Loading...
HomeMy WebLinkAboutTerracon - 5/8/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0232 Service Date: 05/08/18 2501 E Loop 820 N Report Date: 06/06/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Age at Material Information Compressive Sample Information Set Specimen Avg Diam. Specified Strength: 7,000 psi @ 28 days Sample Date: 05/08/18 Sample Time: 1245 Strength Fracture Tested Sampled By: Daniel Blocker Mix ID: 9908 (days) Weather Conditions: clear Supplier: Argos 1 A 4.00 Accumulative Yards: 27 Batch Size (cy): 9 Batch Time: 1200 Plant: Placement Method: bucket Truck No.: 1737 Ticket No.: 12327909 Water Added Before (gal): 28 Field Test Data 9,170 Water Added After (gal): 1 C 4.00 12.57 06/05/18 Sample Location: See placement location Test Result Specification Placement Location: Wall SE corner of hotel basement @ Slump (in): 7 * 3-5 113,670 GL ( G.3/G.6-13.7) Air Content (%): 2.0 0-3 Concrete Temp. (F): 84 9,300 Ambient Temp. (F): 90 Hold Plastic Unit Wt. (pcf): 150.8 Initial Cure: Outside Yield (Cu. Yds.): 45.3 * = Field Test Results do not meet project specifications. Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 05/15/18 7 91,440 7,280 4 1 B 4.00 12.57 06/05/18 28 115,220 9,170 2 1 C 4.00 12.57 06/05/18 28 121,620 9,680 4 1 D 4.00 12.57 06/05/18 28 113,670 9,050 3 Average (28 days) 9,300 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0232 Service Date: 05/08/18 Report Date: 06/06/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600