Loading...
HomeMy WebLinkAboutSFRA2025-0040181000 Buck Dobbs R, RECEIVED IMW025 25-00'01 d8 Aledo, Texas 76008 1905 COBBSCffNEE7 817-374-5559 FOUNDATIONInfo@Nortiedlc.com CUNSUL@NIS' LLC Initial Revolt for Foundation Assessment Date: October 16, 2025 I ALL CHANGES REQUIRE APPROVAL OF REVISED Attention: Structured Foundation Repair (Tbe Client) I PLANS Subject: Foundation Review APPROVED PLANS SHALL BE 1905 Cobbs Dr., Grapevine, Texas KEPT ON JOBSITE AT ALL TIMES Authorization and Scone: Nortier Engineering Consultants, LLC (NEC) has been retained by the Client to perform an evaluation of the slab on grade foundation system of the 1 story residential home with brick veneer located at the subject address referenced above. This report provides guidance as to whether or not the existing foundation system is in need of repay. The report also proposes a recommended plan if repairs are needed. Conclusions/S ific RP.Do me'dmipq NEC performed a visual evaluation of the foundation for the subject property on 10/16/2025. NEC also performed a floor survey using a Zip -level Pro-2000 series, collecting relative floor elevations, to aid in surface topography mapping of the floor(s). Elevations shown are adjusted for the type of flooring encountered to reflect a consistent measuring plane. The map of the existing floor elevations can be seen in the figure attached to this report. Based on review of the foundation. and reasonable professional engineering opinion, we've determined that movement of the foundation has occurred and should be repaired. Although complete levelness cannot be guaranteed, or may not be attainable, the proposed plan should improve the performance of the foundation. It is recommended that six (6) new piers be installed as indicated on the figure(s) attached to this report. Locations of internal piers [if needed] are intended to be approximate. The Contractor should locate the beams and place internal piers accordingly. Furthermore. the proposed foundation repairs shall meet or exceed Chapter 4 of the 2021 International Residential Code (IRC), as it relates to foundations and any local applicable amendments to the IRC. This report is solely based on information gathered during our site visit on 10/16/2025, and does not take into consideration any changes in condition of the foundation or soils after the date which the information was gathered. CONTRACTOR SHALL CNLL FOR INSPECTIONS - (817) 4103010 CONTRACTOR REGISTRATION WILL BE REVOKED UPON PERMIT E%PIRATION_ CONSTRUCTION HOURS 7:00 A.M.-7:00 P.M. MONDAY- SATURDAY ONLY CRY OF GRAPEVINE NO WORK PERMITTED ON SUNDAY CRY BPPROV%VI4arTQ BE KEPT ON THE JOB -TIREI 10/22/2f09215111110 48:10 AM BY KELLY TAFT TSBPE1-3971 PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER NOUN GROPEOTONDMIKA! RELEASE DOES NOT APPLY TO CONSTRR�TIRN N CONFIRMING SITE INSPECTION AND e SENUTSOR PRHuawOHT,O - APPROVAL OF PIER INSTALLATION WHEN — I...—...-- ...... — WORK IS COMPLETE 1000 Buck Dobbs Rd, Aledo, Texas 76008 817-374-3559 Infot@Nornerllccom MLNNIaINt rmrsuuesla uL General Recominen(lations: It is recommended 1 a guttering system be installed if the house does not have gutters. Installing a guttering system will direct water away from the foundation and reduce the potential for ground erosion near the foundation footing. It is also recommended that the plumbing systems be checked after any repairs are made to the foundation system. Vertical movement of the foundation system can impose stresses on the plumbing infrastructure and cause leaks. It is recommended that soil grading be maintained such that the bottom portion of the foundation is below grade, as per the governing code and a watering system be utilized around the perimeter of the house. Fluctuations in moisture content of the soils near the foundation of the house can cause differential movement. If the moisture content is kept consistent, the potential for differential movement is mitigated. Furthermore, grading around the perimeter of the building should be maintained as sloping away from the foundation at a minimum of 6 inches fall within the first 10 feet from the foundation. Stich grading configuration should prevent localized water accumulating around areas of the foundation. Saturated soils decline in bearing capacity and can result in differential movement of the foundation. Limitations: This report is intended for information purposes only, and the sole use of the client and/or homeowner. The scope of this report is limited to the items related to the foundation system only, and it is understood that detection of all existing or potential defects is not feasible for this type of evaluation. The intent of this report does not include judgment on any of the superstructure, detached buildings, retaining or privacy walls, concrete reinforcement and/or site drainage. In addition, the scope of this report excludes material and soil sampling/testing procedures and as such were not performed. The report is not to be used by others for any purpose without our written consent. Compliance with any code or specification other than as expressly noted in this report is specifically excluded. It is the responsibility of any Contractor to abide by any other applicable codes or specifications. No warranty for any repairs, future foundation performance, structure, vegetation, or soils at the subject property are offered by this report, nor does this report imply any liability to NEC, nor Daneel Nortier, PE for any work to be performed as a result of this report. It is understood that soils in this area experience movement due to moisture fluctuations. Such soil movement could cause the foundation to move after the recommended repairs have been made. Any provided floor elevation data and recommended actions are based on soil conditions as they exist at the time of the evaluation. NEC does not warrant or imply that other problems may not occur in the fume. No warranty, expressed or implied, is made or intended and the limit of liability shall be limited to the fee paid for this report at the time of evaluation. Report Prepared by: Nortier Engineering Consultants, LLC Texas Engineering Firm (F-16800) 10/16/2025 Daneel Nortier, P.E. Professional Engineer (TX#113157) PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE OFF GGF pCITY [M.�PpE/NFW TMIESIFAp [EOUEINLI l1011lllpf[4pIWW(IN CITVAEEROVFSITEAT I 1.41 0.4 ALL PMESPTONMEJOR /0.5 4 02 10/22/2025 10 51 17 AM 0.3 BY: KELLY TAFT TSBPE: 1-3971 Interior damage 0.1 0.0 00 E DOES NOTAPPLY TO CONSTRUCTION N EASEMENTS OPPUBUC PIGHTaP Y OD ALL CHANGES MOST BE APPROVED -0A -04 as 114 PROVIDE SIGNED AND SEALED LETTER 40 FROM REGISTERED ENGINEER -1'0 06 CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE 41 i Zero �• 0.6 -1.0 -03 OJ Existing Pier New pier 41 0.2 Stress crack... SO SepemOGn 4.1 4'2 N/A i Photograph Label ?! -0.4. -0.8 -0.8 -5,7 -5.9 -5.7 N Oft 10fl 2011 Garage 1 1 I -O.fi -0.8 � _ � E.7 -6.7 -0.9 eA...uI.INEamawmaaaiw Hmx I �iPt�•OF•I-et t, E Driveway 10/16/25 By: DN 1905 Cobbs Dr Grapevine, Texas ��GW OM 0, 09AN15 Li[ NOTES: 1) Piles shall be driven to refusal 2) Foundations supporting a 2 dory building shall be supported with double piers as shown. however. a single pier may be used if apeceg does not exceed F-P T T `ReiRfOTci,g steel rebaA PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE 1/21/24 I Precast Concrete Piling Detail Diagram Not to scale CITYOF PPEVINE THE PAGE RELEASED FO$CONsiHI1C1 ]-JOB CONFuCT WITH THE BOI DIN. COVE GE ro CROIHNICE W APPROVED PLANS TO SE KEPT ON TI SITE AT ALL R. ES10/22/2025 10:5127 AM BY KELLY TAFT TSBPE 1-3 -J lemon Footing hims Concrete Block "Toecap" Solid 6- Demeter by 12- long Precast Concrete Cylinder. A) Single Pier for 1 Story B) Double Pier fort Story For normal spacing (Bea notes tur additional information) IWITH 001lible6 MUTANTS IIL CITY OF GMPEVME LRYDRABLE CITY APPN VFON JOB SRE AT ALL TIMES PT 10122/2025 10.51:50 AM BY KELLY TAFT TSBPE 1-3971 GUILLI G INSPECTION DIVISION RELEASE DOES ROO APPLY TO CONSTRUCTION IN ALL CHARGES MUST BE APPROVED. PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE