HomeMy WebLinkAboutSFRA2025-0040181000 Buck Dobbs R, RECEIVED IMW025
25-00'01
d8 Aledo, Texas 76008 1905 COBBSCffNEE7
817-374-5559 FOUNDATIONInfo@Nortiedlc.com CUNSUL@NIS' LLC
Initial Revolt for Foundation Assessment
Date: October 16, 2025 I ALL CHANGES REQUIRE
APPROVAL OF REVISED
Attention: Structured Foundation Repair (Tbe Client) I PLANS
Subject: Foundation Review APPROVED PLANS SHALL BE
1905 Cobbs Dr., Grapevine, Texas KEPT ON JOBSITE AT ALL TIMES
Authorization and Scone:
Nortier Engineering Consultants, LLC (NEC) has been retained by the Client to perform an evaluation of
the slab on grade foundation system of the 1 story residential home with brick veneer located at the
subject address referenced above. This report provides guidance as to whether or not the existing
foundation system is in need of repay. The report also proposes a recommended plan if repairs are
needed.
Conclusions/S ific RP.Do me'dmipq
NEC performed a visual evaluation of the foundation for the subject property on 10/16/2025. NEC also
performed a floor survey using a Zip -level Pro-2000 series, collecting relative floor elevations, to aid in
surface topography mapping of the floor(s). Elevations shown are adjusted for the type of flooring
encountered to reflect a consistent measuring plane. The map of the existing floor elevations can be seen
in the figure attached to this report.
Based on review of the foundation. and reasonable professional engineering opinion, we've determined
that movement of the foundation has occurred and should be repaired. Although complete levelness
cannot be guaranteed, or may not be attainable, the proposed plan should improve the performance of the
foundation. It is recommended that six (6) new piers be installed as indicated on the figure(s) attached to
this report. Locations of internal piers [if needed] are intended to be approximate. The Contractor should
locate the beams and place internal piers accordingly. Furthermore. the proposed foundation repairs shall
meet or exceed Chapter 4 of the 2021 International Residential Code (IRC), as it relates to
foundations and any local applicable amendments to the IRC.
This report is solely based on information gathered during our site visit on 10/16/2025, and does not take
into consideration any changes in condition of the foundation or soils after the date which the information
was gathered.
CONTRACTOR SHALL CNLL FOR INSPECTIONS
-
(817) 4103010
CONTRACTOR REGISTRATION WILL BE
REVOKED UPON PERMIT E%PIRATION_
CONSTRUCTION HOURS
7:00 A.M.-7:00 P.M.
MONDAY- SATURDAY ONLY
CRY OF GRAPEVINE NO WORK PERMITTED ON SUNDAY
CRY BPPROV%VI4arTQ BE KEPT ON THE JOB
-TIREI
10/22/2f09215111110 48:10 AM
BY KELLY TAFT TSBPE1-3971
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
NOUN GROPEOTONDMIKA!
RELEASE DOES NOT APPLY TO CONSTRR�TIRN N
CONFIRMING SITE INSPECTION AND
e SENUTSOR PRHuawOHT,O -
APPROVAL OF PIER INSTALLATION WHEN
— I...—...-- ...... —
WORK IS COMPLETE
1000 Buck Dobbs Rd,
Aledo, Texas 76008
817-374-3559
Infot@Nornerllccom
MLNNIaINt rmrsuuesla uL
General Recominen(lations:
It is recommended 1 a guttering system be installed if the house does not have gutters. Installing a
guttering system will direct water away from the foundation and reduce the potential for ground erosion
near the foundation footing.
It is also recommended that the plumbing systems be checked after any repairs are made to the foundation
system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure
and cause leaks.
It is recommended that soil grading be maintained such that the bottom portion of the foundation is below
grade, as per the governing code and a watering system be utilized around the perimeter of the house.
Fluctuations in moisture content of the soils near the foundation of the house can cause differential
movement. If the moisture content is kept consistent, the potential for differential movement is mitigated.
Furthermore, grading around the perimeter of the building should be maintained as sloping away from the
foundation at a minimum of 6 inches fall within the first 10 feet from the foundation. Stich grading
configuration should prevent localized water accumulating around areas of the foundation. Saturated
soils decline in bearing capacity and can result in differential movement of the foundation.
Limitations:
This report is intended for information purposes only, and the sole use of the client and/or homeowner.
The scope of this report is limited to the items related to the foundation system only, and it is understood
that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of
this report does not include judgment on any of the superstructure, detached buildings, retaining or
privacy walls, concrete reinforcement and/or site drainage. In addition, the scope of this report excludes
material and soil sampling/testing procedures and as such were not performed. The report is not to be
used by others for any purpose without our written consent. Compliance with any code or specification
other than as expressly noted in this report is specifically excluded. It is the responsibility of any
Contractor to abide by any other applicable codes or specifications.
No warranty for any repairs, future foundation performance, structure, vegetation, or soils at the subject
property are offered by this report, nor does this report imply any liability to NEC, nor Daneel Nortier, PE
for any work to be performed as a result of this report. It is understood that soils in this area experience
movement due to moisture fluctuations. Such soil movement could cause the foundation to move after
the recommended repairs have been made. Any provided floor elevation data and recommended actions
are based on soil conditions as they exist at the time of the evaluation. NEC does not warrant or imply
that other problems may not occur in the fume. No warranty, expressed or implied, is made or intended
and the limit of liability shall be limited to the fee paid for this report at the time of evaluation.
Report Prepared by:
Nortier Engineering Consultants, LLC
Texas Engineering Firm (F-16800)
10/16/2025
Daneel Nortier, P.E.
Professional Engineer (TX#113157)
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
OFF GGF
pCITY
[M.�PpE/NFW
TMIESIFAp
[EOUEINLI l1011lllpf[4pIWW(IN
CITVAEEROVFSITEAT
I 1.41
0.4
ALL PMESPTONMEJOR
/0.5
4
02
10/22/2025 10 51 17 AM
0.3
BY: KELLY TAFT TSBPE: 1-3971
Interior damage
0.1
0.0
00
E DOES NOTAPPLY TO CONSTRUCTION N
EASEMENTS OPPUBUC PIGHTaP Y
OD
ALL CHANGES MOST BE APPROVED
-0A
-04
as
114
PROVIDE SIGNED AND SEALED LETTER
40
FROM REGISTERED ENGINEER
-1'0
06
CONFIRMING SITE INSPECTION AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
41
i
Zero
�•
0.6
-1.0
-03
OJ
Existing Pier
New pier
41
0.2
Stress crack...
SO
SepemOGn
4.1
4'2
N/A
i
Photograph Label
?!
-0.4.
-0.8
-0.8
-5,7
-5.9
-5.7
N
Oft
10fl 2011
Garage
1
1 I
-O.fi
-0.8
�
_
�
E.7
-6.7
-0.9
eA...uI.INEamawmaaaiw Hmx
I
�iPt�•OF•I-et
t, E
Driveway
10/16/25
By: DN
1905 Cobbs Dr
Grapevine, Texas
��GW OM 0, 09AN15 Li[
NOTES:
1) Piles shall be driven to refusal
2) Foundations supporting a 2 dory
building shall be supported with
double piers as shown. however. a
single pier may be used if apeceg
does not exceed F-P
T
T `ReiRfOTci,g steel rebaA
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
1/21/24 I Precast Concrete Piling Detail Diagram
Not to scale
CITYOF PPEVINE
THE PAGE RELEASED FO$CONsiHI1C1 ]-JOB
CONFuCT WITH THE BOI DIN. COVE GE ro
CROIHNICE
W APPROVED PLANS TO SE KEPT ON TI SITE AT ALL R. ES10/22/2025 10:5127 AM
BY KELLY TAFT TSBPE 1-3
-J
lemon Footing
hims
Concrete Block
"Toecap"
Solid 6- Demeter by 12- long
Precast Concrete Cylinder.
A) Single Pier for 1 Story
B) Double Pier fort Story
For normal spacing
(Bea notes tur additional information)
IWITH 001lible6 MUTANTS IIL
CITY OF GMPEVME
LRYDRABLE
CITY APPN VFON JOB
SRE AT ALL TIMES
PT
10122/2025 10.51:50 AM
BY KELLY TAFT TSBPE 1-3971
GUILLI G INSPECTION DIVISION
RELEASE DOES ROO APPLY TO CONSTRUCTION IN
ALL CHARGES MUST BE APPROVED.
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE