HomeMy WebLinkAboutSFRA2026-000365Provide a signed and sealed letter confirming site
inspection and approval of repairs when work is complete
RECEIVED: 02/05/2026
26-000365
411 E COLLEGE ST
FOUNDATION REPAIR
HGS ENGINEERING
Attn: Jackie Springer
Cc: GL Hunt Co Inc
Date: 02/04/2026
Report # 3011
CONTRACTOR SHALL CALL FOR INSPECTIONS:
Re: Foundation Repair Evaluation (817) 410-3010
411 East College Street
Grapevine, Tx 76051 CONTRACTOR REGISTRATION WILL BE
REVOKED UPON PERMIT EXPIRATION.
The following report constitutes the engineering assessment requested on the
foundation repair proposal of the subject property. This dwelling is of timber
construction and sits on a pier and beam foundation.
In the evaluation of the foundation, floor elevations are taken in conjunction with
visual observations, knowledge of previous construction and repairs, and overall
function of the home to determine the performance of the foundation and make
recommendations if necessary. Foundation performance considers the capability of the
building to serve its intended purpose, including safety, function, durability, and
habitability.
Analysis:
A single floor survey yields the slope of the foundation at one instant. and may or
may not be sufficient information to support recommendations without access to
previous floor elevation surveys for comparison. Guidelines for the Evaluation and
Repair of Residential Foundations adopted by the Texas Section of the American
Society of Civil Engineers defines allowable tolerance as L/360". (ex. across 360" or
30', so 360"/360", you have an allowable tolerance of 1 "). This tolerance range is used
in multiple calculations with points across the foundation to determine localized and
overall deflection. As apparent from the elevation survey and visual observations
provided from the property, there has been undesirable settlement at the home.
Discussion:
This house is situated in a region that is considered semi -arid cl
mate where
there are very wet springs followed many times by extreme drought.
a omeY4 EVINE
THIS PAGE RELEAS{{ErrJJ��F
sits upon expansive clay, therefore it is important that drainage be po
ryryR��CONSTRUCTION
W�LE+4�eO �xlOM1.lI MRIZE ANY WORK
the structure and watering replenish moisture lost through evaporatio
i COfIFLICT Yl9TH JHE UILDING CODE OR
dunngZPe¢I0a9NCE.
of drought. It has moved in the past and will move in the future. even
TMES. E IfFPT ON THE
of any repairs delineated in this report. The owner should adhere to
-oggpq%2 Y: LARRY GRAY
Foundation Maintenance program to keep movement within paramet
s that are
acceptable.
BUILDING INSPECTION DIVISION
RELEASED DOES NOT APPLY TO
CONSTRUCTION IN EASEMENTS OR PUBLIC
RIGHT-OF-WAY
ALL CHANGES MUST BE APPROVED.
Recommendations:
It is recommended at the home to reshim across the structure to create a more
uniform floor surface. Repairs contained herein comply with 2021 IRC.
When foundation repair is being performed, it is recommended that the sanitary
and pressure supply lines be tested to assure that no leaks exist or have been created
before the repairs and after the lift. If leaks are found, or ever found regardless of
foundation repair, they should be repaired as quickly as possible to prevent
over -saturation of the bearing soil.
General Maintenance Information:
Non-structural remedial measures may improve foundation performance and
reduce future movement. Applying these remedial measures and monitoring
foundation performance prior to or in lieu of underpinning may be a prudent approach,
depending on the severity of foundation issues and needs of the occupant. For
example, an owner may choose to perform periodic cosmetic repairs and door
adjustments, rather than comprehensive foundation underpinning. Typical
recommendations for non-structural remedial measures may include, but are not
limited to. vegetation alteration (such as tree removal or root barriers), watering
programs, and drainage improvements. The following are general maintenance tips to
consider.
- In general, in order to achieve adequate drainage, it is recommended to have at least
6 inches of drop in the first 10 feet away from the home for proper runoff. When this
cannot be achieved, a swale should be created (such as between homes) to drain with
a minimum 2% slope. In instances where lot elevations prevent adequate surface water
runoff. subsurface drainage systems may need to be installed. Gutters are also ideal to
collect roof runoff and have extensions that extend at least 4 feet from the foundation
or run underground to discharge at a lower elevation.
- Installing a drip line around the home at the edge of the foundation can improve
foundation performance during the dry months if not already installed,
O NE
there are trees around the home. Drip lines are ideally installed aboION
ut
T PAGE �R j;O
E E.S E DOS FI� E ANY OR
R L ¢ A ZE ANY WORK
the slab and buried approximately 3 inches below the ground. Requir
IN COt FLI WITH THE BUILDING CODE OR
ents 1['W0INANCE
time can vary depending on recent weather conditions, so the soil co
`T.Y APPRf�E� P� I IT ON THE
I IUA'PP a
monitored to see if it is becoming too muddy or remaining dry so adju
nm1enk&$ 0eLARRY GRAY
watering schedule can be made.
BUILDING INSPECTION DIVISION:
RELEASED DOES NOT APPLY TO
CONSTRUCTION IN EASEMENTS OR PUBLIC
RIGHT-OF-WAY
ALL CHANGES MUST BE APPROVED.
Maintenance Continued:
- It is always ideal to remove large trees and shrubs around the home, but root barriers
can also provide benefit if they are far enough from the home to install. It is
recommended to contact an arborist to determine if root barriers are a good choice
without causing damage to trees. Root barriers are installed to a depth of 3' or until no
roots are encountered, whichever is deeper, and a root barrier material installed to
prevent future root growth and extraction of moisture under the home. If trees are not
removed or root barriers installed, it makes watering even more important. There are
several commercial barrier materials on the market or the owner may use corrugated
fiberglass set vertically in the ditch with the edges lapped over, with minimum 10 mil
plastic sheeting set at the outside and then clay soil backfilled and compacted back in
the ditch. Without tree removal or root barriers, it makes adhering to a regular watering
schedule even more important for the foundation.
Please refer to the attached Foundation Maintenance program for more info on
ideal foundation maintenance and how to allow for proper drainage. Adherence to
these recommendations will better protect the foundation and prevent both over
saturation and exposure to over drying.
OF TE
a ��•
CITY OF GRAPEVINE
•� .S P RELEASED FOR CONSTRUCTION
AlopV
40 * •
00
REC€AE ES NOT AUTHORIZE ANY WORK
* �
�^/ITH THE BUILDING CODE OR
•••• ................
HEATH G. SAL
..I.. ..��T ONING ORDINANCE
ON
ON THE
...: ....—*..•
FD PLAN/S TO PE KEPT
TIMES,
<<� -off...• 135871
B SITE AT ALL
:
110ENSF;
`/
'2026 BY: LARRY GRAY
S ••..
;Pj
r
����
�F22�o142/628026
BUILDIFG ITISPEGTION DIVISION:
RELEASED DOES NOT APPLY TO
CONSTRUCTION IN EASEMENTS OR PUBLIC
RIGHT-OF-WAY
ALL CHANGES MUST BE APPROVED.
871.53 sq ft
Legend
Access for Tunnel Existing Access
Existing Beam Reshim
location
Summary of Work:
- Reshim
Notes:
- Measurements are in inches.
- Location and number of piers may change based
upon field conditions/obstructions and contractor
locating the interior grade beams.
- Repairs to comply with 2021 IRC.
® -4.9 -4jj �DI -1.8 -0.4
DO-2.8
® 1.
-3.1 �8 .
REF
-2.8 ; ' -2.4
�___M a
-0.9 -1.1 -1.4 .2
2.4
0.5 ®R 1.1
U
OF T
P.E.......EXq��>J
i
f* * Ilk
' * �• CITY Or. C*A VINE
/•••,•HEA V�J�LMU "S CONSTRUCTION
.......... AFUaS Ii PAN%1111 PY7 RIZE ANY WORK
IN CONFLICT WIT 4HE ILDING CODE OR
// -O'•. 35871 "'NO ANCE.
/Jj ' '�•IITYVEAW. BE KEPT ON THE
/ O� ALL TIMES.
F-21268
` ?l6 BY: LJQM*4&026
N FWAY"ION DIVISION:
H d���� 1AS NOT APPLY TO
RIGHT F-WAY.
PROJECT: DWG BY: HGS
ENGINEERING
SITE: 411E t College Street
Grapevi
Agreements and Limitations
The opinions expressed in this report are based on information supplied by the owner and/or
an evaluation of current conditions observed at the time of this inspection. This writer will not be
responsible for (1) knowledge of subsurface conditions without extensive geotechnical data
supplied by a competent soils engineer, (2) knowledge of cracks, vertical differential displacement
of floors without uncovering of the floor by the owner, and (3) any other element such as joists or
beams and other structural members that are not readily observable for viewing. In no event shall
the liability of HGS Engineering exceed the monies paid by the customer under this agreement.
Any prescribed repair plan detailed by this report is based on observations of apparent
performance of the facility at the time of structural inspection. Compliance with any code or
specification other than as expressly noted is specifically excluded. This site survey and resulting
recommendations are based on conditions as they now exist and do not imply or warrant that other
problems and/or areas may not become manifest in the future.
Unless otherwise indicated, this report was prepared solely for the client involved and
expressly for purposes indicated by the client. Permission for use by any other persons for any
purpose , or by the client for a different purpose, is denied unless otherwise stated in writing by this
letter.
This writer shall have no liability for the acts or omissions by the contractor or his
subcontractors performing work on this project, or the failure of the contractor to perform the work
in accordance with repair documents. This writer is not responsible for the construction means,
methods, techniques, sequence, or procedures or the precautions incidental there in. This writer is
not responsible for the future performance of any repairs that were installed previous to or after this
report by another party. It should be understood that different repair methods can result in varying
long term results.
It is known to knowledgeable Professional Engineers that soils in this area are conducive to
movement, expansion, and/or contraction. This soil movement could possibly cause the foundation
to move, even after the repairs are completed as outlined in the recommendations. Because of the
highly active nature of the soils in the area, risks of continued diminished performance are involved
in all remedial measures. The engineer can, however, provide recommendations for remedial
measures that reduce risks. Not implementing the entire remedial plan may increase such risks.
Although no warranty is expressed or implied as to the performance of this foundation, proper
maintenance of consistent soil conditions along the perimeter of this structure can reduce further
problems after the recommendations listed herein have been completed. The owner should be
aware, however, that if water leaks occur or erosion takes place, stability of the foundation would
be damaged. CITY OF GRAPEVINE
IV-` THIS PAGE RELEASED FOR CONSTRUCTION
SAP. .... TEX ASE DOES NOT AUTHORIZE ANY WORK
INFLICT WITH THE BUILDING CODE OR
dop
* . * ZONING ORDINANCE.
i
Sincerely,
* : T ROVF_ PJ re T(� [� PT ON THE
!.•...............u... ...,JOB IT A�ALL TI .
..i
HEATH G. SALM
Heath Salmon, P.E. •••..............••••• --:OW /2026 BY: LARRY GRAY
135871 do
/CENS�BUILDING INSPECTION DIVISION.
ENGINEERING SS/6NAL�� RT �r§4�S NOT APPLY TO
Ot15 02/01 4 AYTS OR PUBLIC
ALL CHANGES MUST BE APPROVED.