MEMO TO: THE HONORABLE MAYOR, MEMBERS OF THE CITY COUNCIL,
AND THE PLANNING & ZONING COMMISSION
FROM: BRUNO RUMBELOW, CITY MANAGER
MEETING DATE JULY 21, 2026
SUBJECT: PRELIMINARY PLAT APPLICATION
LOT 1, BLOCK 1, 316 ADDITION
PLAT APPLICATION FILING DATE............................................................. May 26, 2026
APPLICANT ....................................................................................... Ridinger Associates
REASON FOR APPLICATION ..... Preliminary platting one (1) lot from unplatted property
PROPERTY LOCATION ................................................. 310 and 316 E. Northwest Hwy.
ACREAGE ................................................................................................................ 0.202
ZONING .................................................................... "HC", Highway Commercial District
NUMBER OF LOTS .............................................................................................. One (1)
PREVIOUS PLATTING ................................................................................................ No
CONCEPT PLAN .......................................................................................................... No
SITE PLAN .......................................................................................................... SP26-03
OPEN SPACE REQUIREMENT.................................................................................... No
AVIGATION RELEASE ................................................................................................. No
PUBLIC HEARING REQUIRED .................................................................................... No
PLAT INFORMATION SHEET
PRELIMINARY PLAT APPLICATION
LOT 1, BLOCK 1, 316 ADDITION
I. GENERAL:
The applicants, Ridinger Associates, Inc., are preliminary platting 0.202 acres
into one (1) lot from unplatted property. The property is currently zoned: "HC",
Highway Commercial District. Property is located at 310 and 316 E. Northwest
Highway.
II. STREET SYSTEM:
The development has access to E. Northwest Highway.
Abutting roads: is on the City Thoroughfare Plan:
are not on the City Thoroughfare Plan:
Curb, Gutter & Sidewalk: Developer required to build curb, gutter and
sidewalk
Curb, gutter and sidewalk exist across the frontage of proposed lot
Periphery Street Fees are due as follows:
Type of Roadway Cost / LF Length Cost
Major Arterial (A) $ 234.57 / LF
Major Arterial (B) $ 178.35 / LF
Minor Arterial (C) $ 203.06 / LF
Minor Arterial (D) $ 170.33 / LF
Collector (E) $ 170.33 / LF
Collector (F) $ 150.98 / LF
Sidewalk $ 25.00 / LF
Curb & Gutter $ 15.00 / LF
Periphery Street Fees are not due:
III. STORM DRAINAGE SYSTEM:
The site drains north towards NW Highway, and into the existing storm drain
system.
The developer will be required to design for onsite as well as offsite drainage in accordance
with the requirements of the City of Grapevine’s Code of Ordinances.
IV. WATER SYSTEM:
The existing water supply system bordering the subject site is adequate to
serve the development.
The existing water supply system bordering the subject site is not adequate
to serve the development. Additional off-site water system improvements will
be necessary to loop water service to serve the site.
V. SANITARY SEWER SYSTEM:
The existing sanitary sewer collection system bordering the subject site is
adequate to serve the development.
The existing sanitary sewer collection system bordering the subject site is not
adequate to serve the development. Owner has submitted construction plans
to extend sanitary sewer to this property.
VI. MISCELLANEOUS:
Water and Wastewater Impact Fees are not required for:
Water and Wastewater Impact Fees are due prior to the issuance of building
permits for: Lot 1, Block 1, 316 Addition
Single Family Residential ( $ 2,388/ Lot)
Multifamily ( $ 1,049/ Unit)
Hotel ( $ 43,606/ Acre)
Corporate Office ( $ 20,572/ Acre)
Government ( $ 4,426/ Acre)
Commercial / Industrial ( $ 5,670/ Acre)
Open Space Fees are not required for:
Open Space Fees are due prior to the preconstruction meeting for public
infrastructure improvements for: Lot 1, Block 1. 316 Addition
R-5.0, R-TH, Zero Lot District ( $ 1,416.00 / Lot)
R-7.5, Single Family District ( $ 1,146.00 / Lot)
R-12.5, Single Family District ( $ 1,071.00 / Lot)
R-20.0, Single Family District ( $ 807.00 / Lot)
Public Hearing Only
Variances were required on the following items:
Rear building lines
Lot depth;
Max. Impervious Area
The following items associated with this plat are not in accordance with the
current subdivision standards:
50’ ROW dedication not met:
Length of cul-de-sac street exceeds the 600-foot limit:
Driveway Spacing not met.
VII. STATEMENT OF FINDINGS:
A. The City has determined that the right-of-way and easements required to be
dedicated for streets, utilities, drainage, access, sidewalks and other
municipal needs and services are consistent with the City's ordinances and
master plan, are reasonable and are connected to the proposed project in the
following manner:
The right-of-way provides for future widening of public streets that will
serve the development of this site.
The onsite utility easements provide for a utility network to serve the
development of this site.
The onsite drainage easements provide for a drainage network to
serve the development of this site.
The onsite access easements provide cross access capabilities to this
site and surrounding property.
The onsite sidewalk easements provide for a sidewalk network to
serve the development of this site.
B. The City further finds that the required dedication is related both in nature
and extent to the impact of the proposed development as follows:
The right-of-way is necessary to provide for future widening of public
streets that will serve the development of this site.
The onsite utility easements are necessary to provide for a utility
system to serve this development and connect to existing utilities on
surrounding property.
The onsite drainage easements are necessary to provide for storm
drainage improvements to serve the development of the site.
The onsite access easements are necessary to provide cross access
capabilities to this site and surrounding property.
The onsite sidewalk easements are necessary to provide for a
sidewalk network to serve the development of this site.
All of the dedications benefit the development to at least the extent of
the impact of such on the development.
VIII. RECOMMENDATION:
The members of the City Council and The Planning & Zoning Commission
consider the following motion: “Move that the City Council (Planning and Zoning
Commission) approve the Statement of Findings and the Preliminary Plat of Lot 1,
Block 1, 316 Addition.”