Initial Ret)ort for Foundation Assessment
Date: November 6. 2025
Attention: Structured Foundation Repair (The Client)
Subject: Foundation Review
832 Heather NVood Dr.. Grapevine. Texas
Authorization and Scooe:,
Nortier Engineering Consultants. LLC'(NE(*) has been retained by the Client to perforni air evaluation of
zr
the slab oil grade foundation systern of the 2 story residential home with brick veneer located at the
subject address referenced above. This report provides guidance as, to whether or not the existing
foundation system is in need of repair. The report also proposes a recommended plan if repairs are
needed.
.Cl,lo,liicltisioiis!Spqcifil,.c,R.e,.c.oiiiiiieiidation:
NEC' performed a visual evaluation of the foundation for the subj1ect property oil 11/6/2025. NEC also
performed a floor survey using a Zip -level Pro-2000 series. collecting relative floor elevations, to aid in
surface topography wrapping of the floor(s). Elevations shown are adjusted for the type of flooring
encountered to reflect a consistent measuring plane. The snap of the existing floor elevations call be seen
in the figure attached to this report.
Based oil review of the foundation, and reasonable professional engineering opinion, we've deteninned
that movement of the foundation has occurred and should be repaired. Although complete levelness
cannot be guaranteed. or may not be attainable. the proposed plan should improve the performance of the
foundation. It is recommended that five (5) new piers be installed and four (4) existing piers be adjusted
as indicated oil the figure(s) attached to this report. Locations of internal piers [if needed] are intended to
Ire approximate. The Contractor should locate the bearris and place internal piers accordingly. It is noted
that exploratory digging on the front left revealed that the shims on the existing piers in this area
were tightly in contact with the piers and the bottom of the perimeter grade beam. As a result, it
appears that the interior of the foundation has settled and should be supported as shown.
Furthermore. the proposed foundation repairs shall nieet or exceed Chapter 4 of the 2021 International
Residential Code (IRC), as it relates to foundations and any local applicable amendments to the IRC.
This report is solely based oil information gathered during our site visit oil 11/6,121025, and does not take
into consideration any changes in condition of the foundation or soils after the date which the information
was gathered.
REQUME
APPr�,IOVAL OF kIEVISFE)
PLM�M
. .. ........... ..
0 <
0 CL
z
W 0
W
>
z
5
W 0 a.
LL
1000 Buck Dobbs Rd..
Aledo. Texas
81'7-374-3559
hifWi-t,Nortierl1c.coiii
General Recommendations:
It is reconuireirded that a guttering system be installed if the house does not have gutters. Installing a
guttering system will direct water away from the foundation and reduce the potential for ground erosion
near the foundation footing.
It is also recommended that the plumbing systems be checked after any repairs are made to the foundation
system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure
and cause leaks.
It is recommended that soil grading be maintained such that the bottom portion of the foundation is below
grade. as per the goven ring code and a watering system be utilized around the perimeter of the house.
Fluctuations in moisture content of the soils near the foundation of the house can cause differential
movement. If the moisture content is kept consistent. the potential for differential movement is mitigated.
Furthennore, grading around the perimeter of the building should be maintained as sloping away from the
foundation at a minimum of 6 inclies, fall within the first 10 feet from the foundation. Stich grading
configuration should prevent localized water accumulating around areas of the foundation. Saturated
soils decline in bearing capacity and can result in differential movement of the foundation.
Limitations:
This report is intended for information purposes only. and the sole use of the client and lor homeowner.
The scope of this report is limited to the items related to the foundation system only, and it is understood
that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of
this report does not include judgment out any of the superstructure, detached buildings. retaining or
privacy walls, concrete reinforcement andlor site drainage. In addition. the scope of this report excludes
material and soil sampling/testing procedures and as such were not performed. The report is not to be
used by others for any purpose without our written consent. Compliance with any code or specification
other than as expressly noted in this report is specifically excluded. It is the responsibility of any
Contractor to abide by any other applicable codes or specifications.
No warranty for any repairs, future foundation performance, structure, vegetation. or soils, at the sultject
property are offered by this report, nor does this report imply any liability to NEC. nor Daneel Nortier, PE
for any work to be performed as a result of this report. It is understood that soils in this area experience
movement due to moisture fluctuations. Such soil movement could cause the foundation to move after
the recontineirded repairs have been made. Any provided floor elevation data and recommended actions
are based on soil conditions as they exist at the time of the evaluation. 'INTEC does not warrant or imply
that other problems may not occur in the future. No warranty, expressed or implied. is made or intended
and the limit of liability shall be limited to the fee paid for this report at the time of evaluation.
Report Prepared by:
Nortier Engineering Consultants. LLC
Texas Engineering Finn (17- 16800)
1 1''&�')025
Daireel Nortier, P.E.
Professional Engineer (TX# I 11157
11-0 SITE AND
P'(OVAL PER INSTALL A'6!Y'"' V
WC D.R-,, C, 0 ',IPLA,.
oF —4
2'p
.... ..........
fi E L P OR 11UR
0 .... ........ .... 0
-i'l -1,2 -0.8 -05
-0.0
-0,7
44
Existing Pier (Non-SFR) l.3 -0,5
Existing Pier (to be adjusted)
Existing Pier -AP -3,3 -12
New pier -0,3
Zero
Stress crack
SP Separation -4,2 -2.7 -23
Photograph Label -0.2 0.2
Garage
T W1
48 -3,8 -3,9
5
Oft loft 20ft
A I Driveway
OF 7-
4�:
D G EN NEUR
C ON F MR 'NC SffF 11 _CTICt
iT tJ, TiON0VI-i N AWFIRWAL 01' PlEr,' N,
..... ........ ".
U"-i aim
TfER EEI OR I
. .. .. ........ ....
11/6/25
832 Heather Wood Dr
By: DN Grapevine, Texas
00ism Nrm MCI
Slab/
C, N �;IAPL7
P -1c P F, s - _KUL
Foundation F
Az: F
A VIWE S MT -IT Kf
JIMM
building shall be supported with
single pier may be used if spacing
does not exceed 6'-0"
'k '^%%XNk4
0 F 4
AW
... ..... ... .......
10 � EEC
ORTIER
. ...... ..
ONNIUMNG
H�N
kN;0'RK K5 rXIMPU: f
1/21/24 Precast Concrete Piling Detail Diagram
fl
---,---Reinforcing steel rebar--
MM
-ete Block
Solid 6" Diameter by 12" long
Precast Concrete Cylinder,
A) Single Pier for 1 Story
B) Double Pier for 2 Story
For normal spacing
iL�e4s a,
, as= MW LMW
OUR MOURNE ONSUITANTS LLC
1-1
M�3 PY'11-1� FIE Lfil5z,U: Cl--PS"N T I !CV
-1, 04 Iv
- APpw�il
PROVM)E' SGN -0 "N'D SFAIED LFTF=r%
'k D E N G Tj E E F k ON; R`-C- IS I--
Ct"IN, I WANG Si I U j�4,
WORK IS COMPLL'