Loading...
HomeMy WebLinkAbout11-20-2025 - Revisions 02 response to City comments 11-18-2025Revision 02 Response to City Comments 3555 N 4N' 58th Stref t .Sate 700MV 17 i Aal Oklahorna Oty OK 73112 b4 ,.4 1 40� 848 9549, F 405 848 9783 inccom Project: Hotel VIN Expansion - Grapevine, TX Project No.: 241960 I I !I IIIRI I I I I li I 11� I 1! 11 1! 1 1! 11 1 1 111 1 ELIM-41"IMM-N&IROM 2. Coordinate Site Plan/Elevations with approved CUP and Civil documents prior to resubmittal. Any changes that occur in the civil document review process must be updated in this drawing set and be approved by Planning Services per CU2025-32. 3. Pool/Spa, Signs, Fences, and Irrigation by separate permit and plan submittal. Trades (i.e. Interior Design & Food Services) require a separate permit and pay their own fees. Design Team Rest)onse: Noted. CM & Owner to coordinate signage for signage permit. WIN 6. Sheet GO.04 - Revise the International Energy Conservation Code (IECC) year to 2015 to match City of Grapevine standards. IIIIIIIIIII i 5�11 - �11 Desicin Team Response: Elevator Lobby is a transient space & considere,# circulation. No occupancy load in the Elevator Lobby. 8. Sheet GO.05 -Revise Prefunction (RM#110) occupant load factor to 1/7 NET overall & 1/15 NET in seating areas. 2!�s�n Team Response: The seating area in the Prefunction space has been recalculated at the requested 1/15 NET occupancy load. The space surrounding the seating area is considered circulation space for egress, therefore it has no occupancy load. Egress in this area has been recalculated accordingly. *j. Sheet GO.05, GO.06, & GO.08 - Provide the occupant load of the Event Lawn for egress reference purposes. 1111011il Desian Team Response: As requested, Event Lawn occupant load has been broken out in the egress plans. Egress calculations have been updated accordingly. Design Team Response: WDC — "Blank sheets have been removed from the plan set." Desicin Team Response: Noted. CM & Owner to coordinate signage for signage permit. 14. Sheet MO.00 - All condensate drain lines shall be routed to the sanitary sewer through an indirect waste connection. Qgaign Team Response: Henderson — "See response in the plumbing section below. All condensate routing is shown in Plumbing sheets." 15. Sheet M9.01, M9.02, & M9.03 - Provide signed & sealed engineered designs for hood system. Desicin Team Response: Henderson — "Hood drawings designed by others and included in the mechanical package for reference only. Removed from sheet set." 16. Sheet P2.02A, P2.02B, P2.06, P401, & P5,02 - Route all condensate discharge to the sanitary sewer through an indirect waste connection. Desicin Team Response: Henderson — "Condensate on Roof is revised to discharge indirectly to sanitary. Refer to view 5 on Sheets P2.0113, P5.01 ant! P5.02. Condensate on Level 6 routes down to Level I indirectly to sanitary." 17. Sheet P3.01 A, P3.0113, P3.02A, P3.02B, P3.03, P3.04, P3.05, P3.06 - Provide RP backflow protection at all water filters. Desiqn Team Response: Henderson — "Backflow preventer revised to RPZ." 1111!11�1;l III,• pIll• drip 2esign Team Response: Henderson — "Revised floor sink to connect to grease waste." 1!!1l!11 1 11 11 1 mil .III !III � ii i,i � I; � i I offoRMENISTM �M*L . M M a TOMMOTOT-TO IN ITF-WroriffeSTAT-Myr-TrOW1111151 in 0 All additions and alterations must comply with the 2021 International Fire Code (IFC) and locally adopted amendments. Design Team Response: Noted. No addition or alteration scope in this project. This project is named "VIN Expansion", however this is new construction; not an addition. I I MEM=* o Items that can self -ignite (e.g., oily rags) must be stored in approved disposal containers. o Temporary wiring during construction, alterations, or demolition must comply with NFPA 70 (National Electrical Code). • Hydrants must be located along fire lanes, spaced no more than 300 ft apart. • FDCs must be within 100 feet of a hydrant, on the same side of the fire lane if possible, and clearly labeled with the area served. • Ensure a 150-foot hose lay requirement for all building sections. • Fire lanes and water supplies (hydrants) must be operational before vertical construction above the foundation begins. Design Team Response: Kimley-Horn — "Fire hydrants will be operational before vertical construction. Fire lane, hydrants and FDC meet all requirements noted, see sheet SP-1 of Hotel in Reserve construction drawings for verification." 6. Fire Extinguisher Requirements * Fire extinguishers must be installed so travel distance does not exceed 75 ft. * Mount extinguishers along paths of egress per NFPA 10. * Minimum rating: 2AAOBC, Design Team Response: Fire extinguishers are located to comply. Refer to egress plans for locations. 7. Fire Sprinkler System • All sprinkler work must be completed by a state -licensed contractor. • Submit sprinkler plans to a Fire Department -approved third -party reviewer. Design Team Response: Noted. CM to provide fire sprinkler drawings for permit. 8. Fire Alarm System • Fire alarm plans to be reviewed by a Fire Department -approved third -party reviewer. • Acceptance testing must be completed prior to occupancy. Design Team Response: Noted. Refer to fire protection plans included in the permit set. CM to provide fire alarm drawings for permit. 9. Knox Box Access * Knox products required for building and gate access. * Provide keys/key cards for all building access points in Knox Boxes. c, Use Knox padlocks for construction gates. * Install exterior Knox Boxes at the main building entrance and riser room. * Automatic gates must include Knox control switch with manual override. * Install Knox Boxes at eye level (5-6 feet) and confirm locations with the Fire Marshal, 4 0 Knox caps required for all FDCs. Design Team Response: Noted. CM to coordinate locations & scope with Fire Marshal. IO.Access Control Requirements (if applicable) * Access control systems must allow free egress at all times. * Must comply with 2021 IFC and NFPA 101. * Egress doors with electronic locks must unlock on fire alarm or sprinkler activation, or during power loss. * Manual release devices must be labeled and mounted 40-48 inches above the floor, within 5 feet of the door. * Submit third -party -reviewed plans from an approved engineering firm. * A Permit for Access Control is required before installation. Design Team Response: Door openings in path of egress apply with all of the above. 11. Electric Vehicle Charging Stations (if applicable) o Knox Remote Power Boxes required, located 30-50 feet from charging stations in clear sight. Desi n Team Response: Refer to Sheet A0.01 12. Fire Lane Requirements • Minimum vertical clearance: 14 feet. • Fire lanes must be concrete and support 85,000 pounds. • Turning radii: 30 feet inside, 50 feet outside. • Fire lanes must be in place before vertical construction begins. Design Team Response: Kimley-Horn - "Fire lane meets all requirements noted, see sheet SP-1 of Hotel VIN Reserve construction drawings for verification." 13. Emergency Radio Coverage • Provide full two-way radio coverage for all floors, corridors, stairwells, public areas, and roof. • Submit design documentation showing coverage and required equipment(boosters/DAS). • Testing must demonstrate compliance and be approved by the Fire Department prior to occupancy. Design Team Response: Henderson - "This system to be provided by the Low Voltage vendor." 5