Loading...
HomeMy WebLinkAboutPMISC2026-000399Texas Commission on Environmental Quality BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT:::',: -The EqLl form must be for each assemW1'wtedL A sb�,wd and da,ted ori inal must be submj!,ed to the ptNiew s'uj�j"*f for re_�kCq�'n_ • # Repairs and Materials Used" T T ype J1 Pressure Princis ple Assembly (RPBA) Asembly....� TICVA 19 Check I 2nd Check*** ME 1 ing, Opened at,�psid Held at (Yes 1111 /No 10� 10 psid p id Did not open Did not Did it fully open Lzaked open 101 at!--j jHel d at! M at L_Jpsid Held at ipsid