HomeMy WebLinkAboutTerracon - 6/08/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0294
Service Date: 06/08/18 2501 E Loop 820 N
Report Date: 07/09/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Reg No: F-3272
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Material Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: D 10000009727
Supplier: Argos
Batch Time: 1545 Plant: 123
Truck No.: 5104 Ticket No.: 12329310
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result
Specification
61/4
5-7
1.1
0-3
93
50-95
91
A
149.2
12.57
Laboratory Test Data
Set
Specimen
Avg Diam.
Area
No.
ID
(in)
(sq in)
1
A
4.00
12.57
1
B
4.00
12.57
1
C
4.00
12.57
1
D
4.00
12.57
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Date Date
Test
Load
Received Tested
(days)
(lbs)
06/15/18
7
55,000
07/06/18
28
69,410
07/06/18
28
67,820
07/06/18
28
68,790
Average (28 days)
06/08/18 Sample Time: 1615
Jalil Edwards
Sunny
3/10 Batch Size (cy): 10
Bucket & lift
0
10
Pier column P10/17
Pier column
Compressive
Strength
Fracture Tested
(psi)
Type By
4,380
4
5,520
3
5,400
4
5,470
4
5,460
1 E Hold
Initial Cure: Outside Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Only 3 yards of concrete used
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jalil Edwards
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0294
Service Date: 06/08/18
Report Date: 07/09/18 Revision 1 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0294
Service Date: 06/08/18 2501 E Loop 820 N
Report Date: 06/20/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: D 10000009727
Supplier: Argos
Batch Time: 1545 Plant: 123
Truck No.: 5104 Ticket No.: 12329310
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
61/4 5-7
1.1 0-3
93
91
149.2
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
10
Sample Date:
06/08/18 Sample Time: 1615
Sampled By:
Jalil Edwards
Weather Conditions:
Sunny
Accumulative Yards:
3/10 Batch Size (cy): 10
Placement Method:
Bucket & lift
Water Added Before (gal):
0
Water Added After (gal):
10
Sample Location:
Pier column P10/17
Placement Location:
Pier column
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
06/15/18
7
55,000
12.57
07/06/18
28
12.57
07/06/18
28
12.57
07/06/18
28
Hold
Final Cure: Moist Room
Comments: Only 3 yards of concrete used
Compressive
Strength Fracture Tested
(psi) Type By
4,380 4
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jalil Edwards
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0294
Service Date: 06/08/18
Report Date: 06/20/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CANCELLED SERVICE REPORT
Report Number: 95181011.0293
Irerracon
Service Date: 06/08/18 2501 E Loop 820 N
Report Date: 06/15/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Proiect Number: 95181011
On 06/08/18 a representative of Terracon arrived at the above referenced project to perform/observe field density. Upon arrival to the site
the technician was notified by Doroteo with Manhattan that services had been cancelled due to the inclement weather from the night
before.
Services:
Terracon Rep.: Humberto Portillo
Reported To: Doroteo w/Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: 95181011.0293
Service Date: 06/08/18
Report Date: 06/15/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0292A
Service Date: 06/08/18
Report Date: 06/15/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On June 8th, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 5 concrete
test cylinders cast on June 7th, 2018. The samples were taken back to the Terracon laboratory where they were cured
under general accordance with ASTM C31 and will be reported under separate cover 95181011.0292
Services:
Terracon Rep.: Kristopher McGarry
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0292A
Service Date: 06/08/18
Report Date: 06/15/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0294
Service Date: 06/08/18 2501 E Loop 820 N
Report Date: 07/09/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Reg No: F-3272
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Material Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: D 10000009727
Supplier: Argos
Batch Time: 1545 Plant: 123
Truck No.: 5104 Ticket No.: 12329310
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result
Specification
61/4
5-7
1.1
0-3
93
50-95
91
A
149.2
12.57
Laboratory Test Data
Set
Specimen
Avg Diam.
Area
No.
ID
(in)
(sq in)
1
A
4.00
12.57
1
B
4.00
12.57
1
C
4.00
12.57
1
D
4.00
12.57
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Date Date
Test
Load
Received Tested
(days)
(lbs)
06/15/18
7
55,000
07/06/18
28
69,410
07/06/18
28
67,820
07/06/18
28
68,790
Average (28 days)
06/08/18 Sample Time: 1615
Jalil Edwards
Sunny
3/10 Batch Size (cy): 10
Bucket & lift
0
10
Pier column P10/17
Pier column
Compressive
Strength
Fracture Tested
(psi)
Type By
4,380
4
5,520
3
5,400
4
5,470
4
5,460
1 E Hold
Initial Cure: Outside Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Only 3 yards of concrete used
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jalil Edwards
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0294
Service Date: 06/08/18
Report Date: 07/09/18 Revision 1 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0294
Service Date: 06/08/18 2501 E Loop 820 N
Report Date: 06/20/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: D 10000009727
Supplier: Argos
Batch Time: 1545 Plant: 123
Truck No.: 5104 Ticket No.: 12329310
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
61/4 5-7
1.1 0-3
93
91
149.2
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
10
Sample Date:
06/08/18 Sample Time: 1615
Sampled By:
Jalil Edwards
Weather Conditions:
Sunny
Accumulative Yards:
3/10 Batch Size (cy): 10
Placement Method:
Bucket & lift
Water Added Before (gal):
0
Water Added After (gal):
10
Sample Location:
Pier column P10/17
Placement Location:
Pier column
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
06/15/18
7
55,000
12.57
07/06/18
28
12.57
07/06/18
28
12.57
07/06/18
28
Hold
Final Cure: Moist Room
Comments: Only 3 yards of concrete used
Compressive
Strength Fracture Tested
(psi) Type By
4,380 4
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jalil Edwards
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0294
Service Date: 06/08/18
Report Date: 06/20/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CANCELLED SERVICE REPORT
Report Number: 95181011.0293
Irerracon
Service Date: 06/08/18 2501 E Loop 820 N
Report Date: 06/15/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Proiect Number: 95181011
On 06/08/18 a representative of Terracon arrived at the above referenced project to perform/observe field density. Upon arrival to the site
the technician was notified by Doroteo with Manhattan that services had been cancelled due to the inclement weather from the night
before.
Services:
Terracon Rep.: Humberto Portillo
Reported To: Doroteo w/Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: 95181011.0293
Service Date: 06/08/18
Report Date: 06/15/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0292A
Service Date: 06/08/18
Report Date: 06/15/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On June 8th, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 5 concrete
test cylinders cast on June 7th, 2018. The samples were taken back to the Terracon laboratory where they were cured
under general accordance with ASTM C31 and will be reported under separate cover 95181011.0292
Services:
Terracon Rep.: Kristopher McGarry
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0292A
Service Date: 06/08/18
Report Date: 06/15/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600