Loading...
HomeMy WebLinkAboutSFRA2016-14692016 DATE OF ISSUANCE: APR 2 �fj APR, or )� PERMIT #• L7— UIL IG E I APPLICATION (PLEASE PRINT LEGI$LY — COMPLETE ENTIRE FORM) JOB ADDRESS: 1729 Sonnet Dr, Grapevine, TX 76051, USA (TARRANT County) SUITE # LOT: BLOCK: SUBDIVISION: BUILDING CONTRACTOR (company name): SolarCity Corporation CURRENT MAILING ADDRESS: 3051 Northern Cross Blvd #401 CITY/STATE/ZIP: Fort Worth, TX 76137 PROPERTY OWNER: Marla Reinders CURRENT MAILING ADDRESS: 1729 Sonnet Drive : # 817-682-5095 Fax # CITY/STATE/ZIP: Grapevine, TX 76051 PHONE NUMBER: 8178760157 PROJECT VALUE: $ 6,300.00 FIRE SPRINKLERED? YES NO _ WHAT TRADES WILL BE NEEDED? (Check ones that apply) ELECTRIC ® PLUMBING MECHANICAL DESCRIPTION OF WORK TO BE DONE: Install Roof Mounted Solar PV System USE OF BUILDING OR STRUCTURE: Residential NAME OF BUSINESS: Total Square Footage under roof: Square Footage of alteration/addition: ❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings, alterations and additions) ❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: (Not required for I & 2 family dwellings) ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). �l PRINT NAME: Clint Austin SIGNATURE ����YLGd1a2� PHONE #: 817-682-5095 EMAIL: ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction Type: V a Permit Valuation: $ Setbacks Approval to Issue Occupancy Group: Fire Sprinkler: YES NO Front: Electrical Division: Building Depth: Left: Plumbing Zoning: Rm Building Width: Rear: Mechanical Occupancy Load: Right: Plan Review Approval: Date: t4 -42Z2v`l6 Building Permit Fee: LD- LL t5 Site Plan Approval: Date: Plan Review Fee: Fire Department: Date: Lot Drainage Fee: Public Works Department: Date: Sewer Availability Rate: Health Department: Date: Water Availability Rate: Approved for Permit: Date: 14 ° - Total Fees: I r �- Lot Drainage Submitted: Approved: Total Amount Due: P.O. BOX 95104, GRAPEVINE, TX 76099 (617) 410-3165 OfORMSMSPERMITAPPLICATIONS 1/02-R-.11104,5/06,2/07,11/09,4111 .QAJ VVINE 6, ls�,T DaIN-W4 X A S -T CITY OF GRAPEVINE • (CIRCLE ONE) An rnmon MECHANICAL ELECTRICAL - PLUMBING - IRRIGATION - FUEL GAS PERMIT APPLICATION (PLEASE PRINT LEGIBLY - COMPLETE ENTIRE FORM) PERMIT #BLDG. I Lf -10 PERMIT # 1 _ I& —1 01 DAT E: 4/14/2016 1 JOB ADDRESS: 1729 Sonnet Dr, Grapevine, TX 76051, USA (TARRANT Countyl"TE # DESCRIPTION OF WORK: Install Roof Mounted Solar PV System PROPERTY OWNER: Maria Reinders CONTRACTING COMPANY: SolarCity Corporation ADDRESS: 1729 Sonnet Drive ADDRESS: 3051 Northern Cross Blvd #401 CITY/STATE/ZIP: Grapevine, TX 76051 CITY/STATE/ZIP: Fort Worth, TX 76137 PHONE NUMBER: 8178760157 PHONE NUMBER: 817-682-5095 TYPE OF OCCUPANCY BUILDING AREA (SQ FT) PERMIT FEES AMOUNT DUE EACH TRADE I. R-3 I - 749 $ 33.25 SINGLE FAMILY, DUPLEX 750— 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 63.18 NEW CONSTRUCTION & 1,501- 1,750 $ 76.48 ADDITIONS (PER UNIT) 1,751- 2,000 $ 83.13 2,001 - 2,250 $ 89.78 TOTAL SQ. FOOT UNDER 2,251- 3,000 $ 96.43 ROOF 3,001- 3,500 $ 103.08 3,501 - 4,000 $ 109.73 $ 4,001 + $ 120.37 EACH TRADE 11. A, E, 1, R-1 1 - 500 $ 37.00 HOTELS, APARTMENTS, 501 — 100,000 $ 17.50+.035 PER DRINKING/DINING, 100,001 — 500,000 $ 3,500.00+.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001 + $15,000.00+.02 FOOT $ INSTITUTIONAL EACH TRADE 111. B, F, H, M, S, U OFFICE, RETAIL, WHOLESALE, 1- 500 $ 37.00 GARAGES, FACTORIES, 501- 50,000 $ 32.00+.01 PER 1 WORKSHOPS, SERVICE 50,001- 100,000 $ 182.00+ .007 SQUARE STATIONS, WAREHOUSE 100,001+ $ 582.00+.003 FOOT $ CONTRACT EACH TRADE IV. ANY OCCUPANCY GROUP VALUATION OF WORK FINISH -OUTS, SHELL COMPLETIONS, 0- 500 $ 37.00 ALTERATIONS OR 501- 1,500 $ 45.00 STAND ALONE PERMITS 1,501- 3,000 $ 57.00 3,001- 5,000 $ 72.00 CONTRACT VALUATION OF WORK: 5,001- 50,000 $ 27.00+.009 50,001- 100,000 $ 127.00+ .007 PER $1500 100,001- 500,000 500,001+ $ 327.00+ .005DOLLAR $ 1,327.00+.003 TVALUATION s45.00 EACH TRADE V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 $ C:\Users\sbatte\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.OuttookXG80E6GQF\MEP APPLICATION 4-1 1.doc n r• r PLAN SUBMITTAL: i WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE OTHERWISE REQUIRED BY STATE LAW. OTHER INSPECTIONS AND FEES: • INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)..... ..................... -- ............. -..$42.00/HOUR* • REINSPECTION FEES.................................................................................................................. $42.00 • PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED........................................................... $37.00 • INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM)......................$42.00/HOUR • ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVEDPLANS ..... .............................. .............................. .............................. ..................... ...$42.00/HOUR • BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE • FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS" I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. 1 FURTHER CERTIFY THAT ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR LOCAL LAW REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND THAT VERIFICATION OF ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT (OR HOMEOWNER FOR HOMEOWNERS PERMITS) 817-682-509A9 Clint Austin � � a EMAIL: "OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER. "ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS. Development Services Department, Building Inspections The City of Grapevine * P.O. Box 95104 * Grapevine, Texas 76099 * (817) 410-3165 Fax (817) 410-3012 * www.grapevinetexas.gov C:\Users\sbatte\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\G80E6GQF\MEP APPLICATION 4-11.doc '*"."."""So1arC1'ty. April 14, 2016 RE: Project/Job # 7601440 Project Address: AHJ SC Office Design Criteria: CERTIFICATION LETTER Reinders Residence 1729 Sonnet Drive Grapevine, TX 76051 Grapevine Fort Worth - Applicable Codes = IRC 2006 / IBC 2012, ASCE 7-10, and 2012 NDS - Risk Category = II - Wind Speed = 115 mph, Exposure Category C - Ground Snow Load = 5 psf - MPl: Roof DL = 12.5 psf, Roof LL/SL = 17 psf (Non -PV Areas), Roof LL/SL = 2.3 psf (PV Areas) Version #56.4 - TBD Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.1223 < 0.4g and Seismic Design Category (SDC) = B < D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from SolarCity. Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation, I certify that the existing structure directly supporting the PV system is adequate to withstand all loading indicated in the design criteria above based on the requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. Digitally signed by Humphrey F. ..... Sincerely, F. ,�HUMPHREY K. KARIUKI Humphrey Kariuki, P.E. Kariukl Professional Engineer Date: 2016.04.1414:07:05 -04'00' Ns,�°��`:; T: 443.451.3515 t\��S/�jNA� email: �`'� NAN- ., .,,, ,im�ar Jew Way ;av'. 'M,�ter, CA 94 102 ' (b,JF . S£; - tt?: 8 (EiFB) 5�'X -t.t7'! f650i 6 .> -1 4-�oj OFFICE COPY Version #56.4 - TBD Landscape Hardware Hardware -Landscape Modules' Standoff Specifications X -X Spacing X -X Cantilever Y-Y'Spacing Y -Y Cantilever Configuration Uplift DCR MPi 72" 24" 39" NA Not -Staggered 48.3% Portrait Hardware Hardware - Portrait Modules' Standoff Specifications X -X Spacing X -X Cantilever Y -Y Spacing Y -Y Cantilever Configuration Uplift DCR MPi 48" 20" 66" NA Not -Staggered 54.1% Structure Mounting Plane Framing Qualification Results Type Spacing Pitch Member Evaluation Results MPi Vaulted Ceiling @ 24 in. O.C. 310 Member Impact Check OK Refer to the submitted drawings for details of information collected during a site survey. All member analysis and/or evaluation is based on framing information gathered on site. The existing gravity and lateral load carrying members were evaluated in accordance with the IBC and the IEBC. , 055 4tParvles;- Way -`m Mateo, OA 04402 (h,M) 6.,5 - 1028 t `8) ,OL. - "!TY . f6SOi e'.? - 1029 .oiar_iiy,.f> ®.® Roof Pitch Member Properties Summary Summa ; PitchAdjust Non -PV Areas PV Areas MPI Horizontal Member S ans' Overhang 1.16 ft Rafter Pro erties Actual W 1.50" Roofstem Pro: ernes San 1 5.51 ft Actual D 5.50" Number of Spans (w/o Overhang) 3 San 2 3.43 ft Nominal Yes Roofing Material Compof San 3 1.0.65 ft A 8.25 in.A2 Re -Roof No Span 4 2.3 psf SX 7.56 in.^3 Plywood Sheathing Yes San 5 27.4 psf I 20.80 In,^4' Board Sheathing None Total Rake Span 24.21 ft TL DON Limit 180 Vaulted Ceiling Yes ` PV 1 Start ' 1.25 It Wood Species ` DF Ceiling Finish 1/2" Gypsum Board PV 1 End 18.42 ft Wood Grade #2 Rafter Sloe 310 PV 2 Start Fb 900 psi Rafter Spacing 24" O.C. PV 2 End F„ 180 psi Top Lat Bracing Full PV 3 Start E 1600000 psi Bot Lat Bracing At Supports PV 3 End Emi„ 580000 psi Roof Pitch Member Loading 7/12 Initial Summa ; PitchAdjust Non -PV Areas PV Areas Roof Dead Load DL 12.5 psf x 1.17 14.6 psf 14.6 psf PN Dead Load PV -DL 9.0 Psf x 1.17 10.5 psf Roof Live Load RLL 20.0 psf x 0.85 17.0 psf Live/Snow Load LL/SLi- 5.0'psf x 0.7 ] x 0.46 3.5 psf 2.3 psf Total Load Gov rning LG TL 18.1 ' psf 27.4 psf Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (IS) Po; Ce=0.9, Ct=1.1, I,=1.0 Member Anal sis Results Summary Governing` Anal sis Pre -PV Demand Post -PV Demand Net Impact Result Gravity Loading Check -1103 psi -929 psi 0.84 Pass Mounting Plane Information Roofing Material KZ Comp Roof Table 30.3-1 PV System Type Kzt SolarCity SleekMountTm Section 26.8 Spanning Vents V No Fig. 26.5-1A Standoff Attachment Hardware I Comp Mount Type C Section 26.7'r Roof Slope qh 310 Fig. 30.4-2A/B/C-SA/B Rafter Spacing h 4" O,C. Section 26.2 Framing Type J Direction Y -Y Rafters T -allow Purlin Spacing X -X Purlins Only NA DCR Tile Reveal Tile Roofs Only NA Tile Attachment System Tile Roofs Only NA Standing Seam/Trap Spacing SM Seam Only NA Wind Design Criteria Wind Design Code KZ ASCE 7-10 Table 30.3-1 Wind Design Method Kzt Partially/Fully Enclosed Method Section 26.8 Basic Wind Speed V 115 mph Fig. 26.5-1A Exposure Category I C Section 26.7'r Roof Style qh Gable Roof Fig. 30.4-2A/B/C-SA/B Mean Roof Height ` h 15 ft Section 26.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure KZ 0.85 Table 30.3-1 Topographic Factor Kzt 1.00 Section 26.8 Wind Directionality Factor Kid 0.85 Section 26.6-1 Importance Factor I NA Trib Velocity Pressure qh qh = 0.00256 (Kz) (Kzt) (Kd) (V^2) Equation 30.3-1 3.0 psf 24.4 psf T actual Ext. Pressure Coefficient U GCp (Up) -0.95 Fig. 30.4-2A/B/C-5A/B Ext. Pressure Coefficient Down GC Down 0.88 Hg. 30.4-2A/B/c-5A/B' Design Wind Pressure p p = qh (GCp) Equation 30.4-1 Wind Pressure U -23.21 Wind Pressure Down 21.411 X -Direction Y -Direction Max Allowable Standoff Spacing Landscape 72" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Not -Staggered Max Standoff Tributary Area Trib 20 sf PV Assembly Dead Load W -PV 3.0 psf Net Wind Uplift at Standoff; T actual -242 lbs Uplift Capacity of Standoff T -allow 500 lbs Standoff Demand Ca acl DCR 48.3% X -Direction Y Direction ! Max Allowable Standoff Spacing Portrait 48" 66" Max Allowable Cantilever Portrait 20" NA Standoff Configuration Portrait Not -Staggered Max Standoff Tributary Area Trib :22 sf PV Assembly Dead Load W -PV 3.0 psf Net Wind Uplift at Standoff T actual -271 lbs Uplift Capacity of Standoff T -allow 500 Itis Standoff Demand/Capacity DCR =- 54.1% ' •ELECTRICAL NOTES10141161 l • • A AMPERE AC ALTERNATING CURRENT BLDG BUILDING CONIC CONCRETE DC `DIRECT CURRENT EGC EQUIPMENT GROUNDING CONDUCTOR (E) EXISTING EMT ELECTRICAL METALLIC TUBING FSB FIRE SET—BACK GALV GALVANIZED GEC GROUNDING ELECTRODE CONDUCTOR GND GROUND HDG HOT DIPPED GALVANIZED I CURRENT Imp CURRENT AT MAX POWER Isc SHORT CIRCUIT CURRENT kVA KILOVOLT AMPERE kW KILOWATT LBW LOAD BEARING WALL MIN MINIMUM (N) NEW NEUT NEUTRAL NTS NOT TO SCALE OC ON CENTER PL PROPERTY LINE P01 POINT OF INTERCONNECTION PV PHOTOVOLTAIC SCH SCHEDULE S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT 1. THIS SYSTEM IS GRID—INTERTIED VIA A UL—LISTED POWER—CONDITIONING INVERTER. 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. 3. A NATIONALLY—RECOGNIZED TESTING LABORATORY SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH ART. 110.3. 4. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A SIGN WILL BE PROVIDED WARNING OF THE HAZARDS PER ART. 690.17, 5. EACH UNGROUNDED CONDUCTOR OF THE MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY PHASE AND SYSTEM PER ART. 210.5. 6. CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH ART. 250.97, 250.92(B). 7. DC CONDUCTORS EITHER DO NOT ENTER BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER ART. 690.31(E). 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY UL LISTING. 9. MODULE FRAMES SHALL BE GROUNDED AT THE UL—LISTED LOCATION PROVIDED BY THE MANUFACTURER USING UL LISTED GROUNDING HARDWARE. 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE BONDED WITH EQUIPMENT GROUND CONDUCTORS. LICENSE GENERAL NOTES TYPE EC # 27006 1. ALL WORK SHALL COMPLY WITH THE 2012 IBC AND 2 I 2. ECTRICAL WORK SHALL COMPLY WITH THE 2005 NA A LECTRIC COD . I MODULE GROUNDING METHOD: * I AHJ: Grapevine UTILITY: MP2 Energy CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHDLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. ,OB NUMBER: JB -7601440 MOUNTING SYSTEM: Comp Mount Type C (19) REC # REC260PEZ INVERTER: ABB # PVI-3.6—OUTD—S— V-1L CHANGES REQUIRE 00 PREMISE OWNER: MARLA REINDERS 1729 SONNET DRIVE GRAPEVINE, TX 76051 PLANSAPPROVAL OF e ic APPROVED PLANS SHALL BE . _; EPT ON JOBSITE AT ALL TIME'S El Marla Reinders RESIDENCE 4.94 KW PV ARRAY PAGE NAME: COVER SHEET M E INE RELEASED .R CONSTRUCTI SHEET- CSF- ELEASE DOES NOT AUTHORIZE ANY WORTS IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. THISPLAN, T -_ f-_ITTON THE JOB AT ALL TI [ S OA 11P BY - BUILDING BUILDING INSPECTION DIVISION RELEASE DOES NOT APPLY TO ONS -1 RUCTION IN EASEMENTS OR PUBLIC RIGHT-OF-WAY, ALL WQE BE _'W- CONTRACTOR SHALL CALL_ FOR INSPECTIONS, (817) 410-3010 CONTRA(,C1TC w F I: GD.1 zS..T.. 1A 'I0N WILL BE REVOKED UPON PERMIT EEXPIRATICH PV1 COVER SHEET PV2 PROPERTY PLAN PV3 SITE PLAN PV4 STRUCTURAL VIEWS PV5 UPLIFT CALCULATIONS PV6 THREE LINE DIAGRAM Cutsheets Attached REV BY DATE COMMENTS REV A NAME DATE COMMENTS Vincenz Buhler MEET: REV: DATE: PV 1 4/14/2016 '=;'lfiu 3055 Clearview Way San Mateo, CA 94402 T:(650) 638-1028 F:(650) 638-1029 (888)—SOL—CITY (765-2489) www.solarcitycom METER IS WITHIN 10 FEET FROM THE AC DISCONNECT OF tj % 1. ...... ...... ... ..HOMPHqEY-k .. KARI UKi ..................... 3 13 STAMPED & SIGNED FOR STRUCTURAL ONLY Digitally signed by Humphrey Kariuki Date: 2016.04.14 14:06:47 -04'00' CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. JOB NUMBER: JB -7601440 00 MOUNTING SYSTEM: Comp Mount Type C (19) REC # REC260PEZ TNVr TER: ABB # PVI-3.6-OUTD-S-US-Z-A PREMISE OWNER: MARLA RENDERS 1729 SONNET DRIVE GRAPEVINE, TX 76051 is Y PEVINE I �L_1_L_r_t%jL_Lj 11yo I rlu%a I lulm SHEET: OF: RELEASE DOES NOT AUTHORiZE ANY WORK IN CONFLICT WITH THE BUILDiNG CODE OR ZONING ORDINANCE. T[flS PLAN TO BE KEPT ON THE JOB AT ALI- TIMES DATE: Z- BY.--_" BUILDING INSPECTION DIVISION RELFASE DOES NOT APPLY TO CONSTRUCTION IN E r-ASEtViENTS OR PUBLIC RIGHT-OF-WAY, ALL CLjAtLQQS NAUST RE APPRQVED DESCRIPTION: Marla Reinders RESIDENCE 4.94 KIN PV ARRAY PAGE NAIL SITE PLAN 31 ARRAY PITCH: 31 MP1 I AZIMUTH: 180 ARRAY AZIMUTH: 180 MATERIAL: Comp Shingle STORY: 1 Si UNNIM (E) UTILITY METER & WARNING LABEL INVERTER W/ INTEGRATED DC DISCO P91 & WARNING LABELS F - 1 _DC jEfEll DC DISCONNECT & WARNING LABELS F—AC 1 JEEE31 AC DISCONNECT & WARNING LABELS M DC JUNCTION/COMBINER BOX & LABELS FG-)] DISTRIBUTION PANEL & LABELS LG LOAD CENTER & WARNING LABELS O DEDICATED PV SYSTEM METER 0 STANDOFF LOCATIONS CONDUIT RUN ON EXTERIOR CONDUIT RUN ON INTERIOR — GATE/FENCE 0 HEAT PRODUCING VENTS ARE RED 1kk 11 INTERIOR EQUIPMENT IS DASHED L - "J SITE PLAN N Scale:1/16" = 1' 14, 16' 3 S Vincenz Buhler SHEET: RM. DATE: PV 3 4/14/2016 T If .010,15olarG . 7. 3055 Clearview Way San Mateo, CA 94402 T.(650) 638-1028 R(650) 638-1029 (888)—SOL—CITY (765-2489) www.solarcity.corn PV MODULE 5/16" BOLT WITH FENDER WASHERS ZED LEVELING FOOT ZEP ARRAY SKIRT ZEP COMP MOUNT C ZEP FLASHING C (E) COMP. SHINGLE (E) ROOF DECKING 5/16" DIA STAINLESS STEEL LAG BOLT WITH SEALING WASHER (2-1/2" EMBED, MIN) (E) RAFTER %1 SIDE VIEW OF MPI NTS MP1 X -SPACING X -CANTILEVER Y -SPACING Y-CANTILEVERI NOTES LANDSCAPE 72" 24" PORTRAIT 48" 20" RAFTER C.7. 2X6 @ 24" OC 2x6 @24" OC ROOF AZT 180 PITCH 31 STORIES: 1 ARRAY AZT 180 PITCH 31 Comp Shingle CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. #_5TAN� MOUNTING SYSTEM: Comp Mount Type C MODULES: (19) REC # REC260PEZ INVERTER: ABB # PVI-3.6—OUTD—S—US—Z—A INSTALLATION ORDER I LOCATE RAFTER, MARK HOLE (1) LOCATION, AND DRILL PILOT HOLE. (2) SEAL PILOT HOLE WITH POLYURETHANE SEALANT. (3) INSERT FLASHING. (4)' PLACE MOUNT. (5) INSTALL LAG BOLT WITH SEALING WASHER. (INSTALL LEVELING FOOT WITH 6)1 BOLT & WASHERS. MARLA REINDERS 1729 SONNET DRIVE GRAPEVINE, TX 76051 DESCRIPTION: Marla Reinders RESIDENCE 4.94 KW PV ARRAY PAGE NAME: STRUCTURAL VIEWS .................................... .,HUMPHREY KKARIUUKI �ONA1.. STAMPED & SIGNED FOR STRUCTURAL ONLY 0-T—Y OF GRAEULNE RELEASED FOR CONSTRUCTION SHEET: _ OF: RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE, THIS PI__AN TO IAF KEr-T O THE ,TOB AT ALL TIES DATE ° _- _� - Bye EUILDIN(I f,N'SRECTION DIVISION F E .E, -b F DOES NOT,c,Ppl_y TU CONSTRUCTION IN EASEMENTS N T S CSR PUBLIC RIMT—OF—tNAY. Vincenz Buhler SHEET: REN DATE: PV 4 4/14/2016 =;;Solar iTV v �.70 3055 Clearview Way San Mateo, CA 94402 T:(650) 63B-1028 F:(650) 638-1029 (888)—SOL—CITY (765-2489) www.solarcitycom w an to] ilL POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: - Address: 1729 Sonnet Drive --—————————--——————— ---� SOLAR PHOTOVOLTAIC AR — --RAYS) UTILITY SERVICE INVERTER AND DC DISCONNECT PHOTOVMTAIC BACK—FED CIRCWT BREAKER IN MAIN ELEC1RICAL PANJ IS AN A/C DISCONNECT ENEC 690.17 - OPERATING VOLTAGE = 240V CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION NTH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. JOB NUMBER: JB -7601440 00 MOUNTING SYSTEM: Comp Mount Type C MODULES: (19) REC # REC260PEZ INVERTER: ABB # PVI-3.6-OUTD-S-US-Z-A PREMISE OWNER: MARLA REINDERS 1729 SONNET DRIVE GRAPEVINE, TX 76051 Marla Reinders RESIDENCE 4.94 KW PV ARRAY PAGE NAME: SITE PLAN PLACARD DESIGN: Vincenz Buhler SHEET: REV: DATE: PV 8 4/14/2016 W00.1 Y 3055 Clearview Way San Mateo, CA 94402 T:(650) 638-1028 F:(650) 638-1029 (888)—SOL—CITY (765-2489) www.solarcitycorn Label Location: (C)(CB) Per Code: NEC 690.31.G.3 Label Location: (DC) (INV) Per Code: NEC 690.14.C.2 Label Location: (DC) (INV) Per Code: NEC 690.53 Label Location: (DC) (INV) Per Code: NEC 690.5(C) Label Location: (DC) (CB) Per Code: NEC 690.17(4) Label Location: (AC) (POI) Per Code: NEC 690.14.C.2 Label Location: (AC) (POI) Per Code: NEC 690.54 CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. Label Set Label Location: (AC)(POI) Per Code: NEC 690.17.E Label Location: (POI) Per Code: NEC 690.17.4; NEC 690.54 Label Location: (POI) Per Code: NEC 690.64.B.4 Label Location: (D) (POI) Per Code: NEC 690.64.B.4 Label Location: (POI) Per Code: NEC 690.64.B.7 Label Location: (DC) (INV) Per Code: NEC 690.35(F) TO BE USED WHEN INVERTER IS UNGROUNDED (AC): AC Disconnect (C): Conduit (CB): Combiner Box (D): Distribution Panel (DC): DC Disconnect (IC): Interior Run Conduit (INV): Inverter With Integrated DC Disconnect (LC): Load Center (M): Utility Meter (POI): Point of Interconnection 3055 Clearview Way iarCitvi San Mateo, CA 94402 T:(650) 638-1028 F:(650) 638-1029 (888)-SOL-cm(765-2488) www.solarcity.com '"SolarCity I ZepSolar Zep System for composition shingle roofs QtOMPAT'A FAC/ OMPA1 uL LISTED zepsolar.com 1 113 Next -Level PV Mounting Technology '^SolarCity I ZepSolar Description • PV mounting solution for composition shingle roofs • Works with all Zep Compatible Modules • Auto bonding UL -listed hardware creates structural and electrical bond • Zep System has a UL 1703 Class "A" Fire Rating when installed using modules from any manufacturer certified as "Type 1" or "Type 2" Specifications • Designed for pitched roofs • Installs in portrait and landscape orientations • Zep System supports module wind uplift and snow load pressures to 50 psf per UL 1703 • Wind tunnel report to ASCE 7-05 and 7-10 standards • Zep System grounding products are UL listed to UL 2703 and UL 467 • Zep System bonding products are UL listed to UL 2703 • Engineered for spans up to 72" and cantilevers up to 24" • Zep wire management products listed to UL 1565 for wire positioning devices • Attachment method UL listed to UL 2582 for Wind Driven Rain This document does not create any express warranty by Zep Solar or about its products or services. Zep Solar's sole warranty is contained in the written product warranty for each product. The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty, The customer is solely responsible for verifying the suitability of ZepSolar's products for each use. Specifications are subject to change without notice. Patents and Apps: zspats.com. Documentif 800-1890-001 Rev A Date last exported: November 13, 2015 2:23 PM Components zepsolar.com Leveling Foot Part No. 850-1172 ETL listed to UL 467 Comp Mount Part No. 850-1382 Listed to UL 2582 Mounting Block Listed to UL 2703 Interlock Next -Level PV Mounting Technology 1*1 Ground Zep V2 Part No. 850-1388 Part No. 850-1511 Listed to UL 2703 Listed to UL 467 and UL 2703 k Array Skirt, Grip, End Caps Part Nos. 850-0113,850-1421, 850-1460,850-1467 Listed to UL 1565 IM DC Wire Clip Part No. 850-1448 Listed to UL 1565 This document does not create any express warranty by Zep Solar or about its products or services. Zep Solar's sole warranty is contained in the written product warranty for each product. The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty. The customer is solely responsible for verifying the suitability of ZepSolar's products for each use. Specifications are subject to change without notice. Patents and Apps: zspats.com. Document # 800-1890-001 Rev A Date last exported: November 13, 2015 2:23 PM This family of single-phase string inverters complements the typical number of rooftop solar panels enabling home -owners to get the most efficient energy harvesting for the size of the property. This inverter offers a dual input section that processes two strings with independent Multiple Power Point Tracking (MPPT). This is especially useful for rooftop installations with two different orientations from two sub -arrays oriented in different directions. (For example: East and West) The dual input sections with independent MPPT enable a more optimal energy harvesting condition. The high-speed MPPT offers real- time power tracking and improved energy harvesting. The flat efficiency curve ensures high efficiency at all output levels allowing a consistent and stable performance across the entire input voltage and output power range. The transformerless operation gives the highest efficiency of up to 97.0%. The wide input voltage range makes the inverter suitable to low power installations with reduced string size. This rugged outdoor inverter has been designed to be a completely sealed unit able to withstand the harshest environmental conditions. Highlights: - Single phase and split phase output grid connection. - Wide input range for increased stringing flexibility. - The high speed and precise MPPT algorithm offers real time power tracking and improved energy harvesting. - Outdoor NEMA 4X rated enclosure for unrestricted use under any environmental conditions. - Integrated DC disconnect switch in compliance with international Standards (-S Version). (newer ;and productivity for a better worfd' Additional highlights: - RS -485 communication interface (for connection to laptop or data logger). - Integrated Arc Fault Detection and Interruption (-A Version). Technical data and types 2 ABB Solar Inverters I Product flyer for PVI-3.0/3.6/3.8/4.2-TL-OUTD ��, S i.° �,....t,. �: r, R � d P All measurements in inches Nominal Power- P_ (Wp) 260 Watt Class Sorting- (Wp) ./-5 Nominal Power Voltage -V,, (V) 30.7 Nominal Power Current - IMPe (A) 8.50 Open Circuit Voltage - Von (V) 37.8 Short Circuit Current - I � (A) 9.01 Panel Efficiency(%) 15.8 The electrical characteristics are within «/-10% of the indicated values of 1, Va and P1pe at standard Test conditions (STC). Values at standard test conditions STC (airmass AM 1.5, irradiance 1000 W%m', cell temperature 77°F (25°C)). At low irradiance of 200 W fm' (AM 15 & cell temperature 77°F (25°C)) at least 97% of the STC panel efficiency will be achieved. Nominal Power -PMP,(Wp) 197 Nominal Power Voltage -VM11P, (V) 29.0 Nominal Power Current - I,, (A) 6.81 Open Circuit Voltage -Vnr (V) 35.7 Short CircuitCurrent -I,_ (A) 7.24 Nominal operating cell temperature NOCT (800 W{m', AM LS, win dspeed 1 m/s, ambient temperature 687 (20°C). 10 year product warranty. c@us 2S year linear power output warranty LISTED (max. degression in performance of 0.7%p.a.). UL 1703, Fire rating. Type 1, Class C REC is a leading global provider of solar energy solutions. With more than 15 years of experience, we offer sustainable, high performing a1� products, services and investments for the solar industry. Together with our partners, we create value by providing solutions that better w,, meet the world's growing energy needs. REC is headquartered in Norway and listed on the Oslo Stock Exchange (ticker: RECSOL). Our 1,600 employees worldwide generated revenues of USD 647 million in 2013. www.recgroup.com BOND (N) #8 GEC TO (E) GROUND ROD Panel Number:NoMatch AT PANEL WITH IRREVERSIBLE CRIMP Meter Number: 115682127 Underground Service Entrance �E 150A MAIN SERVICE PANEL E� 150A/2P MAIN CIRCUIT BREAKER (E) WIRING CUTLER—HAMMER I150A/2P Disconnect (E) LOADS A 20A/2P A � 1 1 I I N 1 �--- - EIGC/GEC TO 120/240V SINGLE PHASE UTILITY SERVICI Voc* = MAX VOC A##T MIN TEMP POI (1)SB eaker,D2UArP 20 2 Spaces, Bolt On ED BREAKER CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. I i 1 I i 1 I I 1 INV 1— ( 1 ) ABB # PVI-3.6—OUTD—S—US—Z—A LABEL: A FCI Inverter, Zigbee 3600W, 240V, 96% INV 2 INV — (19)RECREC26OPEZ # PV odule; 26OW, 236.6W PTC, MC4, 40mm, Black Frame, ZEP Enabled VOC: 37,8 Vpmox: 30.7 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER ADJUST MIN. ACTIVATION VOLTAGES! Inverter 1 IND 3 ABB PVI-3.6-OUTD-S-US-Z-A -- L1 24ov r -------------- L2 DC+ -- ---- ---- ---—- --- --- --- - —- EGCI -- -- -- - - -- -GEC -- ! PE- ( RELEASED HEET: __ OF: RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE ORZONING ORDINANCE. THIS PLAN TO BE KEPT ON THE JOB AT ALL, TIME DATE: - 2.o ) 1 BY: _ BUILDING INSPECTION DIVISION RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT-OF-WAY, VEQ A (1)CUTLER-HAMMER # DG221URB Disconnect; 30A, 24OVac, Non -Fusible, NEMA 3R — (1)CUTLER-RAMMER # DG03DNB Ground/Neutral Kit; 30A, General Duty (DG) go (1)AWG #10, THWN-2, Black __. O (1)AWG #10, THWN-2, Red (1)AWG #10, THWN-2, White NEUTRAL Vmp =240 VAC Imp -16 AAC ..... 70 AWP #8,. TH,WN72,, green . , EGC/GEC.- ( 1 ) Conduit. Kit;, 3/47. EMT. U06 NUMBER, JB -7601440 00 MOUNTING SYSTEM: Comp Mount Type C MODULES (19) REC # REC260PEZ INVERTER: ABB # PVI-3.6-OUTD-S-US-Z-A MARLA REINDERS 1729 SONNET DRIVE GRAPEVINE, TX 76051 tD'ColVstart = 200V MP1: 1x10----------------------------� -_-_1-- ------------------------ +1 - ------------- SEPARATE t I EUCTRJF3 S*N PERNTS WALL E REQUIRED Marla Reinders RESIDENCE 4.94 KW PV ARRAY PAGE NAME: THREE LINE DIAGRAM (1) Conduit Kit; 3/4" EMT VStart = 200V MPl:1x9 C " --------- Digitally signed by Matthew W. Bailey PE Date: 2• ••4 .18 FIN O ('Z) AWG #10, PV Wire, 600V, Black VoC* = 421.89 VDC (1)AWG #iQ THHN/THWN-2, Green EGC Vmp = 307 VDC Isc = 9.01 Imp= 8.5 ADC ADC .....0) ® ....... Conduit Kit;. 3/4'. EMT ...................................... (Y)AWG #10> PV Wire, 60OV, Black VoC* = 379.7 VDC (1)AWG #1Q, THHN/THWN-2, Green EGC Vmp = 276.3 VDC 1 Conduit Kit; 3 4 EMT ( )........./......................................... ISC = 9.01 Imp= 8.5 . ADC ADC Vincenz Buhler SHEET: REV: DATE: PV 6 4/14/2016 ~®olri Y 3055 Clearview Way San Mateo, CA 94402 T.(650) 636-1026 F:(650) 638-1029 (888) -SOL -CITY (765-2489) www.solorcitycom