Loading...
HomeMy WebLinkAboutCOMA2025-003185COMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Information Energy Code: Project Tide: Location: Climate Zone: Project Type: Performance Sim. Specs: Construction Site Building Area 1-Office : Nonresidential Envelope Assemblies Assembly 90.1 (2013) Standard 121 Commerce Center Remote Restroom Grapevine, Texas 3a Addition EnergyPlus 8.1.0.009 (EPW: USA_ TX_ Fort.Worth- Allia nce.AP.722594_TMY3.epw) Owner/Agent: Roof: Attic Roof, Steel Joists, [Bldg Use 1- Office] Floor: Unheated Slab -On -Grade, [Bldg. Use 1- Office] (b) Designer/Contractor. Floor Area 106 Gross Area Cavity Cont. Proposed BudgetU- or R-Value R-Value U-Factor Factor„ Perimeter 106 150 240 0026 0027 42 — — 0730 07W NORTH NORTH INT. WALL 12'-0"H: Steel -Framed, 16in. o.c, [Bldg. Use 137 150 00 0118 0OH 1- Office] EAST EAST INT. WALL 12'-0"H: Steel -Framed, Thin. o c , [Bldg. Use 1 111 150 00 0118 0 OH - Office] SOUTH SOUTH EXT. WALL - LOWER 12'-0". Solid Concrete, gin. 137 150 240 0032 0123 Thickness, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] WE WEST INT. WALL 12'-0"H: Steel -Framed, 16in. o.c, [Bldg. Use 1 111 150 00 0118 0077 - Office] Door. Insulated Metal, Swinging, [Bldg. Use 1 - Office] 24 0500 07M (a) Budget 1-1-factors are used for software baseline calculations ONLY, and are not code requirements. (b) Slab -On -Grade proposed and budget U-factors shown in table are F-factors Envelope Compliance Statement Compliance Statement The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 1 of 12 Digitally signed by Tim Tim Flemin DateFlem: 2g 9 Date:2025.0].21 ,n,,:ag-05•aor Name .-TiNe Signature Date Project Title: 121 Commerce Center Remote Restmom Report date: 07/18/25 Data filename: Page 2 of 12 COMcheck Software Version COMcheckWeb V Interior Lighting Compliance Certificate Project Information Energy Code Project Title: Project Type: Construction Site 90.1 (2013) Standard 121 Commerce Center Remote Restroom Addition Allowed Interior Lighting Power Owner/Agent: Proposed Interior Lighting Power Designer/Contractor: Project Title: 121 Commerce Center Remote Restroom Report date: 07/13/25 Data filename: Page 3 of 12 COMcheck Software Version COMcheckWeb Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: EAerior Lighting Zone Construction Site 90.1 (2013) Standard 121 Commerce Center Remote Restroom Addition 0 (Unspecified) Owner/Agent: Allowed Exterior Lighting Power DesignenContractor: A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts / Wattage (B X C) Total Tradable Waft (a)= 0 Total Albwed Waft = 0 Total Allowed Supplemental Watts (b) = 500 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces (b) A supplemental allowance equal to 500 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power io..,uru,. G.Iu l urr,.w a.uw da—n.iu'u,. au..a wiBa.Lle. uLa ..J Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 4 of 12 COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site Mechanical Systems List Quantity System Type & Description 90.1 (2013) Standard 121 Commerce Center Remote Restroom Grapevine, Texas 3a Addition Omer/Agent: Mechanical Compliance Statement Designer/Contractor: Compbance Statement The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name- Title Signature Date Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 5 of 12 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 90.1 (2013) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. #I Plan Review I complies? I Comments/Assumptions 4.2.2, Plans and/or specifications provide all,OComplies 5A.3.1.1, information with which compliance Dunes Not 5.7 can he determined for the building FlNot Observable [PR1T envelope and document where ONot Applicable exceptions to the standard are claimed. 422, Plans, specifications, and/or OComplies 8.4.1.1 calculations provide all information ElDoes Not 8.4.1.2: with which compliance can be ONot Observable SJ determined for the electrical systems ONot Applicable and equipment and document where exceptions are claimed Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Additional Comments/Assumptions: 11I Hiqh Impact (Ter 1) 1 2 1Medium Impact (Ter 2) Yjtow Impact (Tier 3) 1 Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 6 of 12 6 Req.ID Footing / Foundation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 4.2.4 Installed below -grade wall R- R- (]Complies See the Envelope Assemblies [FOl]' insulation type and R-value ❑Does Not table for values consistent wth insulation ❑Not Observable specifications reported in plans ❑Not Applicable and COMcheck reports. 4.2.4 Installed slab -on -grade insulation R-R- OComplies See me Envelope Asremblies [F031' type and R-value consistent with j] Unheated ❑ Unheated ❑Does Not table for values insulation specifications reported Heated O Heated ONot Observable in plans and COMcheck reports. ❑Not Applicable 5.8.1.2 Slab edge insulation installed per ucomplies IF0412 manufacturer's instructions. Does Not ❑Not Observable ❑Not Applicable 5.5.3.5 Slab edge insulation ft ft OComplies See me Envelope Asemblles [1`051' depthAength. ODoes Not table for values ❑Not Observable ONot Applicable 5.8.1.7 Exterior insulation protected ucomplies [F061r against damage, sunlight, LIDoes Not moisture, wind, landscaping and ❑Not Observable equipment maintenance ❑Not Applicable activities. 5.8.1.7.3 Insulation in contact with the OComplies [FO]jr ground has <=0.3% water LID. Not absorption rate per AS NI C2]2 []Not Observable ❑Not Applicable 6.4.4.1.5 Bottom surface of floor structures R- R- OComplies See Me Envelope Assemblies [F011]' incorporating radiant heating ODoes Not table for values insulated to >=R-3.5. ❑Not Observable ONot Applicable Additional Comments/Assumptions: I High Impact (Ter 1) 12 1Medium Impact (Tier 2) 3 1Low Impact (Tier 3) 1 Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 7 of 12 tf Framing / Rough -In Inspectio 6 Req.ID 5.4.3.2 Factory -built and site -assembled [FRlla fenestration and doors are labeled or certified as meeting a leakage requirements 5.5.4.3a Vertical fenestration U-Factor. [FR8p Plans Verified I Field Verified Complies? Comments/Assumptions Value Value U- 5.5.4.3b Skylight fenestration U-Factor. U= [FR9p U- U- 5.5.4.4.1 Vertical fenestration SHGC value. SHGC: SHGC: [FR1011 5.5A.42 Skylight SHGC value. SHGC: SHGC: H R1111 5.8.2.1, I Fenestration products rated (U- 5.8.2.3, factor, SHGC, and W) in 5.8.2.4, accordance with NFRC or energy 5.8.2.5 code defaults are used. IFR1212 5.8.2.2 Fenestration and door products HT1311 are labeled, or a signed and dated certificate listing the U- factor, SHGC, W, and au leakage rate has been provided by the manufacturer. -- LIDoes Not ❑Not Observable ❑Not Applicable ]Complies See the Envelope Assemblies ❑Does Not table forvalues. ]Not Observable ]Not Applicable (]Complies See the Eevelape Assemblies (]Does Not table for value, ]Not Observable ]Not Applicable (]Complies See the EnvelopeA nrbliess ]Does Not table forvalues. ]Not Observable ]Not Applicable (]Complies See the Eevelape Assemblies (]Does Not table for value, ]Not Observa ble ]Not Applicable ]Complies ]Does Not ]Not Observable ]Not Applicable ,able -able 5.5.3.6 U-factor of opaque doors U- U- LIComplies See the Envelope Assemblies [FR1412 associated with the building Swinging ❑ Swinging ❑Does Not tableforvalue,, thermal envelope meets Nonswmging ❑ Nonswinging ]Not Observable requirements. , ❑Not Applicable 5.43.1 Continuous air barrier is LIComplies [FR1511 wrapped, sealed, caulked, ❑Does Not gasketed, and/ortaped in an ❑Not Observable Emu approved manner, except in ONot Applicable semiheated spaces in climate zones 1-6. Additional Comments/Assumptions: I High Impact (Ter 1) 12 1Medium Impact (Tier 2) 3 1Low Impact (Tier 3) 1 Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 8 of 12 Rough -In Electrical Inspection I Complies? I Comments/Assumptions 8.4.2 At least 50%of all 125 volt 15- and LlComplies [EL10]2 20-Amp receptacles are controlled by ODoes Not an automatic control device. ❑Not Observable ONot Applicable Additional Commends/Assumptions: 11I High Impact (Ter 1) 1 2 1Medium Impact (Tier 2) 3 1Low Impact (Tier 3) 1 Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 9 of 12 Section 6 Req.ID 4.2.4 UN2]' 5.8A.2, 5.8.1.3 [IN3]' 4.2.4 Imp Insulation Inspection Plans Verified Field Verified Complies? Comments/Assumptions Value Value Installed roof insulation type and R- R- OComplies See the Envelope Assemblies R-value consistent with insulation O Above deck ❑ Above deck ❑Does Not table for value, specifications reported in plans O Metal ❑ Metal ❑Not Observable and COMcheck reports. For some ceiling systems, verification may O Attic ❑ Attic ❑Not Applicable need to occur during Framing Inspection. Roof insulation installed per Complies manufacturer's ins[mchars. ❑Does Not Blown or poured loose -fill ❑Not Observable', insulation is installed only where ❑Not Applicable, the ceiling slope is<=3'12. Installed above -grade wall R- R- OComplies Seethe Envelgre Assemblies insulation type and R-value O Mass ,❑ Mass ❑Does Not table for values consistent oath insulation O Metal O Metal ❑Not Observable specifications reported in plans and COMcherk reports. El Steel , Q Steel ­� ❑Not Applicable El Wood I Wood I 5.8.1.2 Above -grade wall insulation uComplies IINM]' installed per manufacturer's Does Not, instructions. '.ONot Observable ❑Not Applicable. 4.2.4 Installed floor insulation type and R- R- IOComplies Seethe Envelope Assembles IIN81e R-value consistent with insulation O Mass, O Mass I]Does Not table her values specifications reported in plans O Steel O Steel ONot Observable and COMcheck reports. ❑ Wood I❑ Wood ❑Not Applicable , 5.8.1.1 Building envelope insulation is UComplies IIN10]' labeled with R-value or insulation ❑Does Not certificate has been provided []Not Observable fisting R-value and other relevant []Not Applicable data. 5.8.1.9 Building envelope insulation (]Complies IIN18]' extends over the full area of the ❑Does Not component at the proposed rated ❑Not Observable R or U value. ❑Not Applicable 5.8.1.4 Eaves are baffled to deflect air to (]Complies [INll]' above the insulation. ❑Does Not ❑Not Observable ❑Not Applicable 5.8.1.5 Insulation is installed in (]Complies IIN12]2 substantial contact with the ❑Does Not inside surface separating ❑Not Observable conditioned space from ❑Not Applicable unconditional space. 5.8.1.6 Recessed equipment installed in OComplies HN13]2 building envelope assemblies ❑Does Not does not compress the adjacent ❑Not Observable insulation. ❑Not Applicable 5.8.1.7.1 Attics and mechanical rooms OComplies [IN15]' have insulation protected where ❑Does Not adjacent to attic or equipment []Not Observable access. .(]Not Applicable 11 High Impact (Ter 1) 12 1Medium Impact (Tier 2) 3 1Low Impact (Tier 3) 1 Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 10 of 12 Plans Verified Field Verified n# .^ Insulation Inspection Value Value Complies? Commentr/Assumptions 5.8.1.7.2 Foundation vents do not interfere []complies HN161' with insulation. j[]Does Not 5.8.1.8 Insulation intended to meet the )L lcomplies pNll]= roof insulation requirements +[]Does Not cannot be installed on top of a suspended ceiling. Mark this )[]Not Obsei requirement compliant if ;[]Not Appli, I insulation is installed accordingly Additional Comments/Assumptions: I High Impact (Ter 1) 12 1Medium Impact (Tier 2) 3 1Low Impact (Tier 3) 1 Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 11 of 12 Final inspection I Complies? I Comments/Assumptions 5.4.33 Weatherseals installed on all loading LJComplies [Fill' dock cargo doors in Climate Zones 4- ❑Does Not 8. ❑Not Observable LJNot Applicable Additional Comments/Assumptions: 11I High Impact (Ter 1) 1 2 1Medium Impact (Tier 2) 3 1Low Impact (Tier 3) 1 Project Title: 121 Commerce Center Remote Restroom Report date: 07/18/25 Data filename: Page 12 of 12 COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Information Energy Code: 90.1 (2013) Standard Project Title: GTIS Grapevine Addition Project Type: Addition Construction Site Owner/Agent: Designer/Contractor: 1800 State Highway 121, Suite 101 Texas Sutton Engineering, LLC. Grapevine, Texas 76051 5600 Tennyson Parkway Suite 240 Plano, Texas 75075 214-763-7300 thuy@sut oaengineering Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts / ft2 Watts 1-Common Space Types:Restroans 79 0.98 ]] Total Allowed Watts = ]] Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. 1-Common Snare Tvnes: Restrooms LED: A/AE. Other: 1 2 19 38 Total Proposed Watts = 38 Interior Lighting PASSES: Design 51% better than code Interior Lighting Compliance Statement Compliance Statement The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application The proposed interior lighting systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. THIEN HUY - ELECTRICAL ENGINEER 06/30/2025 Name - rite Signature Date Project Title: GTIS Grapevine Addition Report date: 06/30/25 Data filename: Page 1 of 4 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 90.1 (2013) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. #I Plan Review I Complies? 4.2.2, Plans, specifications, and/or,OComplies 8.4.1.1, calculations provide all information Dunes Not 8.4.1.2, with which compliance can be Not Observable 8J determined for the. electrical systems ONot Applicable [PR61' and equipment and document where , exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%.. 4.2.2, Plans, specifications, and/or ElComplies 9.4.3. 93 calculations provide all information Dunes Not [PR41- with which compliance can be FlNot Observable determined for the interim lighting Not Applicable, and electrical systems and equipment and document where exceptions to, the standard are claimed. Information provided should include interim lighting power calculations, wattage or bulbs and ballasts, transformers and control devices. Additional Comments/Assumptions: Comments/Assumptions Requirement will be met. 11I Hiqh Impact (Ter 1) 1 2 1Medium Impact (Tier 2) Project Title: GTIS Grapevine Addition Data filename: 'Yltow Impact (Tier 3) 1 Report date: 06/30/25 Page 2 of 4 # 6 Req.ID Rough -In Electrical inspection Complies? 8.4.2 At least 50%of all 125 volt 15- and OComplies [EL10]' 20-Amp receptacles are controlled by ODoeS Not an automatic control device. 'ONot Observable ONotApplicable 9.4.1.1 .Automatic control requirements OComplies [EUJ] prescribed in Table 9.6.1, for the ODoes Not appropriate space type, are installed. ONot Observable Mandatory lighting controls (labeled ONot Applicable as'REQ') and optional choice controls (labeled as'ADDI' and'ADDT) are implemented. 9.4.1.1 Independent lighting controls installed OComplies [EL2]' per approved lighting plans and all Oboes Not manual controls readily accessible and ONot Observable visible to occupants. ONot Applicable 9.4.1.2 Parking garage lighting is equipped OComplies HT11]2 with required lighting controls and ODoes Not daylight transition zone lighting. ONot Observable ONot Applicable 9.4.1.1f Daylight areas under skylights and OComplies [EL13]' roof monitors that have more than Oboes Not 150 W combined input pourer for Observable general lightingONot are controlled by e ONot Applicable photocontrols. pP 9.4.1.3 Separate lighting control devices for OComplies [EL411 specific uses installed per approved ODOas Not lighting plans. ON tOr bl 9.6.2 Additional interior lighting power [EL8]- allowed for special functions per the approved lighting plans and is automatically controlled and [separated from general lighting. Additional Comments/Assumptions: Comments/Assumptions Requirement will be met. Requirement will be met. Exception: Requirement does not apply. Exception: Requirement does not apply. Requirement will be met. o Se. e, ONot Applicable OComplies (Requirement will be met. ODoes Not ONot Observable ONot Applicable I High Impact (Ter 1) 1 2 1Medium Impact (Tier 2) 3 1Low Impact (Tier 3) 1 Project Title: GTIS Grapevine Addition Report date: 06/30/25 Data filename: Page 3 of 4 if 6 Reg. to I Final inspection Complies? 8.7.1 Furnished as -built drawings for OComplies [FI16p electric power systems within 30 days ODoes Not of system acceptance. ONot Observable ONot Applicable 8.7.2 Furnished O&M instructions for OComplies [1`I171' systems and equipment to the ODoes Not building owner or designated ONot Observable representative. ONot Applicable 9.2.2.3 Interior installed lamp and fixture OComplies [F]181' lighting power is consistent with what ODoes Not is shown on the approved lighting ONot Observable plans, demonstrating proposed watts ONot Applicable are less than or equal to allowed watts. Additional Comments/Assumptions: Comments/Assumptions Requirement will be met. Requirement will be met. See the Interior U hdrg fixture schedule for values. I High Impact (Ter 1) 1 2 1Medium Impact (Tier 2) 13 1Low Impact (Tier 3) 1 Projeet Title: GTIS Grapevine Addition Report date: 06/30/25 Data filename: Page 4 of 4 �R DATE OF ISSUANCE: r x x n s PERMIT#: BUILDING PERMIT APPLICATION (PLEASE PRINT LEGIBLY -COMPLETE ENTIRE FORM) JOB ADDRESS: 1800 STATE HIGHWAY 121 SUITE # 101 LOT: 1 BLOCK: 1 SUBDIVISION: 121 COPMMERCE CENTER ADDITION BUILDING CONTRACTOR (company name): HBA DESIGN BUILD, LLC. CURRENT MAILING ADDRESS: 222 WEST WALL NUT STREET, SUITE 200 CITY/STATE/ZIP: CELINA,TX75009 PH.# 214-5164274 Fax# PROPERTY OWNER: GTIS HIGHWAY 121 SPE LP c/o GTIS Partners, LLC CURRENT MAILING ADDRESS: 787 SEVENTH AVENUE, 50TH FLOOR CITY/STATE/ZIP: NEW YORK, NEW YORK 10019 PROJECT VALUE: $ 45,000 PHONE NUMBER: 713-294-9611 FIRE SPRINKLERED? YES X NO WHAT TRADES WILL BE NEEDED? (Cheek ones mat apply) ELECTRIC X PLUMBING X MECHANICAL X DESCRIPTION OF WORK TO BE DONE: REMOTE TOILET TO CONFORM TO CODE REQUIRE TRAVEL DISTRANCE USE OF BUILDING OR STRUCTURE: WAREHOUSE / DISTRIBUTION NAME OF BUSINESS: NOT APPLICABLE. SPECULATIVE IMPROVEMENTS WITH NO TENANT. Total Square Footage under roof: 272,160 Square Footage of alteration/addition: 108 N I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall he made available to the Building Department (required for new buildings, alterations and additions) N/A ❑ I hereby certify that tans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: NY)T APPLICABLE. COST IS LESS THAN $50K (Not required for I & 2 family dwellings) N/A ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. NOT APPLICABLE, EXISTING BUILDING IS NEW CONSTRUCTION. C of O #23-004310 (REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grantor authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINTNAME: DAVIDSEAMAN SIGNATURE PHONE#: 214-697-1711 EMAIL: DAVID@LPM-LLC.NET ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL 7— THE FOLLOWING IS TO BE COMPLETED BY THE BUILM G INSPECTION DEPART M F IT Construction Type: Permit Valuation: $ Setbacks Approval to Issue Occupancy Group: Fire Sprinkler: YES_ NO Front: Electrical Division: Building�Dt the Left: Plumbing Zonin Buildingidth: Rear: Mechanical Occupancy Load: Grease Trap Right: Hood Plan Review Approval: Date: Building Permit Fee: Site Plan Approval: Date: Plan Review Fee: Fire Department: Date: Lot Drainage Fee: Approved for Permit: Date: Total Fees: Lot Drainage Submitted: Approved: Total Amount Due: vo mxss,w.swrcvwe..x-rsmsrema,o.9,ss owamsmseesannevicnnoas,mzxw „masms,aroi.nms:ai,.a,a �R DATE OF ISSUANCE: r x x n s PERMIT#: BUILDING PERMIT APPLICATION (PLEASE PRINT LEGIBLY -COMPLETE ENTIRE FORM) JOB ADDRESS: 1800 STATE HIGHWAY 121 SUITE # 101 LOT: 1 BLOCK: 1 SUBDIVISION: 121 COPMMERCE CENTER ADDITION BUILDING CONTRACTOR (company name): HBA DESIGN BUILD, LLC. CURRENT MAILING ADDRESS: 222 WEST WALL NUT STREET, SUITE 200 CITY/STATE/ZIP: CELINA, TX 75009 PH: # 214-516-4274 Fax # PROPERTY OWNER: GTIS HIGHWAY 121 SPE LP c/o GTIS Partners, LLC CURRENT MAILING ADDRESS: 787 SEVENTH AVENUE, 50TH FLOOR CITY/STATE/ZIP: NEW YORK, NEW YORK 10019 PROJECT VALUE: $ 45,000 PHONE NUMBER: 713-294-9611 FIRE SPRINKLERED? YES X NO WHAT TRADES WILL BE NEEDED? (Cheek ones mat apply) ELECTRIC X PLUMBING X MECHANICAL X DESCRIPTION OF WORK TO BE DONE: REMOTE TOILET TO CONFORM TO CODE REQUIRE TRAVEL DISTRANCE USE OF BUILDING OR STRUCTURE: WAREHOUSE / DISTRIBUTION NAME OF BUSINESS: NOT APPLICABLE. SPECULATIVE IMPROVEMENTS WITH NO TENANT. Total Square Footage under roof: 272,160 Square Footage of alteration/addition: 108 N I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall he made available to the Building Department (required for new buildings, alterations and additions) N/A ❑ I hereby certify that tans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: NY)T APPLICABLE. COST IS LESS THAN $50K (Not required for I & 2 family dwellings) N/A ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. NOT APPLICABLE, EXISTING BUILDING IS NEW CONSTRUCTION. C of O #23-004310 (REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grantor authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINTNAME: DAVIDSEAMAN SIGNATURE PHONE#: 214-697-1711 EMAIL: DAVID@LPM-LLC.NET ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL 7— THE FOLLOWING IS TO BE COMPLETED BY THE BUTAa G INSPECTION DEPART M F IT Construction Type: Permit Valuation: $ Setbacks Approval to Issue Occupancy Group: Fire Sprinkler: YES_ NO Front: Electrical Division: Building�Dt the Left: Plumbing Zonin Buildingidth: Rear: Mechanical Occupancy Load: Grease Trap Right: Hood Plan Review Approval: Date: Building Permit Fee: Site Plan Approval: Date: Plan Review Fee: Fire Department: Date: Lot Drainage Fee: Approved for Permit: Date: Total Fees: Lot Drainage Submitted: Approved: Total Amount Due: vo mxss,w.swrcvwe..x-rsmsrem4,o.9,ss owamsmseesannevicnnoas,mzxw „masms,aroi.nms:ai,.a,a ARCHITECTURAL SYMBOLS GENERAL NOTES \�1111 111eEx s,�rEm..a,wpx �w wxnx,tiwa,x�, NT 0wxxaax Eoo xOw urnx,.T O,wx�arr—l�,iaxo ax„ox: aTWN � AuvazTExlxcsAxonn .xmE a vu�uEA�n PxPm vlEw. svme,u \ oETan xumaG, .uu AL.— Isms —T wI. o. rPe oQi svuc u, N. oltsum,sru se Pawrsammnr�xmesuxraysoxwwvx Num6ER ALL-1 11 xLE xa Tx seau- NN1. mATcx WAuIN wxx:x PxT:euxs coiumNxE�r-xcE O x—NSESATuuorvw..sro n moxsINc�aseo NN - - - - - - —axa"xumew na,uuiurvsµirvop uworvs wm�imssv r,Iuriun—ENN—mss corvsT—T—n,— asorna xanosnrvo mxm �s11 HA T�TM���al<sxaua�L. r�.sus�mluxovEn. oNnwl,w TnTE ARCHITECTURALSYMBOLS w1X°�' �rmox�arvoAnio eclNcixwaEo sAcoM sm 'F-, SAT THE samE tu:AnUu az�rt P�Ton[xn l,ticxrs. m-c�rsiaRLO [twiuvev naOVE EavNumEx. snPaxlxcuxtFaz BUILDING INFORMATION THESE PLANS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY VICINITY MAP KEY PLAN > •- PROJECT LOCATION••exTn ° oFwoxK 79 DRAWING INDEX GENERAL —osAHas— ARCHITECTURAL MECHANICAL Elm S��NNT�R x.��i awxPu onm�ulrmsrxnwcu I I�°.�1) PLUMBING ELECTRICAL ABBREVIATIONS DRAWING INDEX ' MPE ARCHITECTURAL OWNER REP. A. --,I. Engixeenng, LLC Alllaxce A,MN-Ix IGTIS PaMers 5600 Tennyson Pa—y t600 N Co Ilm BVE 2 RfcM1m 4 Avenue Sulte 1000 Sulam 1n0T on PI ertlson TX ]5024 ReM1, TX75NO Ho to XTi09x 114i )3 9i2233.0f00 Chft Sxtbn, P•E., CxA CM1atl D. Mchel, AIA Kyle Roberson RECEIVED: 8/19/2025 25-003185 "VACANT' 1800 STATE 121 #100 (14 ALTERATION TO CONSTRUCT RESTROOM Nnx,x UxmER�w,xwETo�xE<TEywPx C—T..«+Tx .61oTNEA PAR,r,­0ER CmxTxaETWITxALLw,u —41T%INS. ALL CHANGES REQUIRE APPROVAL OF REVISED PLANS APPROVED PLANS SHALL BE KEPT ON JOBSITE AT ALL TIMES Cfi%AATlj Ll j:TVP J{(11 JR3 MON77DAY- SATURDAY ONLY NO WORK PERMITTED ON SUNDAY SEPERATE PLUMBING, MECHANICAL, ELECTRICAL AND SIGN PERMITS SHALL BE REQUIRED. CONTRACTOR SHALL CALL FOR INSPECTIONS: (817)410-3010 CONTRACTOR REGISTRATION WILL BE REVOKED UPON PERMIT EXPIRATION. ALL EGRESS DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUTA KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT MANUALLY OPERATED, FLUSH BOLTS ARE PROHIBITED. �R APPRGUFBP-11jL ff— KE G—AT 09/t t12025 BY:ARNOLD BAMIR—B-141 S8 BUILDING.INSPECTION DIVISION: RELEASE DOES NOTAPPLY TOCONSTRUCTIONIN EASEMENTS DR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. ALLIANCE 121 COMMERCE CENTER REMOTE RESTROOM CONSTRUCTION SET - P PROJECT NO.: =5125. DATE; 0625I25 Accessibility Standards ~ CI 4 .w AZ _ I �T a .. 4 .w I�^•.Mva im.,'imrmlmm.. I... ,� mmma.mmmau I �rI M _ z m.z a, z�wss ,. .xnm,wwamama.+e..a.vn...wu. w —77 i cc«w�u ar,eum /'' FLer�tfra :;;� T —77 �sw,rz.mn�emmwmw.�ww.e<ex.mx,mmnro� ♦amoz � xww r:mmm � R 7 General ADA Details and Mounting Heights O w �a Oa zQ U w p �z- Q Q J (n 2 Co z (n own EL- U U)w¢ w =w �- 5 w It w W W O U OC v W N UW WW 0 n UW r W CV V- ACCESSIBILITY STANDARDS AND MOUNTING HEIGHTS DRAWING RECORD —E oDEEsc�R CI—N I mrz s ACC PROJECT NO.: 2025125 OCCUPANTLOAD cLE or cR THIS PAGE RELEASED " FOR CONSTRUCTION IN, w", IN CONFucr WITH THE EIIILYNS CODE ORI--ORDINANCE. cTr„ __, K ProN�T EaoesreAT a t tR� os "W5 BY: ARNOLOO RANIR. BPE: I - RELEASE DOSSOT NAPpCTIO�y [�Ifll�^f;� IN EASEMENTS DR PUBLId (RIGHT OF WAY. ICI NGES Nu BEIAIIPRI II E EXIT ACCESS TRAVEL DISTANCE GAp:..aL :1716�.. d:: li d'I,IY:L-��& LIFE SAFETY PJ_EGENO'� acoewer � _ _ ca.eame xm a� wa aT ^uNr �Rncmx worx CODE INFORMPITION � I s€ �irvsF- °x;°"�'nrvaes eea TuuExlTw®,N a x�,�;x�o" Laomax �.<., u.olG awvlHv a c.vaaeArvEn o PAN— OCCUPANCY TYPES u , ENe,v ®r OCCUPANCY SIGNAGE ❑ L MAXIMUM OCCUPANCY ■"��" F XXX, GO I } } I I I � — — �) ITo -ta r ss 1I a 14. ++ Ie w W WO U� W N V W W G 0O Ulm W N T LIFE SAFETY PLAN & CODE INFORMATION DRAWING RECORD oATE P n d _ _z rvs �.. I I /II � istm— PLAN L S P NoaTl. PROJECT NO.: 2025125 TYPE V cevirwsuuno .r TYPE P Gvm rvsuunox n 1 TYPE L Wx'�°� TYPE H TYPE U n�ooxrt+nnr s.xurnxa � xawaonw.wMx� �I Wsuu o- .,( ^ �aasrwcaooxsun x TYPE R �a� wxc am9d+90E � bcN� swunex , «x � xE—Ex— TYPE N /� ox�9��aASE ECTION NaE 2, / ,"Tuos xo wrcstEEL ELAtlYI€VY TYPE M WM�`N mMx �,�- /� eca auunox NavunxN ,® TYPE K vmlrvmlurou TYPE G —,�V`�A o NN z TYPE J N rvG1l i — `�91EF.Lsnaa �F�oaxaVs TYPE F vmirvauu rory .. TYPE E xoux IA uAa TYPE B TYPED wvm ixsuunax T TYPE -- -! sLooxalie TYPE C WA mnc --�-sc uieocan xc �I /' � Wsnvulrvsuunavu A9R <auG5p[ - ��asaa sin x. AxAcorw wocA.asa T�roEx„ roams PARTITION TYPES ALLIANCE w LLI Lu 0 Uw W N UW W W 20 02 U W N T PARTITION TYPES DRAWING RECORD I—E DESCCRIRlPTiN P-TYPE PROJECT NO.: 2025125 ,tiNAN V �E THIS PAGE RELEASED FOR CONSTRUCTION WITH THE BUILD NG CODE OR —IN. ORDINANCE CITY APPROVED PLANSTO aE THEJ �T u nM� 0911 Qu, IBCARNOLD RAMIREZ TSBPE:14189E BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. A R C H I T E C T S w W r Z W U W U w W O U Tml T r- O ON I.L. H N W w W H O 2 W w SPECIFICATIONS DRAWING RECORD �—EEscalanoN I SPEC1 PROJECT NO.: 2025125 FLOOR PLAP l Frfgp �� P mmx�Esvueoi cauwwwro-accrssoavrAe �a wrtmowrAe REFLECTED CEILING PLAN LEGEND � � � Fpr Wxr Flxruxas.ICEWNS NpuN,marz wul MouNrm) vAmmcwsuM sous cTYwc REFLECTED CEILING NOTES NOTES 13Y SYMBOL ®wNLro, —, ACCESSORIES & EQUIPMENT 1b REFERENCE MEP REFERENC V-1-MOUNT TOILET-TAS-ADP 3e REFERENCE MEP REFER ENC E WALL MOUNTED SINK Sy �rK 5 K 2 Y%7'iYl'/kW�l iaR,P}I'SRH.N % T"' -: -%�iq� YISPENSER SyLL AP R UR M M RR T TA ELRAIA -944 11e GOBRICK U98R f�PF/iINECESSED GO COAT HOCK WITNB MPERP/CA TOWELOGPENSER8Wg9TE RECEPTACLE INTERIOR MATERL&L SCHEDULE � i�Nxmme '" �� owL PRsHxisznsrury sum�vwerwrr>,exlmnesP orRce nP �R,�a xE,N�mRA� x,. r¢ENoowxcAcr) raNxRH � �K,K�E� ,.w, I,z ,z �,>oawx�,Eswr�x�,cxrrrv�m,Er�o � , WKq`pR�ELFVATION THESE PLANS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY �� eAsea, 6INTERIOR ELEVATION .a_,n ,e FINISH LEGEND eCEIsING�RWN9H Owul rwGn �acq Hwsx'� \ caaw o�a[cricx I noaRmArvsmox INT II A� wNr ww.w�a—, INTERIOR ELEVATION ROOM NAME �X-X , weerwnu� X-X� /^u XX XX X X wu 4 ENlpq(.FD FINISH PLAN E�NLA QFD RCP 22 ENLARGED FLOOR PLAN rvxxrx .,u-�v crsa CRY OF GRAPEVINE THIS PAGE RELEASED FOR CON5TRUCTION RELEASE ODES INCnNFLICT rtH THE BUILDING o ZONNG DRONANCE. C]v APPROVEn-PaNs To"K r-T�Sll— SO1„aozs BY: ARNF� pG Ra TrS-E: Iaalw DOES { i , RELEASE DOE N(, PUB T CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. TTI; I� _ au —I — ——— — i— — i— — i— — -— — 'I 1 I —�— —�— — —�-- — - — --- — — — — — — — — — — — --— —-— — T l I I I I I I orw�n I, I I, I - I J L 1�5� `4� �'./ �� � �Bi V \J 10 Oi�. Ibt 12 1�3 fO � 16 i] 8� B� `l OVERALL FLOOR PLAN w w� w0 U OC H wN Uw w W1..� 1"— h 0 CU w r W CV FLOOR PLAN DRAWING RECORD DATE DEsclllNfD s ,(rnswen o 1 A2.01 PROJECT NO.: 2025125 OOCRTVPES DOORSCHEDULE MATERIAL sow ox DOOR B FRAME LEGEND DOOR HARDWARE SETS oc wax FPAMETYPES rvzEax w¢ED s Mwart IonnRsinP jwa�ujG TS HEAD DETAIL (� INTERIOR DOOR A R C H I T E C T S f;R 11L THIS PAGE RELEASED FOR CONSTRUCTION RN IN GON-CT CITY APPROVED PLAN] TO®FYF,PT On TIE JOB SITE AT o911 """ BY: ARNOLOO NAMIR. TSBPE: I—S BUILDING INSPECTION DIVISION'. RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. � / � po �owMErADUME aPRD S a 1 JAMB DETAIL (d INTERIOR DOOR w W C W0 U� W N VW W W _ 0 02 C) W Tm-W N T DOOR TYPES, AND DOOR 8 WINDOW SCHEDULES DRAWING RECORD oE: A6.01 PROJECT NO.: 2025125 ALLIANCE COMMISSIONING NOTES = -GENERAL MECHANICAL NOTES PIPING SYMBOL LEGEND HVAC DUCTWORK LEGEND HVAC ABBREVIATIONS A, ­N. V111 1- 1.— A." Tx llxd¢ A. NAIZ=�.� Al 11==,1AlD11.l ff 1— T" I'll I'll 11 11= 111 1. .1 TP�.�."N.T.A",� X� �D —T°xn,rxEl' 11 _O 111lT.-11N—­ A—l— Al. V---R I—owaI AN5 -Al— _ , _T %,M,—wAl 1.1. —,wx 11AL —A— T, .—A—, 11A* ,A -—Al I I U- 1: 1*=Allll A A-- T-1— =1" T�* : =T1111, I ll�TlTl.—1 TIIT I I ALL AN— N: ART- I -1AN—1 1e I u—.11 11— IN— lA-D _O: 'Aj IHI ­N.1 Tl ED —11 T- -11 —111 A A— lA1.1, I., Al. �Z. I.ALTL�R Fv -ANNO, 0 D' 0111— 1 —E A —1 1-- -All 1 —111 .-0 —Al - N 110 — TAL —T"'= E11-11,11 OAP ANI "I', — I'V: 'YAl l"l �T HVAC MATERIALS SCHEDULE 0 -,T HVAC SYMBOL LEGEND A AIR A. 0 A 1-11A 'IT —E nnsA'==�.11­ EA.AO T— A' ­D W- AP'l— ME y = L,.j —1. PANN" A DRAWING DETAIL REFERENCE KEY 11= e IT— --T T� w- A--, w- -T 1. —L OWNER FURNISHED EQUIPMENT SCHEDULE All 11 _T 776`7 rIi -1.1 AV— .1 —..1 W— IN—N w -T Il— AN11 1.N -A —TI-111 lAV— 5.- CITY APPROVED PLAlklIM`­ PT ON TIE JQR SOE AT o911 1I2 BY ARJNOLDO RANAIR—PE —98 BUII-TING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS DR PUBLIC RIGLT OF WAY. AU- —INGES MUST HE "PROVED. MECHANICAL COVER SHEET DRAWING RECORD DATE .—NIPTON e --E-T E7'=N�U. INGBI M_000 PROJECT NO.: 0723101.020 ALLIANCE ® iGRA hE CITYOFGRAP-NE THIS PAGE RELEASED FOR CONSTRUCTION 111A III IN, CITY APPROVED PLANS TO BE NEPT ON THEE—SSREAT ALL DNEs. o"""""' BY: ARNOLDO RAMWEZ TSBPE: IJSSB BUILDING INSPECTION DIVISION. RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. w W WO U w W ~ UN W W � W 00 UW r W CV V- MECHANICAL SPECIFICATIONS DRAWING RECORD IRATE oEscRlPnoN I N� J E7;lNGI.N M -001 PROJECT NO.: 0723101.020 Vn� THIS PAGE RELEASED FOR CONSTRUCTION CON—C. DD APPRD PAo Dx HE,DBxI ALCM /tt/2D25 BY: ARNOLDO RAMIREZ TS8PE:1— BUILDING INSPECTION DIVISION. RELEASE DOES NOTAPPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. F �xaw„A,F.,1.,°xaaxoaoxfoFN��x,rv�,nax�,a>,. aE<o,AE.e � -ow �, T>a-O x�ron xINK�M TM n �r c ELECTRIC UNIT HEATER SCHEDULE :mux.:.arMaN:. n w °M N°D,—E fa w°rx mR wxuouRLxfax: °N�o �N N xm¢ n x P .,,�=Pa.xaNx,NEwD� / NOS 5 rnoxnrxrtArz Nlowttxaaccmmoroa —marvurncnacaswwmxxluc ��. (11-fAnoaY Na - oNNEn rIN/A wrvP+EwrvmPrz. Isl FACT (83' ��ITIIIt1NTEDRESTROOMEXHAUSTFANIETAIL (Sr @VON- REMOTERESTROOM-MECHANICAL 131 aolnau osEx araaw rtcr T°maxuracrvxsas xnpunT°N. L 1PBdu wnox LJ 1 f41 c FAN SCHEDULE of�Aa wow Lt t °" � wa; wNIx E OR.E,s w woTMI aRE.,,xamal nxaxrf.P� I.1°`a �a°aA,rxAmPEa �I-a,RxYa�� «wEax,Pmfx. Nx, I=PtooTPORa°° Rx _.,PPW.,..—Taf�,.oA,m,�s o­ i lTT Ni01 ELOORPLAN- 3x (!° 11 12 to w. 15 OVERALL MECHANICAL S w W WO W N U W = W W _ 0 02 U W N T FLOOR PLAN - OVERALL - MECHANICAL DRAWING RECORD DATE IoescRlanoN S RTON E7- ENGINEERSJG� UL M 101r PROJECT NO.: 0723101.020 ALLIANCE PLUMBING SYMBOLS LEGEND PLUMBING ABBREVIATIONS �p T� we 'I, xuwnrTss 1—. ­11­ �l 11 II ­El T NPQ`._1'1'1_`= .1,1=1_ m1,1,1,1LI ­DlY— '1 rto ­1 , ', Q. _==1 P `P ­IP., 11P IT It 11 I.Al PIL 1­1 —1 ,CRAP,' Nrl, P­F_. .1 =T I— ul l­ �,"Zl T 1 11 C­'. P E `E N S TR U C T! 0 N THIS PAGE RELEASED FOR'C0 —P. ­ ­1 FULFAllU ElllTA,TRlF­Y­RlNClN­T T ...... lUILDIll 111111 ZON RD11111, I —El vx IP,lPI RV "N. ALLI A�% TO SE OS THP AOB SITE e,' II 0I T111 Pl­ 011 =5 1 11 BI ARNOLDO RAI TSBPE: 1­8 T.=" BUILDING INSPECTION DIVISION. 111—IT ­11­ 1 RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. T, ALL CHANGES MUST BE AFF—ED, YT,1­1 T.11 11- Y ­1. 0 lAll ­0 ­0­77PITP Z —41 xx 7=7 Z, F" TEIl I lAll IN U.1�1, COMMISSIONING NOTES UJ lIlUlll.r r, F_ ILLIILIIG-111 111111 I'll 111, z I. YNO.r Lu I ALL I— ­T.M­1. 0 --AL LlIIINllI.I.11111--�lH�LL-11-�l, A_= I'D,�Lu R=' 1�1 f_ �UIN I I II 11E '1'.'I'D `X ­ft'N A' L.."_ �� I.. �T II� N AN P. I Lu Lu —COMMI—N RI S 17,E�,S.BLLLEl�0R.­MBL­ 1p_-=V"ALL GENERAL PIPING NOTES GO uj 1­11—— T.1 ­11— P­ L­PP­- N PLUMBING COVER SHEET DRAWING RECORD DATE oES.RIPT.N .11. 1-1-IP-IT EP U. 000 INGIN = _7 PROJECT NO.: 0723101.020 MOTE 1ROOM G [9aOR CO RL[asEq�p Nsnxucnox —APPROVED PUN � TON THE JOB s1TE AT 0B/111—Ii �t BY: ARNOW RAM—TSBPE:I4898 BUILDING INSPECTION DIVISION' RELEASE DOES NOT APPLY TO CONSTRUCTION IN f N� O— EASEMENTS DR PUBLIC RIGHT OF WAY. ^r - - — "I ALL CHANGES MUST BE APPROVED. V�—.) N ,Q 4%R( fR PLVJ-REMOTE RF.SIRODM-PWMBING I B N - 1LT PLAN-REMOTERESIROOM-PLUMBING' aux / =1 e GENERAL PLUMBING NOTES wausPNoaooR. aa. vNoO KEYNOTE LEGEND IT ae1x�jjT ��1=.�RTON..�.H�T�I�NHI. MWNr NV BODR PLAN -CVERAHL-PLUMBING LJ 30 0 SLRiON ENGINE£ANJG� LIL Sr>Gm rmxnputrm Eprmrxyr�mec-tax ALLIANCE WATER NEATER-INSTARTAKOUS 1 L , A *Plu..,.. RISER .-.. @oj �FLTOOR DRAIN DETAIL N S FT, n. WALL NDUTDFTAUF N— WATER HEATER SCHEDULE "77,105, a, wo+Ema (5-- PLUMBING FIXTURE AND CONNECTION SCHEDULUM 1­ -1 T. N.Y C.—T TOw o11. —1. 1-1 CITY OF --pE THIS PAGE RELEASED FO=COENSTRUCTION RELEASE —S NOT AUTHOR -ANY ­RK IN CONFUCT — TFL UIL.N. —E — -RN. -CRAN.E CITY A— P—'_ffqrT 0. THE roe sITEAT ... ARNOLOO -- TG.PE BUILOING INSPECTION DIVISION: RELEASE DOES NOT APPI-Y TO CONSTRUCHHON IN EASEMENTS DR PUBLIC RIGHT OF WAY ALL CHANGES MUST BE APPROVED. w LU F— z 0 Lu 0 Lu cl) L U Lu W O � m Lu 04 T- PLUMBING SCHEDULES & DETAILS DRAWING RECORD DATE ESORIPTI)IN P-701 PROJECT NO.: 0723101.020 ALLIANCE GENERAL LIGHTING NOTES .g � ...... .... GENERAL ELECTRICAL NOTES ELECTRICAL SYMBOLS LEGEND T, v El — ..... _T "I. =NT— ­AL AL­­ 1ueiEwxxArxuwAw11 p.1.2N, LXLT C A- ..T.1 ll.- p .­11 ­T­ =R, Mx.nnooaGxr11— I UITI—N­ -T -11 ­1 T =z­ ST --l-N. I— IT. ='Z T,= V- �N Cl­.A"PACL- I "' '"U" " 'T, I_ N l­ T. TlaZ'A== ZI F—I BASIS OF DESIGN wnp T FIRE ALARM LEGEND IU- ­ R. ­NL V I'll—Ni l­L P­El� P, PHASING LEGEND cITVAPPR yJJ17T .. TRF IS. — BY: ARNOLDDRAMIRIMTSBPE 1-3— BUILDING INSPECTION DIVISION _EASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC El— OF —Y ALL CRANOES MUST BE APPROVED N N INGILIL w LU F_ z 0 Lu 0 (L) w Lu I'-_ cl) 0 Lu W W Lu LU 0 n Lu 04 T_ ELECTRICAL COVER SHEET DRAWING RECORD ..TEDESCRIPTION E-000 PROJECT NO.: 0723101.020 PART1- GENERAL 1. CAREFULLY READ THE SPECIFICATIONS AND COMPLY WITH ALL REQUIREMENTS . THESEGENERALNOTESARE AMENDED TO ASSIST THE CONTRACTOR DURING EXECUTION OF THE WORK. HOWEVER. THEY DO NOT COVER ALL OF THE SPECIFICATION REQUIREMENTS_ ALL BIDDERS MUST BID PER PWI. AND SECIFI A ONS, 2 THE TERM"PROVIDE' IN THESE SPECIFICATIONS ADD ON THE DRAWINGS MEANS: FURNISH, TRANSPORT, INSTALL, CONNECT, WARRANTY AND START-UP, INCLUSIVELY, 8. THE SCOPE OF THE WORK SHALL INCLUDE THE FURNISHING AND INSTALLATION OF THE NECESSARY MATERIAL AND LABOR TO ACCOMPLISH THE WORK INDICATED BY THE DRAWINGS AND HEREIN SPECIFIED. ALL WORK BY GO TRACTOR SHALL CONFORM TO ALL APPLICABLE, FEDERAL, STATE AND LOCAL BUILDING CODES. 4 CONTR DITIONS AND ALLOW OR ALL CHNGESP BEFORE BHAT ARE EMITTING HIS C9SARY TOSIT THE OMPLETENSTALLATION OFREVIEW THE FISTING ME*EEOCITRICAL WORK. SUBMSSON OF PROPOSALS SHALL BE TAKEN AS EVIDENCE THAT SUCHNSPECTON,, HAVE MADE. CLAIMS IN FOR FHOWN ON THE CONTRAEllATCC DOCUM�NTs OR RK NO� SHALL NOT BE ACCEPTED NOR PAE BEEN MARISEEN BY ID WHETHER 5. H OTHER TRADES TO AVOID CONFLICT AND TO PROVIDE CORRECT IRSUGHTN AND NCONNCTIONF ROEQUIPMENT FURNISH. UNDER OTHER TRADES. REPO RTNECESSARYCRANGES NUM N TIME TO PREVENT NEEDLESS HEWORK, 6. DRAWINGS ARE DIAGRAMMATIC AND INDICATE TEE GENERAL ARRANGEMENT OF EQUIPMENT, 11—RKANI CIRCUITS. CONTRACTOR SHALL CHECK ALL INFORMATION ROD REPORT ANY APPARENT DISCREPANCIES BEFORE SIJAEMRUN AND T. CONTRACTOR SHALL SECURE AND PAY FOR ALL CONSTRUCTION PERMITS AND LICENSES AND SHALL PAY ALL GOVERNMENTAL AND PUBLIC UTILITY CHARGES AND INSPECTION FEES NECESSARY FOR THE EXECUTION OF THE WORK. 8. A.PROVDEPRODUCT DATA FOR ALL EUIPENT AND MATERIALS DESIGNATED ON THE DRAWINGS OR LISTED IN A E E9. TIFI SCHEDULE. THE SUBMITTALS INCLUDE WIRING DIAGRAMS, PRODUCT CERCATION, NENANCDATA, AND WARRaNTI B. IF REGO REDSHOP RAWINGSCOORDINATION DRAWINGS WITH DIMENSIREO PLANS AND SECTIONS CTION ORPELEVATION LAYOUTS OF ELECTRICAL EQUIPMENT G DEVIATIONS: THE APPROVAL OF SUBMITTAL DRAWINGS BY THE ARCHITECT/ENGINEER, OR HIS REP ATIVE, SHALL NOT ELIEE THE CON TRATOR ROM RESPONSIBILITY OR DEVIATION ROM DRAWINGS OR THE SPECIFICATIONS UNLESS HE HAS CALLED ATTENTION IN WRITING TO SUCH DEVIATIONS AT THE TIME OF SUBMISSION AND HAS OBTAINED WRITTEN APPROVAL FROM THE ARCHITECTIENGINEER. OR HIS REPRESENTATIVE, OF SUCH DEVIATIONS. S. WITHIN 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE. PROJECT RECORD DOCUMENTATION(DRAWINGS) AMID MANUALS SHALL BE PROVIDE TO TIE BUILDING OWNER AND SHALL INCLUDE: A. OPERATIONS S MAINTENANCE MANUALS: INCLUDE, AS APPROPRIATE TO EACH ITEM. SUFFICIENT INFORMATION TO PROVIDE FOR THE OWNER'S OPERATION AND MAINTENANCE OF EQUIPMENT FURNISHED. THE MANUALS SHALL INCLUDE PTA MINIMUM. THE FOLLOWING. 1, STATING EUIMNT RATING AND SELECTED RTCN3 FOR EACH PIECE OF EQUIPMENTNG MAINTENANCE. A. lEIAND MUAL VIA MANS FOR EACH PIECE OF EQUIPMENT REQUIRING MA NTTENANCE N REQUIRE. ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED. 3 NAMES AND ADDRESSES OF LE AT AST ONE QUALIFIED SERVICE AGNCY, B. - PD"BTLET LLOWING: 1 TRONICDDAWINGS FILESVIN AUTOCAO'DWG REFORMAT, OF ALL DOCUMENTS ON CO DISKS OR FLASH DRIVES, CORRECTED W ITH AS INSTALLED" WORK. 2 ELECTRONIC DRAWINGS FILES, IN° 1'FORMAT, OF ALL DOCUMENTS ON CD DSKS OF FLASH DRIVES, CORRECTED WITH AS INSTALLED' WORK, L-SIZE HARD COPIES OF ALL DOCUMENTS CORRECTED WITH AS INSTALLED" WORK. 4. AS-BUILTRECORD DRAWINGS SHALL INDICATE THE ACTUAL INSTALLATION AND INCLUDE THE OLLOWING: A SINGLE -LANE DIAGRAM " THE DISTRSUTON SYSTEM B, FLOOR LAND AREAS SERVED MR ALL DISTRIBUTION. C. CONTACTS: INCLUDE WITH ALOCATION TH EACH PRODUCTNAE, ADDRESS AND TELEPHONE NUMBERS, OF INSTALLING CONTRACTOR. FACTORY AND LOCAL SERVICE REPRESENTATIVE. D. NSTRUCTIONS OF OW NER'S PERSONNEL PRIOR TO FINAL I NEPECTION AND ACCEPTANCE, FULLY INSTRUCT THE OW NR's DESIGNATED OPERATINGPERFORMANCE BE THE EQUJPMENT PH arvG M1MINTENRGE PERSONNEL IN THE OPERATING AND NISE WARRANT( FENCLUDE WARRANTY I NFORMATION PROPERLY EXECUTED BY RESPECTIVE MANUFACTURERS, SUPPLIERS, CONTRACTORS OR E UIPMNG ENTASYSTEM FURNISHED. 10. INAD OITIONTO THE ABOVECNTIO ONTRACTORFSHAL AU CMULATE DURING THEJOB'S E PROCSS, THE FOLLOWING DATA, IN ME FORMATE. PREPRED IN A NEAT BROCHURE OR PACKET FOLDER AND TURNED OVER TO THE ARCHITECT FOR REVIEW AND SUBSEQUENT DELIVERY TO THE OWNER. A ALL WARRANTIES AND GUARENTEES AND MANUFACTURER'S DIRECTIONS ON EQUIPMENT AND MATERIAL IN THE CONTRACT INCLUDING THE NAMES, ADDRESSES AND TELEPHONE NUMBERS OF THE MRUFACTRER'S REPREENTATIE. B. RPROED FIXTURE BROCHURES, WIRING DIAGRAMS AND CONTROL DAGRAMS(CTOGINAL DATA NO COPIES) O PDRAWINGB. 11. LOF THE AROVEEDATq SHALL BE SUBMITTED TO THE ARCHITECT FOR HIS REVIEW AT SUER TIME AS THE HIS LAST ESTIMATE PRIOR TO HIS FINAL PAYMENT, BUT IN NO CAGE, LESS THAN TWO EKS BEFORE FJNALSNSPEOTION. i2. ALL PANEL DIRECTORIES SHALL BE TYPEWRITTEN AND UPDATED TO SHOW THE NEW WORK. ICED OWN ER FRMSHED EQUIPMENT A CONTRACTOR SHALL REQUEST A COPY OF THE PR URCHASED EQUIPMENT PROCUREMENT BID INSTRUCTONS AND SPECIFICATIONS. B. WHERETHE OWNERHASELECTEDTOPROCURESOME EQUIPMENT FOR THE PROJECT. IT IS THE INTENT OF THESE PROVIDE ECEFFICAT OLLO N $GHAT THE CONTRACTOR SHALL ACCEPT RESPONSIBILITY OF THIS EQUIPMENT AND COO2 PROVIDE SUPTNISIONIC COORONAATTErSHIDAWNG IPPING ANDAOEPT DELIVERY. NPLA 4. PROVIDEINSTALLAPOWER .SETAND CONTROL WIRING TO PROVIDE FUNCTIONS IN ACCORDANCE WITH THESE SPECIFICATIONS, K. SLIVER THE EQUIPMENT TO THE OWNER IN A WORK— OPERATING, AND TESTED CONDITION. II. PROVIDE SUPERVISION TO COORGINATE FACTORY AND ON- SITE TESTING, START- UP. AND COMMISSIONING IN ACCORDANCE WITH THESE OPEC(FCATIONS. T. PROVIDE SUPRVISION TO COORDINATE OWNER TRAINING AND PREPARATION OF O&M MANUALS, C. COORDINATE LIST OF EQUIPMENT PROVIDED BY OWNER WITH OWNER AND GENERAL CONTRACTOR. D. THE CGNTRACTOR SHALL REP LACE ANY OWNER ECUIPMENTSYSTEMS. UNGERHIS CONTROL OR SUPERVISION IF DAMAGED. PART2- PRODUCTS 1. MATERIALAPPRONAL—MATRBLSMUSTBENEWAGBERAULLABEL MAT RIALETHATAENOTCOVEED BY UL TESTING STANDARDS SHALL BE TESTED AND APPROVED BYAN INDEPENDENT TESTING LABORATORY OR A GOVERNINGAGENCY. 2. HOMERUN6 TO PANEL BOARDS SHALL BE ELECTRICAL METALLIC TUBING(EDT) EQUAL TO ALLIED TUBE AND CONDUIT. 3. WHERE ALLOWED BY LOCAL CODES ,TYPE 'US' CABLE MAYBE USE❑.'MC' CABLE MUST BEPROVIDEOWITHALL REQUIRED SUPPORTS. TYPE'BX' OR — CABLE SHALL NOT SE UTILIZED ON THIS PROJECT. 4. AEFUSES SHALL BE CURREMiIMTINGTYPE AND BE U.L.LISTED.AOEPTREMAGFACNRRS: LITTELFUSE BUBBMAN 5. NEW SWTTCHGEAR REQUIREMENTS SHALL UTILIZE EQUIPMENT OF THE SAME BRAND AND TYPE AS THE BASE BUILD NG.N O CASE SHOALLSAID EQUIPMENT BE OF LESS UALTY THAN THE FOLLOWING: A MRIA TYPE TO I_A RROVIDERI— TEMPERATURE RISE RATED AND FOR 3OKVA AND ROVE 150°C. TEMPERATURE RACE RATED * L GHTJNG AND APPLIANCE PANEL BOARDS SHALL BE SQUARE D'NQOD' FOR 120I208V_ SRVICE'NF FOR SERVICE. ALL PANEL BOARDS TO HAVE BOLTON CIRCUIT BEAKERS. C. CHES SHALL BE SURE D TYPE'HY PROVIDE WEATHERPROOF DEVICE WHEN INSTALLED ourDOORlr G CURRENT DEVICE SHORT CIRCUIT RATING: FULLY RATED TO INTERRUPTSVMMETRICA SHORT CIRCUIT AVAILABLE AT TERMINALS_ B. RACEWAYS - A ELECTRIC TLABING ED USE: FITTINGS SHALL BE OF WATERTIGHT STEEL COMPRESSION TYPE COUPONGS FOR POWER, LIGHTING OR CONTROL W (RING. B. FILED USE. IN WALLS. AND ABOVE DEALINGS, IN DRYWALLS, COMPRESSION OR ET SCREW TYPE FILL NGS c ALL SRACEWAY EXPOSED o PHYSICAL LL DAMAGE SHABE RIGID STEEL, HOT DIPPED GALVANIZED AND SHAU- BE ROUTED ANGLES R PARALLE SIR WITH THE STRUCTURE. CONDUITS SHALL BE SECURED AT PHA MAXIMUM INTERVAL S AND WITHIN 36' OF EACH TERMINATION, D. MINIM UM SIZE FOR ALL CONDUITS SHALL BE E I XSEALHCHANGEPIN GIRECTI'E�ATINTER LSNOTOVRIO'MDPROVIDEONESUPPORTNO MR ON F. PROVIDE PULL BOXES AS REQUIRED. G. RIGIDMETALSCONGUIT: USE IN G—REFTEANALLE OR UNCERCONCRETE FLOORSLABS, THROUGH AND ON THE ROOF. H NIBS METALCONOUIT. GALVANIZED STEEL, INTERLOCKING, AND SINGLE STRIPTYPE USE FOR FINAL CONNECTIONS TO TRANSFORMERS, MOTORS AND LIGHTING FIMURES. CLAMP OR ANGLE WEDGE TYPE CONNECTORS. 1. FITTINGS FOR COMMUNICATON SYSTEM RACEWAYS SHALL BE INDENTER OR SET SCREW TYPE COUPLINGS. RE IN ALL RACEWAYS WITHOUT OGUTORS, T. WIRES A'NOICAB Es: WI A CONNECTORS SHALL EU.L. APPROVED FORTHE RLI PCATON IN WHICH THEY ARE USED. INSULATION SHALL BE _F . THWN. B. ALL CONDUCTORS HALL BES CONGUTIVITY OFT DRAWN ANNEALED COPPER 6DO VDLT WINE. C CONDUCTORS SHALLBE NO 12 AWG MINIMUM EXCEPT AS PERMITTED FOR CONTROL CIRCUITS. D. GONGUCTORS NO 8 AND LARGER SHALLBE STRANGE❑, CONDUCTORS NO. IUD AND SMALLER SHALL BE SOLID, F. MWGANG CONNECTIONS WITH SOLDERLESS INSULATED CONNECTORS EQUAL TO SCOTCHLOCK FOR N0,8 E CONDUCTORS NO 6 AWG AND LARGER SHALL BE SPLICED UTILIZING COPPER BOLT CLAMP -TYPE 8 GROUCONN NDINDiTOR OR HYDRAULICALLY .RANTED COPPER RAMP CONNECTORS. A. ALL GROUNDING CONNECTIONS SHALL BE WITH GROUNDING CLAMPS R EXOTHERMIC WELDS. B. WHERE FLEXIBLE CONDUIT IS USED, PROVIDE A CONTINUOUS COPPER BONDING CONDUCTOR. c ALL GO SUITS SUPPLYING FEEDERS AND BRANCH CIRCUITS SHALL BE PROVIDED WITH GROUNDING D OEN GROUNDINGPAGTAAL FOR EACH RECEPTACLE AND PIECE OF EOUI PMENT RATED FOR THE PERAGE OF THE CIRCUIT BEAD CRNECTEO. E, BONO RAN CH CIRCUITNON NT CARRYING METAL PARTS OF EACH. 2, DISTRI6UTION PANELS S. SWITCHBOARDS 4, TRANSFORMERS 5, CONTROLLER ENCLOSURES MOTOR FRAMES T. ACEWAYS P. PAIES AND DEVICE PLATES, ODD WALLS: 112 BEEF. -1S' DEEP WITH%'PAI DMOUNTED D AND LIGHT SWITCHES. B. 4'X4'Xt EEVICE COVER, USED OR FILLSH MOUNTED CATIOUDATA -UGH IN 10, OUTLET,(RO UNCTION AND PULL BOXES'. A -HOT DIPPED GALVANIZER USED FOR FLUX. MOUNTED RECEPTACLES AND LIGHT SWTCHES. 2. -118 DEEP WITH%"RASED SINGE DEVICE COVER, USED OR FLUSH .A DATA ROUGH -IN. 8. JUNCTION AND PULL BOXES: USE OUTLET BOXES WITH APPROPRIATE COVERS AS JUNCTION BOXES WHERE POSSIBLE. LARGER JUNCTION AND PULL BOXES SHALL BE FABRICATED FROM SHEET STEEL,SIZED ACCORDING ToLODE. WITH SCREW ON COVERS, FINISH: GRAY BAKED ENAMEL CEO 1 A. ACLE3: 2-POLE,3-WALE GROUNDING TYPE NEMA 5,AR. STANDARD RECEPTACLE LEVATON HS 62-11 GFI RECEPTACLE LEVTON A GSSA, OR EQUAL B. M INDUSTRIALSPECIFICATION GRADE TOGGLE, DIET TYPE 20 AMP. TCH E E TON 122-t, THREE-WAY SW ITCH: LEVITON 12 1 OR EUAL. C UIRE STAIN FINISH STANLES3 STEEEL PADD LLATESFCONFIRM ACEMOUNTCDES WITH NGINEERENUM EFOE ORDERING ❑. RECEPTACLES- HUBBELL*2162, 1G 162 OR GF-8300 SERIES. P. DIMM VA "NLV"SERESOREOUALRFORLOWVOLAGEAINLANDESLENTES OR EDHAL FOLRIGHTING, 3 WAY 01MMRS SHALL HEEUALINCANDESCENT LUNIANG AND LOTANON DTO NMVERG) ION APP AEARANCE RREFPR TO PLASWITCHES NS FORMNIIMUMADJACENT DIMMER WATTA ES EQUIREMSWITCHES ENTTSSHALL MATCH F FLOOR OUTLETS(PEESTAL)- LEGRAND WIREMOLD FIT-200 SERIES OR EQUAL G FLOOR DUTLETSEFLUSHBY I LEGRANDWIREMOLORC40R6 SERIEe OREQUALUNESSOTHERWISE TECT H. FLOOR OUFIE'TLET CONCRETE EN CASED: LEGRAND WIREMOLD RPNFP SERIES R EQUAL WITH ACTIVATION DEVICES AS D RECTED BY RRITECH VILE WITH A CADDY "H' SERIESSUPORTBRACKET. J. cHNOLQCY, NFRREDAND ULTHAPHONIC AS swRCIH ttCMLEoT WHITE FIiNISSH WITH (1) ONE uPP20 POWER PACK PER NAGFAcrRED BvsNsOR _ BE SUBSCRIPT '. IN AT AI TT 08SENSOR OF CAME FINISH NA OA TIME SETTNGNTY NICHES MINIMUM. N. HALL BE DUAL TECHNOLOGY, IN —RED AND ULTRAPHONIC. AS WALL MOUNT. OCCUPANCY SENSOR S MANUFACTURED By M N SW ITCHONSD I.I.,POT, WHITE FINISH. CONTRACTOR SHALL VERIFY SNSOP TIME IS (2O) TWENTY MINUTES MINIMUM 12. FROM FINISH. FLOOR TO CENTER OF DEVICE: UN18�FOR RECEPTACLES. TELEPHONE AND DATA OUTLETS UNLESS OTHERWISE INDICATED ON PLANS. B. RECEPTACLES AT WOTtK BENCH (ABOVE WORKSURFACE) UNLESS OTHERWISE INDICATED BY THE ♦RCH TECT C. ALL SWITCHES ICED HGHT FIXTURES. A. FIXTURES SHALL BE UL-LISTED AND SUITABLE FOR THEIR ENVIRONMENT. B. E FIXTURES AS LISTED IN THE LIGHTING FIXTURE SCHEDULE ON THE DRAWINGS. PROM VEAR VOLTAHIGHGE TIO BE CCOMPFACTORATIBLEWITHN,, TSOURCEVBALLASTS FOR .MPABT OOLRESCE. TAGET LAMPS. EPROVIDE. W ITH BATTERY BACKUP SYSTEM UNLESSNOTED OTHERW ISE- REFERTOUGHTXINGHXTU ESCHEDULE. F MINIMUM OF SD M)CY NUTEAOURBB S ON BATTHALL BURN SPEAS ERY POWER FOR EMERGNCY EGRESS, THAN I?OOLUMEN OUTPUTFORA PART3- EXECUTION A. REFERTOARCHITECTURAI REFLECTED CEILING PLANS FOR EXACT LOCATION OF ALL LIGHTING FIXTURES VERIFY CEILING TYPES OF ALL ROOMS WITHARCHITECTS ROOM FINISH SCHEDULE PRIOR TO ORDERING LIGHT FIXTURES. B. LOCATION OF OUTLETS SHOWN IS APPROXIMATE ONLY. OUTLETS MAY BE MOVED TO SUIT CONFLICTING EQUIPMENT. C EXACTLOCATION OF O ITCHESFLOOROUTLETS AND CONDUIT STUBS SHALL BE VERIFIED WITH THE O. RECESS. FI PO_ IN SUSPENDED CEILINGS SHALL BE SUPPORTED FROM OVERHEAD STRUCTURES BY NECESSARYE. PROVIDE A NG REQU RED TO INSURE RIGID MOUNTING OUTLET BOXES. F CONDUIT ROUTES SHOWN ARE APPROXIMATE RLY AND MUST BE ADJUSTED IN THE FIELD TO CLEAR OTHER ONDUR ROUTING SHALL BE VNHEAD. CONCEALED IN WALL OR CEILING, UNLESS NOTED OTHERW G. INDICATED AS STARTING R NG FROM THE OUTLET MEANEST THE PANEL AND CONTINUE IN DIRECTTHE GENERAL NOF THAT PANEAL. COANTINUE H CIRCUITS TO THE PANEL AS THOUGH THE ROUTES RETPLY INDICATED. HOME RUNS TO PANELS SHALL BE IN INGIVIDUAL CONDUTS WITH CIRCUITS SSHOWN.EXCEPT FOR SINGLE PHASE DKV CIRCUITS. H. ALL EXPOS. RACEWAY RUNS ABOVE GRADE SHALL BE RIGN STEEL, HOT DIPPED GALVANIZED AND SHALL BE ROUT. AT RIGHT ANGLES TO, R PARALLEL WITH THE STRUCTURE, CONDUITS SHALL BE SECURED AT N. I. JUNCNONMAND PULL BOXES NGDENERALLY SHALLNT BE EXPOSI EACH EED IN FINISH PLACES, PROVIDE PULL BOXES AS INDICATED AND WHEREVER NECESSARY TO FACILITATE PULLING OF WIRES. COORDINATETHE OTHER TRADES. ALL JUNTION AND PULL BOXES SHALL BE ACCESBIBE. PROVIDE PULL BOXESNYLOFORNS A'VERYNITH THREE ODEGEE BENDS -OAS INDICATED ON THE DRAWINGS. J. RUN LOW VOLTAGE CABLES ABVEDROPP. CEILING PARALLEL DR PERPENDICULAR TO OWMN LINES. SECURE LOW E CABLES ON 48" CENTERS TO UNISTRUT CHANNEL OR OTHER SUPPORTS FASTENED To CONCRETE CHEW NG. 'THOMAS AND BETTS TY.LPAY CRHE TIES, OR EQUAL SHALL BE USTO HANG K. ALL EQUIPMENT BY MEANFU S OFOUR, HANGER SUPPORTS, GUIDES, ANCHORS AND AWAY ES TO MAINTA NALIGNMEW AND TO PREVENT EQUIPMENT MOVEMENT. L. INSTALLATION OF CONGUITS: USE RIGID STEEL IN WET LOCATIONS, WHERE SUBJECT TO MECHANICAL DAMAGE IN CONCRETE OR BLOCK WALLS USE MT IN OTHER LOCATIONS WHERE PERMTTTEO BYCOE. 2. INSTALL MECHANICAL AND ELECTRICAL SYSTEMS TO FACILITATE SERVICING, MAINTENANCE, REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL. CONNECT EQUIPMENT FOR EASE OF DISCONNECTING W ATH MINIMUM OF INTERFERENCE WITH OTHER INSTALLATIONS. 3. RUN LOW VOLTAGE CABLES ABOVE DROPPED CEILING PARALLEL OR PERPENDICULAR TO COLUMN LINES. SECURE LOW VOLTAGE CABLES ON 48"CENTERS TO UNISTRT CHANNEL OR O.THR SUPPORTS FASTENED TOCRCREFE N.TITS TY-RAP- CABLE TIED, OR EUAL SHALL BE DGC TO HANG CABLES. 4. ED CONDUIT PNETRATIONS IN FINISHED CEILING AND WALL AREAS SHALL HAVE AN ESCUTCHEON PLAEXPO S. ALL CEILING AND WALL CONDUIT PENETRATIONS AT FIRE RATED AREAS SHALL BE SEALED TO KEEP FIRE RATING N`EGRROVIOE GYPSUM BOARD BOXES FOR RECESSED LIGHT FIXTURES IN FIRE RATED LOCATIONS. S. REMOVE ANY EXISTING STRUCTURAL MEMBER WITHOUT PRIORWRRTEN APPROVAL FROM ARCHITECTTO 7. CONTRACTORGUAL BEESPQNSIBLEFORNLELECTOPICNCONNECTIONSTOMECHANICALEQUIPMENT,UNESS NOTED OTHERWISE. VERIFY EXACT EQUIPMENT LOCATION PRIOR TO INSTALLATION OF CONDUIT. B. INSTALLATION OF WIRES: A. INSTALLALL W TIRES CONTIUT NUOUS FROM OUTLET TO OLET, OR TERMINAL TO TERMINAL. SPLICES IN CABLED WHEN REQUIRED, SHALL BE MADE IN PULL OR JUNCTION BOXES MAKE BRANCH CIRCUIT SPLICES IN OUTLET BOXES WITH IF OF CORRECTLY COLOR -COOED TAILS LEFT IN THE BOX. B. TERM :=ALLEROUGING ED GROUNGAND LINE CONNECTORS TO RECEPTACLES AND WIRING DEVICES TERMC. PROMIGE sRARATEOGROUND ED WIRE FORND RYCEACHE2arzOSV BRANCH CIRCUITAND DIMMING CIRCUIT. D. COLOR 2TIL18W 2D. Are BjzK eV PM1eseC D. Dl, YD— WKse Ne 1 Green Green 9. TRANS FORMER INSTALLATION: A. INSTALL AND ANCHOR THE TRANSFORMER ON AK - THICK HOUSREEPING PAD. B. PROVIDE NEOPRENE WAFFLE PAD FOR VIBRATION ISOLATION, MASON TYPE WF OR EQUAL. tO. CECT ONS TO EQUIPMENT: ONNFURNISH AND INSTALL REQUIRED POWER SUPPLY CONDUIT AND WIRING TO ALL OWNER FURNISHED B.CONTRACTOR LE SHALLBERESPONSIBFORALLELECTRICALCONNECTONSTOMECHANICALEUIPMENT, UNLESS NOTED OTHERWISE. VERIFY EXACT EQUIPMENT LOCATION PRIOR TO INSTALLATION OF CONDUT. AA FURNISH NO INSTALL A DISCONNECT SWITCH IMMEDIATELY AHEAD OF, AND ADJACENT TO EACH MAGNETIC MOTORRTER OR APPLIANCE, UNLESS THE MOTOR OR APPLIANCE IS LOCATED WITHIN SIGHT OF THE SERVICING PANEL BOARD. CIRCUIT BREAKEROR SWITCH. VERIFY ALL EDUIPMENT NAMEPLATE URRENT RATINGB PRIOR TO INSTA WTION. D. BURNISH AND INSTALL MANUALTHERMAL PROTECTION FOR ALL FRACTIONAL HORSEPOWER MOTORS, NOT INTEGRALLY EQUIPPED WITH THERMAL PROTECTION. E. FURNISH 120V POWER TO EACH CONTROL PANEL AND TIME SWTCHH REQUIRING POWER TO OPERATE. 11. ADENTIFICATION: A. PROVIDEEPLAEE—1 SCONSTROCDO6"TH CODING INFORMAUCTIL BIICKPLAR11 (BLACKORWHITUA-kMINATEBMATERIAL. ENGRAVED THROUGH BLACK SURFACE MATERIAL TO EXPOSE WHITE SUB -LAYER. C. IDENDFIGARDN BANDING TAPE: BRADYACUE OR WESTLINE'TEL-A-PIPE' WITH NAME OF THE RVABLEM PRINEO ON THE COLORED DPEER E PROM MRKATC ECOVERS OF ALLLJUNCCION AND PULL BOOXESS. SWIITH A TART BSLACK FEEILT MARKERNECT ?CGCATE THEANELHES AMID PULL S 12. CLEANING LEA RESIGNATION AND CIRCUIT NUMBERS OF ALL WI RES PASSING THROUGH SAID BOX. A A. AFTE NASK REMOVE O A INCLUDINGNGBYSTEMINSTALLATION OUTLET ECT E%POSEO BURRS. A DIET AND CONSTRUCTIONS DEBRAND REPAIR DAMAGED FNISHES E C cm DEP PEYINE THIS PAGE RELEASED FOR CONSTRUCTON '-'I NY WORK IN ONFLIci NFWITH THE BUILDING COOS R ZONING ORDINANCE. I ­ BY BY: ARNOLD O RAMIREZ TSBPE: 141198 BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. E7. BL NENGNEFABJG, LILr ALLIANCE T.- w Lu I— Z Lu U Lu NU Yr LuLu 0 U r CV r 2 0 N0 WI I— N W w Lu I- 00 L Lu w ELECTRICAL SPECIFICATIONS DRAWING RECORD IRATE (DESCRIPTION E-001 PROJECT NO.: 0723101.020 PVN-OVFRALL-D.ECTBICAL ALLIANCE OF GRAPEVINE THIS PAGE RFI EASED F(jRfONSTRUCT[W B—GE—B NOT AUTHORIZE ANY WORN IN CONFLICT THE BUILDING In RDINANCE. att APPaoveo Purvs rn turT Gry TBI111111111 09I1'G"5 BY: ARNOLDO RAMIREZ TSBPE: Id338 BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF W ALL �—GES MUST BE APPROVED. w W C W 0 U� W N VW Lu W _ 0 02 C) W Tm-W N T FLOOR PLAN- OVERALL - ELECTRICAL DRAWING RECORD DATE 'OEBCRIPTION SSUFTON ENGINEERFJGUL E 101 Sr PROJECT NO.: 0723101.020 *FAN FA TSTCUMENTULCUTATiON N SINGLE CONDUCTORS FEEDER SCHEDULE L c_f W '3b. -"9itl �ie— 5'fyPTK� - vOG SINGLE CONDUCTORS FEEDER SCHEDULE IXN co N¢ is Y'� �94��T � v vn r Ili�?S� axt I � i imr IT -11 i �w i s.�n y Ifo €fs I- m �, RT1 qR: c xarccMlLs— i i-�a i 3� i ina m i rw i awi�n i a i-�w. i a k-nMl MG — L2 6 sErf'-P i dJNc j' y�C�HL P3GCTI. Li m¢ ?1 ltCN4S Ir2' DttmNN[cTzy sNUnr � oNrv:zoe/vIDv jl' ,clvn NLTCfR{CAL ONE-LINFOIAGRAM WLENERAL LIGHTING NOTES QR­ e[n[rvum iw,[o MamuaL�mUVM[wT/osnres. srxsssxuv ISTALl— rvc lsaM T a N wwEL�, r` 'FLOOR PIAN- REMOTE RESTROOM-POWER FLOOR PWN-REMOTE RERTOOM-LIGHTING GENERAL EAw C THIS PAGE RELEASED FOR CONSTRUCTION RELEASE DOES NOTAUTHDR ANY WORK IN CONFLICT WITH THE eUIIDING CODE oR ZONING ORDINANCE Ol APPROYEDPN ON THE.I ALL T=PT 09""" BY: ARNOLDO RAMIREZ TSBPE: I— SWEENG INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY. ALL CHANGES MUST BE APPROVED. S E7. R ON ENGINE ALLIANCE ® w LU Lu O U OC W co UW Lu W c � h O O U Lu r � CV ELECTRICAL ENLARGED PLANS DRAWING RECORD i OPTE EESCRI ��O E-401 PROJECT NO.: 0723101.020 ALLIANCE LIGHTING SEQUENCE OF OPERATION: IECC2015 1�2 I M-- COMMISSIONING REQUIREMENTS IE -11 1- -ONS A-NNINN A jAP CITY OF --'E"-E THIS PACE RELEASED FOR CONSTRUCTION WITH THE BUILDING CODE ox 20NINGORDINANGECi CiTYAPPR0REDPUWNSZ"OK7HEJOBSIRE AT A.- RANBRI YSIRIIE: I - BUILDING INEPECFON DIVISION RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF - ALL CHAN BE MUST BE APPROVED. I I IN I PAN ELBOARD: L2 -T-E rIP1.1 'N _E XMZ ZA,11 IM 1- .R.U. A IA YA -IT 2 11 1� A. 1 14 _MT� Pr (E) PANEL H1 E= Q C-- A I I'll VA LIGHTING FIXTURE SCHEDU �AE - --N-1 .1111, L11 --L-- L11- -.1 IYLY 1-1 .112 It a, P_ INY-E, C, ro�0 0 —R— A CAXT Oooc I ifflite- 2 SIR— I I i a rmw49[Rr1I TYPICAL DRY TYPE TRANSFORMER DIAGRAM OS N.TS. E7�N - '2 � L_ INGIR! - w LU z0 F- Lu 0 Lu co Lu Lu O Lu 1714 T— ELECTRICAL SCHEDULES DRAWING RECORD DATE I P�� WINI,11=1 E-701 PROJECT NO.: 0723101.020