Loading...
HomeMy WebLinkAboutTerracon - 3/19/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0112 Service Date: 03/19/18 2501 E Loop 820 N Report Date: 04/18/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Maximum Material Information Set Specimen Avg Diam. Sample Information Date Date Specified Strength: 5,000 psi @ 28 days Sample Date: 03/19/18 Sample Time: 1230 (sq in) Received Tested (days) Sampled By: Daniel Moreno Mix ID: 1504 1 A 4.00 12.57 Weather Conditions: Clear/Heavy wind Supplier: Redi Mix Concrete 5,190 4 Accumulative Yards: 3/3 Batch Size (cy): 3 Batch Time: 1112 Plant: 135 Placement Method: Direct Discharge Truck No.: 1448 Ticket No.: 25816147 Water Added Before (gal): 76,310 Field Test Data 2 1 D 4.00 Water Added After (gal): 04/16/18 28 77,070 6,130 Sample Location: Junction Box Cap- Sta. 0.88 Line A Test Result Specification Placement Location: Junction Box Cap- Sta. 0.88 Line A Slump (in): 3 3-5 Hold Air Content (%): 2.6 0-3 Initial Cure: Outside Concrete Temp. (F): 73 50--95 Ambient Temp. (F): 68 Plastic Unit Wt. (pcf): 145.2 Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 03/26/18 7 65,260 5,190 4 1 B 4.00 12.57 04/16/18 28 74,460 5,930 4 1 C 4.00 12.57 04/16/18 28 76,310 6,070 2 1 D 4.00 12.57 04/16/18 28 77,070 6,130 2 Average (28 days) 6,040 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Moreno Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0112 Service Date: 03/19/18 Report Date: 04/18/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0112 Service Date: 03/19/18 2501 E Loop 820 N Report Date: 04/02/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 1504 Supplier: Redi Mix Concrete Batch Time: 1112 Plant: 135 Truck No.: 1448 Ticket No.: 25816147 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 3 3-5 2.6 0-3 73 50--95 68 1 B 145.2 12.57 Laboratory Test Data Set Specimen Avg Diam. Area No. ID (in) (sq in) 1 A 4.00 12.57 1 B 4.00 12.57 1 C 4.00 12.57 1 D 4.00 12.57 1 E Hold Initial Cure: Outside Comments: Samples Made By: Terracon Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: 03/19/18 Sample Time: 1230 Daniel Moreno Clear/Heavy wind 3/3 Batch Size (cy): 3 Direct Discharge Junction Box Cap- Sta. 0.88 Line A Junction Box Cap- Sta. 0.88 Line A Age at Maximum Date Date Test Load Received Tested (days) (lbs) 03/26/18 7 65,260 04/16/18 28 04/16/18 28 04/16/18 28 Hold Final Cure: Moist Room Compressive Strength Fracture (psi) Type 5,190 4 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Moreno Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0112 Service Date: 03/19/18 Report Date: 04/02/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) CMG Construction, blakec@cmgconstruction.com (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED PIER OBSERVATION REPORT Irerracon Report Number: 95181011.0111 Service Date: 03/19/18 2501 E Loop 820 N Report Date: 03/27/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 A Terracon Representative arrived on the jobsite to perform Drilled Pier Observations. On this day we only drilled down to bearing and set casing in five different piers. Manhatton Construction is planning on finishing these drilled piers on the next day as well as pouring concrete to pier elevation. Services: Drilled Pier Observation Terracon Rep.: Daniel Moreno Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. se0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0111 Service Date: March 19, 2018 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Daniel Moreno Pier Identification E.6/13.8 E.8/13 E.8/12 G.5/13 G.5/12 E.8/11 G.7/11 Pier Diameter (in.) 24 42 42 36 36 42 36 Top of Ground Elevation (ft.) 621.22 623.07 622.11 622.97 622.69 622.50 622.88 Top of Pier Elevation (ft.) 620.25 622.25 622.25 622.25 622.25 622.25 622.25 Depth to Bearing Stratum from Ground (ft.) 17.0 18.0 17.4 18.5 17.8 18.0 23.0 Depth of Pier from Ground (ft.) 28.0 46.0 45.0 43.0 45.3 43.1 44.0 Required Penetration (ft.) 10.0 25.0 25.0 20.0 20.0 25.0 20.0 Actual Penetration (ft.) 11.0 28.0 27.6 24.5 27.5 25.1 21.0 Depth from Top of Concrete (ft.) 28.5 46.0 44.5 42.5 45.3 43.0 43.5 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 44 44 38 38 44 38 Cased Depth (ft.) 18.0 19.0 19.0 23.0 23.0 19.0 24.0 Number of Vertical Bars (ea.) 6 8 8 8 8 8 8 Reinforcing Bar Size (#) 6 9 9 8 8 9 8 Length of Vertical Bars (ft.) 26.2 45.0 44.9 44.2 44.2 43.0 43.2 Time Drilling was Completed 8:10 AM 9:00 AM 9:50 AM 10:55 AM 10:25 AM 1:30 PM 3:00 PM Time Concrete was Placed 12:20 PM 2:05 PM 2:20 PM 2:30 PM 4:00 PM 5:30 PM 5:50 PM "Started penetration below casing. Page 1 of 1 Distribution Page Report Number: 95181011.0111 Service Date: 03/19/18 Report Date: 03/27/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600