Subject: Pre -Foundation Repair Consultation Report
Slab Foundation
2632 Flameleaf Dr, Grapevine, TX
CONSTRUCTION HOURS
7:00 A.M. - ]:00 P.M.
Good Afternoon: MONDAY-EATURDAY ONLY
NO WORK PERMITTED ON SUNDAY
Adam A. Green, P.E. (M, MBA
WIP
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTON
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
10/2012025
BY: ARNMESO RAMIREZ TIMBRE: Id810
BUILDING INSPECTION DIVISION
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC NIGHT OF WAY
ALLCIUNGES MUSTBEAPPROVED.
Crosstown Engineering (CE) was retained to conduct a review of the limited foundation repair plan prepared by GL
Hunt Company Inc (the contractor) to determine, in our opinion, if the recommended remediation plan is a reasona-
ble plan of repair based on the relative elevation map provided.
The contractor provided a limited repair plan that included the pier locations and pre -lift elevations for the structure
for our review. No other information was provided regarding prior engineering reports, recommendations for foun-
dation repairs or construction documents relative to this structure. If existing piers are shown in the limited repair
plan, their locations were provided by the client and are approximated. We do not certify their performance or ex-
istence. If the reader would like to determine if they me present, they must contact the owner or contractor to ob-
tain an engineering certificate for them. CE has not performed a visual inspection of the structure.
The slab -on -grade foundation has settled towards the areas where piers are located on the limited repair plan and
physical damage is present which indicates a need for remedial measures according to the contractor.
GL Hunt Company Inc has recommended performing the following in the approximate locations of the structure as
indicated on the limited repair plan:
coNTRAcroR SBALL CALL FOR INSPECTIONS:
• Installing 19 total pilings (17 exterior, 2 breakouts).
(817( 410-3010
CONTRACTOR REGISTRATION WILL BE
REVOHEO UPON PERMIT EXPIRATION_
Upon review of the elevation drawing and based on the contractor's
evaluation of the property, we believe the pro-
posed limited repair plan to be a reasonable and limited repair.
The foundation repairs me to meet or exceed the
2021 IRC.
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTON AND
EmecWtions and Additionial RCCOmYmCndatiow:
APPROVAL OF PIER INSTALLATION WHEN
WORKISCOMPLETE
This report provides our reasonable professional opinion of the condition of the foundation on the date of the in-
spection by the contractor and is based on the data provided to us and does not take into consideration any changes
in the condition of the foundation or soils after that date. The contents of this report supersede any verbal com-
ments made regarding the structure before, during or after the inspection. Although document review is an integral
part of the foundation repair process, we recommend obtaining a visual inspection by a licensed engineer. CE can
complete this visual inspection for an additional fee.
This limited repair plan is intended to provide a reasonable repair to improve the performance of the foundation and
is not intended to level the foundation. The contractor shall determine the amount of elevation correction needed
based on the reaction of the structure during the lift in order to minhnize damages and additional stress.
Because the structure has endured pre -repair foundation differential movement, residual differential elevation and
perceptible floor slope or other noticeable issues may remain following the foundation repairs. Damage to the struc-
ture may arise during the foundation repair installation activities.
Page 1 of 5 - Date: 6/24/2025
Adam A. Green, P.E. (1'X), MBA
OSCRSTOWN .x-m i >aaaz, Fort«,, aO ton Isa A t..:o l Waco (469)75t_7694
n.�...RR�.GDIN. �... dnON,��mD. �C.cS= eO.�
The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture content
fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls will surface due to
seasonal movement within the soils, even after foundation repair. Periodic repair of this type of cracking may he
needed.
A foundation and yard watering and foundation maintenance program will help control seasonal movement. It is
important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the struc-
ture. In addition, tree and shrub removal or root barrier installations are advisable if trees or bushes are observed to
be close to the foundation. Tree roots can cause "heave" or settlement of the foundation where roots grow and ab-
sorb moisture over time when planted close to the foundation (tree mots extend approximately as far or further than
tree limbs).
Maintaining the soils around the structure to slope away fmm the foundation to prevent excessive pending near the
foundation in areas that are not already sloping away will help prevent future foundation movement. We recom-
mend that a full gutter system with gutter extensions be maintained to discharge a minimum of 4 feet from the
foundation (not in landscaped flower beds or any other location that will trap water near the foundation). Pending
near the foundation can cause "heaving" (upward movement of the foundation), settlement of the foundation due to
overly saturated clays soil or erosion of soil embedment around the foundation.
If the owner, at any time, observes standing water near the foundation, we recommend that they consult with an
engineer or a drainage contractor immediately.
We recommend pre -lift and post -lift plumbing tests be performed on the sewer and potable plumbing lines. All
leaks shall be repaired immediately.
Disclaimer:
We do not warrant the future performance of the subject foundation and the reader is urged to review the Disclosure
& Disclaimer for other limitations and standard recommendations. The limit of liability is limited to the fee paid
for this opinion. No further agreement shall be made, altered, or varied except by written instrument.
This report has been completed to document the repairs to be implemented by the contractor. Neither Crosstown
Engineering nor Adam Green, P.E., are responsible for liability to the owner or others for acts or omissions of the
contractor to carry out the repairs in accordance with their agreement or for the construction means, methods, tech-
niques, sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the
warranty of the work they performed in accordance with their agreement.
Please see the pier specifications and limited repair plan for mom information
Sincerely,
Gr rE .1 ,
Crosstown Land Development Services
4PZE ,
0 .. if r1
� �'
Texas Engineering Firm (F-15944)
/ GREEN,
� gDfq GREEN`.•,
Adam Green. P.E., MBA
4
116697
ti1G.n`./CENSE0'G`�-�
Professional Engineer (TX #116597)
10/725 `39.py�p =
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTON AND
Page 2 of - Date: 6/24/2025
WHEN
APPROVAyVORHES
COMPLETETOH
Adam A. Green, P.E. UX), MBA
CROSSTOWNBustin l Dalle I Foot Wonh, Houran ISm Antonio, Waco 1469, 751.7694
�.� uRR.EE.aA �..P�MdnoNl��mo. ,.w Cr�stmwnLnInCODD,�
DISCLOSURE & DISCLAIMER
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due to expansion, con-
traction or densification of the soils etc. This soil movement could possibly cause the foundation to move after the remediation
plan within the attached report has been implemented and may impact the stability of the foundation and cause damage.
NO WARRANTY IS EXPRESSED OR IMPLIED BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUN-
DATION OR THE REPAIRS THERETO. Diligent foundation maintenance to maintain consistent soil conditions along the
perimeter should reduce further problems after the recommendations within this report have been implemented. However, sea-
sonal moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger
of bother damage.
REPORT LIMITATIONS
This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the property or
an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current conditions observed
at the time of the inspection. THERE IS NO WARRANTY, EXPRESSED OR IMPLIED, CONCERNING THIS ENGI-
NEERING REPORT.
The information in this report supersedes any verbal comments, expressed or implied, made by Crosstown Land Development
Services or its principals, agents or employees. The client agrees that neither CLDS nor its employees or owners will be re-
sponsible for:
1. Knowledge of the subsurface conditions without extensive gemechnical data obtained from onsite drilling and testing of the
recovered samples,
2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the client; and
3. Any other element such as joists or beams and other structural members that is boxed or otherwise not readily available to
CE for viewing, and releases CE from any liability attributable to such knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance of the twit -
BY at the time of this structural survey. Compliance with any code or specification other than as expressly noted is specifically
excluded.
The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and DOES NOT
IVIPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN THE FUTURE.
This report was prepared expressly for the client and expressly for the purposes indicated by the client. Permission for use by
any other person for any purpose, or by the client for different purpose is denied unless otherwise stated in writing by CE.
CE SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIONS BY THE CONTRACTOR OR HIS SUBCONTRACTORS
PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE CONTRACTOR TO PERFORM THE WORK IN
ACCORDANCE WITH THE REPAIR PLAN. CE IS NOT RESPONSIBLE FOR THE CONSTRUCTION MEANS, METH-
ODS, TECHNIQUES, SEQUENCE OR PROCEDURES OR THE PRECAUTIONS INCIDENTAL THERETO. —
CE expressly DISCLAIMS ANY WARRANTY OF FTfNESS FOR A PARTICULAR PURPOSE and the client expressly
disclaims that it has contracted for or received any warranty of fitness for a particular purpose with respect to this report. THE
REPORT UNDER THIS AGREEMENT IS THE OPINION OF CE AND THERE ARE NO WARRANTIES THAT EXTEND
BEYOND THE DESCRIPTION ON THE FACE OF THIS AGREEMENT.
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTON AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
Page 3 of 5 - Date: 6/24/2025
f.RA iYE;
Cm OF GRAPEVINE
MIS PAGE RELEAsm FOR COMSTRucnoM
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE
CHYAPPRnvFn PIANpTORF E SPT ITHF uw _VFFAT
IM012025
BY: ARROLOORAMIREZ TSBPE: IJBSS
BUILDING INSPECTION DIVISION.
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY
ALL CHARGES MUST BE APPROVED.
2632 FLAMELEAF DR,
GRAPEVINE, TX
n � 4E OF 7F�`y IM
-I?= 3 L n cac�w:.
6.2426- itfi597� .
NCRETE OR STEEL C
WI WELDED SLEEVE
OUTER STEEL PIPE
— 2-318' INNER STEEL PIPE —
GROUT FILL —
GYLINDERS PREFERRED
FROM
CONFIRMING SITE IN SPECMON AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
---FRICTION PLATE)
ED
I-
w _
0 n
m a
W
ED C,
a o
W n
m
2 �
W
a
d
w
W
r./� CROSSTOWN ENGINEERING
CRJ���YY' FEPE FIRM F-159-0-0- WYWV.CROSSTOWNENGINEERING, COM
V ■ (972)533-9203-DALLAS METROFLEX
STRI:CTURiL CNOIN[CRING IIOMC IFOOMOIlI10N IRS`CCIION
STEEL PRESSED PILING DIAGRAM
Adam A. Green, P.E. C1X), MBA
CROSSTOWNAnion 1 Dallas 1 LOT Worth 1 Houston 1San Antonin I Warn (469) 7.91-7694
n9unu9uowlxmlxF xane•cwixwnaxllarernex KPWWJc GWuRWCEngnUrRing.coUR
G A .\" _ WE
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AOTHORrzE ANY WORK IN CONFLICT
WI
ITH THE BUILDING CODE OR ZONING ORDINANCE
INDGVPRGVFn VIA. T.RF FITONTHFJGR RSFAT
ALL TIMES.
mrzm20zs
BY: ARNOLOO RAMIREZ TSBPE: 14898
BUILDING INSPECTION XVISION-
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY
ALL CHANGES MUST BE APPROVED
—tomes
11 A IT .t.8 0.4
t6
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTOR A"
,
y _1 2 4D RI 0.1
APPROVAL OF PIER INSTALLATON WHEN
WORK I9 COMPLETE
-2.0
# .11.0
1 -1.0
1.2
6 -1.3
0.5
AD
1 -0.6
)9
Ds
-0.7
Legend
Ell Electnc Panel
T Extenor Breakout
Gas Line
1 Plant
0.3
EP
O. 0.3 .2 04
-02 00 0.3 00
01 0.2
n/� 00 01 00
RJ
0.2
0.2 0.2
AC
0.1 0.4 AC
0.0 0.s
El
r •I
0.5 0.5
2632 FLAMELEAF DR, GRAPEVINE, TX
PLEASE NOTE:
THIS DRAWING IS PROVIDED FOR PRELIMINARY PERMITTING PURPOSES ONLY AND IS A LIMITED PLAN OF PSEOAF ipj.S�L4
REPAIR. ADDITIONAL WORK MAY BE NEEDED ONCE THE FOUNDATION WORK HAS BEGUN BASED ON THE
PERFORMANCE OF THIS LIMITED PLAN OF REPAIR. CROSSTOWN ENGINEERING HAS PROVIDED REVIEW OF
THIS LIMITED PLAN OF REPAIRAND ITISOUR OPINIONTHATIT IS REASONABLEANDSAFE FORTHESTRUCIURE. N' .....R................
IF INTERIOR PIERS ARE SHOWN ON THIS DRAWING THE CONTRACTOR WILL PEACE THEM BASED ON THE ApAM1. A.GRI
LOCATIONS OF GRADE BEAMS, PLUMBING LINES AND POST TENSION CABLES, THEREFORE, THE LOCATIONS r 116597 /4
SHOWN ON THIS MAP ARE APPROXIMATE. THE CONTRACTOR SHALL PROVIDE THE MEANS -AND METHODS OF 6.24.2$ {.�'p�2j
THIS INSTALLATION. ADDITIONAL REPAIRS MAY BE REQUIRED UPON REVIEW OF THE STRUCTURE BY`43%pfjAL�i
CROSSTOWN ENGINEERING. Crosstown Engineering
THIS IS A PROPOSED SCOPE OF WORK AND HAS NOT BEEN COMPLETED THEREFORE WE DO NOT CERTIFY ANY Texas Engineering Firm(F-15944)
EXISTING OR PROPOSED FOUNDATION REPAIR WORK ON THIS MAP AT THIS TIME.
IF THE READER WOULD LIKE TO BE CERTAIN THAT ANY PROPOSED OR EXISTING REPAIRS HAVE BEEN 6119 Greenville Ave, Ste 320
COMPLETED, THEY MUST REQUEST AN ENGINEERING CERTIFICATE FOR THE SUMECT FOUNDATION WORK Dallas, TX 75206
FROM THE FOUNDATION REPAIR COMPANY.