HomeMy WebLinkAboutTerracon - 7/25/2018POST -TENSION OBSERVATIONS REPORT
Report Number: 95181011.0382
Irerracon
Service Date: 07/25/18 2501 E Loop 820 N
Report Date: 08/03/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
PROJECT DATA
Drawings Utilized: Post tension drawings: PT03-08/ Various/ 4-9-18; Reinforcing shop drawings R02 -1G/ plan/ 3-1-18,
R02 -1H/ l/ 3-1-18, R02 -1K/ 5,6,7/ 3-1-18
Locations/Items Observed: Slab on deck Parking garage Level 2 (P7.5 -P10.5/ 17-18)
Test Method: Visual Observation
10:4201 A 9101 Z111111:144 ZIMIN 1161101
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings
Approved
X
Length and Shape
X
Column Tie Spacing &
Type
N/A
Bar and Cable Size
X
Proper Placement
X
Stirrup Spacing & Type
X
Bar and Cable Grade
X
Properly Tied
X
Cables Properly Wrapped
X
Rebar and Cables Clean
X
Dowel Bars in Place
X
Mechanical Splices
N/A
Trash & Debris Removed
X
Proper Supports
X
Lapped Splices
X
Number of Bars and
Cables
X
Proper Cover/Clearance
X
Proper Drape of Cables
X
Discrepancies/Comments:
Any discrepancies found were corrected prior to completion of this observation.
Note. The forms at P10.5/18 have not been installed yet as it is being used to blow the trash a debris off the pour area. The last 2 tendons
running east/west are not installed in the anchors at this point since the forms are not in place.
Services:
Terracon Rep.: Daniel Wright
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940004, 07-01-12, Rev.0 Page 1 of 1
Distribution Page
Report Number: 95181011.0382
Service Date: 07/25/18
Report Date: 08/03/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CANCELLED SERVICE REPORT
Report Number: 95181011.0381
Service Date: 07/25/18
Report Date: 08/03/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On 07/25/2018 a representative of Terracon arrived at the above referenced project to perform/observe Field Density
Testing. Upon arrival to the site the technician was notified by David with Manhattan that services had been cancelled
due to the dirt crew not having anything ready.
Services:
Terracon Rep.: Daniel Wright
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0381
Service Date: 07/25/18
Report Date: 08/03/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0380
Service Date: 07/25/18 2501 E Loop 820 N
Report Date: 08/03/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9727
Supplier: Argos
Batch Time: 1317
Plant:
Truck No.: 1736
Ticket No.: 12331131
Field Test Data
4.00
Test
Result Specification
Slump (in):
6 5-7
Air Content (%):
4.2 3-6
Concrete Temp. (F):
87
Ambient Temp. (F):
95
Plastic Unit Wt. (pcf):
148.3
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
0
Comments:
Samples Made By: Terracon
Sample Date:
07/25/18 Sample Time: 1408
Sampled By:
Joshua Hernandez
Weather Conditions:
clear
Accumulative Yards:
6 Batch Size (cy): 6
Placement Method:
Direct Discharge
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
J/7
Placement Location:
Columns on the 2nd level of building
28
on the southside. K & J / 7
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
08/01/18
7
64,240
12.57
08/22/18
28
12.57
08/22/18
28
12.57
08/22/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
5,110 2
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Joshua Hernandez
Reported To: Dann w/ Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0380
Service Date: 07/25/18
Report Date: 08/03/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0376A
Service Date: 07/25/18
Report Date: 08/03/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On 7, 25, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 6 concrete test
cylinders cast on 7, 24, 2018. The samples were taken back to the Terracon laboratory where they were cured under
general accordance with ASTM C31 and will be reported under separate cover 95181011.0376
Services:
Terracon Rep.: Joshua Hernandez
Reported To: Dann w/ Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0376A
Service Date: 07/25/18
Report Date: 08/03/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0375A
Service Date: 07/25/18
Report Date: 08/03/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On 7, 25, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 6 concrete test
cylinders cast on 7, 24, 2018. The samples were taken back to the Terracon laboratory where they were cured under
general accordance with ASTM C31 and will be reported under separate cover 95181011.0375
Services:
Terracon Rep.: Joshua Hernandez
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0375A
Service Date: 07/25/18
Report Date: 08/03/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600