Loading...
HomeMy WebLinkAboutCOMM2015-4314DATE OF ISSUANCE: PERMIT #:✓ BUILDING i APPLICATION PLEASE PRINT JOB ADDRESS: 1038 Texan Trail Grapevine TX 76051 8/- 0 G -0 ( SUITE # LOT: 2A2 BLOCK: 2A SUBDIVISION: GRAPEVINE STATION BUILDING CONTRACTOR (company name): IRVING HOMES INC CURRENT MAILING ADDRESS: 9001 AIRPORT FREEWAY SUITE 400 CITY/STATE/ZIP: NORTH RICHLAND HILLS TX 76180 PROPERTY OWNER: IRVING HOMES INC # 817 437 7777 Fax # CURRENT MAILING ADDRESS: 9001 AIRPORT FREEWAY SUITE 400 CITY/STATE/ZIP: NORTH RICHLAND HILLS TX 76180 PROJECT VALUE: $ $1,823,250 PHONE NUMBER: 817 437 7777 FIRE SPRINKLERED? YES X NO DESCRIPTION OF WORK TO BE DONE: CONSTRUCTION OF NEW 2 -STORY 28,050 SF OFFICE BUILDING USE OF BUILDING OR STRUCTURE: GENERAL OFFICE / SHOWROOM NAME OF BUSINESS: HISTORYMAKER HOMES **Total Square Footage under roof: 28,967 SF Square Footage of alteration/addition: 28,050 SF X I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings, alterations and additions) I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: &i eaPJ r, 6 6 err- (Not required for 1 & 2 family dwellings) ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas N/A Department of Health. (REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINT NAME:'. EijZi` SIGNATURE v PH #: J7 335� T FAX #: EMAIL: - ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY F, -MAIL THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction Ty e: Permit Valuation: $ Setbacks Approval to Issue Occupancy Group: Fire Sprinkler: YES t;'—No Front: , t Electrical Division: Building Depth: ` Left: Plumbing Zoning:ZA Building Width: Rear: " Mechanica Occupancy Load: St -1 Ar Right: ' Plan Review Approval: Date: ! ""- Building Permit Fee: '2k, a � Site Plan Approval: Date: Plan Review Fee: Igo - 9-6 Fire Department: Date: Lot Drainage Fee: //7-2, 5 Public Works Department: Date: , Sewer Availability Rate: Health Department:------ Date: Water Availability Rate: Approved for Permit: Date: / I Total Fees: - 13 Lot Drainage Submitted: Approved: ��%Z Total Amount Due: P.O. BOX 95104, GRAPEVINE, TX 76099 (817) 410-3165 OfORMSUSPERMITAPPLICATIONS 1102-Rev.11104,5106,2107,11/09,4/11 FEB 29 20 i6 'RA Issue Date: CITY OF GRAPEVINE F L- R 9p, (CIRCLE ONE) ELECTRICAL MECHANICAL � -PLUMBING -IRRIGATION -FUEL GAS P pIT E T APPLICATION IPLEASE PRINT LEGIBLY - COMPLETE ENTIRE FOPM1 PERMIT # BLDG. PERMIT # COM -15-4314 T-641: JOB ADDRESS: 1038 Texan Trail SUITE # DESCRIPTION OF WORK: Ground up construction of office space PROPERTY OWNER: Irving Homes Inc CONTRACTING COMPANY: Facility Solutions Group ADDRESS: 9001 Airport Fwy Ste#400 ADDRESS:2525 Walnut Hill Ste#100 CITYISTATE/ZIP: North Richland Hills, TX 76180 CITYISTATE/ZIP: Dallas, TX 75229 PHONE NUMBER: 817-849-5230 PHONE NUMBER: 214-357-5697 TYPE OF OCCUPANCY BUIL SIGNIFG AREA j PERMIT FEES AMOUNT DUE EACH TRADE I. R-3 1- 749 $ 33,25 SINGLE FAMILY, DUPLEX 750- 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 63.18 NEW CONSTRUCTION & 1,501- 1,750 $ 76.48 ADDITIONS (PER UNIT) 1,751- 2,000 $ 83.13 2,001- 2,250 $ 89.78 TOTAL SO. FOOT UNDER 2,251- 3,000 $ 96.43 ROOF 3,001- 3,500 $ 103.08 3,501- 4,000 $ 109.73 $ 4,001 + $ 120.37 EACH TRADE 11. A, E, 1, R-1 1- 500 $ 37.00 HOTELS, APARTMENTS, 501 - 100,000 $ 17,50+.035 PER DRINKING/DINING, 100,001 - 500,000 $ 3,500.00+.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001+ $15,000.00+.02 FOOT $ INSTITUTIONAL Ill. EF, H, M, S, U EACH TRADE 28050 sq. ft. OFFICE, RETAIL, WHOLESALE,1- snn $ 37.00 $32+$280.50 50 1- 50,000 GARAGES, FACTORIES, $ 32.00+.01 PER J WORKSHOPS, SERVICE $ 182.00+.ou SQUARE 5U'001- 100,000 STATIONS, WAREHOUSE 100,001+ $ 582.00+.003 FOOT 312 .50 CONTRACT EACH TRADE IV. ANY OCCUPANCY GROUP VALUATION OF WORK FINISH -OUTS, SHELL COMPLETIONS, 0- 500 $ 37.00 ALTERATIONS OR 501- 1,500 $ 45.00 STAND ALONE PERMITS 1,501- 3,000 $ 57.00 3,001- 5,000 $ 72.00 CONTRACT VALUATION OF WORK: 5,001- 50,000 $ 27.00+.009 50,001- 100,000 $ 127.00+ .007 PER $ 100,001- 500,000 I $ 327,00+ .005 DOLLAR 500,001+ $ 1,327.00+.003 VALUATION EACH TRADE V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37,00 $ C.AUsP.rqk.Ahnftn1AnnDAtakI n(.aIkMiffoqnft%WindowsITP.mnorary Intamp.tF:ilp.,;k(,nntent0titlnnk%G8()FSGOF%MFPAPPLICATION 4-11 dor. PLAN SUBMITTAL: WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE OTHERWISE REQUIRED BY STATE LAW. OTHER INSPECTIONS AND FEES: • INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)...............................................$42.00/HOUR' • REINSPECTION FEES.................................................................................................................. $42.00 • PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED.. .................... .................. ................ . $37.00 • INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM)- .................... $42.00/HOUR • ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVEDPLANS ..... ............ .................. .................. ............... ........... ........ ................................ $42.00/HOUR • BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE • FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS*" I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE, I FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT (OR HOMEOWNER FOR HOMEOWNERS PERMITS) PHONE #: PRINTED NAME EMAIL: "OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER. —ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS. Development Services Department, Building Inspections The City of Grapevine * P.O. Box 95104 * Grapevine, Texas 76099 * (817) 410-3165 Fax (817) 410-3012 * www.grapevinetexas.gov . _ sr t. :.=.fir "dG2 . xas: t <.•r, . �Yt+. f., .su sT� ori , ;ntnr I F. � ze. i -r i,�cK s,r: E.,..=L. .. , . ,C A7+ - 14 4 =, T Fi-.i; V NE Ems. IT N X A 8 JAN 14 2016 CITY OF GRAPEVINE V� (CIRCLE ONE) MECHANICAL - ELECTRICAL -'vf�LUMBING - IRRIGATION - FUEL GAS PERMIT APPLICATION (PLEASE PV411T LFr.lgl Y - r#11,71PI FTF PERMIT # BLDG. PERMIT # DATE: JOB ADDRESS: IcKt. 7-ex.-ull J SUIT t # DESCRIPTION OF WORK: PROPERTY OWNER: CONTRACTING COMPANY: .. _/_x/ Z. ADDRESS: ADDRESS: CITYISTATE/ZIP: CITY/STATE/ZIP: v/ 50chlilknle 7 PHONE NUMBER: PHONE NUMBER: ?12 575// TYPE OF OCCUPANCY BUILDING AREA (SO FT) PERMIT FEES AMOUNT DUE EACH TRADE I. R-3 1- 749 $ 33.25 SINGLE FAMILY, DUPLEX 750- 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 63.18 NEW CONSTRUCTION & 1,501- 1,750 $ 76.48 ADDITIONS (PER UNIT) 1,751- 2,000 $ 83.13 2,001 - 2,250 $ 89.78 TOTAL SQ. FOOT UNDER 2,251- 3,000 $ 96.43 ROOF 3,001- 3,500 $ 103.08 3,501 - 4,000 $ 109.73 4,001 + $ 120.37 EACH TRADE Ill. A, E, 1, R-1 1 - 500 $ 37.00 HOTELS, APARTMENTS, 501 - 100,000 $ 17.50+.035 PER DRINKING/DINING, 100,001 - 500,000 $ 3,500.00+.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001 + $15,000.00+.02 FOOT INSTITUTIONAL 41117 �i, F, H, PIA, S, U EACH TRADE '-�"OFFICE, RETAIL, WHdLESALE, 1- 500 $ 37.00 GARAGES, FACTORIES, 501- 50,000 $ 32.00+ . 01 PER f WORKSHOPS, SERVICE 50,001- 100,000 $ 182.00+.007 SQUARE STATIONS, WAREHOUSE 100,001+ $ 582.00+ .003 FOOT CONTRACT EACH TRADE IV. ANY OCCUPANCY GROUP VALUATION OF WORK FINISH -OUTS, SHELL COMPLETIONS, 0- 500 $ 37.00 ALTERATIONS OR 501- 1,500 $ 45.00 STAND ALONE PERMITS 1,501- 3,000 $ 57.00 3,001- 5,000 $ 72.00 CONTRACT VALUATION OF WORK: 5,001- 50,000 $ 27.00+.009 $_ 3 50,001- 100,000 100,001- 500,000 500,001+ $ 127.00+.007 PER $ 327.00+ .005 DOLLAR $ 1,327.00+.003 IVALUATION $ EACH TRADE V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 r*klJ.qpr_q\.,hattp.\AnnDpfp\l or.AhMirmqnffkWinrinw kTp.mnnraiv Intp.rnpf Filp.qkrontf-.nt.Oijtlnnkk(,ROFRCOFkMFP APPI ICATinN 4-11 tion WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE OTHERWISE REQUIRED BY STATE LAW. • INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)...............................................$42.00/HOUR" • REINSPECTION FEES.................................................................................................................. $42.00 • PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED........................................................... $37.00 • INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM)......................$42.00/HOUR • ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVEDPLANS.......................................................................................................................$42.00/HOUR • BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE • FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS* I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. I FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. t e SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT (OR HOMEOWNER FOR HOMEOWNERS PERMITS) PHONE #: l S PRINTE .NAME EMAIL: *OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER. **ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS. Development Services Department, Building Inspections The City of Grapevine * P.O. Box 95104 * Grapevine, Texas 76099 * (817) 410-3165 Fax (817) 410-3012 * www.grapevinetexas.gov C"\1J3P.LC\ahattP\AnnDatnM ncal\Minrnsnff\Winrinws\Tamnnraro IntP.rnP.t Filar\Cnntent.0utinnklGAOFfiGOF\MFP APPI (CATION 4-I l Ann a Lei 11.1 o DATE: —1 15 11 / BUILDING ✓ --- ,--- SWIMMING POOL ADDRESS: ®� Z40 ✓t . IRRIGATION PERMIT # _f WATER HEATER I hereby certify that I have inspected the water supply system at the above referenced address. To the best of my knowledge, the materials and methods used in the installation of this system comply with all laws of the State of Texas relating to plumbing that are required to be enforced by municipalities, and the plumbing code adopted by the City of Grapevine. Plumbing regulations are contained in the City of Grapevine Code of Ordinances Article V (Ordinance number 2007-36) and Article VIII (Ordinance number 2007-36), and any and all subsequent related ordinances. In addition, to the best of my knowledge, no cross connection exists at this address at the time of inspection. SIGNATURE OF INSIPECTOR TITLE :L �'2,S90 � LICENSE NUMBER O:\forms\waterservinsp, 05/01 Revised: 7123/14 SEP 15 2016 i A' 0 57.71 11 WONT:11 •rTIM a•• • a aislet; 101112,11,• building. It is further understood that this temporary release is for a thirty (30) day maximum time period and the undersigned releases all claims that may occur through accidents or spoilage of any type resulting from said electric power beingturnedoffat the end ofthe thirty0 day time period. 0 �: .�.,:�.� 1 19 NA E OF APPLICANT:c, ADDRESS OF APPLICANT:12 4r e -r-4- iv�x S°ut` r oc CITY, STATE, ZIP:K/ 9C TELEPHONE UMBER: �11 INSPECTIONS FOR TEMPORARY POWER MUST BE REQUESTED T (817) 410-3010 O:FORMS\DS CONTRACTOR FORMS\TEMP ELEC.doc 10/12/00 Revised: 4/10/02 eL-f n 06/0v JT NAME: ®ATE: 111111111120 MAN S '1101 i A 0 . •• •• •JI R i. i t t tt • • i r • i • • • • o • 11 imm ii f - t,,f • ;f i maximum f me period and the undersigned releases all claims that may occur through accidents or spoilage of any type resulting from i gaspower beingturned off atthe end of thirty (30) day maximum time period. An 91 i O • • ' • ADDRESS: '!• , < PERMIT U / - q3 / NAME OF .P I STATE, ZIP: WE WA i FOR TEMPORARY , REQUESTED 410-3010 / .j , r: SIGNITU PRINT NAMI=-: DAT 4/10/02 Cnp IIV ;, PERMIT NO. /5--� 3Z � ADDRESS: lo3 9' T-�h'Qn %_ra/* BUILDER: -T-i^vr'✓t9 #0/nes The above referenced address meets or exceeds the requirements for protection against termites set forth in the 2006 International Residential Code and the treatment was done in compliance with the Regulations of the Structural Pest Control Board of Texas and the EPA Registered Manufacturer's Directions for the Use of Pesticides. Name of Protection Provider (Company): joidM oA�1J'T iec l 60,1�re / Address: P®. j9oX 56 g' -3/0 Almerg 7?- Phone II ,2 1 � -5 2 7 ..>1 9'l? State License No.: 1 ;Z q 7 STATE OF TEXAS COUNTY OF l r( -a V T I, S�nCIf , being duly sworn both deposed and say that the information contained in the above application is true and correct to the best of my know] dge an elief. Sigriatur Date Subscribed and sworn to before me this ) day of. At-emmer , 20�, A.D. Notary Public i and for the State of Texas STAGY BELL 0110 O:\FORMS\DS CONTRACTOR FORMS\TERMITE PROTECTION.doc 0907 ;gig NOTARY +�f? PUBLIC STATE CiF TEXAS -.,r,�;•...�°}' COW EXP02-14-2018 host ti�+"r� NOTARY ID 125583435 ID E "C" 1, q 2016 ENERGY CONSERVATION INSPECTION CERTIFICATION FORM ) 2, —/ 4--/ (ALL OCCUPANCIES EXCEPT SINGLE FAMILY RESIDENTIAL) Project Name: Address of Insl Name of Company Performing Inspection:_ , 'AJt+y0 C-n� flif Name of Certified Inspector Performing Inspection: �Co O&Vaa--o ICC Energy Code Inspector Certification Number: 11�01 Q05� In accordance with State Law (Senate Bill 5 enacted by the 77th Legislature of the State of Texas), I hereby certify that I have inspected the above referenced structure and that it complies with the International Energy Conservation Code and any Amendments adopted by the State of Texas and / or the City of Grapevine. Signature of Inspector Development Services Department The City of Grapevine * P.O. Box 95104 4 Grapevine, Texas 76099 * (817) 410-3165 Fax (817) 410-3012 * www.grapevinetexas.gov 0-"FORMSIDS ENERGY CODE RELATECACornmewAal Conrple0on Gen. Energy Gade.doc M007;Re,r.242 CITY OF BUILDING PRE -CONSTRUCTION This is not intended to be a compr+ guide to aid in the construction process. tobea i Provide clear and fully legible Project Site Address Sign, readable from the curb. ® No work (including sitework) may proceed prior to issuance of a Building Permit and/or written approval by the Building Official. Separate Permits are also required for all mechanical, electrical, and plumbing work, signs (permanent and temporary) and banners. Each building and/or structure requires a Separate Permit. Working hours in the City of Grapevine are 7:00 AM to 7:00 PM Monday through Saturday. No Work allowed on Sunday. Building or structure in a residential district or non-residential district, excluding any inside work done in an enclosed building or structure in nonresidential districts. ,,,,,,No sitework and/or tree removal is permitted prior to receiving a tree inspection and written approval from the building inspector. No work may be covered prior to receiving written approval from the inspector. All inspection approvals should be kept on site by the project manager. Inspections requested prior to 7:30 A.M. will usually be performed the same morning. Inspections requested by 12:30 P.M. will usually be received that afternoon. Inspection request phone number is (817) 410-3010. After hours inspections are strictly voluntary. Provide a copy of the Foundation Setback Survey for City Of Grapevine approval. Your surveyor may fax this to the Building Department at (817) 410-3012. No inspections on building pad will be made prior to City approval of a Foundation Setback Survey. No changes from - City approved plans first submitting revised plans and receiving written approval from the BuildingDepartment. This includes signs, landscaping, lighting, etc. i COMcheck Software • i Envelope r Compliance , Section 1: Project Information Gross Area or Perimeter Project Type: New Construction Cont. Proposed R -Value U -Factor Project Title : History Maker Corporate Headquarters Roof 1: Attic Roof with Wood Joists Construction Site: Owner/Agent: Designer/Contractor: 1038 Texan Trail Irving Homes Michael Bennett Grapevene, TX 76051 9001 Airport Freeway Bennett Benner Partners Architects Suite 400 500 West 7th Street North Richland Hills, TX 76180 Suite 1400 817 849-5100 Fort Worth, TX 76102 --- 0.320 817 335-4991 Section 2: General Information Building Location (for weather data): Grapevine, Texas Climate Zone: 3a Vertical Glazing /Wall Area Pct.: 40% Activity Type(s) Floor Area Office 21250 Retail 4000 Section 3: Requirements Checklist Climate -Specific Requirements: Component Name/Description Gross Area or Perimeter Cavity R -Value Cont. Proposed R -Value U -Factor Budget U-Factor(a) Roof 1: Attic Roof with Wood Joists 14025 0.0 20.0 0.046 0.027 Brick Venner Wall: Wood -Framed, 16" o.c. 15390 13.0 0.0 0.089 0.089 CW -1 (2): Metal Frame Curtain Wall/Storefront: Double Pane with 186 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 CW -2 (1): Metal Frame Curtain Wall/Storefront: Double Pane with 212 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 CW -3 (2): Metal Frame Curtain Wall/Storefront: Double Pane with 160 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 CW -4 (3): Metal Frame Curtain Wall/Storefront: Double Pane with 465 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 CW -5 (1): Metal Frame Curtain Wall/Storefront: Double Pane with 272 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 CW -6 (1): Metal Frame Curtain Wall/Storefront: Double Pane with 332 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 SF -3: Metal Frame Curtain Wall/Storefront: Double Pane with Low -E, 128 --- --- 0.320 0.600 Clear, SHGC 0.27, PF 0.65 SF -6: Metal Frame Curtain Wall/Storefront: Double Pane with Low -E, 420 --- --- 0.320 0.600 Clear, SHGC 0.27, PF 0.60 SF -7: Metal Frame Curtain Wall/Storefront: Double Pane with Low -E, 631 --- --- 0.320 0.600 Clear, SHGC 0.27 SF -8 102-1: Glass (> 50% glazing):Metal Frame, Entrance Door, 59 --- --- 0.320 0.900 SHGC 0.27, PF 1.00 Project Title: History Maker Corporate Headquarters Report date: 11/30/15 Data filename: E:\no15117.00 Historymaker Homes\04 Regulatory\04-01 City\HMH Energy Comcheck.cck Page 1 of 2 SF -8 114-1: Glass (> 50% glazing):Metal Frame, Entrance Door, 59 --- --- 0.320 0.900 SHGC 0.27, PF 0.38 SF -8: Glass (> 50% glazing):Metal Frame, Non -Entrance Door, 236 --- --- 0.320 0.650 SHGC 0.27 SF -13 (8): Metal Frame Curtain Wall/Storefront: Double Pane with 336 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 SF -14: Metal Frame Curtain Wall/Storefront: Double Pane with 532 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27, PF 0.73 SF -15 115-8: Glass (> 50% glazing):Metal Frame, Non -Entrance 58 --- --- 0.240 0.650 Door, SHGC 0.27 SF -17 112-1: Glass (> 50% glazing):Metal Frame, Non -Entrance 49 --- --- 0.240 0.650 Door, SHGC 0.27, PF 0.43 SF -20 (2): Metal Frame Curtain Wall/Storefront:Double Pane with 50 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27, PF 0.43 SF -23 (3): Metal Frame Curtain Wall/Storefront: Double Pane with 66 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27 SF -26 (10): Metal Frame Curtain Wall/Storefront:Double Pane with 1840 --- --- 0.320 0.600 Low -E, Clear, SHGC 0.27, PF 0.69 door 111-1: Insulated Metal, Swinging 21 --- --- 0.240 0.700 door 134-2: Glass (> 50% glazing):Metal Frame, Non -Entrance 128 --- --- 0.240 0.650 Door, SHGC 0.27 Stucco Roof Wall: Wood -Framed, 16" o.c. 175 13.0 0.0 0.089 0.089 Concrete Slab: Slab -On -Grade: Unheated 503 --- --- --- --- (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: F-1 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. F1 2. Windows, doors, and skylights certified as meeting leakage requirements. F1 3. Component R -values & U -factors labeled as certified. u 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. ❑ 5. 'Other' components have supporting documentation for proposed U -Factors. Fi 6. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. F1 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. Lj 8. Cargo doors and loading dock doors are weather sealed. ❑ 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. F1 10. Building entrance doors have a vestibule equipped with closing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.1 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signature Date Project Title: History Maker Corporate Headquarters Report date: 11/30/15 Data filename: E:\no15117.00 Historymaker Homes\04 Regulatory\04-01 City\HMH Energy Comcheck.cck Page 2 of 2 Section 1: Project Information Energy Code: 2009 IECC Project Title: Historymaker Homes Corporate Office Project Type: New Construction Construction Site: Owner/Agent: 1038 Texan Trail Grapevine, TX 76051 Historymaker Homes Section 2: General Information Building Location (for weather data): Grapevine, Texas Climate Zone: 3a Section 3: Mechanical Systems List Quantity System Type & Description Designer/Contractor: Philip Smart, P.E. HPMB Consulting Engineers, Inc. 2828 Trinity Mills Rd. Suite 210 Carrollton, TX 75006 214-483-6202 RTU -1 (Multiple -Zone) : Heating: 1 each - Central Furnace, Gas, Capacity = 350 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency = 80.00% Ec Cooling: 1 each - Single Package DX Unit, Capacity = 588 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 10.40 EER, Required Efficiency = 9.80 EER Fan System: FAN SYSTEM 1 -- Compliance (Brake HP method) : Passes Fans: FAN 1 Supply, Multi -Zone VAV, 18570 CFM, 20.0 motor nameplate hp, 19.9 brake hp RTU -2 (Multiple -Zone) : Heating: 1 each - Central Furnace, Gas, Capacity = 350 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency = 80.00% Ec Cooling: 1 each - Single Package DX Unit, Capacity = 588 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 10.40 EER, Required Efficiency = 9.80 EER Fan System: FAN SYSTEM 1 -- Compliance (Brake HP method) : Passes Fans: FAN 1 Supply, Multi -Zone VAV, 18570 CFM, 20.0 motor nameplate hp, 19.9 brake hp AC-1/CU-1 (Single Zone) : Cooling: 1 each - Split System, Capacity = 18 kBtu/h, Air -Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 15.30 SEER, Required Efficiency = 13.00 SEER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 425 CFM, 0.1 motor nameplate hp AC-2/CU-2 (Single Zone) : Cooling: 1 each - Split System, Capacity = 18 kBtu/h, Air -Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 15.30 SEER, Required Efficiency = 13.00 SEER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 425 CFM, 0.1 motor nameplate hp Project Title: Historymaker Homes Corporate Office Report date: 11/24/15 Data filename: H:\Jobs\2015\H15136 History Maker Homes\Engineering\Energy\COMcheck\Historymaker Mechanical EH -1 & 2 (Unknown) : Heating: 1 each - Unit Heater, Electric, Capacity = 10 kBtu/h No minimum efficiency requirement applies Fan System: FAN SYSTEM 3 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 3 Supply, Constant Volume, 175 CFM, 0.1 motor nameplate hp WH -1 & 2: Gas Instantaneous Water Heater, Capacity: 0 gallons, Input Rating: 199 Btu/h Proposed Efficiency: 0.95 EF, Required Efficiency: 0.67 EF WH -3: Electric Storage Water Heater, Capacity: 10 gallons w/ Circulation Pump No minimum efficiency requirement applies Section 4: Requirements Checklist Requirements Specific To: RTU -1 : 1. Equipment minimum efficiency: Central Furnace (Gas): 80.00 % Ec F-1 2, Equipment minimum efficiency: Single Package Unit: 9.80 EER (9.5 IPLV) C] 3. Minimum one temperature control device per zone Lj 4. Integrated economizer is required for this location and system. ❑ 5. Cooling system provides a means to relieve excess outdoor air during economizer operation. F -I 6. Systems serving more than one zone must be VAV systems Exception(s): Where pressure relationships must be maintained Zones or supply air systems with at least 75% of reheating/recooling energy site recovered or site solar F-1 Zones with humidity requirements for special processes ❑ Zones with cfm <300 and flow rate <10% of total design flow rate ❑ Outside air needed to meet IMC Chapter 4 n 7. Single -duct VAV terminals reduce primary air before reheating F -i 8. Controls capable of resetting supply air temp (SAT) by 25% of SAT -room temp difference Exception(s): F -I Systems that prevent reheating, recooling or mixing of heated and cooled supply air ❑ Seventy five percent of the energy for reheating is from site -recovered or site solar energy sources. Zones with peak supply air quantities of 300 cfm (142 L/s) or less. 9. VAV fan — 10 hp are driven by mechanical or electrical variable speed drive, or driven by vane -axial with variable speed blades, or operate with motor demand <=30% design kW at 50% design flow - calculations required F1 10. Hot gas bypass prohibited unless system has multiple steps of unloading or continuous capacity modulation 11. Hot gas bypass limited to 25% of total cooling capacity 12.VAV fans with static pressure sensors are placed in a position such that the controller setpoint is no greater than one-third the total design fan static pressure. If placement results in the sensor being located downstream of major duct splits, multiple sensors are installed in each major branch. Exception(s): F1 Systems with DDC of individual zone boxes reporting to the central control panel and reset of static pressure setpoint based on the zone requiring the most pressure. n 13.Systems with DDC of individual zone boxes reporting to the central control panel has static pressure setpoint reset based on the zone requiring the most pressure. Requirements Specific To: RTU -2 : 1. Equipment minimum efficiency: Central Furnace (Gas): 80.00 % Ec ❑ 2. Equipment minimum efficiency: Single Package Unit: 9.80 EER (9.5 IPLV) ❑ 3. Minimum one temperature control device per zone [-1 4. Integrated economizer is required for this location and system. ❑ 5. Cooling system provides a means to relieve excess outdoor air during economizer operation. ❑ 6. Systems serving more than one zone must be VAV systems Exception(s): L) Where pressure relationships must be maintained Zones or supply air systems with at least 75% of reheating/recooling energy site recovered or site solar Zones with humidity requirements for special processes Project Title: Historymaker Homes Corporate Office Report date: 11/24/15 Data filename: H:\Jobs\2015\H15136 History Maker Homes\Engineering\Energy\COMcheck\Historymaker Mechanical ❑ Zones with cfm <300 and flow rate <10% of total design flow rate Outside air needed to meet IMC Chapter 4 F-1 7. Single -duct VAV terminals reduce primary air before reheating ❑ 8. Controls capable of resetting supply air temp (SAT) by 25% of SAT -room temp difference Exception(s): ❑ Systems that prevent reheating, recooling or mixing of heated and cooled supply air L] Seventy five percent of the energy for reheating is from site -recovered or site solar energy sources. L] Zones with peak supply air quantities of 300 cfm (142 Us) or less. n 9. VAV fan — 10 hp are driven by mechanical or electrical variable speed drive, or driven by vane -axial with variable speed blades, or operate with motor demand <=30% design kW at 50% design flow - calculations required n 10. Hot gas bypass prohibited unless system has multiple steps of unloading or continuous capacity modulation F1 11. Hot gas bypass limited to 25% of total cooling capacity Li 12.VAV fans with static pressure sensors are placed in a position such that the controller setpoint is no greater than one-third the total design fan static pressure. If placement results in the sensor being located downstream of major duct splits, multiple sensors are installed in each major branch. Exception(s): Ll Systems with DDC of individual zone boxes reporting to the central control panel and reset of static pressure setpoint based on the zone requiring the most pressure. Ej 13.Systems with DDC of individual zone boxes reporting to the central control panel has static pressure setpoint reset based on the zone requiring the most pressure. Requirements Specific To: AC-1/CU-1 : Lj 1. Equipment minimum efficiency: Split System: 13.00 SEER Requirements Specific To: AC-2/CU-2: F -I 1. Equipment minimum efficiency: Split System: 13.00 SEER Requirements Specific To: EH -1 & 2 None Requirements Specific To: WH -1 & 2: n 1. Water heating equipment meets minimum efficiency requirements: Gas Instantaneous Water Heater efficiency: 0.67 EF F1 2. First 8 ft of outlet piping is insulated Requirements Specific To: WH -3: F-1 1. Water heating equipment meets minimum efficiency requirements: No efficiency requirements for water heater with storage capacity less than 20 gallons. F-1 2. All piping in circulating system insulated 3. Hot water storage temperature controls that allow setpoint of 90°F for non -dwelling units and 110°F for dwelling units. Ll 4. Automatic time control of heat tapes and recirculating systems present F -I 5. Controls will shut off operation of circulating pump between water heater/boiler and storage tanks within 5 minutes after end of heating cycle Generic Requirements: Must be met by all systems to which the requirement is applicable: Ej 1. Plant equipment and system capacity no greater than needed to meet loads Exception(s): Standby equipment automatically off when primary system is operating n Multiple units controlled to sequence operation as a function of load 2. Minimum one temperature control device per system 3. Minimum one humidity control device per installed humidification/dehumidification system o 4. Load calculations per ASHRAE/ACCA Standard 183. n 5. Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup Exception(s): L] Continuously operating zones Lj 6. Outside -air source for ventilation; system capable of reducing OSA to required minimum F1 7. R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly Exception(s): Ducts located within equipment Ducts with interior and exterior temperature difference not exceeding 15°F. Project Title: Historymaker Homes Corporate Office Report date: 11/24/15 Data filename: H:\Jobs\2015\H15136 History Maker Homes\Engineering\Energy\COMcheck\Historymaker Mechanical n 8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment U 9. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181B tapes and mastics C] 10. Hot water pipe insulation: 1.5 in. for pipes —1.5 in. and 2 in. for pipes >1.5 in. Chilled water/refrigerant/brine pipe insulation: 1.5 in. for pipes —1.5 in. and 1.5 in. for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes —1.5 in. and 3 in. for pipes >1.5 in. Exception(s): Piping within HVAC equipment. ❑ Fluid temperatures between 55 and 105°F. ❑ Fluid not heated or cooled with renewable energy. 0 Piping within room fan -coil (with AHR1440 rating) and unit ventilators (with AHR1840 rating). I] Runouts <4 ft in length. ❑ 11.Operation and maintenance manual provided to building owner F-1 12.Thermostatic controls have 5°F deadband Exception(s): F-1 Thermostats requiring manual changeover between heating and cooling F1 Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority having jurisdiction. F-1 13.13alancing devices provided in accordance with IMC 603.17 F1 14. Demand control ventilation (DCV) present for high design occupancy areas (>40 person/1000 ft2 in spaces >500 ft2) and served by systems with any one of 1) an air -side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor airflow greater than 3000 cfm. Exception(s): L] Systems with heat recovery. 0 Multiple -zone systems without DDC of individual zones communicating with a central control panel. LJ Systems with a design outdoor airflow less than 1200 cfm. 0 Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. Fi 15. Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings Exception(s): F-1 Gravity dampers acceptable in buildings <3 stories 16.Automatic controls for freeze protection systems present I] 17. Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70% outside air fraction or specifically exempted Exception(s): Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. Systems serving spaces that are heated and not cooled to less than 60°F. L) Where more than 60 percent of the outdoor heating energy is provided from site -recovered or site solar energy. F1 Heating systems in climates with less than 3600 HDD. [J Cooling systems in climates with a 1 percent cooling design wet -bulb temperature less than 64°F. I] Systems requiring dehumidification that employ energy recovery in series with the cooling coil. ❑ Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements: a) at least 75 percent of exhaust flow rate, b) heated to no more than 2°F below room setpoint temperature, c) cooled to no lower than 3°F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling. Section 5: Compliance Statement Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2009 IECC requirements in COMcheck Version 4.0.1 and to comply with the mandatory requirements in the Requirements Checklist. Philip Smart, P.E. - Mechanical Engineer Name - Title Signature 11-24-15 Date Section 6: Post Construction Compliance Statement F-1 HVAC record drawings of the actual installation, system capacities, calibration information, and performance data for each equipment provided to the owner. (] HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. Project Title: Historymaker Homes Corporate Office Report date: 11/24/15 Data filename: H:\Jobs\2015\H15136 History Maker Homes\Engineering\Energy\COMcheck\Historymaker Mechanical COMcheck Software • 4.0 .0 Interior • •' Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Title: Historymaker Homes Corporate Office Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 1038 Texan Trail Brian Allums, P.E. Grapevine, TX 76051 HPMB Consulting Engineers, Inc 2828 E. Trinity Mills Rd. Ste 210 Carrollton, TX 75006 (214) 483-6202 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Office 28050 1 28050 Total Allowed Watts = 28050 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Office (28050 sq.ft.) Linear Fluorescent 1: A1, A1X: Linear: 48" T8 32W: Electronic: 1 32 31 992 Linear Fluorescent 1 copy 1: A2, A2X: Linear: 48" T8 32W: Electronic: 2 57 59 3363 LED 1: B, BX: Linear: LED Linear 33W: 1 16 38 608 LED 2: C: Pendant: LED MR 8W: 1 9 8 72 LED 3: D1, D1X, DS,DW: Recessed Downlight: Other: 1 66 12 792 LED 1 copy 1: FX: Linear: Other: 1 3 70 210 Compact Fluorescent 1: G: Pendant: Triple 4 -pin 32W: Electronic: 1 66 35 2310 Compact Fluorescent 2: G2: Pendant: Triple 4 -pin 32W: Electronic: 1 8 35 280 LED 1 copy 2: H, HX: Linear: Other: 1 21 70 1470 Compact Fluorescent 3: M: Wall Sconce: Triple 4 -pin 32W: Electronic: 1 10 35 350 LED 6: N: LED Accent Strip: Other: 1 1 137 137 LED 7: T: Track Head: Other: 1 29 30 870 Total Proposed Wafts= 11454 Section 4: Requirements Checklist In#erior Lighting PASSES: [design bg% fsetter than dodo, Lighting Wattage: 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 28050 11454 YES Controls, Switching, and Wiring: 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. Project Title: Historymaker Homes Corporate Office Report date: 11/24/15 Data filename: H:\Jobs\2015\H15136 History Maker Homes\Engineering\Energy\COMcheck\Historymaker Lighting L] 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: LJ Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. ❑ Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. Lj 4. Independent controls for each space (switch/occupancy sensor). Exceptions: L] Areas designated as security or emergency areas that must be continuously illuminated. F-1 Lighting in stairways or corridors that are elements of the means of egress. F -I 5. Master switch at entry to hotel/motel guest room. Lj 6. Individual dwelling units separately metered. U 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. F-1 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires, dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps, switching the middle lamp luminaires independently of other lamps, or switching each luminaire or each lamp. Exceptions: L] Only one luminaire in space. F-1 An occupant -sensing device controls the area. L] The area is a corridor, storeroom, restroom, public lobby or sleeping unit. F1 Areas that use less than 0.6 Watts/sq.ft. F -I 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: L] Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. 10. Photocell/astronomical time switch on exterior lights. Exceptions: [J Lighting intended for 24 hour use. ❑ 11.Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: L] Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement. The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements in the Requirements Checklist. Brian M. Allums, P.E. - Electrical Engineer Name - Title A11-24-15 Signature Date Project Title: Historymaker Homes Corporate Office Report date: 11/24/15 Data filename: H:\Jobs\2015\H15136 History Maker Homes\Engineering\Energy\COMcheck\Historymaker Lighting COMcheck.cck Page 2 of 2 City of Grapevine Building Inspection Department Plan Review Comments P.O. Box 95104 Phone: (817) 410-3129 Grapevine, Texas 76051 Fax: (817) 410-3536 NAME OF PROJECT: HISTORYMAKER HOMES ADDRESS: 1038 TEXAN TRAIL PLANS EXAMINER: ALLEN HUNT NUMBER OF STORIES: 1 TOTAL SQ. FT: 28,050 ZONING: BP OCCUPANCY: B OCCUPANT LOAD: EXITS REQUIRED: 3 FIRE SPRINKLED: YES BUILDING TYPE: VB CU: 15-36 COMMENTS: �1-1- EGRESS DOORS ARE TO BE OPENABLE FROM DIRECTION OF EGRESS WITHOUT THE USE OF KEY, SPECIAL EFFORT OR KNOWLEDGE. Understood. Additional notes have been added o A-641 D Schedule & Legend. =� �'Aa (2., MALINUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE NOT _" PERMITTED. kUndeu, �ood. Additional notes have been added to A-641 Door Schedule & Legend. P :2j PROJECT SHALL BE DESIGNED TO COMPLY WITH THE 2009 IECC. Ir VERIFICATION OF COMPLIANCE SHALL BE SUBMITTED TO THE CITY BY A CERT flED ENERGY CODE INSPECTOR PRIOR TO THE ISSUANCE OF BUILDING FINAL APPROVAL OR CERTIFICATE OF OCCUPANCY. I. . ; a . A, A 1 1:1 Wa k! [216*1111 M MA I 109:49 NMI F-1 0 1 DIVI-1 DID] I I L•01 01 N 2 RWRE <543/4 /633 COORDINATE ALL FIRE ALARM, SMOKE EVACUATION, AND / OR SPRINKLER SYSTEM PLANS, APPROVALS AND INSPECTIONS WITH THE FIRE MARSHALL AND REED ENGINEERING. U 'stood. 6. PLANS THAT EXCEED 10 SHEETS WILL REQUIRE THAT ONE SET BE BOLTED. Under oda ALL MECHANICAL EQUIPMENT IS REQUIRED TO BE SCREENED FROM PUBLIC VIEW. SCREENING TO INCLUDE ALL MECHANICAL EQUIPMENT ON SITE. Understood. All Rooftop Units are screened and located so they are not visible from public view' ALL REQUIRED FLAT WORK FOR RIGHT OF WAY THAT IS ABSENT FROM SITE WILL BE REQUIRED TO BE CONSTRUCTED. CONTACT PUBLIC WORKS DEPARTMENT WHERE THIS WILL BE NECESSARY. Under ood, 9 ALL CONSTRUCTION TO BE IN AGREEMENT WITH THE APPROVED CONDITIONAL USE PLANS. ZUnde ood. 10. SHEET A.0; PROVIDE THE FULL BUILDING DATA SHEET FOR THE PROJECT. s •� s. r-- s r t -s * � 1 . SHEET A.113; GARAGE DOORS TO HAVE THE SAFETY, "EYES", TO PREVENT CLOSING UPON AN OCCUPANT, PLEASE PROVIDE EXPLANATION FOR THE DOORS OPERATION OR NON -OPERATION. interiorf dividing garage doors operable • requirea obstruction detectionensuredanger . closing, with a mechanical system all safety features including electronic beam detection will be incorporated. _A�2.SHEET A.1 13; FOR THE FOLDING DOOR; 134-2, ENSURE THIS WILL MEET WITH THE ENERGY CODE REQUIREMENTS WHEN IN THE OPEN POSISTION WYOUR 3 ITH R• PARTYREVIEW AND INSPECTIONS. Verification will be pursued with the 3rd party review and inspection. SHEET A.113; FOR THE GARAGE DOORS, WILL YOU PUTTING ANY MECHANICAL DEVICES ABOVE GARAGE DOORS FOR AN AIR FAN / CURTAIN? No mechanical devices or air fan or curtains will be placed above the garage doors shown diving rooms. Robert Lee From: Albert Triplett <atriplett@grapevinetexas.gov> Sent: Tuesday, January 05, 2016 4:43 PM To: Robert Lee Cc: Kevin Youngblood Subject: RE: History Maker Mr. Lee, this looks great. Please send two full size copies of each sheet unfolded and unbound. Thank you. Albert L. Triplett Jr. Planner II City of Grapevine 200 S. Main Street Grapevine TX 76051 817.410.3155 From: Robert Lee [ Sent: Tuesday, January 05, 2016 3:57 PM To: Albert Triplett <atriplett@grapevinetexas.gov> Cc: Kevin Youngblood < Subject: RE: History Maker Albert, See attached PDF of the sheets in question. I have added the note with additional information just above the previous signature block. Let me know if this meets with your approval or if you have any edits I need to make. Robert Lee Associate 500 West 7th Street, Suite 1400 Fort Worth, Texas 76102 817.335.4991 1www.k�bgtx.coin From: Albert Triplett [mailto:atriplett grapevinetexas.gov] Sent: Tuesday, January 05, 2016 3:39 PM To: Robert Lee < Subject: RE: History Maker Thank you. Albert L. Triplett Jr. Planner II City of Grapevine 1 200 S. Main Street Grapevine TX 76051 817.410.3155 From: Robert Lee [mailto: Sent: Tuesday, January 05, 2016 3:37 PM To: Albert Triplett <atriplett a grapevinetexas.gov> Subject: RE: History Maker Albert, I did receive your email and I am working on getting the Masonry & glazing numbers your requested. I will send a PDF version to you for approval today. Robert Lee Associate 1i R 500 West 7th Street, Suite 1400 Fort Worth, Texas 76102 817.335.4991 i wvvw.bbptx com From: Albert Triplett[mailto:atriplett@grapevinetexas.gov] Sent: Tuesday, January 05, 2016 3:32 PM To: Robert Lee < Subject: Re: History Maker Mr. Lee, did you receive my email? Thank you. Albert L. Triplett Jr. Planner II City of Grapevine 200 S. Main Street Grapevine TX 76051 817.410.3155 POST-TENSION MATERIAL LIST Quantity: Lela th Tag Quitutity Len th , Ta " 24 140 LS 140 2 127 LB 127 14 140 LB 140 1 22 S22 8 143 LS 143 1 27 S27 7 104 5104 1 39 S39 6 114 5114 1 57 S57 4 100 5100 1 65 S65 4 104 B104 1 68 S68 4 106 S106 1 80 S80 4 143 LB143 1 87 S87 3 88 S88 1 99 S99 3 96 S96 1 123 LS 123 3 101 S101 1 125 LS125 3 109 5109 1 134 LS134 3 112 S112 3 115 S115 2 33 S33 2 33 B33 2 41 S41 2 41 B41 2 80 B80 2 88 B88 2 96 B96 2 99 B99 2 100 13100 2 101 13101 2 102 S102 2 103 S103 2 103 B103 2 107 S107 2 107 B107 2 109 B109 2 114 B114 2 115 B115 2 125 LB125 2 127 LS127 Totals: Notes: Strand 16379 1. This list is provided for estimating Anchors/Wedges 294 purposes only. Verify all lengths Grommets 206 and quantities prior to fabrication. 45° Grommets 2. All strands are single end stressed Chairs 3300 unless noted otherwise. Builder: HISTORY MAKER HOMES, Graham - Martin; ;ltd. , ' 2100N H 360 Ste. 207A Grandl'rairie`I 75050 `By: Phone:(972) 647-1025 FAX (02)647 2630; Date: 11/18/2015 Plan: HISTORY MAKER HOMES Sq.Ft.: 14050 Lot: 2A BG Block: 2A Checked: Street: ECKLEY STREET @ WALNUT ST IGMI# 041658 Subdivision/ City: GRAPEVINE STATION, GRAPEVINE I Sheet 1 of 1 July 14, 2016 History Maker Homes 9001 Airport Fwy North Richland Hills, TX 76180 Attn: Kevin Youngblood Re: History Maker Homes Corp Office Framing Site Observation Report Grapevine, TX F)ATNA Project: #215545 Dear Mr. Youngblood: Pursuant to your request we visited the subject project on the morning of Tuesday, July 12, 2016 in order to observe the construction of the framing at its current state. Based upon my visual observations, the framing appears to be constructed in general conformance with the construction documents. If you need further assistance please consider us available. Sincerely, '/ . OF C-) ........... Frank W. Neal & Associates, Inc. RYAN W. L..........OCKHART .... - .......... ... Ryan W. Lockhart, PE 111552 .--ir Principal 'CEN Se'D r1ockhartafma-en-g.com ONACE eE '1016 W. Broadway Fax (817) 336-8620 Fort Worth, Texas 76104 fwna-eng.com (M) 332-1944 TX Finn Reg. No. F000296 a a, ri FWN, A Frank W. Neal &Assoc., Inc. November 7, 2016 History Maker Homes 4001 Airport Fwy North Richland Hills, TX 76180 Attn: Kevin Youngblood Re: History Maker Homes Corp Office Concurrence Letter Grapevine, TX FWNA Project: #215545 Dear Mr. Youngblood: Pursuant to your request we visited the subject project multiple times during construction. Our visits included observation of the pier construction, grade beam and slab construction, and steel and wood framing construction. Based upon our observations the structure has been completed in general conformance with our construction documents. If you need further assistance please consider us available. Sincerely, .�` E � . -lip y •` Frank W. Neal & Associates, Inc. RYAN W. LOCKHART Ryan W. Lockhart, PF 11552 Principal �` .07 dockhart�3a Mna-eng.corn � u000,296 Allen Hunt To: Robert Lee; Kevin Youngblood Subject: 1038 Texan Trail Bid. #1, Grapevine, Tx. New Commercial Building. Gentlemen, I have completed the revised plans review for the project. There are some items that have come to light that will need to be addressed but I did not want to hold up the project for these so the plans are approved and all the other department approvals are have been completed to issue the plans. The primary needs for clarification concern the walls that are designed to be rated assembly's, the mechanical fire / smoke dampers for penetration of these walls, the second floor mechanical chase and the exterior bearing walls headers / beams. Please see sheets A111 and A121; the designs provide for rated enclosures at the stairwell #1 and the rooms adjoining on the first level. These rated walls are not complete by the tag numbers and the stairwell is not rated at second level. If this stairwell is rated for egress distance or other purpose the entire stairwell is to be rated. The rooms surrounding the stairwell on first floor are incomplete. Please have designer clarify this area for rated assembly's and add ratings to the elevator shaft, elevator equipment room and the duct chase'(s). I do not see any fire / smoke dampers for the first floor system at deck or where penetrating chase walls, sheets M101 and M102. The other walls shown to be rated on first floor do not have all the dampers on plans if these walls are indeed to be rated. The mechanical chase running from deck to first level is in conflict with the second level file room. I do not see the header / beam details for exterior walls at windows / doors. The last item needing attention is sheet A-641, the door schedule. This sheet is not included on revised sets. Please provide sheet to include correct ratings for doors that are opening protection for rated walls, hardware details, comments that doors are openable from egress side without use of key, special effort or knowledge and other details included within the door schedules. I believe this covers the primary elements still needed for the plans. Please include any other details as needed. Thank you, Allen Hunt Plans Examiner/ Field Coordinator City of Grapevine 817-410-3129 2100 N. Hwy 360, Suite 207A Grand Prairie, TX 75050 (972) 647-1025 / (972) 647-2630 Fax September 23, 2015 History Maker Homes, LLC. 9001 Airport Freeway, #400 North Richland Hills, TX 76180 Re: Lot 2A Block 2A Eckley Street @ Walnut Street Grapevine Station, Grapevine Plan: History Maker Office Bldg. GML# 041658 To Whom it May Concern: Engineering Consultants Texas Reg. Eng. Firm F-8336 The foundation for the above referenced location has been designed and evaluated in accordance with the latest recommendations as set forth by the Post -Tensioning Institute's publication: Design and Construction of Post -Tensioned Slabs on Ground. It has also been designed in accordance with the current 1997 Uniform Building Code, the 2006, 2009 and 2012 International Residential Codes, the 2006, 2009 and 2012 International Building Codes, and standard engineering practices. The pertinent soils information utilized in the design was obtained from the following geo-technical investigation: Report by: Alpha Testing Report #: G151668 Dated: 8/19/2015 EmCI: 8.3' Qa: 1500 EmEI: 4.2' PI: 31 YmCI: 1.3" PVR: 6"* YmEI: 1.8" ,. 0 I �t , Sincerely, ®All F yl t, GRAN -MARTIN, LTD .►. s .. :� .. ....... if-- BILL GRAHAM ................................. t � 67899 w� BiII Graham, P.E. ` =fir Principal t!'1igoNA� �e� Allen Hunt To: Subject: 1038 Texan Trail new commercial building HistoryMaker Homes Attachments: 1038 TEXAN TRAIL plan review comments-cloc Mr. Lee, I have reviewed the plans for the above project and have attached the comments to this e-mail. Please review comments and have your designers create revisions with all the changes, additions, corrections and / or commentary as needed. Many of the comments I have put down can be taken care by red lining the plan but please see comments 10-21 for what is needed to clarify, correct and / or add to the plans. Thank you, Allen Hunt Plans Examiner/ Field Coordinator City of Grapevine 817-410-3129 City of Grapevine i P.O. Box 95104 Phone: (817) 410-3129 Grapevine, Texas 76051 Fax: (817) 410-3536 NAME OF PROJECT: HISTORYMAKER HOMES ADDRESS: 1038 TEXAN TRAIL PLANS EXAMINER: ALLEN HUNT NUMBER OF STORIES: 1 ZONING: BP OCCUPANTLOAD: FIRE SPRINKLED: YES CU: 15-36 COMMENTS: TOTAL SQ. FT: 28,050 OCCUPANCY: B EXITS REQUIRED: 3 BUILDING TYPE: VB 1. ALL EGRESS DOORS ARE TO BE OPENABLE FROM DIRECTION OF EGRESS WITHOUT THE USE OF KEY, SPECIAL EFFORT OR KNOWLEDGE. 2. MAUNUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE NOT PERMITTED. 3. PROJECT SHALL BE DESIGNED TO COMPLY WITH THE 2009 IECC. VERIFICATION OF COMPLIANCE SHALL BE SUBMITTED TO THE CITY BY A CERTIFIED ENERGY CODE INSPECTOR PRIOR TO THE ISSUANCE OF BUILDING FINAL APPROVAL OR CERTIFICATE OF OCCUPANCY. 4. ALL CHANGES FROM THE CITY APPROVED PLANS WILL REQUIRE REVISED PLANS SUBMITTED AND ADDITIONAL FEES DUE. 5. COORDINATE ALL FIRE ALARM, SMOKE EVACUATION, AND / OR SPRINKLER SYSTEM PLANS, APPROVALS AND INSPECTIONS WITH THE FIRE MARSHALL AND REED ENGINEERING. 6. PLANS THAT EXCEED 10 SHEETS WILL REQUIRE THAT ONE SET BE BOLTED. 7. ALL MECHANICAL EQUIPMENT IS REQUIRED TO BE SCREENED FROM PUBLIC VIEW. SCREENING TO INCLUDE ALL MECHANICAL EQUIPMENT ON SITE. 8. ALL REQUIRED FLAT WORK FOR RIGHT OF WAY THAT IS ABSENT FROM SITE WILL BE REQUIRED TO BE CONSTRUCTED. CONTACT PUBLIC WORKS DEPARTMENT WHERE THIS WILL BE NECESSARY. 22. PLEASE READ THE FOLLOWING NOTE CAREFULLY AND FOLLOW THE INSTRUCTIONS GIVEN. PLANS WILL NOT BE ACCEPTED THAT ARE REVISED AND DO NOT FOLLOW THESE REQUIREMENTS, THANK YOU. Please review comments and have designers add all review comments, required Information and created changes, all clouded within new plan sets. Please Provide 3 copies of new fully corrected plan sets. Plan size may not exceed 36"x 42" in dimension. Provide one set to city that is bolted if plans are over 10 pages. Thank you for your Time and consideration. APPLICATION RECEIVED: 1ST COMMENTS: REVISIONS RECEIVED: REVISIONS REVIEWED: PERMIT ISSUED: m 0 JAN 5 2017 -SITE PLAN - LIGHTING LEVELS ELECTRICAL LEGEND FOOTCANDLE READING GRADE LEVEL PLANAR POINT OF MEASUREMENT FOOTCANDLE LIGHTING LEVEL. NUMBER INDICATES FC LEVEL. LIGHT STANDARD, REFER TO NOTES BY SYMBOL FOR FIXTURE DESCRIPTION F_ 'ERIE L NOTES I. SITE LIGHTING CONSIST OF TWO TYPES OF POLE MOUNTED LIGHT FIXTURES. ONE TRADITIONAL LIGHT STANDARD AND ONE DECORATIVE .AREA LIGHT. 2.'THERE ARE NO BUILDING MOUNTED LUMINAIRES CONTRIBUTING TO THE OVERALL FOOTCANDLE MEASUREMENTS. 3, ADJACENT PROPERTIES HAVE NO SITE LIGHTS WITHIN 100' OF PROPERTY LINE. NOTES BY SYMBOL '10' 17,218 LUMEN LED LIGHT STANDARD AREA LIGHT (20' ABOVE FINISHED GRADE), 3,036 LUMEN LED DECORATIVE AREA LIGHT (20' ABOVE FINISHED GRADE). GRADE LEVEL FOOTCANDLE READING TAKEN AT BASE OF LIGHT POLE. FOOTCANDLE READING GRADE LEVEL PLANAR POINT OF MEASUREMENT WESTERN PROPERTY LINE IS ACTUALLY TBEYOND AN 8' HIGH MASONRY WALL. FC READINGS ARE TAKEN AT THE MASONRY WALL WELL WITHIN THE PROP- LINE, NORTHPROPERTY LINE IS APPROXIMATE AS BOTH PARCELS ARE OWNED BY THE SAME ENTITY. FC READINGS ARE TAKEN AT 25' BEYOND FIXTURE LOCATIONS IN AN OPEN FIELD. F rim r CONSULTANTS, I NC. Texas BPE Registration # F-207 1300 Summit Awme 4144 N. Central Expwy S.h. 500 Suits 635 Fon Worth, Texas 78102 Dallas, Tens 75204 01817 878 4242 Offloe 214 420 9111 Facsimile 817 878 4240 --it—P.- CONSTRUCTION DOCUMENTS Project No: 15117,00 Issue Date: 11-25-2015 Rev. Description Date 666 1-01 E CL 00 F rim r CONSULTANTS, I NC. Texas BPE Registration # F-207 1300 Summit Awme 4144 N. Central Expwy S.h. 500 Suits 635 Fon Worth, Texas 78102 Dallas, Tens 75204 01817 878 4242 Offloe 214 420 9111 Facsimile 817 878 4240 --it—P.- CONSTRUCTION DOCUMENTS Project No: 15117,00 Issue Date: 11-25-2015 Rev. Description Date 666 7 PZA_ N LIGHTING LEVELS