HomeMy WebLinkAboutSFRA2025-002478ALL CHANGES REQUIRE APPROVAL OF REVISED PLANS CROSSTOWN ��°TL I DaaN= I FcLtANFrdL mDN Date: June 24, 2025 APPROVED PLANS SHALL BE KEPT ON JOBSITE AT ALL TIMES Attention: GL Hunt Company Inc (via email) & Property Owner Subject: Pre -Foundation Repair Consultation Report Slab Foundation 2632 Flameleaf Dr, Grapevine, TX CONSTRUCTION HOURS 7:00 A.M. - ]:00 P.M. Good Afternoon: MONDAY-EATURDAY ONLY NO WORK PERMITTED ON SUNDAY Adam A. Green, P.E. (M, MBA WIP CITY OF GRAPEVINE THIS PAGE RELEASED FOR CONSTRUCTON RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT ALL TIMES. 10/2012025 BY: ARNMESO RAMIREZ TIMBRE: Id810 BUILDING INSPECTION DIVISION RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC NIGHT OF WAY ALLCIUNGES MUSTBEAPPROVED. Crosstown Engineering (CE) was retained to conduct a review of the limited foundation repair plan prepared by GL Hunt Company Inc (the contractor) to determine, in our opinion, if the recommended remediation plan is a reasona- ble plan of repair based on the relative elevation map provided. The contractor provided a limited repair plan that included the pier locations and pre -lift elevations for the structure for our review. No other information was provided regarding prior engineering reports, recommendations for foun- dation repairs or construction documents relative to this structure. If existing piers are shown in the limited repair plan, their locations were provided by the client and are approximated. We do not certify their performance or ex- istence. If the reader would like to determine if they me present, they must contact the owner or contractor to ob- tain an engineering certificate for them. CE has not performed a visual inspection of the structure. The slab -on -grade foundation has settled towards the areas where piers are located on the limited repair plan and physical damage is present which indicates a need for remedial measures according to the contractor. GL Hunt Company Inc has recommended performing the following in the approximate locations of the structure as indicated on the limited repair plan: coNTRAcroR SBALL CALL FOR INSPECTIONS: • Installing 19 total pilings (17 exterior, 2 breakouts). (817( 410-3010 CONTRACTOR REGISTRATION WILL BE REVOHEO UPON PERMIT EXPIRATION_ Upon review of the elevation drawing and based on the contractor's evaluation of the property, we believe the pro- posed limited repair plan to be a reasonable and limited repair. The foundation repairs me to meet or exceed the 2021 IRC. PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTON AND EmecWtions and Additionial RCCOmYmCndatiow: APPROVAL OF PIER INSTALLATION WHEN WORKISCOMPLETE This report provides our reasonable professional opinion of the condition of the foundation on the date of the in- spection by the contractor and is based on the data provided to us and does not take into consideration any changes in the condition of the foundation or soils after that date. The contents of this report supersede any verbal com- ments made regarding the structure before, during or after the inspection. Although document review is an integral part of the foundation repair process, we recommend obtaining a visual inspection by a licensed engineer. CE can complete this visual inspection for an additional fee. This limited repair plan is intended to provide a reasonable repair to improve the performance of the foundation and is not intended to level the foundation. The contractor shall determine the amount of elevation correction needed based on the reaction of the structure during the lift in order to minhnize damages and additional stress. Because the structure has endured pre -repair foundation differential movement, residual differential elevation and perceptible floor slope or other noticeable issues may remain following the foundation repairs. Damage to the struc- ture may arise during the foundation repair installation activities. Page 1 of 5 - Date: 6/24/2025 Adam A. Green, P.E. (1'X), MBA OSCRSTOWN .x-m i >aaaz, Fort«,, aO ton Isa A t..:o l Waco (469)75t_7694 n.�...RR�.GDIN. �... dnON,��mD. �C.cS= eO.� The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture content fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls will surface due to seasonal movement within the soils, even after foundation repair. Periodic repair of this type of cracking may he needed. A foundation and yard watering and foundation maintenance program will help control seasonal movement. It is important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the struc- ture. In addition, tree and shrub removal or root barrier installations are advisable if trees or bushes are observed to be close to the foundation. Tree roots can cause "heave" or settlement of the foundation where roots grow and ab- sorb moisture over time when planted close to the foundation (tree mots extend approximately as far or further than tree limbs). Maintaining the soils around the structure to slope away fmm the foundation to prevent excessive pending near the foundation in areas that are not already sloping away will help prevent future foundation movement. We recom- mend that a full gutter system with gutter extensions be maintained to discharge a minimum of 4 feet from the foundation (not in landscaped flower beds or any other location that will trap water near the foundation). Pending near the foundation can cause "heaving" (upward movement of the foundation), settlement of the foundation due to overly saturated clays soil or erosion of soil embedment around the foundation. If the owner, at any time, observes standing water near the foundation, we recommend that they consult with an engineer or a drainage contractor immediately. We recommend pre -lift and post -lift plumbing tests be performed on the sewer and potable plumbing lines. All leaks shall be repaired immediately. Disclaimer: We do not warrant the future performance of the subject foundation and the reader is urged to review the Disclosure & Disclaimer for other limitations and standard recommendations. The limit of liability is limited to the fee paid for this opinion. No further agreement shall be made, altered, or varied except by written instrument. This report has been completed to document the repairs to be implemented by the contractor. Neither Crosstown Engineering nor Adam Green, P.E., are responsible for liability to the owner or others for acts or omissions of the contractor to carry out the repairs in accordance with their agreement or for the construction means, methods, tech- niques, sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the warranty of the work they performed in accordance with their agreement. Please see the pier specifications and limited repair plan for mom information Sincerely, Gr rE .1 , Crosstown Land Development Services 4PZE , 0 .. if r1 � �' Texas Engineering Firm (F-15944) / GREEN, � gDfq GREEN`.•, Adam Green. P.E., MBA 4 116697 ti1G.n`./CENSE0'G`�-� Professional Engineer (TX #116597) 10/725 `39.py�p = PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTON AND Page 2 of - Date: 6/24/2025 WHEN APPROVAyVORHES COMPLETETOH Adam A. Green, P.E. UX), MBA CROSSTOWNBustin l Dalle I Foot Wonh, Houran ISm Antonio, Waco 1469, 751.7694 �.� uRR.EE.aA �..P�MdnoNl��mo. ,.w Cr�stmwnLnInCODD,� DISCLOSURE & DISCLAIMER It is known to knowledgeable professional engineers that the soils in this area are subject to movement due to expansion, con- traction or densification of the soils etc. This soil movement could possibly cause the foundation to move after the remediation plan within the attached report has been implemented and may impact the stability of the foundation and cause damage. NO WARRANTY IS EXPRESSED OR IMPLIED BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUN- DATION OR THE REPAIRS THERETO. Diligent foundation maintenance to maintain consistent soil conditions along the perimeter should reduce further problems after the recommendations within this report have been implemented. However, sea- sonal moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger of bother damage. REPORT LIMITATIONS This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the property or an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current conditions observed at the time of the inspection. THERE IS NO WARRANTY, EXPRESSED OR IMPLIED, CONCERNING THIS ENGI- NEERING REPORT. The information in this report supersedes any verbal comments, expressed or implied, made by Crosstown Land Development Services or its principals, agents or employees. The client agrees that neither CLDS nor its employees or owners will be re- sponsible for: 1. Knowledge of the subsurface conditions without extensive gemechnical data obtained from onsite drilling and testing of the recovered samples, 2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the client; and 3. Any other element such as joists or beams and other structural members that is boxed or otherwise not readily available to CE for viewing, and releases CE from any liability attributable to such knowledge or conditions. Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance of the twit - BY at the time of this structural survey. Compliance with any code or specification other than as expressly noted is specifically excluded. The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and DOES NOT IVIPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN THE FUTURE. This report was prepared expressly for the client and expressly for the purposes indicated by the client. Permission for use by any other person for any purpose, or by the client for different purpose is denied unless otherwise stated in writing by CE. CE SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIONS BY THE CONTRACTOR OR HIS SUBCONTRACTORS PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE CONTRACTOR TO PERFORM THE WORK IN ACCORDANCE WITH THE REPAIR PLAN. CE IS NOT RESPONSIBLE FOR THE CONSTRUCTION MEANS, METH- ODS, TECHNIQUES, SEQUENCE OR PROCEDURES OR THE PRECAUTIONS INCIDENTAL THERETO. — CE expressly DISCLAIMS ANY WARRANTY OF FTfNESS FOR A PARTICULAR PURPOSE and the client expressly disclaims that it has contracted for or received any warranty of fitness for a particular purpose with respect to this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF CE AND THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS AGREEMENT. PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTON AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE Page 3 of 5 - Date: 6/24/2025 f.RA iYE; Cm OF GRAPEVINE MIS PAGE RELEAsm FOR COMSTRucnoM RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE CHYAPPRnvFn PIANpTORF E SPT ITHF uw _VFFAT IM012025 BY: ARROLOORAMIREZ TSBPE: IJBSS BUILDING INSPECTION DIVISION. RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY ALL CHARGES MUST BE APPROVED. 2632 FLAMELEAF DR, GRAPEVINE, TX n � 4E OF 7F�`y IM -I?= 3 L n cac�w:. 6.2426- itfi597� . NCRETE OR STEEL C WI WELDED SLEEVE OUTER STEEL PIPE — 2-318' INNER STEEL PIPE — GROUT FILL — GYLINDERS PREFERRED FROM CONFIRMING SITE IN SPECMON AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE ---FRICTION PLATE) ED I- w _ 0 n m a W ED C, a o W n m 2 � W a d w W r./� CROSSTOWN ENGINEERING CRJ���YY' FEPE FIRM F-159-0-0- WYWV.CROSSTOWNENGINEERING, COM V ■ (972)533-9203-DALLAS METROFLEX STRI:CTURiL CNOIN[CRING IIOMC IFOOMOIlI10N IRS`CCIION STEEL PRESSED PILING DIAGRAM Adam A. Green, P.E. C1X), MBA CROSSTOWNAnion 1 Dallas 1 LOT Worth 1 Houston 1San Antonin I Warn (469) 7.91-7694 n9unu9uowlxmlxF xane•cwixwnaxllarernex KPWWJc GWuRWCEngnUrRing.coUR G A .\" _ WE CITY OF GRAPEVINE THIS PAGE RELEASED FOR CONSTRUCTION RELEASE DOES NOT AOTHORrzE ANY WORK IN CONFLICT WI ITH THE BUILDING CODE OR ZONING ORDINANCE INDGVPRGVFn VIA. T.RF FITONTHFJGR RSFAT ALL TIMES. mrzm20zs BY: ARNOLOO RAMIREZ TSBPE: 14898 BUILDING INSPECTION XVISION- RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT OF WAY ALL CHANGES MUST BE APPROVED —tomes 11 A IT .t.8 0.4 t6 PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTOR A" , y _1 2 4D RI 0.1 APPROVAL OF PIER INSTALLATON WHEN WORK I9 COMPLETE -2.0 # .11.0 1 -1.0 1.2 6 -1.3 0.5 AD 1 -0.6 )9 Ds -0.7 Legend Ell Electnc Panel T Extenor Breakout Gas Line 1 Plant 0.3 EP O. 0.3 .2 04 -02 00 0.3 00 01 0.2 n/� 00 01 00 RJ 0.2 0.2 0.2 AC 0.1 0.4 AC 0.0 0.s El r •I 0.5 0.5 2632 FLAMELEAF DR, GRAPEVINE, TX PLEASE NOTE: THIS DRAWING IS PROVIDED FOR PRELIMINARY PERMITTING PURPOSES ONLY AND IS A LIMITED PLAN OF PSEOAF ipj.S�L4 REPAIR. ADDITIONAL WORK MAY BE NEEDED ONCE THE FOUNDATION WORK HAS BEGUN BASED ON THE PERFORMANCE OF THIS LIMITED PLAN OF REPAIR. CROSSTOWN ENGINEERING HAS PROVIDED REVIEW OF THIS LIMITED PLAN OF REPAIRAND ITISOUR OPINIONTHATIT IS REASONABLEANDSAFE FORTHESTRUCIURE. N' .....R................ IF INTERIOR PIERS ARE SHOWN ON THIS DRAWING THE CONTRACTOR WILL PEACE THEM BASED ON THE ApAM1. A.GRI LOCATIONS OF GRADE BEAMS, PLUMBING LINES AND POST TENSION CABLES, THEREFORE, THE LOCATIONS r 116597 /4 SHOWN ON THIS MAP ARE APPROXIMATE. THE CONTRACTOR SHALL PROVIDE THE MEANS -AND METHODS OF 6.24.2$ {.�'p�2j THIS INSTALLATION. ADDITIONAL REPAIRS MAY BE REQUIRED UPON REVIEW OF THE STRUCTURE BY`43%pfjAL�i CROSSTOWN ENGINEERING. Crosstown Engineering THIS IS A PROPOSED SCOPE OF WORK AND HAS NOT BEEN COMPLETED THEREFORE WE DO NOT CERTIFY ANY Texas Engineering Firm(F-15944) EXISTING OR PROPOSED FOUNDATION REPAIR WORK ON THIS MAP AT THIS TIME. IF THE READER WOULD LIKE TO BE CERTAIN THAT ANY PROPOSED OR EXISTING REPAIRS HAVE BEEN 6119 Greenville Ave, Ste 320 COMPLETED, THEY MUST REQUEST AN ENGINEERING CERTIFICATE FOR THE SUMECT FOUNDATION WORK Dallas, TX 75206 FROM THE FOUNDATION REPAIR COMPANY.