HomeMy WebLinkAboutSFRA2025-003600City of Grapevine Building - Residential
PO Box 95104 Alteration *11.
Grapevine, Texas 76099
817) 410-3166 Project # 25-003600
Project Description: Installing 8 concrete pilings to stabilize
the foundation. [ELECTRONIC REVIEW]
Issued on: 10.!07'2025 at 9:57 AM
ADDRESS INSPECTIONS 1
4309 Windswept Ln.
Grapevine. TX 76051 1. Building Final
LEGAL
INFORMATION FIELDS
Glade Crossing lii Phase
"`APPLICANT NAME (Individual)
Thomas Kidd
I Blk 4 Lot 21
A 21
"APPLICANT PHONE NUMBER
9724841200
S220 4
APPLICANT E-MAIL
'06201369'
VALUATION
5950
PERMIT HOLDER
' CONSTRUCTION TYPE
VB
Thomas Kidd
' OCCUPANCY GROUP
R-3
Structured Foundation R
epairs. INC.
DOCUMENTS - MISC 01
4309 Windswept GRAPEVINE ap.pdf
(972) 484-1200
DOCUMENTS - MISC 02
4309 Windswept PIER DETAIL.pdf. 4309
Windswept Ln Grape report dwg.pdf
COLLABORATORS
• ZONING DISTRICT
R-7.5
• Thomas Kidd
Structured Foundation
FEE
TOTAL PAID DUE
Repairs, INC.
(972) 484-1200
Building Permit Fee. ($150.00
$ 150.00 $ 150.00 $ 150.00
Flat Fee) Simple Alteration
OWNERS
TOTALS
$ 150.00 $ 150.00 $ 0.00
• Bradley C Sutherland
READ AND SIGN
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF
MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO
THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN
COMPLIANCE WITH THE CITY OF GRAPEVINE ORDINANCE REGULATING
CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT
DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR
ORDINANCE OF THE CITY OF GRAPEVINE.
I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY AND THAT
THE DESIGN PROFESSIONAL OWNER IS RESPONSIBLE FOR OBTAINING
SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL
AGENCY(S).
Page 1 2
MYGOV.US 25-003600. 10 0712025 at 9:57 AM Issued by: Courtney Cogburn
October 07. 2025
Signature Date
City of Grapevine Building - Residential Alteration
Project # 25-003600 x*U1{
'�
NOTICES
1) ALL work must be done in compliance with the 2021 INTERNATIONAL BUILDING CODE.
"ALL work ISSUED prior to January 1. 2024. must be done in compliance with the 2006 INTERNATIONAL
BUILDING CODE.
2) City Approved Stamped Plans must be on -site for ALL INSPECTIONS.
3) Project address must be clearly posted at the job site.
NOTES
> 24 HOUR INSPECTION NUMBER
METRO (817) 410-3010. CUT OFF TIME FOR A.M. INSPECTION IS 7:30 A.M. --- CUT OFF TIME FOR P.M.
INSPECTION IS 12:30 P.M.
> PERMIT ISSUED IN ACCORDANCE WITH APPLICATION ON FILE IN THIS OFFICE.
THIS PERMIT SHALL EXPIRE IF WORK IS NOT COMMENCED WITHIN (180 DAYS) OF ISSUANCE OR IF
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF (180 DAYS). THE ISSUANCE OR
GRANTING OF THIS PERMIT AND OR APPROVAL OF PLANS. SPECIFICATIONS AND
COMPUTATIONS SHALL NOT BE CONSTRUED TO BE A PERMIT FOR. OR AN APPROVAL OF. ANY
VIOLATION OF ANY OF THE PROVISIONS OF THE CODES AND ORDINANCES OF THE CITY OF
GRAPEVINE. THE ISSUANCE OF A PERMIT BASED ON PLANS. SPECIFICATIONS. AND OTHER DATA
SHALL NOT PREVENT THE BUILDING DEPARTMENT FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS. SPECIFICATIONS. AND OTHER OR REQUIRING
CORRECTIONS OF THE CONSTRUCTION ITSELF.
Page 2./2
MYGOV.US 25-003600. 10 0712025 at 9:57 AM Issued by: Courtney Cogburn
Z
W
w p=
Z�
<
LLJ Z
oz0Pw
Q Z U J W
CnDv7H2
0 W Z
Z _ Z U
U
D�Nwcn
ZIL
�wZLLO
U) 2 - j
LU b <
0�0of
X U a.
a. a
W W
SO
W W
IX W N
WOQ
0 J J
Qua
=O
U �
J (L
Qa
U)
w
m:�E
-�
J
Q J
_<
c) <
zw
Q�
a_ U)
om
w0
C�O
a
Qw
Y
CCM ENGINEERING
PRO 2570 FM 407 STE. 209
Highland Village, TX 75077
14b 972.691.6633
TBPE FIRM #605
September 18, 2025
Structured Foundation Repair Company
13301 Trinity Blvd, Ste 133
Fort Worth, TX 76040
RE: Initial Engineering Evaluation
4309 Windswept Ln
Grapevine, Texas
To Structured Foundation Repair Company
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN
CONFLICT WITH THE BUILDING CODE OR ZONING
ORDINANCE
CITY APPROVED PLANS TO BE KEPT ON THE JOB
SITE AT ALL T1MES.
09/30/2025 1:47:18 PM
BY: KELLY TAFT TSBPE: 1-3971
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT-OF-WAY
ALL CHANGES MUST BE APPROVED.
Per your request, our office evaluated the above referenced structure. The structure
is supported by a concrete slab foundation. For the purpose of this report, the
structure faces generally west.
The intent of this evaluation is to formulate an opinion on the performance of the
foundation. Elements of concern are safety, function, durability and habitability.
Inadequate foundation performance may result from inadequate strength or
insufficient stiffness.
The information included herein is based on the opinion of the engineer and is for
informational purposes only.
SUMMARY
Elevations of the foundation, cosmetic damage and other factors were utilized in this
evaluation. It is the opinion of the engineer that repairs as noted below would be
beneficial.
RECOMMENDATIONS
It is recommended that the following repairs be made:
1. Install 8 piers as shown on the attached sketch. Interior piers to be installed
under interior grade beams. Contractor shall locate the interior beams and
contact this office if their location is different than shown.
2. Plumbing tests are recommended on the incoming potable water and waste
water systems after the piers are installed.
General Notes
General notes are intended to assist with the implementation of any recommended
repairs. If no repairs are recommended, these notes may not apply.
If piers are recommended, the foundation can then be raised on these piers.
Proposed underpinning will not improve the performance of the foundation in non -
underpinned areas. Complete leveling of the structure should not be anticipated.
RECEIVED: 09i23i2oThe contra Aor should raise the foundation only as much as the structure will allow
25-003600 ithout cremating additional stress or cosmetic damage.
4309 WINDSWEPT LN
FOUNDATION PILINGS
rn0
<Z
oD
Co 00
U
Om v
-Vrn
rn2
�� o
�D o
rn-i
vp o
z
D�
�r
Or
zW
rn
Z
0
:�E
00 n
�z
v•`•IZ
0
rr' >
�D�n
�Cv7
ITl ;0 0 Z
0CDo=
Z-<-O
co 0 C
CZ N
Z�
v
D
September 18, 2025
Page 2 PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
RE: Initial Engineering Evaluation CONFIRMING SITE INSPECTION AND
4309 Windswept Ln APPROVAL OF PIER INSTALLATION WHEN
Grapevine, Texas WORK IS COMPLETE
These repairs will meet or exceed International Residential Code (IRC) 2021
guidelines.
Contractor to locate all underground and overhead utilities. Our office should be
contacted with any conflicts. We are not responsible for damage to existing utilities.
Any exposed post tension cables should be cleaned of rust and sealed with
waterproof sealant.
Foundation movement can be caused by seasonal variations in the moisture content
of the soil. A consistent foundation watering program should be implemented on all
structures to minimize foundation movements. During dry seasons of the year, soil
should be watered evenly. Water should flow away from the foundation at all times.
Unrepaired foundations may continue to degrade, causing additional cosmetic and
structural damage. If the subject property is attached to an adjacent unit, unrepaired
foundations may impact the adjacent units. The adjacent unit should be notified prior
to any construction.
Pressure grouting is recommended if voids were created under the foundation.
Drainage improvements. if recommended, should be installed so that water drains
away from the foundation and no ponding water remains. The areas surrounding any
proposed drains should be regraded to ensure that the affected area is captured by
the drainage system. Drainage improvements may be altered as needed to ensure
proper functionality.
Limitations of Liability: This evaluation was conducted in accordance with
generally accepted practices and procedures. Recommendations, if any, are
intended to be the most cost effective and practical solution to common problems.
Underpinning will not improve the performance of the foundation in non -underpinned
areas. Most structures are not constructed with the ability to perform as a structurally
suspended slab; therefore, installed piers will not prevent adjacent exterior or interior
areas from settling. Further analysis may be performed if desired. Soil borings may
e3ja uauwtwi esirea; soil
THIS PAGE,Qq�Q,pQy$�6il;ICjIQRICe
RELEASE
CONFLICTVbTIST:Lg-&IIbffId;tRL5DC�Yp6tC
exafff&b`tfonsof any exi:
CITY APPROVSOOaFaa-CVaaoor(u 1clEEre
AMNs seasons ar
09/10ydj�D :tjd'qqa1 inforn
BY: KELLY TAFT TSBPE: 1-3971
BUILDING INSPECTION DIVISION:
RELEASE DOES NOTAPPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT-OF-WAY
ALL CHANGES MUST BE APPROVED.
cation regarding underlying soil conditions. If further
to may be obtained from a geotechnical testing facility
cations of existing repairs, if any, are approximate and
is office. This report does not guarantee the quality or
g repairs. The behavior of the subject foundation and
to the evaluation date. Other problems may become
:limatic conditions change. Such problems or the
ion may be reason to revise the report.
RECEIVED: 09/23/2025
25-003600
4309 WINDSWEPT LN
FOUNDATION PILINGS
September 18, 2025
Page 3
RE: Initial Engineering Evaluation
4309 Windswept Ln
Grapevine, Texas
If you have questions or require additional information, please contact this office.
Sincerely,
Cody D. Crannell. P.E.
TBPE FIRM #605
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND
APPROVAL OF PIER INSTALLATION WHEN
WORK IS COMPLETE
....................®
r.
..... _..- -.. 9/18/2025
CITY OF GRAPEVINE
THIS PAGE RELEASED FOR CONSTRUCTION
RELEASE DOES NOT AUTHORIZE ANY WORK IN
CONFLICT WITH THE BUILDING CODE OR ZONING
ORDINANCE
I CITY APPROVED PLANS TO BE KEPT ON THE JOB
SITE AT ALL TIMES.
09/30/2025 1:50:40 PM
BY: KELLY TAFT TSBPE: 1-3971
BUILDING INSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT-OF-WAY
ALL CHANGES MUST BE APPROVED. ,
f-Z �
J
FP
-0.4
0.0 I-0.1 -0.1 -0.5 -0.8
FR
-0.9
-0.3 0.0
-0.7 I I �
-0.5 -1.0
0.
-0.5 -0.2 -0.1
-0.7
+0.2 1+0.3 -0.3 -0.8
ri
V
'avers INSTALL
-0.1 +0.3 8 PIERS
Conc
.................................
PROVIDE SIGNED AND SEALED LETTER Cody D. Cronnell
FROM REGISTERED ENGINEER
CONFIRMING SITE INSPECTION AND 105947
APPROVAL OF PIER INSTALLATION WHEN �.CE .. •G
WORK IS COMPLETE ANAL
9/18/2025
CONTRACTOR TO VERIFY THE
CCM ENGINEERING 4309 WINDSWEPT LOCATION OF ALL UNDERGROUND
2570 JUSTIN RD. STE. 209 S OVERHEAD UTILITIES. ANY
HIGHLAND VILLAGE, TX 75077 LANE CONFLICTS SHOULD BE REPORTED
HI HLA D VILLAGE,
33 TO OUR OFFICE. WE ARE NOT
GRAPEVINE, TEXAS RESPONSIBLE FOR DAMAGE TO
TBPE FIRM #605 ANY UTILITIES, PUBLIC OR PRIVATE.
PROVIDE SIGNED AND SEALED LETTER
FROM REGISTERED ENGINEER
PILING SPECIFICATIONS CONFIRMING SITE INSPECTION AND
HOLES: APPROVAL OF PIER INSTALLATION WHEN
1. Minimum depth is 2' below the bottom of the grade be�' m.
2. Minimum penetration below slab is 6" or the width of tip grade i�pa�ny y COMPLETE
is greater not to exceed 21".
3. Minimum width under grade beam is 20".
4. Holes should be spaced so that undisturbed dirt between the holes is sufficient
to support the structure until the repair is complete.
All excess material is to be removed.
PILINGS:
1. In the absence of a load bearing strata, minimum acceptable deptch below the grade beam is 10'.
2. Where load bearing strata is encountered, the minimum depth will be the depth of the load
bearing strata.
3. All cylinders that crack or crush during installation will be removed and replace with new
cylinders. If a cylinder cannot be removed after it cracks or crushes, the piling will be abandoned.
A new piling will be driven as close to the abandoned piling as possible.
CONCRETE:
1. Minimum compressive strength is 5,000 psi.
CYLINDERS:
1. Maximum ratio of height to diameter is 3:1.
2. Cylinders will be flat so that cylinders stacked end to end do not rock.
3. A plane passing through end of cylinder will be at an angle of ninety degrees to line passing through
long axis of cylinders plus or minus two degrees.
CAPS:
1. Minimum width is 12", minimum height is 8", minimum deptch is 8".
2. Tops and bottoms will be smooth and level so that a cylinder stacked on pads will stand vertically
and not rock.
PENETRATION OF SLAB:
1. No penetrations will be made through post tension slabs within 6' of the nearest cable anchor.
2. The following procedure will be used when penetrating slabs:
a. The boundaries of the hole will be marked.
b. A 2'x2' pattern will be etched into the slab with a concrete saw to a depth of 1".
c. A sledge hammer or jackhammer will be used to break out the concrete, points (not chisels)
will be used on all jackhammers.
CONCRETE PILING DIAGRAM
W
Z 11 k. SIDE VIEW
of r y�
PEE ........ F 5
IL
' # W to
Cody D. Crannell
.....................
105947 ; CONCRETE
3
VCENS CYLINDERS 12"
N -
SO ... G\ LENGTH 6"
AL DIAMETER
9/18/2025
DETAIL W
4309 WINDSWEPT LN M H ?'
GRAPEVINE TX C C e r
n ,
T T
0M
CRANNELL, CRANNELL & MARTIN m WI
C C 4
PO BOX 295429 LESMLLE, TX M
972-691-6605 Z
TBPE FIRM #605 r
WWW.CRANNELLENG.COM
FRONT VIEW
L
I
RECEIVED: 09/23/2025
25-003600
4309 WINDSWEPT LN
FOUNDATION PILINGS
CCM ENGINEERING
2570 Justin Rd., Ste. 209
HIGHLAND VILLAGE, TX 75077
972.691.6633
TBPE FIRM #605
October 8, 2025
Structured Foundation Repair Company
13301 Trinity Blvd, Ste 133
Fort Worth, TX 76040
RE: Foundation Structural Analysis — Post Repair
4309 Windswept Ln
Grapevine, TX
To Structured Foundation Repair Company,
Per your request, our office inspected the above referenced single-family
structure on October 7, 2025. The purpose of this inspection was to visually
evaluate repairs completed by Structured Foundation. All recommended repairs
have been satisfactorily completed per our original report dated September 18,
2025. The evaluation was based on the onsite evaluation and information
provided by the contractor.
These repairs will meet or exceed International Residential Code (IRC) 2021
guidelines.
If you have any questions or need additional information, please call our office.
Sincerely,
Cody D. Crannell, P.E.
TBPE FIRM #605
025
--Z;
con.
Col.
rP
-0.4
-0.1
-0A
-0.7
Kit
Study
PE
0.9
-0.7 I
I
�
-0.5
-1.0
0.04�
-0.5
-0.7
Utility
E
�
-0.5
-0.2 -G
LR
-0.7
-0.5
c
+0.2
+0.3
1+0.2
-0.3
Garage +0.2
-0.1
-0.3
c
n
V
Pavers
(INSTALLED
-0.1
+0.3
II 8 PIERS
Conc
Conc
�E 0 F , r� C,
.......................
Cody D. Crannell
................................ .
105947
✓ATIONS TAKEN 9/17/2025 /pNAG l�
ELEVATIONS TAKEN 1017/2025
10/8/2025
CONTRACTOR TO VERIFY THE
CCM ENGINEERING 4309 WINDSWEPT LOCATION OF ALL UNDERGROUND
2570 JUSTIN RD. STE. 209 & OVERHEAD UTILITIES. ANY
HIGHLAND VILLAGE, TX 75077 LANE CONFLICTS SHOULD BE REPORTED
HI HLA D VILLAGE,
33 TO OUR OFFICE. WE ARE NOT
GRAPEVINE, TEXAS ANY
FOR DAMAGE TO
0 TBPE FIRM #605 Y UTILITIES. PUBLIC OR PRIVATE.