FOUNDATION REPAIR (14 PIERS) PERMIT #: 25-003773
ELECTRONIC REVIEW
BUILDING PERMIT APPLICATION
(PLEASE PRINT LEGIBLY - COMPLETE ENTIRE FORM)
JOB ADDRESS: 3531 Marsh Lane
SUITE #
LOT: BLOCK: SUBDIVISION:
BUILDING CONTRACTOR (company name): Pinnacle Foundation Repair
CURRENT MAILING ADDRESS: 601 Dickey Rd
CITY/STATE/ZIP: Grand Prairie, TX 75051 PH: # 972-251-0018 Fax #
PROPERTY OWNER: Richard Rawlins
CURRENT MAILING ADDRESS: 3531 Marsh Ln
CITY/STATE/ZIP: Grapevine, TX 76051 PHONE NUMBER: 817-456-4487
PROJECT VALUE: $10540.80 FIRE SPRINKLERED? YES NO
WHAT TRADES WILL BE NEEDED? (Check ones that apply) ELECTRIC PLUMBING MECHANICAL
DESCRIPTION OF WORK TO BE DONE: Install 14 total pilings
USE OF BUILDING OR STRUCTURE: Residential
NAME OF BUSINESS: Pinnacle Foundation Repair
Total Square Footage under roof: 2830 Square Footage of alteration/addition: 300
❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings,
alterations and additions)
❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: (Not required for I & 2 family dwellings)
❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine, I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S).
PRINT NAME: Robby Brown SIGNATURE
PHONE #: 972-251-0018�EMAIL:
19 CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Type: V g � Permit Valuation: $ I Setbacks ( Approval to Issue
Occupanc % Group: R- 3 Fire Sprinkler: YES NO ( Front: I Electrical
Division: Building Depth: Left: I Plumbing,
Zoning: r�Z - lZ .15 Building Width: Rear: I Mechanical
Occupanc% Load: Grease Trap Right: � Hood
Plan Review Approval: �,_- Date: Building Permit Fee: 150.00
Site Plan Approval: Date: Plan Review Fee:
Fire Department: Date: Lot Drainage Fee:
Public Works Department: Date: Sewer Availability Rate:
Health Department: Date: I Water Availability Rate:
Approved for Permit: Date: Total Fees:
Lot Drainage Submitted: Approved: Total Amount Due: -I50.0o
P.O. BOX 95104, GRAPEVINE, TX 76099 (8M 410-3165 O:FORMSIDSPERMITAPPLICATIONS 1/02-Rev.11/04,5/06,2/07,11/09,4/11,2/19
City of Grapevine Building - Residential
PO Box 95104 Alteration
Grapevine, Texas 76099 T B A 3
817) 410-3166 Project # 25-003773
Project Description: Install 14 total pilings (ELECTRONIC
REVIEW]
Issued on:10115/2025 at 3:48 PM
ADDRESS INSPECTIONS 1
3531 Marsh Ln.
Grapevine, TX 76051
1. Building Final
LEGAL
INFORMATION FIELDS
Woodcrest Estates
'*APPLICANT NAME (Individual)
Robby Brown
Addition Blk i Lot 29
A 29
**APPLICANT PHONE NUMBER
9722510018
S220 1
APPLICANT E-MAIL
*03600920`
VALUATION
10540.80
PERMIT HOLDER
Square Footage
2830
Robby Brown
* CONSTRUCTION TYPE
VB
Pinnacle Foundation Rep
* OCCUPANCY GROUP
R-3
air
(972) 251-0018
DOCUMENTS - MISC 01
c Initial Report - 3531 Marsh Lane
9.30.25.pdf
COLLABORATORS
DOCUMENTS - MISC 02
BUILDING PERMIT APPLICATION 3.pdf
• Robby Brown
ZONING DISTRICT
R-12.5
Pinnacle Foundation
Repair
FEE
TOTAL PAID DUE
(972) 251-0018
Building Permit Fee, ($150.00
$ 150.00 $ 150.00 $ 150.00
OWNERS
Flat Fee) Simple Alteration
• Richard H Rawlins
TOTALS
$150.00 $ 150.00 $ 0.00
READ AND SIGN
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF
MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO
THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN
COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING
CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT
DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR
ORDINANCE OF THE CITY OF GRAPEVINE.
I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY AND THAT
THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING
SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL
AGENCY(S).
Page 112
MYGOV.US 25.003773, 10115,12025 at 3:46 PM Issued by: Courtney Cogbum
APPRovED PLANS SHALL Be ALL CHANGES REQ UIRE
KEPT ON J""TEATALLTIMEl
APPROVAL OF REVISED
PLANS
Adam A. Green, P.E. (M, MBA
CROSSTOWN
Austin I Dallas I Forc R'orrh I Fbustrm I San Antonio I Li'aco (469)751-7694
x
onei
mnv.Crosstrnm&igineeavg.com
sxucruxuwemmaxxlxox[a roxxoxnaxueramx
on
a 8
ao
� k
Date: September 30, 2025
F •
jFNf
�.
wmw»x
¢
n
Attention: Pinnacle Foundation Repair (via email) & Property Owner
o
y
800o
Subject: Pre -Foundation Repair Consultation Report
ID1142025355 48 PM
£;
Slab Foundation
BY'. KELLY TAFr TSBPE_ 1-3971
O
z
3531 Marsh lane, Grapevine, TX
RELENS
Gz Good Afternoon: ... CHANGES xusrxE nrwovEo.
Crosstown Engineering (CE) was retained to conduct a review of the limited foundation repair plan prepared by
Q e Pinnacle Foundation Repair (the contractor) to determine, in our opinion, if the recommended remediation plan is a
g o w reasonable plan of repair based on the relative elevation map provided.
The contractor provided a limited repair plan that included the pier locations and pre -lift elevations for the structure
o for our review. No other information was provided regarding prior engineering reports, recommendations for foun-
Elation repairs or construction documents relative to this structure. If existing piers are shown in the limited repair
plan, their locations were provided by the client and are approximated. We do not certify their performance or ex-
istence. If the reader would like to determine if they me present, they must contact the owner or contractor to ob-
tain an engineering certificate for them. CE has not performed a visual inspection of the structure.
The slab -on -grade foundation has settled towards the areas where piers are located on the limited repair plan and
physical damage is present which indicates a need for remedial measures according to the contractor.
Pinnacle Foundation Repair has recommended perforating the following in the approximate locations of the stiuc-
tme as indicated on the limited repair plan:
• Install 14 total pilings (6 exterior, 8 breakouts).
• Add 1 angle iron.
The foundation repairs are to meet or exceed the 2021 IRC. Upon review of the elevation drawing and based on the
contractor's evaluation of the property, we believe the proposed limited repair plan to be a reasonable and limited
repair.
Exoecwtions and Additional Reco n ndations:
This report provides our reasonable professional opinion of the condition of the foundation on the date of the in-
spection by the contractor and is based on the data provided to us and does not take into consideration any changes
in the condition of the foundation or soils after that date. The contents of this report supersede any verbal com-
ments made regarding the structure before, during or after the inspection. Although document review is an integral
part of the foundation repair process, we recommend obtaining a visual inspection by a licensed engineer. CE can
complete this visual inspection for an additional fee.
This limited repair plan is intended to provide a reasonable repair to improve the performance of the foundation and
is not intended to level the foundation. The contractor shall determine the amount of elevation correction needed
based on the reaction of the structure during the lift in order to minimize damages and additional stress.
Because the structure has endured pre -repair foundation differential movement, residual differential elevation and
perceptible floor slope or other noticeable issues may remain following the foundation repairs. Damage to the struc-
ture may arise during the foundation repair installation activities.
PROVIDE SIGNED AND SEALED LETT�
REGISTERED ENGINEER CONFIRMIN 6 of 5 - Date: 9/30/2025
INSPECTION AND APPROVAL OF PIER
INSTALLATION WHEN WORK IS COMPLETE
Adam A. Green, P.E. UX), MBA
CROSSTOWN.Susan, Dallas, Fore R'orrh I trouston I San Antonio, Waco (469)751_7694
The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture content
fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls will surface due to
seasonal movement within the soils, even after foundation repair. Periodic repair of this type of cracking may be
needed.
A foundation and yard watering and foundation maintenance program will help control seasonal movement It is
important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the struc-
ture. In addition, tree and shrub removal or root barrier installations are advisable if trees or bushes are observed to
be close to the foundation. Tree roots can cause "heave" or settlement of the foundation where roots grow and ab-
sorb moisture over time when planted close to the foundation (tree mots extend approximately as far or further than
tree limbs).
Maintaining the soils around the structure to slope away from the foundation to prevent excessive ponding near the
foundation in areas that are not already sloping away will help prevent future foundation movement. We recom-
mend that a full gutter system with gutter extensions be maintained to discharge a minimum of 4 feet from the
foundation (not in landscaped flower beds or any other location that will trap water near the foundation). Ponding
near the foundation can cause "heaving" (upward movement of the foundation), settlement of the foundation due to
overly saturated clays soil or erosion of soil embedment around the foundation.
If the owner, at any time, observes standing water near the foundation, we recommend that they consult with an
engineer or a drainage contractor immediately.
We recommend pre -lift and post -lift plumbing tests be performed on the sewer and potable plumbing lines. All
leaks shall be repaired immediately.
Disclaimer:
We do not warrant the future performance of the subject foundation and the reader is urged to review the Disclosure
& Disclaimer for other limitations and standard recommendations. The limit of liability is limited to the fee paid
for this opinion. No further agreement shall be made, altered, or varied except by written instrument.
This report has been completed to document the repairs to be implemented by the contractor. Neither Crosstown
Engineering nor Adam Green, P.E., are responsible for liability to the owner or others for acts or omissions of the
contractor to carry out the repairs in accordance with their agreement or for the construction means, methods, tech-
niques, sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the
warranty of the work they performed in accordance with their agreement.
Please see the pier specifications and limited repair plan for more information.
Sincerely,e'�syyf
Crosstown Land Development Services
Texas Engineering Firm (F-15944) ��/ IIICCC/// ApgM A. 11 E .1 L
q� 1165970 cif
Adam Green, P.E., MBA t �siOEN
NAS�N=� '
Professional Engineer (TX #116597) 9/3025 xiciN
PROVIDE SIGNED AND SEALED LETTER
REGISTERED ENGINEER CONFIRMING SITE
INSPECTION AND APPROVAL OF PIER] P,
ge 2 of - Date: 9/30/2025
INSTALLATION WHEN WORK IS COMPLETE
an�o .moo. TMF ��a
ra14rz0254:0759 PM
BY. KELLv TA TSBPE-13 71
Adam A. Green, P.E. UXL MBA
CROSSTOWN.Bustin, Dallis, Fore IVANI I HovtANC San Antonio, Waco 1469, 751.7694
DISCLOSURE & DISCLAIMER
It is known Be knowledgeable professional engineers that the soils in this area are subject to movement due to expansion, con-
traction or densificafion of the soils etc. This soil movement could possibly cause the foundation to move after the remediation
plan within the attached report has been implemented and may impact the stability of the foundation and cause damage.
NO WARRANTY IS EXPRESSED OR IMPLIED BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUN-
DATION OR THE REPAIRS THERETO. Diligent foundation maintenance to maintain consistent soil conditions along the
perimeter should reduce further problems after the recommendations within this report have been implemented. However, sea-
sonal moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger
of bother damage.
REPORT LIMITATIONS
This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the property or
an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current conditions observed
at the time of the inspection. THERE IS NO WARRANTY, EXPRESSED OR IMPLIED, CONCERNING THIS ENGI-
NEERING REPORT.
The information in this report supersedes any verbal comments, expressed or implied, made by Crosstown Land Development
Services or its principals, agents or employees. The client agrees that neither CLDS nor its employees or owners will be re-
sponsible for:
1. Knowledge of the subsurface conditions without extensive geolechnical data obtained from onsite drilling and testing of the
recovered samples,
2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the client; and
3. Any other element such as joists or beams and other structural members that is boxed or otherwise not readily available to
CE for viewing, and releases CE from any liability attributable to such knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance of the twit -
BY at the time of this structural survey. Compliance with any code or specification other than as expressly noted is specifically
excluded.
The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and DOES NOT
RAPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN THE FUTURE.
This report was prepared expressly for the client and expressly for the purposes indicated by the client. Permission for use by
any other person for any purpose, or by the client for different purpose is denied unless otherwise stated in writing by CE.
CE SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIONS BY THE CONTRACTOR OR HIS SUBCONTRACTORS
PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE CONTRACTOR TO PERFORM THE WORK IN
ACCORDANCE WITH THE REPAIR PLAN. CE IS NOT RESPONSIBLE FOR THE CONSTRUCTION MEANS, METII-
ODS, TECHNIQUES, SEQUENCE OR PROCEDURES OR THE PRECAUTIONS INCIDENTAL THERETO.
CE expressly DISCLAIMS ANY WARRANTY OF FTfNESS FOR A PARTICULAR PURPOSE and the client expressly
disclaims that it has contracted for or received any warranty of fitness for a particular purpose with respect to this report. THE
REPORT UNDER THIS AGREEMENT IS THE OPINION OF CE AND THERE ARE NO WARRANTIES THAT EXTEND
BEYOND THE DESCRIPTION ON THE FACE OF THIS AGREEMENT.
CITY OF GREFEENE
SITE AT ALL HIMES
PROVIDE SIGNED AND SEALED LETTER
1 Oil 412o2540832 PM
BY KELLY TAFTTSBPE 1-3971
REGISTERED ENGINEER CONFIRMING SITE
INSPECTION AND APPROVAL OF PIER Page 3 Of 5 - ate: 9/30/2025
INSTALLATION WHEN WORK IS COMPLETE
A
a
J
U
w
7
Z
d
x
w
y
�Zom TRANSITION PIER SYSTEM
EXISTING GRADE LEVEL
GRADE BEAM
-� STEEL SHIMS INSTALLED
FOR PRECISE LEVELING
PRE CAST CONCRETE
CYLINDERS 6"X12"
CONCRETE CAP
PROVIDES GREATER
SURFACE AREA
PRE CAST CONCRETE
CYLINDERS 6"X12"
(PRESSED TO POINT OF REFUSAL)
STEEL CABLE ANCHOR
(PREVENTS HORIZONTAL DISPLACEMENTI
STEELTRANSTION PLATE
PROVIDE SIGNED AND SEALED LETTER
REGISTERED ENGINEER CONFIRMING SITE
INSPECTION AND APPROVAL OF PIER
INSTALLATION WHEN WORK IS COMPLETE
K 2 - 718"OUTER STEEL PIPE
2 - 3/8"INNER STEEL PIPE
FRICTION REDUCTION PLATE
DIDYAPPROBED LI-kNR TO BE KEPT DI
SIFLEATALLTIMES
19114/2025 4 08 44 PM
BY: KELLYTAFTTSBPE 1-3971
BUILD GIRUPECDONDIVISLAN
3531 &FXH (ff10 ED
GRAPEVINE, TX
/nl % A,
I/1 G 1/ POgM P. RI
9.30.25 ///�Ih�oT.S ceRSE
Transition Piers
L2�
M
1 r 1 rE
ostter
-oe
-1vV
oz
-0A
-0.5 -0 5
0.5
Bath
— 00
0.0 0
Adam A. Green, P.E. (1X), MBA
CROSSTOWNAustin I Dallas I FOR Werth I BOnftnn IS. AntmI I WHITES (469) 751-7694
nsucru.uawUsmm.I............cne. sE,vV,.(SnsxRFVRE.gineerin,,.
Legend
Angle Iron Added to Piling Exterior Concrete Breakout
Interior Garege Concrete Breakout ! Steel Transdon Pilings
DEFY OF G�PEVINE
THI C PAGE RELEASED FOR CON STRUCTION
CONFLOT SETH THE BUILDING CODE AD MINING
ORDINANCE
SHE AT ALL TIMES.
10/14/2025 4 08 51 PM
BY KEUY TAFT TSBPB 1-3971
EEARMUENTS OR PUBLIC IGHT43FIVEN
ALL CHANGES MAST BE APPROVED
0.1 0.0
D.3
�0.2 _0.7 -0.1
��JIIIIIIII-0.3�IIpII -0.1 -02
0.1 II 0.1 -0.3 --= -- 0.2
rl
1.2 1.1
Garage
-62.1 Imo__ 1.3
r 1.q u o I L— EP
o.z
0.8
— -o.s
21.3
0.1
-0.2 Kitchen
-0.3
0.0
® OS 2.7
0.4
1.]18 3.005 2.9
I
PROVIE E SIGNED AND SEALED LETTER
REGIS-FERED ENGINEER CONFIRMING SITE
INSPECTION AND APPROVAL OF PIER
3531 MARSH LANE,
INSTALLATION WHEN WORK IS COMPLETE
GRAPEVINE, TX
PLEASE NOTE:
THIS DRAWING IS PROVIDED FOR PRELIMINARY PERMUTING PURPOSES ONLY AND IS A DMITED PLAN OF
SE OF E
REPAIR. ADDITIONAL WORK MAY BE NEEDED ONCE THE FOUNDATION WORK HAS BEGUN BASED ON THE
PERFORMANCE OF THIS LIMBED PLAN OF REPAIR. CROSSTOWN ENGINEERING HAS PROVIDED REVIEW OF
THIS LIMITED PLAN OF REPAIR AND IT IS OUR OPINION THAT IT IS REASONABLE AND SAFE FORTHESTRUCTURE.
/ILL - K---"""eRf
GRI
IF INTERIOR PIERS ARE SHOWN ON THIS DRAWING THE CONTRACTOR WILL PEACE THEM BASED
LOCATIONS OF GRADE BEAMS, PLUMBING LINES AND POST TENSION CABLES, THEREFORE, THE LOCATIONS
9r 116597
SHOWN ON THIS MAP ARE APPROXIMATE. THE CONTRACTOR SHALL PROVIDE THE MEANS -AND METHODS OF
9.30.25 'C"-41.EN�{E
THIS INSTALLATION. ADDQIONAL REPAIRS MAY BE REQUIRED UPON REVIEW OF THE STRUCTURE BY`f3%pfj��f
CROSSTOWN ENGINEERING.
Crosstown Engineering
THIS IS A PROPOSED SCOPE OF WORK AND HAS NOT BEEN COMPLETED THEREFORE WE DO NOT CERTIFY ANY
Texas Engineering Firm(F-15944)
EXISTING OR PROPOSED FOUNDATION REPAIR WORK ON THIS MAP AT THIS TIME.
IF THE READER WOULD HKE TO BE CERTAIN THAT ANY PROPOSED OR EXISTING REPAIRS HAVE BEEN
6119 Greenville Ave, Ste 320
COMPLETED, THEY MUST REQUEST AN ENGINEERING CERTIFICATE FOR THE SUMEET FOUNDAION WORK
Dallas, TX 75206
FROM THE FOUNDATON REPAIR COMPANY.