HomeMy WebLinkAboutCOMA2025-002709ALL CHANGES REQUIRE
APPROVAL OF REVISED
PLANS
SEPERATE PLUMBING,
MECHANICAL, ELECTRICAL AND
SIGN PERMITS SHALL BE REQUIRED.
CONSTRUCTION HOURS
7:00 A.M. - 7:00 P.M.
MONDAY - SATURDAY ONLY
NO WORK PERMITTED ON SUNDAY
OISOMETRIC VIEWS
NTS
APPROVED PLANS SHALL BE
KEPT ON JOBSITE AT ALL TIMES
CONTRACTOR SHALL CALL FOR INSPECTIONS:
(817) 410-3010
CONTRACTOR REGISTRATION WILL BE
REVOKED UPON PERMIT EXPIRATION.
APPROVED AS NOTED
6-24-2025
KIOSK SHALL BE INSTALLED IN
ACCORDANCE WITH SECTION 402.6.2
1124Lem F2Molal:i4+telPA0A=14
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
O&OV2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION.
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
O
Y
_ a-
0-0
O J
Lo J_
CV
O Y
csJ c Z 0
I`Uw0
LLJo Q U
wNU�
U o o Z
wfNoC)
keijrrROVED FOR
GRAP I ME`
MILLS
CITY REVIF:W
SHEET N0. 1 1 1 June 19, 2025
Kiosk installation must be completed after mall hours.
Contractor must sign in and out with security located at dock #6
adjacent to LEGOLAND by calling (972) 538-5921 for mall access.
150METRIC VIEWS
NT5
turf
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
08/01/2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION.
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY
ALL CHANGES MUST BE APPROVED.
APPROVED FOR
G� C.
"EV INE
."'A
AILS
'03TY REVIEW
SHEET NO. 12 I June 19, 2025
Installation must comply with building and fire codes.
Must comply with City of Grapevine requirements.
Includes
permits and inspections.
i aI
FINISH SCHEDULE
MP-1 4" White Melamine Panels
Note;
Colors, layout and Function shown are for reference
only and the final kiosk may look and function
differently from the above depiction. Consult the
material schedule for accutate specifications.
AlePROVED eOk
CGr-PT REVIEW
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
0810 V2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY
ALL CHANGES MUST BE APPROVED.
SHEET NO. 13 1 June 19, 2025
I\
0
Location for
Security camera
W
2'-2"
0
V
I 12' ® ��'
2 -2�� ��4�� 7I J�4 ,�,
--------------------------------
Display 94-0
Q
,� Display `�' Cf)la �, �, �
� p Y ,. �
Storage Drawer below M
DISPLAY RACK (DR-1)
1
DISPLAY RACK (DR-1)
Storage Drawer below
IL
Ln
Display
Display
— — — — — -- -- — — — — — — — — — — -
12'
GENERAL PLAN VIEW
II
� = 1 1-011
Af6,
ED
IIIIIIIIIIIIEL-VA-AV
v
A
>Q0
t--1
MN
1�
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01 /2025
BY: ARNOLDO RAMIREZ TSBPE: IJ898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
SHEET NO
APPROVED FOR
!1
4 4NE
V V it ,0
N REVIEW
4 I June 19, 2025
-------_--------------------------_—,
LED Power supply for Lapto a
LED Power supply for Cash register a
machine li
r
LED Power supply for internet router a
2# 12+ Ground MC cable typical betwwr.
recepticles support every Eft and wit rin
12 inches of junction t ox
Flat electrical connectors wiring
concealed under floor
LED Power supply for charging POS--
LED Power supply for Printer —
LED Power supply for security— d
camera
Location for--0
security camera
Possible stub up location for power
Your location may be different
01
i
------_------------I----------L�
J
SOCKET PLAN
It is contractor's responsibility to field verify any existing power.
Any additional power requirements, if any, will be at tenant's sole
expense.
EQUIPMENT LAYOUT
D III I
2 = -11
0
SYMBOL
MC CABLE:
2# 12 and Ground, UL listed
RECEPTICLES:
NEMA 5-20R, UL listed
CORD/PLUG:
Type SJO cord, NEMA 5-20P
Plug, UL listed
BOXES:
NEMA 1, UL Listed
LED LIGHTING:
1.46 Watts/Linear foot
2.92 Watts/Linear foot
120 Volt Power supplies
ARE cord and plug
Connected to 120 Volt
ELECTRICAL LOAD SUMMARY
LED lighting power supply
6 at 158 VA each
POS station
TV Monitors
Total
16.1 Amps at 120 volts
Percentage of circuit used
Electrical requirement
GENERALNOTES
948 VA
600 VA
225 VA
1773 VA
80%
(1) 20Amp
Electrical installation shall comply with
National Electical Code
PS LED Power supply, installed in Toe space
Circuit requirement - (1) 15 Amp
SHEET NO
1�
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01 /2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
APPROVED FOR
(t.til rJ
C 1`i"Y R 7ANI EW
5 1 June 19, 2025
•
•
LL
J
cc
0
•
0
a -
a.
•
J
•
�eW
-Q
W
C3
co
Ln
C7
r
•
J
fi.
O
LL
V
i
t� •
h1 (n
z
0 J
L)
UCH
C)
00—
H J
WW
�
co
Jo
d
��LL
0
c
LL�Lij
1L
.GR.a V DE
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01 /2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
APPROVED FOR
ANE
SILLS
Col"N"Y REVIEW
SHEET NO. 16 1 June 19, 2D25
U7
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01/2025
BY: ARNOLDO RAMIREZ TSBPE: IJ898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
Canvas
Shop
cc nvpas
S e-lo
MP-1 finish
SIN
c+7
In
PPROVED FOR
; I V 11,110
". LS
tt:V REVIEW
0 ELEVATION A SHEET NO. 17 I June 19, 2025
3 II
4 = 1 I —u
�
2'-2"
/MP-1 FINISH
0
(V
DELEVATION B
NT5
2'-2-
I GIl
strip light
12'
34 T. 4" 4"
i I
VIP-1 FINI
�f
I II 1 I
1 1
20X16 20X16 20X16 20X16
1 1 1 I
1 1 I 1
I 1
`-------' `-- -------------------- `------------------ `----------------------
r__________________l r-----------------_- r__________________- --------------------- ____--..__..__-_____
1 1
1 1 I I
1 1 1
1 1 i 1
i
1 1
i i I
1
16X20 I I 16X20 i 16X20 16X20 16X20 '
1 1
1
1 I I
1
1 I
1 1
i i i i i i i i
-------- --- -- - ; -------J i -------------------- ----------------
1 I
1 1
1
I I 1 1 1 1
I I i 1 i
1 1 1 1 1 1
16X20 l j 16X20 16X20 16X20 16X20 ' '
1 �1 I
1 I II 11 I
1 I I 1 1 1 1 1
, I I I 1 1 I
i 1 I 11 1,
CANVAS DISPLAY,
GIt
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLIC-
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
Ut51U VzULD
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
FINISH SCHEDULE
MP-1 I "' White Melamine Panels
APPROVED FOR
HIE
1..
F"' EVI Elf V
SHEET NO. 18 I June 19, 2025
2'-6" 1
.GRA
TIV,
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01/2025
BY: ARNOLDO RAMIREZ TSBPE: "898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
OELEVATION C
311 - I
4 - 1 - II
0
10'
5' 2'-6"
FINISH SCHEDULE
MP-1 4° White Melamine Panels
11PROVED FOR
`s .INE
ILS
c�,`iV � REVIEW
SHEET NO. 19 I June 19, 2025
4
LED
strip light
117 �
LED --
strip light
Of
1x
4" r -1 4" 1 '12*
�P-1 FINISH
I
!
I
! I
20X16 20X16 20X16 20X16
1
IL
! I
-----------------------J L------------------------ i i---_-------------------Jj t------------J
------------------- r___________________ r------------------- r __\ r___________--_-_--i
1 1
I I I I ! I I
I 1 1 1 1
1 1 1
1
1 I 1 1 I 1
I 1 1 I I I I I
1 1 1
16X20 ! 16X20 16X20 16X20 i 16X20 ! '�
! � 1 1 1 I i 1 1
�----------------�------------------J L------------------ i ----- I 1------------------J
i 1 1
1 1
16X20 16X20 1
! ! I 16X20 16X20 16X20 y
I I 1
I 1 I
u L------------------� L------------------ J ----- --_-"- 1 L---------- --r---j 1------------------ J
LED a= T r
strip light CANVAS DISPLAYI
u
DELEVATION D
311 — 11
4 - I I -0
NN
/NIP-1 FINISH
Ln
---------------
FINISH SCHEDULE
MP-1 "' White Melamine Panels
1 1 \ 1
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01/2025
BY: ARNOLDO RAMIREZ TSBPE: IJ898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
SHEET NO. 110I June 19, 2025
APPROVED FOR
2'-s" 1
SIDE ELEVATION
MP-1 MP-1 MP-1
Drawer Drawer Drawer
Lr
a° r
T-8"
FRONT ELEVATION
-jt.. i Canvas display
a°
A
tA Utz "�JINE
.T
X. { i
X 16 is
MP- Zr \ K ti
• �R f v r rr xti
I
fry 4ti
15 \ l k I. MP-1
I .. 1 is •: .� � I \•� titiC���`� � ���.�\ t� r,� � ��
46120 L 36X20 I 16X20 16X20 I ; 1t#X2t5 `"
LED strip light
under the shelf I'
... ��..
I 7 I '� s ,�,r�• \
16X20 ' 16120 I 16:X20 X2 I: 1iJC2t) r
{.•.
1 L ----- -=— --- —.— L 7
REAR ELEVATION
2'-s°
CM �M
• 1 _ - - - - - - - - - - - _ - -------------------------------------
-
Aluminium shelf
bracket 20 X 30
I
i
LED strip light 1+---------------------------------� —
--------------------------------------
Linder the shelf i
I
1
20 X 30
i
I
1
I ,
,
SIN �-'IN
N (V
a°
SIDE ELEVATION
T-8.
PLAN
DISPLAY RACK (DR I)
311 I II
4 = I -0
iT tl•1 1 \'
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CRY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01/2025
BY: ARNOLDO RAMIREZ TSBPE: 13898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
. ALL CHANGES MUST BE APPROVED. .
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08101 /2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
ISOMETRIC VIEW OF DISPLAY RACK
NTS
SHEET NO
APPROVED FOR
INE
PALLS
CITY REVIEW
121 June 19, 2025
(V
Drawer Drawer
1' 114" 1'-114'
6'
Melamine Panel Table top
with MP-1 finish
Power Socket
MP-2 finish with Brushed
Aluminium at the edge
M o
CV
Aluminium G Profile handle —
in all drawers
I MP-1 MP-1
Drawer Drawer
2'-04" 1'-112"
Kiosk must be fire -rated. Check
with the City of Grapevine Building
Department for requirements and
approved materials.
0 WORKING TABLE
3n-- I n
Scale. 4 I -0
2' I 2'-8„ I V-4"
ii
I
cabinet ii .)rawer N
i N
Drawer
i
------------------- --- ---- --- ---------------------
i�
4'
I
10,
PLAN
p MP-1
Drawer Drawer
/ \ Drawer N
MP-1
Drawer MP-1,-- 1\ 1// MP-1 Drawer
10,
REAR ELEVATION ---------------
Melamine Panel Table top
with MP-1 finish
2'-14"
M
MP-2
Position for Printer
I handle Drawer
- - - Soft closing
drawer slides
SECTION
s
--Melamine Panel
with MP-1 finish
ME
1L
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08l01/2025
BY: ARNOLDO RAMIREZ TSBPE: I-3898
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.--------------------------------
----------------------------------
:�N
M
c-IV
N Brushed Aluminium
mat the edge
6" I 1'-8"
2' 2"
SIDE ELEVATION�j-
PPRQVED FOR
I�
.m tiij 110 fink
Lil 141I LL S
rv3r_1Y REVIEW
SHEET N0. 113I June 19, 2025
Contractor must have an updated certificate of insurance submitted to
landlord prior to install. Obtain certificate of insurance requirements from
management office.
lw�sri no P S
Aqw I.- -,�w
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01/2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ISOMETRIC VIEW OF WORKING TABLE
NTS
V. -
PPRCVED
FOR
.\111,,�- =VINE
Us
` If Ell!
SHEET NO. 114I June 19, 2025
ALL CHANGES MUST BE APPROVED.
MP-1
� I
Storage
Drawer
^CV
Vinyl Flooring 4" Medex sub floor
` Plywood ramp
4" Medex batons with spaces to allow
1-1/2" Brushed aluminiun edge for electric chase
lFLOORING DETAIL
5r-alc, : NT5
DSECTION AT G-G
311 _ II
Scale :: — I -0
MP-1
Aluminium Shelf bracket
c
I
Aluminium G
Profile handle
Storage
Drawer
- - - — Soft closing
- drawer slides
SHEET NO
APPRO✓ED FOR
js&
Ov"AF INE
Carus
ary itevIew
1L
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT
ALL TIMES.
08/01/2025
BY: ARNOLDO RAMIREZ TSBPE: 1-3898
BUILDING INSPECTION DIVISION.
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT OF WAY.
ALL CHANGES MUST BE APPROVED.
151 June 19, 2025