Loading...
HomeMy WebLinkAboutPresentation 5/11/2017 2017 Proposed Capital Budget ,GRA IIS _I: F. x A S Mayor and Council Workshop January 9, 2017 Section I — General Obligation Recommended for Funding 1 5/11/2017 CRAP VINE. Section I ��-- , . General Obligation DescriptionProject 313olice Animal Shelter $ 3,000,000 7Fire Build New Firehouse#2 7,392,686 11Fire Build New Firehouse#3 8,425,000 15 Public Works Heritage Ave. Mustang Rd.to SH26 4,021,184 19 Public Works East Worth Street Reconstruction 850,000 23 Public Works Heritage Ave. Bridge Connections 6,015,581 27 Public Works Euless Grapevine Rd.SH360 to Glade Rd 4,371,402 31 Public Works Ruth Wall St. NW HWYto Wildwood Dr. 4,904,748 35 Public Works Boyd Dr. Dove Loop to NW Highway 3,746,297 39 Public Works Traffic Signal Replacements 1,800,000 43 Public Works Dove Road Raising 5,000,000 Sub Total General Obligation $ 49,526,898 General Obligation- Police GRAD VISE r e- z s s Page 3 rrrrrr Description: Project will enhance the environment for the sheltered animals while providing safe working conditions for the caretakers. The current environment is overcrowded and as a consequence,presents safety concerns. Background: The current shelter has been maximized for space and safety. In order to maintain pace with the community size and associated animals,it is the recommendation of staff that the situation is remedied with a shelter that provides adequate and safe space and support to properly care for the animals. 2 5/11/2017 GI P �ISE General Obligation- Police , F s_ Page 3 -JY $3,000,000 Cost Schedule: . . . . . . . . . . . .. Project expenses would commence in the fourth quarter of 2017 with projected completion at the end of 2018. s General Obligation- FireP VIDE Page 7 LN Description:ProjectName: Build Firehouse#2 'W Cost: $7,392,686 Build a new Firehouse#2 at the corner of Dove and Kimball.This will be a complete new modern firehouse in the neighborhood of 13,000 square feet.This firehouse will also contain a back up dispatch center for the City so that with a flip of a switch, 911 calls,fire and police radio communications can be answered and dispatched. Background: The original building was opened in 1981 with approximately 3000 square feet of space which includes bays for 3 fire apparatus.The current living quarters do not provide separate bathroom and shower areas for male and female firefighters.The build of the new firehouse would also ensure that the facility is in compliance with all American with Disabilities Act requirements. 6 3 5/11/2017 GI P �ISE General Obligation- Fire , F s_ Page 7 -jy ProjectName: Build Firehouse#2 Cost: $7,392,686 Cost Schedule: . . . . . . . . . . . .. Engineering and design costs are scheduled to begin in the first quarter of 2018. Construction expenses are estimated to begin in the third quarter of 2018 and extend through 2019. 7 General Obligation - FireAP VIDE T r:- z s s Page 11 ProjectName: Build Firehouse#3 'W Cost: ,,, Description: Build a new Firehouse#3 on Timberline Drive.This will be a complete new modern firehouse in the neighborhood of 14,000 square feet.This firehouse will also include a modern Self Contained Breathing Air Compressor and accommodate future growth. Background: The original building was opened in 1982 with approximately 3000 square feet of space which includes bays for 3 fire apparatus.The current living quarters do not provide separate bathroom and shower areas for male and female firefighters. The firehouse was originally built to house 4 firefighters.The build of the new firehouse would also ensure that the facility is in compliance with all American with Disabilities Act requirements. S 4 5/11/2017 Gl P �ISE General Obligation - Fire , F s_ Page 11 -JY ProjectName: Build Firehouse#3 Cost: ... Cost Schedule: 2017 2018 2019 2020 2021 IIQ 2Q 3Q Q IIQ 2Q 3Q Q IIQ 2Q 3Q Q 1Q 2Q 3Q 4Q IIQ 2Q 3Q 4Q Engineering and design costs are scheduled to begin in the first quarter of 2018. Construction expenses are estimated to begin in the third quarter of 2018 and extend through 2019. 9 General Obligation — Public WorksE r r.• , S Page 15 �Ary MustangProjectName: Heritage Ave; -. to SH26 Cost: Description: Construct new roadway segment with curb&gutter,underground drainage, sidewalks and street lighting partially on DFW Property. Approximately 2,400 LF. Background: This project is on the thoroughfare plan and provides capacity improvements to the south central portion of Grapevine and will complete the connection in the City's thoroughfare network. This project would also help to decrease emergency vehicle response times. io 5 5/11/2017 GI AF VISE. General Obligation — Public Works � . Page 15 . r MustangProjectName: Heritage Ave; -. to SH26 Cost: Cost Schedule: 2017 2018 2019 2020 2021 . 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q Right of way acquisition and design are anticipated to start in 2018 with construction following in 2019. Construction should be completed in 2020. General Obligation — Public Works NAP VIDE r E• 1 :� S' Page 19 L . Description:Project Name: East Worth Street Reconstruction Cost: $850,000 Reconstruct East Worth Street from Austin Street to Ruth Street with some work being done to the existingwaterline. Background: The existing roadway requires complete reconstruction and will not qualify for CDGB funds. The team will take advantage of the open road to complete waterline work. The majority of the expense will be for the roadwork. 12 6 5/11/2017 Gl AF 1 ISE. General Obligation — Public Works � . Page 19 - r Project Name: East Worth Street R�econs ruction Cost: $850,000 Cost Schedule: 2017 2018 2019 2020 2021 . 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q The work will start at the end of 2017 and be completed by the end of 2018. 13 General Obligation — Public Works .CRAP VIN _ E f F:• , S Page 23 � BridgeProject Name: Heritage Ave; Description: Construct a new bridge and trail across Big Bear Creek. Includes connection of Parr Lane to Heritage Ave from the west. Background: This project is on the thoroughfare plan and provides capacity improvements to the south central portion of Grapevine and completes the connection in the City's thoroughfare network. This project would help to decrease emergency vehicle response times. 14 7 5/11/2017 GI AF VISE. General Obligation — Public Works � . Page 23 - r BridgeProject Name: Heritage Ave; Cost Schedule: 2017 2018i i i 2021 Q 2Q 3Q .e 1 e 2Q 3Q .e 1 e 2Q 3Q .e 1 e 2Q 3Q .e 1 e 2Q 3Q -e Engineering design is scheduled to start in 2020 with construction commencing in 2021 with a targeted completion in 2022. 15 General Obligation — Public Works ;*PVINR Page 27 Project Name: Euless Grapevine Rd;SH 360 to Glade Rd Cost: $4,371,402 D- Constructthe east one half of roadway between Hughes Rd and Glade Rd. Construct full pavement width for a four lane pavement section from Hughes Rd to SH 360. Approximately 3,500 LF. Four Lane Minor Arterial Background: This roadway will provide added capacity to the City's thoroughfare network and eliminate a current restriction between Hughes Rd and SH360. 16 8 5/11/2017 GI AF VISE. General Obligation — Public Works � . Page 27 JF Project Name: Euless Grapevine Rd;SH 360 to Glade Rd Cost:�w $4,371,402 Cost Schedule: 2017 2018 2019 2020 2021 . 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q Right of way acquisition and design is anticipated to start in 2020 with construction commencing in 2021 with an anticipated completion date in 2022. 17 General Obligation — Public Works N1 P VIDE T r.• X S S Page 31 � J Project Name: Ruth Wall St; NW Hwy to ••d Dr Cost: •0 Description: Reconstruct segment of Ruth Wall Rd that is experiencing significant distress in the concrete pavement due to soil movement.Approximately 2,100 LF of a four Lane Minor Arterial. Background: Reconstruction of the deteriorated collector roadway serving the Gaylord Texas and the north east portion of the TRA service area. 1s 9 5/11/2017 GI AF VISE. General Obligation — Public Works � . Page 31 Project Name: Ruth Wall St; NW Hwy to .., . Cost Schedule: 2017 2018 2019 2020 2021 . 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q Design and construction is scheduled for 2018. 19 General Obligation — Public Works .CRAP VIDE Page 35 L J Project Name: Boyd Dr; Dove Loop to NW Hwy Cost: $3,746,297 Description: Reconstruct asphalt roadway to address pavement failures.This is the primary route for Fire Department and other emergency equipmentfrom Station#1. Approximately 1,800 LF. Four lane divided local connector. Background: Reconstruction of primary emergency route from Central Fire Station. This road has experienced pavement failures over the past years. 20 10 5/11/2017 GI AF 1 ISE. General Obligation — Public Works � . Page 35 . r Project Name: Boyd Dr; Dove Loop to NW Hwy Cost: Cost Schedule: 2017 2018 2019 2020 2021 . 3Q 4Q 1. 2Q 3Q .. The project is scheduled to start in 2018 and will be completed in the first quarter of 2019. 21 General Obligation — Public Works N VIDE T r:- z s s* Page 39 �a� J ReplacementsProjectName: Traffic Signal . $1,800,000 Description: The project will reconstruct Traffic Signals that are over 20 years in age. Roughly three signalized intersections will be replaced each year at an annual cost of—$360K. Background: A majority of the traffic signals are over 22 years old and are in need of updating. The Institute of Transportation Engineers recommends that all traffic signal equipment be upgraded on a 20 year cycle. This project will provide traffic signal upgrades each year. 22 11 5/11/2017 GI AF VISE. General Obligation — Public Works � . Page 39 ReplacementsProjectName: Traffic Signal Cost Schedule: 2017 2018 2019 2020 2021 . 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q Replacements are planned from 2017 through 2021. 23 General Obligation — Public Works *�' J' E Page 43 Project Name: Dove Road Raising 'W Cost: $5,000,000 Description: The project will raise Dove Road between Silvercrest and the Horseshoe Trailhead parking lot. The objective is to raise Dovel Road above the spillway elevation of Grapevine Lake and to raise the Dove Road curve. Background: At the presenttime,when the lake elevation exceeds flood stage,the road must be closed. 24 12 5/11/2017 Gl AF VISE. General Obligation — Public Works � . Page 43 Project Name: Dove Road Raising Cost: $5,000,000 Cost Schedule: 2017 2018 2019 2020 2021 . 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q 4Q 1. 2Q 3Q The project would start in the fourth quarter of 2018 and would be completed in 2020. 2s Section II — Quality of Life Recommended for Funding 13 5/11/2017 GRAP VIQE; Section I I ��-- , . Quality of Life Project . . 3Police Community Outreach Center Permanent Building $ 40,000 7Parks and Rec. Oak Grove Softball Renovation 6,500,000 11 Parks and Rec. Denton Creek Trail 1,000,000 15 Parks and Rec. Oak Grove Ball field Complex Synthetic Turf Fields 850,000 19 Parks and Rec. REC Main Stairwell Replacement 280,000 23 Parks and Rec. Botanical Garden Fence 135,000 27 Parks and Rec. Mitchell House Upgrades 300,000 31 Parks and Rec. Oak Grove Trail 2,175,000 35 Parks and Rec. Christmas Decorations 750,000 39 Parks and Rec. Connector Landscape 1,725,000 43 Parks and Rec. Outside Studio/Active Adult Area 300,000 47 Li brary Mobile Library 390,000 51 Public Works Backlit Street Name Signs 400,000 Sub Total Quality of Life $ 14,845,000 27 Section I I %V;14NIR Quality of Life — Cash Flow QUALITY OF LIFE FIVE YEAR FUNDING BEGINNING FUND BALANCE $ 8,850,000 $4,905,000',.$3,405,000 $3,405,000',.$6,155,000 TRANSFERIN 3,000,000'.. 3,000,000 3,000,000'.. 3,000,000 3,000,000 TOTAL AVAILABLE FUND BALANCE $11,850,000 $7,905,000 $6,405,000 $6,405,000 $9,155,000 USE OF FUNDS: DEPT. QUALITY OF LIFE PROJECTSCO POLICE ',Cormninuty Outreach Center-Needs Assessment $ 40,000 $ $ $ $ $ 40,000 PARRS Oak Grove Softball Renovation 500,000''.., 3,250,000'..., 2,750,000''.., 6,500,000 PARRS Denton Creek Trail 1,000,000...,,. 1,OD0,000 PARRS '..,.Oak Grove Ball Field adding Synthetic Turf 850,000'.., 850,000 PARRS '..,REC Main Stairwell Replacement '.., 280,000'..., 280,000 PARRS ''..,Botanical Ganfen Fence 135,000'..., 135,000 PARRS '..,Mitchell House Upgrades '.., 300,000'..,. 300,000 PARRS Oak Grove Trail 2,175,000''.., 2,175,000 PARRS Christinas Decorations 150,000''..,. 150,000'..,. 150,000''..,. 150,000'..,. 150,000''..,. 750,000 PARRS Co®ector Landscape 1,725,000'.., 1,725,000 PARRS '..,.Challenge Course at the REC 300,000'.., 300,000 LIBABRY '..,Mobile Library '.., 390,000'..., 390,000 PW '....Backlit Sheet Name Signs 100,000'.... 100,000'.... 100,000'.... 100,000'.., 400,000 TOTALS I I$ 6,945,000 $4,500,000 $3,000,000 $ 250,000 $ 150,000 $14,845,000 ENDING BALANCE $ 4,905,000 $3,405,000 $3,405,000 $6,155,000 $9,005,000 23 14 5/11/2017 GI P �ISE Quality of Life- Police , F s_ Page 3 -jF ... Description: A full assessment is required for the cost benefit analysis related to a facility to house a much needed outreach facility providing the space and safety required for an effective outreach program. Background: The needs assessment will evaluate the number of people served by the facility and the measured success as well as determining lost value as a result of the current location and space. 29 Quality of Life- Police *�Ijl E Page 3 ProjectName: Community Outreach Center Cost: , ,,, Cost Schedule: . . . . . . . . . . . .. The expense for the needs assessment is expected to be incurred in the fourth quarter of 2017. 30 15 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 7 Project Name: •. $6,500,000 Description: This project will add a fourth grass field to the Oak Grove Softball Complex,upgrade the concession stand area and restroom facility to meet current ADA standards.Following the 2011 master plan update,the youth and adult softball along with kickball continue to grow in participation numbers and the existing facility and amenities have become outdated.The design intent will mirror the Oak Grove Ballfield Complex renovation from 2009. Background: The original 2 fields at the softball complex were constructed around 1972. Since that time a third field was added and then eventually lights were added to the third field. Adult and youth softball,baseball and kickball continue to remain very popular and the facility is in need of many upgrades and changes to meet the current ADA standards. Meeting the design standards from Oak Grove Ballfield Complex will allow these 2 facilities to work in tandem bringing in league and tournament revenue for many years to come. 31 Quality of Life — Parks and Rec. AWP VIDE T F.• X S S Page 7 Project Name: •. $6,500,000 Cost Schedule: 2017 2018 2019 020 2021 IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q Due to the large number of adult softball and kickball leagues along with the usage for youth practices,games and tournament play,to avoid interrupted play,the project is targeted for a timely completion between 2017 and 2018. 32 16 1 �,• ZY t y {b `7 ry � GfS t 'brANpr- "� on�rlrfn - mur�caNw p =annc acEs { P MU GFOP OFF MCJnTENANCE SHED ^NNECilONM �,'t,.1�.-,w,`ry.._ ESISnNGTRAILfo t _ nnruxWrro i— — ^T. TIC'. I ��yy CRIlESLOlb f�. � I, - ■R�1■ NMI et�ri 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 11 ProjectName: Denton Creek Trail Cost:�r$1,000,000 Description: This is a project that will continue the Mills Run Trail from the present stopping point at 2499.The trail will continue from 2499 and parallel Denton Creek through the City's 185 Project.The project would be a 10'-12'wide concrete trail. Background: The Mills Run trail behind Grapevine Mills Mall that runs along Denton Creek and up to the apartments on 2499 is a great amenity for the northeast portion of Grapevine. This new portion of Denton Trail would allow users to continue east from 2499 through the City's 185 project and will eventually allow further trail connectivityto Lewisville and Coppell. 35 Quality of Life — Parks and Rec. P VIDE T F.• X S S Page 11 V�I -fl ProjectName: Denton Creek Trail 1W Cost: $1,000,000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q Construction would begin in the second quarter of 2017 and be completed between the fourth quarter of 2017 and the first quarter of 2018. 36 18 5/11/2017 4 ' ATO e � j •�1 t • i PARK „6 i SCOPE KUBOTA IFS PEDESTRIAN CONNECTION � e . �I PEDESTRIAN CONNECTION F� Y Quality of Life — Parks and Rec. CRAP _VINE. T F:• ] '.A S Page 15 � Project Name: • 000 Description: This project will remove the existing grass from Fields H and I at the Oak Grove Ball Field Complex and replace the grass with synthetic turf.The addition of synthetic turf will solve current issues with the water seepage from the underground spring. This affects playability in non weather events.The new turf would also greatly reduce rainouts and other weather events that would normally close the fields.This is a field standard now used on most high school, college and professional fields. Background: Since the reconstruction of the Oak Grove Ballfield Complex in 2009 it has become a premier destination in the State of Texas for youth baseball and softball league play as well as tournaments. The turf being proposed in this project will help tournaments remain playable during rain events that have typically caused cancellation due to wet fields. It is very important that tournament play continue as much as possible because rescheduling is not an option. 3S 19 5/11/2017 GI P ISE Quality of Life — Parks and Rec. F s_ Page 15 -JY Project Name: • 000 Cost Schedule: 2017 2018 2019 020 2021 Due to the large number of you the baseball teams and tournament play on Fields H and I,this project would begin following the 2017 fall baseball season and conclude prior to the spring season opening day in 2018. 39 20 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 19 -jF ImprovementProjectName: REC Main Staircase $280,000 Description: The facility has been in operation 1.5 years,it is evident that the prior existing stairwell is a major pinch point for the amount of members and the number of classes hosted in the facility that need access to the second floor.Initial design was for 12,000 members,currently The REC is at 24,000 members.This project will provide a much more open and wide stairwell which will improve the existing narrow stairwell that causes a back-up of people waiting to go up or down that stairwell. Background: The REC former Community Activities Center was originally opened in 1996. The CAC was closed down in 2014 and opened to rave reviews in April of 2015. Total membership has doubled that of the original business plan. One of the few pinch points in the facility is the original stairwell. The large number of people needing to get to the fitness room or track backs up and has been a concern of many members that has been voiced to staff since the facility has been reopened. 41 Quality of Life — Parks and Rec. AWP VIDE T F.• X S S Page 19 ImprovementProjectName: REC Main Staircase $280,000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q This is a project that will begin after school starts in 2017 and will be completed at the end of 2017. The REC has two other stairwells for patrons to use along with an elevator. 42 21 5/11/2017 � LIr o STMT OYQNe LOMER LEAH • SiM OPiCN�VPPp LEYEl 43 Quality of Life — Parks and Rec. CRAP _VINE. T F:• ] '.A S Page 23 � Project Name: Botanical Garden Fence Cost: 000 Description: This project will completethe fence around the Botanical Gardens and will provide gated entrances improving aesthetics and security. Background: The master plan for the gardens was prepared by architect Oliver Windham and presented to the City Council in September of 1999. Construction of Phase 1 of the gardens began in May of 2000 and included trails,planting beds and the"Great Lawn". Construction of Phase 1 was completed in July of 2000. This summer marks the gardens 17th anniversary 22 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 23 -JY Project Name: Botanical Garden Fence Cost:�W 000 Cost Schedule: 2017 2018 2019 020 2021 This project will begin in second quarter of 2017 and will be complete by the fourth quarter of 2017. 4s Quality of Life — Parks and Rec. AWP VIDE T F.• X S S Page 27 UpgradesProjectName: Mitchell House $300,000 Description: The Mitchell House is a wonderful facilitythat has served the city well for many civic clubs,family functions and business meetings for many years.This facility is now in need of some much needed upgrades and repairs including restroom facilities, kitchen area,etc. Background: This rental facility has served a variety of functions over the years. The facility hosts in excess of three hundred events a year.Due to the popularity and level of use the facility is now in need of repair and upgrades. 46 23 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 27 ProjectName: Mitchell .. $300,000 Cost Schedule: 2017 2018 2019 020 2021 This project will begin in second quarter of 2017 and conclude in the fourth quarter of 2017. Quality of Life — Parks and Rec. VIDE T F. S :5 81 Page 31 � f Project Name: •. 000 Description: This project will add a walking/biking trail from Darren Medlin Trail and Oak Grove Loop near the Trawick pavilion to meet up with the trail near Farris Branch Boat Ramp just past Scott's Marina.Having a trail in this section will keep joggers and bikers off of the main road and provide a safer route for outdoor enthusiasts using this area. Background: Due to the popularity of the lake and the current fitness trends the Oak Grove area has become a highly used park for fitness enthusiasts(bikers and runners)as well as citizens out for a nice walk in the park. Due to the large number of boat ramp and marina users,along with the high number of people driving to Oak Grove Loop for soccer and baseball/softball the loop can become dangerous for bikers and runners. This trail will give the opportunity for the user to keep the lake view while continuing on a safe trail during the workout. There are an average of 17,000 vehicles driving on Oak Grove Loop per month. Most of this traffic is compacted into nights and weekends,causing significant safety concerns for bikers and runners. as 24 5/11/2017 GI P ISE Quality of Life — Parks and Rec. F s_ Page 31 -JF •. 000 Cost Schedule: 2017 2018 2019 020 2021 This project will begin in the second quarter of 2017 and will conclude in the fourth quarter of 2017. 49 L o4�1io� i n a Y r 'o V. so 25 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 35 -JF Project Name: Christmas Decorations Cost:�W 000 Description: The Christmas displays used throughout the City draw huge crowds to Grapevine during the Christmas season. Background: In 2009,The Texas State Senate officially designated Grapevine,the Christmas Capital of Texas. Grapevine has a long standing tradition of being the place to come for Christmas celebrations. The need for replacement and or additional displays and supplies will continue each year. This is an annual investmentto increase the economic impact and traffic to Main Street throughout the Christmas Season. 51 Quality of Life — Parks and Rec. CRAP _VINE. T F:• ] '.A S Page 35 � Project Name: Christmas Decorations Cost: 000 Cost Schedule: 2017 2018 2019 020 2021 This program is ongoing and will use$250K each year during the five year plan.This plan will ensure that Grapevine keeps the high level of Christmas decorating that is expected by the citizens and visitors of Grapevine. 52 26 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 39 -JF Project Name: Connector Landscape Cost: 000 Description: The Grapevine connector landscape project ensures that highly visible areas of Grapevine are landscaped properly enhancing the overall look of Grapevine. Several areas throughout the Connector corridor were not included in TXDOT's landscape plan for the project. Background: The first phase of the landscape project has been completed,the next phase would commence in January of 2017 and would consist of the right of way from Main Street East to Texan Trail. 53 Quality of Life — Parks and Rec. CRAP E T ] '.A S Page 39 � Project Name: Connector Landscape IF Cost: 000 Cost Schedule: '7 7 The project would begin in the second quarter of 2017 and will continuethrough 2017. 54 27 5/11/2017 GI P ISE Quality of Life — Parks and Rec. , F s_ Page 43 Outside Studio/Active $300,000 Description: This project will add a new programming area/opportunity to The REC of Grapevine.This will be a series of obstacles and various equipment to engage the participant in a series of challenges while gaining the health benefits associated with fitness.The course is designed specifically for"Active Adults". Background: Since the REC opened in April of 2015 it has attracted thousand of citizens for recreation, education, and community engagement. The number of patrons using the fitness area and to attend fitness classes continues to grow. The outdoor trail around The REC, Library,and Convention Center is already a popular amenity of the facility. The equipment being proposed for the Challenge Course will provide additional options for fitness and wellness in an outdoor setting. The equipment selected will be appropriate for"Active Adults". Facility users from this demographic have been vocally in favor of this type of equipment and course. 55 Quality of Life — Parks and Rec. P VIDE T F:• X S S Page 43 T�10 Outside Studio/Active $300,000 Cost Schedule: 2017 2018 2019 020 2021 This project would start in the spring of 2017 and will be completed by the fourth quarter of 2017. 56 28 5/11/2017 w �` R sem-•.. .C,RAP VISE. Quality of Life — Library T F Page 47 LN .. $390,000 Description: The Mobile Library will extend library services to all residents regardless of travel restrictions. Additional operating costs of$170K are required(over a two year period)are in addition to the $390K capital cost projection. Recent demographic changes have resulted in underserved areas due to lack of transportation or easy access to the Library. Adding Mobile Library access will provide the opportunity to increase that presence at the Community Outreach Center,Parks,Grapevine Mills Mall area, retirement centers,assisted living&other areas in the community where there is limited access or transport to visit a central location. This mobile service would bring the library to the community that is not currently being served. The proposed service would also provide programming to younger children before kindergarten and include the early grades to help improve literacy levels and success rate for children in our community. ss 29 5/11/2017 GI P �ISE Quality of Life — Library , F s_ Page 47 -JF Project Name: .. $390,000 Cost Schedule: 2017 2018 2019 020 2021 The costs would be 50%($195K)due with order and 50%($195K)due upon delivery which is generally 9—12 months after ordering.The bus is built and then shipped to the company that provides the custom interior. 59 Quality of Life — Public Works AP VINE T F:• X S S Page 51 —Vrf ProjectName: Backlit Street Name Signs Cost: $400,000 Description: This project includes the installation of Backlit street name signs at arterial intersections&state highways.The signs would be installed by City traffic staff. Cost of the signs are approximately$3,250 per sign including free swinging mount,bracket, cantileverarm,and other required hardware. Background: The City Council initiatedthis program in November,2012. The signs improve street name visibility,aid with navigation and improve safety for drivers. 60 30 5/11/2017 GI P �ISE Quality of Life — Public Works , F s_ Page 51 ProjectName: Backlit Street Name Signs Cost:�w $400,000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The project would commence in late summer of 2017 and would be completed in the fall of 2020. 61 Section III — Utility & Storm Drainage Bond Projects Recommended for Funding 31 5/11/2017 Section III 'GR,"F�� ;� ��,, Utility & Storm Drainage Bond Projects x J �rilliProject Description 3 Water Replace Altitude Valves at Dove&Barton Water T. $ 300,000 7 Water College Street 12"Waterline.Replacing 8" 500,000 11 Water Peach St.Hilltop Rd.12"&Meadowbrook 8"line 850,000 15Water Business 11412"Waterline Project 1,250,000 19 Water Barton Water Tower-Repair and Paint 1,250,000 23 Water Raw Water Pump Station and New Waterline 6,000,000 27 Wastewater Ozone Injection at Hilton Lift Station 568,150 31 Wastewater Phase IV Wastewater Collection System 1,000,000 35 Wastewater Phase V Wastewater Collection System 1,000,000 39 Wastewater Phase VI Wastewater Collection System 1,000,000 63 Section III *PNE rUtility & Storm Drainage Bond Projects Project Description 43 Wastewater Wastewater Airlines to Trains 2&3 at WW Plant 1,450,000 47Wastewater Wastewater Aerial Crossings 1,500,000 51 Wastewater Wastewater Treatment Plant Belt Press 2,750,000 55Storm Drainage Wall Street Culvert at Moorhead Branch 500,000 59Storm Drainage College Street Culvert at Morehead Branch 500,000 63Storm Drainage Kimball Road Raising-Required for Future Trail 1,000,000 67Storm Drainage Country Estates CMP Lining 1,500,000 71Storm Drainage Big Bear Creek Bank 1,500,000 75Storm Drainage Denton Creek Bank 2,000,000 Sub Total Utility&Storm Drainage Bond Projects $ 26,418,150 64 32 5/11/2017 Utility & Storm Drainage — Water GI�AF 1-IN�E..�. Page 3 ProjectName: Replace Altitude Valves Cost: $300,000 Description: Replace altitude valves at Dove and Barton Water Towers. Background: Improve functionality at Barton and Dove Tower by replacing the existing altitude valves. This will also help to reduce overflows. 65 Utility & Storm Drainage — WaterAP VIDE T F.• X S S Page 3 � J •jectName: Replace Altitude • $300,000 Cost Schedule: 2017 2018i i i 2021 Q 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q -e The project will commence mid 2017 and be completed at the end of the third quarter in 2018. 66 33 5/11/2017 � N��. Utility & Storm Drainage — Water GI�AF IS Page 7 jF ProjectName: College St. Line Replacement Cost: $500,000 Description: Replace existing 8"with 12"waterline on College Street from SH 114 to Drexel Drive. Background: Replace existing lines in poor condition that serve the Cannon Elementary and Baylor Hospital. This line will also be upsized for additional capacity. 67 Utility & Storm Drainage — WaterAP VIDE T F.• X S S Page 7 � J •jectName: College • • $500,000 Cost Schedule: 2017 2018i i i 2021 e 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q -e The project will commence in the spring of 2017 and be completed by summer of 2018. 6s 34 5/11/2017 Utility & Storm Drainage — Water GI�AF 1-IN�E..�. Page 11 . r Project Name: Peach .. . .. 000 Description: This project involves the construction of a 12"waterlinefrom the Scribner/Hilltop intersection westto the Hilltop/Lucas intersection continuingwest to Dove Road for a length of approximately 2,670 linear feet(LF). This project also involves the construction of 8"waterlines in replacement of older 6"waterlines in Meadowbrook Drive and North Lucas Drive for a total length of approximately 5,070 linear feet(LF). Background: This project also involves the construction of 8"waterlines in replacement of older 6"waterlines in Meadowbrook Drive and North Lucas Drive for a total length of approximately 5,070 linear feet(LF). 69 Utility & Storm Drainage — WaterAP VIDE Page 11 , ProjectName: Peach .. . .. 000 Cost Schedule: 2017 2018 2019 2020 2021 IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q The project will commence at the start of 2018 and will be completed by the summer of 2019. 70 35 5/11/2017 Utility & Storm Drainage — Water Gl�AF 1-IN�E..�. Page 15 Cost:ProjectName: Business 114 12"Waterline 000 Description: This project involves the construction of approximately 2,870 linear foot(LF)segment of 12"waterline connecting BS 114 L(NW Hwy)at the north to the SH 114 Transmission Line Crossing near Industrial Blvd. The construction of an approximately 470 linear foot(LF)segment of 12"waterline connecting the existing City water system on either side of SH 114 @ Industrial Blvd including boring costs and the construction of a new 8"&12"waterline in the vicinity of the BS 114&SH 114 interchange to provide improved north/south transmission capacity. Totals approximately 1,020 linear feet. Background: This project involves the construction of approximately 2,870 linear foot(LF) segment of 12"water line. The project will also provide improve north/south transmission capacity. i Utility & Storm Drainage — Water VINE.CRAP f F:• ] 'S Page 15 � J ProjectName: Business 114 12"Waterline Cost: 000 Cost Schedule: 2017 2018 2019 2020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The project will begin in 2019 and will be completed in the fall of 2020. 72 36 5/11/2017 Utility & Storm Drainage — Water Gl�AF 1-IN�E..�. Page 19 . r Barton000 Description: The project will be to repair and paint the watertower on Barton. Background: Rehabilitation of existing watertower for the safety,health and welfare of Grapevine citizens will include cleaning,sanding and painting. 73 Utility & Storm Drainage — Water CRAP VIN� E f F:• ] 'S Page 19 � J TowerProjectName: Barton Water 000 Cost Schedule: 2017 2018 2019 2020 2021 The project will begin in the third quarter of 2018 and will be completed the third quarter of 2019. 74 37 5/11/2017 � N��. Utility & Storm Drainage — Water GI�AF IS Page 23 _ r ProjectName: Raw Water Pump Station Cost: $6,000,000 Description: Reconstruct the raw water intake structure and raw water lines that provide water from Grapevine Lake to the Water Treatment Plant. Background: The existing raw water pump station is antiquated and needs to be replaced to assure continuous supply of water to the WTP. This project will also evaluate the location of the raw water lines on the corps of engineers property. 7s Utility & Storm Drainage — Water N1 P VIDE T r.• X S S Page 23 11 J • • Station Cost: . 111111 Cost Schedule: 2017 2018i i i 2021 e 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q -e The project is expected to commence in the spring of 2017 and be completed mid way through 2018. 76 38 5/11/2017 GRAF 1ISE. Utility & Storm Drainage — Wastewater ,, Page 27 ;t _ r Ozone Description: The project will construct the ozone generator and associated piping for ozone injection at the Hilton Lift Station. This will improve sewer quality to keep it from going septic and improving odor control and corrosion control along the outfall for this lift station. Background: This project will help eliminate corrosion of the lift station and downstream sanitary sewer system. The project will also help improve the odor quality at the lift station and outfall area. n .*NX E. Utility & Storm Drainage — Wastewater Page 27 • Ozone Injection • • • 1 Cost Schedule: 2017 2018i i i 2021 Q 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q -e The project is expected to start in the fourth quarter of 2017 and be completed by the end of the third quarter of 2018. 7s 39 5/11/2017 GI AF 1 ISE. Utility & Storm Drainage — Wastewater ,, Page 31 ;t _ r ProjectName: Phase IV Wastewater Collection Cost: $1,000,000 Description: Inflow and Infiltration Phase IV is the design and construction of improvementsto the wastewater collection system in the Lakeview Addition. Background: Repairs are required by the State of Texas for wastewater lines that are experiencing inflow and infiltration of groundwater into the wastewater collection system. The project will help to meet the state requirements. 79 IT P VIDE.Utility & Storm Drainage — Wastewater � F. ,ti Page 31 � J •jectName: Phase IV Wastewater Collection Cost: $1,000,000 Cost Schedule: 2017 2018i i i 2021 e 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q -e The project will commence during the second quarter of 2017 and be completed by the end of the third quarter of 2018. 80 40 5/11/2017 GI AF 1 ISE. Utility & Storm Drainage — Wastewater ,, Page 35 ;t _ r ProjectName: Phase VWastewate`Mollection� Cost: $1,000,000 Description: Inflow and Infiltration Phase V is the design and construction of improvements to the wastewater collection system in the Central Business District and TichnorTerrace. Background: Repairs are required by the State of Texas for wastewater lines that are experiencing inflow and infiltration of storm water runoff groundwater into the wastewater collection system. 81 fi,I�AP VIDE. Utility & Storm Drainage — Wastewater ..T F. ,ti Page 35 � J •jectName: Phase V Wastewater Collection Cost: $1,000,000 Cost Schedule: 2017 2018i i i 2021 Q 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q -e The project will begin in the fourth quarter of 2018 and will be completed during the third quarter of 2020. 82 41 5/11/2017 GI AF 1 ISE. Utility & Storm Drainage — Wastewater ,, Page 39 ;t _ r ProjectName: Phase V1 Wastewater Collection Cost: $1,000,000 Description: Inflow and Infiltration Phase VI is the design and construction of improvementsto the wastewater collection system in the Bellaire Addition. Background: Repairs are required by the State of Texas for wastewater line that are experiencing inflow and infiltration of groundwater into the wastewater collection system. The project will help to meet state requirements. 83 P VIDE. Utility & Storm Drainage — Wastewater F. ,ti R Page 39 � J • • • • $1,000,000 N Cost Schedule: i17 2018 20192020 2021 Q 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q ,• 1 e 2Q 3Q -e The project starts in the fourth quarter of 2020 and is completed in year 2022. 84 42 5/11/2017 GI AF 1 ISE. Utility & Storm Drainage — Wastewater ,, Page 43 ;t _ r ProjectName: Wastewater Airlines to Trains 2&3 Cost: 000 Description: Replace airlines at the wastewater treatment plant. Background: Replace existing air lines at the plant that feed the aeration basins. This will help to improve functionally at the wastewater treatment plant. 8s .CRAP E. Utility & Storm Drainage — Wastewater ,r F, �_;� �* Page 43 ,�� r Cost:Project Name: Wastewater Airlines to Trains 2&3 000 Cost Schedule: 2017 2018 2019 020 2021 The project begins in the spring of 2017 and will be completed in the summer of 2018. 86 43 5/11/2017 GI AF VISE. Utility & Storm Drainage — Wastewater ,, Page 47 ;t _ r ProjectName: Wastewater Aerial Crossings Cost: $1,500,000 Description: This project encompasses the replacement of wastewater line aerial crossings over Big Bear Creek,Farris Branch and Morehead Branch. Background: Creek bank erosion and debris have damaged wastewater lines that cross Big Bear Creek,Ferris Branch and Morehead Branch creek. The bank repair will help to eliminate future damage including sewer releases into the creek. 87 fi,I�AP VIDE. Utility & Storm Drainage — Wastewater ..T F. ,ti Page 47 11 J •jectName: Wastewater Aerial Crossings Cost: $1,500,000 Cost Schedule: 2017 2018i i i 2021 e 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q ,• 1Q 2Q 3Q -e The project will begin in the spring of 2018 and will be completed in June of 2020. 88 44 5/11/2017 GI AF 1 ISE. Utility & Storm Drainage — Wastewater ,, Page 51 ;t _ r Cost:ProjectName: Wastewater Treatment Belt Press 000 Description: Replace existing belt press to more effectively separate water and sludge reducing landfill costs. Background: Existing belt press has reached the end of its useful life. A new press is required to continue plant operations. 89 .CRAP E. Utility & Storm Drainage — Wastewater ,r F• �_;� �* Page 51 ,�� r ProjectName: Wastewater Treatment Belt Press Cost: 000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The project should commence in the beginning of 2017 and be completed at the end of the third quarter. 90 45 5/11/2017 Utility — Storm DrainageL Page 55 -jF ProjectName: Wall St.Culvert& Morehead Branch Cost: $500,000 Description: This project will replace the existing culvert under Wall Street at Morehead Branch. Background: The existing culvert is aged and undersized. The new culvert will provide better flow and structural integrity. 91 .CRAP VISE. Utility - Storm Drainage T F. Page 55 ProjectName: Wall St.Culvert& Morehead Branch Cost: $500,000 Cost Schedule: 2017 2018 2019 020 2021 The project is scheduled to start in the fourth quarter of 2020 and be completed at the end of the third quarter 2021. 92 46 5/11/2017 Utility — Storm DrainageL Page 59 • $500,000 Description: The project will replace the existing culvert under College Street at Morehead Branch. Background: The existing culvert is aged and undersized. The new culvert will provide additional flow and structural integrity. 93 .CRAP VINE. Utility - Storm Drainage T F. Page 59 Project $500,000 Cost Schedule: 2017 2018 2019 020 2021 e 2Q 3Q -e 1Q 2Q 3Q -e 1Q 2Q 3Q -e 1Q 2Q 3Q -e 1Q 2Q 3Q -e The project is scheduled to commence in the fourth quarter of 2019 and be completed at the end of the third quarter 2020. 94 47 5/11/2017 Utility — Storm DrainageL Page 63 -jF Project Name: Kimball Rd. Raising Cost: $1,000,000 Description: The project will raise Kimball Road curve between Snakey Lane and Lakeridge Drive to prevent road closures when lake levels rise 2'above conservation pool elevation of 535.00. Background: The aim of the project is to reduce frequency of Kimball Road flooding due to intermediate lake levels above conservation pool. 95 .CRAP VISE. Utility - Storm Drainage T F. Page 63 Project Name: Kimball Rd. Raising 'W cost: $1,000,000 Cost Schedule: 2017 2018 2019 020 2021 The project should commence in the fourth quarter of 2018 and is targeted for completion in the third quarter of 2020. 96 48 5/11/2017 Utility — Storm DrainageL Page 67 -jF Project Name: Country Estates Pipe Lining Cost: $1,500,000 Description: The existing infrastructure is aging and the pipe is leaking at the joints allowing groundwaterto infiltratethe pipe. The entire system will be sprayed with a lining to stop infiltration and provide additional strength and years of service life. Background: The existing corrugated metal pipe is aged and leaking groundwater and soil at the joints. This project will stop the infiltration and provide additional strength to the existing system. 97 .CRAP VISE. Utility - Storm Drainage T F. Page 67 ProjectName: Country Estates CMP Lining Cost: $1,500,000 Cost Schedule: 2017 2018 2019 020 2021 This project will start in the summer of 2017 and is targeted for completion in the fall of 2018. 98 49 5/11/2017 Utility — Storm DrainageL Page 71 -jF Project Name: Big Bear Creek Bank Cost: $1,500,000 Description: The project is designed to repairthe creek bank in several locationswhere bank erosion has occurred. Background: Rise of the creek over time has caused significant erosion within the creek bed in multiple locations. The erosion is at a point where sanitary sewer crossings,bridge and trail structures may be compromised with additional bank erosion. 99 .CRAP VISE. Utility - Storm Drainage T F. Page 71 Project Name: Big Bear Creek Bank 'W Cost: $1,500,000 Cost Schedule: 2017 2018 2019 020 2021 The project is scheduled to commence in the fall of 2017 and be completed the third quarter of 2020. 100 50 5/11/2017 Utility — Storm DrainageL Page 75 -jF Project Name: Denton Creek Bank 0 Wr Cost: $2,000,000 Description: The project is designed to repair creek banks at various location where erosion has occurred. Background: The project will stabilize banks of Denton Creek at several locations where erosion has occurred and is beginning to threaten sanitary sewer and trail structures. 101 .CRAP VISE. Utility - Storm Drainage T F. Page 75 Project Name: Denton Creek Bank 'W Cost: $2,000,000 Cost Schedule: 2017 2018 2019 020 2021 The project is scheduled to commence in June of 2018 and be completed in the third quarter of 2019. 102 51 5/11/2017 Section V1 — CO's or Cash Recommended for Funding 103 Section IV PP VISE r E• 1 A S CO's or Cash. Project . . 3CVB Storage Facility for Christmas and Festival Eq. $ 1,700,000 7CVB Feasibility Study for Multi Show Exhibit Hall 40,000 11CVB Relocation of Rail Yard Train Concourse 1,220,000 Feasibility Study for Clubhouse Renovation, Practice Area,Teaching Facility,4 Hole Wedge Course and 15Golf Practice Area 25,000 19 Public Works Traffic Signal Detection Upgrade 500,000 21 Public Works Pan and Tilt Cameras at Major Arteries 180,000 23 Public Works Safe Access to Schools 250,000 27 Public Works ADA Transition Plan 250,000 Sub Total CO's or Cash $ 4,165,000 104 52 5/11/2017 CO's or Cash - CVB Page 3 -jY Project Name: Facility to Store Christmas and Festival Eq. Cost: $1,700,000 Description: The project is to provide an addition of 15,000-20,000 sq.feet of enclosed storage for Festival equipment/props and Christmas Decorations to be generally located within easy access of Main Street. Background: The Locker building at the corner of Main Street and Dallas is currently being used to store equipment and Christmas decorations. The locker building will soon be demolished so there is a need for another storage facility for these items. The building will be paid for the by the CVB but will be shared between the Parks Department and the CVB. 105 CO's or Cash - CVB AP VISE T r:- z s s Page 3 Project Name: Facility to Store Christmas and Festival Eq. Cost: $1,700,000 Cost Schedule: 2017 2018 2019 020 2021 The project does not have a cost schedule at this time. 106 53 5/11/2017 CO's or Cash - CVB Page 7 -jY . Err 000 Description: The project is to first conduct a feasibilitystudy to analyze the construction of a Multipurpose Exhibition Hall of 150,000-200,000 sq.feet to accommodate consumer shows,trade and industry exhibits,indoor festivals and events that will drawn larger groups into Grapevine for extended periods of time. Background: The feasibility study will provide the proper due diligence with respect to the facility, operations and associated cost and competing priorities prior to facility investment. 107 CO's or Cash - CVBAP VISE T F.• X S S Page 7 Feasibility000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The feasibility study is scheduled to commence in the beginning of 2017 with completion the same year. 108 54 5/11/2017 CO's or Cash - CVB Page 11 Relocation000 Description: The addition of commuter rail will require the relocation of GVRR Rail Yard, Locomotives,Coaches and Commissary as well as the rest room dump stations and docking power of 480 volts. Background: Although separate,the project will provide required support and operational logistics for the new train station,hotel and parking garage project. 109 CO's or Cash - CVBAP VISE T F.• X S S Page 11 RelocationProject Name: 000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The project is schedules to start January 2017 and be completed in the third quarter of the same year. 110 55 5/11/2017 Gl AP �I\E COs or Cash - Golf ;- F s_ Page 15 -JY 000 Description: The project starts with a needs assessment for the replacement of existing clubhouse to include:golf shop,locker room/restrooms,restaurant,patio,and meeting rooms. New facility should incorporate latest modern design and functionality to serve community and better match the golf course product upgraded in 2003.The study will include a review for a practice area and teaching facility with a four hole wedge course.This project will require Corp.of Engineer approval. Background: The assessment is required to take a critical look at what is required to bring the facilities and playing area of the Grapevine Golf Course in line with 2017 standards. The assessment would also include what additional revenues could be generated with such upgrades providing rate of return data for the potential investment. CO's or Cash - Golf _VINE. f F:• , S Page 15 � ProjectName: Feasibility Study Cost: 000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The feasibility study would commence in June of 2017 and be completed by the end of the same year. 112 56 5/11/2017 GI P �ISE COs or Cash — Public Works , F s_ Page 19 Pro .. �� ���jectName: Traffic Signal Detection Description: The project will replace video detection with radar detection systems. Five intersections will be completed at$20K per intersection per year. Background: The City Council was briefed on this item in March,2015. Video detection developed in the 1990s is currently deployed at a majority of the city's traffic signal locations. Since that time TxDOT has adopted vehicle detection using radar as its standard. The Texas Transportation Institute has determined that radar vehicle detection is more reliable and is more efficient in detecting vehicles. 113 CO's or Cash — Public WorksAP VIDE T F.• X ,5 S' Page 19 UpgradeProjectName: Traffic Signal Detection $500,000 Cost Schedule: 2017 2018 2019 020 2021 The city plans to replace 5 intersections per year starting in the fourth quarter of 2017 and complete the work early in 2022. 114 57 5/11/2017 GI P �ISE COs or Cash — Public Works , F s_ Page 21 Project Name: Pan and Tilt Cameras Cost:�w $180,000 Description: The project will install Pan and Tilt cameras at major arterial intersections. The cost is $6,000 per intersection and will cover 30 intersections over the next four years. Background: The City currently has Pan and Tilt cameras installed at 21 intersections. Pan and Tilt cameras provide the ability to perform real-time monitoring of traffic flow at intersections. 115 CO's or Cash — Public Works NMAP VIDE -T F.• X ,5 S' Page 21 V�I _fl Project Name: Pan and Tilt Cameras cost: $180,000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The project is scheduled to begin in the fourth quarter of 2017 and will continue through 2021. 116 58 5/11/2017 GI P �ISE COs or Cash — Public Works , F s_ Page 23 Schools,ProjectName: Safe Access to 000 Description: The project will install sidewalks,upgrade school flashers and warning systems providing for safe entrance ways to all schools. Background: The program is designed to decrease vehicle traffic and improve safety around school campuses. The program promotes walking and biking to schools.This project will include construction of missing sidewalk segments and upgrade of traffic control devices surrounding school campuses. 117 CO's or Cash — Public Works N _ E r r.• ] i S Page 23 1 , SchoolsProjectName: Safe Access to 000 Cost Schedule: 2017 2018 2019 020 2021 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q The project is scheduled to start in October of 2017 and will be completed in 2022. us 59 5/11/2017 GI P �ISE COs or Cash — Public Works , F s_ Page 27 000 Description: The project will replace handicapped ramps and sidewalks that are not in compliance with ADA regulations bringing all walkways within code. Background: Complete city wide improvements as required by Department of Justice ADA regulations. The Department of Justice is increasing enforcement of public jurisdictions. 119 CO's or Cash — Public Worksr. _ E r • ] '.A S Page 27 � ADA 000 Cost Schedule: 2017 2018 2019 020 2021 The project will start in October of 2017 and will be ongoing. 120 60 5/11/2017 Section V — Future Projects 121 Section VAP VISE r e- x s Future Projects. Project Description 3 Parks and Rec. Horseshoe Trail Restrooms $ 300,000 7Parks and Rec. Addl Parking Lot at Meadowmere Soccer Complex 300,000 11 Parks and Rec. Field Lights&Turf at Meadowmere Soccer Complex 1,650,000 15 Parks and Rec. Parr Park Playground Surfacing 150,000 19 Parks and Rec. Acorn Woods Restroom 70,000 23 Parks and Rec. Liberty Park Turf Project 75,000 27 Parks and Rec. Parr Park Lights on Soccer Field 510,000 31 Parksand Rec. 2499 Trail Extension 1,100,000 122 61 5/11/2017 Section V GI�AP �IQ�; Future Projects Project Descri 35 Parks and Rec. Destination Entry Features 5,150,000 Kimbal Trail-Dependent upon Kimbal Rd Storm 39 Parks and Rec. Drainage 2,500,000 43 Police Indoor Firing Range 5,000,000 47 Public Works Fairway Drive Improvements 2,822,687 51 Public Works LED Arterial Lighting-Roadway Lighting 790,960 55 Public Works Sidewalk Replacements Program 1,000,000 57 Public Works Links Trail from SH26 to Anderson Gibson Rd 100,000 61Technology Council Chambers Audio Visual Upgrade 100,000 Sub Total Future Projects $ 21,618,647 123 .,RAP VINE. Future Projects — Parks and Rec. �;T F.• S , Page 3 Project Name: Horseshoe Trail .. $300,000 Description: This project will place a total of 3 restroom facilities near highly used trails.One restroom will be place on Horseshoe Trails on the west end near the Dove Loop Trailhead parking area and the second will be placed in the McPherson Slough area. The third restroom facility will be placed near Trawick Pavilion and the Workout station at Darren Medlin Trail and Oak Grove Loop. Background: Horseshoe Trails is one ofthe most populartrails in north Grapevine. The high usage of this trail requires quality restrooms along the trail. The 3 restrooms being proposed will allow a restroom to be placed at 2 major parking areas near the trail as well as near the Trawick Pavilion for those that rent the pavilion or use the workout station at Oak Grove Loop and Darren Medlin Trail. 124 62 5/11/2017 GI P �ISE Future Projects — Parks & Rec. F:s_ Page 3 -jY Project Name: Horseshoe Trail .. $300,000 Cost Schedule: 2017 20181 11 2021 The project initially was estimated to take a year to complete. The start date is pending approval at this time. its a hl ak R f4Uk''PAK.H6 'GlY RO At tv,t, :era !! • ' �11M uF7f 126 63 5/11/2017 ,GRAD VINE. Future Projects — Parks and Rec. �:T F:. , Page 7 ProjectName: Add. Parking Lot at MM Soccer Cost: $300,000 Description: Due to the growth of soccer and the number of participants attending games along with friends and family it has become necessary to increase the number of paved parking spaces available at the Meadowmere Soccer Complex.The current overflow lot to the west is the proposed area. Background: The soccer fields at Meadowmere have been in existence since January of 2002. Since 2002 the fields have been adjusted,changed,etc.based on the needs of the Grapevine Southlake Soccer Association. Due to the number of fields at the facility and the need to keep Perch Lane free from parking additional parking is needed to keep the facility operating safely and successfully. When vehicles are parked on Perch Lane the area becomes too tight for emergency vehicles to pass through causing safety issues in the event of an injury on or near the fields. 127 Future Projects — Parks & Rec. P VINE T F.• X S S Page 7 Project Name: Adtl. Parking Lot at Meadowmere Cost: $300,000 Cost Schedule: 2017 2018 2019 020 2021 IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q IQ 2Q 3Q 4Q The project would be scheduled to begin in 2017 with a target completion date of May 2018 pending approval. 128 64 5/11/2017 GI P �ISE Future Projects — Parks and Rec. , Page 11 -JY Field 000 Description: Due to the growth being experienced by GSSA it has become necessary to light an additional four fields at Meadowmere.These lights will offer the additional practice and game times needed to host the growing number of soccer games in Grapevine. Along with lighting the four additional fields,this project will also allow for the installation of artificial turf on fields 1 and 2. Background: GSSA continues to grow and gain in popularity. Due to this increase in the number games being played at the complex it is necessary to add lighting to four of the fields and install artificial turf on fields 1 and 2. The artificial turf will be a definite improvement allowing for play to continue in rain events when many times games have to be cancelled and rescheduled due to the damage that could be caused if the game were to be played on wet fields. 129 Future Projects — Parks & Rec. _VINE. f F:• , S Page 11 � FieldProject Name: 000 Cost Schedule: 2017 2018 2019 020 2021 The project would be scheduled to begin in 2017 with a target completion date of June 2018 pending approval. 130 65 5/11/2017 GI P �ISE Future Projects — Parks and Rec. , Page 15 -JY Wr PlaygroundProject Name: Parr Park 000 Description: The project will provide a clean and safe play surface for the children. Background: The Parr Park Playground has seen different phases and styles of equipment through the many years of operation. Through all of the years one things has been consistent: during large rain events the park floods and water travels through the playground mulch requiring complete removal and replacement. The surfacing being recommended in this project will allow for flood recovery to happen much quicker with much less staff time being required to safely get the playground back open and usable. 131 Future Projects — Parks & Rec. _VINE. f F:• , S Page 15 � PlaygroundProject Name: Parr Park 000 Cost Schedule: 2017 2018 2019 020 2021 The project would be scheduled to begin in 2017 with a target completion date of May 2018 pending approval. 132 66 5/11/2017 GI P �ISE Future Projects — Parks and Rec. , F:s_ Page 19 -JY Project Name: Acorn Woods Restroom Cost:�w $70,000 Description: This project will add anew restroom facilitythat will enhance and make the use of the Acorn Woods easier for those enjoying the park. Background: Acorn Woods is a day use picnic area where many families come to enjoy a picnic. The original Corps of Engineers restroom that was at Acorn Woods was removed many years ago. The restroom was in disrepair and was a safety hazard due to its condition and its placement across the road from the park. It was very dangerous for patrons to cross the road. Port-A-Potties have been used at this location for many years,but the facilities are unsightly and tend to be turned over via wind or vandals from time to time. I fully functioning restroom facility in this area would be a great amenity for park users. 133 Future Projects — Parks & Rec. P VINE T F.• X S S Page 19 I�Irjv Project Name: Acorn Woods Restroom Cost: $70,000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2017 and be completed in May of 2018 pending approval. 134 67 5/11/2017 135 Future Projects — Parks and Rec. _VINE. f F:• , S Page 23 � ProjectNarne: Liberty Park Turf Project Cost: 000 Description: This project will install turf at Liberty Park to improve the look and remove the existing crushed granite through the Park.Turf was installed near the Gazebo on Main Street and has held up very well to the traffic. Background: Liberty Park on Main Street is a highly used area for citizens and visitors to Grapevine. As such the crushed granite that is in place throughout the park is a durable way to handle the crowds,but is not very aesthetically pleasing. The turf that was installed near the gazebo has been a wonderful improvement to that area. This project will provide for Liberty Park with the same amenity as at the Main Street Gazebo. 10 136 68 5/11/2017 GI P �ISE Future Projects — Parks & Rec. , F:s_ Page 23 -JF ProjectName: Liberty Park Turf ' 000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2017 and be completed in May of 2018 pending approval. 137 Future Projects — Parks and Rec. P VIDE T F.• X S S Page 27 Lights �rj Project Name: Parr Park 000 Description: This project was approved in the Parks Master Plan update and is a top priority for the youth soccer and football associations supported by the Grapevine Parks and Recreation Department.Lighted practice locations for youth sports is becoming a larger need each year.Having these two extra fields with lights will be a huge benefits for both sports.The plan would be to use new LED sports lighting technology,there is no light pollution or glare with the LED product. Background: For many years the Grapevine Southlake Soccer Association along with the Grapevine Colleyville Youth Football Association have discussed the need for additional lighted practice locations for youth sports. The new lighting technology will allow for the lightingto be installed and not be an issue with the neighbors near the park. 138 69 5/11/2017 GI P �ISE Future Projects — Parks & Rec. , F:s_ Page 27 SoccerProject Name: Parr Park 000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2017 and be completed in May of 2018 pending approval. 139 Future Projects — Parks and Rec. � P VIDE T F.• X S S Page 31 Project Name: 2499 Trail Extension Cost: $1,100,000 Description: This is a project that will continue the Mills Run Trail from the present stopping point at 2499.The trail will continue from 2499 and proceed north to the Flower Mound City limit. Background: The Mills Run trail behind Grapevine Mills Mall running along Denton Creek and up to the apartments on 2499 is a great amenity for the northeast portion of Grapevine. This new portion of Denton Trail would allow users to continue east from 2499 along Denton Creek up to Flower Mound. 140 70 5/11/2017 GI P �ISE Future Projects — Parks & Rec. , F:s_ Page 31 Project Name: 2499 Trail Exten., Cost: $1,100,000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence June of 2017 and be completed May of 2018 pending approval. 141 Future Projects — Parks and Rec. _VINE. f F:• , S Page 35 � Project Name: Destination Entry Features Cost: 000 Description: The project would provide City entry features and signage at key focal points in Grapevine.This is a multi-year project needing a total of$S.OM with approximately$1.OM designated for each of the 5 years. Background: Several areas throughout the DFW Connector corridor were not included in TxDOT's landscape plan for the project. The landscaping of these highly visible areas will enhance the appearance of Grapevine. In July 2013 staff presented the concept of contracting with a landscape architectural firm to design several areas of the DFW Connector project. Council asked staff to broaden the landscape scope and incorporate entry signage/features to the scope. This multi- year project will bring a sense of welcome and place for drivers using the many highways passing through Grapevine. These features will provide drivers the ability to understand they are in Grapevine and will welcome them in to come enjoy all that Grapevine has to offer. 142 71 5/11/2017 GI P �ISE Future Projects — Parks & Rec. , F:s_ Page 35 Project Name: Destination Entry Features Cost: 000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2017 and be completed in September of 2020 pending approval. 143 Future Projects — Parks and Rec. *�X E Page 39 ProjectName: KimballTrail 1W Cost: $2,500,000 Description: This project would connect residents near Kimball Road and Meadowmere Park with a walk/bikewayto safely transit to Meadowmere Park from the neighborhood. Background: Many homeowners in northwest Grapevine has requested a safe route to get from the neighborhoods to Meadowmere Park. This route could be used by runners, walkers or bikers to gain access to the park that presently offers no safe route due to the road change topography and the sharp turn on Kimball Road. 144 72 5/11/2017 GI P �ISE Future Projects — Parks & Rec. F:s_ Page 39 .. $2,500,000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2017 and be completed May of 2018 pending approval. 145 Future Projects — Police *�XE Page 43 Project Name: Indoor Firing Range V Cost: $5,000,000 Description: The range would provide a safe and controlled environment for the pubic safety personnel to achieve and or maintain skills required as professionals.Construction cost estimate only. Does not include land acquisition or estimated operating expenses. Background: The indoor firing range would provide a safe,controlled and convenient location for law enforcement to maintain and increase firearm skills required for the safety of themselves and the public. 146 73 5/11/2017 GI P �ISE Future Projects — Police , Page 43 Project Name: Indoor Firing Range Cost: $5,000,000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2017 and be completed in May of 2018 pending approval. 147 Future Projects — Public WorksAP VIDE Page 47 Project Name: Fairway Drive Improvements Cost: $2,822,687 Description: The project would widen Fairway Drive from SH 26 to Cowboys Golf Course entrance. In conjunction with a dual left turn from SH 26 to Fairway Dr,these improvements should improve the operation of the current left turn and provide a significant length of 2 lane NB roadway with a required merge before the Dam. Approximately 2,500 LF. Background: The project provides capacity improvements and dual left turn lanes from northbound SH 26 to Fairway Drive. Id 148 74 5/11/2017 GI Pp�l Future Projects — Public Works , F: e.�,- Page 47 Tairway Drive Improvements Project Name: Cost: $2,822,687 Cost Schedule: 2017 2018 2019 020 2021 The project would start in June of 2018 and be completed in June of 2019 pending approval. 149 Future Projects — Public WorksAP VIDE T r:- z s s Page 51 ProjectName: LED Arterial Lighting V Cost: $790,960 Description: The project would install LED roadway lighting along arterial network. Dallas Road WD Tate to SH114 at$112,000 and SH26 SH114 to Brumlow$432,000. Annual lighting cost per fixture is$140. Background: This project will install LED roadway lighting along arterial roadways where no lighting exists. LED roadway lighting provides significant life cycle cost saving($50 per fixture per year)over metal halide and high pressure sodium lighting.LED lighting also provides more focused light and does not emit light in all directions. A 150 75 5/11/2017 GI Pp�l Future Projects — Public Works , F: e.�,- Page 51 -JY ProjectName: LED Arterial Lighting �ii •� •.� Cost Schedule: 2017 2018 2019 020 2021 The project would start in the fourth quarter of 2017 and be completed in 2022 pending approval. 151 Future Projects — Public Works .CRAP VIDE Page 55 ProjectName: Sidewalk Replacement Program Cost: $1,000,000 Description: The project would install missing sidewalk links and repair damaged sidewalks along collectors and arterial streets increasing safety and appearance.$200,000 per year. Background: This project will replace failing sidewalks and provide a safer walking environment for pedestrians. 152 76 5/11/2017 GI Pp�l Future Projects — Public Works , F: e.�,- Page 55 -jy ProjectName: Sidewalk Replacement Program Cost: $1,000,000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in October of 2017 and be completed in 2022 pending approval. 153 Future Projects — Public WorksAP VIDE IT F.• X S S Page 57 Project Name: Links TI.from SH26 to Anderson Gibson Rd. Cost: $100,000 Description: The project is designed to provide a safe complete trail linkage along the apartment complex. Background: This project will provide linkage between the Links Trail and the Denton Creek Trail. 154 77 5/11/2017 GI Pp�l Future Projects — Public Works , F: e.�,- Page 57 Project Name: Links TI.from SH26 to Anderson Gibson Rd. Cost: $100,000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2020 and be completed in June of 2021 pending approval. 155 Future Projects — Technology BF.VI VIDE Page 61 Project Name: Council Chambers Audio Visual Upgrade Cost: $100,000 Description: The project would provide a technology upgrade of the Council chambers audio/visual system. The current system is outdated,making it difficult to purchase replacement parts.It also does not provide an excellent experience for citizens,Council members,City staff,and outside vendors who do presentations at Council.Phase one of this project includes the replacement of the video projection screens and projectors with a video wall,replacement of the 16 monitors in the dais with HDCP-compliant widescreen monitors, 1 HD multimedia presentation system to provide switching and video routing between the video walls,dais monitors,podium monitor(future addition),and the OFE display in the AV control room. Background: The current system is outdated,making it difficult to purchase replacement parts. It also does not provide an excellent experience for citizens,Council members,City staff,and outside vendors who do presentations at Council. A 156 78 5/11/2017 GI P �ISE Future Projects — Technology F:s_ Page 61 -jY Project Name: Council Chamber Audio Visual Upgrade Cost: $100,000 Cost Schedule: 2017 2018 2019 020 2021 The project would commence in June of 2017 and be completed in July of 2018 pending approval. 157 79