Loading...
HomeMy WebLinkAboutTerracon - 4/10/2018FIELD DENSITY TEST REPORT Irerracon Report Number: 95181011.0168 Service Date: 04/10/18 2501 E Loop 820 N Report Date: 04/18/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Lab Test Data Project Requirements Optimum Water Max. Lab Water Mat. Proctor Laboratory Content Density Content Compaction No. Ref. No. Classification and Description Test Method (%) (pcf) 1 95181011.0006 Dark Reddish Brown Sandy Clay ASTM D698 18.1 106.4 +4 95+ 2 95181011.0006 Dark Reddish Brown Sandy Clay ASTM D698 18.1 106.4 Opt +4 94+ Field Test Data Probe Wet Water Water Dry Percent Test Lift / Mat. Depth Density Content Content Density Compaction No. Test Location Elev. No. (in) (pcf) (pcf) (%) (pct) (%) Water line 1 backfill 1 STA 5+00 Final 1 6 128.2 20.5 19.0 107.7 100+ 2 STA 4+00 l 6 127.6 20.0 18.6 107.6 100+ 3 STA 3+00 l 6 130.9 20.6 18.7 110.3 100+ Very SEC of parking garage grade beam backfill 4 Sewer line next too parking Final l 6 124.5 21.7 21.1 102.8 97 garage Datum: S/N: Make: Model: Last Cal. Date: Comments: Test and/or retest results on this report meet project requirements as noted above. Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition (ASTM D-6938). Terracon Rep.: Brandon Martin Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: __Lto Tul Senior Project Manager Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cRoo07, 11-16-12, Rev.7 Page 1 of 1 Distribution Page Report Number: 95181011.0168 Service Date: 04/10/18 Report Date: 04/18/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 GENERAL OBSERVATION REPORT Report Number: 95181011.0167 Irerracon Service Date: 04/10/18 2501 E Loop 820 N Report Date: 04/16/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to perform concrete inspections. The oncrete pour was pushed back to 2:00pm, then pushed again to 3:00pm, and finally arrived at 4:30pm. Concrete had an 11" slump, which was rejected by the superintendent David Sader, and the pour was cancelled. Services: Travel to the project site to perform testing/observation services as requested. Terracon Rep.: James Jimenez Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 Distribution Page Report Number: 95181011.0167 Service Date: 04/10/18 Report Date: 04/16/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0166 Service Date: 04/10/18 2501 E Loop 820 N Report Date: 05/09/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 3,000 psi @ 28 days Sample Date: 04/10/18 Sample Time: 1300 Sampled By: Daniel Blocker Mix ID: 9458 Weather Conditions: clear Supplier: Argos Accumulative Yards: 20 Batch Size (cy): 10 Batch Time: 1215 Plant: Placement Method: pump Truck No.: 6238 Ticket No.: 12326689 Water Added Before (gal): Field Test Data Water Added After (gal): Sample Location: Piers @ GL (B/6.7) Test Result Specification Placement Location: see report 0165 Slump (in): 6 5-7 Air Content (%): 2.2 0-3 Concrete Temp. (F): 66 50-95 Ambient Temp. (F): 72 35-100 Plastic Unit Wt. (pcf): 147.6 Yield (Cu. Yds.): 44.5 Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 04/17/18 7 48,610 3,870 4 1 B 4.00 12.57 05/08/18 28 62,510 4,970 4 1 C 4.00 12.57 05/08/18 28 62,980 5,010 5 1 D 4.00 12.57 05/08/18 28 60,610 4,820 4 Average (28 days) 4,940 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0166 Service Date: 04/10/18 Report Date: 05/09/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0166 Service Date: 04/10/18 2501 E Loop 820 N Report Date: 04/18/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 3,000 psi @ 28 days Mix ID: 9458 Supplier: Argos Batch Time: 1215 Plant: Truck No.: 6238 Ticket No.: 12326689 Field Test Data Test Result Specification Slump (in): 6 5-7 Air Content (%): 2.2 0-3 Concrete Temp. (F): 66 50-95 Ambient Temp. (F): 72 35-100 Plastic Unit Wt. (pcf): 147.6 05/08/18 Yield (Cu. Yds.): 44.5 12.57 Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 48,610 Initial Cure: Outside 05/08/18 Comments: Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 04/17/18 7 48,610 12.57 05/08/18 28 12.57 05/08/18 28 12.57 05/08/18 28 Hold Final Cure: Moist Room 04/10/18 Sample Time: 1300 Daniel Blocker clear 20 Batch Size (cy): 10 PUMP Piers @ GL (B/6.7) see report 0165 Compressive Strength Fracture Tested (psi) Type By 3,870 4 Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0166 Service Date: 04/10/18 Report Date: 04/18/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED BELLED PIER OBSERVATION REPORT Report Number: 95181011.0165 Irerracon Service Date: 04/10/18 2501 E Loop 820 N Report Date: 04/18/18 Revision 1 - Scope Correction Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Belled Pier Observation. See attached sheet for recorded data. NOTE: Elevation data provided by others or taken from plans. Services: Drilled Pier Observation Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0165 Service Date: April 10, 2011 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Dan Blocker Pier Identification 13/6.7 A.9/7 D.6/6 D.6/5.6 G.4/7.4 E.2/6 Pier Diameter (in.) 24 54 24 24 36 24 Top of Ground Elevation (ft.) 624.45 627.03 623.73 623.85 622.90 623.80 Top of Pier Elevation (ft.) 622.25 622.25 615.66 615.00 616.25 615.00 Depth to Bearing Stratum from Ground (ft.) 18.0 21.7 18.0 18.0 18.0 18.0 Depth of Pier from Ground (ft.) 29.0 46.7 28.0 28.0 38.2 28.8 Required Penetration (ft.) 10.0 25.0 10.0 10.0 20.0 10.0 Actual Penetration (ft.) 11.0 25.0 10.0 10.0 20.2 10.8 Depth from Top of Concrete (ft.) 27.8 42.0 20.0 20.0 32.0 20.8 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 58 26 26 38 26 Cased Depth (ft.) 18.0 22.0 18.0 18.0 18.0 18.0 Number of Vertical Bars (ea.) 6 18 6 6 8 6 Reinforcing Bar Size (#) 6 10 6 6 8 6 Length of Vertical Bars (ft.) 27.2 42.4 22.1 21.3 38.0 22.2 Time Drilling was Completed 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM Time Concrete was Placed 1:00 PM 2:00 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM Page 1 of 1 Distribution Page Report Number: 95181011.0165 Service Date: 04/10/18 Report Date: 04/18/18 Revision 1 - Scope Correction Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED BELLED PIER OBSERVATION REPORT Report Number: 95181011.0165 Irerracon Service Date: 04/10/18 2501 E Loop 820 N Report Date: 04/18/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Belled Pier Observation. See attached sheet for recorded data. NOTE: Elevation data provided by others or taken from plans. Services: Drilled Belled Pier Observation Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0165 Service Date: April 10, 2011 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Dan Blocker Pier Identification 13/6.7 A.9/7 D.6/6 D.6/5.6 G.4/7.4 E.2/6 Pier Diameter (in.) 24 54 24 24 36 24 Top of Ground Elevation (ft.) 624.45 627.03 623.73 623.85 622.90 623.80 Top of Pier Elevation (ft.) 622.25 622.25 615.66 615.00 616.25 615.00 Depth to Bearing Stratum from Ground (ft.) 18.0 21.7 18.0 18.0 18.0 18.0 Depth of Pier from Ground (ft.) 29.0 46.7 28.0 28.0 38.2 28.8 Required Penetration (ft.) 10.0 25.0 10.0 10.0 20.0 10.0 Actual Penetration (ft.) 11.0 25.0 10.0 10.0 20.2 10.8 Depth from Top of Concrete (ft.) 27.8 42.0 20.0 20.0 32.0 20.8 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 58 26 26 38 26 Cased Depth (ft.) 18.0 22.0 18.0 18.0 18.0 18.0 Number of Vertical Bars (ea.) 6 18 6 6 8 6 Reinforcing Bar Size (#) 6 10 6 6 8 6 Length of Vertical Bars (ft.) 27.2 42.4 22.1 21.3 38.0 22.2 Time Drilling was Completed 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM Time Concrete was Placed 1:00 PM 2:00 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM Page 1 of 1 Distribution Page Report Number: 95181011.0165 Service Date: 04/10/18 Report Date: 04/18/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0163A Irerracon Service Date: 04/10/18 2501 E Loop 820 N Report Date: 04/16/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5 Report No.: 95181011.0163 No. of Cylinders: 1 set of 5 (4x8) Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �,T Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of I Distribution Page Report Number: 95181011.0163A Service Date: 04/10/18 Report Date: 04/16/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600