HomeMy WebLinkAboutTerracon - 5/14/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0241 Service Date: 05/14/18 2501 E Loop 820 N Report Date: 05/24/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 9211 Supplier: Argos Batch Time: 1405 Plant: 123 Truck No.: 1736 Ticket No.: 12328242 Field Test Data Test Result Specification Slump (in): 7 6-8 Air Content (%): 2.0 0-3 Concrete Temp. (F): 85 45-95 Ambient Temp. (F): 88 Plastic Unit Wt. (pcf): 149.2 Yield (Cu. Yds.): 44.9 Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 05/15/18 Initial Cure: Outside 7 Comments: Samples Made By: Terracon Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 05/15/18 05/21/18 7 44,090 12.57 05/15/18 06/11/18 28 12.57 05/15/18 06/11/18 28 12.57 05/15/18 06/11/18 28 05/15/18 Hold Final Cure: Moist Room 05/14/18 Sample Time: 1500 Daniel Blocker Clear 8 Batch Size (cy): 8 Bucket Pier, Grid Line P8/16 Drilled Piers, see report 95181011.0240 Compressive Strength Fracture Tested (psi) Type By 3,510 2 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0241 Service Date: 05/14/18 Report Date: 05/24/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED PIER OBSERVATION REPORT Report Number: 95181011.0240 Irerracon Service Date: 05/14/18 2501 E Loop 820 N Report Date: 06/06/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet for recorded data. NOTE: Elevation data provided by others or taken from plans. Services: Drilled Pier Observation Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0240 Service Date: May 14, 2018 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Dan Blocker Pier Identification P8/16 Pier Diameter (in.) 48 Top of Ground Elevation (ft.) 630.65 Top of Pier Elevation (ft.) 631.08 Depth to Bearing Stratum from Ground (ft.) 37.0 Depth of Pier from Ground (ft.) 63.9 Required Penetration (ft.) 26.0 Actual Penetration (ft.) 26.9 Depth from Top of Concrete (ft.) 64.5 Condition of Bottom (wet or dry) Dry Plumb Within Tolerance (yes or no) Yes Casing Diameter (in.) 50 Cased Depth (ft.) 37.0 Number of Vertical Bars (ea.) 16 Reinforcing Bar Size (#) 10 Length of Vertical Bars (ft.) 67.0 Time Drilling was Completed 3:00 PM Time Concrete was Placed 5:30 PM Casing stuck into ground had to cut at top of concrete. Page 1 of 1 Distribution Page Report Number: 95181011.0240 Service Date: 05/14/18 Report Date: 06/06/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 REINFORCING STEEL OBSERVATIONS REPORT Report Number: 95181011.0246 Irerracon Service Date: 05/14/18 2501 E Loop 820 N Report Date: 05/17/18 Revision 1 - Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 PROJECT DATA Drawings Utilized: Structural Sheets S3.01 Locations/Items Observed: Basement Floor P4 -P7/15-16 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type X Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Ber Supports X Lapped Splices X Number of Bars X Proper Cover/Clearance X Discrepancies/Comments: Services: Observation of Reinforcing Steel Placement Terracon Rep.: Daniel Blocker Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: John, Tupa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 5-5-10, Rev.7 Page 1 of 1 Distribution Page Report Number: 95181011.0246 Service Date: 05/14/18 Report Date: 05/17/18 Revision 1 - Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 REINFORCING STEEL OBSERVATIONS REPORT Report Number: 95181011.0246 Irerracon Service Date: 05/14/18 2501 E Loop 820 N Report Date: 05/17/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 PROJECT DATA Drawings Utilized: Structural Sheets S3.01 Locations/Items Observed: Basement Floor P4 -P7/15-16 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type X Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Ber Supports X Lapped Splices X Number of Bars X Proper Cover/Clearance X Discrepancies/Comments: Services: Observation of Reinforcing Steel Placement Terracon Rep.: Daniel Blocker Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: J Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 5-5-10, Rev.7 Page 1 of 1 Distribution Page Report Number: 95181011.0246 Service Date: 05/14/18 Report Date: 05/17/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 FIELD DENSITY TEST REPORT Irerracon Report Number: 95181011.0242 Service Date: 05/14/18 2501 E Loop 820 N Report Date: 05/15/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Lab Test Data Project Requirements Mat. No. I Proctor Ref. No. 95181011.0006 Classification and Description Dark Reddish Brown Sandy Clay Laboratory Test Method ASTM D698 Optimum Water Max. Lab Water Content Density Content Compaction (%) (pcf) (%) (%) 18.1 106.4 Opt. +4 93-98 Field Test Data Probe Wet Water Water Dry Percent Test Lift / Mat. Depth Density Content Content Density Compaction No. Test Location Elev. No. (in) (pcf) (pcf) (%) (pcf) (%) Grade Beam 60 See Attachment Test #1 F.G. 1 8 122.6 22.3 22.2 100.3 94 61 See Attachment Test #2 F.G. 1 8 127.7 23.9 23.0 103.8 98 62 See Attachment Test #3 F.G. 1 8 126.1 24.8 24.5 101.3 95 63 See Attachment Test #4 F.G. 1 8 128.3 25.5 24.8 102.8 97 64 See Attachment Test #5 F.G. 1 8 123.7 22.9 22.7 100.8 95 Datum: BackFill - Moisture Condition Std. Cut. M:2238 Std. Cut. D: 652 S/N: 31150 Make: Troxler Model: 3430 Last Cal. Date: 04/28/2017 Comments: Test and/or retest results on this report meet project requirements as noted above. Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition (ASTM D-6938). Terracon Rep.: Carlos Vela Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: (V'to- Senior Project Manager Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cRoo07, 11-16-12, Rev.7 Page 1 of 1 FIELD DENSITY TESTING REPORT Irerracon Report Number: 95181011.0242 Service Date: 05/14/18 2501 E Loop 820 N Report Date: 05/15/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 I Fr -r .16 Yd p f_J I.J k' I JL .. _ i IF I L •�. i 1 nom`_ 3 - - -.1, A Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition (ASTM D-6938). Terracon Rep.: Carlos Vela Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: J Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sc0001, 10-16-13, Rev.10 Page 1 of 1 Distribution Page Report Number: 95181011.0242 Service Date: 05/14/18 Report Date: 05/15/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0241 Service Date: 05/14/18 2501 E Loop 820 N Report Date: 06/12/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05/14/18 Sample Time: 1500 Sampled By: Daniel Blocker Mix ID: 9211 Weather Conditions: Clear Supplier: Argos Accumulative Yards: 8 Batch Size (cy): 8 Batch Time: 1405 Plant: 123 Placement Method: Bucket Truck No.: 1736 Ticket No.: 12328242 Water Added Before (gal): Field Test Data Water Added After (gal): Sample Location: Pier, Grid Line P8/16 Test Result Specification Placement Location: Drilled Piers, see report Slump (in): 7 6-8 95181011.0240 Air Content (%): 2.0 0-3 Concrete Temp. (F): 85 45-95 Ambient Temp. (F): 88 Plastic Unit Wt. (pcf): 149.2 Yield (Cu. Yds.): 44.9 Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 05/15/18 05/21/18 7 44,090 3,510 2 1 B 4.00 12.57 05/15/18 06/11/18 28 63,420 5,050 4 1 C 4.00 12.57 05/15/18 06/11/18 28 62,180 4,950 5 1 D 4.00 12.57 05/15/18 06/11/18 28 63,870 5,080 4 Average (28 days) 5,030 1 E 05/15/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0241 Service Date: 05/14/18 Report Date: 06/12/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600