HomeMy WebLinkAboutSFRA2016-14692016 DATE OF ISSUANCE: APR 2
�fj
APR, or )� PERMIT #• L7—
UIL IG E I APPLICATION
(PLEASE PRINT LEGI$LY — COMPLETE ENTIRE FORM)
JOB ADDRESS: 1729 Sonnet Dr, Grapevine, TX 76051, USA (TARRANT County) SUITE #
LOT: BLOCK: SUBDIVISION:
BUILDING CONTRACTOR (company name): SolarCity Corporation
CURRENT MAILING ADDRESS: 3051 Northern Cross Blvd #401
CITY/STATE/ZIP: Fort Worth, TX 76137
PROPERTY OWNER: Marla Reinders
CURRENT MAILING ADDRESS: 1729 Sonnet Drive
: # 817-682-5095
Fax #
CITY/STATE/ZIP: Grapevine, TX 76051 PHONE NUMBER: 8178760157
PROJECT VALUE: $ 6,300.00 FIRE SPRINKLERED? YES NO _
WHAT TRADES WILL BE NEEDED? (Check ones that apply) ELECTRIC ® PLUMBING MECHANICAL
DESCRIPTION OF WORK TO BE DONE: Install Roof Mounted Solar PV System
USE OF BUILDING OR STRUCTURE: Residential
NAME OF BUSINESS:
Total Square Footage under roof: Square Footage of alteration/addition:
❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings,
alterations and additions)
❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: (Not required for I & 2 family dwellings)
❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S). �l
PRINT NAME: Clint Austin SIGNATURE ����YLGd1a2�
PHONE #: 817-682-5095
EMAIL:
❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Type: V a
Permit Valuation: $
Setbacks
Approval to Issue
Occupancy Group:
Fire Sprinkler: YES NO
Front:
Electrical
Division:
Building Depth:
Left:
Plumbing
Zoning: Rm
Building Width:
Rear:
Mechanical
Occupancy Load:
Right:
Plan Review Approval:
Date: t4 -42Z2v`l6
Building Permit Fee:
LD- LL t5
Site Plan Approval:
Date:
Plan Review Fee:
Fire Department:
Date:
Lot Drainage Fee:
Public Works Department: Date:
Sewer Availability Rate:
Health Department:
Date:
Water Availability Rate:
Approved for Permit:
Date: 14 ° -
Total Fees:
I r �-
Lot Drainage Submitted:
Approved:
Total Amount Due:
P.O. BOX 95104, GRAPEVINE, TX 76099 (617) 410-3165
OfORMSMSPERMITAPPLICATIONS 1/02-R-.11104,5/06,2/07,11/09,4111
.QAJ VVINE 6, ls�,T DaIN-W4
X A S
-T CITY OF GRAPEVINE
•
(CIRCLE ONE) An rnmon
MECHANICAL ELECTRICAL - PLUMBING - IRRIGATION - FUEL GAS
PERMIT APPLICATION
(PLEASE PRINT LEGIBLY - COMPLETE ENTIRE FORM)
PERMIT #BLDG.
I Lf -10
PERMIT #
1 _ I& —1 01
DAT E:
4/14/2016 1
JOB ADDRESS: 1729 Sonnet Dr, Grapevine, TX 76051, USA (TARRANT Countyl"TE #
DESCRIPTION OF WORK:
Install Roof Mounted Solar PV System
PROPERTY OWNER:
Maria Reinders
CONTRACTING COMPANY:
SolarCity Corporation
ADDRESS:
1729 Sonnet Drive
ADDRESS:
3051 Northern Cross Blvd #401
CITY/STATE/ZIP:
Grapevine, TX 76051
CITY/STATE/ZIP:
Fort Worth, TX 76137
PHONE NUMBER:
8178760157
PHONE NUMBER:
817-682-5095
TYPE OF OCCUPANCY
BUILDING AREA
(SQ FT)
PERMIT FEES
AMOUNT DUE
EACH TRADE
I. R-3
I - 749
$ 33.25
SINGLE FAMILY, DUPLEX
750— 1,199
$ 49.88
TOWNHOUSE,
1,200- 1,500
$ 63.18
NEW CONSTRUCTION &
1,501- 1,750
$ 76.48
ADDITIONS (PER UNIT)
1,751- 2,000
$ 83.13
2,001 - 2,250
$ 89.78
TOTAL SQ. FOOT UNDER
2,251- 3,000
$ 96.43
ROOF
3,001- 3,500
$ 103.08
3,501 - 4,000
$ 109.73
$
4,001 +
$ 120.37
EACH TRADE
11. A, E, 1, R-1
1 - 500
$ 37.00
HOTELS, APARTMENTS,
501 — 100,000
$ 17.50+.035 PER
DRINKING/DINING,
100,001 — 500,000
$ 3,500.00+.03 SQUARE
EDUCATIONAL, ASSEMBLY,
500,001 +
$15,000.00+.02 FOOT
$
INSTITUTIONAL
EACH TRADE
111. B, F, H, M, S, U
OFFICE, RETAIL, WHOLESALE,
1- 500
$ 37.00
GARAGES, FACTORIES,
501- 50,000
$ 32.00+.01 PER
1
WORKSHOPS, SERVICE
50,001- 100,000
$ 182.00+ .007 SQUARE
STATIONS, WAREHOUSE
100,001+
$ 582.00+.003 FOOT
$
CONTRACT
EACH TRADE
IV. ANY OCCUPANCY GROUP
VALUATION OF
WORK
FINISH -OUTS,
SHELL COMPLETIONS,
0- 500
$ 37.00
ALTERATIONS OR
501- 1,500
$ 45.00
STAND ALONE PERMITS
1,501- 3,000
$ 57.00
3,001- 5,000
$ 72.00
CONTRACT VALUATION OF WORK:
5,001- 50,000
$ 27.00+.009
50,001- 100,000
$ 127.00+ .007 PER
$1500
100,001- 500,000
500,001+
$ 327.00+ .005DOLLAR
$ 1,327.00+.003 TVALUATION
s45.00
EACH TRADE
V. MISCELLANEOUS
IRRIGATION SYSTEMS
$ 37.00
MOBILE HOME SERVICE
$ 37.00
TEMPORARY POLE SERVICE
$ 37.00
SWIMMING POOLS
$ 37.00
SIGN ELECTRIC
$ 37.00
$
C:\Users\sbatte\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.OuttookXG80E6GQF\MEP APPLICATION 4-1 1.doc
n
r•
r
PLAN SUBMITTAL: i
WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING
OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED
PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE
OTHERWISE REQUIRED BY STATE LAW.
OTHER INSPECTIONS AND FEES:
• INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)..... ..................... -- ............. -..$42.00/HOUR*
• REINSPECTION FEES.................................................................................................................. $42.00
• PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED........................................................... $37.00
• INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM)......................$42.00/HOUR
• ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO
APPROVEDPLANS ..... .............................. .............................. .............................. ..................... ...$42.00/HOUR
• BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT
SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE
• FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS"
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE
PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE
WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF
THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF
GRAPEVINE.
1 FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR
LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS,
AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST.
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT
(OR HOMEOWNER FOR HOMEOWNERS PERMITS)
817-682-509A9
Clint Austin
� � a
EMAIL:
"OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER.
"ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS.
Development Services Department, Building Inspections
The City of Grapevine * P.O. Box 95104 * Grapevine, Texas 76099 * (817) 410-3165
Fax (817) 410-3012 * www.grapevinetexas.gov
C:\Users\sbatte\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\G80E6GQF\MEP APPLICATION 4-11.doc
'*"."."""So1arC1'ty.
April 14, 2016
RE:
Project/Job # 7601440
Project Address:
AHJ
SC Office
Design Criteria:
CERTIFICATION LETTER
Reinders Residence
1729 Sonnet Drive
Grapevine, TX 76051
Grapevine
Fort Worth
- Applicable Codes = IRC 2006 / IBC 2012, ASCE 7-10, and 2012 NDS
- Risk Category = II
- Wind Speed = 115 mph, Exposure Category C
- Ground Snow Load = 5 psf
- MPl: Roof DL = 12.5 psf, Roof LL/SL = 17 psf (Non -PV Areas), Roof LL/SL = 2.3 psf (PV Areas)
Version #56.4 - TBD
Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.1223 < 0.4g and Seismic Design Category (SDC) = B < D
To Whom It May Concern,
A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from SolarCity.
Structural evaluation was based on site observations and the design criteria listed above.
Based on this evaluation, I certify that the existing structure directly supporting the PV system is adequate to withstand all loading
indicated in the design criteria above based on the requirements of the applicable existing building and/or new building provisions
adopted/referenced above.
Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the
manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading.
The PV assembly hardware specifications are contained in the plans/docs submitted for approval.
Digitally signed by Humphrey F. .....
Sincerely, F. ,�HUMPHREY K. KARIUKI
Humphrey Kariuki, P.E. Kariukl
Professional Engineer Date: 2016.04.1414:07:05 -04'00' Ns,�°��`:;
T: 443.451.3515 t\��S/�jNA�
email: �`'� NAN-
., .,,, ,im�ar Jew Way ;av'. 'M,�ter, CA 94 102 ' (b,JF . S£; - tt?: 8 (EiFB) 5�'X -t.t7'! f650i 6 .>
-1 4-�oj OFFICE COPY
Version #56.4 - TBD
Landscape
Hardware
Hardware -Landscape Modules' Standoff Specifications
X -X Spacing X -X Cantilever Y-Y'Spacing Y -Y Cantilever Configuration Uplift DCR
MPi
72" 24" 39" NA Not -Staggered 48.3%
Portrait
Hardware
Hardware - Portrait Modules' Standoff Specifications
X -X Spacing X -X Cantilever Y -Y Spacing Y -Y Cantilever Configuration Uplift DCR
MPi
48" 20" 66" NA Not -Staggered 54.1%
Structure Mounting Plane Framing Qualification Results
Type Spacing Pitch Member Evaluation Results
MPi Vaulted Ceiling @ 24 in. O.C. 310 Member Impact Check OK
Refer to the submitted drawings for details of information collected during a site survey. All member analysis and/or evaluation is based on framing information
gathered on site. The existing gravity and lateral load carrying members were evaluated in accordance with the IBC and the IEBC.
, 055 4tParvles;- Way -`m Mateo, OA 04402 (h,M) 6.,5 - 1028 t `8) ,OL. - "!TY . f6SOi e'.? - 1029 .oiar_iiy,.f>
®.®
Roof Pitch
Member Properties Summary
Summa ;
PitchAdjust
Non -PV Areas
PV Areas
MPI
Horizontal Member S ans'
Overhang 1.16 ft
Rafter Pro erties
Actual W 1.50"
Roofstem
Pro: ernes
San 1
5.51 ft
Actual D
5.50"
Number of Spans (w/o Overhang) 3
San 2
3.43 ft
Nominal
Yes
Roofing Material
Compof
San 3
1.0.65 ft
A
8.25 in.A2
Re -Roof
No
Span 4
2.3 psf
SX
7.56 in.^3
Plywood Sheathing
Yes
San 5
27.4 psf
I
20.80 In,^4'
Board Sheathing
None
Total Rake Span
24.21 ft
TL DON Limit
180
Vaulted Ceiling
Yes `
PV 1 Start '
1.25 It
Wood Species `
DF
Ceiling Finish
1/2" Gypsum Board
PV 1 End
18.42 ft
Wood Grade
#2
Rafter Sloe
310
PV 2 Start
Fb
900 psi
Rafter Spacing
24" O.C.
PV 2 End
F„
180 psi
Top Lat Bracing
Full
PV 3 Start
E
1600000 psi
Bot Lat Bracing
At Supports
PV 3 End
Emi„
580000 psi
Roof Pitch
Member Loading
7/12 Initial
Summa ;
PitchAdjust
Non -PV Areas
PV Areas
Roof Dead Load
DL
12.5 psf
x 1.17
14.6 psf
14.6 psf
PN Dead Load
PV -DL
9.0 Psf
x 1.17
10.5 psf
Roof Live Load
RLL
20.0 psf
x 0.85
17.0 psf
Live/Snow Load
LL/SLi-
5.0'psf
x 0.7 ] x 0.46
3.5 psf
2.3 psf
Total Load Gov rning LG
TL
18.1 ' psf
27.4 psf
Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv
per ASCE 7 [Figure 7-2] 2. pf
= 0.7 (Ce) (CO (IS) Po; Ce=0.9, Ct=1.1, I,=1.0
Member Anal sis Results Summary
Governing` Anal sis Pre -PV Demand Post -PV Demand Net Impact Result
Gravity Loading Check -1103 psi -929 psi 0.84 Pass
Mounting Plane Information
Roofing Material
KZ
Comp Roof
Table 30.3-1
PV System Type
Kzt
SolarCity SleekMountTm
Section 26.8
Spanning Vents
V
No
Fig. 26.5-1A
Standoff Attachment Hardware
I
Comp Mount Type C
Section 26.7'r
Roof Slope
qh
310
Fig. 30.4-2A/B/C-SA/B
Rafter Spacing
h
4" O,C.
Section 26.2
Framing Type J Direction
Y -Y Rafters
T -allow
Purlin Spacing
X -X Purlins Only
NA
DCR
Tile Reveal
Tile Roofs Only
NA
Tile Attachment System
Tile Roofs Only
NA
Standing Seam/Trap Spacing
SM Seam Only
NA
Wind Design Criteria
Wind Design Code
KZ
ASCE 7-10
Table 30.3-1
Wind Design Method
Kzt
Partially/Fully Enclosed Method
Section 26.8
Basic Wind Speed
V
115 mph
Fig. 26.5-1A
Exposure Category
I
C
Section 26.7'r
Roof Style
qh
Gable Roof
Fig. 30.4-2A/B/C-SA/B
Mean Roof Height `
h
15 ft
Section 26.2
Wind Pressure Calculation Coefficients
Wind Pressure Exposure
KZ
0.85
Table 30.3-1
Topographic Factor
Kzt
1.00
Section 26.8
Wind Directionality Factor
Kid
0.85
Section 26.6-1
Importance Factor
I
NA
Trib
Velocity Pressure
qh
qh = 0.00256 (Kz) (Kzt) (Kd) (V^2)
Equation 30.3-1
3.0 psf
24.4 psf
T actual
Ext. Pressure Coefficient U GCp (Up)
-0.95 Fig. 30.4-2A/B/C-5A/B
Ext. Pressure Coefficient Down GC Down
0.88 Hg. 30.4-2A/B/c-5A/B'
Design Wind Pressure p
p = qh (GCp) Equation 30.4-1
Wind Pressure U
-23.21
Wind Pressure Down
21.411
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Landscape
72"
39"
Max Allowable Cantilever
Landscape
24"
NA
Standoff Configuration
Landscape
Not -Staggered
Max Standoff Tributary Area
Trib
20 sf
PV Assembly Dead Load
W -PV
3.0 psf
Net Wind Uplift at Standoff;
T actual
-242 lbs
Uplift Capacity of Standoff
T -allow
500 lbs
Standoff Demand Ca acl
DCR
48.3%
X -Direction
Y Direction !
Max Allowable Standoff Spacing
Portrait
48"
66"
Max Allowable Cantilever
Portrait
20"
NA
Standoff Configuration
Portrait
Not -Staggered
Max Standoff Tributary Area
Trib
:22 sf
PV Assembly Dead Load
W -PV
3.0 psf
Net Wind Uplift at Standoff
T actual
-271 lbs
Uplift Capacity of Standoff
T -allow
500 Itis
Standoff Demand/Capacity
DCR =-
54.1%
' •ELECTRICAL NOTES10141161 l • •
A AMPERE
AC ALTERNATING CURRENT
BLDG BUILDING
CONIC CONCRETE
DC `DIRECT CURRENT
EGC EQUIPMENT GROUNDING CONDUCTOR
(E) EXISTING
EMT ELECTRICAL METALLIC TUBING
FSB FIRE SET—BACK
GALV GALVANIZED
GEC GROUNDING ELECTRODE CONDUCTOR
GND GROUND
HDG HOT DIPPED GALVANIZED
I CURRENT
Imp CURRENT AT MAX POWER
Isc SHORT CIRCUIT CURRENT
kVA KILOVOLT AMPERE
kW KILOWATT
LBW LOAD BEARING WALL
MIN MINIMUM
(N) NEW
NEUT NEUTRAL
NTS NOT TO SCALE
OC ON CENTER
PL PROPERTY LINE
P01 POINT OF INTERCONNECTION
PV PHOTOVOLTAIC
SCH SCHEDULE
S STAINLESS STEEL
STC STANDARD TESTING CONDITIONS
TYP TYPICAL
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
Vmp VOLTAGE AT MAX POWER
Voc VOLTAGE AT OPEN CIRCUIT
W WATT
3R NEMA 3R, RAINTIGHT
1. THIS SYSTEM IS GRID—INTERTIED VIA A
UL—LISTED POWER—CONDITIONING INVERTER.
2. THIS SYSTEM HAS NO BATTERIES, NO UPS.
3. A NATIONALLY—RECOGNIZED TESTING
LABORATORY SHALL LIST ALL EQUIPMENT IN
COMPLIANCE WITH ART. 110.3.
4. WHERE ALL TERMINALS OF THE DISCONNECTING
MEANS MAY BE ENERGIZED IN THE OPEN POSITION,
A SIGN WILL BE PROVIDED WARNING OF THE
HAZARDS PER ART. 690.17,
5. EACH UNGROUNDED CONDUCTOR OF THE
MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY
PHASE AND SYSTEM PER ART. 210.5.
6. CIRCUITS OVER 250V TO GROUND SHALL
COMPLY WITH ART. 250.97, 250.92(B).
7. DC CONDUCTORS EITHER DO NOT ENTER
BUILDING OR ARE RUN IN METALLIC RACEWAYS OR
ENCLOSURES TO THE FIRST ACCESSIBLE DC
DISCONNECTING MEANS PER ART. 690.31(E).
8. ALL WIRES SHALL BE PROVIDED WITH STRAIN
RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY
UL LISTING.
9. MODULE FRAMES SHALL BE GROUNDED AT THE
UL—LISTED LOCATION PROVIDED BY THE
MANUFACTURER USING UL LISTED GROUNDING
HARDWARE.
10. MODULE FRAMES, RAIL, AND POSTS SHALL BE
BONDED WITH EQUIPMENT GROUND CONDUCTORS.
LICENSE GENERAL NOTES
TYPE EC # 27006 1. ALL WORK SHALL COMPLY WITH THE 2012 IBC
AND 2 I
2. ECTRICAL WORK SHALL COMPLY WITH
THE 2005 NA A LECTRIC COD .
I MODULE GROUNDING METHOD: * I
AHJ: Grapevine
UTILITY: MP2 Energy
CONFIDENTIAL — THE INFORMATION HEREIN
CONTAINED SHALL NOT BE USED FOR THE
BENEFIT OF ANYONE EXCEPT SOLARCITY INC.,
NOR SHALL IT BE DISCLOSED IN WHDLE OR IN
PART TO OTHERS OUTSIDE THE RECIPIENTS
ORGANIZATION, EXCEPT IN CONNECTION WITH
THE SALE AND USE OF THE RESPECTIVE
SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN
PERMISSION OF SOLARCITY INC.
,OB NUMBER: JB -7601440
MOUNTING SYSTEM:
Comp Mount Type C
(19) REC # REC260PEZ
INVERTER:
ABB # PVI-3.6—OUTD—S—
V-1L CHANGES REQUIRE
00 PREMISE OWNER:
MARLA REINDERS
1729 SONNET DRIVE
GRAPEVINE, TX 76051
PLANSAPPROVAL
OF e
ic
APPROVED PLANS SHALL BE
. _;
EPT ON JOBSITE AT ALL TIME'S
El
Marla Reinders RESIDENCE
4.94 KW PV ARRAY
PAGE NAME:
COVER SHEET
M E INE
RELEASED .R CONSTRUCTI
SHEET- CSF-
ELEASE DOES NOT AUTHORIZE ANY WORTS IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE.
THISPLAN, T -_ f-_ITTON
THE JOB AT ALL TI [ S
OA 11P BY -
BUILDING
BUILDING INSPECTION DIVISION
RELEASE DOES NOT APPLY TO ONS -1 RUCTION IN
EASEMENTS OR PUBLIC RIGHT-OF-WAY,
ALL WQE BE _'W-
CONTRACTOR SHALL CALL_ FOR
INSPECTIONS,
(817) 410-3010
CONTRA(,C1TC w F I: GD.1 zS..T.. 1A 'I0N
WILL BE REVOKED UPON
PERMIT EEXPIRATICH
PV1 COVER SHEET
PV2 PROPERTY PLAN
PV3 SITE PLAN
PV4 STRUCTURAL VIEWS
PV5 UPLIFT CALCULATIONS
PV6 THREE LINE DIAGRAM
Cutsheets Attached
REV BY DATE COMMENTS
REV A NAME DATE COMMENTS
Vincenz Buhler
MEET: REV: DATE:
PV 1 4/14/2016
'=;'lfiu
3055 Clearview Way
San Mateo, CA 94402
T:(650) 638-1028 F:(650) 638-1029
(888)—SOL—CITY (765-2489) www.solarcitycom
METER IS WITHIN 10 FEET FROM THE
AC DISCONNECT
OF
tj
% 1.
...... ...... ...
..HOMPHqEY-k .. KARI UKi
.....................
3
13
STAMPED & SIGNED
FOR STRUCTURAL ONLY
Digitally signed by
Humphrey Kariuki
Date: 2016.04.14 14:06:47
-04'00'
CONFIDENTIAL — THE INFORMATION HEREIN
CONTAINED SHALL NOT BE USED FOR THE
BENEFIT OF ANYONE EXCEPT SOLARCITY INC.,
NOR SHALL IT BE DISCLOSED IN WHOLE OR IN
PART TO OTHERS OUTSIDE THE RECIPIENTS
ORGANIZATION, EXCEPT IN CONNECTION WITH
THE SALE AND USE OF THE RESPECTIVE
SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN
PERMISSION OF SOLARCITY INC.
JOB NUMBER: JB -7601440 00
MOUNTING SYSTEM:
Comp Mount Type C
(19) REC # REC260PEZ
TNVr TER:
ABB # PVI-3.6-OUTD-S-US-Z-A
PREMISE OWNER:
MARLA RENDERS
1729 SONNET DRIVE
GRAPEVINE, TX 76051
is
Y PEVINE
I �L_1_L_r_t%jL_Lj 11yo I rlu%a I lulm
SHEET: OF:
RELEASE DOES NOT AUTHORiZE ANY WORK IN CONFLICT
WITH THE BUILDiNG CODE OR ZONING ORDINANCE.
T[flS PLAN TO BE KEPT ON
THE JOB AT ALI- TIMES
DATE: Z-
BY.--_"
BUILDING INSPECTION DIVISION
RELFASE DOES NOT APPLY TO CONSTRUCTION IN
E
r-ASEtViENTS OR PUBLIC RIGHT-OF-WAY,
ALL CLjAtLQQS NAUST RE APPRQVED
DESCRIPTION:
Marla Reinders RESIDENCE
4.94 KIN PV ARRAY
PAGE NAIL
SITE PLAN
31 ARRAY PITCH: 31
MP1 I AZIMUTH: 180 ARRAY AZIMUTH: 180
MATERIAL: Comp Shingle STORY: 1 Si
UNNIM
(E) UTILITY METER & WARNING LABEL
INVERTER W/ INTEGRATED DC DISCO
P91 & WARNING LABELS
F - 1
_DC
jEfEll DC DISCONNECT & WARNING LABELS
F—AC 1
JEEE31 AC DISCONNECT & WARNING LABELS
M DC JUNCTION/COMBINER BOX & LABELS
FG-)] DISTRIBUTION PANEL & LABELS
LG LOAD CENTER & WARNING LABELS
O DEDICATED PV SYSTEM METER
0 STANDOFF LOCATIONS
CONDUIT RUN ON EXTERIOR
CONDUIT RUN ON INTERIOR
— GATE/FENCE
0 HEAT PRODUCING VENTS ARE RED
1kk 11 INTERIOR EQUIPMENT IS DASHED
L - "J
SITE PLAN N
Scale:1/16" = 1'
14, 16' 3
S
Vincenz Buhler
SHEET: RM. DATE:
PV 3 4/14/2016
T
If
.010,15olarG . 7.
3055 Clearview Way
San Mateo, CA 94402
T.(650) 638-1028 R(650) 638-1029
(888)—SOL—CITY (765-2489) www.solarcity.corn
PV MODULE
5/16" BOLT WITH
FENDER WASHERS
ZED LEVELING FOOT
ZEP ARRAY SKIRT
ZEP COMP MOUNT C
ZEP FLASHING C
(E) COMP. SHINGLE
(E) ROOF DECKING
5/16" DIA STAINLESS
STEEL LAG BOLT
WITH SEALING WASHER
(2-1/2" EMBED, MIN)
(E) RAFTER
%1 SIDE VIEW OF MPI NTS
MP1
X -SPACING X -CANTILEVER Y -SPACING Y-CANTILEVERI
NOTES
LANDSCAPE
72" 24"
PORTRAIT 48" 20"
RAFTER
C.7.
2X6 @ 24" OC
2x6 @24" OC
ROOF AZT 180 PITCH 31 STORIES: 1
ARRAY AZT 180 PITCH 31
Comp Shingle
CONFIDENTIAL — THE INFORMATION HEREIN
CONTAINED SHALL NOT BE USED FOR THE
BENEFIT OF ANYONE EXCEPT SOLARCITY INC.,
NOR SHALL IT BE DISCLOSED IN WHOLE OR IN
PART TO OTHERS OUTSIDE THE RECIPIENTS
ORGANIZATION, EXCEPT IN CONNECTION WITH
THE SALE AND USE OF THE RESPECTIVE
SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN
PERMISSION OF SOLARCITY INC.
#_5TAN�
MOUNTING SYSTEM:
Comp Mount Type C
MODULES:
(19) REC # REC260PEZ
INVERTER:
ABB # PVI-3.6—OUTD—S—US—Z—A
INSTALLATION ORDER I
LOCATE RAFTER, MARK HOLE
(1) LOCATION, AND DRILL PILOT
HOLE.
(2) SEAL PILOT HOLE WITH
POLYURETHANE SEALANT.
(3) INSERT FLASHING.
(4)' PLACE MOUNT.
(5) INSTALL LAG BOLT WITH
SEALING WASHER.
(INSTALL LEVELING FOOT WITH
6)1 BOLT & WASHERS.
MARLA REINDERS
1729 SONNET DRIVE
GRAPEVINE, TX 76051
DESCRIPTION:
Marla Reinders RESIDENCE
4.94 KW PV ARRAY
PAGE NAME:
STRUCTURAL VIEWS
....................................
.,HUMPHREY KKARIUUKI
�ONA1..
STAMPED & SIGNED
FOR STRUCTURAL ONLY
0-T—Y OF GRAEULNE
RELEASED FOR CONSTRUCTION
SHEET: _ OF:
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE OR ZONING ORDINANCE,
THIS PI__AN TO IAF KEr-T O
THE ,TOB AT ALL TIES
DATE ° _- _� - Bye
EUILDIN(I f,N'SRECTION DIVISION
F E .E, -b F DOES NOT,c,Ppl_y TU CONSTRUCTION IN
EASEMENTS N T S CSR PUBLIC RIMT—OF—tNAY.
Vincenz Buhler
SHEET: REN DATE:
PV 4 4/14/2016
=;;Solar iTV
v
�.70
3055 Clearview Way
San Mateo, CA 94402
T:(650) 63B-1028 F:(650) 638-1029
(888)—SOL—CITY (765-2489) www.solarcitycom
w an to] ilL
POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE
FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN:
- Address: 1729 Sonnet Drive
--—————————--———————
---�
SOLAR PHOTOVOLTAIC AR — --RAYS)
UTILITY
SERVICE
INVERTER AND
DC DISCONNECT
PHOTOVMTAIC BACK—FED CIRCWT BREAKER IN MAIN ELEC1RICAL PANJ
IS AN A/C DISCONNECT ENEC 690.17
-
OPERATING VOLTAGE = 240V
CONFIDENTIAL — THE INFORMATION HEREIN
CONTAINED SHALL NOT BE USED FOR THE
BENEFIT OF ANYONE EXCEPT SOLARCITY INC.,
NOR SHALL IT BE DISCLOSED IN WHOLE OR IN
PART TO OTHERS OUTSIDE THE RECIPIENTS
ORGANIZATION, EXCEPT IN CONNECTION NTH
THE SALE AND USE OF THE RESPECTIVE
SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN
PERMISSION OF SOLARCITY INC.
JOB NUMBER: JB -7601440 00
MOUNTING SYSTEM:
Comp Mount Type C
MODULES:
(19) REC # REC260PEZ
INVERTER:
ABB # PVI-3.6-OUTD-S-US-Z-A
PREMISE OWNER:
MARLA REINDERS
1729 SONNET DRIVE
GRAPEVINE, TX 76051
Marla Reinders RESIDENCE
4.94 KW PV ARRAY
PAGE NAME:
SITE PLAN PLACARD
DESIGN:
Vincenz Buhler
SHEET: REV: DATE:
PV 8 4/14/2016
W00.1
Y
3055 Clearview Way
San Mateo, CA 94402
T:(650) 638-1028 F:(650) 638-1029
(888)—SOL—CITY (765-2489) www.solarcitycorn
Label Location:
(C)(CB)
Per Code:
NEC 690.31.G.3
Label Location:
(DC) (INV)
Per Code:
NEC 690.14.C.2
Label Location:
(DC) (INV)
Per Code:
NEC 690.53
Label Location:
(DC) (INV)
Per Code:
NEC 690.5(C)
Label Location:
(DC) (CB)
Per Code:
NEC 690.17(4)
Label Location:
(AC) (POI)
Per Code:
NEC 690.14.C.2
Label Location:
(AC) (POI)
Per Code:
NEC 690.54
CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR
THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED
IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION,
EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE
SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC.
Label Set
Label Location:
(AC)(POI)
Per Code:
NEC 690.17.E
Label Location:
(POI)
Per Code:
NEC 690.17.4; NEC 690.54
Label Location:
(POI)
Per Code:
NEC 690.64.B.4
Label Location:
(D) (POI)
Per Code:
NEC 690.64.B.4
Label Location:
(POI)
Per Code:
NEC 690.64.B.7
Label Location:
(DC) (INV)
Per Code:
NEC 690.35(F)
TO BE USED WHEN
INVERTER IS
UNGROUNDED
(AC): AC Disconnect
(C): Conduit
(CB): Combiner Box
(D): Distribution Panel
(DC): DC Disconnect
(IC): Interior Run Conduit
(INV): Inverter With Integrated DC Disconnect
(LC): Load Center
(M): Utility Meter
(POI): Point of Interconnection
3055 Clearview Way
iarCitvi
San Mateo, CA 94402
T:(650) 638-1028 F:(650) 638-1029
(888)-SOL-cm(765-2488) www.solarcity.com
'"SolarCity I ZepSolar
Zep System
for composition shingle roofs
QtOMPAT'A
FAC/
OMPA1
uL LISTED
zepsolar.com
1 113
Next -Level PV Mounting Technology '^SolarCity I ZepSolar
Description
• PV mounting solution for composition shingle roofs
• Works with all Zep Compatible Modules
• Auto bonding UL -listed hardware creates structural and electrical bond
• Zep System has a UL 1703 Class "A" Fire Rating when installed using modules from
any manufacturer certified as "Type 1" or "Type 2"
Specifications
• Designed for pitched roofs
• Installs in portrait and landscape orientations
• Zep System supports module wind uplift and snow load pressures to 50 psf per UL 1703
• Wind tunnel report to ASCE 7-05 and 7-10 standards
• Zep System grounding products are UL listed to UL 2703 and UL 467
• Zep System bonding products are UL listed to UL 2703
• Engineered for spans up to 72" and cantilevers up to 24"
• Zep wire management products listed to UL 1565 for wire positioning devices
• Attachment method UL listed to UL 2582 for Wind Driven Rain
This document does not create any express warranty by Zep Solar or about its products or services. Zep Solar's sole warranty is contained in the written product warranty for
each product. The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty, The customer is solely
responsible for verifying the suitability of ZepSolar's products for each use. Specifications are subject to change without notice. Patents and Apps: zspats.com.
Documentif 800-1890-001 Rev A
Date last exported: November 13, 2015 2:23 PM
Components
zepsolar.com
Leveling Foot
Part No. 850-1172
ETL listed to UL 467
Comp Mount
Part No. 850-1382
Listed to UL 2582
Mounting Block Listed to UL 2703
Interlock
Next -Level PV Mounting Technology
1*1
Ground Zep V2
Part No. 850-1388 Part No. 850-1511
Listed to UL 2703 Listed to UL 467 and UL 2703
k
Array Skirt, Grip, End Caps
Part Nos. 850-0113,850-1421,
850-1460,850-1467
Listed to UL 1565
IM
DC Wire Clip
Part No. 850-1448
Listed to UL 1565
This document does not create any express warranty by Zep Solar or about its products or services. Zep Solar's sole warranty is contained in the written product warranty for
each product. The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty. The customer is solely
responsible for verifying the suitability of ZepSolar's products for each use. Specifications are subject to change without notice. Patents and Apps: zspats.com.
Document # 800-1890-001 Rev A
Date last exported: November 13, 2015 2:23 PM
This family of single-phase string
inverters complements the typical
number of rooftop solar panels
enabling home -owners to get the most
efficient energy harvesting for the size
of the property.
This inverter offers a dual input
section that processes two strings
with independent Multiple Power Point
Tracking (MPPT).
This is especially useful for rooftop
installations with two different
orientations from two sub -arrays
oriented in different directions. (For
example: East and West)
The dual input sections with
independent MPPT enable a more
optimal energy harvesting condition.
The high-speed MPPT offers real-
time power tracking and improved
energy harvesting.
The flat efficiency curve ensures high
efficiency at all output levels allowing
a consistent and stable performance
across the entire input voltage and
output power range.
The transformerless operation gives the
highest efficiency of up to 97.0%.
The wide input voltage range makes
the inverter suitable to low power
installations with reduced string size.
This rugged outdoor inverter has been
designed to be a completely sealed
unit able to withstand the harshest
environmental conditions.
Highlights:
- Single phase and split phase output
grid connection.
- Wide input range for increased
stringing flexibility.
- The high speed and precise MPPT
algorithm offers real time power
tracking and improved energy
harvesting.
- Outdoor NEMA 4X rated enclosure
for unrestricted use under any
environmental conditions.
- Integrated DC disconnect switch
in compliance with international
Standards (-S Version).
(newer ;and productivity
for a better worfd'
Additional highlights:
- RS -485 communication interface
(for connection to laptop or data
logger).
- Integrated Arc Fault Detection and
Interruption (-A Version).
Technical data and types
2 ABB Solar Inverters I Product flyer for PVI-3.0/3.6/3.8/4.2-TL-OUTD
��, S
i.°
�,....t,. �: r, R �
d
P
All measurements in inches
Nominal Power- P_ (Wp)
260
Watt Class Sorting- (Wp)
./-5
Nominal Power Voltage -V,, (V)
30.7
Nominal Power Current - IMPe (A)
8.50
Open Circuit Voltage - Von (V)
37.8
Short Circuit Current - I � (A)
9.01
Panel Efficiency(%)
15.8
The electrical characteristics are within «/-10% of the indicated values of 1, Va and P1pe at standard Test conditions
(STC).
Values at standard test conditions STC (airmass AM 1.5, irradiance 1000 W%m', cell temperature 77°F (25°C)).
At low irradiance of 200 W fm' (AM 15 & cell temperature 77°F (25°C)) at least 97% of the STC panel efficiency will be achieved.
Nominal Power -PMP,(Wp)
197
Nominal Power Voltage -VM11P, (V)
29.0
Nominal Power Current - I,, (A)
6.81
Open Circuit Voltage -Vnr (V)
35.7
Short CircuitCurrent -I,_ (A)
7.24
Nominal operating cell temperature NOCT (800 W{m', AM LS, win dspeed 1 m/s, ambient temperature 687 (20°C).
10 year product warranty.
c@us 2S year linear power output warranty
LISTED (max. degression in performance of 0.7%p.a.).
UL 1703, Fire rating. Type 1, Class C
REC is a leading global provider of solar energy solutions. With more than 15 years of experience, we offer sustainable, high performing a1�
products, services and investments for the solar industry. Together with our partners, we create value by providing solutions that better w,,
meet the world's growing energy needs. REC is headquartered in Norway and listed on the Oslo Stock Exchange (ticker: RECSOL). Our 1,600
employees worldwide generated revenues of USD 647 million in 2013. www.recgroup.com
BOND (N) #8 GEC TO (E) GROUND ROD Panel Number:NoMatch
AT PANEL WITH IRREVERSIBLE CRIMP Meter Number: 115682127
Underground Service Entrance
�E 150A MAIN SERVICE PANEL
E� 150A/2P MAIN CIRCUIT BREAKER
(E) WIRING CUTLER—HAMMER
I150A/2P Disconnect
(E) LOADS
A
20A/2P
A �
1 1
I
I
N
1
�--- -
EIGC/GEC
TO 120/240V
SINGLE PHASE
UTILITY SERVICI
Voc* = MAX VOC A##T MIN TEMP
POI (1)SB eaker,D2UArP 20 2 Spaces, Bolt On ED BREAKER
CONFIDENTIAL - THE INFORMATION HEREIN
CONTAINED SHALL NOT BE USED FOR THE
BENEFIT OF ANYONE EXCEPT SOLARCITY INC.,
NOR SHALL IT BE DISCLOSED IN WHOLE OR IN
PART TO OTHERS OUTSIDE THE RECIPIENTS
ORGANIZATION, EXCEPT IN CONNECTION WITH
THE SALE AND USE OF THE RESPECTIVE
SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN
PERMISSION OF SOLARCITY INC.
I
i
1
I
i
1
I
I
1
INV 1— ( 1 ) ABB # PVI-3.6—OUTD—S—US—Z—A LABEL: A
FCI Inverter, Zigbee 3600W, 240V, 96%
INV 2
INV
— (19)RECREC26OPEZ
#
PV odule; 26OW, 236.6W PTC, MC4, 40mm, Black Frame, ZEP Enabled
VOC: 37,8 Vpmox: 30.7
Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER
ADJUST MIN. ACTIVATION VOLTAGES!
Inverter 1 IND
3 ABB
PVI-3.6-OUTD-S-US-Z-A --
L1 24ov r --------------
L2 DC+
-- ---- ---- ---—- --- --- --- - —- EGCI
-- -- -- - - -- -GEC --
! PE- (
RELEASED
HEET: __ OF:
RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT
WITH THE BUILDING CODE ORZONING ORDINANCE.
THIS PLAN TO BE KEPT ON
THE JOB AT ALL, TIME
DATE: - 2.o ) 1 BY: _
BUILDING INSPECTION DIVISION
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT-OF-WAY,
VEQ
A (1)CUTLER-HAMMER # DG221URB
Disconnect; 30A, 24OVac, Non -Fusible, NEMA 3R
— (1)CUTLER-RAMMER # DG03DNB
Ground/Neutral Kit; 30A, General Duty (DG)
go
(1)AWG #10, THWN-2, Black __.
O (1)AWG #10, THWN-2, Red
(1)AWG #10, THWN-2, White NEUTRAL Vmp =240 VAC Imp -16 AAC
..... 70 AWP #8,. TH,WN72,, green . , EGC/GEC.- ( 1 ) Conduit. Kit;, 3/47. EMT.
U06 NUMBER, JB -7601440 00
MOUNTING SYSTEM:
Comp Mount Type C
MODULES
(19) REC # REC260PEZ
INVERTER:
ABB # PVI-3.6-OUTD-S-US-Z-A
MARLA REINDERS
1729 SONNET DRIVE
GRAPEVINE, TX 76051
tD'ColVstart = 200V
MP1: 1x10----------------------------�
-_-_1-- ------------------------ +1 - -------------
SEPARATE t I
EUCTRJF3 S*N PERNTS
WALL E REQUIRED
Marla Reinders RESIDENCE
4.94 KW PV ARRAY
PAGE NAME:
THREE LINE DIAGRAM
(1) Conduit Kit; 3/4" EMT
VStart = 200V
MPl:1x9
C "
---------
Digitally signed
by Matthew W.
Bailey PE
Date: 2• ••4
.18
FIN
O
('Z) AWG #10, PV Wire, 600V, Black VoC* = 421.89 VDC
(1)AWG #iQ THHN/THWN-2, Green EGC Vmp = 307 VDC
Isc = 9.01
Imp= 8.5
ADC
ADC
.....0)
®
.......
Conduit Kit;. 3/4'. EMT ......................................
(Y)AWG #10> PV Wire, 60OV, Black VoC* = 379.7 VDC
(1)AWG #1Q, THHN/THWN-2, Green EGC Vmp = 276.3 VDC
1 Conduit Kit; 3 4 EMT
( )........./.........................................
ISC = 9.01
Imp= 8.5
.
ADC
ADC
Vincenz Buhler
SHEET: REV: DATE:
PV 6 4/14/2016
~®olri
Y
3055 Clearview Way
San Mateo, CA 94402
T.(650) 636-1026 F:(650) 638-1029
(888) -SOL -CITY (765-2489) www.solorcitycom