HomeMy WebLinkAboutPLIRR2024-001746 (3)Bailey's Landscape Management, Inc.
145 Desiree Lane
MgMand Village, TX 70577
U# 3665
Irl-igation Final Inspection Sigri Off
Installation !':iarrl;yebon Date�
Irrigation Cuniractor: Inn
InstaRation a('Oresv I-Losk
The hADWinCI 1'eMS boen proOdeo mid coxplakc..,d tc,, it,)c- systen) cyvvner, (If "he
currant c,'wner is tho, buildi'r tie oi, res�)onsible for passim, 'formaluorl On to flow
this it
whe'n Sold
1, The rna!MZA tit' Controiler,
2, .4 seasona� viatenng', schcd0e,
3. A list ,,s! cw-nponerlts that InapHenance and
maulenance
4, A t.ntffT11I W! 0, [1' AM Muted to W contwhf-'cr indicatmq tme warranty period for the
Agahon syskrn argi instaker contam infornialroft.
instaflod� design 0ans Andicating the dct"ua� in6tallation and
C,(r-)?,y I p rA I r Its of t I Ic,' S y 's te' t I' $ .
6 The WaUan and upt�ration the isolation vac v#?
doll-RiaHon Ovvnor RepresenU&ve i Date
t!"N(Al"p-S into).
This Agascm systm vas Wn inmakd W auvrdamR BY at axkcable stale and 10cal laws,
ordinances. rulv,, and or orders, ! te�tod ths, system and dplanimed that A has
bean WaHed accor6ng to We urtakon plai Wall for tht, nw-,t i'ftcient
%vi. ,,er at !'Ns tirrw
44Z,�—j, OF
DAM 9 BAWSY
6,1 3665
-TAN, I
�
9753170506 7�0
Iq -2-Lf
Datf.'.r
baileys, land scape@venzon, net