR HIGH RESISTANCE USING A CALIBRATED TORQUE WRENCH, TO ENSURE THAT MANUFACTURERS RECOMMENDED TORQUE IS PROVIDED. CONTRACTOR SHALL INSPECT ALL COMPRESSION-APPLIED CONNECTORS FOR CORRECT CABLE MATCH AND INDENTATION. CONTRACTOR SHALL INSPECT ALL EQUIPMENT AND CONDUCTORS TO ENSURE PROPER AND CORRECT IDENTIFICATION ACCORDING TO THE SPECIFICATIONS. CONTRACTOR SHALL INSPECT ALL CONDUCTOR AND CABLING INSULATION/JACKETING FOR DEFECTS AND IMPERFECTIONS. ALL CONDUCTORS AND CABLES SHALL BE PROVIDED FREE OF DEFECTS AND/OR IMPERFECTIONS. CONTRACTOR SHALL TEST ALL THREE PHASE EQUIPMENT FOR CORRECT PHASE ROTATION PRIOR TO ENERGIZING EQUIPMENT. 11. WARRANTY: CONTRACTOR SHALL PROVIDE A FULL FIVE-YEAR WARRANTY ON ALL ELECTRICAL SYSTEMS. THIS WARRANTY SHALL COVER ANY/ALL DEFECTS IN BOTH MATERIAL AND INSTALLATION. ALL DEFECTS DETECTED WITHIN THE WARRANTY PERIOD SHALL BE CORRECTED AT THE SOLE EXPENSE OF THE CONTRACTOR. THE WARRANTY PERIOD SHALL START ON THE DATE OF BENEFICIAL OCCUPANCY BY THE OWNER. A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 1 0 : 2 6 : 0 4 A M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - E - 2 4 . r v t JSR JSR MAP ELECTRICAL SPECIFICATIONS OCTOBER 06, 2025 E-002 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW FSB2025-014-00 HV A C U p g r a d e s DESCRIPTION DATE Engineering CoA - F-12819 Exp. 08/31/2026 10 0 % C O N S T R U C T I O N D O C U M E N T S T T GFIC GFIC GFI48" GFI48" GFI48" GFI48" GFI48"GFI 48" GFI 48" GFI 48" GFI48" GFI48" GFI48" GFI GFI GFI GFI48" A A 1 B B 2 LP1 LP2 LP1A +72" +84" +60" +76" A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: GENERAL SHEET NOTES Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 1 0 : 2 6 : 0 5 A M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - E - 2 4 . r v t JSR JSR MAP ELECTRICAL INTERIOR POWER PLAN OCTOBER 06, 2025 EP101 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW FSB2025-014-00 HV A C U p g r a d e s SCALE: N 1/8" = 1'-0" ELECTRICAL POWER PLAN1 A.THIS SHEET IS INCLUDED FOR REFERENCE TO EXISTING PANELBOARD LOCATIONS. DESCRIPTION DATE Engineering CoA - F-12819 Exp. 08/31/2026 10 0 % C O N S T R U C T I O N D O C U M E N T S GFI WP GFI WP A A 1 1 B B 2 2 RTU-2RTU-1 LP1 - 31,33,35LP2 - 32,34,36 11 LP1 - 9LP2 - 12 22 SHEET KEYNOTES A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 1 0 : 2 6 : 0 7 A M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - E - 2 4 . r v t JSR JSR MAP ELECTRICAL ROOF POWER PLAN OCTOBER 06, 2025 EP102 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW FSB2025-014-00 HV A C U p g r a d e s SCALE: N 1/8" = 1'-0" ELECTRICAL ROOF POWER PLAN1 KEY VALUE DESCRIPTION 1 PROVIDE THREE (3) #4 AND ONE (1) #8 EG IN 1"C. PENETRATE ROOF THROUGH UNIT CURB. PROVIDE TERMINATIONS TO TERMINALS AT FACTORY INSTALLED DISCONNECTING MEANS. COORDINATE DETAILS WITH DIVISION 23. 2 PROVIDE TWO (2) #10 AND ONE (1) #10 EG IN 3/4"C. PENETRATE ROOF THROUGH UNIT CURB. PROVIDE TERMINATIONS TO TERMINALS AT FACTORY INSTALLED SERVICE RECEPTACLE. COORDINATE DETAILS WITH DIVISION 23. DESCRIPTION DATE Engineering CoA - F-12819 Exp. 08/31/2026 10 0 % C O N S T R U C T I O N D O C U M E N T S A B C D 1 2 3 4 5 A B C D 1 2 3 4 5 SHEET NUMBER ISSUE DATE REVISION HISTORY PROJECT INFORMATION DRAWN BY: DESIGNED BY:REVIEWED BY: PROJECT MANAGER: PROJECT NUMBER SHEET TITLE: Frankfurt-Short-Bruza Associates, P.C. 5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436 405.840.2931 | fsb-ae.com 6"1'-6"1'0 1 1/2" = 1'-0" 0 6"1'2' 1" = 1'-0" 0 1'2'4' 1/2" = 1'-0" 0 2'4'8' 1/4" = 1'-0" 0 4'8'16' 1/8" = 1'-0" 0 8'16'32' 1/16" = 1'-0" 3"9"6"0 3" = 1'-0" 1'3'2'0 3/4" = 1'-0" 2'6'4'0 3/8" = 1'-0" 4'12'8'0 3/16" = 1'-0" 8'24'16'0 3/32" = 1'-0" 10 / 6 / 2 0 2 5 1 0 : 2 6 : 0 7 A M Au t o d e s k D o c s : / / A A D F W C P 2 8 R e l o c a t i o n / 5 0 1 4 0 0 - C P 2 8 H V A C - E - 2 4 . r v t JSR JSR MAP PANEL SCHEDULES OCTOBER 06, 2025 EP701 Am e r i c a n A i r l i n e s DF W - I T S t o r a g e & D i s t r i b u t i o n F a c i l i t y DF W I n t e r n a t i o n a l A i r p o r t , T e x a s PU T Y O U R C E N T R A L F I L E P A T H H E R E AAW FSB2025-014-00 HV A C U p g r a d e s LP1 LP2 *1- EXISTING LOAD/BREAKER *2- UTILIZE EXISTING SPARE BREAKER TO SERVE NEW LOAD Notes: Total Est. Demand Current:46 A Total Conn. Current:46 A Total Est. Demand:16524 VA RECEPTACLE 540 VA 100.00%540 VA Total Conn. Load:16524 VA HVAC 15984 VA 100.00%15984 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:44 A 46 A 48 A Total Load:5328 VA 5508 VA 5688 VA 41 ------0 VA 0 VA ------42 39 ------0 VA 0 VA 2 50 A WAREHOUSE TWISTLOCK (*1)40 37 SPARE (*1)50 A 3 0 VA 0 VA ------38 35 ------5328 VA 0 VA ------36 33 ------5328 VA 0 VA 3 100 A LP1A (*1)34 31 RTU-2 (*2)60 A 3 5328 VA 0 VA ------32 29 #2 FURN (*1)20 A 1 0 VA 0 VA ------30 27 ------0 VA 0 VA 3 60 A A/C CONDENSER (*1)28 25 ------0 VA 0 VA ------26 23 A/C CONDENSER (*1)40 A 3 0 VA 0 VA 2 20 A WAREHOUSE LIGHTS (*1)24 21 RECEPT LEFT OF PANEL LP1 (*1)20 A 1 0 VA 0 VA ------22 19 RECEPT RM 123 (*1)20 A 1 0 VA 0 VA 2 20 A WAREHOUSE LIGHTS (*1)20 17 ACS RECEPTACLE COMM 123 (*1)20 A 1 360 VA 0 VA 1 20 A SPARE (*1)18 15 RECEPTS RM 100, 101, 102 (*1)20 A 1 0 VA 0 VA 1 20 A CEILING RECEPT RM 113 (*1)16 13 OFFICE LIGHTS (*1)20 A 1 0 VA 0 VA 1 20 A RECEPT RM 104, 106, 113 (*1)14 11 SPARE (*1)20 A 1 0 VA 0 VA 1 20 A RECEPT RM 110, 113 (*1)12 9 SERVICE GFI AT RTU-2 (*2)20 A 1 180 VA 0 VA 1 20 A RECEPT RM 108, 113 (*1)10 7 RAMP #1 OHD (*1)20 A 1 0 VA 0 VA 1 20 A RECEPT RM 113, OFFICE LIGHTS (*1)8 5 RECEPT RM 103, 105, 113 (*1)20 A 1 0 VA 0 VA 1 20 A RECEPTS GEN OFFICE (*1)6 3 RECEPT RM 107, 109, 113 (*1)20 A 1 0 VA 0 VA 1 20 A CEILING RECEPT RM 113, OFFICE LIGHTS (*1)4 1 SPARE (*1)20 A 1 0 VA 0 VA 1 20 A RECEPT RM 100, OFFICE LIGHTS (*1)2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT MODIFIED EXISTING PANELBOARD Notes: Enclosure:NEMA 1 Mounting:SURFACE Wires:4 Mains Rating:225 A Supply From:Phases:3 Mains Type:MLO Location:ELEC. 124 Volts:208/120 WYE A.I.C. Rating:10000 Branch Panel:LP1 *1- EXISTING LOAD/BREAKER *2- REMOVE EXISTING 2P-30A AND 1P-20A SPARE BREAKERS AND PROVIDE NEW 3P-60A BREAKER FOR NEW LOAD *3- UTILIZE EXISTING SPARE BREAKER TO SERVE NEW LOAD Notes: Total Est. Demand Current:46 A Total Conn. Current:46 A Total Est. Demand:16704 VA RECEPTACLE 720 VA 100.00%720 VA Total Conn. Load:16704 VA HVAC 15984 VA 100.00%15984 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:48 A 44 A 48 A Total Load:5688 VA 5328 VA 5688 VA 41 ------0 VA 0 VA ------42 39 SPARE (*1)30 A 2 0 VA 0 VA ------40 37 ------0 VA 0 VA 3 30 A TWISTLOCK RECEPT (*1)38 35 WATER HEATER (*1)30 A 2 0 VA 5328 VA ------36 33 SPARE (*1)20 A 1 0 VA 5328 VA ------34 31 RECEPTACLE REPAIR 111 (*1)20 A 1 360 VA 5328 VA 3 60 A RTU-1 (*2)32 29 RECEPTS WAREHOUSE TIN WALL (*1)20 A 1 0 VA 0 VA 1 20 A UNKNOWN LOAD (*1)30 27 RECEPTS WAREHOUSE TIN WALL (*1)20 A 1 0 VA 0 VA 1 20 A UNKNOWN LOAD (*1)28 25 DOCK RECEPTS (*1)20 A 1 0 VA 0 VA 1 20 A UNKNOWN LOAD (*1)26 23 FURNACE #2 (*1)20 A 1 0 VA 0 VA 1 20 A FURNACE #1 (*1)24 21 ------0 VA 0 VA ------22 19 WAREHOUSE LIGHTS (*1)30 A 2 0 VA 0 VA 2 30 A WAREHOUSE LIGHTS (*1)20 17 ------0 VA 0 VA ------18 15 ------0 VA 0 VA ------16 13 A/C #2 (*1)40 A 3 0 VA 0 VA 3 30 A A/C #1 (*1)14 11 SPARE (*1)20 A 1 0 VA 180 VA 1 20 A SERVICE GFI AT RTU-1 (*3)12 9 SPARE (*1)20 A 1 0 VA 0 VA 1 20 A SPARE (*1)10 7 RECEPT RM 109, 111, 112, 113 (*1)20 A 1 0 VA 0 VA 1 20 A SPARE (*1)8 5 COUNTERTOP RECEPT RM 115 (*1)20 A 1 0 VA 180 VA 1 20 A ICE MACHINE RECEPT (*1)6 3 RECEPT RM 115, 118, 120 (*1)20 A 1 0 VA 0 VA 1 20 A LIGHTS RM 115, 118, 120 (*1)4 1 SPARE (*1)20 A 1 0 VA 0 VA 1 20 A REFRIGERATOR (*1)2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT MODIFIED EXISTING PANELBOARD Notes: Enclosure:NEMA 1 Mounting:SURFACE Wires:4 Mains Rating:225 A Supply From:Phases:3 Mains Type:MLO Location:CORRIDOR 119 Volts:208/120 WYE A.I.C. Rating:10000 Branch Panel:LP2 DESCRIPTION DATE Engineering CoA - F-12819 Exp. 08/31/2026 10 0 % C O N S T R U C T I O N D O C U M E N T S