HomeMy WebLinkAboutSFRA2025-004616 : 1
JOB ADDRESS:
RECEIVED: 12/09/2025 DATE OF ISSUANCE:
25004616
2939 BROOKSHIRE DRIVE
PERAM
231 SQ FT ATTACHED PATIO COVER WITH SLAB — ELECTRIC
BUILDING PERMIT APPLICATION
1 �T� 7�1
11 —�— " �� — , — �. Y — �:N —_ Z._
B
SUBDIVISION. LOCK:
BUILDING CONTRACTOR (company name):
CURRENT MAILING ADDRESS:
CITY/STATE/ZIP: PH: # Fax
PROPERTY OWNER:
PROJECTVALUE:
FIRE SPRENKLERED? YES NO
WHAT TRADES WILL BE NEEDED?,
ELECTRIC PLUMBING MECHANICAL
DESCRIPTION OF WORK TO BE DONE;
USE OF BUILDING OR STRUCTURE:
ity of Grapevine
Building - Residential
PO Box 95104
Addition
Grapevine, Texas 76099
817) 410-3166
Project # 25-004616
Project Description: Construct 231 sf Attached Patio Cover
with Electric 32sf concrete, 22sf concrete border
[ELECTRONIC
REVIEW]
Issued on: 01/14/2026 at 10:13 AM
ADDRESS
INSPECTIONS
8
2929 Brookshire Dr.
Grapevine, TX 76051
1. Building Setback
5. Building Bracing Sheathing
2. Building Foundation/Footing
6. Building Termite Verification
LEGAL
3. Building Pier
7. Lot Drainage Inspection
Oak Creek Estates Blk
4. Building Framing
8. Building Final
12 Lot 31
S
INFORMATION FIELDS
PERMIT HOLDER
—APPLICANT NAME (individual)
Kelsey Dawson
Kelsey Dawson
Allied Outdoor Solutions
"APPLICANT PHONE NUMBER
8153031663
(713) 465-0400
APPLICANT E-MAIL
COLLABORATORS
VALUATION
1389DO
- Kelsey Dawson
Square Footage
231
Allied Outdoor
CONSTRUCTION TYPE
VB
Solutions
OCCUPANCY GROUP
R-3
(713) 465-0400
BUILDING PERMIT
OWNERS
DOCUMENTS - ISC 01
M
APP— 202104070956011105.pdf, 325-
0416 Clark - Stamped Plan Set -
• Alfred Clark
11.27.25 1.pdf
DOCUMENTS - MISC 02
Lot Drainage Plan.pdf
ZONING DISTRICT
R-7.5
APPROVED TO ISSUE ELECTRIC
YES
FEE
TOTAL PAID DUE
Building Permit Fee, ($150.00 $150.00 $150.00 $150.00
Flat Fee) Simple Alteration
TOTALS $150.00 $ 150.00 $0.00
READ AND SIGN
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF
MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO
THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN
COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING
CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OFT I PERMIT
Page 1/2
MYGOV.us 25-004616, 01/14/2026 at 10:13 AM Issued by: Amanda Robeson
I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED+ BY AND THAT
THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING
SUCH APPROVAL -i APPROPRIATE! OR FEDERAL
Signature
City of GrapevineBuilding i ni I Addition
Project # 2-001
r
NOTICES
1) ALL work must be done In compliance with the 201 INTERNATIONAL UILDI O .
`* ALL work ISSUED prior to January 1, 2024, must be done in compliance with the 2006 INTERNATIONAL
BUILDING O .
2) City Approved Stamped Plans must be on -site for ALL INSPECTIONS.
) Project address must be clearly posted at the job site.
NOTES
> 24 HOUR INSPECTION
METRO (17) 410- 01 , CUT OFF TIME FOR A.M. INSPECTION IS 7:30 A.M. --- CUT OFF TIME FOR P.M.
INSPECTION 11:30 P.M.
> PERMIT ISSUED IN ACCORDANCE WITHAPPLICATION IN THISOFFICE.
MYGOV.US 25-004616, 01114/2026 at 10:13 AM Issued by: Amanda Robeson
RECEIVED: 12/0912025
25-004616
2929 BROOKSHIRE DRIVE IMPERVIOUS COVERAGE
0'' DONI_'v
231 SO FT ATTACHED PATIO COVER W/ SLAB - ELEC.Mf'!D;a11'1URAY CALCULATIONS:
EXISTING:
BUILDING AREA - 2120 SQ FT
WOOD DECK HAS BEEN GARAGE - 402 SQ FT
FRAME BUILDING - 147 SQ FT
NEW CONCRETE BORDER PREVIOUSLY REMOVED
DRIVEWAY - 586 SQ FT
EXISTING SHADE -
WALKWAY - 126 SO FT
STRUCTURE 2 PORCH - 149 SQ FT
AC PAD - 16 SQ FT
TRANSFORMER PAD - 16 SQ FT
POOL DECK - 808 SO FT
24�
POOL COPING - 112 SQ FT
POOL EQUIPMENT - 20 SQ FT
!7_=�_
SHADE
STRUCTURE I - 77 SQ FT
cr
NEW CONCRETE SHADE
STRUCTURE 2 - 180 SO FT
NEW PATIO COVER
TOTAL - 4759 SQ FT
LOT - 11745 SQ FT
IMPERVIOUS
COVERAGE-40.52%
W21,2025
log
PROPOSED:
BUILDING AREA - 2120 SQ FT
402 SO FT
GARAGE
FRAME BUILDING - 147 SQ FT
DRIVEWAY - 586 SQ FT
WALKWAY - 126 SO FT
ER
PORCH - 149 SO FT
< WATER
NEW ROCK FLOW
AC PAD - 16 SQ FT
WATERFALL TRANSFORMER PAD - 16 SQ FT
POOL DECK - 615 SQ FT
POOL COPING - 112 SQ FT
POOL EQUIPMENT- 20 SQ FT
EXISTING SHADE
SHADE
STRUCTURE
STRUCTURE I - 77 SQ FT LAJ
SHADE
STRUCTURE 2 - 180 SQ FT
'M
PROPOSED
PATIO COVER - 231 SQ FT
PROPOSED CONCRETE - 2 SQ FT
PROPOSED
ti CONCRETE BORDER - 22 SQ FT
TOTAL - 4821 SQ FT
-_tl i-, G ®r i -7. LOT - 11745 SO FT
IMPERVIOUS
I ol� SITE PLAN SCOPE OF WORK: SLPLR,11�2 PLUMSING.
SCALE VC'�O" 'L AND
NEW PATIO: NEW ROCK WATERFALL: Sill PLAN
1 -P
NEW 32 SO FT CONCRETE - NEW ROCK WATERFALL AT THE LOCATION OF THE SPA
F177
NEW 22 SQ FT CONCRETE BORDER
y=. et r� ,p
NOTE:
NEW PATIO COVER: S-10* vV`MNr U L
AO
NEW 231 SQ FT PATIO COVER 1. ALL CONSTRUCTION TO COMPLY WITH IRC 2021 & NEC 2020
(3) NEW 6"X6" CEDAR POSTS JI
(1) NEW FAN
(4) NEW RECESSED CAN LIGHTS
CEDAR TONGUE & GROOVE CEILING tK:2*_X,___M%Tx0 T_=!__L
------------------- ----- ------------------------------------------------------------------------
------ ------
24'-10"
EXISTING FENCE
NEW CONCRETE 9 BORDER EXISTING AC PAD
EXISTING EXISTING FRAME
GRASS BUILDING
EXISTING
DRIVEWAY
EXISTING
HOUSE
EXISTING
POOL
4'4"P EXISTING
POOL DECK
(3) NEW 6l CEDAR POSTS —
EXISTING
WALKWAY EXISTING NEW CONCRETE—C•
PORCH
TAIS EDGE OF EXISTING CONCRETE
OD
NEW ROCK WATERFALL
2,V
P N311 I'ME Ji, SfE a;
_ics'
J -2"
WATER FLOW
-'i 'j-
L-------------------------------- --------------- L___J__ ---___ -- -------------
PROPOSED FLOOR PLAN E FIE E A R-1
—z: t--AF� T ZZ,
�a 0 SCALE 1 F-V-G'
FAR
fill I
]
F--�� 7 7 7 7 7- 7, 7,------------------------------------------
I---— — — — — —
EXISTING FRAME
BUILDING ROOF
EXISTING SHADE
STRUCTURE 2
254,01,
NEW PATIO
COVER
EXISTING SHADE
STRUCTURE I
- - - - - - - - - - - - - - - - - - - - - - - - - - -
G
PROPOSED ROOF PLAN
Q SIALE O
0,11 11121,2025
CS a
c-,)
m 2
CD
ul-A A L ji IF-5, NO; RA-10
PROPOSED
ROOF
PLAN
A2
Z. L L 1 11 Giz'o MU`� PR401��O
NEW PATIO COVER
(3) NEW 6"X6"
CEDAR POSTS
NEW ROCK
WATERFALL
AT FOUNDATION
29'-11"
12
4E---_
V-7" 1 18'-811
f-oil
r1r,
CD CS ar
C.D
CD
-r-R, K
PROPOSED
-M o'—&-
ELEVATION
A3
m" iq
1--� ------------------------------------- I
EXISTING FRAME
BUILDING
EXISTING
HOUSE
ED
REMOVE THE EXISTING LIGHT R�M l -�BE RE:Cz! IlRi
AND RUN NEW LIGHTS FROM IT
(1) NEW TV
(1) NEW ELECTRIC OUTLET
HIGH ON WALL FOR TV
7!
(2) NEW SINGLE POLE SWITCHES z 1
11 0_1
(2 NEW FANS 41
(4) NEW RECESSED CAN LIGHTS
(2) NEW ELECTRIC —
OUTLETS IN SOFFIT
L— — — — — — — — — — — — -- — I- - — — — — — — — — —
<� oPROPOSED PARTIAL ELECTRICAL PLAN l
05,
a.
3�
z "JiYA �L �k' k K K�PJ 1IN 1 li,-Rc 11 5 �'kT
AL: CHA4(.' 0;
TBU
POWER LEGEND
CEILING FAN WITH LIGHT
W.J
Q)
6" RECESSED CAN LIGHT
C.D
a
2r
SINGLE POLE SWITCH
hd
ZE
110V DUPLEX OUTLET
NOTES:
A. ELECTRICAL INSTALLATION TO BE IN ACCORDANCE WITH THE NEC 2020
B. EXTERIOR RECEPTACLES TO BE GFCI AND WEATHER PROTECTED
[MCI
141
i I
i 1
f T BRACE DOWN TO
EXISTING STRUCT. TYP.
I I
I (
I CEDAR BEAM
1 , I
I I 12
x x S2
3 NEW
COLUMN '
l 4;' FOOTERS
NEW PATIO
F COVER
I EXISTING r r '^ j (1) 6"X12"
I ROOF ' CEDAR BEAM
(1) 6"X12"
I ft 4 j,Y J' CEDAR BEAM 1
1 % I
ALL ROOF RAFTERS TO
BE 2"XS" @16" O.C. TYP.
I (2) 2"X12° f^ I
I CEDAR BEAM
I I I
I I I
L..� .... m - - _. _ - - ,.., - - - �...... i- m . �......m Ctrm- _ . _ .m .m _ - �,..m _. , _ , _ �.......� ,,.. ,, � ... - m �.. .m .... _.- - Jill
f `� FOUNDATION, BEAM & ROOF FRAMING PLAN
STRUCT. LEGEND
T BRACE TO WALLS OR
BEAMS, OR DOUBLE JOIST,
C WHERE EXISTING JOIST
REINFORCE TO DOUBLE JOIST.
SEE DETAIL ON PAGE S2.
ROOF SHINGLES
1/2" COX SHEATHING
W/ 15# FELT
R60F RAFTER PER PLAN
METAL DRIP EDGE
1/2 TRIM
IX FASCIA SEE ELEV.
3/8' PLYWOOD SOFFIT
(2) SIMPSON 18" GAUGE
STRAPS ON BOTH SIDES
CEDAR POST
PER PLAN
ROT BARRIER SLEEVES
NEW SLAB
-4- CONCRETE
3000 PSI
io
2- (4) #3 BARS
TYPICAL SECTION
SCALE: NTS
X41
CEDAR POST
PER PLAN
(4) #3 BARS
COLUMN FOOTER PLAN
SCALE: WS
1-1/2- HOT DIPPED GALVANIZED
NAILS IN EVERY HOLE
ROOF RAFTER PER PLAN
LSIMPSON 18" GAUGE STRAP
-RIDGE BEAM PER PLAN
NEW BEAM
EXISTING DECORATIVE
BRICK/SIDING
EXISTING WALL��
BEAM
PER PLAN
-(2) SIMPSON 18" GAUGE
STRAPS ON BOTH SIDES
1-1/2' HOT DIPPED
GALVANIZED NAILS IN
EVERY HOLE
-POST PER PLAN
JJJ 3 NAILS ON
EACH SIDE
H1.81Z TIE
4 NAILS ON TOP PLATE
TOP PLATE
BEAM SITS ON TOP OF TOP PLATE
SCALE STS
SIMPSON H2,5 CLIP -
-ROOF RAFTER
PER PLAN
SIMPSON
H275 CLIP
BEAM
PER PLAN
ROOF RAFTER -
PER PLAN t BEAM PER PLAN
RAFTER TO RIDGE BEAM CONNECTION (DPOST TO BEAM CONNECTION RAFTER TO BEAM CONNECTION
SCALE NTS SCALE NTS (D SCALE NTS
r"'N
0 m 34 =Rc ;j
-LAY DOWN RAFTER ATTACHED TO
EXISTING RAFTERS WITH 2-1/4"X4"
LAG SCREWS OR 2-16D SCREW
SHANK NAILS AT EACH RAFTER.
NEW RAFTER
EXISTING ROOF RAFTER, ROOF
n�.=
DECK, FELT AND SHINGLES
GROOF TO ROOF TIE IN DETAIL
SCALE NI'S
-ALL SLABS SHALL BE REINFORCED
WITH #3 REBAR C 18" O.C. EACH WAY
#3 DEFORMED
REBAR Cll� 24" D.C.
NEW SLAB EXISTING SLAB
zz
SECTIONS,
DETAILS & NOTES
S2
NOTES:
A. ALL NAILS ARE SMOOTH -COMMON, BOX OR DEFORMED
SHANKS EXCEPT WHERE OTHERWISE STATED.
B. STAPLES ARE 16 GAGE WIRE AND HAVE A MINIMUM
7/16-INCH ON DIAMETER CROWN WIDTH.
C. NAILS SHALL BE SPACED AT NOT MORE THAN 6 INCHES OR
CENTER AT ALL SUPPORTS WHERE SPANS ARE 48 INCHES
OR GREATER.
D. FOUR-FOOT-BY-8-FOOT OR 4-FOOT-BY-9-FOOT PANELS SHALL
BE APPLIED VERTICALLY.
E. SPACING OF FASTENERS NOT INCLUDED IN THIS TABLE
SHALL BE BASED ON TABLE R602.3(1)
F. FOR REGIONS HAVING BASIC WIND SPEED OF 110 MPH OR
GREATER, 8O DEFORMED NAILS SHALL BE USED FOR
ATTACHING PLYWOOD AND STRUCTURAL PANEL ROOF
SHEATHING TO FRAMING WITHIN MINIMUM 48-INCHES
DISTANCE FROM GABLE END WALLS. IF MEAN ROOF
HEIGHT IS MORE THAN 25 FEET. UP TO 35 FEET MAXIMUM
G. FOR REGIONS HAVING BASIC WIND SPEED OF 100 MPH OR
LESS, NAILS FOR ATTACHING WOOD STRUCTURAL PANEL
ROOF SHEATHING TO GABLE END WALL FRAMING SHALL
BE SPACED 6INCHES ON CENTER WHEN BASIC WIND
SPEED IS GREATER THAN 100 MPH, NAILS FOR ATTACHING
PANEL ROOF SHEATHING TO INTERMEDIATE SUPPORTS
SHALL BE SPACED 6 INCHES ON CENTER FOR MINIMUM
48-INCHES DISTANCE FROM RIDGES, EAVES AND GABLE
END WALLS; AND 4 INCHES ON CENTER TO GABLE END
WALL FRAMING.
H. GYPSUM SHEATHING SHALL CONFORM TO ASTM C 79 AND
SHALL BE INSTALLED IN ACCORDANCE WITH GA 253.
FIBERBOARD SHEATHING SHALL CONFORM TO EITHER AHA
194.1 OR ASTM C 208
L SPACING OF FASTENERS ON FLOOR SHEATHING PANEL
EDGE APPLIES TO PANEL EDGES SUPPORTED BY
FRAMING MEMBERS AND AT ALL FLOOR PERIMETERS
ONLY. SPACING OF FASTENERS ON ROOF SHEATHING
PANEL EDGES APPLIES TO PANEL EDGES SUPPORTED BY
FRAMING MEMBERS AND AT ALL ROOF PLANE
PERIMETERS. BLOCKING OF ROOF OR FLOOR SHEATHING
PANEL EDGES PERPENDICULAR TO THE FRAMING
MEMBERS SHALL NOT BE REQUIRED EXCEPT AT
INTERSECTION OF ADJACENT ROOF PLANES. FLOOR AND
ROOF PERIMETER SHALL BE SUPPORTED BY FRAMING
MEMBERS OR SOLID BLOCKING.
WIND LOADS
115 MPH ULTIMATE WIND SPEED
RISK CATEGORY II
ALL CONSTRUCTION TO COMPLY WITH IRC 2021
J_ COMPOSITION SHINGLES TO BE INSTALL ON SLOPES
GREATER THAN OR EQUAL TO 2:12. FOR SLOPES LESS
THAN 4:12 USE DOUBLE LAYER FELT PER IRC R905.2.7.
2. LAG BOLTS CONNECTING LEDGER TO WALL SHALL BE
LOCATED 11/2" FROM TOP AND BOTTOM OF LEDGER.
BOLTS SHALL HAVE A 1/2" PRE -DRILLED HOLES. (2) ROWS
OF 1/2"X4-1/2" BOLTS TO STUDS AND/OR WALL TOP
PLATES WITH 16" MAX SPACING EACH ROW TYPICAL.
3. USE S.Y.P. #2 OR HIGHER GRADE.
GENERAL NOTES:
1. CLEAN HOLES WITH OIL FREE, MOISTURE FREE
COMPRESSED AIR.
2. HOLES AND DOWELS SHALL BE DRY AND FREE OF DUST,
DIRT, GREASE, OIL AND ANY OTHER FOREIGN
CONTAMINANTS.
3. ALLOW EPDXY TO HARDEN BEFORE PLACING CONCRETE.
4. PLACE BARS A MINIMUM OF 2" FROM EXPOSED
SURFACES.
5. USE #4 OR #5 DOWELS n 24" O.C.
6. HOLE DEPTH AND DIAMETER ARE AS PER THE EPDXY
MANUFACTURE'S RECOMMENDATIONS (OTHERWISE 6"
DEEP AND 1/4" LARGER THAN BAR DIAMETER).
€
W
c ar
W
CD
y,rc ae,rex<s s
¢TRUCV. ,TkAI�-
iAo7&& m
sE4 yaw
NOTES