HomeMy WebLinkAboutTerracon - 5/30/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0272
Service Date: 05/30/18 2501 E Loop 820 N
Report Date: 07/02/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 4,500
psi @ 28
days
Sample Date:
05/30/18 Sample Time: 1000
Sampled By:
Norman Noel
Mix ID: 9727
Weather Conditions:
Sunny
Supplier: Argos
Accumulative Yards:
10/20 Batch Size (cy): 10
Batch Time: 0942
Plant:
123
Placement Method:
Bucket & lift
Truck No.: 5104
Ticket No.:
12328957
Water Added Before (gal):
0
Water Added After (gal):
0
Field Test Data
Sample Location:
Pier: 18/P1,P4 17/P8,P9.
Test
Result
Specification
Placement Location:
Pier: 18/P1,P4 17/P8,P9. Wall:
Slump (in):
6
5-7
17/P4 -P7.
Air Content (%):
3.9
3-6
Concrete Temp. (F):
73
50-95
Ambient Temp. (F):
85
Plastic Unit Wt. (pcf):
146.0
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
05/31/18
06/06/18 7 56,610
4,500 4
1 B 4.00
12.57
05/31/18
06/27/18 28 75,360
6,000 2
1 C 4.00
12.57
05/31/18
06/27/18 28 69,850
5,560 4
1 D 4.00
12.57
05/31/18
06/27/18 28 73,840
5,880 4
Average (28 days)
5,810
1 E
05/31/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Norman Noel
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0272
Service Date: 05/30/18
Report Date: 07/02/18 Revision 2 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0272
Service Date: 05/30/18 2501 E Loop 820 N
Report Date: 06/07/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9727
Supplier: Argos
Batch Time: 0942 Plant: 123
Truck No.: 5104 Ticket No.: 12328957
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result
Specification
6
5-7
3.9
3-6
73
50-95
85
4.00
146.0
0
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
0
Comments:
Samples Made By: Terracon
Sample Date:
05/30/18 Sample Time: 1000
Sampled By:
Norman Noel
Weather Conditions:
Sunny
Accumulative Yards:
10/20 Batch Size (cy): 10
Placement Method:
Bucket & lift
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
Pier: 18/P1,P4 17/P8,P9.
Placement Location:
Pier: 18/P1,P4 17/P8,P9. Wall:
28
17/P4 -P7.
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.57
05/31/18
06/06/18
7
56,610
12.57
05/31/18
06/27/18
28
12.57
05/31/18
06/27/18
28
12.57
05/31/18
06/27/18
28
05/31/18
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
4,500 4
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Norman Noel
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0272
Service Date: 05/30/18
Report Date: 06/07/18 Revision 1 - 7 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0272
Service Date: 05/30/18 2501 E Loop 820 N
Report Date: 05/31/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9727
Supplier: Argos
Batch Time: 0942 Plant: 123
Truck No.: 5104 Ticket No.: 12328957
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
6 5-7
3.9 3-6
73
85
146.0
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
0
Comments:
Samples Made By: Terracon
Sample Date:
05/30/18 Sample Time: 1000
Sampled By:
Norman Noel
Weather Conditions:
Sunny
Accumulative Yards:
10/20 Batch Size (cy): 10
Placement Method:
Bucket & lift
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
Pier: 18/P1,P4 17/P8,P9.
Placement Location:
Pier: 18/P1,P4 17/P8,P9. Wall:
06/27/18
17/P4 -P7.
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.57
05/31/18
06/06/18
7
12.57
05/31/18
06/27/18
28
12.57
05/31/18
06/27/18
28
12.57
05/31/18
06/27/18
28
05/31/18
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Norman Noel
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
John, Tupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0272
Service Date: 05/30/18
Report Date: 05/31/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
FIELD DENSITY TEST REPORT Irerracon
Report Number: 95181011.0271
Service Date: 05/30/18 2501 E Loop 820 N
Report Date: 06/05/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Lab Test Data
Project Requirements
Optimum
Water
Max. Lab
Water
Mat. Proctor
Laboratory
Content
Density
Content
Compaction
No. Ref. No.
Classification and Description
Test Method
(%)
(pcf)
1 95181011.0253
Crushed Concrete
ASTM D698
11.7
119.9
Dptimum +
98%+
2 95181011.0004
Yellowish Brown Clayey
Sand
ASTM D698
18.4
106.2
Min/+3
Min/93
Field Test Data
Probe Wet
Water
Water
Dry
Percent
Test
Lift /
Mat.
Depth Density
Content
Content
Density
Compaction
No. Test Location Elev.
No.
(in) (pcf)
(pcf)
(%)
(pct)
(%)
Pl-P4/15-16
1 P2/15.3
FG
1
6 133.2
17.4
15.0
115.8
97
2 P2/15.7
FG
1
6 131.8
17.4
15.2
114.4
95
3 P3/15.3
FG
1
6 133.3
17.3
14.9
116.0
97
Wall/Backfill
4 P3/15.8
3
2
6 121.7
22.7
22.9
99.0
93
5 P3.8/15.8
2
2
6 122.6
22.6
22.6
100.0
94
Datum:
Std. Cut. M:668 Std. Cut. D: 2021
S/N: 32312 Make: Troxler
Model: 3440
Last Cal. Date: 02/16/2018
Comments: Test and/or retest results on this report meet project requirements as noted above.
Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture
condition (ASTM D-6938).
Terracon Rep.: Daniel Moreno
Reported To:
Contractor:
Report Distribution:
See attached distribution list. Reviewed By:
__Lto Tul
Senior Project Manager
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cRoo07, 11-16-12, Rev.7 Page 1 of 1
Distribution Page
Report Number: 95181011.0271
Service Date: 05/30/18
Report Date: 06/05/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600