HomeMy WebLinkAboutCOMA2026-001630RECEIVED: 05,106/2026 DATE OF ISSUANCE:
V 26-001630 "ABSOLUTE RECOMP" _j 800 INDUSTRIAL BLVD #300
PALLET RACKING PERMIT #:
T
Z
BUILDING PERMIT APPLICATION
7
JOB ADDRESS: 800 Industrial Blvd. Grapevine Texas 76051 .SUITE# 300
T:
2a CK: 3 SUBDIVISIONHERITAGE BUSINESS PARK ADDN-GV
LOBLO.
BUILDING CONTRACTOR (company name): Malin Systems
CURRENT MAILING ADDRESS: 15870 Midway Rd
CITY/STATE/ZIP: Addison, Texas 75001 PH: # 469-315-6203 Fax #
PROPERTY OWNER: KTR DFW LLC
CURRENT MAILING ADDRESS: 800 Industrial Blvd. Suite #300
CITY/STATE/ZIP: Grapevine, Texas 76051 PHONENUMBER- 817-793-9804
PROJECT VALUE: $ 26,854.00 FIRE SPRINKLERED? YES X NO
WHAT TRADES WILL BE NEEDED? ELECTRIC PLUMBING - MECHANICAL
DESCRIPTION OF WORK TO BE DONE: Small rack installation within an existing warehouse. No changes to building or fire protection systems are expected
USE OF BUILDING OR STRUCTURE: Gym Warehouse Equipment
NAME OF BUSINESS: Absolute Recomp LLC
Total Square Footage under roof: 14,869
Square Footage of alteration/addition: 500
21 1 hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings,
alterations and additions)
El I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: (Not required for 1 & 2 family dwellings)
U I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S).
PRINT NAME: Chelsea Culbertson SIGNATURE Chelsea Culbertson
PHONE #: 469-315-6203 EMAIL: Chelsea.Culbertson@MalinSystems.
BOX IF PREFERRED TO BE CONTACTED BY E-MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Type: j� �� FirePermit ri
nklerioSetbacks oal -o Issue
ccurancy Group- Front: ElectcSYES NO
Division: itdin°." Del Ith: Left: Plumlytin-
7
Zoning: Building Width: Rear: Me,/hanical
cccy Load: Grease Tray Right: I 1,6od
Ou,�an
Plan Review Approvate x uilding Permit Fee:
Site Plan Aj-,roval: Date: Plan Review Fee:
Fire Del �artment: Date: Lot Drainage Fee:
Public Works Department: Date: Sewer Availabilit,\ Rate:
Health Dei;lartment: Date: Water Availability Rate:
Approved for Permit: Date: Total Fees:
- - ------- -
Lot Drainage Submitted: Approved: Total Amount Due:
P.O. BOX 95104, GRAPEVINE, TX 76099 (817) 410-3165 0 FORMSTSPERMITAPPLIGATIONS
WJ77XSWV-T;[W"
PO Box 95104
Grapevine, Texas 76099
817) 410-3166
ADDRESS
In trial lvd.
Project # 26-001630
OWW' 0
INSPECTIONS
1. Final Fire Dept Inspection
LEGAL
INFORMATION FIELDS
Heritage Business Park
—APPLICANT NAME (individual)
Addn-Gv Bik 3 Lot 2a
—APPLICANT PHONE NUMBER
PERMIT HOLDER
Tahtianna Fry
APPLICANT E-MAIL
Reliance Material Handli
"NAME OF BUSINESS
ng Systems, LLC
(214) 683-1381
VALUATION
Square Footage
COLLABORATORS
Acreage
• Chelsea Culbertson
Malin Systems
What is use of Building/Structure?
(469) 315-6203
* CONSTRUCTION TYPE
• Tahtianna Fry
* OCCUPANCY GROUP
Reliance Material
DOCUMENTS - MISC 01
Handling Systems,
LLC
DOCUMENTS - MISC 02
(214) 683-1381
ZONING DISTRICT
OWNERS
- Ktr Dfw LIc
FEE
TENANTS Building Permit, Plan Review
- Tim Kurtz *Building Permit Fee (Value)
Absolute Recomp
TOTALS
UA��N
F
9:�
Chelsea Culbertson
469-315-6203
Absolute Recomp
26854
500
0.0087
Gym Equipment Warehouse
II B SPRINKLERED
B/S-1
Absolute—Recomp_.26-0416-7PLANS.pdf
BUILDINGPERMITAPPLICATION-
AbsoluteRecompLLC-
GrapevineTexas.pdf
Ll
TOTAL PAID DUE
$342.55 $342.55 $342.55
$527.00 $527.00 $527.00
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST
MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING
THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND I
COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULAT11
CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMI
Page 1/2
MYGOV.US 26-001630, 05/11/2026 at 4:28 PM Issued by: Amanda Robeson
DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR
ORDINANCE OF THE CITY OF GRAPEVINE.
FURTHERMORE
UNDERSTAND , it SPECIFICATIONS ..
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY AND THAT
THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING
SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL
Signature
City of GrapevineBuilding Commercial Alteration
Project # 26-001630
- 1 a
1) ALL work must be done in compliance with the 2021 INTERNATIONAL UILING CODE.
"ALL work ISSUED prior to January 1, 2024, must be done in compliance with the 2006 INTERNATIONAL
BUILDING CODE.
2) City Approved Stamped Plans must be on -site for ALL INSPECTIONS.
) Project address must be clearly posted at the job site.
NOTES
> 24 HOUR INSPECTION
MET (17) 410-3010, CUT OFF TIME FOR A.M. INSPECTION IS 7:30 A.M. --- CUT OFF TIME FOR P.M.
INSPECTION IS 1:3 .
> PERMIT ISSUED IN I APPLICATION I IN THIS I .
Page 2/2
MYGGV.US 26-001630, 05/11/2026 at 4:28 PA Issued by: Amanda Robeson
AFF
I I DAIE 111, 11E ENTEN T, � END
ILI
NET 11-1 DO D _ETEP
M, D,
Flw -1A,ET OAD,
N
ft IFT-Al. L � L
LEVEL
.71
"E D 1111TEI
E�
PeF
I.-D. TEP INE. 1.1
"IT
T
TIP T, 11 IEL 111 . T� 11 DEITD
T
J1— INDE-IN IN
"A
VICINITY MAP
7 4".
F1
Ij
RACKING PLANS
ABSOLUTE RECOMP
800 INDUSTRIAL BLVD. #300
GRAPEVINE, TX 76051
it
W—E
Enhao igned —PZ�—
Zhang,,,--',,-,�,
0700
coon
0 <
xc.
c' . m
C) x > o
x m
z 0 > u)
.
omw
c ED
m
00
0
5:
SITE MAP INDEX OF SHEETS CODE SUMMARY
nri
M
L4
OWNER DEVELOPER
Oc 0—t-t- TIP, 113
.,- Load Caliulatans
-
TOM WAREHOUSE
IMax -... ."I SqFt -
DISIN-1— I Per RMANS1 MH16.1-2023
D—T Specification for the
Design, Testing and Utilization
of Steel Storage Racks
RAErc1—T
PA- ELED-1—
-IPE
_L F IIATENALI
F1
I: P I T
F1
( z w � ei< �.I n c.
Absolute Recomp
24143-010828-1
O 0i
10i I
SUITE400
25,200 SF
0 0:
C)
---- - .......
SUITE 300
SUITE 200
30,240 SF
j
P� -77
6:
Enhoo Zhang
71 0 SUITE 125 SUITE 100
5 SU5 1 SF 20,560 SF 29,600 SF
FT -T
------------
ICI
�" I � � 1 1
7 - ---------
ti
GENERAL NOTES
IPe, RMIIANSIMH161-2023
S—T—.—, the Dak,gd, Tast,IT antl
Jiffl-oa of
SiA., S.,dg. R.-)
1 A11119--fth ...... p .... S, Iffi,, than shown ,snot poaddlitIll
2 Instruct all h. bl,dg --.It ooperatorsi
I To correct,, of the
hIldflog equ,pment
3 The 11,111 the
structural
dtod ty _l_ talk
'y— by "'.6hR P.P., ,I-oko.p, E — —Iii—Ild
P..d.,k. Idad,bg b. I. 1,.,.d
to III bild,ang
-P,.hlb't ,y overloading It .,y pallet P-1.1 antl If
the overall talk system
-Regularly inspece for damage
If d.—ge s found,
—d-dbly -- the affected
and replace or 1111 111Y damaged """ Ibeams . othad l..I.nenI -E,,,,, that pa"I'l areP'P'dy placed onto the pallet wpp,II
.—b,do id . p,dp.,I, stacked
and stable p—odd
4 Ma"' — h,,,,,,t, loads —I ... Ad
to 2023 R MI kpoo "CIt'd— 1 5% If
'InIcal load Racks are not
fo horzontal
'"pact
se smc
5 All ,pright. shall bebill, d -bg
(1 ) 112" DIA anchorwth3314" embedL
per
a.. plate J N Uptgt. ah.11 I.
,,,t,,I,d old, t 114'pa, 1 V-0"
a Ralk—lb,11baold--d—
,ath manufactures p,bl,,h,d load oh,-
7 1, —pl th 2023 RMI
lip-011 dIla— racksl, a,e doa,ad to
poladt —11,119 fa l— 11 the event that
column ".11I If - column collapses
bays beyond III bays adjacent to
the ballot III— shoultl not also collapse
All Ilk 1111 111PI111d for 111
to'Any d,,,g,d components
, , flames with b- 11 damaged p,ght,.
b- r It—, , d,,,g,d beams, to be -P.oad -d
p,00 pp al ft., th. Ig,I...
„,,, vS�PtEOFTfXgs\`11
I
EnhaO
Diyirauragnea by
i
(3 ( 4 5
Zhang
Enha°zba°g ................................i
Dare. io1c of 21 y+q:, Ik33R9 .eVQ�
r5oosr drdo ff�0
GENERAL NOTES
J J
Per RMIIANSI MH161-2023
Specificabonfor the D—gn, T-T,g and
48'-0" 48'-0"
wmzanan of Steel Storage Racks)
1 Ariangementoflhesecomponenis
oNer than shown is not perm,U,d
without engineer's approval
2 Instruct all handling equipment
Phase 2
operators inihe correct ode of the
E
anmg equrpment
3 The owne..hall malntarn [he
structural integrity of the inslalletl rack
A (_
^ ^
_ _ _
system by assuring proper op—tb
housekeeping maintenance
antl
l
_
�, c� e B e _ _
procedures including but not limitetl
to the following
-Prohrblt any overloading
¢
of any pallet positron antl of
the overell rack system
-
-Regularly insp— for damage
¢
If daemage is found,
m diately unload the affected
..
and replace or repair any
damaged columns beams or
SUITE 300
Ener.th,l 11
-Ensure that pallets are ppp.,l
placed onto the pallet support
¢
embers m a properly stacked
and stable posi4on
_
4 Maximum horizontal loatlere limited
J
2023 RMI specifca[rons' 1 5°0 of
1
¢
vertical load Racks are not maximum
tlerot horizontal impact, seismic
Phase 1
—d Ioads
wind
¢
5 All shall be anchored using
`D IA
ti) I—pl. an
N Up,h3-3t4"embed.
per base plate U N Uprights shall be
¢
installed plum i 1/4" per 10'-0"
6 Racks shall be esetl in acmrtlance
-
with manufacfu,es published charts.
] In compliancek, 2023 RMI
¢
spRicaGo...... ks are designeto
ec
-
'-
prevent cascatling failure in the e,vent that
I c)
o �
column collapses Ifa column collapses,
then bays beyond the bays adjacent to
the failed column shoaltl not also collapse
¢
rack to be inspected for damage prior
to installation. Any damaged components
JAI'
fiamesw,ih bent or damaged uprights.
WORKOUT ¢
bent or missing bracing, d—ma d beams,
EQUIPMENT _,.
ro be separated and not installed
wnnout prior approval rtom the engineer
DEMO
AREA ¢
`EV# o o.,Yimei xs
F :. .. ..
a,,,L. bsolutteRecomPria„
oTX
:";r ....:. .. :. ... �..:. .....
'. ._. 24143-010828-1
II
Enhao
- ----------- 48'-0- ---------------- ---------------- 48'-0er
SUITE 309
Forklift --
Alsle
WORKOUT
EQUIPMENT
DEMO
AREA
L
-------------------
60" x 120"
ro 60" x 120"
L— — — — — — — — — — — — — — -- — — -
GENERAL NOTES
,P., RMIIANSI MH16 1-2023
S—T—.—, the Design, Testing antl
ut"j'.1- of
S-1 Storage R.-)
1 A11119--fth ...... I .... I,
III,, In,, shown 11 not permuted
2 In.1.1 bl�h. dIg equipment
operators I I, III-Ilt use If the
handling qb,pbn. I
3 The m— shall --, the
st,nnn—1 ntIgnty IF th.—t.l.d rack
system by....' ng P.P., operatbn.I,
L.—M.pnE — In—t—Ill
p..d.Lk. Idld,bg b. I. 1,.,.d
to In. follow rig
-Prohibit ,y .... Indng
If any pallet P-1.1 antl If
the overall —k system
-Regularly p— for d—ge
fd—ge s found,
--tbly .,I,,d the affected
. . . and replace or :pI11 any
damaged """ I1 —.1
other —1-en" -E,,,,, that I'll- are p,p,dy
placed onto the palletsupsupport-1,pp,Ib n P,,p,,Iy stacked
and stable p—tin,
4 Mn,,,,, horizontal loatls ere limited
In 2023 NMI specifcations 1 5% If
--t, --1 i..d Racks are not designed
In, h"'In"' .""I I, wind InIdI
5 All uprights sI.11 N, anchored using
(1) 112' DIA Iml-11 with 3 314" llbld.
per It— S.I. U N Uprights shall I.
,,b,lI,d P111 t 114'pl, 1 V-0"
6 Racks shall b,,,,d——dance
with manufacfutes published 1,,d lh,-
7 In compliance with 2023 RMI
1011 111— racks are d,,,gI,d In
P111- —11d,19 111[— 11 In, —It that
column "'JI.M. If - columncollapses
I.Ys beyond the bays adjacent t,
III f,,I,d -1—n should III also wllapse
All rack 1111 111PI111d for damage prior
to installation. Any damaged components
fi.— with bent or damaged npIghIk.
b- IL missing bracing, damaged I—,
--
In, — I. I P.,IJ -d no[ installetl
-h- pI., approval from the engineer
/ s ySPSE OF TEkgSy1 „ , '
EnhaoZhan Tang
a>'00
lt��.`S6`CENSE�.Gh��
C�46,_4"
0
21
1' 48'-0"
SUITE 400
25,200 SF
Nales.
:EGRESS START
1 Tmyet paths shown are inristmtN. of maximum barrel distance
..'"..
....
only and do not designate all egress paths
" :EGRESS PATH
2, Doors marked 'Required Exit' are required exterior exit doors
and shall comply with requirements of2415113C Secrruii iv
- - -
400' :EGRESS DISTANCE
3 Doors marked'R. Cold Access' are required fire department
ss doors and shall comply ,th requirements of 2015 IFC
GENERAL NOTES
International Fire Code Section 3206 6 i
IPei RMIIANSI
the Doe2023
Specificafionfr and
J 3
1 t J
$ J
I( I 1 �) ($
Steel tomp.,Testing
Utilization of Steel Storage Racks)
1 Ariangemeni of these components
=
--
--'
-� -' --
oNer than shown is no[ permt[tetl
without engineer's approval
2 Instruct all hantlling equipment
3'-0" 18'-0"
48'-0" 1; S'-0" 1 B'-0" 18
op,,,m,, in the correct rise of the
handing equipment
3 Theowne..hall maintain In
ti. ea J
structural integrity of the installed rack
system by assu,ing proper operational,
-i,
pocedures nclud rig but not mitetl
In. b,11—nig
ang
d by palat xcen.,and of
the overell rack system
',,�;CC _..
e a s
.__.
-Regularly inspec, for dama a,
If tlemage is found,
m tlniely untoatl the affected
and replace or reparz a
ony
damaged columns beams r
---
other components
-Ensure that pallets are property
pIs.d onto the pallet support
',--
embers in a properly stacked
and stable position
SUITE 30'I,0
.¢
4 Maximum hone c,el loads ere limited
to 2023 RMI specifcations 1 5°0 of
rraxmvertical loatl Racks are not
tlesigned fpi h-sontal i rpacr seismic
or w dleads
o
o ,,
,
5 All uprights shall be anchored using
¢
-
ti) It2" DIA an,h,r with 3-314' embed.
per base plate U N Uprights shall be
Plum i VE, Per 10'-0"
I ',
6 Racks shall be esetl in acmrtlance
?"
rr 200
SUITE
wih manufacfutes publ shed load charts
] In comcewin 2
plan 023 RMI
l
specfcatons acks a e desgnetl to
present caacatl rig n the avant that
'
'.
SF
a column collapses If a column collapses
30,240
b.ond the bays adjacent to
then bays beythe
the failetl column h,,Id not also collapse
All rack to be inspecietl for tlamage prior t
_
to installation. Any damaged components
e fiameswtih bent or damaged uprights.
be or missing bracing, damaged beams,
to be sepamrsd and no[installetl
without prior approval from the engineer
WORKOUT,
EQUIPMENT
DEMO
AREA-
p
i
8 9 8
5 I
881 9f 18)
..ori LeS Mnx y 1 fi rna
5 1
12%
FPli I-, '"IFP1)
I"A RACK ELEVATIONxe"4_
10 10 10 SiOi
_ -''' •�. .�._.L.__asm Lss wax I im. r.>e
ISO) 10 SO31
IrSoosBS nnax 1r a
1,3.
I1I
(FP2! FP21
p B RACK ELEVATION
...... .. .... .... ... ...
Ot•. TE�9S1f
EtPSE
(PALLET COUNT
¢•"x,�u,�.'`�,�,�,�,�
CWIRE LENGTH:
Enhao'b'IT"°o7'na� ;..�.........389.....q;
GENERAL NOTES
�� F'�. SENSE; .G?�
Zhang;°o60a1p/no'
;/N
EbRMI/ANSIMIT i61-2023
SpecifcaGonfor the Design, Tesllng and
Uhkzahon of Steel Storage Racks)
1 AtangemenIdithesecomponents
th oei than shown Is not permitted
without engm-', app,,,F
2 Inshuct all hantlimg equipment
operators I, the correct use of the
hantlimg equipment
3 The owner shall maintain the
structural integrity of the installed rack
system by assuring operational,
proper
housekeeping and maintenance
procedures including but not limited
to the following
-Prohlbrt any ovarioading
of any pallet position antl of
the overall rack system
_
-Regularly Inspect for damage
If damageis found
med"ady u,load the aff,,t,d
"
antl replace or repalr any
damaged columns beams or
other components
-Ensure that pallets are properly
placed onto the pallet support
members n a properly stacketl
11T0; 'S01
and stapos[ble on
4 Max mum horzontal loatls arelmfea
to 2023 RMi sp,,fadt-, 15%of
pooe es mnk
r a
max mum rertcal load Racks are not
desgned for horzontal mpact ses m c
-, �
prw ad loatls
X ( 10 ! 101 4 )
5 All uprghts shall be a,,h.,.d usng
(1) DI,, anchorwih embed
per ba bapU htsl.oh shall be
N Uprig
too M4x�
nstalletlse plumlate
s 1/4 pet 100
-
6 Racksshallbe—d naccordance
7 4 .,
with manufactures published load charts
7.In—plan. with 2023 RMI
LO) 10 1
sp.Oficationa packs are desgned to
I I )
prevent cascading failure in the even[that
a column collapses If a column collapses
3poc rvtax� e
rhan bays beyond the bays adjacent to
the fa led column should not also collapse.
4 1
to be nspected far tlamagetonstallat on Any tlamagetl components
/I
�Al,-,k
e frames w th bent or damaged uprghts
1
bent o m s rig brae rig damaged beams
----_—_ -J-
are to be and not instanad
FP2/ ,,,.", �FP2 rye
-th pp,— b
without poor approval from the engineer
RACK ELEVATION
C ; xac a
-� '
i
(PALLET COUNT
i
I
i. CWIRE LENGTH:
Enhao b9Enhao 9ha g ''190+ <11iiNvp GENERAL NOTES
Zhang °soo'.°oo' %,<iss°::
Eb RMI/ANSI MH16 1-2023
Specificabonfor the Design, Testing and
Ubirzahon of Steel Storage Racks)
^ 1 Airangemeniofihesecomponenis
other than shown is not permibed
wlihoutenglneel'sappr l
V 2 I Ituct all handing equlpmenf
- operators in the correct use of the
haequipment
3 Th, The owner shall maintain the
- _ structural l b— p Ib, of the mstrack
system—,d properoerabonai,
housekeeping
end maintenance
sln,,ns 1. — aEno vEne�rnr ap - anrt✓a.n_uo-_ proce
thdures includingbut not limited
to e following
n I'... - Prohlbitany overloading
NNNddd G] kkk"'lll «r{{{»1 of any pallet posllion antl of
_ n the overall rack system
-Regularly inspect for damage
ri aE _ _ F/J"r sure If damage is fo..d
q mediaiely "I"d the affect,d
(yz ® a and replace or repair any
dahmegg'd'c I"" beams or
.open
co j -Ensure thatpallets are properly
mle ed onto the pallet support
tiers in a propery stacketl
r" antl stable pos II,
eqa r� A Maximum horizontal loads are l—Id
ero' Wa' to 2023 RM I specificabons 15%of
�
1 53'32 �' maximum vertical load Racks are not
esi778n� dg d f ho zontal impact, seismic
d
5 All upnghts shall be anchoretl using
FPl) FOOTPLATE (FPZ1 FOOTPLATE 0 pt v2"IN an<hor w,h 3-3/4"emb,d
per base plate U N Uprights shall be
" installed plum x i/4" pe, 10'-0"
6 Racks shall be used in accordance
with manufactures published loatl charts
7. In compliance with 2023 RMI
specifications ,acks are designed to
prevent cascading failure in the event that
columncollapses Ifs column collapses,
rhen bays beyond the bays adjacent to
the failed column.houltl not also collapse.
31 All rack to be inspected far damage Prior
by
8 toe ' framles with Abent o'r tlen aged upnghts.
- -- wtith—pI.approvali b— theoetginteailed
III a missin bbracin tl d d beams,
pasl
8 i
t 6 AISLE PROTECTOR WITH FPl
11, ANGLE IRON ';'
nEsi eie.i, r,,e,,,.,
� a
- p r _, Absolute RecomP,i.�,
AISLE PROTECTOR WITH FP2
sa.� s-, -r c :s, + nn,. ,..-c •. (. 24143-010828-1
?,_912'.
9'WIRE-DECK TO BE ALTERED
ZE Of Tf��l
etP"""Pr9s11
1 PALLET COUNT
(WIRE LENGTH:
Enhao
by Enhao Zha g11'9': i333N9 :
110 !
050231
GENERAL NOTES
-0.000'1 /A"` NG
Zhang
Eb RMI/ANSI MH161-2023
Specrficabonfo, the Design, Testing and
Uhkzahon of Steel Storage Racks)
1 Anangemeni of these components
other than shown s not perm tied
without engineer's approval
2 Instinct all handimg equipment
operators I, the correct use of the
hantllrng equipment
3 The owner shall maintain the
structural integrity of the mstalletl rack
system by assuring operational,
proper
housekeeping end maintenance
procedures including but not limited
to the following
-Prohibit any overloading
of any pallet position and of
the overall rack system
-Regularly inspect for damage
If damageis fo..d
mmedraiely "I"d the aff,,t,d
and replace or repair any
damaged columns beams or
other components
-Ensure that pallets are properly
mle ed onto the pallet support
tiers in a properly sftd
antl stable position
4 Maximum horizontal loatls are limrtetl
to 2023 RIM I specrficabons 15%of
IF,rbrt 1load Racks are not
desrgnetl for honzontalrmpact, seismic
tn�ind loatls
5 All uprights shall be a,,h.,.d using
(1) 112" DIA anchor with 3-3/4" embed
per base plate U N Opnghls shall be
installed plum x 1/4" pe, 10'-0"
6 Racks shall bccpe u,.d in ad—.
with manufactures published I..d charts
,. In compliance with 2023 RMI
specifications ,,Oks are designed to
p--.cascading failure in the event that
- 00 O
a column collapses If a column collapses,
d'
(hen bays beyond the bays adjacent to
the failed column ,hO.Id not also collapse.
All rack 1, be i,,p,,Id far damage prior
to installation Any damagetl components,
e, frames with bent or tlamaged uprights,
bent a missing bracing, tlamaged beams,
etc , are to be sepa,ated antl not installed
without poor approval from the engine.,
1�.2
tt�< icA=i A»Pi oEsiuiP.i
raEPo��E��aaaaaEEa�ei „i,,,, .i
-�=>•.r..::.: -,,.r
I tn.,�i. Ikwuirrrrei<,
OF
Recomp
24143-010828-1
i
TMO15579
• h• /.! i0000TKA015425
• ••11'&111 1 tl4:
GI 1 01`4 AM / 11 .:
T0210985
T0202176
12
BCf3-175425WA
FP1
5.094 x4.688 x 0.194 i n
FP2
7.874 x 7.874 x 0.394 i n.
RACK El LLOF MATERIALS
DESCRIPPON
Rack Equipment
N-FR2.102 BM G20' X42"
IQ-FR2.314G20' X60"
BEAM IK59EF5M-144", 5.93" tall face
BEAM IK40EF4M- 96", 4'talI face
BEAM I K40EF4M-120", 4" tall face
ST.BOLT-ON COLUMN PROT. U3P 12", Bolt -on Type
ODLUMN r,mj i t.; i t A-W 8"X8" EB3, 16" tal I - yellow - floor mounted type
Wire Mesh Deck, 60" deep x 46"wide, 2.5" x 4.0" mesh, 6 ga wire, 41ep
channels, 1.5" waterfall, 2500lbs cap (UDL), Powder coat gray
V1! re Mesh Deck, 60" deep x46" wi de, 2.5" x 4.0" mesh, 6 ga wire, 4 3ep
channels, 15"waterfall, 2500lbs cap (UDL), Powder coat gray
VUA re Mesh Deck, 42" deep x 46"wide, 2.5" x 4.0" mesh, 6 ga wire, 3 step
channels, 1.0" waterfall, 2200lbs cap (UDL), Powder coat gray
Angle Iron, 50" long, 5" x3" angle, Powder Coated Yellow
3/4" x41/4" WedgeAnchor
5.094x4.688x0.194in. -1 anchors/plate
7.874 x 7.874 x 0.394 in. - 4 anchors/plate
Interlake
Interlake
Interlake
Interlake
Interlake
Interlake
Interlake
V\+brldwide Material
Handling
Worldwide Material
Handling
V\+brldwide Material
Handling
V\brldwide Material
Handling
Worldwide Material
Handling
Interlake
Interlake
7
15
16
6
56
15
7
SSPtE of Tfkgsll
(PALLET COUNT
.
m n.� 1,
WIRE LENGTH:
oauvsigned
Enhaob yEnhao I...:.........��.....
119'.
2„ang I13iYY 4Qi
pore
GENERAL NOTES
9
(Pei RMI/ANSI MH76 I-2023
Specification forth. Des T.gantl
on of Steel Storage Racks)
go
1 A,z a
1 a of these components
d, all.t
other than shown is not permlVed
,
without
allhb:'sapproval
2 Instinctallhantlimgt
,,ofth,
operators q the correct use of the
handling equipment
3 The owner shall n the
N07ESstructural
GA7
f dh,
tab—,, of the mstalletl rack
systembyassund properoperational,
housekeeping end maintenance
procedures including but not limited
to the following
-Prohlbrt any ove,Iony Palle, ppallio, aad of
the overall rack system
B and C bays
-Regularly impact for d.mage
If damageis fo,,d
madiaiely I'll al the affectad
antl replace or repair any
damaged columns beams or
other components
-Ensure that pallets are properly
placed onto the pallet support
embers In a propody stackod
antl stable position
4 Maximum honzontal load, are kmited
to 2023 RIM specificaa-, 1 5% of
vertical load Racks are not
desig,,d for honzontal impact, seismic
wind Ipada
5 All apnghts shall be a,,h.,.d using
I I ) VTDI anchor with 3-3/4" embed
per base plate J N Upnghts shall be
mstalletl plum x i/4" pet "' 0"
6 Racks shall be used In accordance
with manufactures p-,l h.d load charts
,. In compliance with 2023 RMI
specifica,iona tacks are designed to
28
WredeckstobealteredforA bays
p feven"aa`aP5e5allpr`ip`heeventthat
co lomncolla Ifa columnc orbea,
,hen bays beyond the bays adjacent to
the failed column ,h..1d not also collapse.
All rack to be inspected far do-,,, pnor
33
For B and C bays
to ma,allatien Any damaged aomp.nenta,
e, frames with bent or tlamaged apnghts.
bent a missing bracing, tlamaged beams,
etc , are to be s,p,,,I,d antl not installed
without pnor approval from the engine.,
28
112
30
For A bays
12
For B and C bays
E ''
�r�< 'pA=, A,dPi oEsiuiP.i�g ,,tar:„,.,rs
i�Absolute Recomp:.�,
an.1i,,
24143-010828-1
I1 B 1 I2B
-
2. 37
COLUMN
7104"
T S
USOE@ TYPES B, C MECALUX
----- ---7874"----�
COLUMNIBASE LOCATIONS
DESCRIPTION
BASE PLATE 7 874" X_ 7874"
_ DESCRIPTION COLUMN MCLX H1 2
MATERIAL
0394"T"GKPFATE
MATERIAL 12 GAGE THK STEEL
STEELYIELD
ASTM A36, Fy=36 000 PSI
STEELYIELD ASTM A570, Fy=55 000
PSI
TYP
4
43/8" CI
L9
/'
K,
0
6iJI
2"
II
5I16'O SAFEfY CLIP I�
2,
7/ e"O -
GR 55 RNET
DESCRIPTION '�, 4-TAB CONNECTOR
NOTES
MATERIAL ''�, 7 GAGE
USE @ TYPES A. C BEAM TO COLUMN
STEELYIELD j ASTM A570, Fy=55000 PSI
CONNECTION LOCATIONS
il8"I TYP
_
13)16"'r �
4 3/8"�'
„
I
—5/1sG3AFETY
a
.LIP
2"
2" I n
�Y
DESCRIPTION'', 5-TAB CONNECTOR
GR70 R0
VFT
NOTES
MATERIAL 7 GAGE
''I USE @ TYPE B BEAM TO COLUMN
.STEEL YIELD ASTM A570, Fy=55,000 PSI
'1, CONNECTION LOCATIONS
COLUMN
2 3 OT NOTES
PROJECT l GENERAL -
METE —To—NT Q
OAL
IF
J - - FF �IaaEor air-..�ro,o�E
gi.
.
1 — oBSY ,sovr .116so vs oae.oGv a�orm
46
urvrr.oa�lcavvucayss
2 54
- cr rvs roT<,ansgacs s000 esq snr
', .rrrvemuorr.m TOT,.. s000 veq a.�
'135"MIN EDGE DISTANCE, ear.aosrs c
GEG I-E.q soq esnza,.nsrni. rosnucrrcun yr ov esrrsq
NOTES
USE C TYPE A MECALUX
w, as
-HERS—HE
NOTES = uaeouq.n voq nl.r.s quc=r,w.._rver.es r:,..evrrogwesoinc ca,,e
e
Ir Tre cl.c+...... ee_owsvq rva.e-_ __
CONFIRM O A L OF ANCHORS WITH INSTALLER TO q„rvwc aenmIN or is serner_rvrov or T„-,roan 1-me
COLUMNIBASE LOCATIONS
ENSURE REQUIRED
EMBEDMENT IS OBTAINED _siurvc avw�:nsaq esres:.roq
-
_ -
DESCRIPTION BASE PLATE 51"X469"
''.DESCRIPTION COLUMN MCLX 314
-! --
DESCRIPTION
Ie Tre=gocucrsnorrn onrne aernv,egeiry isnssumec To aew aoco urvo.unGec corvvv or:-ee
HILTI KWIK80LT TZ2 ANCHOR _ _ _ _
agooucT m:.s ee FAss of auronnlaG,All I'll i.;ancnoe rncr,c ss oa wgsaunarrres irs-vs
MATERIAL 0,194"THICK PLATE
MATERIAL 14 GAGE TIFF STEEL
SIZE
,oc
1/2"0X 3-3/4"NOM EMBED NOTES cEssaysie.uno=rne cvme=usevveocucT=ao•nv=_v nrvv:oq rvsrn.,�q or Tr=_cavververvrs ro
STEELYIELD ASTM A36, Fy=36,000 PSI
STEEL YIELD ASTM A570, Fy=55000 PSI
ESR#
4266 SEE NOTE#4 ABOVE FOR ANCHOR SPECS "
5
6
ATTACHMENT
ATTACH WI(2)5/i6"OX3-]/i6"GR
- - ----- Icl*re-ne,resvorvsreiuTror Trveanrveq nr:ooqusea or TIE :om=wer:,s sr-owrvvegeiry Ta ncnr vEc
580LT5 PER BRACE (1)EA END 7
_
13l4" I
li,r rs megasvorvsraiuTror Tn=aw„eq:.eea oe Tre srognGI,v;r<,s sn
- eq nn. °iawE, r-eaeo, ra-All II e=annwn4
'IEII
qo.,sE�E[>n�anom,,MEvr,,cEcacc[o,r,E<euruor,nTECTIITI'E
uG
1513"
iow
- nrvornxe aPagovgwT=_ Taysra
,15/8'
11 IT 11 -1 ITI
r.es nrvco none nvvsionoG.voeeron avv gncco, rv,r.gnT crvvo-IG, ror+sragaGe
L2 ]---
5928"
, s nqa vgoaaas, vucea orvre P1LLET sonc scv= 1 mun1- 111-1111I'll xEo nno
a"
A I Il
',, - _ _ - oorvon,ero .osrnosr �orv, on�essrreancl,
no.s nqE rvor noo FEoogge,nqnrvo orvnmgrvrveaa..nT
_-_ _- _ ._
, c}
o�a„c a,c. orveo�IGI on
NOTES
NOTESI.E
cn oq
USE @TYPES A, C BEAM LOCATIONS
USE @ TYPE B BEAM LOCATIONS
_ _ - _l—E -
DESCRIPTION 4" BEAM (INTLK40E)
DESCRIPTION 5928" BEAM (INTLK59E)
DESCRIPTION
BRACING HORIZ & DIAG
MATERIAL 16 GAGE
MATERIAL 16 GAGE
MATERIAL
16 GAGE STEEL IC715) NOTES, - e ea=rvgasrogeoroa. srr ague l n ces:GnGaon
r=neGT.I-1� s�mav=al
STEELYIELD ASTM AS]O, Fy=55000 PSI
STEELYIELD ASTM AS]O, Fy=55,000 PSI
STEELYIELD
T II 'ENIRe
ASTM A570 Fy-50,000 PSI USE @ALL 4102 MCLX BRACE LOCATIONS gevaa sae"onor„c stove orrnl,_rnnongv gene, ro rrecomvervrngreoq,.egcweq cacuscrory on Trve
8 ATTACHMENT n
ATTACH W/ (2) 5I16"O X 2-318' OR 5 BOLTS PER BRACE, (1) @ EA END 7
DESCRIPTION BRACING HORIZ &DIAG
MATERIAL 16 GAGE STEEL (C456) NOTES
STEELYIELD ASTM A570 FV=50,000 PSI USE @ ALL314 MCLX BRACE LOCATIONS
SEE ATTACHED MALIN DWG.
FOR STORAGE RACK ELEVATIONS.
DESCRIPTION I STORAGE RACK ELEVATIONS
1,
D,gitairy 11, •'�::.s..tir.\.sf.T ENgs.. �f
Enha0 byll
Enhao Zhang
DsS:Etr+sE:?
Zha ngZa62te 60421 i6,x,
15.03.06-07'00'
." 28-0416-7
SED 1 OF 1
8()0INDUSTRIAL 110111 STE 3()4
G-RAPEW" T)(16)"
SCOPE or VVORK:
STORAGE RACK CALCULATIONS
DATE: 412112026
Enhao
Zhang
S S EDINC
ja,VjR1GHTAVE SUIT' 200
I,p,\/ERNE CA91760
englnet �03
—f6
CTgITS
Of
ov,
lS
Structural
Engineering & Design Inc.
t , V— c'.A 9175f! T,I qo
BY: 81b S
PId—t A1,1-1,, R-- ot, I, 2G-Q41ti 7
L"!M-0-111
1h,I o"YS"' 1. tt
Ifle S'l,"; 'Old
ANSI MH Jrv. 1 10,13 6, o .;f
All
other >t,,l
it, with ol flolo 111411 It I All" d .Iltel Iha t It, 5;:,1, —11, 1,
o-U,Iq Ut . —d " 6 v— 31K)o 0 It,"p-111 ltlltql, MI —Mc, Whl I -I,:) ,,P-ty a 750 �,f
TIIE dt,,Iati of the xiqj, , F ab is o,0-
6) L-1 CIRIbInAon, to, Mck —p-)� --p-t o,, 202t RVI Sa'd,t 7A ? & /.: 3 f,, MO &, RID 16 1-1 1
Structural
Engineering & Design Inc.
9; N
coaNu-W & Summary: 'fyK-A—sELxE1—v1 �c
T
4S� WA
58 4NIN, t
W
AIM
5�, NIM' �1&
10SLAMMEN-
4
SWSMiC Criteria SM LVIS F,,,, Oepnj FaT.., Hwahtl 111090MIS Beam Length Loth R.M.
TYP.
UO
P—iptl-
STRESS
.-1,, 314 3.11 60 'CAm,
0.28 OK
1—NV,
N/A
Fr-SsBeam I=d
AVE ;H,2,7V,10 06 TIk U, oo,n Q1,110:31W hp
0,36-OK
C,, FV S k,
L/ 4 �It 01 1 '010.6 wa, 5000 1, lb
U OK
50 Y,,
^ri C45f, Sgj ;,7q53Xj,37.q,tU93tv311)
003 OK
Q.,ol i r, 50
Me, C+%
p,,,,
1, -1 OK
Rd,Net S, U.Jff,O b)
0,008-OK
0 ,09-01,
Level L�&
Wy Force Story FC.I... W.—
� rI
a.
.m._t
P., lave!SPW i
Brace 7-- Loqgft. ftla) r4....t
Connector
_200 1v 96.0
32.0 .n 16 It 4, i, 19 lG t,91,, 1,011
4 tdb OK
2 i,200,�, -6.0,1.
&; 0 a 32 91, 5,9 1r 6r�, 3`3
4 tab OK
EA�
68"1
TOM 16 "? 111 Iu
Structural
Engineering & Design Inc,
ey
p 4 2C,.1
Seismic —Fo— T,,, —fl, j w. rYl E A S �LL IC I VE P A CX
Sifi
F-1 1 M
(�J- SO,
C;
ljo
v 635
00' Elf Nr, 6 Q75
MW ".fl,�l 0
Gs mnx_ 0M211 0.027$ (150 lb + 1608 lb)
Lo
48 lb
".R 1"
01, ol H`alli U
i'm bc"
i:200 b Ir. JO
C, -- 0,0076
CS2 = D 0048
C53- Orools
VjaJ= OM76 (150
lb + 1608 lb)
C-- 0,00)4
IElongkutlitrai= 13 lb
level P40:UC WAO P
P«Ok?*P- OL
I '7'flo
BWO 75 in
4L3�lb
2 t 200 Ih
so^ lb b
i9.
168,768 S 7 ih
Structural
Engineering & Design Inc.
structural
Engineering & Design Inc.
By Bob G RII-11
95W k,
r, Lt1 '6
KI o'a
U- kl ii,
K, I
I
K
5,0
lj%3
0,9087
'0 012 nl
FV= 55 ksi
sf-sf, 01221
Cl 2
0,268
-11 :2 k.
3 ksi
'2'E t
`Y� �Kv'LVIYY2
Aar
A— SQ-t(FY/Rre)
1.59 ,S
FyiU777fc*?),' AQ 29541 lb
19A ksi = 0.5911
ANq.F, 0,0,8S lig-
It"97 lb il,WW
9,330 ft,
Wll- IP
Mnt=F
28 '116 11, )GO jtu
11- n,IINOI,Mlldl Ob - 21Ai31,
,Afll SNK'l
Structural
Engineering & Design Inc.
, — -- ------------- L"_uftldQuAm_LA_
By Rk S Plje,-f A-1- R--b
BEAN 1 lT A 511,C1 Ilb RAII
DETERMINE ALI OWARLIF MOI,IMT CAPACM
M 0.11 qn, I
U�522 UV3 LON
81, 1"t
Y„-{fi
Grtl to
_A_,23
52 k,
_.
I'll' Vy?)= 91n,2R kli
y Q/I''
r.q 87.1
`.
k- a a �J-Y)'l - 2"t 1)
F4. 5?3
flat Illpth V!
UIL! (!
J 'E) 0,1
[J,OJL LO i j 51 ' 3 6
` K,'52le-19LsCe'O 5
0,3V 0.613
tb— 3 oio
2= te, 2
01- tlt?, Y)
= !,62 1,
= L,113
"'t 2.53 1A)5 11,
Wh,i '111.
D,nun, eq— 4 IM ellkf_ — ..., 1 11 Fla) ^w ��,,- ATZ
I— "I" �!�QIFY
IEQ A7.2- 11
(P12)
0 2b3
2": ;Lfi ?'Lcl
13PO
01,60
once fu,rY 127 _2 OK
,.,d t= 2,0833 10K
tben F,,L & , F,,,rtk It),,,.
- /6369,
Thus,rW_t_ W.5/ vs,
FVa blbo,- Fya'YqJ(oepth -YC9,
LflAbLot=Lfb- Ut Otto, - 2
= 2
CMbOM=Ch-
- 0 '7'
ChlFv, . (I Ch)�ryf
'R 62 k,,
by,,- It,, tepy(ryn,,,. bl+llt.ql',
10 /0 k,
1F10 7.+! �w 3
OK
F—Fy- !".00
Fu =F': 10,00 isl
E= 111WO k,-
:b 82. L) 1^plavqbz,Mt� in
RM
b,!t- fhq 2JSa In
Web J,Pth-'�
,2= d-V!M-Y-.q- '1320 '1
','
3= 1.1 75 11
Structural
Engineering & Design Inc.
-IMN-11 A- I. Vcm. CA 1,17UIT-1 1351
:604I6-7
BEAM C—p,lt,- TvPI,.A
Rml Sr'i- 1.2' Zink
1- 1) 1160 E- "950 11
I— lu k' IA'-'
"0 6 U I,,", L11- i
W:�" I oll= I'i'00 If j";
�J
L
,I D1,11 I,— 1 6
L Check Sending Stress Allowable Leads
souf
LVO RAUZZ —8
R— 1
1
212ju-120 I
0,
The, ODIW=MFya'Sz 39,30 ir, k
ft,, aI—W lode
pe, hea, pa-V, ?-JM64 2 D P-.L—'-14
3,864(b/pair allowablehuadbacedoeboodingshcoa
---V-
Mend- W'L'(3 RIVS
(3W c?) 120u " (I-- al�) 8
.1,521 _tl d '664'xx ofocP
of 1200 W unposed product load
2. Check Oaflectiou, Stness, Alleaelete Loads
Al! —do D111,11— L,
t4l A 1
0,66-
13
uellstll11 R11—d L.J= 0 242 l,i
If U,nax= L/180 &I-1 L!dil DIIY—a 11 0�11
drdl ED—
Ll ' 11- >'W'L^
Yeld,,
lh'_ 38A�ElI'2PI80-L'2lRd)
384 1
3,303111c"Ic .110-01eluadbascdaodffe &-Aft
Thus, based on the least capacity of ging I and 2 above:
A='Ild=
11.11 llpl:j
ings ..it g:B"
Issue S-- 0— P"ll"Ll"'i
2-
Structurat
Engineering & Design Inc.
:_2,I �,_, �0- �P� �71 __ — —
gY BEN
4 Tab S... I. CW— C-IM--fi-A —P-N'T"Mi --PE A SMCMLE—RA�CK—
i.-Ib toad at I —I I
(-rd—, I}P- 4Tab
She�r CaPaOtY of Tab ------
1,ibt,"to+U'Sn"n
0.135 In
675 M
CapacitySearmq
oTab . .... .. .....
65,
2,2L
pb—,g: alpha b *N11
221 1 0,,5
2,2751 1465 d
Moment
Edge D'Itt—E, 1,90 in T,,, Sp, ng= 10,,i
F, 551LIG p"i
t,,p= D,V5 n
"'p. 0 183,n'3
M.P:Sap' 'b—N
E f 2
0,102 m, 3 615
6,650 "HI,
u Ip Mlap/(2,154 d
6,17S 11,
t 16 5' 1 p I Fz5 51,4S, P:, G 5 ;'6.5
485 4 �VE5 N,S 1�2� 1 1�0'
L 2
51011r, In I,
5 A00 A-11, s .1.1d n"i., ',)k
Structural
Engineering& Design Inc,
A-�
WN 0156 Sqt
Anlq> 0125117:
G J 1300
UGGIOWS
K
Pob
10 9"W?
,I- I Fy ,
w-
PC
0 8 k't
p1' 2'-ifKy'Ly;rv)1 2
,6A W
71"
151 in
51'2
1.703 m
I
L M13 lb
1.7,14
In
b
ncjlt(FYIP;,rc�
n
2.U1 11,5
Fn=
10.9 n5r
pm- 2,79? 15
P— ANg ' FnID� Q,� = 1. 8
- 1,554 lb
= 0.2577
Pr.11-
Structural
Engineering& Design Inc.
5 V'!raht_Atre La Uptn -A 4, r571 W,9, ' �71 8�
By ft, S ro.eut AW,'Wl R—c
L
1,1C, C4} Syl LZ953x1,
Mur,
ih,
)95(10
C—
Kt� 0. 8
510
1,739 ih
K,-
SU."
Ky- 1
YO
NO
Wyk
U.i k,
"'y ', 2'F/(WL"W2
axrir
➢n—Anfg'F, 3,13.
Prrd= 1 L'7% o
L9
Ad=
In- Fl` 1 W11(A, 2)x
P- ANI'Fl/91
k
0,2571
P,,!a: AeF'
3, 1,10
Structural
Engineering & Design Inc
Bj 8,,4S PfR-U Abso-R,
76 W 8-'
SingW R_ Frame QVettgmip9 C;:nib-„:V ?t, TYPE f. SELECTIVE RACK
loads
c H I
11 RPU 1 :0 q P
51- U. 11 (IQ
IT-
1012sili- MIRI
PEAD LOAD PER UPRIGPI,-D- 15I):h �0,q4Q5;11 a,17W,
PRODUCT LOAD PER UPR:GTffP, 2,TOC, It 8= tRoW
II I
P"P I .bw 1h
iha IT I —I'M I", 111`11•11111): IM31"
F—o D', w,o I,
PIW It L"I'd D1,, L,111,1, 7.P= I'Ail 19", C
DL/Ld - 11 Ib
A,
It, I
j- I WP
Aliquitl2akil
Umd
tDt ,,.I - o% v
r- mu,t-I&U/Df
5,10, 1-1b lv,3 't, WI
f5l"s rr lb 4P,P)o,I 4b)/W jr.
46, 110 n to
iwl It N. Uplift
Net Seismic Uplift- -1,362 PIT
8) T.. Level 1,mmel OMP
toad .. I
V� I CS Tip PNr ' 0.0
hW 0 81" 'M 60 :I 2
t2M lb I tL(V
3,051 P 0
FV,, 1, * V2
V1 2< 0 R
4,61 'N,I,
TO W, C'IM
MITI- MM , D - 0 Q
11,2
35,559 111,
M-2 'VI "I , V2 Hj, fh.
-515
T.-- -59 b No Uplift
Or"ga d—'t ?IVIV t,, T2 ag,t t C—d 1,Y mWCr forc
I Net SoNm,,UDIfft= -5911,
Structural
Engineering & Design Inc
I � V1— (TA q I751 Tp 2LW, 71A9
By, 0k,b S Prolert AU11, RN-1 4
Base Plot. TYT-E A SELECT IVE PACK
vl"I!h,
N Mlterh 1
M't'
'T'
.—a Aisle Loads ',IV C!. I I
111 •Sd- 'V I A0,1111h1d
COLUMN b,
Axdal^P= 1.01155 75 W + 0.7_5> (1L4154 0.7 I'ZOO To)
COLUf IN PL= 1 '00 j
= 968 On
OaseM'n t= 1.91J nI
Mb= Osse Moment a'MO.Ptho
M'o !'M'
- 1916,73862917215 in -lb ` 0.75-0,7',Ihi
14 -0.:4St - 1,4154
= 1,006 hi -lb
B O.MO
I Axial Lead P = 968 In mbase=mb = 1,006 in -a I Ette
)T,IJW P/A - P/(WW)
11! 2 WL' Z 2
it ,,
., n
4/S
R , V:
Mi �'f
riT
112 fb-L'L- }) 2
11.5 I"
- �6 "IT
hit - I'll
1111 1421 �M3
5-"t' f�yt
1
't� 0.73-F
�ZWU
V'rc
0*2
OR = 1-00 Ps OK
T—hor (ITT IP.PW3.15'OA6X
, "1" 11 Tal— 1,961 Th OR
8,21,
NU TEli9r
.Cn— AisleLoadsCheck
uplift load on Oapai
Pst.tic= 968 lb
M.M,75'0.7'M 16S91,
- 110Af—c �Ptn
P
F—c DIM- 60,f
- 6i I
AP' IT_ PramTd
p=p,tft.p..f`pdk= 11029 In
T1
�' �Cnll
2,69:,
Rak, Crc" cv Dult- 1,05
i-
I,= P.'A - "flMI)
'M=L'2j2- 1�11'2/2
24 N 114,
SM"b" ,)IN
13 N -
A,, " Je, BP= I
Net T n;r lrl,t„r=Tl= I ih
044
OR
S1141= 1) G29 !1,' 3
OR
, j !!' i I ,I I S 1- 1 ,.:
Structurai
Engineering & Design Inc
By Hobs.._
Prot^ct Ab3oute R,--r
A Vc "non I,
VA,;-o, 0,6
_4
i flail
""4z JSO Ptf
Mot.- 5.405 irz It:
so,- OA to
od .5d, V 022
x- 0600
4- I!:
3.UG n
dlnli. =b 2 0 n ll=- 1,09,
owi, 4A F,-'O 5= S4.H0 f�f
f.
.1 12 1 1S Is I o 7 12or, It, so Ili
vW,-,P-
25,)'R'Papp
804 16 P,
Lo d Cava 2) 00 0 2Sds,D
Ojn7s -5 In . 0 SA 0.-' 844 Ill I 1 90 ]1,
P ,—l-E- (MIA lla— 1.01)
67 It'.
10 4.Iolll
-P
OX S&= 1 2`20
Effefive Column wad=P— 1,770 Its rer wimn
O.losd- 0.8:180
puncture-
- — ---------
Ap—t=
Fpunctt= Lt4" -
5} wF,- Pi,{Aird'Fp,�n. i
= 1 -
41 57
0.066 OK
FpO-Q- 2,1 0 i)
l
FP.W ff- 87,5
Sian ftndl.a
F5r= DL+Pt -E= J,TIO rl
A5',,1 01- 144Y(f, n,
L - 1Kwl S 0.5 2't
,K) i, 2
44 = is- ll
iL-VI
2A,
13 ,1
(144'j) i"n
tb
1-1 n4b
-
0,004 11, OK
— ------ ---
Structural
Engineering & Design Inc.
_}2ut A 11MR— P
Configuratian & smnw±ly'-!YPE p SELECT RACK
No
2<
"'e"MC Criteria IBM LM I Frlm Ofilf"eal 8 Oil # mav1
m,f� I
$, =1LA'I F- t'49 1 7 2g'o". 1 6
A50 LVAR5
AXIAL 1W 711 D
IWA, a - 410offi
snIA17C 4 V4,1 1 v , 171 Mt
64SE qf'pjp�T, 4, -11 a,
flemn Eangkn
I Fe.M. TYP.
N—,, &
1
WA
beam
"51 k,
101k
81 OK
B — C,,—A
F-55
1: 1 1,h OK 0 o 14. ap 5)M,, 1b
0 34 OK
gy 50
11�1 ',70, S4, ?�7bll 39,16qg�JIIIOF
0 0 3,OK
"g-ti
" w "
S91 ,
M5 OK
Bnsn Plate
F,36
M4.9 " 6
.9 39-OK
M-1
4
125 E-ff E-4C H!ii[ M' ESR 41bo 114R.lof g 46111 N{ uphft=o W
U08 OK
SW & S61
730 .,5., pi—ge
1?o-OK
LmmI Load—
— I C.'eam ClImel Camn,
Rely F* I I
Beam
I Pei, eve]
,.=,I L"it �am Moment p4armant
Conme at
1 4 SIN)
138.0 Ir
24.0,1 7ob, 18;1 3,941 IL 4979
:W OK
�o
24,500 1,
50 In
24,01, 1W b 25:G 1,91"' It goo 950 *
tab OK
4.0
24 11,
61
64S` m
—1-- T, U: : 70 it 41
Ui
�#,io�ova 4o m�oo�
to
,2 -
w � �
tla_ _9ynMm
m
x
z
0
-n
;a
m
(J) cl)
c -0
A
mz
(4;9
CD r,
CD F"
M
-n
r,
0
O
Z
z
o ZA
m
X
cn
z
0
m
> cn
z n
<
M
> m
c;a
r- 2
ox
a r-
r M
> M
z m
r-
a
0
0
FIVE STAR FIRE SYSTEMS, INC. ABSOULTE RECOM - CORP. OFFICES
Soof VEST k FARLM ROAD 800 INDUSTRIAL BLVD.
FORT NVORTH, T EXAS 76119 GRAPEVINE, TX 76051
PHONE (817) 435-8113
G-1, VV Em,,,g j, I,,,
SCR - C - 1926920 EXISTING FIRE SPRINKLER PIPING PLAN
�n� FP-01
I \ i�Tl �, 1. li l MI It.tl'IU\'I.Ll�lt l lf' \I1 l i`lI \l i—
. v�.rsx- a1 ell„L.R as nv, rra rR. a; 'T
a
SUITE 300 FIRE PROTECTION GENERAL NOTES:
.. .— . —
.- -w -'—
�,
xmw (eau:
mc. t
=
I DIMIGN AND INS IALIA
1,1 '019, 5T,\ND \RD
Z. S STFM PrHEN CRITERIA
JAR LE23.3.1 ESFI( SPRINALER
(LAMS I('(IN ODI II P\1
R-I+.O DECR IRTI, FSPR
ION SEALL BE IN A((ORDANLI. w11111I(, NI PA
FIRE ('ODES \ND LUD CHA —LAMENTS.
FOR NFW IT\CK STORAGE
CE ILING ONLI TOR —GLE RCAN R\CK S PORANN
11171D OPT V MET I"RACNING
PENDENT 50 PSI END TIE ID PRESSURE
- -
- - -
8 9 8
- --
_ 10 LO LO
:; - - .-----
to to
o
'� &R
MANIMUM ROOF DFCN 30
M.ATERI AL BEING STORLD
Pl.
IN RA( RS ARE ENFRCIMF FI2(mSILNT-
,2"Ls,
_
10 L0 10
To LoW
q
u
10 J
_ - Lnv
-
��'I
�? o
to m
W
o.
o
o. y
,-
Kea J
Ell
.,,
FRI
11
FP2 ., ,.. ... FP2 '-
FPS ,.. ,. 1„ FP2
rro
d
A RACK ELEVATION
RACK ELEVATION
g
--
C RACK ELEVATION
-1
0
m =
EGRESS
START
400'
.EGRESS
EGRESS
PATH
DISTANCEI
3 ems or zniyli
L
f
Z 3
1 �
46'-4" 48' 0"
4
48'-0" 48, 0"
5
48'_0'
6
7 8
4 3' 0" 48' 0" 48
e-
v
y � n
ME
m
SUITE 300--
i
-
SUITE 200
r
30,240 SFlf
_
SUITE 400
_
—_
c
p
25, 200 SF
e a
''I ON UOUT -
CDEMONT
AREA
ESFR NOTE
o E S F R SYSTEMS
EXISTING SYSTEM GENERAL NOTES:
REQUIRE SleECAL CONSDERATON REGARDING PLACEMENT OF LOT ITNG DUCTWORK
_
- _
ry
v
E
'',
-JJ-
-
PROCESSPINNG ELECTRCALCONDUT RUNS ETC HYDRAULIC FLOWS AND HEAD PLACEMENTS ARE VERY
CRIECAL AND ARE ASSUMED TO TAKE PRECEDENCE PIPING CAN NOT BE ROUTED AROUND OBSTRUCTIONS
DUE TO INCREASED FRICTION LOSSES OR LOWERED FROM ROOF STRUCTURE DUE TO PENDENT DESIGN ONLY
- AND REQUIRED I_DEFLECTOR DISTANCE FROM ROOF DECK ITS UNDERSTOOD THAT RECUIRED COORDINATION
WITH ROOF STRUCTURE JOIST PANEL POINTSDUCTING LIGHTING AND OTHER PIPING WILL BE
- -,
"
ACCOMPLISHED
BETWEEN ESFR
,ROOF
TO ACCOMMODATE REQUIRED SPRINKLER SPACING PROPER SPACING MUST ALSO BE MADE
SPRINKLERS By THIS EQUIPMENT TO MEET REOUIREDCODES
I'
___ .._..._
�I
-
I
I