HomeMy WebLinkAboutTerracon - 3/20/2018REINFORCING STEEL OBSERVATIONS REPORT
Report Number: 95181011.0116
Irerracon
Service Date: 03/20/18 2501 E Loop 820 N
Report Date: 03/27/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
PROJECT DATA
Drawings Utilized: Structural Sheets- PKS-302 Detail: C3, PKS-007 Detail: A5, PKS-610 Detail: E3, PKS-300 Detail:
D7 (See Reinforcement Schedule)
Locations/Items Observed: CIP Basement Wall- P4/15-15.4
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings
Approved
X
Bar Length and Shape
X
Column Tie Spacing & Type
X
Bar Size
X
Proper Bar Placement
X
Stirrup Spacing & Type
X
Bar Grade
X
Properly Tied
X
Welded Splices
Rebar Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash & Debris Removed
X
Proper Bar Supports
X
Lapped Splices
X
Number of Bars
X
Proper Cover/Clearance
X
Discrepancies/Comments:
Any discrepancies found were corrected prior to completion of this observation.
Services: Observation of Reinforcing Steel Placement
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001, 5-5-10, Rev.7 Page 1 of 1
Distribution Page
Report Number: 95181011.0116
Service Date: 03/20/18
Report Date: 03/27/18
Task:
Distribution List
(1) Coury Hospitality, mark@brookshc.com
(1)AECC Inc, leel@aeccinc.com
(1) City of Grapevine TX, curtisb@grapevinetexas.gov
(1) Manhattan Construction Co, bjensen@manhattanconstruction.com
(1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com
(1) Manhattan Construction Co, cpritchard@manhattanconstruction.com
(1) Manhattan Construction Co, drideau@manhattanconstruction.com
(1) Manhattan Construction Co, dsaiter@manhattanconstruction.com
(1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com
(1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0115
Service Date: 03/20/18 2501 E Loop 820 N
Report Date: 04/18/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Maximum
Material Information
Set Specimen Avg Diam.
Sample Information
Date Date
Specified Strength: 4,000
psi @
28 days
Sample Date:
03/20/18 Sample Time: 1130
(sq in)
Received Tested
(days)
Sampled By:
Daniel Moreno
Mix ID: 9458
1 A 4.00
12.57
Weather Conditions:
Clear/ light wind
Supplier: Argos
3,550
5
Accumulative Yards:
20/80 Batch Size (cy): 10
Batch Time: 1100
Plant:
123
Placement Method:
Pump
Truck No.: 4071
Ticket No.:
12325932
Water Added Before (gal):
63,140
Field Test Data
4
1 D 4.00
Water Added After (gal):
04/17/18
28
59,880
4,770
Sample Location:
(Hotel) Pier- E.8/14
Test
Result
Specification
Placement Location:
(Hotel) Pier- E.8/14
Slump (in):
5 1/2
5-8
Hold
Air Content (%):
2.0
0-3
Initial Cure: Outside
Concrete Temp. (F):
63
50-95
Ambient Temp. (F):
50
35-100
Plastic Unit Wt. (pcf):
146.8
Yield (Cu. Yds.):
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date Date
Test
Load
Strength
Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days)
(lbs)
(psi)
Type By
1 A 4.00
12.57
03/27/18
7
44,570
3,550
5
1 B 4.00
12.57
04/17/18
28
62,420
4,970
5
1 C 4.00
12.57
04/17/18
28
63,140
5,020
4
1 D 4.00
12.57
04/17/18
28
59,880
4,770
3
Average
(28 days)
4,920
1 E
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0115
Service Date: 03/20/18
Report Date: 04/18/18 Revision 1 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
DRILLED PIER OBSERVATION REPORT
Report Number: 95181011.0114
Irerracon
Service Date: 03/20/18 2501 E Loop 820 N
Report Date: 07/02/18 Revision 1 - Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Proiect Number: 95181011
On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet
for recorded data.
NOTE: Elevation data provided by others or taken from plans.
Services: Drilled Pier Observation
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
DRILLED PIER OBSERVATION
Report Number: 95181011.0114
Service Date: March 20, 2018
Client: Brooks Hospitality Consulting Corp
Attn: Mark Brooks
206 Oldenwood Ct
Colleyville, TX 76034
Driller: CMG
1 rerracon
2501 E. Loop 820 North
Fort Worth, Texas 76118
817-268-8600 Reg No: F-3272
Project:
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project No.: 95181011
Technician: Daniel Moreno
Pier Identification
E.6/13.8
E.8/13
E.8/12
G.5/13
G.5/12
E.8/11
G.7/11
Pier Diameter (in.)
24
42
42
36
36
42
36
Top of Ground Elevation (ft.)
621.22
623.07
622.11
622.97
622.69
622.50
622.88
Top of Pier Elevation (ft.)
620.25
622.25
622.25
622.25
622.25
622.25
622.25
Depth to Bearing Stratum from Ground (ft.)
16.0
17.0
17.0
23.0
23.0
18.0
24.0
Depth of Pier from Ground (ft.)
28.0
46.0
45.0
43.0
45.3
43.1
44.0
Required Penetration (ft.)
10.0
25.0
25.0
20.0
20.0
25.0
20.0
Actual Penetration (ft.)
12.0
29.0
28.0
20.0
22.3
25.1
20.0
Depth from Top of Concrete (ft.)
28.5
46.0
44.5
42.5
45.3
43.0
43.5
Condition of Bottom (wet or dry)
Dry
Dry
Dry
Dry
Dry
Dry
Dry
Plumb Within Tolerance (yes or no)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Casing Diameter (in.)
26
44
44
38
38
44
38
Cased Depth (ft.)
18.0
19.0
19.0
23.0
23.0
19.0
24.0
Number of Vertical Bars (ea.)
6
8
8
8
8
8
8
Reinforcing Bar Size (#)
6
9
9
8
8
9
8
Length of Vertical Bars (ft.)
26.2
45.0
44.9
44.2
44.2
43.0
43.2
Time Drilling was Completed
8:10 AM
9:00 AM
9:50 AM
10:55 AM
10:25 AM
1:30 PM
3:00 PM
Time Concrete was Placed
12:20 PM
2:05 PM
2:20 PM
2:30 PM
4:00 PM
5:30 PM
5:50 PM
"Started penetration below casing.
Page 1 of 1
Distribution Page
Report Number: 95181011.0114
Service Date: 03/20/18
Report Date: 07/02/18 Revision 1 -
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
DRILLED PIER OBSERVATION REPORT
Report Number: 95181011.0114
Irerracon
Service Date: 03/20/18 2501 E Loop 820 N
Report Date: 04/11/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Proiect Number: 95181011
On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet
for recorded data.
NOTE: Elevation data provided by others or taken from plans.
Services: Drilled Pier Observation
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
DRILLED PIER OBSERVATION
Report Number: 95181011.0114
Service Date: March 20, 2018
Client: Brooks Hospitality Consulting Corp
Attn: Mark Brooks
206 Oldenwood Ct
Colleyville, TX 76034
Driller: CMG
1 rerracon
2501 E. Loop 820 North
Fort Worth, Texas 76118
817-268-8600 Reg No: F-3272
Project:
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project No.: 95181011
Technician: Daniel Moreno
Pier Identification
B.8/14
B.8/13
B.8/12
G.5/13
G.5/12
G.5/13
G.5/14
Pier Diameter (in.)
24
42
42
36
36
42
36
Top of Ground Elevation (ft.)
621.22
628.07
622.11
622.13
622.69
622.80
622.80
Top of Pier Elevation (ft.)
622.25
622.25
622.25
622.25
622.25
622.25
622.25
Depth to Bearing Stratum from Ground (ft.)
17.0
18.0
17.4
18.5
17.8
18.0
23.0
Depth of Pier from Ground (ft.)
28.0
46.0
45.0
43.0
45.3
43.1
44.0
Required Penetration (ft.)
10.0
23.0
25.0
20.0
20.0
25.0
20.0
Actual Penetration (ft.)
11.0
28.0
27.6
24.5
27.5
25.1
21.0
Depth from Top of Concrete (ft.)
28.5
46.0
44.5
42.5
45.3
43.0
43.5
Condition of Bottom (wet or dry)
Dry
Dry
Dry
Dry
Dry
Dry
Dry
Plumb Within Tolerance (yes or no)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Casing Diameter (in.)
26
44
44
33
38
44
33
Cased Depth (ft.)
18.0
19.0
19.0
23.0
23.0
19.0
24.0
Number of Vertical Bars (ea.)
6
8
8
8
8
8
8
Reinforcing Bar Size (#)
6
9
9
8
8
9
8
Length of Vertical Bars (ft.)
26.2
45.0
44.1
49.2
44.2
43.0
43.2
Time Drilling was Completed
8:10 AM
9:00 AM
9:30 AM
10:55 AM
10:25 AM
1:30 PM
3:00 PM
Time Concrete was Placed
12:20 PM
2:05 PM
2:20 PM
2:30 PM
4:00 PM
5:30 PM
5:50 PM
Started penetration below casing
Page 1 of 1
Distribution Page
Report Number: 95181011.0114
Service Date: 03/20/18
Report Date: 04/11/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) City of Grapevine TX, Curtis A Bergthold
(1) CMG Construction, Blake Cearley
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0112A
Irerracon
Service Date: 03/20/18 2501 E Loop 820 N
Report Date: 04/02/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5
Report No.: 95181011.0112A
No. of Cylinders: 1 set of 5
Services:
Terracon Rep.: Daniel Moreno
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,T
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of I
Distribution Page
Report Number: 95181011.0112A
Service Date: 03/20/18
Report Date: 04/02/18
Task:
Distribution List
(1) Coury Hospitality, mark@brookshc.com
(1)AECC Inc, leel@aeccinc.com
(1) City of Grapevine TX, curtisb@grapevinetexas.gov
(1) CMG Construction, blakec@cmgconstruction.com
(1) Manhattan Construction Co, bjensen@manhattanconstruction.com
(1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com
(1) Manhattan Construction Co, cpritchard@manhattanconstruction.com
(1) Manhattan Construction Co, drideau@manhattanconstruction.com
(1) Manhattan Construction Co, dsaiter@manhattanconstruction.com
(1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com
(1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
FIELD DENSITY TEST REPORT Irerracon
Report Number: 95181011.0119
Service Date: 03/20/18 2501 E Loop 820 N
Report Date: 03/27/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Lab Test Data Project Requirements
Mat. Proctor
No. Ref. No.
1 95181011.0004
Field Test Data
Classification and Description
Yellowish Brown Clayey Sand
Test
No. Test Location
Laboratory
Test Method
ASTM D698
Optimum
Water
Max. Lab
Water
Content
Density
Content
Compaction
(%)
(pcf)
(%)
(%)
18.4
106.2
+4
Min 93
Probe Wet Water Water Dry Percent
Lift / Mat. Depth Density Content Content Density Compaction
Elev. No. (in) (pcf) (pcf) (%) (pcf) (%)
Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture
condition (ASTM D-6938).
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
__Lto Tul
Senior Project Manager
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cRoo07, 11-16-12, Rev.7 Page 1 of 1
Exterior basement Wall (P4/15.5 -P4/16 -P7/16 -P7/15.3)
1
P4/15.8 4 1
6
127.6
24.1
23.3
103.5
97
2
P5.5/16 4 1
6
126.6
23.8
23.2
102.8
97
3
P7/15.6 4 1
6
126.1
24.4
24.0
101.7
96
P5.5/16 -P7/16 -P7/15.3
4
P6/16 4 1
6
124.8
24.6
24.6
100.2
94
5
P7/15.5 4 1
6
125.5
23.7
23.3
101.8
96
Datum: Moisture Condition.
Std.
Cut. M:671 Std. Cut.
D: 2049
S/N:
Make:
Model:
Last Cal. Date:
Comments: Test and/or retest results on this report meet project requirements as noted above.
Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture
condition (ASTM D-6938).
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
__Lto Tul
Senior Project Manager
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cRoo07, 11-16-12, Rev.7 Page 1 of 1
Distribution Page
Report Number: 95181011.0119
Service Date: 03/20/18
Report Date: 03/27/18
Task:
Distribution List
(1) Coury Hospitality, mark@brookshc.com
(1)AECC Inc, leel@aeccinc.com
(1) City of Grapevine TX, curtisb@grapevinetexas.gov
(1) Manhattan Construction Co, bjensen@manhattanconstruction.com
(1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com
(1) Manhattan Construction Co, cpritchard@manhattanconstruction.com
(1) Manhattan Construction Co, drideau@manhattanconstruction.com
(1) Manhattan Construction Co, dsaiter@manhattanconstruction.com
(1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com
(1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600