Loading...
HomeMy WebLinkAboutCA2017-12025 October 2017 Erika Arpero, T UrIV 1. I Or) A Future With A Pa.st RE: HISTORIC PRESERVATION COMMISSION CERTIFICATE OF APPROPRIATENESS #CA17-120 Imo, a,' HOUSE 320 CHURCH STREET GRAPEVINE, TEXAS 76051 Fhis letter confirms on October 24, 2017 the Historic Preservation staff approved with conditions #CAI 7-120 for the property addressed 320 Church Street, legally described as Block: I Lot: 1, South Church Street Addition, Grapevine, Texas. The following was approvelf-.1- #n this Certificate of Appropriateness: 1. Repair of existing pier and bean foundation of the Scribner House; as per the attached engineering report and drawings with the condition a buildims, permit is obtained from the Building Department. An approved Certificate of Appropriateness is not an approved Building Permit and a , n 1\17 permit (J�), / is not required. Contact the City of Grapevine's Building Department ai ,-17-410-3165 for fees and information regarding permits. Thank you, David Klempin Historic Preservation Officer Me! cc. Property Owner CA File THE CITY OF GRAPEWNE HISTORIC PRESERVA-VION - 636 South Main Street - Grapevine, Texas'76051 Pliorie 817/410-3556 - Fax 817/410-3038 OCT 2 4 CERTIFICATE OF APPROPRIATENESS APPLICATION Aw roperty Owner Name, Address & Ph2on!eN=uniberficant ame, Address & Phone Num )i e -r 41 ) C (2- ODS. 3 z 6 cl o, -r 1 14 o (L L) 5-i Tenant Narne/Occupancy/Use Sj J� I A ryl ) L Request/Description of Work to Be Done Ph -One: L4 '2 ir l I Mobile Email: L _Ltqal Qescription Block 4 Lot Subdivision bp Aj f 12- -4- i i& j. r d —,ef ki AjEd_ 1 A-��� I Drawings/Sketches Attached o,/' Yes 0 No Material Sara les Attached (please list) () Current o Historic / hereby certify that this information is correct to the best of my knowledge and that the said work will be done in conformance with all submissions herein set forth, and in compliance with the City of Grapevine's Historic Overlay District Ordinances and Building Codes. APPROVAL OFA CERTIFICATE OFAPPROPRIATENPSS DOES NOT CONSTITUTE APPROVAL. OF OTHER REQUIRED BUILDING PERMITS. x-----ppC ---- EPriniName Owner or Co actor Office Use Approved- Approved with Conditions: Staff HPC 0 EEied „.,,� 0 'Commission L.Pat�e Building Official DELIVER TO: HISTORIC PRESERVATION DEPARTMENT OFRCE 817-410-355C, 636 SOUTH MAIN STREET, G RAPEVINE, TEXAS 10/25/2017 Property Search Results — Tarrant Appraisal District https://www.tad.org/property-search-results/ 1/1 CRdrS'i OWN -,�.�,M �461Y Date: October 4, 2017 Attention: Arch Foundation Repair (via email) & Property Owner Subject: Pre -Foundation Limited Repair Consultation Report Pier & Beam Foundation 320 S Church St, Grapevine, TX 76051 Crosstown Engineering (CE) was retained to conduct a review of the limited foundation repair plan prepared by Arch Foundation Repair (the contractor) to determine, in our opinion, if the recommended remediation plan is a reasonable limited plan of repair based on the provided relative elevation map and the judgment of the contractor. The contractor provided an agreement and a limited repair plan that included repair locations and pre -Lift elevations for the structure for our review. No other information was provided regarding prior engineering reports, recommen- dations for limited foundation repairs or construction documents. If existing piers are shown in the limited repair plan, their locations were provided by the client and are approximated. We do not certify their performance or exist- ence. If the reader would like to determine if they are present, they must contact the owner or contractor to obtain an engineering certificate for them. According to the contractor, physical damage is present which indicates a need for remedial measures. Arch Foundation Repair has recommended installation of 12 LF of 2 (2x6) wood beam, 3 block and base piers, and to re -shim the area of work with steel shims. All limited repairs are to be made in the approximate locations of the structure as indicated on the limited repair plan and may be altered based on field conditions of the foundation. Upon review of the elevation drawing and based on the contractor's evaluation of the property, we believe the pro- posed limited repair plan to be a reasonable and limited repair. Expectations and Additional Recommendations.- This ecommendations:This report provides our reasonable professional opinion of the condition of the foundation on the date of the inspec- tion by the contractor and is based on the data provided to us and does not take into consideration any changes in the condition of the foundation or soils after that date. The contents of this report supersede any verbal comments made regarding the structure before, during or after the inspection. Although document review is an integral part of the limited foundation repair process, we recommend obtaining a visual inspection by a licensed engineer. CE can com- plete this visual inspection for an additional fee. If Crosstown is not contracted to perform a visual inspection it is unknown to us as to whether or not additional repairs may be needed. This limited repair plan is intended to provide a reasonable repair to improve the performance of the foundation and is not intended to level the foundation. The contractor shall determine the amount of elevation correction needed based on the reaction of the structure during the lift in order to minimize damages and additional stress. Because the structure has endured pre -repair foundation differential movement, residual differential elevation and perceptible floor slope or other noticeable issues may remain following the limited foundation repairs. The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture content fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls will surface due to seasonal movement within the soils, even after limited foundation repair. Periodic repair of this type of cracking may be needed. Page 1 of 6 - Date: 10/4/2017 N 17 - 110 ca k.l(A c cry, IJ I X %I I OSSTOWN--­-­­­-,_­­,­ A foundation and yard watering and foundation maintenance program will help control seasonal movement. It is important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the structure. In addition, tree and shrub removal or root barrier installations are advisable if trees or bushes are observed to be close to the foundation. Tree roots can cause "heave" or settlement of the foundation where roots grow and absorb moisture over time when planted close to the foundation (tree roots extend approximately as far or further than tree limbs). Maintaining the soils around the structure to slope away from the foundation to prevent excessive ponding near the foundation in areas that are not already sloping away will help prevent future foundation movement. We recommend that a full gutter system with gutter extensions be maintained to discharge a minimum of 4 feet from the foundation (not in landscaped flower beds or any other location that will trap water near the foundation). Ponding near the foundation can cause "heaving" (upward movement of the foundation), settlement of the foundation due to overly saturated clays soil or erosion of soil embedment around the foundation. If standing water is observed at any time in the pier and beam area by the owner, we recommend immediately pump- ing the water out to prevent water damage to wood elements and to prevent humid conditions in the crawlspace. Humidity in the crawlspace can cause wood rot. If standing water is observed near the foundation after a rainstorm, we recommend consulting a drainage expert or engineer to evaluate the terrain and develop a drainage management strategy to address the issue. We recommend pre -lift and post -lift plumbing tests be performed on the sewer and potable plumbing lines. All leaks shall be repaired immediately. Disclaimer: We do not warrant the future performance of the subject foundation and the reader is urged to review the Disclosure & Disclaimer for other limitations and standard recommendations. The limit of liability is limited to the fee paid for this opinion. No further agreement shall be made, altered, or varied except by written instrument. This report was completed to document the repairs to be implemented by the contractor. Neither Crosstown Engi- neering nor Adam Green, P.E., are responsible for liability to the owner or others for acts or omissions of the con- tractor to carry out the repairs in accordance with their agreement or for the construction means, methods, techniques, sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the warranty of the work they performed in accordance with their agreement. Please see the attached disclaimer/disclosure, pier specifications and elevation map for more information. Sincerely, Crosstown Land Development Services Texas Engineering Firm (F- 15944) Adam Green, P.E., MBA Professional Engineer (TX 4116597) 10/4/17 Page 2 of 6 - Date: 10/4/2017 0 :4 NIMUCKOM CA (7 -/7-0 Adim A, ro (, i H, r�IlAr 1. 9 7 CROSSTOWN"' DISCLOSURE & DISCLAIMER It is known to knowledgeable professional engineers that the soils in this area are subject to movement due to expansion, con- traction or densification of the soils etc. This soil movement could possibly cause the foundation to move after the remediation plan within the attached report has been implemented and may impact the stability of the foundation and cause damage. NO WARRANTY IS EXPRESSED OR IMPLIED BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUNDA- TION OR THE REPAIRS THERETO. Diligent foundation maintenance to maintain consistent soil conditions along the perim- eter should reduce further problems after the recommendations within this report have been implemented. However, seasonal moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger of further damage. REPORT LIMITATIONS This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the property or an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current conditions observed at the time of the inspection. THERE IS NO WARRANTY, EXPRESSED OR IMPLIED, CONCERNING THIS ENGINEERING REPORT. The information in this report supersedes any verbal comments, expressed or implied, made by Crosstown Land Development Services or its principals, agents or employees. The client agrees that neither CLDS nor its employees or owners will be respon- sible for: 1. Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite drilling and testing of the recovered samples, 2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the client; and 3. Any other element such as joists or beams and other structural members that is boxed or otherwise not readily available to CE for viewing, and releases CE from any liability attributable to such knowledge or conditions. Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance of the facility at the time of this structural survey. Compliance with any code or specification other than as expressly noted is specifically excluded. The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and DOES NOT IMPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN THE FUTURE. This report was prepared expressly for the client and expressly for the purposes indicated by the client. Permission for use by any other person for any purpose, or by the client for different purpose is denied unless otherwise stated in writing by CE. CE SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIONS BY THE CONTRACTOR OR HIS SUBCONTRACTORS PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE CONTRACTOR TO PERFORM THE WORK IN ACCORDANCE WITH THE REPAIR PLAN. CE IS NOT RESPONSIBLE FOR THE CONSTRUCTION MEANS, METH- ODS, TECHNIQUES, SEQUENCE OR PROCEDURES OR THE PRECAUTIONS INCIDENTAL THERETO. CE expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE and the client expressly dis- claims that it has contracted for or received any warranty of fitness for a particular purpose with respect to this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF CE AND THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE OF MS AGREEMENT. Page 3 of 6 - Date: 10/4/2017 �dam/LG/cr�Pl(H�1�]'MR� CRC S ST N__-_-_'-- . b(16*)73l-76�1 DRAWING LEGEND �New Pilings --Prop. Line E) Builders Piers Fence E] Previous Work A/C Unit + Slab Crack * Wall Cracks _ __ .__ __ .-_ __ . L ',-! Tunnel LF ° Slope cit -Elect. Panel -- Interior Grade Beam � l-' | =�= momn�un�/mm"�e, wo���� Install 3Block « Ba§ a2iem -J 1 x�n�moan�m��w��elshims -�' pmwu�onomeemJFw��mo/o9off /eue � / / . I . | ' | | -- -- '-- -- |-- -- | | | | ' | -- --� -- | -- -/ | | . . - -- —n r")FaRAPErINE DATE", QjFN,_ BY CONTAC - [- ---^l~~~'~�-~~M`^~~~ | / PLEASE NOTE: THIS DRAWING |SPROVIDED FOR PERMITTING AND CONSTRUCTION PURPOSES ONLY. ADDITIONAL 32USCHURCH STREET WORK MAY BE NEEDED ONCE THE FOUNDATION WORK HAS BEGUN BASED ON THE PERFORMANCE OF GRAPEVINE, TX7d05l TH|SREPA|RPLAN. CROSSTOWN ENGINEERING HAS PROVIDED REVIEW OFTHIS REPAIR PLAN AND |T|S OUR OPINION THAT |T|5REASONABLE AND SAFE FOR THE STRUCTURE. / IF INTERIOR PIERS ARE SHOWN ON THIS DRAWING THE CONTRACTOR WILL PLACE THEM BASED ON THE / LOCATIONS OF GRADE BEAMS, PLUMBING LINES AND POSTTENSION CABLES, THEREFORE, THE '~1���[�k GREEN LOCATIONS SHOWN ON THIS MAP ARE APPROXIMATE. THE CONTRACTOR SHALL PROVIDE THE MEANS- AND -METHODS 0FTHIS |N5TALLAT|ON ADDITIONAL � lU/4/l7 STRUCTURE BYCROSSTOWN ENGINEERING. THIS IS A PROPOSED SCOPE OF WORK AND HAS NOT BEEN COMPLETED THEREFORE WE DO NOT CERTIFY CmustonoEogineering ANY EXISTING ORPROPOSED FOUNDATION REPAIR WORK ONTHIS MAP ATTHIS TIME. Texas Engineering Pirm(P-|5944) IF THE READER WOULD LIKE TO BE CERTAIN THAT ANY PROPOSED OR EXISTING REPAIRS HAVE BEEN COMPLETED THEY MUST REQUEST AN ENGINEERING CERTIFICATE FOR THE SUBJECT FOUNDATION WORK 23I8flood St#727 FROM THE FOUNDATION REPAIR COMPANY. Dallas, TX 75219 -rj � x/ `��� ch � ����~ ��� � 11, 11, V"uh(46^)7Sl-76v1 , . 415 f) q-� - 15A , �f CE9�UF*CAg�E8F - CffY OF GRAPEVINE RELEAS PURSUA DATE' ^,MIE..wF / 0EVElOPMEW'SE@VICES ' . CONIACT S0H.MNG INSPECT*0NS� ' FOR PERMIT INFORVAnON PLEASE NOTE: THIS DRAWING |SPROVIDED FOR PERMITTING AND CONSTRUCTION PURPOSES ONLY. ADDITIONAL 320 CHURCH STllBB7 WORK MAY BE NEEDED ONCE THE FOUNDATION WORK HAS BEGUN BASED ON THE PERFORMANCE OF GRAPEVINE, T}{76O5l TH|S REPA|R PLAN. CROSSTOWN ENGINEERING HAS PROVIDED REVIEW OFTHIS REPAIR PLAN AND IT IS OUR OPINION THAT |T|3REASONABLE AND SAFE FOR THE STRUCTURE. IF INTERIOR PIERS ARE SHOWN ON THIS DRAWING THE CONTRACTOR WILL PLACE THEM BASED ON THEA. LOCATIONS OF GRADE BEAMS, PLUMBING LINES AND POST TENSION CABLES, THEREFORE, THE GREEN, LOCATIONS SHOWN ONTHIS MAP ARE APPROXIMATE. THE CONTRACTOR SHALL PROVIDE THE MEANS '4, 116597 AND -METHODS OF THIS INSTALLATION. ADDITIONAL REPAIRS MAY BE REQUIRED UPON REVIEW OF THE 10/4/17 STRUCTURE BYCROSSTOWN ENGINEERING. THIS IS A PROPOSED SCOPE OF WORK AND HAS NOT BEEN COMPLETED THEREFORE WE DO NOT CERTIFY Crosstown Engineering ANY EXISTING ORPROPOSED FOUNDATION REPAIR WORK ONTHIS MAP ATTH|ST|yNE . Texas Euginrrxin�Pinn(F-|5944) |FTHE READER VV0ULDLIKE TDBECERTAIN THAT ANY PROPOSED OREXISTING REPAIRS HAVE BEEN COMPLETED THEY MUST REQUEST AN ENGINEERING CERTIFICATE FOR THE SUBJECT FOUNDATION WORK 272CHood St#727 FROM THE FOUNDATION REPAIR COMPANY. Dallas, TX 7.5219 CR di'S � OWN-­­ t VVorUh(�6,)75l'7691 7( �5M , '. (CER77K,ATEOF APPROPRWTENESS crRe.)FGRAPEVINE REf.EAS P COWACTMQLDING IWSPECTMNS PLEASE NOTE: THIS DRAWING |SPROVIDED FOR PERMITTING AND CONSTRUCTION PURPOSES ONLY. ADDITIONAL 920SCHURCH STREET WORK MAY BE NEEDED ONCE THE FOUNDATION WORK HAS BEGUN BASED ON THE PERFORMANCE OF GRAPEVINE, TX 76051 TH|SREPA|RPLAN. CROSSTOWN ENGINEERING HAS PROVIDED REVIEW OFTHIS REPAIR PLAN AND r[|S OUR OPINION THAT |T|SREASONABLE AND SAFE FOR THE STRUCTURE. |F|NTER0RPIERS ARE SHOVVNONTHIS DRAVV|NGTHE CONTRACTOR VV|LLPLACE THEyNBASED ONTHE ' ' /�j~7iJ~` LOCATIONS BEAMS, °116597 LOCATIONS SHOWN ON THIS MAP ARE APPROXIMATE. THE CONTRACTOR SHALL PROVIDE THE MEANS- AND -METHODS OF THIS INSTALLATION. ADDITIONAL REPAIRS MAY BE REQUIRED UPON REVIEW OF THE 10/4/17 STRUCTURE BY CROSSTOWN ENGINEERING. THIS IS A PROPOSED SCOPE OF WORK AND HAS NOT BEEN COMPLETED THEREFORE WE DO NOT CERTIFY CrosutownUng(oecdng ANY EXISTING ORPROPOSED FOUNDATION REPAIR WORK ONTHIS MAP ATTHIS TIME. Texas Engineering Firm (F -]5Y44) IF THE READER WOULD LIKE TO BE CERTAIN THAT ANY PROPOSED OR EXISTING REPAIRS HAVE BEEN COMPLETED THEY MUST REQUEST AN ENGINEERING CERTIFICATE FOR THE SUBJECT FOUNDATION WORK 2728Hood 8t#7Z? FROM FROK4THEFOUNDAT|DNREPA|RCON1PANY. Dallas `