Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
COMA2016-3428
DATE OF ISSUAN f �4 2 y SEP ' _ PERMIT #: /6 —3 V' BUILDING PERMIT APPLICATION (PLEASE PRINT LEGIBLY — COMPLETE ENTIRE FORM) 2401 Bass Pro Drive, Grapevine, TX 76051 SUITE # N/A LOT: 1 A BLOCK: 1 SUBDIVISION: BUILDING CONTRACTOR (company name): Jason CURRENT MAILING ADDRESS: 27186 Newport Road, Suite #2 CITY/STATE/ZIP: Menifee CA 92584 PH: # 951-200-7540 Fax # 951-200-7501 CURRENT MAILING ADDRESS: 2398 E. Camelback Rd. Suite #935 CITY/STATE/ZIP: Phoenix AZ 85016 PHONE NUMBER: 480-393-1386 PROJECT VALUE: $ 2,500,000 (est, const. cost) FIRE SPRINKLERED? YES X NO WHAT TRADES WILL BE NEEDED? (Check ones that apply) ELECTRIC X PLUMBING X MECHANICAL X DESCRIPTION OF WORK TO BE DONE: Renovation of 1 st level Lobby/Atrium & 2nd Level partial rend. USE OF BUILDING OR STRUCTURE: Hotel NAME OF BUSINESS: Embassy Suites, Dallas DFW Airport North 1 st Level 20,450 SF Total Square Footage under roof: 331,014 SF Square Footage of alteration/addition: 2nd 1 aver 2 439 0,f= M I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings, alterations and additions) ® I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: EABPRJB6822733 (Not required for 1 & 2 family dwellings) M I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINT NAME: Luis Angulo SIGNATURE PHONE #: 562-424-1720 EMAIL: ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL I THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT I Construction Type: I A Permit Valuation: $ Setbacks Approval to Issue Occupancy Group: A17142 Fire Sprinkler: YES t---- NO Front: Electrical " Division: Building Depth: Left: Plumbing Zoning: C c Building Width: Rear: Mechanical Occupancy Load: Right: Plan Review A roval: Date: Building Permit Fee: .-,5� Site Plan Approval: Date: Plan Review Fee: J_ _3 Fire Department: Date: - 16 Lot Drainage Fee: All, Public Works Department: Date: Sewer Availability Rate: Health Department: Date: . zY. /Qf Water Availability Rate: Approved for Perin it:- 'Tim Date: 10-1\- 1 Total Fees: Lot Drainage Submitted: Approved: Total Amount Due: , 3 `7. �;2 5 MECHANICAL CITY OF GRAPEVINE ELECTRICALS PLUMBING FUEL GAS PERMIT APPLICATION (PLEASE PRINT) PERMIT # BLDG. PERMIT# )L 3q2 yl DATE: 1AKI JOB ADDRESS:'SUITE # '? ifo I i � DESCRIPTION OF WORK: PROPERTY OWNER:rnmpAmv, CONTRACTIN( , A� tri ADDRESS: A D r)?R'�F 4 f% 2 Rd -Si;e /ovo -.Zb ix iL CITY/STATE/ ZIP� CITY/STATE/ZIP: PHONE NUMBER: IIH6NE NUMB R: '- ,%i -i-596 TYPE OF OCCUPANCY BUILDING AREA PERMIT FEES AMOUNT DUE (SQ FT) EACH TRADE I. R-3 1- 749 $ 33.25 SINGLE FAMILY, DUPLEX 750— 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 63.18 NEW CONSTRUCTION & 1,501- 1,750 $ 76.48 ADDITIONS (PER UNIT) 1,751- 2,000 $ 83.13 2,001 - 2,250 $ 89.78 TOTAL SQ.FOOT UNDER 2,251- 3,000 $ 96.43 ROOF 3,001- 3,500 $ 103.08 3,501 - 4,000 $ 109.73 $ 4,001 + $ 120.37 EACH TRADE 11. A, E, 1, R-1 1 - 500 $ 37.00 /C0TE`LSj APARTMENTS, 501 — 100,000 $ 17.50+.035 PER )JM'NKING/DINING, 00,001 �—500, OO $ 3,500.00+.03 SQUARE EDUCATIONAL, ASSEMBLY, 00I + $15,000.00+.02 FOOT $ INSTITUTIONAL EACH TRADE 111. B, F, H, M, S, U 1- 500 $ 37.00 OFFICE, RETAIL, WHOLESALE, 501- 50,000 $ 32.00+ .01 PER 1 GARAGES, FACTORIES, 50,001- 100,000 $ 182.00+ .007 SQUARE WORKSHOPS, SERVICE 100,001+ $ 582.00+ .003 FOOT $ STATIONS, WAREHOUSE CONTRACT EACH TRADE IV. ANY OCCUPANCY GROUP VALUATION OF WORK FINISH -OUTS, SHELL COMPLETIONS, 0- 500 $ 37.00 ALTERATIONS OR 501- 1,500 $ 45.00 STAND ALONE PERMITS 1,501- 3,000 $ 57.00 OF 3,001- 5,000 JgQjz $ 72.00 $ 27.00+.009 CIO CONTRACT VALUATION WORK: �50000 el_F 50,001- 100,000 $ 127.00+ .007 PER I -n $ & &04706' Wo 500,001+ $ 327.00+ .005DOLLAR $ 1,327.00+.003 TVALUATION EACH TRADE+ol V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 $ 0:\FORMS\DS APPLICATIONS - FEESWEP APPLICATION 4-1 l.doc PLAN SUBMITTAL: WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE OTHERWISE REQUIRED BY STATE LAW. OTHER INSPECTIONS AND FEES: • INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)...............................................$42.00/HOUR' • REINSPECTION FEES.................................................................................................................. $42.00 • PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED........................................................... $37.00 • INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM)......................$42.00/HOUR • ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVEDPLANS.......................................................... ....................... .................. .................... $42.00/HOUR • BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE • FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS'" I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. I FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. '0 - \ . Q -q va� SIGNATURE OF CONTRACTOR -OR AUTHORIZED AGENT (OR HOMEOWNER FOR HOMEOWNERS PERMITS) PHONE #: PRINTED ME V EMAIL: 'OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER. "ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS. , r. W. 6/21/01 REVISED: 10/01, 5/06,2/07,7/07, 8/09, 11/09,4/11 O:\FORMS%DS APPLICATIONS - FEESMEP APPLICATION 4-11.doc (817) 410-3165 T B A B MECHANICAL Issue Date: JA CITY OF GRAPEVINE 3 ELECTRICAL LUMSIN IRRIGATION - FUEL GAS ►, I I W-11=01DWAtne PERMIT #BLDG. -� PERMIT # — Q2_$ DATE: % !2307 o —acv JOB ADDRESS: � u Q ` �"2„ � SUITE # tp DESCRIPTION OF WORK: ` tV Vl% llV g�MGC \ PROPERTY OWNER: CONTRACTING COMPANY: ` ADDRESS: � 2 �g � ` r� ADDRESS: `r CITY/STATE/ZIP: -j��`� M1 •` S56 l6 � G(O�{� 11`` ['t � �vAso� ';- CITY/STATE/ZIP: f'4 7 Q !8 O�oO PHONE NUMBER:41 S 1 - ZAP - 75 Bio PHONE NUMBER:t� cj3& - 025�- (9 66 TYPE OF OCCUPANCY BUILDING AREA SQ FT PERMIT FEES AMOUNT DUE EACH TRADE I. R-3 1— 749 $ 33.25 SINGLE FAMILY, DUPLEX 750— 1,199 $ 49.88 TOWNHOUSE, 1,200— 1,500 $ 63.18 NEW CONSTRUCTION & 1,501— 1,750 $ 76.48 ADDITIONS (PER UNIT) 1,751— 2,000 $ 83.13 2,001 — 2,250 $ 89.78 TOTAL SQ. FOOT UNDER 2,251— 3,000 $ 96.43 ROOF 3,001— 3,500 $ 103.08 3,501 — 4,000 $ 109.73 $ 4,001 + $ 120.37 EACH TRADE II. A, E, I, R-1 1 — 500 $ 37.00 HOTELS, APARTMENTS, 501 — 100,000 $ 17.50+.035 PER DRINKING/DINING, 100,001 — 500,000 $ 3,500.00+.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001 + $15,000.00+.02 FOOT $ INSTITUTIONAL EACH TRADE III. B, F, H, M, S, U OFFICE, RETAIL, WHOLESALE, 1— 500 $ 37.00 GARAGES, FACTORIES, 501— 50,000 $ 32.00+.01 PER 1 WORKSHOPS, SERVICE 50,001— 100,000 $ 182.00+ .007 SQUARE STATIONS, WAREHOUSE 100,001+ $ 582.00+.003 FOOT $ CONTRACT EACH TRADE IV. ANY OCCUPANCY GROUP VALUATION OF WORK FINISH—OUTS, SHELL COMPLETIONS, 0— 500 $ 37.00 ALTERATIONS OR 501— 1,500 $ 45.00 STANDALONE PERMITS 1,501- 3,000 $ 57.00 3,001— 5,000 $ 72.00 CONT ACT VALUATION OF WORK: 5,001— 50,000 $ 27.00+.009 50,001— 100,000 $ 127.00+ .007 PER $ Q 100,001— 500,000 500,001+ $ 327.00+ .005DOLLAR $ 1,327.00+.003 TVALUATION $ e V. MISCELLANEOUS EACH TRADE IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 $ Ct\Users\sbatte\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\G80E6GQF\MEP APPLICATION 4-11.doc PLAN SUBMITTAL: WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE OTHERWISE REQUIRED BY STATE LAW. OTHER INSPECTIONS AND FEES: • INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)...............................................$42.00/HOUR' • REINSPECTION FEES.................................................................................................................. $42.00 • PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED.. .................................. ................ $37.00 • INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM).... .................. $42.00/HOUR • ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVEDPLANS .......... ................. ........................ .................................. ........................... ....... $42.00/HOUR • BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE • FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS"" I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. 1 FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. 1 Gni.. AA 0 C! !e A -4, G c_ SIGNATURCOF CONTRACTOR OR AUTH ZED AGENT PRINTED NAME (OR HO OWNER FOR HOMEOWNERS RMITS) PHONE #: L G� �- - X� *OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER. —ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS. Development Services Department, Building Inspections The City of Grapevine * P.O. Box 95104 * Grapevine, Texas 76099 * (817) 410-3165 Fax (817) 410-3012 * www.grapevinetexas.gov C:\Userslsbatte\AppData\Local\Microsoft\Windows\Temporary Intemet Files\Content.000ook\G80E6GQF\MEP APPLICATION 4-11.doc Susan Batte From: Renee L. Minnfee < Sent: Tuesday, October 31, 2017 8:04 AM To: Susan Batte Subject: Re: Inspection - Embassy Suites Yes, I have and the have passed their health inspections for the remodel. Renee Minnfee, MPH RS Sanitarian I 1101 S. Main Street, Rm 2300 Fort Worth, TX 76104 i innfe t rr ntc nt .c 817.321.4979 (office) 817.321.4961 (fax) From: Susan Batte <sbatte@grapevinetexas.gov> Sent: Monday, October 30, 2017 12:20 PM To: Renee L. Minnfee Subject: Inspection - Embassy Suites Have you done an inspection for permit COMA16-3428 - 2401 Bass Pro Drive. Our system says it has not been done Susan Batte Planning Technician City of Grapevine P O Box 95104 1 Grapevine, TX 76099 p: (817) 410-3155 1 f: (817) 410-3018 sbatte@grapevinetexas.gov *** Exte al email communication — please use caution before clicking links and/or opening attacl eats *** 1 To: A -Affordable Construction Attention: Bill Dutton Ready Cable Inc. Post -Tensioning Materials & Rebar 4416 Keller — Hicks Road Fort Worth, Texas 76244 (817) 379-6553 Fax -(817) 379-4007 May 30, 2017 Project: Embassy Suites Dallas DFW Airport North 2401 Bass Pro Dr. Grapevine, TX 76051 Subject: Repair procedures for Post Tension cables Level 1, G/L H -K (4-6) 1. Installed the splice chucks onto the existing cables. 2. Installed new cables into splice chucks and slab. 3. Stressed cables to 33kips. I hereby state that I have inspected the repair work completed at the above mentioned location. All repair work completed meets or exceeds the Post Tension Institute's recommendations and the 2006 IBC Building Code required by the City of Grapevine. 2401 Bass Pro Dr. Grapevine, TX 76051 Respectfully Submitted, Slava Tkachuk, P.E. Vice President, High -Rise Construction -r- OF , e 7*,��st'� �...;...... ,k VYACHESLAV TKA C UK 91440 i�4� • EF N S!�� r Ready Cable Ine. Post-'rensioninglMaterials & Reber 4416 Beller-- Hicks Road Fot�t Worth. Texas '6244 379-6553 379-400'7 A -'121 '101 -7 pi I- d: A -Affordable Constructior) Attention: Bill Dutton Protect: Enibassy Suites Dallas DFW Ail -port North 2401 Bass Pro Dr. Grapevine, TX 760-S I Repair procedures, for Post Tension cables G/L 12-14 (L6 -J.8) 1. Installed the splice chucks onto the existing, cables. 2. Installed nevv cables Into splice chucks and slab. 3. Stressed cables to 33kips. I hereb,,'state that I have inspected the repair work completed at the above mentioned location. All repair Nvork completed meets or exceeds the Post Tension Institute's recommendations and the 2006 IBC BUIlding, Code required C1 - v, - )Afil D r- A ^rmf% r!^M ass to , � Grapevine, fI X ".7605 1 Respectfully Submitted. Slava TkaChLik. P.E. Vice President, High -Rise COIISMICtioil 40 J easa Prb'� IA , 0�r:,-b"qy s-.,;6 $4 THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY VYACHESLAV TKACHUK, P.E. 91440 4/21/20 -17 CONTRACTOR COpy H F5 14 W CONCEPTS4PHONE, 2229 E SPRING STREET SUITE 200 562,424A720 LONG EIEA4CH , CA 90806 rAx 562.424.3720 HOSPITALITY FOCUSED SOLUTIONS, INC. / CONCEPTS 4 City of Grapevine, Building Inspections 200 S. Main Street Grapevine, TX 76051 April 28, 2017 Re: Building Inspections Permitted Plan Update, COMA -16-3428 Embassy Suites DFW, Grapevine TX Remodel — Public Area Permitted Plan Update Enclosed for your use and review are "Updated Plan" for Permit #COMA -16-3428 Remodel for Embassy Suites DFW, Grapevine, Texas COMA -16-3428 Pemitted Plan Update 04-28-2017 Item Sheet Revisions Architectural Changes 1. A -1.04A Bulletin #1: Submitted drawing for plan check shows 6 existing lavatory in Men's Restroom #021. The actual existing lavatory is 7 units. Revision is clouded as shown. 2. A -104B Bulletin #1: Dimensions was revised per existing. See A-2.04 revision is clouded as shown. 3. A -105A Revision #3: Note #DOI & #D02 was deleted. It was replaced note #D16, #d17 & D18 which was added in Ceiling Demo Key Notes. Revision is clouded as shown. 4. A -106A Bulletin #1: Note 111 & 112 was deleted. Detail call -out #6/a-5.06 was added, dimensions and door #016B. Revision is clouded as shown. 5. A -107A Bulletin #1: Note #28 & #29 was deleted. Projector, projector lift & motorized drop screen was deleted in the scope of work. Revision is clouded as shown. Game Room #127, Business Center #141 & Pool Lobby #124: Two ceiling lights was deleted from the scope of work see #2/A-2.01. Revision 3: Tate #024 Jenkins #032 and Bennett #030 Boardrooms: Gypsum board ceiling is not possible because there is an existing FCU unit. ACT ceiling is provided to have an access to FCU units. Partial gypsum board ceiling was installed in Jenkins #032 & Bennet #030 boardroom. Re -layout lightings. Revision is clouded as shown. OFFICE G�'IDPY Hallford's Coffee Shop #133: A -1.07A Gypsum board ceiling is not possible because of FCU units. ACT is provided to Continuation have in preparation area to have access to FCU units. Gypsum board is provided above the bar counter. Lightings was re -layout & see #2/A-2.01. Revision is clouded as shown. 6. A-109 Revision 3: Franklin MeetinE Room #209: Note #03 was deleted and note # 12 was added. Revision is clouded as shown. Sales Manner's Office #202: Note #12 was added. 5 downlights, dimensions and door #201 was added. Revisions is clouded as shown. 7. A-2.01 Bulletin #1: Lounse Area #127, Business Center #141, Pool Lobby #124 & Unisex Restroom #125: Two ceiling lights was deleted from the scope of work see #2/A-2.01. Dimensions were added. Soap dispenser was added in Unisex restroom vanity. Detail #9/A- 5.01 call -out was deleted. Revision 3: Hallford's Cooffee Shop #131: Gypsum board ceiling is not possible because of FCU units. ACT is provided to have in preparation area to have access to FCU units. Gypsum board is provided above the bar counter. Li htin s was re -layout. Revision is clouded as shown. 8. A-2.04 Bulletin #1: Dimensions and soap dispensers were added in women's restroom #022 and men's restroom #021 and added another lavatory to men's restroom #021. The submitted drawing has 6 lavatory the existing has 7 lavatory in men's restroom #021. Added notes. Dimensions were added in women's restroom #110 and men's restroom #109. The baby changing station in men's restroom #109 was moved to end left side of the restroom as per existing lay -out and wing wall besides ADA vanity in left side was deleted because does not exist as per existing. Revision is clouded as shown. 9. A-5.02 Bulletin #1: Detail #1 & detail #2 call -out were added and add the soap dispenser in the drawing. Detail #3 size of apron was changed from 4'/z" to 5", the removable panel was change from 16" to 19". The gap between bottom of apron and top of removable panel is %". Dispenser specification was added in the callout. Detail #4 top rail is 34" and top of counter is 311. Revisions is clouded as shown. 10. A-5.06 Bulletin #1: Detail #6 (Typical detail plan of TV niche in Boardroom) and detail #7 (Typival detail section of TV niche in boardroom) was added. Revision is clouded as shown. 11. A.5.07 Revision #3: In this sheet the planter boxes in the retaining wall was redesigned and the water feature. Sheet number is clouded as shown. 12. A-5.08 This sheet was added when we issue the Construction Set on 01-11-2017. Detail #1 Enlarged Plan of Comp Breakfast Banquette), Detail #2 Section of Carving Station), Detail #3 (Wall Detail Plan @ Atrium between Slatted Wall), Detail #4 (Section of Comp Breakfast Banquette) Detail #5 (Section Of Wall @ Atrium between Slatted Wall), Detail #6 (Soffit Detail (g Atrium), Detail #7 (Enlarged Partial Plan Lobby), & Detail #8 (Enlarged Partial Plan g Lobby). 13. A-8.10 Bulletin #1: Room Names was change from Pleasant Ridge Ballroom I -VII to Heritage Ballroom I -VII. Preston Trail Ballroom 1 -III to Cross TIMBER Ballroom 1 -III & Tele/Comp #115 was changed to West Boardroom #016. Door # 16B (West Boardroom door) & door #105B, 105C, 105D (Cross TIMBER Ballroom II-III) were added. Revision #3: Door #201A Delany Meeting Room is now assigned to Reception and Sales Office & from hardware set #18 was change to hardware set #23. 14. A -8.10A Bulletin #1: Door #202A was moved in this sheet. Door #207, #208, #209 & #209A (Franklin Meeting Room) were added in this sheet. Door #211 Men' Room) & #212 (Women's Room) were added in this sheet. Revision is clouded as shown. Revision #3: Hardware Set #23 was added in this sheet. Revision is clouded as shown. 15. A-8.11 Revision #3: Detail #3/A-8.11 Bracing At Top Wall To Metal Deck was added. Revision is Clouded as Shown. 16. A-8.30 Bulletin #1: Al wall type was added in the wall schedule. Revision is clouded as shown. Item Sheet Revisions Structural Changes 17. S-1 In this sheet dimensions were added in Comp Breakfast area. Added dimensions are clouded as shown. 18. S-2 Bulletin #1: Diagonal beam was added. Revision is clouded as shown. 19. S-3 Bulletin #1: Detail #5/S-3 was revised. Revision is clouded as shown. Mechanical Changes Item Sheet Revisions Mechanical Changes 20. M-2.00 This sheet was added when Construction Set was issued on 01-11-2017. Electrical Changes Item Sheet Revisions 21. E-1.07 Bulletin #1: Lights were added in Pool Lobby #124, Business Center #141 & Lounge Room #127. Revision is clouded as shown. 22. E-1.09 Revision #3: 2-2' x 4' fluorescent lights was deleted and 5 Down lights were added in Sales Manger's Office. Revision was clouded as shown. 23. E-2.00 Revision #3: 1 floor outlet and 2 wall outlet were added in Comp Breakfast Area. Revision is clouded as shown. 24. E-3.00 Revision #3: Load changes in Panel "A" & Load were added in Panel "K". Revision is clouded as shown. 25. E-4.00 Revision #3: Panel "J" & Panel "K" was added in the panel schedule. Revision is clouded a shown. Item Sheet Revisions Plumbing Changes 27. P-1.0 Revision #3: FS -1 was relocated underneath the counter of espresso machine (equipment #17) & underneath the ice bin (drop-in) counter (equipment #20). Equipment #13 was deleted from the scope of work. Equipment #17 espresso machine was relocated to front bar counter. Equipment #20 was added in the scope of work. Revision is clouded as shown. 28. P-1.09 This sheet is added when the Construction Set was issued on 01-11-2017. 29. P-2.0 Revision #3: Note #7 was added. Equipment #17 (espresso machine) was relocated in front bar counter. Equipment #13 was deleted in the scope of work. Equipment #20 was added in the scope of work. 30. P-2.04 This was added when the Construction drawings was issued on 01-11-2017. Item Sheet Revisions Interior Design Changes. 31. I-1.15 Bulletin #1: New Boardroom table, chairs, & pendant lights was deleted in scope of work. Revision is clouded as shown. 32. 1-1.19 Revision #3: Note #6, ceiling height and finish was added to ceiling plan. New drywall ceiling in meeting room storage #228 and ACT was removed. Partial new drywall ceiling in Franklin Meeting Room formerly La Bodega. Revision clouded as shown. Manger's Sales Office #202 5 down lights was added in the ceiling. Revision clouded as shown. 33. 1-2.01 Bulletin #1: Soap dispensers were added in women's restroom #022 and men's restroom #021 and added another lavatory to men's restroom #021. The submitted drawing has 6 lavatory the existing has 7 lavatory in men's restroom #021. Revision is clouded as shown. 34. 1-2.02 Dimensions were added in women's restroom #110 and men's restroom #109. The baby changing station in men's restroom #109 was moved to end left side of the restroom as per existing lay -out and wing wall besides ADA vanity in left side was deleted because it does not exist as per existing. Revision is clouded as shown. 35. 1-2.04 Bulletin #1: Removable panel was change from 16" to 18'/2". Apron was change from 4 %" to 5". Soap dispenser was added in Unisex Restroom. Revision is clouded as shown. Revision #3: Soap dispenser note hole and centerline was added. Removable panel was change from 18 '`/i" to 19". The bottom of apron and top of removable panel gap is ''/z" was added. Faucet hole centerline note was added. Revision is clouded as shown. 36. I-2.05 Revision #3: Plumbing fixtures tag& dimensions were added in enlarged plan. Material reference CT -115 was added, Y2" gap dimension between apron and removable panel & faucet hole center line note was added in Typical Vanity Detail. Revision is clouded as shown. Soap dispenser was added in both men's & women's restroom elevations. Revision is clouded as shown. 37. I-2.06 This sheet was added in the Construction Set issued to the contractor on 01-11- 2017. 38. I-3.01 Revision #3: Theatrical lights was added in the elevation with notes. Revision is clouded as shown. 39. I-3.02 Revision #3: Theatrical lights was added in the elevation with notes. Revision is clouded as shown. 40. I-3.04 #2 Elevator Lobby Elevations was revised when the Construction Set was issued to the contractor 01-11-2017 item #2 was void and refer to I-5.18. 41. I-3.05 #2 Elevator Cab Enlarged Plan & Elevations was added in the sheet when Construction Set was issue to the contractor on 01-11-2017. 42. I-3.06 Bulletin #1: In elevations #2/"B"/"D"/"F"/"H"/"I"/"L" the pendant lights and artwork was added. The chair rail was removed in elevation #2/"D"/"H". In elevations #3/"A" finish was change to WC -105 & elevation "C" pendant light was deleted in scope of work. Revisions is clouded as shown. 43. I-3.07 Bulletin #I: CT -106 was added in elevation #1/ "A", "B", & "E". In elevation #1/"B" & "E" bar die finish was re -design. Revision is clouded as shown. 44. I-3.08 Revision #3: In #2 Enlarged Plan Caffeina's Entrance added dimensions, move Section "A" and show the business center plan completely. Revision is clouded as shown. 45. I-3.09 Bulletin #1: Men's Room Elevation #021 #1/"A" removable panel and apron gap was change to %:". Women's Room Elevation #022 #2/"A" removable panel and apron gap was chap a to %2". Revision is clouded as shown. 46. I-3.01 Bulletin #1: Men's Room Elevation #109 #1/"A" removable panel and apron gap was change to ''/z". Women's Room Elevation #110 #2/"A" removable panel and apron gap was change to '/2". Revision is clouded as shown. 47. I-5.02 Wall Detailed Plan was added when the Construction Set was issued to the contractor on 01-11-2017. 48. I-5.04 Detail #6 was added when the Construction Set was issued to the contractor on 01- 11-2017. 49. I-5.05 Partial Detail Plan #2, Detailed Section #3, Partial Detailed Plan, Partial Enlarged Elevation #5 & Art Wall @ Lobby "C" was added was added when the Construction Set was issued to the contractor on 01-11-2017. 50. I-5.06 Section #3 was revised when the Construction Set was issued to the contractor on 01-11-2017. 51. I-5.07 Plan View #2, Elevation #3, Elevation #4, Elevation #5, Elevation #6 Frame Detail "B", Detail "C" & Section View "A" was added when the Construction Set was issued to the contractor on 01-11-2017. 52. I-5.08 Bulletin #1: Plan Section #9 Name was change from Cross Timber Conference Area To Tate Boardroom. Section #11 was added. Revision is clouded as shown. 53. I-5.11 This sheet was added when the Construction Set was issued to the contractor on 01- 11-2017. 54. I-5.12 This sheet was added when the Construction Set was issued to the contractor on 01-11-2017. 55. I-5.13 Bulletin #1: Plan "A" Added dimensions. Elevation "B" & Section "C" Height 37" was revise to 34", TV Wall @ Jenkins & Bennett Boardroom #3 was added & Section #4 was added. Revisions are clouded as shown. 56. I-5.14 Revision #3: #1/"A" Plan View, TV niche opening width was revised from +/-11'-9" to +/-11'-6 3/4". The slatted wall was move back aligned with the wall @ corridor side. #1/"I" Elevation TV size & model no. was added and the opening was changed as per plan. #1/"2" Plan, slatted wall was move back aligned with the wall @ corridor side. #1/"4" Section, height was revised. #2 Artwork Tower Wall Enlarged Plan and Elevation (a) Fireplace Lounge was added when the Construction Set was issued to the contractor on 01-11-2017. 57. I-5.18 Water Feature was revised when the Construction Set was issued to the contractor on 01-11-2017. Item Sheet Revisions Food Service Changes 58. FS1.0 Revision #3: FS -1 was relocated underneath the counter of espresso machine (equipment #17) & underneath the ice bin (drop-in) counter (equipment #20). Equipment #13 was deleted from the scope of work. Equipment #17 espresso machine was relocated to front bar counter. Equipment #20 was added in the scope of work. Equipment #21 (Point of Sales Machine) & #21.1 (Point of Sales Machine Printer where relocated besides the Grab and Go equipment #12. Revisions are clouded as shown. 59. FS1.1 Revision #3: Equipment #21 (Point of Sales Machine) & #21.1 (Point of Sales Machine Printer) data and power outlet where relocated besides the Grab and Go equipment #12. Power outlet was provided in equipment #17 (Espresso Machine). Revisions is clouded as shown. Item Sheet Revisions Lighting Design Changes 60. LD -0.01 DPI was deleted from Lighting Fixture Schedule when the Construction Set was issued on 01-11-2017. TLl, LO -502 & LO -550 was added in the Hardware Decorative Lighting Schedule when the Construction Set was issued on 01-11-2017. CSl was added in the Lighting Controls Schedule when the Construction Set was issued on 01-11-2017. 61. LD -0.11 Bulletin #1: B-06 was added in the Lighting Control Intent Schedule Notes. Revision is clouded as shown. Please review the enclosed Updated Permitted Plan and let me know if you have any questions 562-424-1720, ext. 2159. Your time and consideration in reviewing our responses is very much appreciated. Sincerely, Luis Angulo Architect/Project Manager HFS Concepts 4, Inc. cc: Brent Lynch (HFS) Luis Angulo (HFS) 62. LD -1.07A This sheet was added when the Construction Set was issued on 01-11-2017. 63. LD -1.09 Revision #3: Lights in Tate #024, Jenkins #032 & Bennett #030 Boardroom were relocated because of the change in design of ceiling. ACT was used instead of drywall. Jenkins #032 & Bennett #030 Boardroom has a partial drywall ceiling with the size of 6'-0" wide x 24'-0" long. Lights in the Registration Area #137 were relocated because of change in design of ceiling. The existing design of ceiling was retained. The lights are centered in the ACT and in Soffit. Lights in the Hallford's Coffee Shop above #131 Preparation Area and Front Bar Counter were relocated because of the change in ceiling design. ACT was used in Preparation Area and drywall ceiling was retained above the Front Bar Counter. Revisions is clouded as shown. 64. LD -1.09A This sheet was added when the Construction Set was issued on 01-11-2017. 65. LD -1.17 This sheet was revised when the Construction Set was issued on 01-11-2017. The final lights locations are mounted on the wall facades. Please review the enclosed Updated Permitted Plan and let me know if you have any questions 562-424-1720, ext. 2159. Your time and consideration in reviewing our responses is very much appreciated. Sincerely, Luis Angulo Architect/Project Manager HFS Concepts 4, Inc. cc: Brent Lynch (HFS) Luis Angulo (HFS) 4h A10 H FS 4raw Sheet Revisions 3229 E SPRING STREET SUITE 200 LONG BEACH , CA 90806 ,ONCEPT IS4 PHONE: 562.424.1720 FAX: 562.424.3720 HOSPITALITY FOCUSED SOLUTIONS, INC. / CONCEPTS 4 City of Grapevine, Building Inspections 200 S. Main Str-- .p- - eapevineTX 76051 Re: Building Inspections Permitted Plan Update, COMA -16-3428 Embassy Suites DFW, Grapevine 7X Remodel — Public Area Permitted Plan Update Enclosed for your use and review are "Updated Plan" for Permit #COMA -16-3428 Remodel for Embassy Suites DFW, Grapevine, Texas Item Sheet Revisions Architectural Changes 1. A -1.04A Bulletin 411: Submitted drawing for plan check shows 6 existing lavatory in Men's Restroom #021. The actual existing lavatory is 7 units. Revision is clouded as shown. 2. A -104B Bulletin fl: Dimensions was revised per existing. See A-2.04 revision is clouded as shown. 3. A -105A Revision 43: Note #DOI & #D02 was deleted. It was replaced note #D16, #d17 & D18 which was added in Ceiling Demo Key Notes. Revision is clouded as shown. 4. A -106A Bullet -in 41: Note III & 112 was deleted. Detail call -out #6/a-5.06 was added, dimensions and door #016B. Revision is clouded as shown. 5. A- I 07A Bulletin #11: Note #28 & #29 was deleted. Projector, projector lift & motorized drop screen was deleted in the scope of work. Revision is clouded as shown. Game Room #127. Business Center #141 & Pool Lobby #124: Two ceiling lights was deleted from the scope of work see #2/A-2.01. Revision 3: Tate #024, Jenkins #032 and Bennett #030 Boardrooms: Gypsum board ceiling is not possible because there is an existing FCU unit. ACT ceiling is provided to have an access to FCU units. Partial gypsum board ceiling was installed in Jenkins #032 & Bennet #030 boardroom. Re -layout lightings. Revision is clouded as shown. OFFICE COPY Hallford's Coffee Shop jtI33- A-1.07A Gypsum board ceiling is not possible because of FCU units. ACT is provided to Continuation have in preparation area to have access to FCU units. Gypsum board is provided above the bar counter. Lightings was re -layout & see #2/A-2.01. Revision is clouded as shown. 6. A-109 Revision 3: Franklin Meeting Room #209: Note #03 was deleted and note # 12 was added. Revision is clouded as shown. Sales Manager's Office #202: Note #12 was added. 5 downlights, dimensions and door #201 was added. Revisions is clouded as shown. 7. A-2.01 Bulletin #I— Lounge Area #127, Business Center #141, Pool Lobby #124 & Unisex Restroom #125: Two ceiling lights was deleted from the scope of work see #2/A-2.01. Dimensions were added. Soap dispenser was added in Unisex restroom vanity. Detail #9/A- 5.01 call -out was deleted. Revision 3: Hallford's Cooffee Shop #131: Gypsum board ceiling is not possible because of FCU units. ACT is provided to have in preparation area to have access to FCU units. Gypsum board is provided above the bar counter. Lightings was re -layout. Revision is clouded as shown. 8. A-2.04 Bulletin ,1: Dimensions and soap dispensers were added in women's restroom #022 and men's restroom #021 and added another lavatory to men's restroom #021. The submitted drawing has 6 lavatory the existing has 7 lavatory in men's restroom #021. Added notes. Dimensions were added in women's restroom #110 and men's restroom #109. The baby changing station in men's restroom 9109 was moved to end left side of the restroom as per existing lay -out and wing wall besides ADA vanity in left side was deleted because does not exist as per existing. Revision is clouded as shown. 9. A-5.02 Bulletin #1: Detail #1 & detail #2 call -out were added and add the soap dispenser in the drawing. Detail #3 size of apron was changed from 4 Yz" to 5", the removable panel was change from 16" to 19". The gap between bottom of apron and top of removable panel is 1/2". Dispenser specification was added in the callout. Detail #4 to rail is 34" and to of counter is 31'. Revisions is clouded as shown. 10. A-5.06 Bulletin 41: Detail #6 (Typical detail plan of TV niche in Boardroom) and detail #7 (Typival detail section of TV niche in boardroom) was added. Revision is clouded as shown. 11. A.5.07 Revision H3: In this sheet the planter boxes in the retaining wall was redesigned and the water feature. Sheet number is clouded as shown. 12. A-5.08 This sheet was added when we issue the Construction Set on 01-11-2017. Detail #1 Enlarged Plan of Comp Breakfast Banquette), Detail #2 Section of Carving Station), Detail #3 (Wall Detail Plan * Atrium between Slatted Wall), Detail #4 (Section of Comp Breakfast Banquette) Detail #5 (Section Of Wall C&, Atrium between Slatted Wall), Detail #6 (Soffit Detail * Atrium), Detail #7 (Enlarged Partial "Ian (d,) Lobby), & Detail #8 (Enlarged Partial Plan * Lobby). 13. A-8.10 Bulletin 41: Room Names was change from Pleasant Ridge Ballroom I-VII to Heritage Ballroom I-VII. Preston Trail Ballroom 1-111 to Cross TIMBER Ballroom 1-111 & Tele/Comp #115 was changed to West Boardroom #016. Door # 16B (West Boardroom door) & door #105B, 105C, 105D (Cross TIMBER Ballroom 11-111) were added. Revision 43: Door #201A Delany Meeting Room is now assigned to Reception and Sales Office & from hardware set #18 was change to hardware set #23. 14. A-8.10A Bulletin 41: Door #202A was moved in this sheet. Door #207, #208, #209 & #209A (Franklin Meeting Room) were added in this sheet. Door #211 Men' Room) & #212 (Women's Room) were added in this sheet. Revision is clouded as shown. Revision 43: Hardware Set #23 was added in this sheet. Revision is clouded as shown. 15. A-8.11 Revision #3® Detail #3/A-8.11 Bracing At Top Wall To Metal Deck was added. Revision is Clouded as Shown. 16. A-8.30 Bulletin #1: Al wall type was added in the wall schedule. Revision is clouded as shown. Item Sheet Revisions Structural Changes 17. S-1 In this sheet dimensions were added in Comp Breakfast area. Added dimensions are clouded as shown. 18. S-2 Bulletin 41: Diagonal beam was added. Revision is clouded as shown. 19. S-3 Bulletin I'll: Detail #5/S-3 was revised. Revision is clouded as shown. Mechanical Changes Item Sheet Revisions Mechanical Changes 20. M-2.00 This sheet was added when Construction Set was issued on 01-11-2017. Electrical Changes Item Sheet Revisions 21. E-1.07 Bulletin #1: Lights were added in Pool Lobby #124, Business Center #141 & Lounge Room #127. Revision is clouded as shown. 22. E-1.09 Revision 43: 2-2' x 41 fluorescent lights was deleted and 5 Down lights were added in Sales Manger's Office. Revision was clouded as shown. 23. E-2.00 Revision. #3: 1 floor outlet and 2 wall outlet were added in Comp Breakfast Area. Revision is clouded as shown. 24. E-3.00 flevision 43-. Load changes in Panel "A" & Load were added in Panel "K". Revision is clouded as shown. 25. E-4.00 Revision 43: Panel 1131' & Panel "K" was added in the panel schedule. Revision is clouded a shown. Item Sheet Revisions Plumbing Changes 27. P-1.0 Revision #'3-. FS-1 was relocated underneath the counter of espresso machine (equipment 917) & underneath the ice bin (drop-in) counter (equipment #20). Equipment #13 was deleted from the scope of work. Equipment #17 espresso machine was relocated to front bar counter. Equipment #20 was added in the scope of work. Revision is clouded as shown. 28. P-1.09 This sheet is added when the Construction Set was issued on 01-11-2017. 29. P-2.0 Revision 43: Note #7 was added. Equipment #17 (espresso machine) was relocated in front bar counter. Equipment 913 was deleted in the scope of work. Equipment #20 was added in the scope of work. 30. P-2.04 This was added when the Construction drawings was issued on 01-11-2017. Item Sheet Revisions Interior Design Changes. 31. 1-1.15 Bulletin 41: New Boardroom table, chairs, & pendant lights was deleted in scope of work. Revision is clouded as shown. 32. 1-1.19 Revision 43. Note #6, ceiling height and finish was added to ceiling plan. New drywall ceiling in meeting room storage #228 and ACT was removed. Partial new drywall ceiling in Franklin Meeting Room formerly La Bodega. Revision clouded as shown. Manger's Sales Office #202 5 down lights was added in the ceiling. Revision clouded as shown. 33. 1-2.01 Bulletin #1: Soap dispensers were added in women's restroom #022 and men's restroom #021 and added another lavatory to men's restroom #021. The submitted drawing has 6 lavatory the existing has 7 lavatory in men's restroom #021. Revision is clouded as shown. 34. 1-2.02 Dimensions were added in women's restroom #110 and men's restroom #109. The baby changing station in men's restroom #109 was moved to end left side of the restroom as per existing lay-out and wing wall besides ADA vanity in left side was deleted because it does not exist as per existing. Revision is clouded as shown. 35. 1-2.04 Bulletin 9.l: Removable panel was change from 16" to 181/7". Apron was change from 4 V2'1 to 511. Soap dispenser was added in Unisex Restroom. Revision is clouded as shown. Revision #3- Soap dispenser note hole and centerline was added. Removable panel was change from 18 V2" to 19". The bottom of apron and top of removable panel gap is 1/2" was added. Faucet hole centerline note was added. Revision is clouded as shown. 36. 1-2.05 Revision 1 3: Plumbing fixtures tag& dimensions were added in enlarged plan. Material reference CT -115 was added, Y2" gap dimension between apron and removable panel & faucet hole center line note was added in Typical Vanity Detail. Revision is clouded as shown. Soap dispenser was added in both men's & women's restroom elevations. Revision is clouded as shown. 37. 1-2.06 This sheet was added in the Construction Set issued to the contractor on 01-11- 2017. 38. 1-3.01 Revision 43 - Theatrical lights was added in the elevation with notes. Revision is clouded as shown. 39. 1-3.02 Revision 413: Theatrical lights was added in the elevation with notes. Revision is clouded as shown. 40. 1-3.04 #2 Elevator Lobby Elevations was revised when the Construction Set was issued to the contractor 01-11-2017 item #2 was void and refer to 1-5.18. 41. 1-3.05 #2 Elevator Cab Enlarged Plan & Elevations was added in the sheet when Construction Set was issue to the contractor on 01-11-2017. 42. 1-3.06 Bulletin 41: In elevations #2/"B"/"D"/"F"/"H"/"I"/"L" the pendant lights and artwork was added. The chair rail was removed in elevation #2/11D1'/"H". In elevations #3/"A" finish was change to WC -105 & elevation "C" pendant light was deleted in scope of work. Revisions is clouded as shown. 43. 1-3.07 Bulletin 41. CT -106 was added in elevation #I/ 11A"� "B", & "E". In elevation #1/"B" & IIE" bar die finish was re -design. Revision is clouded as shown. 44. 1-3.08 Revision 1#3: In #2 Enlarged Plan Caffeina's Entrance added dimensions, move Section "A" and show the business center plan completely. Revision is clouded as shown. 45. 1-3.09 Bulletin 0: Men's Room Elevation #021 #1/11A" removable panel and apron gap was change to 11h". Women's Room Elevation #022 #2/"A" removable panel and apron gap was change to Y2". Revision is clouded as shown. 46. 1-3.01 Bulletin 41: Men's Room Elevation #109 #1/"A" removable panel and apron gap was change to %2". Women's Room Elevation #110 #2/"A" removable panel and apron gap was change to Y2". Revision is clouded as shown. 47. 1-5.02 Wall Detailed Plan was added when the Construction Set was issued to the contractor on 01-11-2017. 48. 1-5.04 Detail #6 was added when the Construction Set was issued to the contractor on 01- 1-11-2017. 11-2017. 49. 1-5.05 Partial Detail Plan #2, Detailed Section #3, Partial Detailed Plan, Partial Enlarged Elevation #5 & Art Wall (& . Lobby "C" was added was added when the Construction Set was issued to the contractor on 01-I1-2017. 50. 1-5.06 Section #3 was revised when the Construction Set was issued to the contractor on 01-11-2017. 51. 1-5.07 Plan View #2, Elevation #3, Elevation #4, Elevation #5, Elevation #6 Frame Detail "B", Detail "C" & Section View "A" was added when the Construction Set was issued to the contractor on 01-11-2017. 52. 1-5.08 Bulletin 4 1: Plan Section #9 Name was change from Cross Timber Conference Area To Tate Boardroom. Section #11 was added. Revision is clouded as shown. 53. 1-5.11 This sheet was added when the Construction Set was issued to the contractor on 01- 11-2017. 54. 1-5.12 This sheet was added when the Construction Set was issued to the contractor on 01-11-2017. 55. 1-5.13 Bulletin #1: Plan "A" Added dimensions. Elevation "B" & Section "C" Height 37" was revise to 3411, TV Wall * Jenkins & Bennett Boardroom #3 was added & Section #4 was added. Revisions are clouded as shown. 56. 1-5.14 Revision 43: #1/"A" Plan View, TV niche opening width was revised from +/-I l'-9" to +/-11'-6 3/4". The slatted wall was move back aligned with the wall * corridor side. #1/"I" Elevation TV size & model no. was added and the opening was changed as per plan. #1/"2" Plan, slatted wall was move back aligned with the wall * corridor side. # 1 /"4" Section, height was revised. 42 Artwork Tower Wall Enlarged Plan and Elevation (t� Fireplace Lounge was added when the Construction Set was issued to the contractor on 01-11-2017. 57. 1-5.18 Water Feature was revised when the Construction Set was issued to the contractor on 01-11-2017. Item Sheet Revisions Food Service Changes 58. FS1.0 Revision #3: FS -I was relocated underneath the counter of espresso machine (equipment #17) & underneath the ice bin (drop-in) counter (equipment #20). Equipment #13 was deleted from the scope of work. Equipment #17 espresso machine was relocated to front bar counter. Equipment #20 was added in the scope of work. Equipment #21 (Point of Sales Machine) & #21.1 (Point of Sales Machine Printer where relocated besides the Grab and Go equipment #12. Revisions are clouded as shown. 59. FSLI Revision #3: Equipment #21 (Point of Sales Machine) & #21.1 (Point of Sales Machine Printer) data and power outlet where relocated besides the Grab and Go equipment #12. Power outlet was provided in equipment #17 (Espresso Machine). Revisions is clouded as shown. Item Sheet Revisions Lighting Design Changes 60. LD -0.01 DPl was deleted from Lighting Fixture Schedule when the Construction Set was issued on 01-11-2017. TLI, LO -502 & LO -550 was added in the Hardware Decorative Lighting Schedule when the Construction Set was issued on 01-11-2017. CSI was added in the Lighting Controls Schedule when the Construction Set was issued on 01-11-2017. 61. LD -0.11 Bulletin #I - B-06 was added in the Lighting Control Intent Schedule Notes. Revision is clouded as shown. Please review the enclosed Updated Permitted • and let me • if you have any questions • ext. 2159. • time and consideration in reviewing • responses is very much .•• 61. rl=— Luis Angulo HFS Concepts 4, Inc. cc: Brent Lynch (HFS) Luis Angulo (HFS) 62. LD -1.07A This sheet was added when the Construction Set was issued on 01-11-2017. 63. LD -1.09 Revision #3: Lights in Tate #024, Jenkins #032 & Bennett #030 Boardroom were relocated because of the change in design of ceiling. ACT was used instead of drywall. Jenkins #032 & Bennett #030 Boardroom has a partial drywall ceiling with the size of 6'-0" wide x 24'-0" long. Lights in the Registration Area #137 were relocated because of change in design of ceiling. The existing design of ceiling was retained. The lights are centered in the ACT and in Soffit. Lights in the Hallford's Coffee Shop above #131 Preparation Area and Front Bar Counter were relocated because of the change in ceiling design. ACT was used in Preparation Area and drywall ceiling was retained above the Front Bar Counter. Revisions is clouded as shown. 64. LD -1.09A This sheet was added when the Construction Set was issued on 01-11-2017. 65. LD -1.17 This sheet was revised when the Construction Set was issued on 01-11-2017. The final lights locations are mounted on the wall facades. Please review the enclosed Updated Permitted • and let me • if you have any questions • ext. 2159. • time and consideration in reviewing • responses is very much .•• 61. rl=— Luis Angulo HFS Concepts 4, Inc. cc: Brent Lynch (HFS) Luis Angulo (HFS) 4 — a— — 4T AT (E) CONCRETE OVER METAL DECK ovm rEXISTING WALL TO REMAIN. W& oecx I '—(3) 0.145'0 X 1 1/4" LT- 04-14-1017 LONG POWDER ACTUATED PIN F 1 3 5/8' x 20 GA. STEEL x).' UNDERSIDE OF SK -2 STUDS AND 4'x20 CA STUD, 4'-0' O.C. EXISTING TRACKS @ STAGGER. MAX. 12'-0' BRACING METAL DECK 16" O.C. LENGTH MAX.— TYP. 1! 3 #10 SMS 3 5/8 GA. / METAL STUDS 0 11111 1 METAL STUDS 0 16' 0. C. LINE OF CEILING 3 5/8" 20 GA. METAL STUDS DIAGONAL BRACING 0 48' 0. C. STAGGARD LLf 5/8' THICK BRACING AT DRAPERY POCKET GYPSUM BOARD TOP OF WALL DETAIL @ BOARD ROOM CEILING 0 3' 6' 1 1/2" = V—O" . 0 " OF L 0 LLLLLLLLLLUr12 nN E. spq S' Sssm m Un @..d, CA 96 VMAN W � :�sz 4A� d.htw.*_ ommms cure wic EMBASSY SURES DALLASDFW AIRPORTNORUI 2401 B— P. DH,. 6.pc'iu"J'x 76u5i pmw m PUBLIC ARFArNnTA101t RENOVATION METAL STUD WALL FRAMING DETAILS "meg m ft ---------- LT- 04-14-1017 % O 15-564 04-14-1017 % x).' SK -2 City of Grapevine, Building Inspections 200 S. Main Street Grapevine, TX 76051 April 28, 2017 Re: Building Inspections Permitted Plan Update, COMA -16-3428 Embassy Suites DFW, Grapevine 7X Remodel — Public Area Permitted Plan Update Enclosed for your use and review are "Updated Plan" for Permit #COMA -16-3428 Remodel for Embassy Suites DFW, Grapevine, Texas Item Sheet Revisions Architectural Changes 1. A -1.04A Bulletin is Submitted drawing for plan check shows 6 existing lavatory in Men's Restroom #021. The actual existing lavatory is 7 units. Revision is clouded as shown. 2. A -104B Bulletin 91 - Dimensions was revised per existing. See A-2.04 revision is clouded as shown. 3. A -105A Revision 0: Note #DOI & #1302 was deleted. It was replaced note #1316, #d17 & D18 which was added in Ceiling Demo Key Notes. Revision is clouded as shown. 4. A -106A Bulletin 0: Note 111 & 112 was deleted. Detail call -out #6/a-5.06 was added, dimensions and door #016B. Revision is clouded as shown. 5. A -107A Bufflefin fl. Note #28 & #29 was deleted. Projector, projector lift & motorized drop screen was deleted in the scope of work. Revision is clouded as shown. Game Room #127, Business Center #141 & Pool Lobby #124: Two ceiling lights was deleted from the scope of work see #2/A-2.01. Revision 3: Tate #024, Jenkins #032 and Bennett #030 Boardrooms: Gypsum board ceiling is not possible because there is an existing FCU unit. ACT ceiling is provided to have an access to FCU units. Partial gypsum board ceiling was installed in Jenkins #032 & Bennet #030 boardroom. Re -layout lightings. Revision is clouded as shown. OFFICE COPY Hallford's Coffee Shap _LI33- A-1.07A Gypsum board ceiling is not possible because of FCU units. ACT is provided to Continuation have in preparation area to have access to FCU units. Gypsum board is provided above the bar counter. Lightings was re -layout & see #2/A-2.01. Revision is clouded as shown. 6. A-109 Revision 3: Franklin Meeting Room #209- _ Note #03 was deleted and note # 12 was added. Revision is clouded as shown. Sales Manner's Office #202: Note #12 was added. 5 downlights, dimensions and door #201 was added. Revisions is clouded as shown. 7. A-2.01 Bulletin #I— Lounge Area #127. Business Center #141, Pool Lobby #124 & Unisex Restroom #125: Two ceiling lights was deleted from the scope of work see #2/A-2.01. Dimensions were added. Soap dispenser was added in Unisex restroom vanity. Detail #9/A- 5.01 call -out was deleted. Revision 3: Hallford's Cooffee Shop _#131: Gypsum board ceiling is not possible because of FCU units. ACT is provided to have in preparation area to have access to FCU units. Gypsum board is provided above the bar counter. Lightings was re -layout. Revision is clouded as shown. 8. A-2.04 Bulletin Vii: Dimensions and soap dispensers were added in women's restroom #022 and men's restroom #021 and added another lavatory to men's restroom #021. The submitted drawing has 6 lavatory the existing has 7 lavatory in men's restroom #021. Added notes. Dimensions were added in women's restroom #110 and men's restroom #109. The baby changing station in men's restroom #109 was moved to end left side of the restroom as per existing lay -out and wing wall besides ADA vanity in left side was deleted because does not exist as per existing. Revision is clouded as shown. 9. A-5.02 Bulletin #1. Detail #1 & detail #2 call -out were added and add the soap dispenser in the drawing. Detail #3 size of apron was changed from 4'/i" to 5", the removable panel was change from 16" to 19". The gap between bottom of apron and top of removable panel is !/2". Dispenser specification was added in the callout. Detail #4 to rail is 34" and to of counter is 31'. Revisions is clouded as shown. 10. A-5.06 Bulletin 41: Detail #6 (Typical detail plan of TV niche in Boardroom) and detail #7 (Typival detail section of TV niche in boardroom) was added. Revision is clouded as shown. 11. A.5.07 Revision 43: In this sheet the planter boxes in the retaining wall was redesigned and the water feature. Sheet number is clouded as shown. 12. A-5.08 This sheet was added when we issue the Construction Set on 01-11-2017. Detail #1 Enlarged Plan of Comp Breakfast Banquette), Detail #2 Section of Carving Station), Detail #3 (Wall Detail Plan * Atrium between Slatted Wall), Detail #4 (Section of Comp Breakfast Banquette) Detail #5 (Section Of Wall Atrium between Slatted Wall), Detail #6 (Soffit Detail * Atrium), Detail #7 (Enlarged Partial Plan * Lobby), & Detail #8 (Enlarged Partial Plan Lobb 13. A-8.10 Bulletin 91: Room Names was change from Pleasant Ridge Ballroom I -VII to Heritag-. Ballroom I -VII. Preston Trail Ballroom 1-111 to Cross TIMBER Ballroom 1-111 & Tele/Comp #115 was changed to West Boardroom #016. Door # 16B (West Boardroom door) & door #105B, 105C, 105D (Cross TIMBER Ballroom 11-111) were added. Revision 43: Door #201A Delany Meeting Room is now assigned to Reception and Sales Office & from hardware set #18 was change to hardware set #23. 14. A -8.10A Bulletin 41: Door #202A was moved in this sheet. Door #207, #208, #209 & #209A (Franklin Meeting Room) were added in this sheet. Door 4211 Men' Room) & #212 (Women's Room) were added in this sheet. Revision is clouded as shown. Revision #3: Hardware Set #23 was added in this sheet. Revision is clouded as shown. 15. A-8.11 Revision 43: Detail #3/A-8.11 Bracing At Top Wall To Metal Deck was added. Revision is Clouded as Shown. 16. A-8.30 Bulletiq#l: Al wall type was added in the wall schedule. Revision is clouded as shown. Item Sheet Revisions Structural Changes 17. S-1 In this sheet dimensions were added in Comp Breakfast area. Added dimensions are clouded as shown. 18. S-2 Bulletin 91: Diagonal beam was added. Revision is clouded as shown. 19. S-3 Bulletin 41 - Detail #5/S-3 was revised. Revision is clouded as shown. Mechanical Changes Item Sheet Revisions Mechanical Changes 20. M-2.00 This sheet was added when Construction Set was issued on 01-11-2017. Electrical Changes Item Sheet Revisions 21. E-1.07 Bulletin #-1: Lights were added in Pool Lobby #124, Business Center #141 & Lounge Room #127. Revision is clouded as shown. 22. E-1.09 Revision 43: 2-2' x 4' fluorescent lights was deleted and 5 Down lights were added in Sales Manger's Office. Revision was clouded as shown. 23. E-2.00 Revision #3- 1 floor outlet and 2 wall outlet were added in Comp Breakfast Area. Revision is clouded as shown. 24. E-3.00 Revision 43: Load changes in Panel "A" & Load were added in Panel "K". Revision is clouded as shown. 25. E-4.00 Revision #.3: Panel "J" & Panel 11K" was added in the panel schedule. Revision is clouded a shown. Item Sheet Revisions Plumbing Changes 27. P-1.0 Revision 0: FS-I was relocated underneath the counter of espresso machine (equipment #17) & underneath the ice bin (drop-in) counter (equipment #20). Equipment #13 was deleted from the scope of work. Equipment #17 espresso machine was relocated to front bar counter. Equipment #20 was added in the scope of work. Revision is clouded as shown. 28. P-1.09 This sheet is added when the Construction Set was issued on 01-11-2017. 29. P-2.0 Revision 43: Note #7 was added. Equipment #17 (espresso machine) was relocated in front bar counter. Equipment #13 was deleted in the scope of work. Equipment #20 was added in the scope of work. 30. P-2.04 This was added when the Construction drawings was issued on 01-11-2017. Item Sheet Revisions Interior Design Changes. 31. 1-1.15 Bulletin #1: New Boardroom table, chairs, & pendant lights was deleted in scope of work. Revision is clouded as shown. 32. 1-1.19 Revision 43: Note #6, ceiling height and finish was added to ceiling plan. New drywall ceiling in meeting room storage #228 and ACT was removed. Partial new drywall ceiling in Franklin Meeting Room formerly La Bodega. Revision clouded as shown. Manger's Sales Office #202 5 down lights was added in the ceiling. Revision clouded as shown. 33. 1-2.01 Bulletin 41. Soap dispensers were added in women's restroom 9022 and men's restroom #021 and added another lavatory to men's restroom #021. The submitted drawing has 6 lavatory the existing has 7 lavatory in men's restroom #021. Revision is clouded as shown. 34. 1-2.02 Dimensions were added in women's restroom #110 and men's restroom #109. The baby changing station in men's restroom #109 was moved to end left side of the restroom as per existing lay-out and wing wall besides ADA vanity in left side was deleted because it does not exist as per existing. Revision is clouded as shown. 35. 1-2.04 Bulletin #1. Removable panel was change from 16" to 18'/z". Apron was change from 4'/z" to 5". Soap dispenser was added in Unisex Restroom. Revision is clouded as shown. Revis;on #3- Soap dispenser note hole and centerline was added. Removable panel was change from 18'/2" to 19". The bottom of apron and top of removable panel gap is !/2" was added. Faucet hole centerline note was added. Revision is clouded as shown. 36. 1-2.05 Revision 43: Plumbing fixtures tag& dimensions were added in enlarged plan., Material reference CT -115 was added, Y2" gap dimension between apron and removable panel & faucet hole center line note was added in Typical Vanity Detail. Revision is clouded as shown. Soap dispenser was added in both men's & women's restroom elevations. Revision is clouded as shown. 37. 1-2.06 This sheet was added in the Construction Set issued to the contractor on 01-11- 2017. 38. 1-3.01 Revision 43 - Theatrical lights was added in the elevation with notes. Revision is clouded as shown. 39. 1-3.02 Revision 43: Theatrical lights was added in the elevation with notes. Revision is clouded as shown. 40. 1-3.04 #2 Elevator Lobby Elevations was revised when the Construction Set was issued to the contractor 01-11-2017 item #2 was void and refer to 1-5.18. 41. 1-3.05 #2 Elevator Cab Enlarged Plan & Elevations was added in the sheet when Construction Set was issue to the contractor on 01-11-2017. 42. 1-3.06 Bulletin 4-'!: In elevations #2/"B"/"D"/"F"/"H"/"I"/"L" the pendant lights and artwork was added. The chair rail was removed in elevation #2/"D"/"H". In elevations #3/"A" finish was change to WC -105 & elevation "C" pendant light was deleted in scope of work. Revisions is clouded as shown. 43. 1-3.07 Bu Ilefin i'1 - CT -106 was added in elevation #I/ "A", "B", & "E". In elevation #1/"B"& "E" bar die finish was re -design. Revision is clouded as shown. 44. 1-3.08 ReviSiOFI P13: In #2 Enlarged Plan Caffeina's Entrance added dimensions, move Section "A" and show the business center plan completely. Revision is clouded as shown. 45. 1-3.09 Bulletin #1: Men's Room Elevation #021 OPIA11 removable panel and apron gap was change to Y2". Women's Room Elevation #022 #2/"A" removable panel and apron gap was chap to '/2". Revision is clouded as shown. 46. 1-3.01 Bulletin #1: Men's Room Elevation #109 #1/"A" removable panel and apron gap was change to !/2". Women's Room Elevation #110 #2/"A" removable panel and apron gap was change to Y2". Revision is clouded as shown. 47. 1-5.02 Wall Detailed Plan was added when the Construction Set was issued to the contractor on 01-I1-2017. 48. 1-5.04 Detail #6 was added when the Construction Set was issued to the contractor on 01- 11-2017. 49. 1-5.05 Partial Detail Plan #2, Detailed Section #3, Partial Detailed Plan, Partial Enlarged Elevation #5 & Art Wall * Lobby "C" was added was added when the Construction Set was issued to the contractor on 01-11-2017. 50. 1-5.06 Section #3 was revised when the Construction Set was issued to the contractor on 01-11-2017. 51. 1-5.07 Plan View #2, Elevation #3, Elevation #4, Elevation #5, Elevation #6 Frame Detail "B", Detail "C" & Section View "A" was added when the Construction Set was issued to the contractor on 01-11-2017. 52. 1-5.08 Bulletin 41: Plan Section #9 Name was change from Cross Timber Conference Area To Tate Boardroom. Section #11 was added. Revision is clouded as shown. 53. 1-5.11 This sheet was added when the Construction Set was issued to the contractor on 01- 11-2017. 54. 1-5.12 This sheet was added when the Construction Set was issued to the contractor on 01-11-2017. 55. 1-5.13 Bulletin 41: Plan "A" Added dimensions. Elevation "B" & Section "C" Height 37" was revise to 3411, TV Wall * Jenkins & Bennett Boardroom #3 was added & Section 44 was added. Revisions are clouded as shown. 56. 1-5.14 Revision #3: #I/"A" Plan View, TV niche opening width was revised from +/-111-9" to +/-11'-6 3/4". The slatted wall was move back aligned with the wall * corridor side. #1/"I" Elevation TV size & model no. was added and the opening was changed as per plan. 41/"2" Plan, slatted wall was move back aligned with the wall @ corridor side. 41/"4" Section, height was revised. #2 Artwork Tower Wall Enlarged Plan and Elevation C Fireplace Lounge was added when the Construction Set was issued to the contractor on 01-11-2017. 57. 1-5.18 Water Feature was revised when the Construction Set was issued to the contractor on 01-11-2017. Item Sheet Revisions Food Service Changes 58. FSLO Revision 0 - FS -1 was relocated underneath the counter of espresso machine (equipment #17) & underneath the ice bin (drop-in) counter (equipment #20). Equipment #13 was deleted from the scope of work. Equipment #17 espresso machine was relocated to front bar counter. Equipment #20 was added in the scope of work. Equipment #21 (Point of Sales Machine) & 421.1 (Point of Sales Machine Printer where relocated besides the Grab and Go equipment #12. Revisions are clouded as shown. 59. FSLI Revision 413 - Equipment #21 (Point of Sales Machine) & #21.1 (Point of Sales Machine Printer) data and power outlet where relocated besides the Grab and Go equipment #12. Power outlet was provided in equipment #17 (Espresso Machine). Revisions is clouded as shown. Item Sheet Revisions Lighting Design Changes 60. LD -0.01 DPI was deleted from Lighting Fixture Schedule when the Construction Set was issued on 01-11-2017. TLI, LO -502 & LO -550 was added in the Hardware Decorative Lighting Schedule when the Construction Set was issued on 01-11-2017. CS1 was added in the Lighting Controls Schedule when the Construction Set was issued on 01-11-2017. 61. LD -0.11 Bulletin 91: B-06 was added in the Lighting Control Intent Schedule Notes. Revision is clouded as shown. Sincerely, Luis Angulo HFS Concepts 4, Inc. cc: Brent Lynch (HFS) Luis Angulo (HFS) 62. LD -1.07A This sheet was added when the Construction Set was issued on 01-11-2017. 63. LD -1.09 Revision 43: Lights in Tate #024, Jenkins #032 & Bennett #030 Boardroom were relocated because of the change in design of ceiling. ACT was used instead of drywall. Jenkins #032 & Bennett #030 Boardroom has a partial drywall ceiling with the size of 6'-0" wide x 241-011 long. Lights in the Registration Area #137 were relocated because of change in design of ceiling. The existing design of ceiling was retained. The lights are centered in the ACT and in Soffit. Lights in the Hallford's Coffee Shop above #131 Preparation Area and Front Bar Counter were relocated because of the change in ceiling design. ACT was used in Preparation Area and drywall ceiling was retained above the Front Bar Counter. Revisions is clouded as shown. 64. LD -1.09A This sheet was added when the Construction Set was issued on 01-11-2017. 65. LD -1.17 This sheet was revised when the Construction Set was issued on 01-11-2017. The final lights locations are mounted on the wall facades. Sincerely, Luis Angulo HFS Concepts 4, Inc. cc: Brent Lynch (HFS) Luis Angulo (HFS) CONCEPTS Y229 E. Sp , St Seita M UM beach, CA9M T.4 08L42UT20 Fee 562.424. 4_�.._.... �.� Q_ '� waxeamu eaoet.emc � I e - a WtSI pm (E) CONCRETE OYWI(3) ' EXISTING METAL PECK WALL TO a REMAIN. C"(( aero D:cw EMBASSY SUFPES DALLASDFW 0.145"0 X 1 1/4" y 2402 B—P. Dmv 1LONG POWDER ACTUATED PIN 3 5/8" x 20 GA. STEEL UNDERSIDE OF iI` ( ( STUDS AND PUBLIC AREA INTERIOR 4'x20 GA STUD, 4'-0" O.C. EXISTING Ii I I TRACKS @ REnOvArtox METAL DECK ` �'— " 16" O.C. SIM MESTAGGER, MAX. 12'-0" BRACING I f I MAX.— TYP. METAL STUD WALL i FRAMING DETAILS I I k 3 #10 SMS 3 5/$" 2a GA. METAL scups I` I I I METAL STUDS @ 16" 0.-1;7 C. f , "I I" +lo' —0" I A.F.F. I LINE OF CEILING 3 5/8" 20 CA. METAL STUDS DIAGONAL A.F.F. BRACING 0 4$" 0. C. STAGGARD 5/$" THICK o BRACING AT DRAPERY POCKET GYPSUM BOARD TOP OF WALL DETAIL @ BOARD ROOM CEILING 3"-1'-0 0 3" 6" .=; 1 1/2" = 1"-0" OF �®t t i t tit L i t h E2 {{y, scue As TSD ,cti ®2 OFFICE COPY lu HFS " 4F 1111 CONCEPTSl� Corporate Headquarters Tel 562 424 1720 3229 East Spring Street, Suite 200 Fax 562 424 3720 Long Beach, CA 90806 www.hfsc4.com FROM: JAMES LAWLESS Letter of Transmittal DATE: 09.02.2016 PROJECT NUMBER, NAME & LOCATION: 15-564 EMBASSY SUITES DALLAS — DALLAS FORT WORTH, TX RECIPIENT(S): COPY TO: To: Attn: Guita Mcl/roy/Vicki Hecko Accounting HFS Transmittal & Air Bill via hand delivery Company: City of Grapevine — Building Inspections Dept. Head HFS Electronic copy of Transmittal Address: 200 S. Main Street Grapevine, TX 76051 File Copy HFS Electronic copy of Transmittal 1 TDLR APPLICATION SHEET R'CVD. UPON SUBMISSION 08.15.2016. 1 CHECK 08.31.2016 Phone: 817-410-3166 COMMENTS: 'THIS IS FOR YOUR (CITY OF GRAPEVINE) "BUILDING PLAN REVIEW". IF ANY QUESTIONS, PLEASE LET ME KNOW WE ARE SENDING YOU: •,i PRINTS 0 SAMPLES • € SPECIFICATIONS • i OTHER — BUILDING PERMIT APPLICATION & RELEVANT INFORMATION VIA: 0 FIRST-CLASS MAIL 0PRIORITY MAIL 0 EXPRESS MAIL 0 HAND DELIVERED 0 COURIER 0 EMAIL 0 FAX 0 3td DAY EXPRESS SAVER 02ND DAY •,STANDARD OVERNIGHT OPRIORITY OVERNIGHT (FIRST OVERNIGHT AROUND TYPE OF PACKAGE: 0 BOX • TUBE 0 LETTER 0 PACK 0 OTHER COPIES DATE DESCRIPTION %4-�Spy 09.02.2016 3+1 (FOOD SERVICE) < 36"; ALL SETS W/ BOLTS/SCREWS — ARCHITECTURAL, MEP (W/ COMCHECK I& SPECS ON SHEETS), STRUCTURAL STAMPED, SIGNED, AND DATED.. 1'SET 07.09.2016 1 SET FOOD SERVICE (BRESCO) SPECIFICATIONS (CAFFEINA, COMP. SERVERY, BAR), 1 DOC. 10.23.2012 1 ASBESTOS LETTER & REPORT (8 PAGES TOTAL). 1 TDLR APP. 08.15.2016 1 TDLR APPLICATION SHEET R'CVD. UPON SUBMISSION 08.15.2016. 1 CHECK 08.31.2016 BUILDING PLAN REVIEW FEE (-FEE CALCULATOR = $5,939.21) COMMENTS: 'THIS IS FOR YOUR (CITY OF GRAPEVINE) "BUILDING PLAN REVIEW". IF ANY QUESTIONS, PLEASE LET ME KNOW ... JAMES LAWLESS THESE ARE TRANSMITTED AS CHECKED BELOW: 0 For Approval 0 Approved as Submitted 0 Resubmit 0 Copies of Approval 0,s For Your Use 0 Approved as Noted 0 Submit 0 Copies for Distribution 0 As Requested 0 Returned for Corrections 0 Return 0 Corrected Prints • ; For Review and Comment 0 1�t 0 For Bids Due 0 Prints Returned After Loan to Us Approved by (Dept. Head): % % Date: 09.02.2016 Reviewed by: Approved by (Contract Administration - BL): Date: Date: HFS Concepts 4 -Letter ojT wosminol doc Lost Updmed 4120/16 HFS e'9 CONCEPTS 4 &Vj Letter of Transmittal Corporate Headquarters Tel 562 424 1720 3229 East Spring Street, Suite 200 Fax 562 424 3720 Long Beach, CA 90806 www,hfsc4.com FROM: JAMES LAWLESS DATE: 09.02.2016 PROJECT NUMBER, NAME & LOCATION: 15-564 EMBASSY SUITES DALLAS — DALLAS FORT WORTH, TX RECIPIENT(S): COPY TO: To: Attn: Guita Mcl/roy/Vicki Hecko Accounting HFS Transmittal & Air Bill via hand delivery Company: City of Grapevine — Building Inspections Dept. Head HFS Electronic copy of Transmittal Address: 200 S. Main Street Grapevine, TX 76051 File Copy HFS Electronic copy of Transmittal 1 ASBESTOS LETTER & REPORT (8 PAGES TOTAL). 1 TDLR APP. 08.15.2016 Phone: 817-410-3166 08.31.2016 BUILDING PLAN REVIEW FEE (`FEE CALCULATOR = $5,939.21) COMMENTS: 'THIS IS FOR YOUR (CITY OF GRAPEVINE) "BUILDING PLAN REVIEW". IF ANY QUESTIONS, PLEASE LET ME KNOW WE ARE SENDING YOU: • € PRINTS 0 SAMPLES 0 j SPECIFICATIONS • OTHER — BUILDING PERMIT APPLICATION & RELEVANT INFORMATION VIA: 0 FIRST-CLASS MAIL OPRIORITY MAIL 0 EXPRESS MAIL 0 HAND DELIVERED 0 COURIER 0 EMAIL 0 FAX 03rd DAY EXPRESS SAVER 02ND DAY *,STANDARD OVERNIGHT OPRIORITY OVERNIGHT O=IRST OVERNIGHT OGROUND TYPE OF PACKAGE: 0 BOX • TUBE 0 LETTER 0 PACK 0 OTHER COPIES DATE DESCRIPTION Resubmit 0 Copies of Approval 0 ; For Your Use O Approved as Noted SETS 09.02.2016 3+1 (FOOD SERVICE) < 36"; ALL SETS W/ BOLTS/SCREWS —ARCHITECTURAL, MEP (W/ COMCHECK & Returned for Corrections 0 SPECS ON SHEETS), STRUCTURAL STAMPED, SIGNED, AND DATED.. 1 SET 07.09.2016 1 SET FOOD SERVICE (BRESCO) SPECIFICATIONS (CAFFEINA, COMP. SERVERY, BAR). 1 DOC. 10.23.2012 1 ASBESTOS LETTER & REPORT (8 PAGES TOTAL). 1 TDLR APP. 08.15.2016 1 TDLR APPLICATION SHEET R'CVD. UPON SUBMISSION 08.15.2016. 1 CHECK 08.31.2016 BUILDING PLAN REVIEW FEE (`FEE CALCULATOR = $5,939.21) COMMENTS: 'THIS IS FOR YOUR (CITY OF GRAPEVINE) "BUILDING PLAN REVIEW". IF ANY QUESTIONS, PLEASE LET ME KNOW ... JAMES LAWLESS THESE ARE TRANSMITTED AS CHECKED BELOW: 0 For Approval 0 Approved as Submitted 0 Resubmit 0 Copies of Approval 0 ; For Your Use O Approved as Noted O Submit 0 Copies for Distribution 0 As Requested 0 Returned for Corrections 0 Return 0 Corrected Prints • For Review and Comment 0 air 0 For Bids Due Prints Returned After Loan to Us Approved by (Dept. Head): �0 % % Date: 09.02.2016 Reviewed by: Date: Approved by (Contract Administration - BL): Date: HFS Con p.4 -Ler .of T,1dae Las Updated 4/20/16 HFSfha' CONCEPTS q Letter of Transmittal 4F go Corporate Headquarters Tel 562 424 1720 3229 East Spring Street, Suite 200 Fax 562 424 3720 Long Beach, CA 90806 www.hfsc4.com FROM: JAMES LAWLESS DATE: 09.02.2016 PROJECT NUMBER, NAME & LOCATION: 15-564 EMBASSY SUITES DALLAS — DALLAS FORT WORTH, TX RECIPIENT(S): COPY TO: To: Attn: Guita Mciiroy/Vicki Hecko Accounting HFS Transmittal & Air Bill via hand delivery Company: City of Grapevine — Building Inspections Dept. Head HFS Electronic copy of Transmittal Address: 200 S. Main Street Grapevine, TX 76051 File Copy HFS Electronic copy of Transmittal 1 TDLR APPLICATION SHEET R'CVD. UPON SUBMISSION 08.15.2016. 1 CHECK 08.31.2016 Phone: 817-410-3166 ... JAMES LAWLESS WE ARE SENDING YOU: •,: PRINTS 0 SAMPLES • g SPECIFICATIONS • s OTHER — BUILDING PERMIT APPLICATION & RELEVANT INFORMATION VIA: 0 FIRST-CLASS MAIL 0PRIORITY MAIL 0 EXPRESS MAIL 0 HAND DELIVERED 0 COURIER 0 EMAIL 0 FAX 0 3rd DAY EXPRESS SAVER 02ND DAY *,STANDARD OVERNIGHT ()PRIORITY OVERNIGHT CFIRST OVERNIGHT GROUND TYPE OF PACKAGE: 0 BOX •, TUBE 0 LETTER 0 PACK 0 OTHER COPIES DATE DESCRIPTION TS 09.02.2016 3+1 (FOOD SERVICE) < 36"; ALL SETS W/ BOLTS/SCREWS —ARCHITECTURAL, MEP (W/ COMCHECK & SPECS ON SHEETS), STRUCTURAL STAMPED, SIGNED, AND DATED.. 1 SET 07.09.2016 1 SET FOOD SERVICE (BRESCO) SPECIFICATIONS (CAFFEINA, COMP. SERVERY, BAR). 1 DOC. 10.23.2012 1 ASBESTOS LETTER & REPORT (8 PAGES TOTAL). 1 TDLR APP. 08.15.2016 1 TDLR APPLICATION SHEET R'CVD. UPON SUBMISSION 08.15.2016. 1 CHECK 08.31.2016 BUILDING PLAN REVIEW FEE (*FEE CALCULATOR = $5,939.21) COMMENTS: *THIS IS FOR YOUR (CITY OF GRAPEVINE) "BUILDING PLAN REVIEW". IF ANY QUESTIONS, PLEASE LET ME KNOW ... JAMES LAWLESS THESE ARE TRANSMITTED AS CHECKED BELOW: 0 For Approval 0 Approved as Submitted 0 Resubmit 0 Copies of Approval • For Your Use 0 Approved as Noted 0 Submit 0 Copies for Distribution 0 As Requested 0 Returned for Corrections 0 Return 0 Corrected Prints • For Review and Comment 0 ,r 0 For Bids Due �0 Prints Returned After Loan to Us Approved by (Dept. Head): % % Date: 09.02.2016 Reviewed by: Approved by (Contract Administration - BL): Date: Date: HFS C ncepis 4 -Lein, ofT wnsmiaol doc Last Updwed 4/20//6 Texas Department of Licensing and Regulation Architectural Barriers Project Registration Confirmation Page Monday, August 15, 2016 EABPRJB6822733 PERSON FILING FORM Name: Julie Gereda Phone: 915-588-6141 Person Address: 10 Silver Crest Drive, El Paso, TX 79902 Ras Number: 00000222 Project Name: Embassy Suites, Dallas DFW Airport North Project Address: Embassy Suits by Hilton 2401 Bass Pro Drive Grapevine, TX 76051 County: Tarrant TENANT Contact Name: Todd Rayburn, General Manager Phone: 972-724-2600 Contact Address: 2401 Bass Pro Drive ... Grapevine, TX 76051 BUILDING/FACILITY Name: Embassy Suits by Hilton FACILITY Owner: Atrium Finance i LP Dallas Ft. Worth Phone: 480-393-1386 Owner Address: 2398 E. Camelback Road Suite 9, Phoenix, AZ 85016 Contact Name: Daniel Abernethy Phone: 678-830-2416 Contact Address: 12734-5 Morris Rd Ext, Ste 400, Alpharetta, GA 30004 Contact Email: dabemethv(datriumhospitality.com DESIGN FIRM Name: HFS Concepts 4 Phone: 562-424-1720 Firm Address: 3229 E. Spring Street Ste. 200, Long Beach, CA 90806 Designer Name: Luis Angulo Email: languloghfsc4.com Type of License: Architect License Number: 24063 PROJECT DESCRIPTION Start Date: 01/2017 Completion date: 06/2017 Estimated Cost: $2,500,000.00 Type of Work: Renovation/Alteration Type of Funds: This project is privately funded, on private land for private use. Are the private funds provided by a tenant? No State Lease No. : Scope of Work: Renovation of I st level Lobby/Atrium and 2nd level partial renovation Does this building(s) have more than one level? Yes Are there any elevators, escalators, or platform lifts in this building? Yes Are there any boiler in this building? Yes This AB Project registration Confirmation Page, construction documents, and applicable fees must be submitted in accordance with the Texas Administrative Code Chapter 68, Rule 68.51. If TDLR will be performing the review or inspection services, see Rule 68.80 If a RAS will be performing the review or inspection services, please contact the RAS as they set and collect their own fees, see Rule 68.75. In accordance with Rule 68.52, the owner of a building or facility must also obtain an inspection from the department or a registered accessibility specialist not later than the first anniversary of the completion of construction. Request for inspection shall be made by completing the Request for Inspection form and submitting it no later than 30 calendar days after the completion of construction. � "�(��� l����l�� Asbestos Inspections & Solution Management October 2I2Q12 MortyMcGahan OFFURTIN Dear Marty McGahan On October 22, 2012, the above- referenced property was inspected for the presence of asbestos containing by and the Texas Asbestos Health Protection Rules (TAHPR). The survey also met the inspection requirements of Texas Senate Bill 509. A total of Twenty -Four (24) samples were collected and analyzed of those materials you indicated would be impacted by the impending renovations, None of the samples collected were found to contain regulated levels ofasbestos. You may present this report to the City of Grapevine building department and it will serve msyour proof ofinspection. I appreciate your business and let me know if I can help you in the future. Sincerely, Mike Glover, |AK8P TDSHSLicense #ZOS573 4120 Prospect Lane - Piano, TX 75093 - (214)755-3773 - Fax (972)596-70 CA Labs Crisp Analytical, L.L.C. CA Labs, L.L.C. 1929 Old Denton Road 12232 lndustriplex, Suite 32 Dedicated to Carrollton, TX 75006 Baton Rouge, LA 70809 Quality Phone 972-242-2754 Phone 225-751-5632 Fax 972-242-2798 Fax 225-751-5634 Materials Characterization - Bulk Asbestos Analysis Laboratory Analysis Report - Polarized Light AISM 4120 Prospect Lane Plano, TX 75093 Attn: Mike Glover Customer Project: 2401 Bass Pro Dr, Grapevine, TX Reference #: CAU 2108528RO Date: 10/23/12 Analysis and Method Summary of polarizing light microscopy (PLM / Stereo microscopy bulk asbestos analysis) using the methods described in 40CFR Part 763 Appendix E to Subpart E (Interim and EPA 600 / R-93 / 116 (Improved). The sample is first viewed with the aid of stereo microscopy. Numerous liquid slide preparations are created for analysis under the polarized microscope where identifications and quantifications are preformed. Calibrated liquid refractive oils are used as liquid mouting medium. These oils are used for identification (dispersion staining). A calibrated visual estimation is reported, should any asbestiform mineral be present. Other techniques such as acid washing are used in conjugation with refractive oils for detection of smaller quantities of asbestos. All asbestos percentages are based on calibrated visual estimation traceable to NIST standards for regulated of asbestos. Traceability to measurement and calibration is achieved by using known amounts and types of asbestos from standards where analyst and laboratory accuracy are measured. As little as 0.001 % asbestos can be detected in favorable samples, while detection in unfavorable samples may approach the detection limit of 0.50% (well above the laboratory definition of trace). Discussion Vermiculite containing samples may have trace amounts of actinolite -tremolite, where not found be PLM should be analyzed using TEM methods and / or water separation techniques. Suspected actinolite/vermiculite presence will be indicated through the sample comment section of this report. Fibrous talc containing samples may even contain a related asbestos fiber known as anthophyllite. Under certain conditions the same fiber may actually contain both talc and anthophyllite (a phenomenon called intergrowth). Again, TEM detection methods are recommended. CA Labs PLM report comments will denote suspected amounts of asbestiform anthophyllite with talc, where further analysis is recommended. Some samples (floor tiles, surfacings, etc.) may contain fibers too small to be delectable by PLM analysis and should be analyzed by TEM bulk protocols. A "trace asbestos" will be reported if the analyst observes far less than 1% asbestos. CA Labs defines "trace asbestos" as a few fibers detected by the analyst in several preparations and will indicate as such under these circumstances. Quantification of <1 % will actually be reported as <=1 % (allowable variance close to 1 % is high). Such results are ideal for point counting, and the technique is mandatory for friable samples (NESHAP, Nov. 1990 and clarification letter 8 May 1991) under 1 % percent asbestos and the "trace asbestos". In order to make all initial PLM reports issued from CA Labs NESHAP compliant, all <i% asbestos results (except floor tiles) will be point counted at no additional charge. Qualifications CA Labs is accredited by the National Voluntary Accreditation Program (NVLAP) for selected test methods for airborne fiber analysis (TEM), and for bulk asbestos fiber analysis (PLM). CA Labs is also accredited by AIHA LAP, LLC. in the PLM asbestos field of testing for Industrial Hygiene. All analysts have a college degree in a natural science (geology, biology, or environmental science) or are recognized by a state professional board in one these disciplines .Extensive in-house training programs are used to augment education background of the analyst. The group leader of polarized light has received supplemental McCrone Research training for asbestos identification. Analysis performed at Crisp Analytical Labs, LLC 1929 Old Denton Road Carrollton, TX 75006 Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 AIHA LAP, LLC Laboratory #102929 Page 1 of 7 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Overview of Project Sample Material Containing Asbestos Customer Project: 2401 Bass Pro Dr, Grapevine, TX CA Labs Project #: CAU 2108528RO Sample # Layer Analysts Physical Description of Asbestos type / # Subsample calibrated visual List of Affected Building estimate percent Material Types No Asbestos Detected. Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Glossary of abbreviations (non -asbestos fibers and non-fibrous minerals): ca -carbonate pe - perlite gypsum - gypsum qu - quartz bi - binder or - organic ma - matrix mi - mica ve - vermiculite of - other fg - fiberglass pa - palygorskite (clay) mw - mineral wool wo - wollastinite to - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples. Page 2 of 7 Crisp Analytical, L.L.C. CA Labs 1929 Old Denton Road Dedicated to Carrollton, TX 75006 Quality Phone 972-242-2754 Fax 972-242-2798 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Overview of Project Sample Material Containing Asbestos Customer Project: 2401 Bass Pro Dr, Grapevine, TX CA Labs Project #: CAU 2108528RO Sample # Layer Analysts Physical Description of Asbestos type / # Subsample calibrated visual List of Affected Building estimate percent Material Types No Asbestos Detected. Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Glossary of abbreviations (non -asbestos fibers and non-fibrous minerals): ca -carbonate pe - perlite gypsum - gypsum qu - quartz bi - binder or - organic ma - matrix mi - mica ve - vermiculite of - other fg - fiberglass pa - palygorskite (clay) mw - mineral wool wo - wollastinite to - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples. Page 2 of 7 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM CAL12108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, Plano, TX 75093 TX Date: Turnaround Time: Samples Received 10/23/12 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent / percent us estimate percent (Y/N) Brown Carpet & Mastic/ BP 01 01-1 brown carpeting y None Detected 100% sy 01-2 tan mastic y None Detected 100% gy,bi Brown Carpet & Mastic/ BP 02 02-1 brown carpeting y None Detected 100% sy 02-2 tan mastic y None Detected 100% gy,bi Brown Carpet & Mastic/ BP 03 03-1 brown carpeting y None Detected 100% sy 03-2 tan mastic y None Detected 100% gy,bi Red Carpet & Mastic/ red BP 04 04-1 carpeting y None Detected 100% Sy Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fg - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other wo - wollastinite ka - kaolin (clay) or - organic pe - partite to - talc be - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic Tanner Rasmussen Analyst QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 6. Anthophyllite in association with Fibrous Talc 2. Fire Damage no significant fiber damages effecting fibrous percentages 7. Contamination suspected from other building materials 3. Actinolite in association with Vermiculite 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 9. < 1 % Result point counted positive 5. Not enough sample to analyze 16. TEM analysis suggested Page 3 of 7 Crisp Analytical, L.L.C. CA Labs 1929 Old Denton Road Dedicated to Carrollton, TX 75006 Quality Phone 972-242-2754 Fax 972-242-2798 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM CAL12108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, Plano, TX 75093 TX Date: Turnaround Time: Samples Received 10/23/12 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent / percent us estimate percent (Y/N) Brown Carpet & Mastic/ BP 01 01-1 brown carpeting y None Detected 100% sy 01-2 tan mastic y None Detected 100% gy,bi Brown Carpet & Mastic/ BP 02 02-1 brown carpeting y None Detected 100% sy 02-2 tan mastic y None Detected 100% gy,bi Brown Carpet & Mastic/ BP 03 03-1 brown carpeting y None Detected 100% sy 03-2 tan mastic y None Detected 100% gy,bi Red Carpet & Mastic/ red BP 04 04-1 carpeting y None Detected 100% Sy Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fg - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other wo - wollastinite ka - kaolin (clay) or - organic pe - partite to - talc be - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic Tanner Rasmussen Analyst QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 6. Anthophyllite in association with Fibrous Talc 2. Fire Damage no significant fiber damages effecting fibrous percentages 7. Contamination suspected from other building materials 3. Actinolite in association with Vermiculite 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 9. < 1 % Result point counted positive 5. Not enough sample to analyze 16. TEM analysis suggested Page 3 of 7 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM CAU 2108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, Plano, TX 75093 TX Date: Turnaround Time: Samples Received 10/23/12 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent / percent us estimate percent (Y/N) 04-2 tan mastic y None Detected 100% gy,bi Red Carpet & Mastic/ red BP 05 05-1 carpeting y None Detected 100% sy 05-2 tan mastic y None Detected 100% gy,bi Red Carpet & Mastic/ red BP 06 06-1 carpeting y None Detected 100% sy 06-2 tan mastic y None Detected 100% gy,bi Blue Carpet & Mastic/ multi - BP 07 07-1 colored carpeting y None Detected 100% sy Blue Carpet & Mastic/ multi - BP 08 08-1 colored carpeting y None Detected 100% sy Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fg - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other wo - wollastinite ka - kaolin (clay) or - organic pe - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic Tanner Rasmussen Analyst f , , e!_ QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 6. Anthophyllite in association with Fibrous Talc 2. Fire Damage no significant fiber damages effecting fibrous percentages 7. Contamination suspected from other building materials 3. Actnolite in association with Vermiculite 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 9. < 1% Result point counted positive 5. Not enough sample to analyze 10. TEM analysis suggested Page 4 of 7 Crisp Analytical, L.L.C. CA Labs 1929 Old Denton Road Dedicated to Carrollton, TX 75006 Quality Phone 972-242-2754 Fax 972-242-2798 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM CAU 2108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, Plano, TX 75093 TX Date: Turnaround Time: Samples Received 10/23/12 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent / percent us estimate percent (Y/N) 04-2 tan mastic y None Detected 100% gy,bi Red Carpet & Mastic/ red BP 05 05-1 carpeting y None Detected 100% sy 05-2 tan mastic y None Detected 100% gy,bi Red Carpet & Mastic/ red BP 06 06-1 carpeting y None Detected 100% sy 06-2 tan mastic y None Detected 100% gy,bi Blue Carpet & Mastic/ multi - BP 07 07-1 colored carpeting y None Detected 100% sy Blue Carpet & Mastic/ multi - BP 08 08-1 colored carpeting y None Detected 100% sy Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fg - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other wo - wollastinite ka - kaolin (clay) or - organic pe - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic Tanner Rasmussen Analyst f , , e!_ QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 6. Anthophyllite in association with Fibrous Talc 2. Fire Damage no significant fiber damages effecting fibrous percentages 7. Contamination suspected from other building materials 3. Actnolite in association with Vermiculite 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 9. < 1% Result point counted positive 5. Not enough sample to analyze 10. TEM analysis suggested Page 4 of 7 Tanner Rasmussen Analyst 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 2. Fire Damage no significant fiber damages effecting fibrous percentages 3. Actinolite in association with Vermiculite 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 5. Not enough sample to analyze QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 6. Amin ophylIite in association with Fibrous Talc 7. Contamination suspected from other building materals 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 9. < 1% Result point counted positive 10. TEM analysis suggested Page 5 of 7 Crisp Analytical, L.L.C. CA Labs, L.L.C. CA Labs 1929 Old Denton Road 12232 Industriplex, Sulte 32 Dedicated to Carrollton, TX 75006 — Baton Rouge, LA 70,309 Quality Phone 972-242-2754 Phone 225-751-5632 Fax 972-242-2798 Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM CAL12108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, Plano, TX 75093 TX Date: 10/23/12 Turnaround Time: Samples Received: 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent / percent us estimate percent (Y/N) Blue Carpet & Mastic/ multi - BP 09 o9-1 colored carpeting y None Detected 100% sy 2x2 Lay In Ceiling Tile/ white BP 10 10-1 surfacing y None Detected 100% 11 37% ce lo -2 tan ceiling tile y None Detected 33% fg 30% qu,pe,ca 2x2 Lay In Ceiling Tile/ tan 38% ce BP 11 11-1 ceiling the y None Detected 32% fg 30% qu,pe,ca 2x2 Lay In Ceiling Tile/ white BP 12 12-1 surfacing y None Detected 100% qu,bi 37% ce 12-2 tan ceiling the y None Detected 34% fg 29% qu,pe,ca Pipe Insulation/ tan insulation 70% fg BP 13 13-1 with foil & paper y None Detected 10% ce 20% bi,ot Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becks line method. ca - carbonate mi - mica fg - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - bruCite bi - binder of -other wo - wollastinite ka - kaolin (clay) or - organic per - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic Tanner Rasmussen Analyst 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 2. Fire Damage no significant fiber damages effecting fibrous percentages 3. Actinolite in association with Vermiculite 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 5. Not enough sample to analyze QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 6. Amin ophylIite in association with Fibrous Talc 7. Contamination suspected from other building materals 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 9. < 1% Result point counted positive 10. TEM analysis suggested Page 5 of 7 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM CAL12108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, Plano, TX 75093 TX Date: 10/23/12 Turnaround Time: Samples Received: 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent / percent us estimate percent (Y/N) Crisp Analytical, L.L.C. CA Labs 1929 Old Denton Road Dedicated to Carrollton, TX 75006 Quality Phone 972-242-2754 y Fax 972-242-2798 CA Labs, L.L.C. 12232 Industriplex, Suite 32 Baton Rouge, LA 70809 Phone 225-751-5632 Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM CAL12108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, Plano, TX 75093 TX Date: 10/23/12 Turnaround Time: Samples Received: 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent / percent us estimate percent (Y/N) Leaf Wall Paper & Mastic/ tan BP 20 20-1 covering y None Detected 25% ce 75% qu,bi Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fg - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other wo - wollastinite ka - kaolin (clay) or - organic pe - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic Tanner Rasmussen Analyst 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 2. Fire Damage no significant fiber damages effecting fibrous percentages 3. Actinolite in association with Vermiculite 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 5. Not enough sample to analyze QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 6. Anthophyllite in association with Fibrous Talc 7. Contamination suspected from other build',ng materials 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 9. < 1% Result point counted positive 10. TEM analysis suggested Page 6 of 7 Pipe Insulation/ tan insulation 71% fg BP 14 14-1 with foil & paper y None Detected 10% ce 19% bi,ot Pipe Insulation/ tan insulation 71% fg BP 15 15-1 with foil & paper y None Detected 10% ce 19% bi,ot Beige Wall Paper & Mastic/ BP 16 16-1 tan covering y None Detected 24% ce 76% qu,bi Beige Wall Paper & Mastic/ BP 17 17-1 tan covering y None Detected 25% ce 75% qu,bi Beige Wall Paper & Mastic/ BP 18 18-1 tan covering y None Detected 26% ce 74% qu,bi Leaf Wall Paper & Mastic/ tan BP 19 19-1 covering y None Detected 27% ce 73% qu,bi Leaf Wall Paper & Mastic/ tan BP 20 20-1 covering y None Detected 25% ce 75% qu,bi Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fg - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other wo - wollastinite ka - kaolin (clay) or - organic pe - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic Tanner Rasmussen Analyst 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 2. Fire Damage no significant fiber damages effecting fibrous percentages 3. Actinolite in association with Vermiculite 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 5. Not enough sample to analyze QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 6. Anthophyllite in association with Fibrous Talc 7. Contamination suspected from other build',ng materials 8. Favorable scenario for water separation on vermiculite for possible analysis by another method 9. < 1% Result point counted positive 10. TEM analysis suggested Page 6 of 7 Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fig - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other we - wollastinite ka - kaolin (clay) or - organic pe - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic f Tanner Rasmussen Analyst 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 2. Fire Damage no significant fiber damages effecting fibrous percentages 3. Actinolite In association with Vermiculite 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 5. Not enough sample to analyze k mit QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 6. Anthophyllite in association with Fibrous Talc 7. Contamination suspected from other building materials e. Favorable scenario for water separation on vermiculite for possible analysis by another method 9. a 1% Result point counted positive 10. TEM analysis suggested Page 7 of 7 Crisp Analytical, L.L.C. CA Labs, L.L.C. CA Labs 1929 Old Denton Road 21-1 covering y None Detected 12232 Industriplex, Suite 32 Dedicated to Carrollton, TX 75006 Brown Wall Paper & Mastic/ Baton Rouge, LA 70809 Quality Phone 972-242-2754 22-1 brown covering y None Detected Phone 225-751-5632 72% qu,bi Fax 972-242-2798 Brown Wall Paper & Mastic/ Fax 225-751-5634 Polarized Light Asbestiform Materials Characterization Customer Info: Attn: Mike Glover Customer Project: CA Labs Project #: AISM Brown Wall Paper & Mastic/ CAL12108528RO 4120 Prospect Lane 2401 Bass Pro Dr, Grapevine, BP 24 Plano, TX 75093 y None Detected TX Date: 10/23/12 Turnaround Time: Samples Received: 10/22/12 2PM Phone # 214-755-3773 24 Hour Date Of Sampling: 10/22/12 Fax # 972-596-7003 Purchase Order #: Sample # Com Layer Analysts Physical Description of Homo- Asbestos type / Non -asbestos fiber Non-fibrous type ment # Subsample geneo calibrated visual type / percent /.percent us estimate percent (Y/N) Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fig - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other we - wollastinite ka - kaolin (clay) or - organic pe - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic f Tanner Rasmussen Analyst 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 2. Fire Damage no significant fiber damages effecting fibrous percentages 3. Actinolite In association with Vermiculite 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 5. Not enough sample to analyze k mit QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 6. Anthophyllite in association with Fibrous Talc 7. Contamination suspected from other building materials e. Favorable scenario for water separation on vermiculite for possible analysis by another method 9. a 1% Result point counted positive 10. TEM analysis suggested Page 7 of 7 Leaf Wall Paper & Mastic/ tan BP 21 21-1 covering y None Detected 25% ce 75% qu,bi Brown Wall Paper & Mastic/ BP 22 22-1 brown covering y None Detected 28% ce 72% qu,bi Brown Wall Paper & Mastic/ BP 23 23-1 brown covering y None Detected 27% ce 73% qu,bi Brown Wall Paper & Mastic/ BP 24 24-1 brown covering y None Detected 27% ce 73% qu,bi Dallas NVLAP Lab Code 200349-0 TEM/PLM EPA H2O TX 01402 TDH 30-0235 A/HA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA -600 / R-93/116) Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method. ca -carbonate mi - mica fig - fiberglass ce - cellulose gypsum - gypsum ve - vermiculite mw - mineral wool or - brucite bi - binder of -other we - wollastinite ka - kaolin (clay) or - organic pe - perlite to - talc pa - palygorskite (clay) Approved Signatories: ma - matrix qu - quartz sy - synthetic f Tanner Rasmussen Analyst 1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers 2. Fire Damage no significant fiber damages effecting fibrous percentages 3. Actinolite In association with Vermiculite 4. Layer not analyzed - attached to previous positive layer and contamination is suspected 5. Not enough sample to analyze k mit QAC Technical Manager Leslie Crisp, P.G. Chad Lytle 6. Anthophyllite in association with Fibrous Talc 7. Contamination suspected from other building materials e. Favorable scenario for water separation on vermiculite for possible analysis by another method 9. a 1% Result point counted positive 10. TEM analysis suggested Page 7 of 7 RELEASED FOR CONSTRUC-nON SHEET., OR LEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE, THIS 8E KEPT ON THE JOB ATALL TIMES s H IF i..`r BUILDING INSPECTlONI DIV15`10 r CONCEPTS q RELEASEDOES S NT AF3P_ r TO CONS —RUCTION IN p EASEMENTS OR L'UBI IG RIGHT -OF -WA`{, n29F 9°�.c"n'm3. 20° g ANGE ° a^.. � Bqw. hh 66242UR0 (( d Yey.�. 1 Fla (E) CONCRETE OVER Iln— EXISTING METAL DECK WALL TO wraarrc ora, REMAIN. ""'"""' mm ora P.MBASSY SUTE5 DALLASDFW AIRPORTNORTI3 (3) 0.145"14 X 1 1/4" \ 2401 B.. Pm Drive 1 LONG POWDER hs. — O®pe me,Tx7(Ast ACTUATED PIN i 3 5/8" x 20 GA. STEEL PRO= nnr PUBLIC AREA INTERIOR UNDERSIDE OF \ �I "� I STUDS AND RENovnrtox 4"x20 GA STUD, 4'-0" O.C. IXISTING I1 I I 'TRACKS STAGGER, MAX. 12'-0" BRACING METAL DECK \ 16' O.C. LENGTH ( \ \ j MAX.— TYP. METAL STUD WALL FRAMING DETAILS I I I I 3 #10 SMS 3 5/820 GA I METAL STUDS i I METAL STUDS 0 16' 0. C. A.F.F. UNE OF CEILING i i , Esm rox p it s ' 3 5/8" 20 GA METAL STUDS DIAGONAL I �- A.F.F.A.FA.F.F. BRACING @ 48" 0. C. STAGGARD BRACING AT DRAPERY POCKET 5/e" THICK GYPSUM BOARD TOP OF WALL DETAIL © BOARD ROOM CEIUNG 3"-1'-0 0 3" 6" 1 1/2" = 1'-0" 0 6" 12" UP " p 1111111 illlll — t� scar: AS NOTED ..9 mwx en RAD mAmm fu SK -2 t SITEEg August 21, 2017 A -Affordable Construction Inc. 6406 Treaschwig Spring, TX 77373 CL LU RE Embassy Suites - DFW Project To Whom It May Concern, Based on visual inspections/observations, it is my professional opinion that the installation of items listed below are structurally sound and have been installed in substantial compliance with industry best practices, the approved Construction Drawings, and/or manufacturer specifications. • Pendant Light Kits Over Bar Area • Fireplace Framing • Lobby Chandeliers • Restaurant Chandeliers • Trellis Framing Please refer to the attached images for clarifications on installation methods. If you have any additional questions, please feel free to contact me: Hisham ElChaar PE 1106 TwinFalls Rd Houston, Tx 77088 isha elc aar (&, a oo.co Tel. 713 7015071 Sincerely, HiSHAM EL CHAAA r �o :.........:.. 76596 Texas Steel Tech LLC 6620 Mineral Wells Hwy Weatherford, TX 76088 817-894-7041 H FS CONCEPTS 4 3229 E. Spring Street Long Beach, CA 90806 Tel: 562-424-1720 Fax: 562-424-3720 Manufacturer: Restoration Hardware SPECIFICATION Project: Embassy Suites Dallas Fort Worth PA Project M 564-PA-FFE Date: 10/19/2016 7:00:00 AM Revision M 0 Source: Restoration Hardware -Trade Bank of America Lockbox Services PO BOX #50081 Los Angeles, CA 90074-0081 Phone: (415)250-4249 ext: 0000 Fax: (415)507-1901 ext: 0000 Contact: - Contact: - Contact: - Contact: - Vendor Contact: Angela King; P:626-375-0067 ;E: Reference M RBX-500 Pendant Light: PENDANTS @ RESTAURANT BAR DESCRIPTION: Solid brass teardrop style pendants suspended in a staggered linear fashion. Light emitted from bottom of fixture by inset LED bulb. NOTE: Electrician to cut suspension cords on site to specified OAL; see dimensions below. DETAILS Construction Brass Dimensions (OAH x OAW x Drop) 72" OAL x 11" OAW X 60" OAH (Mfgr standard dimensions shown; height to Entered By: EA, LG, SP be adjusted on site) NOTE: Suspension cords to be cut on site for OAL of 40" from canopy to bottom of fixture. Coordinate all details with DESIGNER. (H x W x Drop) See above Model No. 68860032 ABRS Finish Burnished Brass Canopy Type Rectangular Suspension Type Black Cord Suspension Finish Black Detail Sheets: RBX-500 QUANTITY: 3 Ea Issued By: Susan Prann ITEM: PENDANTS @ RESTAURANT BAR Entered By: EA, LG, SP ITEM #: RB -500 Page: 1 3229 E. Spring Street Long Beach, CA 90806 Tel: 562-424-1720 Fax: 562-424-3720 Body Type Teardrop Body Material Brass Body Size See above Diffuser None Total Watts / Voltage 42 W SPECIFICATION Project: Embassy Suites Dallas Fort Worth PA Project M 564-PA-FFE Date: 10/19/2016 7:00:00 AM Revision M 0 Ap' prn imp tely *88 ifis./ekh fixture Clearance A.F.F. Approximately 6-10" AFF NOTE: SIDEMARK: PENDANTS OVER BAR @ RESTAURANT BAR (RB -500) ITEM SUMMARY NOTE: 1. Fixture to be UL approved for direct -wire commercial use and carry UL Label. 2. Provide all parts required for complete installation. 3. Provide mounting points and details for coordination with installer. 4. Confirm J -box size prior to fabrication to assure correct attachment detail. 5. Must be contract quality and suitable for commercial use. 6. On-site measurements must be verified by fabricator prior to ordering. 7. Provide Shop Drawing for written DESIGNER approval prior to fabrication. 8. Submit two (2) samples of all specified finishes to DESIGNER for written approval prior to production. Designer will retain one (1) sample. 9. Coordinate all details and submit prototype for approval when requested by DESIGNER. 10. Manufacturer to provide powder coating of metal components to prevent corrosion. 11. Refer to HFS/C4 CUSTOM LIGHTING PREAMBLE and DETAIL SHEET for additional information. AREA TYPE LOCATION QTY RB -Restaurant Bar Restaurant Bar 3 Ea Detail Sheets: RBX-500 QUANTITY: 3 Ea Issued By: Susan Prann ITEM: PENDANTS @ RESTAURANT BAR Entered By: EA, LG, SP ITEM #: RB -500 Page: 2 FS4w 4 SPECIFICATION 3229 E. Spring Street Project: Embassy Suites Dallas Fort Worth PA Long Beach, CA 90806 Project M 564-PA-FFE Tel: 562-424-1720 Fax: 562-424-3720 Date: 10/19/2016 7:00:00 AM Revision M 0 Description: Chandelier Image Detail Sheet #: RBX-500 Detail Sheets: RBX-500 QUANTITY: 3 Ea Issued By: Susan Prann ITEM: PENDANTS @ RESTAURANT BAR Entered By: EA, LG, SP ITEM #: RB -500 Page: 3 BAR RCP ENLARGED PLAN AND ELEVATION H FS 'trlll CONCEPTSA EMBASSY SUITES DALLAS DFW AIRPORT NORTH 2401 Bass Pro Drive Granevine- TX 76051 PUBLIC AREA INTERIOR RENOVATION BAR RCP ENLARGED PLAN & ELEVATION .—(t plB Ip: NN BY SK -22 i1 COLUMN DETAIL SECTION . ,-yr-rb. (� SECTION/ELEVATION &COLUMN DETAIL PLAN i g 3 ELEVATION H FSp Is e,r%Kinrn'Tr A ,, .om wA„wx axxr wire: EMBASSY SUITES DALLAS DEW AIRPORT NORTH 2401 Bass Pro Drive 4 � m PUBLIC AREA INTERIOR RENOVATION ELEVATION OF 2 COLUMNS Q r2 FIRE PLACE/LOUNGE AREA NEcr- - FIREPLACE ENLARGED ro PLAN ELEVATIONS AND i 1 1 I r 1, _ = - 1 I --- I I I I I 4 r r 1 ELEVATION 4 — a r I __- - DETAIL PLAN VIEW 5��E0 iqt pAR — PEV5pN5: B!: Q CONSTRUCTION Ins SET QANUARY 11, 2017 °Ib.: DAR'. 09-D2-3016 seU AS NOTED owAwN ar: wD/si saw NU - 1 1-5.01 FIREPLACE ENLARGED PLAN, ELEVATIONS AND SECTIONS m ME Ross A. Dungca Project Coordinator HFS Concepts4 229 A. SSW- The use of the V2" dia. "Red Head" drop-in anchors in lieu of the hanger detail provided by this office are being or have been installed. As informed, the weight of these chandeliers are only 150# with the 6 attachments (25# per anchor) or 285# with the 9 attachments (32# per anchor) and the "Red Head" drop-in anchors will be inserted as per the vendor's instructions into the bottom of the concrete slab in pre -drilled holes. One "Red Head" anchor can support up to 2,300# in tension which is 8 to 15 times more capacity than the total weight of the chandelier then required. Again, these Red Head anchors are more than capable of supporting these chandelier light fixtures. If there are any questions or further information required, please do not hesitate to call. 9= BEN JR 55896 ay IST ...... RED HEAD .Y2" OXO' -2" STEEL CONCRETE FINISHED CEILING DRIP---IN-ANCHORS, 2" EMBEDMENT. "'0 ALL THREAD ROD LO -500 = 200 LBS. DIRECTLY INTO DROP -IN -ANCHOR, USE 6 ANCHORS CUT DOWN ROD TO REQUIRED LO -501 = 300 LBS. LENGHT (BY OTHERS) USE 9 ANCHORS-----/ FOR 7CHMANIDEUERS BVBASSY SUffl= -CHANCBJER STFUCTLPLAL =AJL 9600 DYER, SPACE "C" El Paso, Texas SK -1 FRONT ELEVATION SCALE: 1/2" = 1'-0" -- 4" OCTAGONAL J -BOX Per Changes: (BY OTHERS) Review / Approved as — (9) 1/2"-13 ALL THREAD u Review/ Approved AND NUT (BY OTHERS) for Production: SECURE TO PRIMARY Date STRUCTURE AS NECESSARY (BY OTHERS) NOTE: CUT DOWN ALL THREAD TO THE REQUIRED LENGTH (BY OTHERS) CEILING LINE CANOPY METAL FINISH: PLATED T STAINLESS STEEL GLASS GLOBES 2"DIA, (24) 7W GU10 MR16 LED 'il T DIA, 5"DIA' 6"DIA 120V DIMMABLE AIRCRAFT CABLE AMBER, LIGHT AMBER, u-- ---- EYELET SMOKE AND CLEAR GLASS GLOBES 2"DIA, 3"DIA,'.. 5"DIA, 6"DIA .. ---- ---- -- AIRCRAFT WIRE (9)3W G9 LED (BYOTHERS) INSIDE 6" GLASS GLOBES AT CENTER GLASS GLOBE DETAIL SCALE: 3" = V-0" --- CANOPY METAL FINISH: PLATED POLISHED STAINLESS STEEL AMBER, LIGHT AMBER, SMOKE AND CLEAR GLASS GLOBES 2"DIA, 3"DIA, 5"DIA, 6"DIA (24) 7W GU10 MR16 LED 120V DIMMABLE REFLECTIVE CEILING PLAN LAYOUT SCALE: 1/2" = V-0" ------ 3"0 ACCESS COVER Q6+ -- --- CLEAR WIRE GLASS GLOBE W/ G9 DETAIL SCALE: 3" = V-0" ®LUSIVE W W W.LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323,227.9207 F: 323,227.9208 E: LD–DESIGN DEPT@LUSIVEDECOR.COM 'rolect Acronym: PW: HESD_ 'ro)ect Name: EMBASSY SUITES DALLAS we�grrer: HFS/ CONCEPTS 4 _— LO -501 Locatlon I Description: CUSTOM CEILING PENDANT LOBBY Qty:Approa. Welaht: 2 300 LBS 81xe: 72"0 X 156"OAH Lampine: (24) 7W GU10 MR16 LED, 120V DIMMABLE (BY OTHERS) Max Wattage Allow : 250 WATTS MAX 16 SUBMITTALDATE DRAFTER PROJCTMA ENAGER __10-27-E.S _ PM _ REV. DATE BY REV. DATETBY 12-2-16 E S 12-8-16 E -. (9)3W G9 LED (BYOTHERS) ------ INSIDE 6" GLASS GLOBES NOTE/STAMP: AT CENTER SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: I__J Review / Approved as Noted for Production: u Review/ Approved for Production: Signature Date INSTALLATION INSTRUCTIONS �1 DISCONNECT POWER. 02PERFORM ELECTRICAL CONNECTION AT 4" OCTAGONAL J -BOX (BY OTHERS). SECURE CANOPY TO 1/2"-13 ALL THREAD (BY OTHERS). ®INSTALL LIGHT BULBS (BY OTHERS). 5�TEST LIGHT BULBS / ELECTRICAL CONNECTION AS NECESSARY PRIOR TO DRESSING FIXTURE. ©ATTACH GLASS SHADE AS NECESSARY WITH HARDWARE PROVIDED. (I)MATCH LABELS ON DECORATIVE ELEMENTS TO LABELS ON PLAN + ON CANOPY (BEGIN AT CENTER OF LAYOUT PLAN) MOUNTING SECTION SCALE: 3" = 1'-0" MOUNTING RCP SCALE: 3/4" = V-0" 4" OCTAGONAL J -BOX (BY OTHERS) (9) 1/2"-13 ALL THREAD AND NUT (BY OTHERS) SECURE TO PRIMARY STRUCTURE AS NECESSARY (BY OTHERS) NOTE: CUT DOWN ALL THREAD TO THE REQUIRED LENGTH (BY OTHERS) FINISHED CEILING CANOPY METAL FINISH: PLATED POLISHED STAINLESS STEEL '24) 7W GU10 MR16 LED 120V DIMMABLE (BY OTHERS) 'ECORETAVE ALLTHREAD BUTTON METAL FINISH: POLISHED STAINLESS STEEL AIRCRAFT CABLE =AR WIRE FOR GLASS 'BES W/ G9 LED CANOPY METAL FINISH: PLATED POLISHED STAINLESS STEEL -- (9) 1/2"-13 ALL THREAD AND NUT (BY OTHERS) SECURE TO PRIMARY STRUCTURE AS NECESSARY (BY OTHERS) NOTE: CUT DOWN ALL THREAD TO THE REQUIRED LENGTH (BY OTHERS) 4" OCTAGONAL J -BOX (BY OTHERS) ®LUSIVE .1USIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E. LD_DESIGN_DEPT@LUSIVEDECOR.COM EMBASSY SUITES DALLAS HFS/ CONCEPTS 4 em.: - LO -501 mafion I DescOption. -- CUSTOM CEILING PENDANT LOBBY M: -- - APProx. Weight -- 2 300 LBS L•ei__... 72"0 X 156"OAH S.Ping; (24) 7W GU10 MR16 LED, 120V DIMMABLE (BY OTHERS) laz wattage Allow: 250 WATTS MAX BY 12-2-16 E.S 12-6-16 ES -- -- _ NOTE/STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review / Approved for Production: Signature Date JI'lGG I JILL. 11 All JnGG 1. L Vr' l l ®LUSIVE WVVW.LUSIVECOM 3400 Medford Street Los Angeles, CA 90063 -- -- T: 323.227.9207 F: 323.2229208 i - -_-- BEGIN STRAND LAYOUT AT CENTER E. LD_DESIGNDEPT@LUSIVEDECOR.COM N-3 l 2 ProectA�ro�Ym H__P°" B ��� , Project Name A3 EMBASSY SUITES DALLAS Al B3 1 $2 AlCode QtY - ._ -- -- A2 1 Desig er. BZ B3HFS/ CONCEPTS 4 A2 B.1 C2 B4 A3 Dl - -- — C3. B 1 C4 G D5 D6 -i It¢m l: D2 C4 $1 Al C � LO-501 Al q B C3 D4 E5 E6 E.1 D� �y r A B3 E2. G5 62 AG D CUSTOM CEILING PENDANT i E4 � E6 F1 E3 01 B3 A E 1— A2 F4 F-3 LOBBY $2 G2 D3 F5� C6 E D2 F3 K6 1 Oy. APProx.Weleht— G1 I�5",1 , — K-1 \ Al B7 ,; K5,. Hl, Bixe: E2 �I1 2 aoo Les F/2 ffl l H2 "> A 1 �J ��� i 1 � � 72"0 X 156"OAH A C6 D� G6 �l E!. H - B;4 1 K4 H 0 D6 02 B`,1 A2 lem (24) - I + 1 i �10 � � (24) 7W GU10 MR16 LED, 120V DIMMABLE G2 H2 F (BY OTHERS) D 1 A' G 1 3 1 K4 3 Mex Wegnge Allow. 6 � I I 3 C15 D6 E6 K, I�9 �'5 G H"4 ;`� � xl� 4 g� B2 250 WATTS MAX E1 C 2 B SUBMITTALDATE DRAFTER PROJECT MANAGER 10-27-16 E.S PM -- —_— BS H H"5,; REV. DATE BY REV. DATE BY E`� _ C4 D5 1�4 K2 ' K5 F 2 D2 4 ' B3 o Al 2.2_,6 Es A,1 . B,2 " H7 12-8 18 E S A3 B1 E4 F3 K1 6 F4 E B4 A2 NOTE/STAMP: — C3 D4 F2- E-5 D-3 G5 E3 .R F1 E6 E A2 B4 C2 D3 E2G6 E5 B`1 'A3 E-1 ' E6 D4 � pn� Al B'3 C1 D2 1J1 D5 C1 X42 Al- CANOPY D-1 A3 B2 CC G5 _ GJ CZ METAL FINISH PLATED POLISHED B-3 A2 STAINLESS STEEL (NOT TO SCALE A2 B1 �: B4 A3 B4_ I',__ __ B-1 Al p B3. B2 Al AJA __ At- q A2 __ (24) 7W GU10 MR16 LED A- 1 A-3 120V DIMMABLE -- _.- (9)1/2"-13 ALL THREAD AND NUT (BY OTHERS) SECURE TO PRIMARY STRUCTURE AS NECESSARY (BY OHE STRAND LAYOUT NOTEETCUT DOWN ALL THREAD TO THE REQUIRED LENGTH (BY OTHERS) SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review / Approved for Production: Signature Date E E6 _ Al 1 3205(1263/16') EIS E 14pc l _I � for Production: A2 � 3140(123 5/6" _) #50/W #50/Y i., E A3 3075(1211/16') I_ t, #50/Y I #50/W 14pc B1 Code L, _ I _ Al 1 3205(1263/16') #501Y #50/W 14pc l _I � for Production: A2 � 3140(123 5/6" _) #50/W #50/Y 14pc A3 3075(1211/16') I_ t, #50/Y I #50/W 14pc B1 '', 3360(1329/32") #50/Y '', #80/W ''' #50/W 9pC B2 3435(13515/64") #80/Y #50/W #80/Y I 9pC 63 3360(1329/32') #50/W #80/Y #50/Y- 9pc- B4 �..- 3435(13515/64') #801W #50N #80/W 911oC 20*18*18*T1.0mm clip 01.6*H3mm eyelet 00.6mm S.S wire i J I _ 6 eyelet I _ 7 w r i N m eyelet 1 I Al A2 A3 eyelet B1 B2 B3 B4 #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE WVVW.LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323 227 9208 E: LD_DESIGN_DEPT@LUSIVEDECOR.COM 'ro ect Aeron _ —-- Ym: HE_SD 'rojoct Nemo: EMBASSY SUITES DALLAS HFS/ CONCEPTS 4 LO -501 Locationl DmcriPgon: _.... CUSTOM CEILING PENDANT LOBBY APProt. Weight: 2 300 LBS 72"0 X 156"OAH (24) 7W GU10 MR16 LED, 120V DIMMABLE (BY OTHERS) Nattage Allow: -- -- 250 WATTS MAX AITTAL DATE ONAPTEft PROJECT MANAGER 0-27-16 E.SPM V. DATE BY REV. DATE�— 12-2-16_ ES 12 &16 ES NOTE / STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes Review / Approved as (� Noted for Production: l _I Review/ Approved for Production: Signature Date SHEET SIZE: 11 X 17 SHEET: 4 OF 11 E$ L i. E E Ea E E ` f Review / Approved � 1 for Production:-� `ry Signature 7 Cl C1 C2 C3 C4 C5 C6 Code L #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS 1 ` f C1 C2 C3 C4 C5 C6 Code L #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z Review / Approved for Production:-� Signature Date Cl 3500(13751/64") #50N #80fW #80N 1 #50/W 5pc C2 3575(137 51164") #50/W #80/Y #80IW #50/Y ''I 5pc C3 3500 #50N #50N #80IW #50/W 5pc C4 i 3575 #50/W #801W I #50/Y 11 5pc C5 3500 I #50/Y #80/W #80N #50/W !, 5pc C6 3575 #50/W #801Y #80/W :i #50N 5pc #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE VWM LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9206 E: LD_DESIGN_DEPT@LUSIVEDECOR.COM 'rolact Acronym: pDX: HE_SD� rolect Nem¢: EMBASSY SUITES DALLAS HFS/ CONCEPTS 4 LO -501 Lm do / Doe Iption: CUSTOM CEILING PENDANT LOBBY Oly: APProz. Woigftt 2 300 LBS 72"0 X 156"OAH (24) 7W GU10 MR16 LED, 120V DIMMABLE I La"p„a (BY OTHERS) Maz Wattage Allow. 250 WATTS MAX SUBMITTAL DATE bRAFTER PROJECTMANAGER 10-2716__ E.S Pte___ rKE.S1 STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review / Approved for Production:-� Signature Date D4 D5 Code ' L I D1 3670(14431/64") #50N#50IW #80/Y #80lW i ' 4pc C C� Date D2 3570(14035/64") #50/W #60/Y 1 #50/Y 4pc D3 3670 #50N I #80AN #80/W #50/Y 1 4pc D4 3570 #50IW #80/Y I #80N #501/ 4pc D5 3670 #50N I #80N #801W #50IW II 4pc D6 3570 #50/W J #80/Y #50/Y 4pc ®LUSIVE VWM IUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD_DESIGN_DEPT@LUSIVEDECOR.COM aolact Acronym: POR: HESD_=— rolact Name: EMBASSY SUITES DALLAS -- HFS/ CONCEPTS 4 yam a: — LO -501 .ovation 1 Daacoptlon -- CUSTOM CEILING PENDANT LOBBY ]ty: APprox. WeighT 2 300 LBS 72"0 X 156"OAH ...ping: (24) 7W GUiO MR16 LED, 120V DIMMABLE (BY OTHERS) aax Waltaga —All- 250 llow:250 WATTS MAX iUBM1TTAL—DATE "RAFTER PROJECTMANAGER 10-27-16 ES_ PM REV. DATE BY R�DAATEBY 12. D E,S 12-8-16 ES NOTE/STAMP SHOP DRAWING APPROVAL #50- 2"DIA GLASS #80-3"DIA GLASS #120-5"DIA GLASS #150-6"DIA GLASS CLEAR GLASS FINISH: W MEDIUM AMBER FINISH: X SMOKE GLASS FINISH: Y LARGE AMBER FINISH: Z Revised/Resubmit Per Changes: Nosed for ProdApproved uction. Review/Approved for Production: Signature C C� Date a 4 E1 E2 Code L Revised / Resubmit Per Changes #80-3"DIA GLASS MEDIUM AMBER FINISH: X Review /Approved asNoted for j #120-5"DIA GLASS E1 3740(1471/4") #50/W I #120/X I #80/W li #120/Z -- #50N 4pc E2 3670(14431/640 #50/W #120/W #80/Z #50/W 4pc E3 3740 #50/X i #80/Z #120/X #50/Y 4pc E4 3680(1447/8") #50/W #120/X #120/Z #80AN#50/Y 4pc 4 #50/W #120/Z #80/X #120/Y #50/W 4pc E6 3680 #50/W #80/Z #120/W #50/X I 4pc ®LUSIVE W W W.LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LO_DESIGN DEPTQLUSIVEDECOR.COM rolaot —A Y ym H_ESu 'rolact Name: EMBASSY SUITES DALLAS HFS/ CONCEPTS 4 LO -501 Longo 11) Ipfi— CUSTOM CEILING PENDANT LOBBY CRY: APProa. WeigftF. -_- 2 300 LBS 72"0 X 156"OAH Lamaing: -- (24) 7W GU 10 MR16 LED, 120V DIMMABLE (BY OTHERS) Maawmraga Agow: ---- 250 - -250 WATTS MAX SUBMITTAL DATE ORAFTER PROJECT MANAGER o z? -1s E S PM 1z -a -1s Es NOTE / STAMP: SHOP DRAWING APPROVAL #50- 2"DIA GLASS CLEAR GLASS FINISH: W Revised / Resubmit Per Changes #80-3"DIA GLASS MEDIUM AMBER FINISH: X Review /Approved asNoted for j #120-5"DIA GLASS SMOKE GLASS FINISH: Y Review /Approved Review/Appr vee for Production: #150-6"DIA GLASS LARGE AMBER FINISH: Z Signature Date F4 F5 I F6 Code__ 4 ` MEDIUM AMBER FINISH: X v SMOKE GLASS FINISH: Y F1 F2 F3 F4 F5 I F6 Code__ L #80-3"DIA GLASS MEDIUM AMBER FINISH: X v SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z F1 3795(14913/3z) #50/X I #80/W F4 F5 I F6 Code__ L #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z F1 3795(14913/3z) #50/X #120/Z #80/W #120/Z J #50/Y 4pc F2 i 3795 #50/W #150/Y #80/Z #120/W #50/X 4pc F3 _I 3795 #50/Z #80/W #120/X li #50/W 4pc F4 3795 #50/X #120/X #80/W #150/W #50/Y % 4pc F5 1 3795 #50/W #120N I #80/X #120/Z #50/Y 4pc F6 3795 #50/Z i #80/W #150/Z I #120/X #50/W 4pc #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE WVWV LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD DESIGN DEPT@LUSIVEDECOR.COM oacucrPnYm.HESD PoM. — 'roject Nemo: EMBASSY SUITES DALLAS HFS/ CONCEPTS 4 ------- LO-501 .ocatbn / Daecrwon: -- CUSTOM CEILING PENDANT LOBBY NY: -- App— Weight- : ---2 300 LBS ---- 72"0 X 156"OAH amPieg: __ _..— (24) 7W GUI MR16 LED, 120V DIMMABLE (BY OTHERS) Aax W.Up Allow: 250 WATTS MAX UBMITTAL DATE DRAFTER PROJECTMANAGER 10-27-16 ES __ PM _ REV.DATE BY REV. DATE BY 12 2-16 E 12-8-16 ES NOTE/STAMP cunD MDA%Annlc ADnD!'1ArAi Revised / Resubmit Per Changes: Review / Approved as 1 1 Noted for Production: �_ Review / Approved for Production: u Signature Date T y f m m m in 7 m r 0 I K2 K3 K4 K5 K6 Code L Per Changes: Review / Approved as Noted for Production: K1 3835(151")#50/W for Production: #120/X #8( #120N #50/W 2pc K2 3835#50/Z #80/Y #150/Z #120/X #50/Y 2pc K3 3835 #50/W #80/Y #120/X #50/W 2pc K4 3835 #50/X #120/Z #80NV #150N #50/Z 2pc K5 3835 #50/Y #80/X 1 #120N #120/W #50/Z 2pc 1 K6 3835 #50/W i #80/W #1201W2 #50/W 2pc pc #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z EDLUSIVE WVVW.LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD DESIGN_DEPT@LUSIVEDECOR.COM ,aantA_ren,m:HESD PDa. — 'raJJect N.— EMBASSY SUITES DALLAS halo -r HFS/ CONCEPTS 4 am x: — LO -501 -ation 1 Description: CUSTOM CEILING PENDANT LOBBY xtr: APorax. welgne 2 300 LBS 4.- 72"0 . -72"0 X 156"OAH .a-pl-: -- -- (24) 7W GU10 MR16 LED, 120V DIMMABLE (BY OTHERS) liax Wattage Allow: -- -- 250 WATTS MAX 'UBMITTAI DATE DRAFTER PROJECT MANAGER 10-27-16 ES PM _ REV. DATEBY REV. DATE BY 12-2-16 E.S 12-8-16 E.S -- --- NOTE/STAMP SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review / Approved F for Production: L Signature Date SHEET SIZE: 11 X 17 (SHEET: 9 OF 11 ®LUSIVE W W W LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD_DESIGN DEPT@LUSIVEDECOR.COM roject Acronym: POO: _ HESD_�_ roject Neme: EMBASSY SUITES DALLAS _.-- HFS/ CONCEPTS 4 - LO -501 ocatlon I Deacrlpllom CUSTOM CEILING PENDANT LOBBY m: Avvro:. walene: __—_ 2 300 LBS 1=a — 72" 0 X 156"OAH amPing: — (24) 7W GU10 MR16 LED, 120V DIMMABLE (BY OTHERS) taxWattag AAllow: -- 250 WATTS MAX DBMITTALDATE DRAFTER PROJECTMANAGER 10-27-i6 E S PM REV. DATE BY REV.D_ATFBBY 12-2-16 E S 12-8-16 E.S NOTE/STAMP SHOP DRAWING APPROVAL Revised / Resubmit Code L Review / Approved as F - Noted for Production: I I 33860' ##80/Y Date JI #50/Z Pc H3 #50/X #150/W #80 # 00/W 1Pc� H5 3860 I #50/Z #80N #12 0/Z #150N #50/X 1 c P I, , H7 3860 #50/Z #120/W #80/Y #80/W #150/X #50/Z IPC H9 3860 #50/X #80N #150/W #80/X #50/Z — 1P c H11 3860 #50/Z #80N #1202 #150N #50/X 1 Pc a e 6" GLASS GLOBES W/ G9 LEDS- H2, I H4, H6, H8, H10, H12 I i f gg I - �o - 7 EX E y n = EIS m= — W2 I I l � III i � m H10 m m H8 H3 H5 H7 H9 H11 #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE W W W LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD_DESIGN DEPT@LUSIVEDECOR.COM roject Acronym: POO: _ HESD_�_ roject Neme: EMBASSY SUITES DALLAS _.-- HFS/ CONCEPTS 4 - LO -501 ocatlon I Deacrlpllom CUSTOM CEILING PENDANT LOBBY m: Avvro:. walene: __—_ 2 300 LBS 1=a — 72" 0 X 156"OAH amPing: — (24) 7W GU10 MR16 LED, 120V DIMMABLE (BY OTHERS) taxWattag AAllow: -- 250 WATTS MAX DBMITTALDATE DRAFTER PROJECTMANAGER 10-27-i6 E S PM REV. DATE BY REV.D_ATFBBY 12-2-16 E S 12-8-16 E.S NOTE/STAMP SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as F - Noted for Production: Review/Approved for Production: Signature Date Code L Per Changes: Review / Approved as Noted for Production: Review/Approved - 3x6 4 ) for Production: 0 Ev n E G3 3880 #50/Y #80/W #80/Y #50lX #120/ZL #50 X 1PD Code L Per Changes: Review / Approved as Noted for Production: Review/Approved - 3x6 4 ) for Production: 0 Signature - G3 3880 #50/Y #80/W #80/Y #50lX #120/ZL #50 X 1PD I' l J1 38658($503") I #50/Z #80/Y #80/X #50/X #80/W #50/Y 1pD 6" GLASS GLOBES W/ G9 LEDS- G2, G4, G6 20'18`18*T1.0mm clip E E4 _ 01.6'1-13mm eyelet E --- 00.6mm S.S wire Gs eyelet eyelet eyelet G5 J1 #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE WA'W.LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9206 E: LD_OESIGN DEPT@LUSIVEDECOR.COM 'rolect Acronym: pOa: --- HESD__ 'rolect Neme: EMBASSY SUITES DALLAS HFS/ CONCEPTS 4 LO -501 ocat1on,0e-1pt1on:- -- CUSTOM CEILING PENDANT tma: LOBBY Hy: APProx. M-Ight: 2 300 LBS Iha: 72"0 X 156"OAH (24) 7W GU10 MR16 LED, 120V DIMMABLE (BY OTHERS) Aa>; WaltaBn Allow: - — 250 WATTS MAX :us— AL DATE -RAFTER PROJECTMANAGER M'-16 E.S PM 12-6-i6 E S NOTE/STAMP SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review/Approved F for Production: Signature Date FRONT ELEVATION SCALE: 3/4" = V-0" SEE MOUNTING DETAIL -_... 4" OCTAGONAL J -BOX - GLASS GLOBES 2" DIA, (BY OTHERS) r>• -- - (6) 1/2"-13 ALL THREAD EYELET AND NUT (BY OTHERS) It it,II SECURE TO PRIMARY I II STRUCTURE AS NECESSARY RI II II I R I II l p 1,. (BY OTHERS) II I RI I II II 1 ,I NOTE: CUT DOWN ALL THREAD pl II IIII III 111 II 10. TO THE REQUIRED LENGTH I I l l 11 j II III I I (BY OTHERS) IRI II IIII IIj Ijj �I I� III Ip II CEILING LINE I RI II IIII II IRI II II II I11 I --- CANOPY II II II I Itl ql METAL FINISH: PLATED POLISHED I RI I Ilj II j l jj STAINLESS STEEL R I II II II 1 I II 1 I -- (22) 7W GUtO MR16 LED I lit" 111 II Itl 1 120V DIMMABLE (BY OTHERS) 11 I I I R (� -�{{{I IT 1 1 I �iI AIRCRAFT CABLE III Ipl)tt II qyI VV jj I SMOKE AND 1 `� Il1011 CI EAR GLASS GLOBES (73)2"0. (44) 3"0. 11 `b (18) 5"0'(22) 6" 0 II ill�ly�yyi n, � 1 j II j (5) 3W G9 LED (BY OTHERS) I III Op INSIDE 6" GLASS GLOBES ill ipj l AT CENTER IIII In ai Ia Itl f"' I� �II{I(N IIII 1 I �j Iii II III1 I"P • • 'MOO •'' a ii • • � f's � S REFLECTIVE CEILING PLAN SCALE'. 3/4" = 1'-0" -_-_-- CANOPY METAL FINISH: PLATED POLISHED STAINLESS STEEL - --- AMBER, LIGHT AMBER, SMOKE AND CLEAR GLASS GLOBES (73)2"0,(44) 3"0, (18) 5'.0'(22)6"0 ---..--- (22) 7W GUtO MR16 LED 120V DIMMABLE (BY OTHERS) ------- 3"0 ACCESS COVER -- — (5) 3W G9 LED (BY OTHERS) INSIDE 6" GLASS GLOBES AT CENTER GLASS GLOBE DETAIL SCALE. 3" = 1'-0" C6+ GLASS GLOBE W/ G9 DETAIL SCALE: 3" = 1'-0" ®LUSIVE NWVW.LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD_DESIGN_DEPT@LUSIVEDECOR.COM --- CLEAR CORD (5) 3W G9 LED (BY OTHERS) INSIDE 6" GLASS GLOBES AT CENTER 12-8-16 ES_ NOTE/STAMP: SHOP DRAWING APPROVAL Revised / Resubmit EMBASSY SUITES DALLAS GLASS GLOBES 2" DIA, oaalg�r� – WDIA,5"DIA'6"DIA HFS/ CONCEPTS 4 EYELET LO -500 Review / Approved Locehun/DPscnpt— -- for Production: CUSTOM CEILING PENDANT — AIRCRAFT WIRE Am-- — -_ LOBBY �APProz. Weigh: 1 200 LBS size! --- 48"0 x 120"OAH L..ping: (22) 7W GU10 MR16 LED 120V DIMMABLEBY OTHERS MaR Wattage Allow 160 WATTS MAX --- CLEAR CORD (5) 3W G9 LED (BY OTHERS) INSIDE 6" GLASS GLOBES AT CENTER 12-8-16 ES_ NOTE/STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: 1 Review / Approved as Noted for Production: 1 Review / Approved for Production: Signature Date SHEET SIZE: 11 X 17 ( SHEET: 1 OF 9 INSTALLATION INSTRUCTIONS J1 DISCONNECT POWER. 02 PERFORM ELECTRICAL CONNECTION AT 4" OCTAGONAL J -BOX (BY OTHERS). �3 SECURE CANOPY TO 1/2"-13 ALL THREAD (BY OTHERS). *INSTALL LIGHT BULBS (BY OTHERS). 5�TEST LIGHT BULBS / ELECTRICAL CONNECTION AS NECESSARY PRIOR TO DRESSING FIXTURE. ©ATTACH GLASS SHADE AS NECESSARY WITH HARDWARE PROVIDED. (7 MATCH LABELS ON DECORATIVE ELEMENTS TO LABELS ON PLAN + ON CANOPY (BEGIN AT CENTER OF LAYOUT PLAN) MOUNTING SECTION SCALE: 3" = V-0" "a41 MOUNTING RCP SCALE: 3/4" = V-0" (BY OTHERS) HFS/ CONCEPTS 4 FINISHED CEILING CANOPY METAL FINISH: PLATED POLISHED STAINLESS STEEL (22) 7W GU10 MR16 LED 120V DIMMABLE (BY OTHERS) DECORETAVE ALLTHREAD BUTTON METAL FINISH: POLISHED STAINLESS STEEL AIRCRAFT CABLE _AR WIRE R (6) 1/2"-13 ALL THREAD AND NUT (BY OTHERS) SECURE TO PRIMARY STRUCTURE AS NECESSARY (BY OTHERS) NOTE: CUT DOWN ALL THREAD TO THE REQUIRED LENGTH (BY OTHERS) METAL FINISH: PLATED POLISHED STAINLESS STEEL 3"0 ACCESS COVER / - 4" OCTAGONAL J -BOX (BY OTHERS) LO -500 Locatlon / Ooscriptlon: CUSTOM CEILING PENDANT LOBBY Oty: Approx. Weight: 1 200 Les Sim- 48"0 ie: —_48"0 x 120"OAH (22) 7W GU10 MR16 LED 120V DIMMABLE (BY OTHERS__ Max Wattage Ali - 160 WATTS MAX BY [12-2-1 1 ES 12-8-i6_-_ E.S — _ NOTE / STAMP: SHOP DRAWING APPROVAL ®LUSIVE 4" OCTAGONAL J -BOX W WN.LUSIVE.COM (BY OTHERS) 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD_DESIGN_DEPT@LUSIVEDECOR.COM (6) 1/2"-13 ALL THREAD AND NUT (BY OTHERS) rrojact Acronym: HESD P0564-PA-FFE-0045 Project Name: -- -'— SECURE TO PRIMARY STRUCTURE AS NECESSARY (BY OTHERS) EMBASSY SUITES DALLAS NOTE: CUT DOWN ALL THREAD TO THE REQUIRED LENGTH beelgnor: _._ - (BY OTHERS) HFS/ CONCEPTS 4 FINISHED CEILING CANOPY METAL FINISH: PLATED POLISHED STAINLESS STEEL (22) 7W GU10 MR16 LED 120V DIMMABLE (BY OTHERS) DECORETAVE ALLTHREAD BUTTON METAL FINISH: POLISHED STAINLESS STEEL AIRCRAFT CABLE _AR WIRE R (6) 1/2"-13 ALL THREAD AND NUT (BY OTHERS) SECURE TO PRIMARY STRUCTURE AS NECESSARY (BY OTHERS) NOTE: CUT DOWN ALL THREAD TO THE REQUIRED LENGTH (BY OTHERS) METAL FINISH: PLATED POLISHED STAINLESS STEEL 3"0 ACCESS COVER / - 4" OCTAGONAL J -BOX (BY OTHERS) LO -500 Locatlon / Ooscriptlon: CUSTOM CEILING PENDANT LOBBY Oty: Approx. Weight: 1 200 Les Sim- 48"0 ie: —_48"0 x 120"OAH (22) 7W GU10 MR16 LED 120V DIMMABLE (BY OTHERS__ Max Wattage Ali - 160 WATTS MAX BY [12-2-1 1 ES 12-8-i6_-_ E.S — _ NOTE / STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review / Approved for Production: Signature Date BEGIN STRAND LAYOUT AT CENTER CANOPY METAL FINISH: PLATED A3POLISHED STAINLESS STEEL tttJJJ . B, C3' • i STRAND LAYOUT (22) 7WGU10 MR16 LED 120V DIMMABLE (BY OTHERS) BY 12-2-16 1 ES NOTE/STAMP: SHOP DRAWING APPROVAL Revised / Resubmit ®LUSIVE Review / Approved as W W W. LUSIVE.COM Noted for Production: 3400 Medford Street for Production: Los Angeles, CA 90063 Signature Date T: 323.227.9207 F: 323.227.9208 E'. LD_DESIGN_DEPT@LUSIVEDECOR.COM --- Prolect Acronym: POP: HESD POS--PA-FFE-0045 '-- Code(� Qty , Prolect Neme: EMBASSY SUITES DALLAS A 1�I— - Dpelgrwr. B 1 HFS/ CONCEPTS 4 C- D 1 _. LO -500 --- --- E 1 locagcn,Dmcrlpt1 n. CUSTOM CEILING PENDANT F1 Area: G 1 LOBBY 1 2N LBS 48"0 x 120"OAH �amvi�e: (22) 7W GU10 MR16 LED 120V DIMMABLE SBY OTHER M.. Wattage Allow: 160 WATTS MAX BY 12-2-16 1 ES NOTE/STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review / Approved for Production: Signature Date I 0 0 0 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23 A24 Cod e 1 L #80-3"DIA GLASS Al 2550(150 25/64^) 1 #50/Y I #50/W A2 '', 2485(97 53/64") #50/W !, #50/Y A3 ''' 2420 #50/Y#50/W A4 2550 #50/Y #50/W A5 !, 2485 #50/W #50/Y A6 2420 #50/Y 1I #50/W A7 2550 #50/Y #50/W A8 2485 #50/W #50/Y A9 ! 2420 #50/Y #50/W A101 2550 #50/Y #50/W All i 2485 #50AN #50/Y Al2 2420 #50/Y 1#50/W A13 2550 #50/Y #50/W 2485 #50/W #50/Y A15 2420 #50/Y #50/W A16 2550 #50/Y #50/W 2485 #50/W #50/Y A18 2420 #50/Y #50/W A19 2550 #50N #50/W A20 2485 #50/W #50/Y A21 2420 #50/Y #50/W A22 2550 #50/Y #50/W A23 2485 , #50/W #50/Y A24 ''! 2420 #50/Y #50/W #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE . LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323 227 9208 E LD_DESIGN_DEPT@LUSIVEDECOR.COM EMBASSY SUITES DALLAS signer. ---- HFS/ CONCEPTS 4 m.: LO -500 cation I Description: CUSTOM CEILING PENDANT LOBBY r: -- Approa. Waigh _- 1 200 LBS 48"0 x 120"OAH (22) 7W GU10 MR16 LED 120V DIMMABLE (BY OTHERSL__ is Wattage Allow: 160 WATTS MAX 12-2-16 1 E S 12-8-i6 ES [NOTE/STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as Noted for Production: Review / Approved F for Production: Signature Date ®LUSIVE IAMW LUSIVE.COM 3400 Medford Street -- `-- r -- 1 -- f---- -- r -----323.227,9207 _-- -_--- -- Cod --- - Los Angeles, CA 90063 T: F: 323.227.9208 I I i I DESIIGN_DEPT@LUSIIVEDECOR.COM Pro)a tDc HESD P0664-PA-FFE-0045 I ") /Y #80/W B1 2650(10421/64 #50 #50/W EMBASSY SUITES DALLAS B2 2725(1079/32') #80/Y #50/W #80/Y - o B3 2650 #50/W #80/Y #50/Y 1 — HFS/ CONCEPTS 4 EE N E o N N — 4 2725 B/VV #80#50/Y #80/W am«, " ` , I Bs 2850 I I #50/Y #80/W #50M/ LO-500 m o ' � a , a o -- - 68 l 2725 I— #80/Y #50/W #80/Y Localionl Deacriptlon: CUSTOM 1 M } #50/Y CEILING PENDANT Area: -- LOBBY M o O o N N NBS 2725 #80/W #50/Y ! #80/VV - I 1 l � 69 - 2650 #50/Y i #80/VV 5 /W Oty: _ APProx. Walilht: 1 200 LBS B1 B2 63 B4 B5 B6 B7 68 B9 610 B10 2725 #80/Y #50/W #80/Y 5xa: - 48"0 x 120^OAH B11 i 2650 /W #80/Y j- J #50/Y 612 2725 #80/VV #50/Y #80/NV LemPinB _— (22) 7W GU10 MR16 LED 120V DIMMABLE (BY OTHERS__ - -- - I 613 2650 - { #50/Y #80/W #50/W Mex Wattego Allow: 160 WATTS MAX B 14 2725 #80/Y #50/W #80/Y E DRAFTER VROJECT MANAGER ES P M E BY REV.DATE BY B15 2650 #50AN #80N #50/Y r12-2-16 es o 2725 #801W #50/Y #80/W E.S816 - -- NOTE/STAMP: N N N N N N 2650 #50/Y #80/W #50W L t 1 I B18 2725 1 p /\/ #80/Y #50/W l#80r N O O O 1 O O M O B19 2850 #50/W #80/Y II #50/Y I y O I 1 �, N - B20 2725 � #80/W l #50/Y #80/W a t a I� 1 { ♦ - O {- 3— Y �-l.' i —Y 1 1 ' l.' B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: #50- 2"DIA GLASS CLEAR GLASS FINISH: W Review vedas Noted forrPProdroduction: #80-3"DIA GLASS MEDIUM AMBER FINISH: X Review/Approved for Production: #120-5"DIA GLASS SMOKE GLASS FINISH: Y Signature Date #150-6"DIA GLASS LARGE AMBER FINISH: Z ---- SHEET SIZE: 11 X 17 SHEET: 5 OF 9 N 1 C8 COLI e L SHOP DRAWING APPROVAL Revised / Resubmit r Per Changes: Review rProd Production Noted for Production. Review/Approved for Production: �J Signature Date -. --- En Cl 2755(10815/32^) E� #120/W #80/Y % � C2 2830(11127/64") N A #80/Y t ry #50/Y C3 ( I th #50/Y #120/Y #80/W #50/W N - Cl C2 C3 N 1 C8 COLI e L SHOP DRAWING APPROVAL Revised / Resubmit r Per Changes: Review rProd Production Noted for Production. Review/Approved for Production: �J Signature Date -. --- Cl 2755(10815/32^) #50/Y #120/W #80/Y % #50/W C2 2830(11127/64") #50/W #80/Y #80/W #50/Y C3 ( I th #50/Y #120/Y #80/W #50/W - 0 C4 2830 #50/W #80/W /Y #120 i #50/Y C4 C5 #50/Y C6 #80/Y C7 N 1 C8 COLI e L SHOP DRAWING APPROVAL Revised / Resubmit r Per Changes: Review rProd Production Noted for Production. Review/Approved for Production: �J Signature Date -. --- Cl 2755(10815/32^) #50/Y #120/W #80/Y % #50/W C2 2830(11127/64") #50/W #80/Y #80/W #50/Y C3 ( 2755 #50/Y #120/Y #80/W #50/W - I C4 2830 #50/W #80/W /Y #120 i #50/Y C5 2755 #50/Y #120/W #80/Y #50/W C6 2830 1 #50/W #80/Y #80/W #50/Y I C7 f 2755 #50/Y #120/Y #80/W #50/W C8 2830 #50/W #80/W #120N #50/Y C9 2755 #50/Y #120/W #80/Y #50/W I C10 2830 #50/W #80/Y #80/W I #50/Y C11 2755 i #50/Y #120N #80/W #50/W C12 2830 #50/VV #80/W li #120/Y _ #50/Y C13 '', 2755 #50/Y #120/W #80/Y #50/W C14 2830 #50/W #80/Y #80/W #50/Y C15 J2755#50/Y #120/Y #80/W #50/W C16 2830 #50/W #80/W - _ #120/Y #50/Y ®LUSIVE IMNW.LUSIVECOM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E. LD_DESIGN_DEPT@LUSIVEDECOR.COM a,ect Aoroaym. HESD PD.. 0 - EMBASSY of ct Name: � EMBASSY SUITES DALLAS grer. HFS/ CONCEPTS 4 li-LO-500 CUSTOM CEILING PENDANT— LOBBY city: _.... Approz. Welghl 11 200 Les Bka: -- 48"0 x 120"OAH (22) 7W GU10 MR16 LED 120V DIMMABLEYOTHERS)_____ Jaz WaRaga Allow: 160 WATTS MAX IUBMITTAL DATE DRAFTER PROJECT MANAGER 11_11-16 ES P M REV.DATE BY REV. DATE BY 12-2-16 E.S 12-8-16 E.S NOTE/STAMP C9 C10 C11 C12 C13 C14 C15 C16 #50- 2"DIA GLASS #80-3"DIA GLASS #120-5"DIA GLASS #150-6"DIA GLASS CLEAR GLASS FINISH: W MEDIUM AMBER FINISH: X SMOKE GLASS FINISH: Y LARGE AMBER FINISH: Z SHOP DRAWING APPROVAL Revised / Resubmit r Per Changes: Review rProd Production Noted for Production. Review/Approved for Production: �J Signature Date -. --- N � } E E D2 D3 D4 D5 D6 7 D7 D8 m i D9 D10 Cod e L #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y D1 2880(11325/64") #50/Y ' #80/Y i I #120/W #50/W D2 2780(10929/64") #50/W #120/Y #50/Y D3 1 2880 #50/Y #80/W #120/VV #50/Y D4 2780 #50/W #120/Y #80/Y i #50/W D5 2880 #50/Y #80/Y j #120/W #50/W D6 2780 #50/W #120N #50/Y D7 2880 #50/Y #80/W #120/W #50/Y D8 2780 #50/W #120/Y #80/Y #50/W 2880 #50/Y #80/Y 1 #120/W #50/W D10 2780 #50/W #120/Y #50/Y D11 2880 , #50/Y #80/W #120/W #50/Y D12 2780 #50/W #120/Y #80/Y #50/W #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z 0LUSIVE Wl4NV LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T'. 323.227.9207 F: 323.227.9208 E: LD DESIGN DEPT@LUSIVEDECOR.COM o1a�tA�.PnYm.HESD POx. P0564-PA-FFE-0045 ojact Name: EMBASSY SUITES DAL I AS a„gam.. HFS/ CONCEPTS 4 em x: LO -500 acation / D¢acrlptlon: ---- CUSTOM CEILING PENDANT LOBBY APP101: Walght: 1 200 LBS 48"0 x 120"OAH (22) 7W GU10 MR16 LED 120V DIMMABLE LBY OTHER____ IaM Wattage Allow: 160 WATTS MAX USMITTALDATE DRAFTER PROJECT MANAGER 11-11-16 —ES P M _ REV. DATE BY REV. DATE BY 12 2 16 ES _--� - 12 8 66 E.S NOTE/STAMP SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as� Noted for Production: Review / Approved for Production: Signature Date SHEET SIZE: 11 X 17 I SHEET: 7 OF 9 #50- 2"DIA GLASS - #80-3"DIA GLASS ._. #120-5"DIA GLASS Cod #150-6"DIA GLASS LARGE AMBER FINISH: Z Review / Approved for Production: Signature Date e L E1 zsao(lls 3/4°)#501W #120/X #80/W #120/Z #50/Y E3 2870(113") - #50/W #120/W #80/Z #50/W E4 2940 #50/W #80/Z #120/X #50/Y EII, E pN a � � I E''� E �N oN E5 2940 #50/W #120/X #120/Z #80/W #50/Y NM N E6 2890(113 25/32")#50/1/V #120/Z #80/X #120/Y #50/W N ro N E7 2870 #50/W #120/Z #80/W #50/X N N N E9 2840 #50AN i #120/Y i #120/W #80/Z #50/W N o N E10 2890 #50/W #120/Z #80/Z #50/Y } 7 t, E11 2870 #50AN #120/Z #80M/ #50/X E1 E3 E4 E5 E6 E12 2940 #50/X #80/W #120/Z t #50/Y #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE WNNV LUSIVECOM 3400 Medford Street Los Angeles, CA 90063 T: 323 227 9207 F: 323.227.9208 E LD DESIGN DEPT@LUSIVEDECOR.COM oi¢at Acronym POR: HESD P0564-PA-FFE-0045 c sect Nama EMBASSY SUITES DALLAS .gaar: HFS/ CONCEPTS 4 Itam R: - LO -500 CUSTOM CEILING PENDANT LOBBY Dly. -- APProa. WeighC 1 200 LBS Slid- --' ----- --- 48" 0 x 120"OAH -"(22) 7W GU10 MR16 LED 120V DIMMABLE BY OTHERS) Mex Wattage Allow: - 160 WATTS MAX SUBMITTAL DATE DRAFTER PROJECT MANAGER 11-11-i6 E.S P.M _ REV. DATE BY REV. DATE BY 12-2-16 E,S -- 12-6-16 E,S NOTE/STAMP: SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: Review / Approved as j--� Noted for Production: L� Review / Approved for Production: Signature Date Cod e L Per Changes: O Review / Approved as Noted for Production: Review / Approved 11 for Production: F11 2965(11647(64") ! #50/X #80/W #120/Z #50/Y F3 2965 J #50/Z #80/W #120/X #50/W F5 2965 #50/X #80/W #120/Z #50/Y G 2975(1171/8„) !, #50/Y #120/X #50/Y #80/W !I #50/Z F4 En F2 #50- 2"DIA GLASS CLEAR GLASS FINISH: W #80-3"DIA GLASS MEDIUM AMBER FINISH: X #120-5"DIA GLASS SMOKE GLASS FINISH: Y #150-6"DIA GLASS LARGE AMBER FINISH: Z ®LUSIVE VWVW..LUSIVE.COM 3400 Medford Street Los Angeles, CA 90063 T: 323.227.9207 F: 323.227.9208 E: LD_DESIGN_DEPT@LUSIVEDECOR.COM EMBASSY SUITES DALLAS HFS/ CONCEPTS 4 L LO -500 CUSTOM CEILING PENDANT LOBBY ay: Approx. WeighF --- 1 200 LBS -- 48"0 x 120"OAH t—j ree—w-,w-Iwv DIMMABLE (BY OTHERS) Mx WaBAge Alhiw: 160 WATTS MAX iUBMITTAL DATE DRAFTER RROJ — —NAGER ii -11-16 ES _ P.M REV. DATE BY REV. DATE ES 12-2-16 S -- -- 12-8-16 E.S NOTE/STAMP SHOP DRAWING APPROVAL Revised / Resubmit Per Changes: O Review / Approved as Noted for Production: Review / Approved for Production: Signature Date HFS e"* CONCEPTS 4 4W 4 3229 E. Spring Street Long Beach, CA 90806 Tel: 562-424-1720 Fax: 562-424-3720 Manufacturer: Restoration Hardware SPECIFICATION Project: Embassy Suites Dallas Fort Worth PA Project #: 564-PA-FFE Date: 10/19/2016 7:00:00 AM Revision M 0 Source: Restoration Hardware -Trade Bank of America Lockbox Services PO BOX #50081 Los Angeles, CA 90074-0081 Phone: (415)250-4249 ext: 0000 Fax: (415)507-1901 ext: 0000 Contact: - Contact: - Contact: - Contact: - Vendor Contact: Angela King; P:626-375-0067 ;E: aking@rh.com Reference M RBX-501 Pendant Light: PENDANTS @ RESTAURANT BAR DESCRIPTION: Industrial, round chandelier with ribbed hurricane glass shades. Fixture comes with two 18" rods, two 12" rods and two 6" rods. NOTE: Electrician to cut rods on site to specified OAL; see dimensions below. Construction Brass Dimensions (OAH x OAW x Drop) 60" dia, 72" OAH (Mfgr standard dimensions shown, height to be adjusted Entered By: EA, LG, SP on site) NOTE: Rods to be cut on site for OAL of 30" from canopy to bottom of fixture. Coordinate all details with DESIGNER. (H x W x Drop) See above Model No. 68450981 BRZ Finish Bronze Canopy Type Round Suspension Type Rod Suspension Finish Bronze Detail Sheets: RBX-501 QUANTITY: 2 Ea Issued By: Susan Prann ITEM: PENDANTS @ RESTAURANT BAR Entered By: EA, LG, SP ITEM M RB -501 Page: 1 3 3229 E. Spring Street Long Beach, CA 90806 Tel: 562-424-1720 Fax: 562-424-3720 Body Type Round Body Material Brass Body Size See above Diffuser None Total Watts / Voltage 320 W SPECIFICATION Project: Embassy Suites Dallas Fort Worth PA Project M 564-PA-FFE Date: 10/19/2016 7:00:00 AM Revision M 0 Qt L p La T e 8) 0 W max T8 Edison bulbs (included) Wei ht 77 lbs Ceiling Height Approximately 9'-5" Clearance A.F.F. 7'-0" NOTE: SIDEMARK: PENDANTS @ SEATING AREA @ RESTAURANT BAR (RB -501) ITEM SUMMARY NOTE: 1. Fixture to be UL approved for direct -wire commercial use and carry UL Label. 2. Provide all parts required for complete installation. 3. Provide mounting points and details for coordination with installer. 4. Confirm J -box size prior to fabrication to assure correct attachment detail. 5. Must be contract quality and suitable for commercial use. 6. On-site measurements must be verified by fabricator prior to ordering. 7. Provide Shop Drawing for written DESIGNER approval prior to fabrication. 8. Submit two (2) samples of all specified finishes to DESIGNER for written approval prior to production. Designer will retain one (1) sample. 9. Coordinate all details and submit prototype for approval when requested by DESIGNER. 10. Manufacturer to provide powder coating of metal components to prevent corrosion. 11. Refer to HFS/C4 CUSTOM LIGHTING PREAMBLE and DETAIL SHEET for additional information. RB -Restaurant Bar Restaurant Bar 2 Ea Detail Sheets: RBX-501 QUANTITY: 2 Ea Issued By: Susan Prann ITEM: PENDANTS @ RESTAURANT BAR Entered By: EA, LG, SP ITEM #: RB -501 Page: 2 AFS e'* CONCEPTS 3229 E. Spring Street Long Beach, CA 90806 Tel: 562-424-1720 Fax: 562-424-3720 SPECIFICATION Project: Embassy Suites Dallas Fort Worth PA Project M 564-PA-FFE Date: 10/19/2016 7:00:00 AM Revision M 0 Description: Chandelier Image Detail Sheet #: RBX-501 Detail Sheets: RBX-501 QUANTITY: 2 Ea Issued By: Susan Prann ITEM: PENDANTS @ RESTAURANT BAR Entered By: EA, LG, SP ITEM #: RB -501 Page: 3 RESTORATION HARDWARE AQUITAINE LINEAR CHANDELIER 72" PARTS ENCLOSED (A) Mounting Plate (1) (B) Canopy (1) (C) Canopy Screws (8) (D) Allen Wrench (1) TO ASSEMBLE SAFETY CABLE 1. Join fixture safety cable with safety cable from ceiling. 2. Wrap both safety cables around the cable lock nut. 3. Secure by tightening both hex nuts until tight. ceiling fixture 96 IMPORTANT SAFETY INSTRUCTIONS WARNING: DO NOT EXPOSE THE ADAPTOR TO RAIN OR MOISTURE. TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS. 1. This fixture is NOT dimmer compatible. 2. Do not break or pull out LED bulbs. 3. Indoor use only. 4. Do not look directly at the light. 5. Keep lamp away from materials that may burn. 6. If the supply cord or adaptor is damaged, it must be replaced only by service agent or a qualified -technician. 7. The Mounting Plate must be secured to a structural member of the building, independent of the outlet box. Consult your local hardware store for the proper fasteners for your application. TO ASSEMBLE 1. Carefully remove all parts from the box and remove all plastic covering. 2. Remove Mounting Plate (A) from Canopy (B) by removing Canopy Screws (C) with Allen Wrench (D) provided. 3. Attach mounting Plate (A) to ceiling and secure with mounting screws (not included)//proper fasteners from your local hardware store. 4. Connect the safety steel wire from the fixture and the safety cable from ceiling. Refer to the illustration. 5. Attach the fixture ground wire (green or green/yellow) to the ground wire from the outlet box (usually green insulation or bare wire) with a plastic wire connector and wrap the connection with electrical tape. IT IS IMPERATIVE THAT THE OUTLET BOX IN YOUR HOME BE PROPERLY GROUNDED. 6. Connect the neutral wires from the ballast (white wire) to the neutral outlet wire (usually white) with a plastic wire connector and wrap the connection with electrical tape. 7. Connect the hot wires (black wire) to the hot outlet box wire (usually black) with a plastic wire connector and wrap the connection with electrical tape. DO NOT REVERSE THE HOT AND NEUTRAL CONNECTIONS OTHERWISE SAFETY WILL BE COMPROMISED. 8. Attach Canopy (B) with light fixture to affixed Mounting Plate (A) and secure with Canopy Screws (C). Tighten with Allen Wrench (D). 9. Restore power to outlet box and check operation of fixture. 10. Assembly is complete. CARE INSTRUCTIONS Avoid the use of all polishers, cleaners, and abrasives, as they will damage the finish of your lamp. To remove dust or fingerprints, wipe gently with a soft, clean cloth. Caution: Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy, and if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to connect the interference by one or more of the following measures - reorient or relocate the receiving antenna or increase the separation between the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Consult the dealer or an experienced radio/TV technician for help. PARTS ENCLOSED (A) Mounting Plate (1) (B) Canopy Screws (3) (C) Canopy (1) (D) Flathead Screws (3) (E) Flat Disk (1) (F) Hex Nuts (4) (G) Wiring Box (1) (H) T Wrench (1) (J) Rod Connectors (4) RESTORATION HARDWARE CANNELE ROUND CHANDELIER 60" (K) 6" Rod w/ Connectors (8) (L) 12" Rod w/ Connectors (8) (M) 18" Rod w/ Connectors (8) (0) Glass Tubes (12) (P) Light Bulbs (12) (Q) Sockets (12) SAFETY CABLE ASSEMBLY 1. Join fixture safety cable with safety cable from ceiling. 2. Wrap both safety cables around the cable lock nut. 3. Secure by tightening both hex nuts until tight. ceiling safety cable fixture safety ca ley, ................ . E - J -C io n -P IMPORTANT SAFETY INSTRUCTIONS WE RECOMMEND INSTALLATION BY A LICENSED ELECTRICIAN. This fixture has been rated for up to twelve (12) 40 -watt maximum Type T bulbs (P) (included) or twelve (12) 9 - watt compact fluorescent light bulbs (not included) To avoid the risk of fire, do not exceed the recommended wattage. WARNING 1. All wires are connected. 2. Do not remove the lamp from its packaging by pulling on the power cord, as a bad connection may result. 3. Do not connect electricity until your lamp is fully assembled. 4. To reduce the risk of fire, electrical shock, or personal injury, always turn off and unplug lamp and allow it to cool prior to replacing light bulb. 5. Do not touch bulb when fixture is turned on or look directly at lit bulb. 6. Keep flammable materials away from lit bulb. 7. This lighting fixture contains lead, a chemical known to the State of California to cause cancer, birth defects and other reproductive harm. Wash hands after installing, handling, cleaning or otherwise touching this light fixture. 8. The Mounting Plate must be secured to a structural member of the building, independent of the outlet box. Consult your local hardware store for the proper fasteners for your application." TO ASSEMBLE 1. Carefully remove all parts from the box and remove all plastic covering. 2. Determine the hanging length of chandelier. Connect Connection Rods (K) to one or two sets of Connection Rods (L) and Connective Rods (M) according to the height needed. 3. Remove Mounting Plate (A) from Canopy (C) by unscrewing Canopy Screws (B). 4. Unscrew Wiring Box (G) with rod from Canopy (C) by turning in counter -clockwise directions. 5. Detach Flat Disk (E) with rod on top from Wiring Box (G) by removing Flathead Screws (D). 6. Loosen Hex Nuts (F) inside of Wiring Box (G) by using T Wrench (H) provided. 7. Connect 3 sets of longest Connection Rods (M) to the connectors (N) in middle of the fixture, follow with Connection Rods (L), shortest Connection Rods (K) and connectors (J), and tighten Hex nuts (F) with T Wrench (H) provided. 8. Feed wires through the fourth sets of Connection Rods (M), (L), (K) and Connectors (J), letting wires come out from the inside of Wiring Box (G). Connect the Rods and Connector (J), tighten the Hex Nut (F) with T wrench (H) provided. 9. Attach mounting Plate (A) to ceiling and secure with mounting screws (not included) and proper fasteners from your local hardware store. 10. Feed wires through the rod on top of Flat Disk (E), Canopy (C). 11. Replace the Flat Disk (E) to Wiring Box (G) and secure with Flathead Screws (D). 12. Thread the rod on top of (E) to bottom of (C) and tighten by hand. 13. Connect the safety steel wire from the fixture and the safety cable from ceiling.(Refer to the illustration) 14. Carefully inspect the chandelier's two fixture wires. One has very fine ridges molded into the plastic covering - this is the NEUTRAL WIRE. The second wire's covering is smooth - this is the HOT WIRE. The bare wire is the GROUND WIRE. 15. Connect the GROUND WIRE from the fixture with the ground wire (usually bare) from your ceiling box using a wire nut. If you house does not have ground wire, then attach the GROUND WIRE from the fixture to the green grounding screw inside of the outlet box. IT IS IMPERATIVE THAT THE OUTLET BOX IN YOUR HOME BE PROPERLY GROUNDED. 16. Connect the NEUTRAL WIRE from your fixture with the Neutral wire (usually white) from your ceiling box using a wire nut. 17. Connect the HOT WIRE from your fixture with the Hot wire (usually black) from your outlet box using a wire nut. DO NOT REVERSE THE HOT AND NEUTRAL CONNECTIONS OTHERWISE SAFETY WILL BE COMPROMISED. 18. Attach Canopy (C) with light fixture to the affixed Mounting Plate (A) and secure with Canopy Screws (B). 19. Insert the recommended light bulbs (P) into the Sockets (Q). 20. Carefully slide Glass Tube (0) onto Sockets (Q). 21. Assembly is complete. CARE INSTRUCTIONS Wipe all surfaces with a soft dry cloth. Clean glass with a mild soap and water mixture. Do not use any harsh cleaners (including ammonia -based products) or abrasives, as they will damage the finish.