HomeMy WebLinkAboutTerracon - 6/05/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0288
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/13/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
1792
Supplier:
Argos
Batch Time:
1430
Truck No.:
1737
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Plant: 123
Ticket No.: 12329164
Set Specimen Avg Diam.
Result
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
06/06/18
Initial Cure: Outside
7
Comments:
41/2
2.0
94
95
148.8
44.8
Specification
3-5
0-3
50-95
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.57
06/06/18
06/12/18
7
58,880
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
06/06/18
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 1515
Daniel Blocker
clear
10 Batch Size (cy): 10
PUMP
P11.5/17
Wall Footing @ P10.5 -P12.5/16-17
Compressive
Strength Fracture Tested
(psi) Type By
4,690 3
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0288
Service Date: 06/05/18
Report Date: 06/13/18 Revision 1 - 7 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0288
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 1792
Supplier:
Batch Time: 1430
Truck No.: 1737
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Plant: 123
Ticket No.: 12329164
Set Specimen Avg Diam.
Result
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
28
Initial Cure: Outside
07/03/18
Comments:
41/2
2.0
94
95
148.8
44.8
Specification
3-5
0-3
50-95
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date Date
Test Load
(sq in)
Received Tested
(days) (lbs)
12.57
06/12/18
7
12.57
07/03/18
28
12.57
07/03/18
28
12.57
07/03/18
28
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 1515
Daniel Blocker
clear
10 Batch Size (cy): 10
PUMP
P11.5/17
wall footing @ P10.5 -P12.5/16-17
Compressive
Strength Fracture Tested
(psi) Type By
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list. Reviewed By:
John, Tupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0288
Service Date: 06/05/18
Report Date: 06/06/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0287
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 07/05/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
06/05/18 Sample Time: 1115
Sampled By:
Daniel Blocker
Mix ID: 9727
Weather Conditions:
clear
Supplier: Argos
Accumulative Yards:
9 Batch Size (cy): 9
Batch Time: 1015
Plant:
109
Placement Method:
bucket
Truck No.: N/a
Ticket No.:
10906497
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Column P4/15
Test
Result
Specification
Placement Location:
Columns @ GL (P4/15,16) Walls @
Slump (in):
6
5-7
GL (P9/16.3-17) (P6 -P7/17)
Air Content (%):
3.8
3-6
Concrete Temp. (F):
93
50-95
Ambient Temp. (F):
94
Plastic Unit Wt. (pcf):
145.6
Yield (Cu. Yds.):
44.0
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
06/06/18
06/12/18 7 58,380
4,650 4
1 B 4.00
12.57
06/06/18
07/03/18 28 73,540
5,850 4
1 C 4.00
12.57
06/06/18
07/03/18 28 74,820
5,950 3
1 D 4.00
12.57
06/06/18
07/03/18 28 76,260
6,070 4
Average (28 days)
5,960
1 E
06/06/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0287
Service Date: 06/05/18
Report Date: 07/05/18 Revision 2 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0287
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/13/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
9727
Supplier:
Argos
Batch Time:
1015 Plant: 109
Truck No.:
N/a Ticket No.: 10906497
Field Test Data
Test
Result Specification
Slump (in):
6 5-7
Air Content (%):
3.8 3-6
Concrete Temp. (F):
93 50-95
Ambient Temp. (F):
94
Plastic Unit Wt. (pcf):
145.6
Yield (Cu. Yds.):
44.0
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
06/06/18
Initial Cure: Outside
7
Comments:
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.57
06/06/18
06/12/18
7
58,380
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
06/06/18
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 1115
Daniel Blocker
clear
9 Batch Size (cy): 9
bucket
Column P4/15
Columns @ GL (P4/15,16) Walls @
GL (P9/16.3-17) (P6 -P7/17)
Compressive
Strength Fracture Tested
(psi) Type By
4,650 4
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0287
Service Date: 06/05/18
Report Date: 06/13/18 Revision 1 - 7 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0287
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9727
Supplier:
Batch Time: 1015 Plant: 109
Truck No.: N/a Ticket No.: 10906497
Field Test Data
Test
Result Specification
Slump (in):
6 5-7
Air Content (%):
3.8 3-6
Concrete Temp. (F):
93 50-95
Ambient Temp. (F):
94
Plastic Unit Wt. (pcf):
145.6
Yield (Cu. Yds.):
44.0
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
28
Initial Cure: Outside
07/03/18
Comments:
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date Date
Test Load
(sq in)
Received Tested
(days) (lbs)
12.57
06/12/18
7
12.57
07/03/18
28
12.57
07/03/18
28
12.57
07/03/18
28
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 1115
Daniel Blocker
clear
9 Batch Size (cy): 9
bucket
Column P4/15
Columns @ GL (P4/15,16) Walls @
GL (P9/16.3-17) (P6 -P7/17)
Compressive
Strength Fracture Tested
(psi) Type By
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
John, Tupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0287
Service Date: 06/05/18
Report Date: 06/06/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0286
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 07/05/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
06/05/18 Sample Time: 0815
Sampled By:
Daniel Blocker
Mix ID: 9621
Weather Conditions:
clear
Supplier: Argos
Accumulative Yards:
10 Batch Size (cy): 10
Batch Time: 0725
Plant:
110
Placement Method:
pump
Truck No.: 5117
Ticket No.:
11027089
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Garage SOG P1.5/16.9
Test
Result
Specification Placement Location:
Garage SOG (P1 -P5/16.7-18)
Slump (in):
6
5-7
Air Content (%):
4.0
3-6
Concrete Temp. (F):
90
Ambient Temp. (F):
90
Plastic Unit Wt. (pcf):
146.0
Yield (Cu. Yds.):
44.1
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
06/06/18
06/12/18 7 52,350
4,170 4
1 B 4.00
12.57
06/06/18
07/03/18 28 66,100
5,260 4
1 C 4.00
12.57
06/06/18
07/03/18 28 65,290
5,200 3
1 D 4.00
12.57
06/06/18
07/03/18 28 65,100
5,180 4
Average (28 days)
5,210
1 E
06/06/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0286
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 07/05/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
06/05/18 Sample Time: 1000
Sampled By:
Daniel Blocker
Mix ID: 9621
Weather Conditions:
clear
Supplier: Argos
Accumulative Yards:
120 Batch Size (cy): 10
Batch Time: 0930
Plant:
110
Placement Method:
pump
Truck No.: 4046
Ticket No.:
10906492
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Garage SOG P4.5/17.6
Test
Result
Specification Placement Location:
Garage SOG (P1 -P5/16.7-18)
Slump (in):
5 1/2
5-7
Air Content (%):
3.7
3-6
Concrete Temp. (F):
90
Ambient Temp. (F):
92
Plastic Unit Wt. (pcf):
145.6
Yield (Cu. Yds.):
44.0
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type By
2 A 4.00
12.57
06/06/18
06/12/18 7 52,450
4,170 5
2 B 4.00
12.57
06/06/18
07/03/18 28 65,840
5,240 4
2 C 4.00
12.57
06/06/18
07/03/18 28 63,100
5,020 5
2 D 4.00
12.57
06/06/18
07/03/18 28 62,140
4,940 2
Average (28 days)
5,070
2 E
06/06/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: 95181011.0286
Service Date: 06/05/18
Report Date: 07/05/18 Revision 2 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0286
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/14/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
9621
Supplier:
Argos
Batch Time:
0725 Plant: 110
Truck No.:
5117 Ticket No.: 11027089
Field Test Data
Test
Result
Slump (in):
6
Air Content (%):
4.0
Concrete Temp. (F):
90
Ambient Temp. (F):
90
Plastic Unit Wt. (pcf):
146.0
Yield (Cu. Yds.):
44.1
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
06/06/18
Initial Cure: Outside
7
Comments:
Samples Made By: Terracon
Specification
5-7
3-6
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.57
06/06/18
06/12/18
7
52,350
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
06/06/18
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 0815
Daniel Blocker
clear
10 Batch Size (cy): 10
PUMP
Garage SOG P1.5/16.9
Garage SOG (P1 -P5/16.7-18)
Compressive
Strength Fracture Tested
(psi) Type By
4,170 4
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0286
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/14/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9621
Supplier: Argos
Batch Time: 0930 Plant: 110
Truck No.: 4046 Ticket No.: 10906492
Field Test Data
Test
Result
Slump (in):
5 1/2
Air Content (%):
3.7
Concrete Temp. (F):
90
Ambient Temp. (F):
92
Plastic Unit Wt. (pcf):
145.6
Yield (Cu. Yds.):
44.0
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
2 A
4.00
2 B
4.00
2 C
4.00
2 D
4.00
2 E
06/06/18
Initial Cure: Outside
7
Comments:
Specification
5-7
3-6
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.57
06/06/18
06/12/18
7
52,450
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
12.57
06/06/18
07/03/18
28
06/06/18
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 1000
Daniel Blocker
clear
120 Batch Size (cy): 10
PUMP
Garage SOG P4.5/17.6
Garage SOG (P1 -P5/16.7-18)
Compressive
Strength Fracture Tested
(psi) Type By
4,170 5
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: 95181011.0286
Service Date: 06/05/18
Report Date: 06/14/18 Revision 1 - 7 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0286
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9621
Supplier:
Batch Time: 0725 Plant: 110
Truck No.: 5117 Ticket No.: 11027089
Field Test Data
Test
Result
Slump (in):
6
Air Content (%):
4.0
Concrete Temp. (F):
90
Ambient Temp. (F):
90
Plastic Unit Wt. (pcf):
146.0
Yield (Cu. Yds.):
44.1
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
28
Initial Cure: Outside
07/03/18
Comments:
Samples Made By: Terracon
Specification
5-7
3-6
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date Date
Test Load
(sq in)
Received Tested
(days) (lbs)
12.57
06/12/18
7
12.57
07/03/18
28
12.57
07/03/18
28
12.57
07/03/18
28
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 0815
Daniel Blocker
clear
10 Batch Size (cy): 10
PUMP
Garage SOG P1.5/16.9
Garage SOG (P1 -P5/16.7-18)
Compressive
Strength Fracture Tested
(psi) Type By
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0286
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9621
Supplier:
Batch Time: 0930 Plant: 110
Truck No.: 4046 Ticket No.: 10906492
Field Test Data
Test
Result
Slump (in):
5 1/2
Air Content (%):
3.7
Concrete Temp. (F):
90
Ambient Temp. (F):
92
Plastic Unit Wt. (pcf):
145.6
Yield (Cu. Yds.):
44.0
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
2 A
4.00
2 B
4.00
2 C
4.00
2 D
4.00
2 E
28
Initial Cure: Outside
07/03/18
Comments:
Specification
5-7
3-6
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date Date
Test Load
(sq in)
Received Tested
(days) (lbs)
12.57
06/12/18
7
12.57
07/03/18
28
12.57
07/03/18
28
12.57
07/03/18
28
Hold
Final Cure: Moist Room
06/05/18 Sample Time: 1000
Daniel Blocker
clear
120 Batch Size (cy): 10
PUMP
Garage SOG P4.5/17.6
Garage SOG (P1 -P5/16.7-18)
Compressive
Strength Fracture Tested
(psi) Type By
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
John, Tupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: 95181011.0286
Service Date: 06/05/18
Report Date: 06/06/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
REINFORCING STEEL OBSERVATIONS REPORT
Report Number: 95181011.0285
Irerracon
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
Services Requested By: David Saiter
Connection Type/Description: Lapped splice
Visual Observation Elevation(s)/Location(s): Garage SOG (P1 -P5/16.7-18) (631.00)
Type of Observation: visual
Referenced Documents: ROI -2B
Observation Results:
Based on our visual observations, the connections observed at the referenced locations appeared to be the proper size, type, in
the proper location and placed in general accordance with the identified referenced documents.
Exceptions:
Comments: spacing was corrected and chairs needed to be added, fixed promptly.
Services: Observation of Reinforcing Steel Placement
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0019, 6-30-11, Rev.1 Page 1 of 1
Distribution Page
Report Number: 95181011.0285
Service Date: 06/05/18
Report Date: 06/06/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0283A
Irerracon
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5
Report No.: 95181011.0283
No. of Cylinders: 1 set of 5 (4x8)
Services:
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,T
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of I
Distribution Page
Report Number: 95181011.0283A
Service Date: 06/05/18
Report Date: 06/06/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
REINFORCING STEEL OBSERVATIONS REPORT
Report Number: 95181011.0290
Irerracon
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
Services Requested By: David Saiter
Connection Type/Description: lapped splice
Visual Observation Elevation(s)/Location(s): Wall Footing @ (P10.5 -P12.5/16-17)
Type of Observation: visual
Referenced Documents: R00 -9A
Observation Results:
Based on our visual observations, the connections observed at the referenced locations appeared to be the proper size, type, in
the proper location and placed in general accordance with the identified referenced documents.
Exceptions:
Comments:
Services: Observation of Reinforcing Steel Placement
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0019, 6-30-11, Rev.1 Page 1 of 1
Distribution Page
Report Number: 95181011.0290
Service Date: 06/05/18
Report Date: 06/06/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
REINFORCING STEEL OBSERVATIONS REPORT
Report Number: 95181011.0289
Irerracon
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 06/06/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
Services Requested By: David Saiter
Connection Type/Description: lapped splice
Visual Observation Elevation(s)/Location(s): Columns @ (P4/15,16) (P9/16.3 -17;17/P6 -P7)
Type of Observation: visual
Referenced Documents: ROI -2B
Observation Results:
Based on our visual observations, the connections observed at the referenced locations appeared to be the proper size, type, in
the proper location and placed in general accordance with the identified referenced documents.
Exceptions:
Comments: Spacing which was fixed promptly. One stirrup needed to be tied. fixed
Services: Observation of Reinforcing Steel Placement
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0019, 6-30-11, Rev.1 Page 1 of 1
Distribution Page
Report Number: 95181011.0289
Service Date: 06/05/18
Report Date: 06/06/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0288
Service Date: 06/05/18 2501 E Loop 820 N
Report Date: 07/05/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
1792
Supplier:
Argos
Batch Time:
1430
Truck No.:
1737
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Plant: 123
Ticket No.: 12329164
Result
41/2
2.0
94
95
148.8
44.8
Specification
3-5
0-3
50-95
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
06/05/18 Sample Time: 1515
Daniel Blocker
clear
10 Batch Size (cy): 10
PUMP
P11.5/17
Wall Footing @ P10.5 -P12.5/16-17
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type By
1 A 4.00
12.57
06/06/18
06/12/18
7
58,880
4,690
3
1 B 4.00
12.57
06/06/18
07/03/18
28
73,040
5,810
4
1 C 4.00
12.57
06/06/18
07/03/18
28
77,360
6,160
2
1 D 4.00
12.57
06/06/18
07/03/18
28
73,010
5,810
4
Average
(28 days)
5,930
1 E
06/06/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0288
Service Date: 06/05/18
Report Date: 07/05/18 Revision 2 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600