HomeMy WebLinkAboutTerracon - 5/25/2018REINFORCING STEEL OBSERVATIONS REPORT
Report Number: 95181011.0269
Irerracon
Service Date: 05/25/18 2501 E Loop 820 N
Report Date: 06/05/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
Services Requested By: David Saiter
Connection Type/Description: lapped splice
Visual Observation Elevation(s)/Location(s): wall along P7/16.3-17
Type of Observation: visual
Referenced Documents:
Observation Results:
Based on our visual observations, the connections observed at the referenced locations appeared to be the proper size, type, in
the proper location and placed in general accordance with the identified referenced documents.
Exceptions:
Comments: added dowels.. fixed promptly
Services:
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0019, 6-30-11, Rev.1 Page 1 of 1
Distribution Page
Report Number: 95181011.0269
Service Date: 05/25/18
Report Date: 06/05/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0268
Service Date: 05/25/18 2501 E Loop 820 N
Report Date: 06/26/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days Sample Date:
05/25/18 Sample Time: 0940
Sampled By:
Daniel Blocker
Mix ID: 9727
Weather Conditions:
clear
Supplier:
Accumulative Yards:
10 Batch Size (cy): 10
Batch Time: 0915
Plant:
109 Placement Method:
bucket
Truck No.: 16
Ticket No.:
10906347 Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Wall @ GL (P5/P7)
Test
Result
Specification Placement Location:
Wall @ GL (P5,P5.4/P7)
Slump (in):
6
5-7
Air Content (%):
3.4
3-6
Concrete Temp. (F):
94
50-95
Ambient Temp. (F):
96
Plastic Unit Wt. (pcf):
146.8
Yield (Cu. Yds.):
44.3
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
06/01/18 7 67,940
5,410 4
1 B 4.00
12.57
06/22/18 28 82,160
6,540 2
1 C 4.00
12.57
06/22/18 28 79,890
6,360 4
1 D 4.00
12.57
06/22/18 28 79,160
6,300 4
Average (28 days)
6,400
1 E
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0268
Service Date: 05/25/18
Report Date: 06/26/18 Revision 2 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0268
Service Date: 05/25/18 2501 E Loop 820 N
Report Date: 06/06/18 Revision 1 - Plant Number Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9727
Supplier:
Batch Time: 0915
Truck No.: 16
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Plant: 109
Ticket No.: 10906347
Set Specimen Avg Diam.
Result
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
67,940
Initial Cure: Outside
06/22/18
Comments:
6
3.4
94
96
146.8
44.3
Specification
5-7
3-6
50-95
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
06/01/18
7
67,940
12.57
06/22/18
28
12.57
06/22/18
28
12.57
06/22/18
28
Hold
Final Cure: Moist Room
05/25/18 Sample Time: 0940
Daniel Blocker
clear
10 Batch Size (cy): 10
bucket
Wall @ GL (P5/P7)
Wall @ GL (P5,P5.4/P7)
Compressive
Strength Fracture Tested
(psi) Type By
5,410 4
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0268
Service Date: 05/25/18
Report Date: 06/06/18 Revision 1 - Plant Number
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0268
Service Date: 05/25/18 2501 E Loop 820 N
Report Date: 06/05/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9727
Supplier:
Batch Time: 0915
Truck No.: 16
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Plant:
Ticket No.: 10906347
Set Specimen Avg Diam.
Result
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
67,940
Initial Cure: Outside
06/22/18
Comments:
6
3.4
94
96
146.8
44.3
Specification
5-7
3-6
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
06/01/18
7
67,940
12.57
06/22/18
28
12.57
06/22/18
28
12.57
06/22/18
28
Hold
Final Cure: Moist Room
05/25/18 Sample Time: 0940
Daniel Blocker
clear
10 Batch Size (cy): 10
bucket
Wall @ GL (P5/P7)
Wall @ GL (P5,P5.4/P7)
Compressive
Strength Fracture Tested
(psi) Type By
5,410 4
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0268
Service Date: 05/25/18
Report Date: 06/05/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0265A
Service Date: 05/25/18
Report Date: 06/05/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On 5/25/18 a representative of Terracon was present at the above referenced project to obtain 1 set of 5 concrete test cylinders cast on
5/24/18. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31
and will be reported under separate cover 95181011.0265.
Services:
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0265A
Service Date: 05/25/18
Report Date: 06/05/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0262A
Service Date: 05/25/18
Report Date: 06/05/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On 5/25/18 a representative of Terracon was present at the above referenced project to obtain 2 set(s) of 5 concrete test cylinders cast
on 5/24/18. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM
C31 and will be reported under separate cover 9518011.0262.
Services:
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0262A
Service Date: 05/25/18
Report Date: 06/05/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery