HomeMy WebLinkAboutTerracon - 7/25/2018POST -TENSION OBSERVATIONS REPORT Report Number: 95181011.0382 Irerracon Service Date: 07/25/18 2501 E Loop 820 N Report Date: 08/03/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 PROJECT DATA Drawings Utilized: Post tension drawings: PT03-08/ Various/ 4-9-18; Reinforcing shop drawings R02 -1G/ plan/ 3-1-18, R02 -1H/ l/ 3-1-18, R02 -1K/ 5,6,7/ 3-1-18 Locations/Items Observed: Slab on deck Parking garage Level 2 (P7.5 -P10.5/ 17-18) Test Method: Visual Observation 10:4201 A 9101 Z111111:144 ZIMIN 1161101 ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape X Column Tie Spacing & Type N/A Bar and Cable Size X Proper Placement X Stirrup Spacing & Type X Bar and Cable Grade X Properly Tied X Cables Properly Wrapped X Rebar and Cables Clean X Dowel Bars in Place X Mechanical Splices N/A Trash & Debris Removed X Proper Supports X Lapped Splices X Number of Bars and Cables X Proper Cover/Clearance X Proper Drape of Cables X Discrepancies/Comments: Any discrepancies found were corrected prior to completion of this observation. Note. The forms at P10.5/18 have not been installed yet as it is being used to blow the trash a debris off the pour area. The last 2 tendons running east/west are not installed in the anchors at this point since the forms are not in place. Services: Terracon Rep.: Daniel Wright Reported To: David with Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: �njupa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R940004, 07-01-12, Rev.0 Page 1 of 1 Distribution Page Report Number: 95181011.0382 Service Date: 07/25/18 Report Date: 08/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CANCELLED SERVICE REPORT Report Number: 95181011.0381 Service Date: 07/25/18 Report Date: 08/03/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On 07/25/2018 a representative of Terracon arrived at the above referenced project to perform/observe Field Density Testing. Upon arrival to the site the technician was notified by David with Manhattan that services had been cancelled due to the dirt crew not having anything ready. Services: Terracon Rep.: Daniel Wright Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0381 Service Date: 07/25/18 Report Date: 08/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0380 Service Date: 07/25/18 2501 E Loop 820 N Report Date: 08/03/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 9727 Supplier: Argos Batch Time: 1317 Plant: Truck No.: 1736 Ticket No.: 12331131 Field Test Data 4.00 Test Result Specification Slump (in): 6 5-7 Air Content (%): 4.2 3-6 Concrete Temp. (F): 87 Ambient Temp. (F): 95 Plastic Unit Wt. (pcf): 148.3 Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 0 Initial Cure: Outside 0 Comments: Samples Made By: Terracon Sample Date: 07/25/18 Sample Time: 1408 Sampled By: Joshua Hernandez Weather Conditions: clear Accumulative Yards: 6 Batch Size (cy): 6 Placement Method: Direct Discharge Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: J/7 Placement Location: Columns on the 2nd level of building 28 on the southside. K & J / 7 Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 08/01/18 7 64,240 12.57 08/22/18 28 12.57 08/22/18 28 12.57 08/22/18 28 Hold Final Cure: Moist Room Compressive Strength Fracture Tested (psi) Type By 5,110 2 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Joshua Hernandez Reported To: Dann w/ Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0380 Service Date: 07/25/18 Report Date: 08/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0376A Service Date: 07/25/18 Report Date: 08/03/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On 7, 25, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 6 concrete test cylinders cast on 7, 24, 2018. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0376 Services: Terracon Rep.: Joshua Hernandez Reported To: Dann w/ Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0376A Service Date: 07/25/18 Report Date: 08/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0375A Service Date: 07/25/18 Report Date: 08/03/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On 7, 25, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 6 concrete test cylinders cast on 7, 24, 2018. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0375 Services: Terracon Rep.: Joshua Hernandez Reported To: David with Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0375A Service Date: 07/25/18 Report Date: 08/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600