Loading...
HomeMy WebLinkAboutSFRA2025-004798E ntek Entek Engineering, LLC 300 Harwood Rd. Bedford, TX 76021 469-751-2433 ALL CHRx� S cox aau*n=an*�x October 01, 2025 AppNCVRLCFREVISEO n°fie ruxz a Laura Bayyouk 709 Premier PI, z Grapevine, TX 76051 PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER o m . F Sent via email CONFIRMING SITE INSPECTION AND `''^"PPPO9m,'„AL°M,ES j w o APPROVAL OF PIER INSTALLATION WHEN o m WORK IS COMPLETE 12n920259'54.00 AM W o O BY KELLY TAF TSBPE 1-3971 rciLL Subject: Foundation Evaluation Report 709 Premier PI, Grapevine, TX 76051 `E—T' "`"""°'°"`.1 Entek Engineering was hued to inspect the subject foundation and to provice an evaluation regarding the performance of the subject foundation. This report has been prepared In accordance with the requirements of a "Level B" survey as defined by the Texas Chapter of the American Society of Civil Engineers (ASCE). This report is in compliance with 2021 IRC Code. This report provides our reasonable professional opinion of the condition of the foundation on the date of our inspection and does not take into consideration any changes in the condition of the foundation or soils after inspection is completed. The contents of this report supersede any verbal comments made regarding the structure before, during or after the inspection and this report was prepared for exclusive use of the person or persons this report was prepared for and we do not have any obligation or contractual relationship to any other party other than the party this report was prepared for. Observations for compliance with any code or specification other than those explicitly stated are not included. Scope of Work: The subject foundation was visually inspected and a floor elevation survey was performed in areas that were accessible at the time of the inspection. The opinions provided within this report are based on the experience and judgment of the inspector and the information provided at the time of the inspection. This report also gives engineering advice in regard to repair methods assuming normally expected subsurface conditions and conventional construction methods. Scope of Work Limitations: This report is for informational purposes only and is not intended to provide a detailed inventory of defects or a technical evaluation of the structure, drainage system or the overall property. The inspection excludes plumbing tests or procedures, verification of previous foundation repairs, framed superstructure, detached buildings, privacy or retaining walls, general site drainage away from the structure, material and soil samplingitesting, and verification of concrete reinforcement or knowledge of the location of interior grade beams, boxed structural members 11 Page PROVIDE SIGNED AND SEALED LETTER Entek Engineering, LLC ivxslmi5 s5annm FROM REGISTERED ENGINEER 9v KEILY Tn TSBPP 13971 CONFIRMING SITE INSPECTION AND 300 Harwood Rd. APPROVAL OF PIER INSTALLATION WHEN Bedford, TX 76021 WORK IS COMPLETE 469-751-2433 ALL Sx„„VES.„S BE AP1111EE not in plain sight or previous repair work. This report does not include any termite or any other insect infestation inspection or report. The client or individual ordering this report agrees that Entek Engineering is not responsible for knowledge of the subsurface conditions without extensive geotechnical investigation Including on -site drilling or testing of samples. The future performance of this foundation cannot be predicted due to variables out of the control of the inspector. Therefore, this report does not predict or warrant the future performance of the subject foundation and the reader is encouraged to read the entire report. General Observations: For the purposes of this report directions will be described using the terms left, right, front, and back with the front referring to the side of the structure indicated on repair plan. The structure is a two-story tall with a slab on grade foundation. The foundation was not exposed during our inspection and was covered with various floor -covering types. Floor Elevation Discussion: A relative elevation floor survey was performed using a Zip -level Pro-2000B to map the surface topography of the floor of the living area and garage (if present). The floor plans and the elevations are illustrated on the repair plan. The elevations were adjusted based on the flooring type encountered to be on the same plane as the base point floor type. Visual Observations: Based on our observations and inspection of the structure foundation, and review of the elevation map, we believe the structure foundation is not performing as intended and foundation repairs are required at this time. This conclusion correlates with visual evidence of movements and floor elevations. Foundation Repair Recommendations: 1. Install (5) new exterior concrete pressed piers. 2. Use steel shims for all final vertical adjustments. Foundation Maintenance Recommendations: 1. Install splash block or downspout extension to control water discharge away from the foundation, as shown in the attached drawing. Refer to attached pier diagram for more details and elevations. 211=� xmA �. — PROVIDE SIGNED AND SEALED LETTER w�mveoruxsmeEunw FROM REGISTERED ENGINEER Entek Engineering, 12aWD259553IAM CONFIRMING SITE INSPECTION AND 9 g, LLC BY XLY TAFTTSBPE. 13971 APPROVAL OF PIER INSTALLATION WHEN 300 Harwood Rd. WORK IS COMPLETE Bedford, TX 76021 469-751-2433 �. Lifting the foundation may cause damage on structural walls, ceiling and roof joists. A post -lift inspection by others of these structural members is recommended to ensure members are structurally sound. Maintaining a fully functioning gutter system will minimize ponding, soil loss and erosion, and will help control seasonal movement near the foundation. The gutter system should direct storm water discharge away from the foundation through downspouts to a well -drained area that is graded away from the foundation. Optimally, we recommend the gutter system discharge via in - ground solid pipe to a low-lying area far away from the foundation. Vegetation maintenance and a foundation and yard -watering program will also help control seasonal movement. Maintaining consistent moisture levels In supporting soils at all times of the year is necessary. It is important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the structure to prevent erosion and an exposed or improperly embedded foundation. Large to medium-sized trees, and even large or numerous shrubs, growing too close to a foundation can dramatically affect the moisture content of the soils within the zone of influence beneath the structure. Root systems extract large quantities of water from underlying soils and result in soil shrinkage. As the tree absorbs water from the soil and the soil volume decreases, the foundation will settle in unsupported. If problematic roots are observed, we recommend removal or installation of tree root barriers. Grading of the soils around the foundation is a critical element to your foundation good performance. Sloping soils away from the home and preventing water from ponding near the foundation is needed to prevent soil "heave". If ponding is noticed near the foundation during the rainy season, consult with an engineer or a drainage contractor immediately. Over -saturated soils can cause "heave" or settlement and contribute to foundation movement. Disclaimer and Disclosure: The fees collected are for the preparation of this report and inspection only and do not include any additional services. Additional engineering services such as construction compliance inspections or post -repair inspections are available at an additional cost. Soils in Texas areas are subject to movement due to expansion, contraction or densificatlon of the soils, etc. This soil movement could possibly cause the foundation to move after the remediation plan has been implemented and may impact the stability of the foundation and cause damage. We do not warrant the future performance of the subject foundation and the reader is urged to review this entire report. The limit of liability towards Entek Engineering is limited to the fee paid for this opinion. No further agreement shall be made, altered, or varied except by written instrument. Diligent foundation care to maintain consistent soil conditions along the perimeter should reduce further problems after the recommendations within this report have been implemented. 31 Page PROVIDE SIGNED AND SEALED LETTER FROM REGISTERneerinED ENGINEER Entek En ii2vmi5956113 AM CONFIRMING SITE INSPECTION AND 9 TVA—D PL-STO BE KEPT ON LEE JOB g, LLC By KELLY TAET TSBPE 1 3971 APPROVAL OF PIER INSTALLATION WHEN 300 Harwood Rd. WORK IS COMPLETE Bedford, TX 76021 ILI 469-751-2433 MT BE— u, —However, seasonal moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger of further damage. Neither Entek Engineering, its sub -contractors, nor Carlos Encarnacion, P.E., are responsible for liability to the owner or others for acts or omissions of the contractor to carry out the repairs in accordance with their agreement or for the construction means, methods, techniques, sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the warranty of the work performed in accordance with their agreement. Entek Engineering will not testify at a Court of Law in favor or against the contractor or owner under no circumstances, unless it is a mandatory Subpoena ordered by the Court. Please refer to pier diagram and repair plan for more information. The purpose of this visual Investigation is to determine the physical characteristics of the foundation and to note conditions that could affect the behavior and performance of the foundation. The scope of this investigation is limited solely to observations made of conditions of the exterior and interior of the structure which are readily visible. It is assumed that accepted construction specifications have been followed during the construction of the structure, including the proper design of the foundation. It Is beyond the scope of this investigation to inspect concealed framing or the foundation structure below grade. The comments made in this report are based on the observation of apparent performance of the structure and the experience and knowledge of the firm. Compliance of any specifications, legal or code requirements is excluded from this report. The conclusions reached in the report are based on the conditions observed at the time of the investigation and no guarantee or warranty as to future life, performance, or need for repair of any item inspected is intended or implied. Because of slab movements associated with expansive soils in Texas, some interior cracks may appear on walls and ceilings in the future. Some cracks in the walls and ceilings are normal for a structure in this area and with this type of foundation. Periodic repair of this type of cracking should be considered a normal item and not a structural failure. It is possible that soil movement, site drainage, plumbing leaks, or other items may cause foundation movements, thus affecting the performance of the foundation. Entek Engineering shall not be liable nor held accountable for the future performance of the foundation. All comments or evaluations concerning the condition of the foundation are professional opinions based solely on a visual inspection of the foundation. No warranty, expressed or implied, is made regarding the future performance of this foundation. I further certify that the findings and conclusions contained in this report have been, to the best of my knowledge, correctly and completely stated with no bias, and is based upon my observations and experience. No responsibility is assumed for the events that occur after the final inspection and submission of this report and no warranty is either expressed or implied. The limit of liability towards Entek Engineering is the fee paid for this professional opinion. 41 Page Entek Foundation Maintenance: Entek Engineering, LLC 300 Harwood Rd. Bedford, TX 76021 469-751-2433 It is recommended that the soil around the foundation be watered regularly. Foundation movements associated with expansive clay soils are usually caused by moisture changes in the soil which result in foundation movements or deflections. When the moisture content around the perimeter of the foundation is maintained uniformly, foundation failure and movements are reduced. Proper drainage must be maintained around the entire perimeter of the foundation. It is important that water is not allowed to stand around the foundation. Positive drainage should be provided around the foundation perimeter in a manner that water runs away from the foundation. A gutter and downspout system should discharge at least 18 inches to 24 inches away from the foundation perimeter. Keep ground cover around the perimeter of the foundation. It is suggested that shrubs be planted at least 2 feet away from the foundation. Water should be allowed to soak into the soil around the foundation. A soaker hose may be placed about 8 inches to 12 inches away from the foundation. Do not flood the foundation with water and this can be accomplished by reducing the water pressure on the soaker hose and not running the hose for long periods of time. Soaker Hose Recommendations: Run soaker hoses 2-3 times a week for 20 min to 30 min. Rule of thumb for soaker hose watering: if you see soil separation between the edge of the foundation and the soil edge, you are lacking water and therefore increase the frequency or amount of water from soaker hoses. If you see water ponding on top of soil, reduce the frequency or amount of water from soaker hoses. Electronic timers on soaker hoses are recommended to better control the frequency of the watering of your foundation. Respectfully, Carlos Encarnacion, P.E. Entek Engineering, LLC PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN WORK IS COMPLETE 10-01-2025 12/29/2025 9 56 40 AM BY. KELLY TAR TSBPH 13971 51 Page O—GRCWev 0.4 -0.3 1 -04 0.2 NALEMAY Fl 0.6 0 0 ao -Lo 0.2 urorex III --III I ^� u -02 Nrvv+G 04 A. T N EXIIN. LIVING 0 0.4 .1 709 PREMIER PL- PLAN VIEW 0.4 0.4 O.NME PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION WHEN MRK IS COMPLETE LIST OF FOUNDATION REPAIRS 1 INSTALL (5) NEW EXTERIOR CONCRETE PRESS EC PIERS 2 USE STEEL SHIMS ON ALLNERI CAL AOJCSTMENTS. LEGEND • PIERS 2 J o Wan Z OwW Z If paw rna Do� O rc'm OIL OF xwNE €u.EOAGRAP� eoe.o.'.S w O ro env o snnl2/29/2925 L9 fi8 OF LATATL 9.8AMme gee Z.p Lu O GIS e GO BY KELLY TAFT TBBPE. I-3 W 1 E.FFT. OR"'L ALL eM-PROVED . SASIO. EXISTING 5'RUCNRE y 1 EXISTWC FOUNDATION _ STEEL SHIMS 1 AS REQUIRED SUPPORT CONC CYLINDERS _ _ 6'XI2" TYP _ CONC CYLINDERS (PIERS) UST PER DRINEN UNDL RETUSP SLAB -ON -GRADE DETAIL PROVIDE SIGNED AND SEALED LETTER FROM REGISTERED ENGINEER CONFIRMING SITE INSPECTION AND APPROVAL OF PIER INSTALLATION MEN NARK IS COMPLETE )' ,. TrvI _ 4X6JDITttF XX6 WOOD HEM, TOF.*�.U' I\ , PIP BLOCK PIERS. PIERS. TYP. M. OFY OF o� CnYAPPA lIITl Il Il IT""' ATALLTES 12/29/2025 9 57 04 AM BY KELLY TAFT T59PE 1-3971 — EXISTING STRUOURL UTOOVAFDGE PIER -AND -BEAM DETAIL Q' — J Wax D _ W 0 Lu Z aaW Z O K 11 a \ar 1W012f25 Z-1 �f INC y„+ 4 /. r E-L �,» ��° � �:'` r �.. �;�-- i' V71- `q i I