HomeMy WebLinkAboutREA2026-001406DATE OF ISSUANCE:
PERMIT #:
CERTIFICATE OF OCCUPANCY RE VEST
FEE: $50.00
NO FEE REQUIRED IF THE CERTIFICATE OF OCCUPANCY IS ASSOCIATED WITH AN ACTIVE CURRENT BUILDING PERMIT
ADDRESS OF OCCUPANCY: 3000 GRAPEVINE MILLS PKWY SUITE# 341
LOT: BLOCK: SUBDIVISION:
**°'*CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED WITHOUT LEGAL DESCRIPTION****
NAME OF BUSINESS: THE LATTE FACTORY LLC
NEW OCCUPANT: YES x NO
NEW BUILDING/PROPERTY OWNER:
YES
NO x
NEW BUILDING: YES NO x
NEW BUSINESS NAME CHANGE:
YES
NO X
kfUMBER OF EMPLOYEES: 3
NEW BUSINESS OWNER:
YES
NO X
`e ���
FREIGHT FORWARDING:
YES
NO x
TYPE OF BUSINESS: COFFEE SHOP (Example: Retail Clothing /Attorney'sOffice / Restaurant /Office/Warehouse)
**IF OFFICE/WAREHOUSE PROVIDE BREAKDOWN OF SQUARE FOOTAGES:
SF OFFICE: SF WAREHOUSE: TOTAL SQUARE FOOTAGE: 1456 SOFT
NAME OF TENANT [PERSON'S NAME]: SYED OBAID
CURRENT MAILING ADDRESS: 1304 W WALNUT HILL LN STE 260
CITY/STATE/ZIP: IRVING / TX / 75038 PHONE NUMBER: 214-686-9533
PROPERTY OWNER: SIMON PROPERTY GROUP
MAILING ADDRESS: 3000 GRAPEVINE MILLS PKWY
CITY/STATE/ZIP: GRAPEVINE / TX / 76051 PHONE NUMBER: 972-724-4900
• IS YOUR BUSINESS SUBJECT TO SALES TAX LAW? (if yes, provide copy of Sales Tax Certificate) - - - - - - -
YES
X NO
♦ WILL THERE BE ALCOHOLIC BEVERAGE SALES? (if yes, provide copy of Alcoholic Beverage Permit) - - -
YES
_ NO
♦ WELL THERE BE FOOD SALES? (if yes, contact Tarrant County Health 817-3214993 for more information) - -
YES X NO
• PERMITS ARE REQUIRED FOR SIGNS. WILL ANY SIGNS BE INSTALLED? - - - - - - - - - - - - - - - - - - - - -
YES
_ NO X
• WILL BUSINESS GENERATE ANY INDUSTRIAL WASTE DISCHARGE TO SEWER SYSTEM? - - - - - - - -
YES
_ NO X
• WILL OUTSIDE REFUSEIRECYCLING/COMPACTING CONTAINERS BE NECESSARY? (screening is required)
YES
_ NO X
• WILL THERE BE ANY OUTSIDE STORAGE (including storage of company/fleet vehicles), DISPLAY/ USE/DINING? YES
_ NO X
♦ WILL ANY ALTERATIONS BE MADE TO THE SITE OR BUILDING? - - - - - - - - - - - - - - - - - - - - - - - - - - - -
YES
X NO _
♦ IS BUILDING SPRINKLERED?----------------------------------------------------------
YESNO
♦ WILL BUSINESS STORE OR HANDLE HAZARDOUS MATERIALS OR LIQUIDS?
(if yes, provide list of types & quantities, along with material safety data sheets) - - - - - - - - - - - - - - - - - - - - - - - - -
YES
_ NO X
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND THE SAID
OCCUPANCY IS IN CONFORMANCE WITH THE INFORMATION HEREIN SET FORTH.
(If access to the building/space is not provided at the time of the scheduled inspection, a $50.00 re -inspection fee will be charged)
FOR QUESTIONS or to -SCHEDULE, PLEASE CALL (817) 410-3165 or (817) 410-3166
SIGNATURE: -q� PRINT NAME: SYED OBAID
PHONE #: 214-686-9533 EMAIL: BRIAN.HARRISON@THECLEARSTORE.
Department
The City of Grapevine * P.O. Box 95104 * Grapevine, Texas 76099
(817) 410-3165 * (817) 410-3166
www.grapevinetexas.gov (OVER)
C FORY58SAPPMATION FEESCOAPP
11'212.
TEXAS SALES TAX
Texas Sales Tax is charged and collected on sales within the State and City of Grapevine, Texas of "taxable items." Taxable
items include both tangible personal property, specified services. If you are in a business that will be selling "taxable items"
within the City of Grapevine, Texas you will be required to collect State and Local Sales Tax in the amount of 8.25%.
A "Seller or Retailer" means a person engaged in the business of making sales of "taxable items", the receipts from which are
included in the measure of sales or use tax.
The term, "place of business" includes any location at which three or more orders are received by the "Seller or Retailer
in a calendar year. If an order is received at the place of business of a retailer in Texas, but delivery or shipment is made
from a location within the state other than the retailer's place of business. State and local sales tax is due and is allocated to
the city where the order was received.
I have read the above and I understand that I will be required to provide a copy of the Sales Tax Permit to the City of
Grapevine, Texas if the circumstance applies to my business.
Texas Sales Tax Number: 32088320687
Signature
WHERE DO YOU WANT YOUR COMPLETED CERTIFICATE OF OCCUPANCY MAILED?
ADDRESS: 1304 W Walnut Hill In Ste 260
CITY, STATE, ZIP: Irving, TX 75038
ryxx �X� xx�xFOR OFFICE USE ONLY'�xYxx� �x x� rYX
TYPE OF CONSTRUCTION:
ZONING DISTRICT:
PERMITTED USE:
BUILDING DEPARTMENT:
BUILDING INSPECTOR:
ZONING APPROVAL:
FIRE DEPARTMENT:
LOT DRAINAGE INSPECTION:
PUBLIC WORKS DEPARTMENT:
HEALTH DEPARTMENT:
CITY SECRETARY:
LANDSCAPING APPROVAL:
OCCUPANCY: DIVISION:
CONDITIONAL USE:
OCCUPANT LOAD:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
APPROVAL FOR ISSUANCE: DATE:
RECEIVED: 04/17/2026
26-001406 "LATTE FACTORY"
3000 GRAPEVINE MILLS PKWY #341
RESTAURANT ALTERATION
SIMON
Syed Obaid
Latte Factory LLC
Reference: CONSTRUCTION DOCUMENT REVIEW
Latte Factory Grapevine Mills #5211
Space #: 341 Grapevine , TX
Dear Syed:
April 16, 2026
Via Email
We have completed a review of your final construction documents . and they are approved as noted . Note
that this review is for aeneral criteria conformance and desia_ n intent only. One set of plans marked with
review comments is enclosed for your records.
You are responsible for informing your contractors and vendors of pertinent lease requirements. Please
ensure the GC schedules a preconstruction meeting with the on site management team at least 48 hours
prior to start of construction. Your general contractor will be required to sign the Mall Rules and
Regulations document. acknowledging that construction will proceed according to those documents
unless otherwise directed by local building officials or written instruction from Landlord .
Please contact me if I can provide assistance with the required information to be submitted .
Sincerely..
Taro Saito
Senior Tenant Coordinator 973-364-6524
Copy: Mall Mgmt
TC01.11saa
225 west Washington Street Indianapolis. 114 46204-3438 T 317 636 1600 F 317 685 7222
SIMON,COM
F EcEovE
Dg,25,zD2E D
E�r�"�51 O�N:dax
Health Is submitted separately Mrough Tarrant County Public HeaIM
Oemol,i,dling.. are available RI. expedite wns111b, .
Tenants doing no work (paint 8 carpet) must still file to obtain a C of O,
'mat plans required.
TOUR A. survey requires.
TOUR compliance enforced.
Demolition Comments, • Y:
-Any exiAll ng equipment ar component In or p-,ni to the
premises that is being abandanea must be demolished •
completely and properly removed rmm prem;ses.
•AII agave ground Wlity in. rat to be RR used must be
re ved to point of orBln. AII antler slab utlllty Imes Io be
cu4�.,p d antl sealed per code
•AII root mounted gwpm ,t above the leased premses It
ID be re -used must be Temovetl by tenant GC At tenant
expense Roof must be properly patched by Mall required
Rooter. Roe` curbs must be removed and lml paiAh.I
not cap Ceortl,nale all work wnh Mall Cperahans Director
Slab on aratlemTenanrs General Conimclor shall .Mise the
OpembG Tee ll verYt in-l shell nil confllciwi any
xI "II simctuml, utility, or other under -slab contlnion
oNDmeawcmesee°cr reran:bwor 11In ape ina
relmhursea si Tenants expense -
I, (O^ `rotors Team pnor I any slab 11—ion or removal. Ir Ty e y el-Md slabs to be in —in in anyway (dolled, cmed.
P"Mi tell. tell pr enant shovide dmp aed and Inbred
'ngs by licensed s hnileRgine Mdc N.d in the
' IOEeljunsd,EJO All pARRVations shall Ire CORE BORED
ONLY. Sew cuing, jack hammering, end benching Is strict,
rohIhMd. All nebarons shall be sleeved sealed rye
P Pe
am ea. aria water mores Tne enetmeon sleeve anal)
erctnna a mmimnm m a'� on either stde onhe sme one tie
labeled III the regdred NFPA rating Tenant GC shall verny
It Work shall iIt -Indn.h h any existing atmctural utlllty
-,r mner,gi,i smbconaeon. Mnnaaaea.tl ii,rfeeuon
maybe requTetl I Any damage or tlmadnme Eaused by
Tenants work shall be repalre0 end relmbursetl at Tenants '
erc�AM_M.J • E • , • •
C/J
SIMON
AeRR s1M 3�2V(IT11TRadoe
07/07/2026 1.23:55 PM
BY: KELLY TAFT TSBPE: 1-3971
• •
Field Verification Requirement: -
Tenant, Tenant's Design Team, and
Tenant's Contractors shall field verify all
field conditions prior to the start of any
construction. Be advised that all changes .
- and modification to the Landlord's
approved drawings shall be resubmitted
to Landlord for re -approval. Any
- construction completed with out Landlord
- approval shall be corrected as approved
by Landlord at Tenant's expense.
t t t I t
SI MON M,
General Comments . • E E E • E
•Plans reviewed and approvetl by Lantlmrd's Tenant
M E Ivir 77 nZ sou- THIN BED METHOD xe,reaw,x,m...ravm.xocwr wwvac maveixs. w.m,wuenw.aumamFsaiaaw M Coordinator must be present In tnelob s,, and be
x ux xsmnwa wm ar rw wau xreEs araiw ompan;ed by plans approvetl foT bu;lbing pe,mn. Any
pmposetl devlaiwn from Me LA-li approved plans must
n P vFres, BRI An
sTIXVE be numbered and clouded on the plans, and then ,
axr nxlx SETTNc MORiM submided by Me Tenant Io Me L-01- for re -approval
., r, T , w . vxs a uxoaa ra rza, coots m - pnor to any construobon changes taking place In the field
L axr ewmmc �w`agRN F cR a z xcc ♦,e�enmwnuwrwovmuams L Tenant's GC Is requ;red b, check in with Landlord's In s;te
orwixu assr.xr us. muxa .Pm^eet Maanage,pnoreo`hoe sear) of tenant construction. 1 a.e.mm mimxo ro roar, mxee mu: me o.wm - Co a M II Managem nt Me
mr sru. es x Dams am wau xor Exam s //���� c NeRETE FD ND ON Submit shop do wings - •Contact Property Management for construction barricade
K sa+EEas+wEE P1unIa Datall - Dommerclalnl to .w,an ar x-r .e wwxr:,aixu:.xow -
FP1 1/4' = 1'-t
POslgns@sim n.cim _ K requirements, minding barricade graphics.
.�--- x - •Tenant's be is responsible to comply with all Mall Rules antl ,
no,T ce a c a .-A a r,c xasT. __ -"`-"" _'��•"�- I n ... Eusrmm - ao +mu oconwm -Regulations antl as Instructed on site by Mall Management.
e aweea warz ar acamem raevnzs waE w di•`-_ry >r _ - . i
_
_ +� no xa xrz xaz/rz am -Any damage M Lantllord's property tluNrH tenant demolition ;
d wroox .wD ronx sumac wau aE ncczmau. s' °XE consiruceon (mall flooring, bulkhead, neutral p;ers, ek.)
will be repairetl per Mall sin-fi-l-at tenant's expense_
PROVIDE ALLAPPLIANCESCONNECTED TO ___ - -Any Landlord equipment, compnnem, and/ n, aemEe
POTABLE WATER WITH BACKFLOW PREVENTORS ---- -_ 12-y 19-4"; :� g reeamg order tenanl(a)mat la existingmme avape meat
-s'•w�L¢ visible antl accessible to Me Lantllord Tenant sM1all '
H PER SECTION 606 OF THE 2021 IPC. _ _sells-_�P:�==== I H �srali aaaeaa panels as Tegmretl In ma;nta;n acaass_ AaEass,
` '- LLL '' 1 WALL TYPES: panels shall be labeled to pro fly i entry system
MALL ENTRY gib-n to wth Mall Operators
w'
O... •AIILantllortl drb comments from prev ous rev are to be
L 24'-0 1 /2" 29•-5 1 /2" _ 24 0 1 /2 29• 5 1 /2 ncorporated nto Me final set of approvetl tlavi ngs and are
0 ^mom"•Y*Y 0
71 to be adhered I. Io the field_ '
1 ","" •AII Landlord comments on th;s set of tlrewings shall apply to
usTom
the erne document sal, even ,f not repeated on every sheet
�v dT�yl -g ,n draw;ng set.
m R13 �` RR/ ., �® wtwin aevanw sa xsx •The reuse of any-Abing construction, finishes, equipment,
F _ IAg
_, �gxg E relecNcal, plumbing or HVAC systems currentlym the
JJ kE- space ,s con p-n It being eppropnate for re-use_Any.
tl,eonal u
s isa,.0 song cord eon or equipment to be re-usetl must be
STORAGE CSERMCER \ w STORAGE CSERrVICER \ x ems° .. - toyed M I,ke neW ..-d ns_ Th. Landlord makes ne
$f 9 NEW "The LGtte Factory" warranty nn Me I. nee of any ex,aeng Eonaleon ;n me apace. -
E RECEIVING n REaEluiNc @ N 3000 GRAPEVINE MILLS MALL E •If at any po,nea raaure, upgrades. and /-r improvements I.
Space 5211, Grapevine, Texas ex,almg ayAtema IEEnr, table ante N-P.-ndIiy If the '
m m
401 225-OD76. tenant to repair or replace, of tenant expense.
n oe.ia, D."err D pe+ •Landlord and Tenant responsMdMes areas, lned m Lease
O ERING Agreement
D OFFICE OFFICE gyp-- deov ,.cam D
•Landlord strongly prefers use of energy star pi -I is and/or
eq.,pmentwh.n.., possible tlunng Tenant III out, w Ih '
w® lorry DeovemorP E. ,reduce energy consumption. %
C 1,450 S F. PSAa De� gaD&"o i ganrea ,. C SI ONt
34•-2" 34•-2"
eaaid.her. , D De+e,ape+ ev : � ,ww.... oar en ammenn
B N Space341, (by Bluebonnet Entry Area)^/S
0.11 Existing Ploor Plan m om,re a. N TYPE II SPRINKLERED s PROPOSED FLOOR PLAN °^^°�•�°^°�°111Lttnau°^a 1vm ix. •'�"',
-
SCALE: 1 8"-1�-0" .n.m �.=°.,,,.,mu.r,°
/ ° z Proposed loot P
P
P Ian
enavx,c scare �/e. ` t -o
A3
SCALE: 1 8"--
1'-
0"
A A .
m.,. FP1
as m..w�.. ..°mm."°.x.,.."°.isa, All
1 2 3 4 5 8 =m. ��.a° 9 10 11 12 13 14
..a,.,»m.m mp awm'n•am°r. .. .;^mx'w' or
BUILDING CODE DATA:
ALL CHANGES REQUIRE
c Nr `I ,r lqN HOURS
SEPERATE PLUMBING,
CONSTRUCTION TYPE: IIB
APPROVAL OF REVISED
NDA -S URD P.M DAY ONLY
MECHANICAL, ELECTRICAL AND
OCCUPANCY CLASS: B
PLANS
NO WORKPERMITTEDON SU NDAY
SIGN PERMITS SHALL BE REQUIRED.
SPRINKLERED:YES
OCCUPANCY LOAD:31
CONTRACTOR SHALL CALL FOR INSPECTIONS'
PLANS NOT
ZONING: CC
APPROVED PLANS SHALL BE
I
10TRATI
REVIEWEDTHESE
OR AARE
PED
SP/CU: NO
KEPT ON JOBSITE AT ALL TIMES
TOR RE RAnoN will BE
coVOKED
ACCESSIBILITY
URN PER N.
REVOKED UPON PERMIT EXPIRATION.
1 2 3 1 4 1 5 1 6
7 8 1 9 10 1
11 I 12 1 13 1 14
M
L
K
1 j 2 3 4 5 6 7 a 9 10 z 11 LX12 13
9I
F
mu.
M
9 q
L
K
ROOM�JJSIGNS
eLl J
i
N
m1&
G
S IOAPPED SIGNS _
NEW : "The LGtW FGGtory'
3000 GRAPEVINE MILLS MAIZE
Gr4DI1— Te., os
w oo>o
—ERS a GweeRI- "
eovmenginren.cam D
21 CLEAR FLOOR AREA AT DOOR
111 DT.'Devekpimen�
C
%S�ADA"SDETAILS
�Iw�`�"
—z 5 "MEE CRAI Wmuw.w w.ex ".m w.vuam .. rmm rwn nwz rm mmn,r. w,waus aoi.vnwra. eewwz��� A
7 29• } I� SIDE REAGFj IMITS � �I 1 11 LAVA7ARIEE .. 7 . .
1 2 1 3 1 4 1 _ I 6 I 7 I B 1 9 1 10 1 11 1 12 1 13
vMm eoimnaen `z �i xac. "xe is �wwn ms mm rGnss wpm
rN.e=�,mae.mm .e�.me�"et,e,n e.,,..a m.�l e.m�a"e IR.R« RIP,anM�..r. R...r wn a�Miom R..rMM
n:aHie��p mR,Pme.m enure ... ,
uffi n
lev are Rol acaeplme eMNpe ne eM Nm tPameq ���
49
•Z. . l
'sire"x�e:laem`.
naowry _
seat m x:�a�la:"
e a�1a°nveo°i1. 1-,i l"'o:;,'maml.,mm'
aumm :aiam
1eeue % .m e„ne"W. N ar�mu..mz.u. �..a�mm. �arw,n i.eimro
%i'�Existing El.— Floor Plan
A3 SCALE. 1/8'•-1' 0" 0 4 a'
sreeSpaceD 341, (by Bluebonnet Entry Area)
N TYPE II SPRINKLERED
�OProposed Lighting Plan
V:: 1/8' — 7-0"
14
dcTnic�L ions
M
L
caarlrePnmaNaoaec,Rc«.pwere. K
c
NEW : "The Latte Factory"
.3000 GRAPEVINE MILLS MALL E
Space 5211, Grapevine, Texas
e o PPlon Deb a 9 a& VDmflingeniac e.
C
ossmxs vamn a ova m a maWw vim•.
m a ..a ELECTRICAL PLANS
7 1 a 1 9 1 10 1 11 1 12 1 13 1 14
PROVIDE ALL APPLIANCES CONNECTED TO
POTABLE WATER WITH BACKFLOW PREVENTORS
PER SECTION 606 OF THE 2021 IPC.
E1 A
CITY OF GRAPEVINE
SITE AT ALL TIMES
07/0712026 1.27:05 PM
BY: KELLY TAFT TSBPE: 1-3971
ALL CHANGES MUST Be APPROVED.
COMcheck Software Version 4.1.5.5
Envelope Compliance Certificate
Project Information
Energy Code: 2018 IECC
Project Title: The Latte Factory
Location: Grapevine, Texas
Climate Zone: 3a
Project Type: Alteration
Vertical Glazing / Wall Area: 10%
Construction Site:
3000 Grapevine Mills Mall
#5211
Grapevine, TX 75061
Owner/Agent:
Syed Obaid
the Latte Factory
670 N. COIT RD
#2360
RICHARDSON, TX 75080
9013358582
Building Area
1-dining area (Dining: Cafeteria/Fast Food) : Nonresidential
Envelope Assemblies
Post -Alteration Assembly
Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - dining area]
Roof 1: Insulation Entirely Above Deck: High Albedo Roof
Required, [Bldg. Use 1 - dining area], Exemption: Neither
sheathing nor insulation is exposed.
NORTH
Exterior Wall 2: Metal Building Wall, [Bldg. Use 1 - dining area]
Window 4: Metal Frame with Thermal Break:Fixed, Other, Fixed,
Fixed, [Bldg. Use 1 - dining area]
Window 5: Metal Frame with Thermal Break:Fixed, Other, Fixed,
Fixed, [Bldg. Use 1 - dining area]
Door 2: Insulated Metal, Swinging, [Bldg. Use 1 - dining area]
Door 3: Insulated Metal, Swinging, [Bldg. Use 1 - dining area]
EAST
Demisingr Wall 3: Metal Building Wall, [Bldg. Use 1 - dining area]
Door 4: Insulated Metal, Swinging, [Bldg. Use 1 - dining area]
SOUTH
Demising Wall 4: Metal Building Wall, [Bldg. Use 1 - dining area]
WEST
Exterior Wall 1: Metal Building Wall, [Bldg. Use 1 - dining area],
Exemption: Framing cavity not exposed.
Window 1: Metal Frame with Thermal Break:Fixed, Other, Fixed,
Fixed, [Bldg. Use 1 - dining area]
Window 2: Metal Frame with Thermal Break:Fixed, Other, Fixed,
Fixed, [Bldg. Use 1 - dining area]
Designer/Contractor:
Patrick Saucedo
PSA Designs
8900 Hunter Glen Trail
Fort Worth, TX 76120
8178082664
Floor Area
1450
R-Value Proposed Max. Allowed
Cavity Cont. U-Factor SHGC U-Factor SHGC
12.0 0.083 - 0.532 --
12.0 30.0 0.028
-
0.079
-
- - 0.250
0.250
0.460
0.331
- - 0.250
0.250
0.460
0.331
- - 0.120
-
0.610
-
- - 0.120
-
0.610
-
12.0 30.0 0.028
-
0.079
--
- - 0.250
-
0.610
--
12.0 30.0 0.028
-
0.079
-
- - 0.250
0.250
0.460
0.400
- - 0.250
0.250
0.460
0.400
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 1 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck
R-Value Proposed Max. Allowed
Post -Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC
Window 3: Metal Frame with Thermal Break:Fixed, Other, Fixed, — — 0.250 0.250 0.460 0.400
Fixed, [Bldg. Use 1 - dining area]
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, — — 0.240 0.250 0.770 0.400
Entrance Door, Entrance Door, [Bldg. Use 1 - dining area]
(a) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(b) Slab -On -Grade proposed and budget U-factors shown in table are F-factors.
Project Notes
Envelope Compliance Statement
Compliance Statement- The proposed envelope alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Patrick Saucedo /q�uc� 5-18-26
Name - Title Signature Date
EXISTING CEILING AND LIGHTING & MECHANICAL TO REMAIN
CHANGE BULBS AND FILTERS AS REQUIRED
jECT *D0622263
L—)4�
FIRM# F-16777
06/22/2026
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 2 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck
COMcheck Software Version 4.1.5.5
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Construction Site:
3000 Grapevine Mills Mall
#5211
Grapevine, TX 75061
Allowed Interior Lighting Power
2018 IECC
The Latte Factory
Alteration
Owner/Agent:
Syed Obaid
the Latte Factory
670 N. COIT RD
#2360
RICHARDSON, TX 75080
9013358582
Designer/Contractor.
Patrick Saucedo
PSA Designs
8900 Hunter Glen Trail
Fort Worth, TX 76120
8178082664
A B
C
D
Area Category Floor Area
Allowed
Allowed Watts
(ft2)
Watts / ft2
(B X C)
1-open sales and coolers (Common Space Types:Office - Open Plan): Exempt
2-Common Space Types:Restrooms: Exempt
Total Allowed Watts = N/A
Area Category Exemption Qualifications
# Fixtures
Total # Watts
Activity Area
Pre -Alt. Repl./Added
Pre -Alt.
Post -Alt.
open sales and coolers ( Common Space Types:Office -
40.000
40.000
Open Plan 1960 sa.ft.)
Exemption: Replacement of bulbs and ballasts only.
Common Space Types:Restrooms ( 62 3 sgAJ
40.000
40.000
Exemption: Replacement of bulbs and ballasts only.
Proposed Interior Lighting Power
A B
C
D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/
# of
Fixture (C X D)
Fixture
Fixtures
Watt.
oWn sales and coolers ( Common Space Types:Office - Open Plan 1960 sq.ft.): Exempt
Common Space Tvpes:Restrooms (263 sa.ft.): Exempt
Total Proposed Watts = N/A
Interior Lighting Compliance Statement
Compliance Statement- The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Patrick Saucedo /oa&zu� '!�a za"Z�& 5-18-36
Name - Title Siqnature Date
�'tcor rr
................:...
MARRY DEAVERS
Project Title: The Latte Facto ;: 74428 •�� Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMiIIsM ss/oN�ica Y\la Page 3 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck
FIRM* F-16777
06/22/2026
COMcheck Software Version 4.1.5.5
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Exterior Lighting Zone
Construction Site:
3000 Grapevine Mills Mall
#5211
Grapevine, TX 75061
Allowed Exterior Lighting Power
A
Area/Surface Category
2018 IECC
The Latte Factory
Alteration
2 (Residential mixed use area (LZ2))
Owner/Agent:
Syed Obaid
the Latte Factory
670 N. COIT RD
#2360
RICHARDSON, TX 75080
9013358582
B
Quantity
Designer/Contractor:
Patrick Saucedo
PSA Designs
8900 Hunter Glen Trail
Fort Worth, TX 76120
8178082664
C D E
Allowed Tradable Allowed Watts
Wafts/ Unit Wattage (B X C)
Total Tradable Watts (a) = 0
Total Allowed Watts = 0
Total Allowed Supplemental Watts (b) = 400
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 400 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt.
Parkina area (6 ft2): Exempt: Non -tradable Wattaae
Total Tradable Proposed Watts =
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting
systems have been designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
PATRICK SAUCEDO Aa&� �az4c� 5-18=26
Name - Title Signature Date
el
.....................:...
LARRY DEAVERS
.........................
74428
Menoszzw
FIRM# F-16777
06/22/2026
0
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 4 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck
COMcheck Software Version 4.1.5.5
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
3000 Grapevine Mills Mall
#5211
Grapevine, TX 75061
Mechanical Systems List
2018 IECC
The Latte Factory
Grapevine, Texas
3a
Alteration
Owner/Agent:
Syed Obaid
the Latte Factory
670 N. COIT RD
#2360
RICHARDSON, TX 75080
9013358582
Designer/Contractor:
Patrick Saucedo
PSA Designs
8900 Hunter Glen Trail
Fort Worth, TX 76120
8178082664
Quantity System Type & Description
1 HVAC System 1 (Single Zone):
Cooling: 1 each - Packaged Terminal Unit, Capacity = 7 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 12.00 EER, Required Efficiency: 11.90 EER
Fan System: None
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Patrick Saucedo
Name - Title
AZ&Uc� 17�auc¢�
Signature
>IEIl=ll0632263
FIRM# F-16777
06/22/2026
5-18-26
Date
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 5 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck
COMcheck Software Version 4.1.5.5
Inspection Checklist
Energy Code: 2018 IECC
Requirements: 97.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies?
Comments/Assumptions
& Req.ID
C103.2
Plans and/or specifications provide all
❑Complies
Requirement will be met.
[PR1]1
in'_ � 'i_ with which compliance
❑Does Not
can be determined for the building
❑Not Observable
Location on plans/spec: mep
envelope and document where
❑Not Applicable
exceptions to the standard are
claimed.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR2]1
calculations provide all information
❑Does Not
with which compliance can be
❑Not Observable
Location on plans/spec: mep
determined for the mechanical
❑Not Applicable
systems and equipment and
document where .,- r _' _ � to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR4]1
calculations provide all information
❑Does Not
with which compliance can be
❑Not Observable
Location on plans/spec: mep
determined for the interior lighting
❑Not Applicable
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR8]1
calculations provide all information
❑Does Not
with which compliance can be
❑Not Observable
Location on plans/spec: mep
determined for the exterior lighting
❑Not Applicable
and electrical systems and equipment
and document where e.,_ ,''_ � to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
C402.4.1
The vertical fenestration area <= 30
❑Complies
Requirement will be met.
[PR10]1
percent of the gross above -grade wall
❑Does Not
area.
Location on plans/spec: me
C402.4.1 The skylight area <= 3 percent of the
[PR1111 gross roof area.
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable Location on plans/spec: n/a
❑Not Applicable
1 I High Impact (Tier 1) 12J Medium Impact (Tier 2) u Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 6 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:,.cck
Section
& Req.ID
C402.4.2
[PR14)i
Plan Review I Complies?
In enclosed spaces > 2,500 ft2
directly under a roof with ceiling
heights >15 ft. and used as an office,
lobby, atrium, concourse, corridor,
storage, gymnasium/exercise center,
convention center, automotive
service, manufacturing, non -
refrigerated warehouse, retail store,
distribution/sorting area,
transportation, or workshop, the
following requirements apply: (a) the
daylight zone under skylights is >_
half the floor area; (b) the skylight
area to daylight zone is >= 3 percent
with a skylight VT >= 0.40; or a
minimum skylight effective aperture
> = 1 percent.
Additional Comments/Assumptions-
Comments/Assumptions
❑Complies Requirement will be met.
❑Does Not
❑Not Observable Location on plans/spec: mep
❑Not Applicable
1 1 1 High Impact (Tier 1) 1 21 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 7 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVEMENTS22 _. ::-:,.cck
Section
#
Footing / Foundation Inspection
Complies?
Comments/Assumptions
& Recl.ID
C303.2
Slab edge insulation installed per
❑Complies
[FO412
manufacturer's instructions.
❑Does Not
❑Not Observable
❑Not Applicable
C303.2.1
Exterior insulation protected against
❑Complies
Requirement will be met.
[F0611
damage, sunlight, moisture, wind,
❑Does Not
landscaping and equipment
❑Not Observable
maintenance activities.
❑Not Applicable
C105
Installed slab -on -grade insulation type
❑Complies
See the Envelope Assemblies table for values.
[FO312
and R-value with insulation
❑Does Not
specifications reported in plans and
❑Not Observable
COMcheck reports.
❑Not Applicable
C402.2.4
Slab edge insulation depth/length.
❑Complies
See the Envelope Assemblies table for values.
[FO712
Slab insulation extending away from
❑Does Not
building is covered by pavement or
❑Not Observable
>= 10 inches of soil.
❑Not Applicable
C403.12.2
Snow/ice melting system and freeze
❑Complies
Exception: Requirement does not apply.
protection systems have sensors and
❑Does Not
C403.12.3
controls configured to limit service for
❑Not Observable
[FO9]3
pavement temperature and outdoor
❑Not Applicable
temperature. future connection to
controls.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 1 Medium Impact (Tier 2) 31 Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 8 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:..cck
Section
#
Framing / Rough -In Inspection
Complies?
Comments/Assumptions
& Recl.ID
C303.1.3
F �J c "' _ products rated in
❑Complies
Requirement will be met.
[FR12]2
a 1... with NFRC.
❑Does Not
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C303.1.3
Fe L. - c . _ products are certified as
❑Complies
Requirement will be met.
[FR13]1
to performance labels or certificates
❑Does Not
provided.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C402.4.3
Vertical c 1',. . SHGC value.
❑Complies
See the Envelope Assemblies table for values.
[FR10]1
❑Does Not
❑Not Observable
❑Not Applicable
C402.4.3,
Installed vertical fenestration U-factor
❑Complies
See the Envelope Assemblies table for values.
C402.4.3.
and SHGC consistent with label
❑Does Not
4
specifications and as reported in plans
❑Not Observable
[FR8]1
and COMcheck reports.
❑Not Applicable
C402.5.1
The building envelope contains a
❑Complies
Requirement will be met.
[FR16]1
continuous air barrier that is sealed in
❑Does Not
an approved manner and either
❑Not Observable
Location on plans/spec: mep
constructed or tested in an approved
❑Not Applicable
manner. Air barrier pe .._ ci" _ � are
sealed in an approved manner.
C402.5.2,
Factory -built fenestration and doors
❑Complies
Requirement will be met.
C402.5.4
are labeled as meeting air leakage
❑Does Not
[FR18]3
requirements.
❑Not Observable
❑Not Applicable
C402.5.7
Vestibules are installed on all building
❑Complies
Exception: Requirement does not apply.
[FR1713
entrances. Doors have self -closing
❑Does Not
devices.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 9 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:..cck
Section
# Plumbing Rough -In Inspection Complies? Comments/Assumptions
& Req.ID
C404.5, Heated water supply piping conforms ❑Complies Requirement will be met.
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 requirements. Refer to section details. Location on plans/spec: mep
[PL6]3 ❑Not Observable
❑Not Applicable
C404.6.3 Pumps that circulate water between a
❑Complies
[PL7]3 heater and storage tank have controls
❑Does Not
that limit operation from startup to
❑Not Observable
<= 5 minutes after end of heating
❑Not Applicable
cycle.
C404.7 Demand recirculation water systems
❑Complies
[PL8]3 have controls that start the pump
❑Does Not
upon receiving a signal from the
❑Not Observable
action of a user of a fixture or
appliance and limits the temperature
❑Not Applicable
of the water entering the cold -water
piping to 104°F.
Additional Comments/Assumptions:
Exception: Requirement does not apply.
Exception: Requirement does not apply.
1 I High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 10 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:,.cck
Section
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
C402.2.6
Thermally ineffective panel surfaces of ❑Complies
Requirement will be met.
[ME41]3
sensible heating panels have
❑Does Not
insulation >= R-3.5.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C402.5.5,
Stair and elevator shaft vents have
❑Complies
Exception: Requirement does not apply.
C403.2.4.
motorized dampers that automatically
❑Does Not
3
close. Refernece section C403.7.7 for
❑Not Observable
[ME3]3
operational details.
❑Not Applicable
C403.8.1
HVAC fan systems at design
❑Complies
Requirement will be met.
[ME65]3
conditions do not exceed allowable
❑Does Not
fan system motor nameplate hp or fan
❑Not Observable
Location on plans/spec: mep
system bhp.
❑Not Applicable
See the Mechanical Systems list for values.
C403.8.3
Fans have efficiency grade (FEG) >_
❑Complies
Requirement will be met.
[ME117]2
67. The total efficiency of the fan at
[]Does Not
the design point of operation <= 15%
❑Not Observable
Location on plans/spec: mep
of maximum total efficiency of the
fan.
❑Not Applicable
C403.12.1 Systems that heat outside the building
❑Complies
Requirement will be met.
[ME71]2
envelope are radiant heat systems
❑Does Not
controlled by an occupancy sensing
❑Not Observable
Location on plans/spec: mep
device or timer switch.
❑Not Applicable
C403.2.3
HVAC equipment efficiency verified.
❑Complies
See the Mechanical Systems list for values.
[ME55]2
❑Does Not
❑Not Observable
❑Not Applicable
C403.2.3
PTAC and PTHP with sleeves 16 in. by
❑Complies
[ME73]3
42 in. labeled for replacement only as
❑Does Not
per Footnote b to Table C403.2.3(3).
❑Not Observable
❑Not Applicable
C403.2.2
Natural or mechanical _ : _ is
❑Complies
Requirement will be met.
[ME59]1
provided in accordance with
❑Does Not
International Mechanical Code
❑Not Observable
Location on plans/spec: mep
Chapter 4. Mechanical ventilation has
capability to reduce outdoor air supply
❑Not Applicable
to minimum per IMC Chapter 4.
C403.7.1
Demand control ventilation provided
❑Complies
Requirement will be met.
[ME59]1
for spaces >500 ft2 and >25
❑Does Not
people/1000 ft2 occupant density and
❑Not Observable
Location on plans/spec: mep
served by systems with air side
❑Not Applicable
_ _ _ " , auto modulating outside
air damper control, or design airflow
>3,000 cfm.
C403.7.2 Enclosed parking garage ventilation
❑Complies Exception: Requirement does not apply.
IME115]3 has automatic _ _ 1 ' � nt detection
❑Does Not
and capacity to stage or modulate
❑Not Observable
fans to 50% or less of design capacity.
❑Not Applicable
C403.7.6 HVAC systems serving guestrooms in
❑Complies Requirement will be met.
[ME141]3 Group R-1 buildings with > 50
❑Does Not
gL :. _ _ .. Each guestroom is
❑Not Observable
provided with controls that
automatically manage temperature
❑Not Applicable
setpoint and ) _ � : _ (see sections
C403.7.6.1 and C403.7.6.2).
1 I High Impact (Tier 1) 12J Medium Impact (Tier 2) u Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 11 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:,.cck
Section
# Mechanical Rough -In Inspection Complies? Comments/Assumptions
& Req.ID
C403.7.4 Exhaust air energy recovery on ❑Complies Requirement will be met.
[ME57]1 systems meeting Table C403.7.4(1) ❑Does Not
and C403 7 4(2)
❑Not Observable
❑Not Applicable
C403.7.5 Kitchen exhaust systems comply with
❑Complies
[ME116]3 replacement air and conditioned
❑Does Not
supply air limitations, and satisfy hood
❑Not Observable
rating requirements and maximum
❑Not Applicable
exhaust rate criteria.
C403.11.1 HVAC ducts and plenums insulated in
❑Complies
accordance with C403.11.1 and
❑Does Not
C403.11.2 constructed in accordance with
❑Not Observable
[ME60]2 C403.11.2, verification may need to
❑Not Applicable
occur during Foundation Inspection.
C403.4.1. Heating for vestibules and air curtains ❑Complies
4 with integral heating include ❑Does Not
[ME63]2 automatic controls that shut off the ❑Not Observable
heating system when outdoor air
temperatures > 45F. Vestibule ❑Not Applicable
heating and cooling systems
controlled by a thermostat in the
vestibule with heating setpoint <_
60F and cooling setpoint >= 80F.
Exception: Requirement does not apply.
Requirement will be met.
Exception: Requirement does not apply.
C403.3.3 Hot gas bypass limited to: <=240 ❑Complies Requirement will be met.
[ME35]1 kBtu/h - 50% >240 kBtu/h - 25% ❑Does Not
C408.2.2. Air outlets and zone terminal devices
1 have means for air balancing.
[ME53]3
C403.5, Refrigerated display cases, walk-in
C403.5.1, coolers or walk-in freezers served by
C403.5.2 remote compressors and remote
[ME123]3 condensers not located in a
condensing unit, have fan -powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Additional Comments/Assumptions:
❑Not Observable Location on plans/spec: mep
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
1 I High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 12 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:,.cck
Section
& Req.ID
C405.2.2.
2
[EL22]1
C405.2.1,
C405.2.1.
1
[EL18]1
C405.2.1
2
[EL19]1
Rough -In Electrical Inspection I Complies?
Complies
❑
❑Does Not
Spaces required to have light -
reduction controls have a manual
control that allows the occupant to
reduce the connected lighting load in
a reasonably uniform illumination
pattern >= 50 percent.
Occupancy sensors installed in
ch �., i.. .,,'lecture/training rooms,
conference/meeting/multi purpose
rooms, copy/print rooms,
lounges/breakrooms, enclosed offices,
open plan office areas, :,:.. .3.
storage rooms, locker rooms,
warehouse storage areas, and other
spaces <= 300 sqft that are enclosed
by floor -to -ceiling height partitions.
Reference section language
C405.2.1.2 for control function in
warehouses and section C405.2.1.3
for open plan office spaces.
Occupancy sensors control function in ❑Complies
warehouses: In warehouses, the ❑Does Not
lighting in aisleways and open areas is
controlled with occupant sensors that ❑Not Observable
automatically reduce lighting power ❑Not Applicable
by 50% or more when the areas are
unoccupied. The occupant sensors
control lighting in each aisleway
independently and do not control
lighting beyond the aisleway being
controlled by the sensor.
❑Not Observable
❑Not Applicable
❑Does Not
❑Complies
Comments/Assumptions
Requirement will be met.
Location on plans/spec: mep
Requirement will be met.
❑Not Observable Location on plans/spec: mel)
❑Not Applicable
C405.2.1. Occupant sensor control function in ❑Complies
3 open plan office areas: Occupant ❑Does Not
[EL20]1 sensor controls in open office spaces ❑Not Observable
>= 300 sq.ft. have controls 1)
configured so that general lighting can ❑Not Applicable
be controlled separately in control
zones with floor areas <= 600 sq.ft.
within the space, 2) at .. c : _c Ily turn
off general lighting in all control zones
within 20 minutes after all occupants
have left the space, 3) are configured
so that general lighting power in each
control zone is reduced by >= 80% of
the full zone general lighting power
within 20 minutes of all occupants
leaving that control zone, and 4) are
configured such that any daylight
responsive control will activate space
general lighting or control zone
general lighting only when occupancy
for the same area is detected.
C405.2.2, Each area not served by occupancy ❑Complies
C405.2.2. sensors (per C405.2.1) have time- [-]Does Not
1, switch controls and functions detailed
C405.2.2. in sections C405.2.2.1 and C405.2.2.2. ❑Not Observable
2 ❑Not Applicable
[EL21]z
Requirement will be met.
Location on plans/spec: mep
Requirement vvill be met.
Location on plans/spec: mep
Requirement will be met.
Location on plans/spec: mep
111
High Impact (Tier 1) � 21 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: O5/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 13 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVEMENTS22_. ! :_:,.cck
❑Not Observable
❑Not Applicable
❑Does Not
❑Complies
Comments/Assumptions
Requirement will be met.
Location on plans/spec: mep
Requirement will be met.
❑Not Observable Location on plans/spec: mel)
❑Not Applicable
C405.2.1. Occupant sensor control function in ❑Complies
3 open plan office areas: Occupant ❑Does Not
[EL20]1 sensor controls in open office spaces ❑Not Observable
>= 300 sq.ft. have controls 1)
configured so that general lighting can ❑Not Applicable
be controlled separately in control
zones with floor areas <= 600 sq.ft.
within the space, 2) at .. c : _c Ily turn
off general lighting in all control zones
within 20 minutes after all occupants
have left the space, 3) are configured
so that general lighting power in each
control zone is reduced by >= 80% of
the full zone general lighting power
within 20 minutes of all occupants
leaving that control zone, and 4) are
configured such that any daylight
responsive control will activate space
general lighting or control zone
general lighting only when occupancy
for the same area is detected.
C405.2.2, Each area not served by occupancy ❑Complies
C405.2.2. sensors (per C405.2.1) have time- [-]Does Not
1, switch controls and functions detailed
C405.2.2. in sections C405.2.2.1 and C405.2.2.2. ❑Not Observable
2 ❑Not Applicable
[EL21]z
Requirement will be met.
Location on plans/spec: mep
Requirement vvill be met.
Location on plans/spec: mep
Requirement will be met.
Location on plans/spec: mep
111
High Impact (Tier 1) � 21 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: O5/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 13 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVEMENTS22_. ! :_:,.cck
Requirement will be met.
Location on plans/spec: mep
Requirement vvill be met.
Location on plans/spec: mep
Requirement will be met.
Location on plans/spec: mep
111
High Impact (Tier 1) � 21 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: O5/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 13 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVEMENTS22_. ! :_:,.cck
Section
#
& Recl.ID
Rough -In Electrical Inspection
Complies?
Comments/Assumptions
C405.2.3,
Daylight zones provided with
❑Complies
Requirement will be met.
C405.2.3.
individual controls that control the
❑Does Not
1,
lights independent of general area
❑Not Observable
Location on plans/spec: mep
C405.2.3.
lighting. See code section C405.2.3
❑Not Applicable
2
Daylight -responsive controls for
[EL23]2
applicable spaces, C405.2.3.1 Daylight
responsive control function and
section C405.2.3.2 Sidelit zone.
C405.2.4
Separate lighting control devices for
❑Complies
Requirement will be met.
[EL26]1
specific uses installed per approved
❑Does Not
lighting plans.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C405.2.4
Additional interior lighting power
❑Complies
Requirement will be met.
[EL27]1
allowed for special functions per the
❑Does Not
approved lighting plans and is
❑Not Observable
Location on plans/spec: mep
automatically controlled and
❑Not Applicable
separated from general lighting.
C405.2.5
Manual controls required by the
❑Complies
Requirement will be met.
[EL28]ni°
energy code are in a location with
❑Does Not
ready access to occupants and
❑Not Observable
Location on plans/spec: mep
located where the controlled lights are
visible, or identify the area served and
❑Not Applicable
their status.
C405.2.6
Automatic lighting controls for exterior
❑Complies
Requirement will be met.
[EL30]ni°
lighting installed. Controls will be
❑Does Not
daylight controlled, set based on
❑Not Observable
Location on plans/spec: mep
business operation time -of -day, or
❑Not Applicable
reduce connected lighting > 30%.
C405.3
Exit signs do not exceed 5 watts per
❑Complies
Exception: Requirement does not apply.
[EL6]1
face.
❑Does Not
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C405.6
Low -voltage dry -type distribution
❑Complies
Requirement will be met.
[EL26]2
electric transformers meet the
❑Does Not
minimum efficiency requirements of
❑Not Observable
Table C405.6.
❑Not Applicable
C405.7
Electric motors meet the minimum
❑Complies
Requirement will be met.
[EL27]2
efficiency requirements of Tables
❑Does Not
C405.7(1) through C405.7(4).
❑Not Observable
Efficiency verified through certification
❑Not Applicable
under an approved certification
program or the equipment efficiency
ratings shall be provided by motor
manufacturer (where certification
programs do not exist).
C405.8.2,
Escalators and moving walks comply
❑Complies
Exception: Requirement does not apply.
C405.8.2.
with ASME A17.1/CSA B44 and have
❑Does Not
1
automatic controls configured to
❑Not Observable
[EL28]2
reduce speed to the minimum
❑Not Applicable
permitted speed in accordance with
ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
C405.9
Total voltage drop across the
❑Complies
Requirement will be met.
[EL29]2
combination of feeders and branch
❑Does Not
circuits <= 5%.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 12J Medium Impact (Tier 2) u Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 14 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:,.cck
I I High Impact (Tier 1) 12 I Medium Impact (Tier 2) 13 I Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 15 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck
Section
#
Insulation Inspection
Complies?
Comments/Assumptions
& Req.ID
C303.1
Roof insulation installed per
❑Complies
Requirement will be met.
[IN3]1
manufacturer's instructions. Blown or
❑Does Not
poured loose -fill insulation is installed
❑Not Observable
Location on plans/spec: II
only where the roof slope is <=3 in
❑Not Applicable
12
C402.2.1
Insulation installed on a suspended
❑Complies
Requirement will be met.
[IN20]1
ceiling having ceiling tiles is not being
❑Does Not
specified for roor/ceiling assemblies.
❑Not Observable
Location on plans/spec: mep
Continuous insulation board installed
❑Not Applicable
in 2 or more layers with edge joints
offset between layers.
C303.1
Building envelope insulation is labeled
❑Complies
Requirement will be met.
[IN10]Z
with R-value or insulation certificate
❑Does Not
providing R-value and other relevant
❑ Not Observable
data.
❑Not Applicable
C303.2
Above -grade wall insulation installed
❑Complies
Requirement will be met.
[IN7]1
per manufacturer's instructions.
❑Does Not
❑Not Observable
Location on plans/spec: n/a
❑Not Applicable
C303.2.1
Exterior insulation is protected from
❑Complies
Requirement will be met.
[IN14]2
damage with a protective material.
❑Does Not
Verification for exposed foundation
❑Not Observable
Location on plans/spec: mep
insulation may need to occur during
❑Not Applicable
Foundation Inspection.
C105
Installed above -grade wall insulation
❑Complies
See the Envelope Assemblies table for values.
[IN6]1
type and R-value consistent with
❑Does Not
insulation sp _" ' _� - _ s reported in
❑Not Observable
plans and COMcheck reports.
❑Not Applicable
C402.2.3
Installed floor insulation type and R-
❑Complies
See the Envelope Assemblies table for values.
[IN8]2
value __ �*.'- ; with insulation
❑Does Not
specifications reported in plans and
❑Not Observable
COMcheck reports.
❑Not Applicable
C402.2.6
Radiant panels and associated
❑Complies
Exception: Requirement does not apply.
[IN18]3
components, designed for heat
❑Does Not
transfer from the panel surfaces to the
❑Not Observable
Location on plans/spec: mep
occupants or indoor space are
❑Not Applicable
insulated with a minimum of R-3.5.
C402.3
High-albedo roofs satisfy one of the
❑Complies
Requirement will be met.
[IN5]3
following: 3-year-aged solar
❑Does Not
reflectance >= 0.55 and thermal
❑Not Observable
Location on plans/spec: mep
emittance >= 0.75 or 3-year-aged
❑Not Applicable
solar reflectance index >= 64.0.
C105
Installed roof insulation type and R-
❑Complies
See the Envelope Assemblies table for values.
[IN2]1
value __ .*.'- ; with insulation
❑Does Not
specifications reported in plans and
❑Not Observable
COMcheck reports. For some ceiling
❑Not
systems, verification may need to
Applicable
occur during Framing Inspection.
C402.5.1. All sources of air leakage in the
1 building thermal envelope are sealed,
[IN1]1 caulked, gasketed, weather stripped
or wrapped with moisture vapor -
permeable wrapping material to
minimize air leakage.
Additional Comments/Assumptions:
❑Complies Requirement will be met.
❑Does Not
❑Not Observable Location on plans/spec: mep
❑Not Applicable
1 I High Impact (Tier 1) 12J Medium Impact (Tier 2) u Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 16 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:,.cck
I I High Impact (Tier 1) 12 I Medium Impact (Tier 2) 13 I Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 17 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck
Section
#
& Recl.ID
Final Inspection
Complies?
Comments/Assumptions
C303.3,
Furnished O&M instructions for
❑Complies Requirement will be met.
C408.2.5.
systems and equipment to the
❑Does Not
2
building owner or designated
❑Not Observable
[FI17]3
representative.
❑Not Applicable
C303.3,
Furnished O&M manuals for HVAC
❑Complies Requirement will be met.
C408.2.5.
systems within 90 days of system
❑Does Not
3
[FI8]3
acceptance.
❑Not Observable
❑Not Applicable
C402.5.6
Weatherseals installed on all loading
❑Complies
Exception: Requirement does not apply.
[FI37]1
dock cargo door openings and provide
❑Does Not
direct contact along the top and sides
❑Not Observable
of vehicles parked in the doorway.
❑Not Applicable
C402.5.8
Recessed luminaires in thermal
❑Complies
Requirement will be met.
[FI26]3
envelope to limit infiltration and be IC
❑Does Not
rated and labeled. Seal between
❑Not Observable
Location on plans/spec: mep
interior finish and luminaire housing.
❑Not Applicable
C403.2.2
HVAC systems and equipment
❑Complies
Requirement will be met.
[FI27]3
capacity does not exceed calculated
❑Does Not
loads.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C403.2.4.
Heating and cooling to each zone is
❑Complies
Requirement will be met.
1
controlled by a thermostat control.
❑Does Not
[F147]3
Minimum one humidity control device
❑Not Observable
Location on plans/spec: mep
per installed
humidification/dehumidification
❑Not Applicable
system.
C403.4.1.
Thermostatic controls have a 5 °F
❑Complies
Requirement will be met.
2
deadband.
❑Does Not
[FI38]3
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C403.2.4.
Temperature controls have setpoint
❑Complies
Requirement will be met.
1.3
overlap restrictions.
❑Does Not
[F120]3
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C403.2.4.
Each zone equipped with setback
❑Complies
Requirement will be met.
2
controls using automatic time clock or
❑Does Not
[F139]3
programmable control system.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C403.2.4.
Automatic Controls: Setback to 55°F
❑Complies
Requirement will be met.
2.1,
(heat) and 85°F (cool); 7-day clock, 2-
❑Does Not
C403.2.4.
hour occupant override, 10-hour
❑Not Observable
Location on plans/spec: mep
2.2
[F140]3
backup
❑Not Applicable
C405.4.1 Interior installed lamp and fixture
❑Complies See the Interior Lighting fixture schedule for values.
[FI18]1 lighting power is consistent with what
❑Does Not
is shown on the approved lighting
❑Not Observable
plans, d _ _ c .' , proposed watts
are less than or equal to allowed
❑Not Applicable
watts.
C405.5.1 Exterior lighting power is consistent
❑Complies See the Exterior Lighting fixture schedule for values.
[FI19]1 with what is shown on the approved
❑Does Not
lighting plans, demonstrating
❑Not Observable
proposed watts are less than or equal
❑Not Applicable
to allowed watts.
1 I High Impact (Tier 1)
12J Medium Impact (Tier 2) 31 Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 18 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ ' �_I..cck
Section
#
& Req.ID
Final Inspection
Complies?
Comments/Assumptions
C408.1.1
Building operations and �' ,- � _z
❑Complies
Requirement will be met.
[FI57]1
documents will be provided to the
❑Does Not
owner. Documents will cover
❑Not Observable
manufacturers' information,
specifications, programming
❑Not Applicable
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
C408.2.1
Commissioning plan developed by
❑Complies
Requirement will be met.
[F128]1
registered design professional or
❑Does Not
approved agency.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C408.2.3.
HVAC equipment has been tested to
❑Complies
Requirement will be met.
1
ensure proper operation.
❑Does Not
[FI31]1
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C408.2.3.
HVAC control systems have been
❑Complies
Requirement will be met.
2
tested to ensure proper _ _ c .' _ ,
❑Does Not
[FI10]1
calibration and adjustment of controls.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C408.2.4
Preliminary commissioning report
❑Complies
Requirement will be met.
[F129]1
completed and certified by registered
❑Does Not
design professional or approved
❑Not Observable
Location on plans/spec: mep
agency.
❑Not Applicable
C408.2.5.
Furnished HVAC as -built drawings
❑Complies
Requirement will be met.
1
submitted within 90 days of system
❑Does Not
[FI7]3
acceptance.
❑Not Observable
❑Not Applicable
C408.2.5.
Furnished as -built drawings for
❑Complies
Requirement will be met.
1
electric power systems within 90 days
❑Does Not
[FI16]3
of system acceptance.
❑Not Observable
❑Not Applicable
C408.2.5.
An air and/or hydronic system
❑Complies
Requirement will be met.
3
balancing report is provided for HVAC
❑Does Not
[FI43]1
systems.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C408.2.5.
Final commissioning report due to
❑Complies
Requirement will be met.
4
building owner within 90 days of
❑Does Not
[F130]1
receipt of certificate of occupancy.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
C408.3
Lighting systems have been tested to
❑Complies
Requirement will be met.
[FI33]1
ensure proper calibration, adjustment,
❑Does Not
programming, and operation.
❑Not Observable
Location on plans/spec: mep
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) U Low Impact (Tier 3)
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 19 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22__ _: �_:,.cck
Project Title: The Latte Factory Report date: 05/18/26
Data filename: E:\Users\New\Desktop\Patman\Projects\Retail\SyedObaid\GrapevineMillsMall\LATTEFACTORY\la Page 20 of 20
FactoryGrapevineMillsMallGrapevineTXIMPROVE MENTS22comcheck.cck